LEHIGH COUNTY AUTHORITY
ALLENTOWN, PA
10-YEAR CAPITAL PLAN
ALLENTOWN DIVISION
2016-2025
SEPTEMBER 2015
LEHIGH COUNTY AUTHORITY 10‐YEAR CAPITAL PLAN 2016‐2025 INDEX Page Introduction Water Department Summary Project Details WasteWater Department Summary Project Details 1‐3 4 5‐24 25 26‐38 LEHIGH COUNTY AUTHORITY
ALLENTOWN DIVISION
CAPITAL PLAN
2016 – 2025
SUMMARY
The Allentown Division Capital Plan (Plan) is a ten-year plan that covers the years 2016 through
2025. The Plan includes water and wastewater projects to assure facility / infrastructure
reliability and to comply with the Lease required projects. It also includes projects and studies
deemed necessary by LCA, where the latter will identify and evaluate upgrades and
improvements that will be incorporated in future Capital Plans. The Lease requires that LCA
submit a 5-year Capital Plan to the City for review and approval which is incorporated within the
Capital Project summary tables.
The projects identified in the Plan fall into to two primary categories, those funded by LCA and
those funded by the City, with the latter further categorized as Administrative Order (AO)
projects and Uncompleted Work (UW).
AO Projects: This includes projects necessary to bring the City’s wastewater system into
compliance with the US Environmental Protection Agency (USEPA) Administrative Order to
eliminate Sanitary Sewer Overflows / By-passes at Outfall 003 of the wastewater treatment
plant. Pursuant to the Concession Lease Agreement (Lease) the City is responsible for making
all decisions related to this work; and for funding said work. LCA is responsible for the
execution of the work. .
UW Projects: This category includes projects that the City’s expected to be completed before
the Lease began, but were not completed prior to the Lease start. The City and LCA reached an
agreement providing that LCA will manage these projects but be reimbursed by the City for all
project cost. Of these projects, the WWTP Bar Rack replacements and WFP Chemical Building
Roof replacements, have been completed by LCA since the Lease inception.
Funding by Budget Area and category is as follows:
Capital Funding 2015-2024
Budget Area
LCA
City
UW
Water
$69,765,100
$ 1,306,000
Wastewater
$17,795,600
$
225,000
Totals
$87,560,700
$1,531,000
AO
Sub-Total
Totals $ 1,306,000
$ 71,071,100
$ 4,880,000
$ 5,105,000
$ 22,900,600
$ 4,880,000
$ 6,411,000
$ 93,971,700
(1) Reflects 2/3 of the Project costs. Reference Administration Projects section in the next page for
additional information
1
Water Projects: Focus on regulatory compliance, immediate and future needs at the Water
Filtration Plant (WFP) future needs and addressing the Lease operating standards. Projects at
the WFP include a Master Plan that will identify capital improvements to address future
regulatory requirements and/or operational needs. Funding is also provided to replace a leaking
segment of the Schantz Spring main located on Martian Luther King Blvd; the annual
replacement of 2-miles of aged and/or failing spun and pit cast water main as required by the
Lease; and other infrastructure replacement as needed.
Wastewater Projects: The Projects focus on regulatory compliance, immediate and future needs
at the Wastewater Treatment Plant (WWTP) and addressing the Lease operating standards.
Projects include the replacement of five motor control centers, replacement and/or rehabilitation
of the three belt filter presses, the replacement of two digester covers at the WWTP, and for the
replacement and/or rehabilitation of defective sewer mains when warranted.
Additional information regarding these projects can be found in the Plan’s individual detail
sheets.
Supplemental Revenues: Under the Concession Agreement, LCA is able to charge Capital Cost
Recovery Fees and Capital Recovery Fees to City customers. These charges will be applied to
all Major Capital Improvements (MCI), which are defined as projects exceeding $1 million
(indexed for inflation in the future) within the proposed Plan. We expect 8 projects will generate
capital recovery charges, which will generally begin in the year following completion of MCI.
Over the span of Plan annual charges will rise from $373,000 beginning in 2017 to $4,542,000
in 2025 and generate total charges of $27,867,000.
These revenues will be used to pay capital project costs on a current basis or used to justify
incurring additional debt. For example, the $4,542,000 annual revenue would justify borrowing
over $70,000,000 for a 30 year term and provide all funding designated as Operating Revenues
in the table below.
2
FINANCIAL JUSTIFICATION
Under the Concession financing, LCA financed projected Capital Improvements for the
Allentown Division, in the amount of $ 32,105,407 with $ 24,220,000 projected to be available
as of 1/1/16. These funds are anticipated to be exhausted by 2017 based on the proposed plan.
In 2018 and beyond, LCA anticipates that Capital Projects will be funded through a combination
of available reserves, operating surplus and/or additional borrowings.
2016 ‐2025 Capital Plan
City Division
Funding Sources
Plan Part Water Bonds 2013 Issue $16,925,700 Wastewater $7,294,300 Total $24,220,000 LCA Sources
Operating Contributions‐
Reserves
in‐Aid
$51,233,900
$10,089,400
$61,323,300
City Sources Administrative Uncompleted Order
Work $1,605,500
$411,900
$4,880,000
$2,017,400
3
$4,880,000
Total Sources
$1,306,000 $71,071,100
$225,000 $22,900,600
$1,531,000 $93,971,700
WATER 4
-
-
192,500
$ 6,643,173
$
3,500
N/A
189,000
GRAND TOTAL
E
On-going
D
$
UW N/A
UW N/A
UW N/A
TOTAL CITY FUNDED PROJECTS
Itron/ AMR Meter Project
Pre-Lease Valve Replacements
$
0
0
0
CITY FUNDED PROJECTS
Schantz Spring Chlorine Booster Station
$
$ 6,450,673
P
P
P
P
$ 6,450,673
$ 5,576,460
$ 304,085
$ 381,300
$ 135,148
$
39,680
$
14,000
-
$
No
Yes
Yes
Yes
Partial-D
Various
E
S
Various
Various
$
N/A
N/A
N/A
N/A
N/A
N/A
N/A
TOTAL LCA FUNDED PROJECTS
S7
Yes
No
No
Yes
No
No
A
A
A
A
A
A
A
Amount
Subtotal
Pending Authorization
WFP SCADA Upgrades
Schantz Spring Main Replacement
Badger Meter Replacements
Fixed Base Meter Reading System
S7
No
No
No
No
No
No
No
Stage (3)
Approvals
1,690,000
600,000
250,000
1,203,800
850,000
4,925,000
1,235,000
5,130,000
560,000
1,555,000
1,300,000
1,715,000
1,650,000
250,000
290,000
1,110,000
$ 77,400,100
$
$
$
$
$ 75,750,100
$
$
$
$
$
$ 59,866,300
$ 47,850,000
$ 1,425,000
$
381,300
$ 5,150,000
$ 4,260,000
$
800,000
$
$
$
$
$
$
$
$
$
$
6,329,000
344,000
90,000
40,000
214,000
5,985,000
-
-
5,935,000
5,350,000
125,000
170,000
150,000
40,000
100,000
50,000
50,000
-
Project Cost
Prior
Years (4)
$ 10,753,800
$
$
$
$
$
$
$
Total
Cost
$
$
$
$
$
$
$
$
$
$
9,954,100
1,096,000
160,000
40,000
896,000
8,858,100
720,000
560,000
150,000
10,000
6,441,300
5,060,000
350,000
211,300
620,000
200,000
1,696,800
260,000
50,000
25,000
86,800
350,000
675,000
250,000
2016
Year -1
(4) Includes estimate of expenditures through 2015.
Note: Shading indicates new project or significantly revised project scope.
(3) A= Annual Item, S= Study/Planning, D= Design, C= Construction / Implementation, P = Pending Approval, E = Entire Project Approved,
AO= "Administrative Order" Projects as per the Agreement are to be Funded by the City and executed by LCA.
S7= Required Capital Improvement as shown on Schedule 7 of the Agreement and will be funded by LCA.
(2) MCI = Major Capital Improvement. Pursuant to the Agreement if approved by the City the cost of the project will be recovered from the customers via a
Capital Cost Recovery Charge over the useful life of the improvement or 30-years whichever is less.
Note: At the request of the City of Allentown, LCA has agreed to identify Projects that at the time of the Capital Plan preparation are known to be a MCI. This
information is being provided for informational purposes only. The City acknowledges that Article 4 of the Concession Agreement sets forth the methodology
for MCI submittal and approval.
$
$
$
$
$
$
$
$
$
$
LEHIGH COUNTY AUTHORITY
ALLENTOWN DIVISION
2016 - 2025 CAPITAL PROGRAM
WATER
(1) UW= "Uncompleted Work" City Projects that were supposed to be complete by the time of settlement or executed by City personnel after settlement. The City will fund these
projects but has requested that LCA execute them.
AD-W-13
AD-W-15
AD-W-16
AD-W-6
AD-W-11
AD-W-20
AD-W-21
Subtotal
Water System Hydraulic Model
Transmission Main Evaluation, Replacements & Rehabilitation
General Water System Replacements/Improvements
Emergency Power - Water & Wastewater Facilities
Previously Authorized
Water Main Replacements
Various Water System Related Studies
Subtotal
Name or Title of Proposal
LCA FUNDED PROJECTS
Annual
New & Replacement Meter Installations (non AMR & Badger projects)
Distribution Mains - Development and Service Connections
Distribution Mains - Upsizing
Mobile Equipment
Other Equipment
WFP General Improvements
Reservoir Rehabilitation / Maintenance
(1) Type
AD-W-7
AD-W-9
AD-W-10
AD-W-18
AD-W-19
AD-W-22
AD-W-4
AD-W-5
AD-W-8
AD-W-17
AD-W-1
AD-W-2
AD-W-3
Project
#
9/11/2015
(2) MCI
10,410,000
140,000
140,000
-
10,270,000
2,810,000
1,405,000
500,000
905,000
5,960,000
4,160,000
150,000
1,000,000
400,000
250,000
1,500,000
260,000
50,000
25,000
165,000
100,000
650,000
250,000
2017
Year -2
$
$
$
$
$
$
$
$
$
$
7,832,500
15,000
15,000
-
7,817,500
1,600,000
800,000
800,000
4,910,000
4,160,000
100,000
400,000
250,000
1,307,500
155,000
62,500
25,000
260,000
50,000
650,000
105,000
2018
Year -3
$
$
$
$
$
$
$
$
$
$
6,569,500
10,000
10,000
-
6,559,500
-
-
5,660,000
4,160,000
100,000
1,000,000
400,000
-
899,500
145,000
62,500
25,000
32,000
50,000
500,000
85,000
$
$
$
$
$
$
$
$
$
$
5,517,500
10,000
10,000
-
5,507,500
-
-
4,660,000
4,160,000
100,000
400,000
-
847,500
145,000
62,500
25,000
80,000
50,000
400,000
85,000
This Capital Program
2019
2020
Year -4
Year -5
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
40,283,600
1,271,000
160,000
215,000
896,000
39,012,600
5,130,000
560,000
1,555,000
1,300,000
1,715,000
27,631,300
21,700,000
800,000
211,300
2,000,000
2,220,000
700,000
6,251,300
965,000
287,500
125,000
623,800
600,000
2,875,000
775,000
Years 1-5
Sub-Total
$
$
$
$
$
$
$
$
$
$
30,787,500
35,000
35,000
-
30,752,500
-
-
26,300,000
20,800,000
500,000
3,000,000
2,000,000
-
4,452,500
725,000
312,500
125,000
580,000
250,000
2,000,000
460,000
2021 - 2025
Years 6-10
Sub-Total
1,690,000
600,000
250,000
1,203,800
850,000
4,875,000
1,235,000
5,130,000
560,000
1,555,000
1,300,000
1,715,000
1,306,000
160,000
250,000
896,000
$ 71,071,100
$
$
$
$
$ 69,765,100
$
$
$
$
$
$ 53,931,300
$ 42,500,000
$ 1,300,000
$
211,300
$ 5,000,000
$ 4,220,000
$
700,000
$ 10,703,800
$
$
$
$
$
$
$
Grand
Total
Medium
Medium
Medium
Medium
Medium
Medium
Medium
High
High
Medium
Medium
Medium
High
Hiigh
High
High
Low
High
Mandated
High
Dept.
Priority
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
FJL
8/27/15
Date:
New & Replacement Meter Installations (non AMR or Badger Projects)
AD-W-1
Preparer:
Allentown
2. Location:
3. Description:
Covers meters for new water customers and also includes funds annually to cover routine meter and radio reading
equipment replacement
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Regulatory agencies require metering of all properties connected to the water system. The costs associated with
meters for new customers are recovered through customer paid meter fees.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
$
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
585,000
1,055,000
Total Operating Costs
50,000
1,690,000
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
1,690,000
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
50,320
50,320
$
50,320
-
$
$
$
916,500
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
260,000
260,000
155,000
145,000
145,000
725,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
182,000
182,000
54,250
50,750
50,750
253,750
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid (1)
78,000
78,000
100,750
94,250
94,250
471,250
Legally Mandated
(1) Yrs 1 & 2 assumes ~30% recovered from meter fees paid by new customers; and/or for damaged meters. Yrs
Yrs 3-10 assumes ~65% recovered from meter fees paid by new customers; and/or for damaged meters.
5
$
$
$
$
$
$
$
X
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
RA
9/11/15
Date:
Distribution Mains & Service Connections
AD-W-2
Preparer:
Allentown
2. Location:
3. Description:
Plan review and construction inspection of extensions and connections to the water system. Also included are general
planning expenses.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
To assure that development water lines and service connections to the City water system are designed and constructed
according to the applicable specifications. Also allows for planning expenses.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
Capital Works (Staff)
Land Acquisition
Construction/Equip.
Professional Services
Other (Labor)
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
550,000
$
600,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
50,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
600,000
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
$
$
$
600,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
50,000
50,000
62,500
62,500
62,500
312,500
$
$
$
$
$
$
$
Oper.
Revenues
Medium
$
$
$
$
$
$
$
Low
Borrowing
-
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid (1)
50,000
50,000
62,500
62,500
62,500
312,500
Legally Mandated
(1) Plan Review and Inspection fees paid by Developers
6
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Distribution Mains Upsizing
AD-W-3
Preparer:
RA
7/28/15
Allentown
2. Location:
3. Description:
Contribute to developer-installed systems to increases pipe diameters to provide additional flow capabilities ; or the
extension of water mains to serve a development all pursuant to the LCA Main Extension Policy.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
To economically provide proper pipe capacities and extensions to meet future service needs.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
Capital Works (Staff)
Land Acquisition
Construction/Equip.
Professional Services
Other (Labor)
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
$
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
25,000
225,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
250,000
250,000
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
16,260
16,260
$
16,260
-
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
25,000
25,000
25,000
25,000
25,000
125,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
Low
$
$
$
$
$
$
$
X
7
Borrowing
25,000
25,000
25,000
25,000
25,000
125,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
$
$
$
$
$
$
$
Reserves
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Other Equipment
Project:
AD-W-4
Preparer:
RJK/JG
8/6/15
Allentown
2. Location:
3. Description:
Generally utilized for individual equipment greater than $5000 for both the water filtration plant and distribution system.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Replacement and new equipment is required periodically to maintain and improve service integrity and reliability. Items
include electric and electronic equipment, pumping equipment, leak detection equipment and other equipment as
needed.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
Capital Works (Staff)
Land Acquisition
Construction/Equip.
Professional Services
Other (Labor)
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,000,000
$
850,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
25,000
975,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
55,290
55,290
$
55,290
-
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
350,000
100,000
50,000
50,000
50,000
250,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
350,000
100,000
50,000
50,000
50,000
250,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
8
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION -CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Water Filtration Plant (WFP) General Improvements
AD-W-5
Preparer:
JWP
9/9/15
Allentown
2. Location:
3. Description:
Funding will cover the on-going replacement of equipment that is nearing the end of its useful life and to address
unforeseen equipment failures Equipment will be constantly evaluated and repaired or replaced as needed. A Water
Optimization Study and a Water System Master Plan will begin in 2015. Future projects will be identified as a result of
these studies.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The Water Filtration Plant was constructed in the 1920's with upgrades in the mid 1950s and mid 1990s. Much of the
water plant infrastructure is at or past its expected useful life. The WFP and associated pumping facilities provides the
water for City of Allentown and a large portion for LCA central Lehigh Division. A breakdown of critical equipment could
lead to regulatory violations and/ or interruption or reduction the water supply.
5. Status of Proposal:
x Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other (Labor)
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
$
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
400,000
3,525,000
850,000
Total Operating Costs
100,000
4,875,000
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
4,875,000
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
$
$
-
-
320,380
320,380
$
320,380
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
50,000
675,000
650,000
650,000
500,000
400,000
2,000,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
50,000
675,000
650,000
650,000
500,000
400,000
2,000,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
9
$
$
$
$
$
$
$
Reserves
10
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
DEPARTMENT:
Sub-Organizational Unit:
Project:
AD-W-6
Preparer: PRB
Date: 8/3/2015
Water Filtration Plant (WFP) SCADA Upgrade
1. Proposal Title:
AD-WFP
2. Location:
3. Description:
Upgrade existing Dynac SCADA software to latest version Dynac ES. This will also include replacing existing PC hardware.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Project will complete upgrade of SCADA systems at both WWTP and WFP giving a common operator interface and system.
Replace hardware the is nearing its life expectancy (6-years).
5. Status of Proposal:
X Preliminary Estimate
6. Cost of Land Rights:
ac.
l.f.
Plans and Specs Completed
Other (Specify)
Total:
@
@
$
/acre
/lin ft.
0
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Yrs.
Personnel Services
Material Supplies
Equipment
Other
Sub-Total
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
$
$
$
$
$
-
Sub-Total
$
$
$
36,430
36,430
Total Operating Costs
$
36,430
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
8. Estimated Costs:
Engineering (Staff)
Land Acquisition
Meters/Equipment
Professional Services
Other (Labor)
Contingencies
Total Project Cost
$
$
$
$
$
$
$
50,000
460,000
Requested in this
Capital Program
$
560,000
50,000
560,000
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Other
11. Source of Funds:
$
$
$
$
$
$
$
560,000
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Borrowing
560,000.00
-
Assess.,
Contr.-in-Aid
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
$
$
-
Source
Oper.
Revenues
Need
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
Beyond 5th Year
$
Medium
X
Low
Legally Mandated
10
Reserves
$
$
$
$
$
$
$
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Water Main Replacements
AD-W-7
Preparer:
JMP
8/26/15
Allentown
2. Location:
( Spun Cast, Pit Cast & City Streets Program Areas)
3. Description:
A majority of the City's water distribution system is pit cast iron or spun cast iron mains. Some of the pit cast mains date
back to the turn of the century, however the spun cast mains have a higher failure. Although the entire system will be
evaluated, LCA will work closely with the City Streets department to coordinate main replacements in advance of the
annual City Street paving schedule. Note: At minimum $500,000 of spun cast iron water main shall be replaced in any
given year
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The Operating Standards of the Concession Agreement require replacement of 2-miles of pipe per year (1-mile in the
first year) . Until such time as the City deems it not necessary.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
Capital Works (Staff)
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
37,800,000
4,410,000
500,000
3,570,000
47,850,000
$
42,500,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
1,570,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
3,112,710
3,112,710
$
3,112,710
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
5,350,000
5,060,000
4,160,000
4,160,000
4,160,000
4,160,000
20,800,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
5,350,000
5,060,000
4,160,000
4,160,000
4,160,000
4,160,000
20,800,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
Notes: This a Required Capital Improvement as shown on Schedule 7 of the Agreement and will be funded by LCA
11
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JWP
9/9/15
Date:
Reservoir Rehabilitation / Maintenance
AD-W-8
Preparer:
Allentown
2. Location:
3. Description:
In the Allentown Division, there are ten water storage facilities consisting of three welded steel tanks and seven concrete
tanks. The storage facilities range in capacity from 0.118 MG to 30 MG. Rehabilitation / maintenance for the three welded
steel tanks are covered under an long-term contract with Utility Services Corporation. The needs of the remaining
aboveground concrete tanks will be addressed when applicable on an individual basis or group basis with separate contracts.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The reservoirs are in need of regular inspection, maintenance and rehabilitation as they age to assure their viability and
maximize their useful life. Some of the tasks include both interior and exterior inspections, sandblasting and recoating
interior and exterior surfaces, structural repairs and interior chemical cleaning . Note: The Operating Standards of the
Concession Agreement requires this work.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Misc
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
935,000
50,000
100,000
1,235,000
$
1,235,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
150,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
72,300
72,300
$
72,300
-
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
250,000
250,000
105,000
85,000
85,000
460,000
Medium
$
$
$
$
$
$
$
Oper. (1)
Revenues
25,000
25,000
10,500
8,500
8,500
46,000
$
$
$
$
$
$
$
Low
Borrowing
225,000
225,000
94,500
76,500
76,500
414,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
12
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Various Water System Related Studies
AD-W-9
Preparer:
JWP
8/24/15
Allentown
2. Location:
3. Description:
The following studies are included in this Project
(1) Water Filtration Plant Coagulant Change - Conduct a study to assure that the change in the type of coagulant to a
more reliable and robust chemical will not impact the quality of the finished water. (2) Water System Master Plan - (a)
conduct a full-scale condition assessment of the water plant and all remote stations, reservoirs, and storage tanks. (b)
conduct an operational audit to optimize plant operations, chemical usage, power consumption, etc. (c) prepare shortterm, medium-term and long term Capital Plans based on condition assessment and operational audit results. Master
Plan will evaluate among other items: both surface water intakes, filter upgrades, preparation to fully-treat Schantz
Spring water. (3) West End Pressure Booster Station Feasibility Study - conduct a study to assess the location, cost,
etc for a pump station/storage tank on the city's west end where typical pressures have historically been only slightly
higher than the regulatory limit of 20 psi.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
To assure the highest quality water and to plan for future upgrades to the WFP in order to meet water production needs.
Focus will be made on keeping both ground water sources fully operational and reliable as they are the groundwater is
less costly to treat than either surface water.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
200,000
1,185,000
25,000
15,000
1,425,000
$
1,300,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
92,700
92,700
$
92,700
-
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
125,000
350,000
150,000
100,000
100,000
100,000
500,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
125,000
350,000
150,000
100,000
100,000
100,000
500,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
13
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
City Water System Hydraulic Model
AD-W-10
Preparer:
ELH
8/4/15
Allentown
2. Location:
3. Description:
Develop a calibrated all-pipe, hydraulic model of the City water system. It is envisioned that the model will utilize, when
applicable, the semi-automated data update programming that was developed for the LCA Central Lehigh Division
model. The model will be upgraded from the current 10,000-pipe version to the unlimited-pipe version.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
There is no model of the City water system. As such there is no dynamic way to evaluate the capabilities of the water
system and identify areas where pipe sizes or the network configuration impacts needed fire flows and water age. A
model would be a useful tool in evaluating sections of aged mains that have not structurally failed to determine if
replacement is warranted.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other (SELECT subscription)
Sub-Total
8. Estimated Costs:
Capital Works (Staff)
Land Acquisition
Software Upgrade
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
5,500
234,800
35,000
36,000
381,300
$
211,300
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
70,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
150
3,416
1,250
4,666
$
$
6,148
24,800
30,948
$
35,613
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
170,000
211,300
Medium
$
$
$
$
$
$
$
X
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
170,000
211,300
-
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
14
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Schantz Spring Main Replacement
AD-W-11
Preparer:
JMP
8/20/15
Allentown
2. Location:
3. Description:
Replacement of approximately 2,000 l.f of 1903 vintage 30-inch diameter main in Martin Luther King, Jr. Boulevard from
Schribers Bridge to the Water Filtration plant. The project also includes addressing other leaks that were identified
during the Smart Ball leak detection work.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
To maintain the integrity of the Schantz Spring water supply transmission main. A previous smartball survey
conducted by the City indicated there are a dozen some leaks in the last 2000' feet of the Schantz Transmission main
prior to the water plant. The SmartBall leaks have been identified by PaDEP as needing to be repaired.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,300,000
60,000
15,000
120,000
1,555,000
$
1,555,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
60,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
101,150
101,150
$
101,150
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
$
$
$
$
$
$
$
150,000
1,405,000
Medium
X
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
150,000
1,405,000
-
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
Note: This a Required Capital Improvement as shown on Schedule 7 of the Agreement and will be funded by LCA
15
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water-Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JWP
8/6/15
Date:
Schantz Spring Chlorine Booster Station
AD-W-13
Preparer:
Allentown
2. Location:
3. Description:
Schantz Spring and the surrounding areas have historically been subjected to local power failures, leading to operational
problems such as interrupted chlorine feed. In order to address this, a chlorine booster station was to be added
between Schantz Spring and the Allentown Water Plant. With the inability to obtain clearance for a site in the City
Parkway, and with the installation of LCA's backup generator across Schantz Road, the project was changed to provide
localized backup power at the Schantz Spring chlorination building. A UPS backup supply will be added to the building
to power the chemical feed pumps and the building has been interconnected with the LCA generator. More reliable
chemical pumps have been added in addition to automatic data recorders. A static mixer may be added to the
transmission line ahead of the chlorine analyzer if fluctuating chlorine levels are seen.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Schantz Spring is a inexpensive groundwater supply source for the Allentown Division and as such is subject to the EPA
Ground Water Rule, which requires that a specified minimum chlorine residual be maintained at all times. If the residual
is not maintained, all of the water in the 30-inch diameter 5-mile long Schantz Spring transmission main must be wasted
otherwise a boil water notice might be required. Currently there is only one chlorination station on the Schantz
transmission line and it is located at the Spring. Historically unreliable local power supply has made operation of the
Schantz Spring station problematic during storm events.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
x No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
165,000
25,000
5,000
25,000
250,000
$
160,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
30,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
16,260
16,260
$
16,260
-
$
$
$
250,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
90,000
160,000
Medium
$
$
$
$
$
$
$
X
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
90,000
160,000
-
Assess.,
Contr.-in-Aid (1)
$
90,000
$
160,000
$
$
$
$
$
Legally Mandated
(1) This an Uncompleted Work (UW) Project that will be funded by the City of Allentown
16
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water-Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JWP
8/24/15
Date:
Itron/ AMR Meter Project
AD-W-15
Preparer:
Allentown
2. Location:
3. Description:
This Project completes the remaining work of the City's Automatic Meter Reading (AMR) project. The City AMR project
included the replacement of ~27,000 aged residential meters ranging in size from 5/8" to 2" and ~155 commercial meters
that were 3" or greater in size. Radio read capability was included on all meter exchanges, allowing for mobile read
application. The project includes the purchase and implementation of Water Analytics software package which is a data
repository to store massive amounts of data that will be gathered from the meters in the Allentown division. The stored
data will be used in identifying and addressing customer metering issues. 747 meter installs were not completed in the
city AMR because the sites were either vacant or not accessible.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Replacement of aged meters that may not be registering all water usage is expected to reduce the amount of nonrevenue water. Analysis of metering data will allow for enhanced customer service including data-backed resolution of
customer metering complaints, flow analysis and other useful functions.
5. Status of Proposal:
Preliminary Estimate
Plans and Specs Completed
X Other (Specify)
City/LCA contracts- work underway
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
120,000
$
250,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
75,000
35,000
Total Operating Costs
20,000
250,000
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
-
$
$
$
290,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
40,000
40,000
140,000
15,000
10,000
10,000
35,000
Medium
$
$
$
$
$
$
$
X
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid (1)
40,000
40,000
140,000
15,000
10,000
10,000
35,000
Legally Mandated
(1) This an Uncompleted Work (UW) Project that will be funded by the City of Allentown
17
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water-Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JMP
8/26/15
Date:
Pre-Lease Valve Replacements
AD-W-16
Preparer:
Allentown
2. Location:
3. Description:
The replacement of ~ 55 valves that were identified as inoperable prior to the Lease settlement.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Replacement of inoperable valves will allow for greater operation and flexibility in the water system when planned or
unplanned outages occur.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
800,000
60,000
10,000
120,000
1,110,000
$
896,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
120,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
-
$
$
$
1,110,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
214,000
896,000
Medium
$
$
$
$
$
$
$
X
Oper.
Revenues
$
$
$
$
$
$
$
Low
Assess.,
Contr.-in-Aid (1)
$
214,000
$
526,000
$
370,000
$
$
$
$
Borrowing
Legally Mandated
(1) This an Uncompleted Work (UW) Project that will be funded by the City of Allentown
18
$
$
$
$
$
$
$
Reserves
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
DEPARTMENT:
City-Organizational Unit:
OPERATIONS
Water Capital
1. Proposal Title:
Mobile Equipment
2016
3. Description:
Project:
Preparer:
Date:
KG
8/20/15
Allentown
2. Location:
2- Utility trks.,2 SUVs
AD-W-17
2019 1 Mid-size trk.
2 Pick-up trks., 1 Van, Fork Lift
2020 1- Mini Excavator
1 mid size trk.
2018
2 SUVs, 1 Lg. Dump trk.
2021-2025 Undefined
1 Mid-size trk.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Vehicles are replacements. Aged vehicles will be traded in or sold to the highest bidder.
2017
5. Status of Proposal:
6. Cost of Land Rights:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
ac.
Total: l.f.
@
@
$
/acre
/lin ft.
0
9. Add.
Annual
Personnel
Oper. Cost
Man-Hrs.
Impact: Incr./(Decr.)
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
$
$
$
$
$
Sub-Total
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-20yr.)
8. Estimated Costs:
Engineering (Staff)
Land Acquisition
Construction/Equip.
Professional Services
Other (Labor)
Contingencies
Total Project Cost
$
$
$
$
$
$
$
Requested in this
Capital Program
$
-
89,450
$
$
89,450
$
89,450
Sub-Total
1,203,800
Total Operating Costs
10.Gain/Loss
Revenuein
Impact:
Annual Revenue
1,203,800
Assessment, Contributionin-Aid-of-Construction
Grants & Other
$
$
$
1,203,800
11. Source of Funds:
89,000
Source
Oper.
Revenues
Need
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
$
$
$
$
$
$
$
86,800
165,000
260,000
32,000
80,000
580,000
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Borrowing
79,800
153,000
244,500
30,500
77,000
530,000
Assess.,
Contr.-in-Aid (1)
$
$
$
$
$
$
$
7,000
12,000
15,500
1,500
3,000
50,000
12. Departmental Priority Rating:
High
-
X
Medium
Low
Legally Mandated
(1) Represents trade-in value on replaced vehicles.
19
Reserves
$
$
$
$
$
$
$
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water-Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Project:
AD-W-18
Preparer:
DL / JWP
9/11/15
Date:
Transmission Main Evaluation, Replacements & Rehabilitation
Allentown
2. Location:
3. Description:
This project involves leak detection of many older and large sized water transmission mains that are located within the city
which is planned to be completed in 2015 . Based on the findings, appropriate repairs or replacements of those mains will
be made. The costs of the replacements and repairs are included in this project. The previous year of the project
involved non-invasive leak detection of approximately 32,000 feet of cast iron and steel transmission mains. Years 1-10
assumes, when warranted, that the rehabilitation and/or replacement of approximately 500 feet of transmission main will
be done annually.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Many of the existing transmission mains are approaching 100 years old. The mains range in size from 16" to 36", and
could cause serious local damage if a major break should occur. A pro-active program to find any leaks in these areas,
followed by remediation of the problem, will keep the chances of major damage to a minimum.
5. Status of Proposal:
x Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
150,000
4,600,000
250,000
50,000
100,000
5,150,000
$
5,000,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
335,010
335,010
$
335,010
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
150,000
$
$
$
$
$
$
$
1,000,000
1,000,000
3,000,000
Medium
x
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
150,000
1,000,000
1,000,000
3,000,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
20
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water-Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JWP
9/8/15
Date:
General Water System Replacements/Improvements
AD-W-19
Preparer:
Allentown
2. Location:
3. Description:
Distribution system valve, fire hydrant, blow-off, sample station, ect. replacements will occur annually. If warranted,
funding is also allocated to replace some lead services and to provide looping for problematic dead end water mains.
Funding is also allocated for replacement of other infrastructure on an as-needed basis, an example of the is replacement
of a segment of the Schantz Spring raw water main that is exposed due to erosion.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Valves that are found to be defective during routine exercising must be repaired, if possible, or must be replaced. Fully
operational valves are needed throughout the distribution system in the event that a leak or main break must be isolated
in order to allow for remediation. In some cases, eliminating dead ends in the distribution system will generally improve
water quality and fire service.
5. Status of Proposal:
x Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,387,000
$
4,220,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
2,633,000
75,000
25,000
100,000
4,220,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
277,120
277,120
$
277,120
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
40,000
620,000
400,000
400,000
400,000
400,000
2,000,000
Medium
$
$
$
$
$
$
$
X
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
40,000
620,000
400,000
400,000
400,000
400,000
2,000,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
21
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water-Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JWP
8/6/15
Date:
Badger Meter Replacements
AD-W-20
Preparer:
Allentown
2. Location:
3. Description:
There are approximately 5,000 badger water meters that are currently being used to monitor water
consumption in the city. These sites were not a part of the original City of Allentown AMR project in
2012/2013. The sites also have existing, but outdated ERTs which are now approaching the end of their useful
lives. Should LCA decide to implement Project AD-W-21 (Fixed Base AMR), the outdated 40W/50W/60W ERTs
will not be readable on the new system. The replacement Neptune meters can read much lower flows
compared to the badger meters and some revenue may be lost because very low flows are not being recorded
presently.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The existing badger water meters are reaching the end of their useful life. They also utilize the old 40W/50W/60W
ERTs which are also approaching the ends of their useful life.
5. Status of Proposal:
Preliminary Estimate
Plans and Specs Completed
X Other (Specify)
Use cost data from AMR
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
$
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
200,000
1,050,000
Total Operating Costs
25,000
25,000
1,300,000
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
1,300,000
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
84,570
84,570
$
84,570
-
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
500,000
800,000
Medium
$
$
$
$
$
$
$
x
Oper.
Revenues
Borrowing
500,000
800,000
-
$
$
$
$
$
$
$
Low
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
22
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water-Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JWP
8/24/15
Date:
Fixed Base Meter Reading System
AD-W-21
Preparer:
Allentown
2. Location:
3. Description:
The city of Allentown's original AMR project started in 2011 and ran into 2013. There were insufficient funds from the
Pennvest Loan to cover all 33,000 water meters and a drive by system was selected for this reason also. The original
AMR was installed as a hybrid system which is upgradeable to a fixed base system. A fixed base system provides
instantaneous readings of any water meter via a radio signal directly to the customer care center through a series of
transmitters and repeaters installed throughout the water system service area.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
A fixed base system would allow for instantaneous readings on any account. In order to implement the fixed base
system, a data repository must be installed to house the enormous volume of data that will accumulate. The data
repository was an original component of the City's AMR project.
5. Status of Proposal:
x Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,050,000
110,000
250,000
205,000
1,715,000
$
1,715,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
100,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
111,560
111,560
$
111,560
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
$
$
$
$
$
$
$
10,000
905,000
800,000
Medium
x
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
10,000
905,000
800,000
-
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
23
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water-Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JWP
8/6/15
Date:
Emergency Power - Water & Wastewater Facilities
AD-W-22
Preparer:
Allentown
2. Location:
3. Description:
There have been several instances over the past few years when the water plant and/or the high level distribution
systems were without power. All four (4) high level distribution systems presently have manual transfer switches and a
single portable generator was purchased in 2015. The wastewater plant needs a permanent generator and manual
transfer switch for the chlorination building, both having been designed in 2015. 2016 will include design of back-up
power needs for the Crystal Spring and Schantz Spring pumps in the water plant. Having the Schantz and Crystal pumps
operational during a power failure will allow for approximately 10-12 MGD of potable water to be pumped into the
distribution system until the power failure is over and the water plant can be re-started.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Emergency power will allow the water plant to pump both Crystal and Schantz Springs, providing 10-12 MGD while
extending the time until the distribution system starts to experience low pressure.
5. Status of Proposal:
x Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
10,000
700,000
70,000
10,000
10,000
800,000
$
700,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
52,040
52,040
$
52,040
-
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
100,000
200,000
250,000
250,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
100,000
200,000
250,000
250,000
-
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
24
$
$
$
$
$
$
$
Reserves
WASTEWATER 25
Various
Various
$ 1,120,000
$ 5,394,955
TOTAL CITY FUNDED PROJECTS
GRAND TOTAL
585,000
535,000
-
$
$
$
N/A
N/A
N/A
N/A
$ 4,274,955
$ 2,482,000
$ 162,695
$ 1,630,260
CITY FUNDED PROJECTS
WWTP-Security Upgrades
Sanitary Sewer Manhole Lining
Sanitary Sewer Manhole Collars & Water Tight Covers
WWTP Interim Blending Pumping System
UW
AO
AO
AO
E
D
E
A
A
A
N/A
N/A
N/A
N/A
N/A
$ 4,274,955
No
Yes
Yes
Yes
A
A
Amount
TOTAL LCA FUNDED PROJECTS
Pending Authorization
Various Wastewater System Related Studies
Subtotal
S7
S7
No
No
No
No
No
Stage (3)
Approvals
650,000
7,129,000
2,482,000
2,747,000
1,900,000
344,500
1,810,100
1,125,000
2,750,000
6,950,000
12,979,600
6,095,000
225,000
3,428,000
1,192,000
1,250,000
$ 26,203,600
$
$
$
$
$
$
$
$
$
$
-
-
3,953,000
990,000
478,000
512,000
-
2,963,000
-
2,963,000
1,800,000
163,000
1,000,000
Project Cost
Prior
Years (4)
$ 20,108,600
$
$
$
$
$
$
$
$
$
$
Total
Cost
$
$
$
$
$
$
$
6,608,000
2,110,000
225,000
295,000
340,000
1,250,000
4,498,000
200,000
200,000
2,874,000
682,000
1,292,000
900,000
26,000
148,000
225,000
275,000
750,000
1,424,000
2016
Year -1
(4) Includes estimate of expenditures through 2015.
Note: Shading indicates new project or significantly revised project scope.
(3) A= Annual Item, S= Study/Planning, D= Design, C= Construction / Implementation, P = Pending Approval, E = Entire Project Approved,
AO= "Administrative Order" Projects as per the Agreement are to be Funded by the City and executed by LCA.
S7= Required Capital Improvement as shown on Schedule 7 of the Agreement and will be funded by LCA.
(2) MCI = Major Capital Improvement. Pursuant to the Agreement if approved by the City the cost of the project will be recovered from the customers via a
Capital Cost Recovery Charge over the useful life of the improvement or 30-years whichever is less.
Note: At the request of the City of Allentown, LCA has agreed to identify Projects that at the time of the Capital Plan preparation are known to be a MCI. This
information is being provided for informational purposes only. The City acknowledges that Article 4 of the Concession Agreement sets forth the methodology
for MCI submittal and approval.
$
$
$
$
$
$
$
$
LEHIGH COUNTY AUTHORITY
ALLENTOWN DIVISION
2016 - 2025 CAPITAL PROGRAM
WASTEWATER
(1) UW= "Uncompleted Work" City Projects that were supposed to be complete by the time of settlement or executed by City personnel after settlement. The City will fund these
projects but has requested that LCA execute them.
AD-S-12
AD-S-14
AD-S-15
AD-S-16
AD-S-9
Subtotal
WWTP- Digester Cover Replacements
Facility Roof Replacements (Water & Wastewater Facilities)
Previously Authorized
WWTP- Replacement of Motor Control Centers
WWTP General Improvements
Subtotal
Other Equipment
Sanitary Sewer Main Replacements and/or Rehabilitation
Mobile Equipment
Name or Title of Proposal
LCA FUNDED PROJECTS
Annual
Collection System - Development and Service Connections
(1) Type
AD-S-5
AD-S-7
AD-S-18
AD-S-1
AD-S-17
AD-S-2
AD-S-4
AD-S-3
Project
#
9/11/2015
(2) MCI
3,483,300
635,000
295,000
340,000
-
2,848,300
50,000
50,000
1,292,000
1,292,000
-
26,000
505,300
100,000
275,000
600,000
1,506,300
2017
Year -2
$
$
$
$
$
$
$
1,520,500
295,000
295,000
-
1,225,500
50,000
50,000
-
-
32,500
168,000
100,000
275,000
600,000
1,175,500
2018
Year -3
$
$
$
$
$
$
$
1,876,300
295,000
295,000
-
1,581,300
50,000
50,000
-
-
32,500
523,800
100,000
275,000
600,000
1,531,300
$
$
$
$
$
$
$
1,367,500
295,000
295,000
-
1,072,500
50,000
50,000
-
-
32,500
15,000
100,000
275,000
600,000
1,022,500
This Capital Program
2019
2020
Year -4
Year -5
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
14,855,600
3,630,000
225,000
1,475,000
680,000
1,250,000
11,225,600
400,000
400,000
4,166,000
682,000
2,584,000
900,000
149,500
1,360,100
625,000
1,375,000
3,150,000
6,659,600
Years 1-5
Sub-Total
$
$
$
$
$
$
8,045,000
1,475,000
1,475,000
-
6,570,000
250,000
250,000
-
-
195,000
450,000
500,000
1,375,000
3,800,000
6,320,000
2021 - 2025
Years 6-10
Sub-Total
650,000
650,000
4,166,000
682,000
2,584,000
900,000
344,500
1,810,100
1,125,000
2,750,000
6,950,000
12,979,600
5,105,000
225,000
2,950,000
680,000
1,250,000
$ 22,900,600
$
$
$
$
$ 17,795,600
$
$
$
$
$
$
$
$
$
$
Grand
Total
Medium
Mandated
Mandated
High
High
High
Medium
High
High
High
High
High
High
Dept.
Priority
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
RA
9/11/15
Date:
Collection System - Development and Service Connections
AD-S-1
Preparer:
Allentown
2. Location:
3. Description:
Plan review and construction inspection of extensions and connections to the sanitary sewer system. Also included are
general planning expenses.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
To assure that development sewer mains and the connection of laterals to the City sanitary sewer system are designed
and constructed according to the applicable specifications.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
324,500
$
344,500
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
20,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
344,500
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
$
$
$
344,500
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
26,000
26,000
32,500
32,500
32,500
195,000
$
$
$
$
$
$
$
Oper.
Revenues
Medium
$
$
$
$
$
$
$
Low
Borrowing
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid (1)
26,000
26,000
32,500
32,500
32,500
195,000
Legally Mandated
(1) Plan Review and Inspection fees paid by Developers
26
$
$
$
$
$
$
$
Reserves
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Other Equipment
Project:
AD-S-2
Preparer:
RJK/JG
8/24/15
Allentown
2. Location:
3. Description:
Generally utilized for purchase of individual equipment greater than $5,000 and will be used for needs of both the
wastewater treatment plant and the sanitary collection system.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Replacement equipment is required from time to time to maintain service integrity. Items include valves, sampling
equipment, electric and electronic equipment, Infiltration & Inflow (I/I) equipment and other equipment as needed.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
$
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
70,000
1,050,000
50,000
Total Operating Costs
1,170,000
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
1,125,000
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
73,180
73,180
$
73,180
-
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
225,000
100,000
100,000
100,000
100,000
500,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
225,000
100,000
100,000
100,000
100,000
500,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
27
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Waste Water Treatment Plant (WWTP) General Improvements
AD-S-3
Preparer:
JWP
9/8/15
Allentown
2. Location:
3. Description:
This annual funding is to cover the on-going replacement of equipment that is nearing the end of its useful life and to
address unforeseen equipment failures Equipment will be constantly evaluated and repaired or replaced as needed.
The Wastewater Treatment Plant will undergo a condition assessment in 2016. Funds have been budgeted in Years 210 of this project to address deficiencies that are found in that study.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The WWTP was built in the 1920's with major upgrades in 1968, 1978 and 1998. Replacement of failed critical WWTP
equipment is required immediately to assure proper operation and compliance with regulatory permits.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
6,000,000
500,000
50,000
200,000
6,950,000
$
6,950,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
200,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
452,110
452,110
$
452,110
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
750,000
600,000
600,000
600,000
600,000
3,800,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
750,000
600,000
600,000
600,000
600,000
3,800,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
28
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
JMP
8/26/15
Date:
Sanitary Sewer Main Replacements and/or Rehabilitation
AD-S-4
Preparer:
Allentown
2. Location:
3. Description:
This is annual funding for the replacement and/or rehabilitation of sanitary sewer mains that have been found to be
defective. The replacement and/or rehabilitation of "Building Sewers" or Laterals as defined in City Ordinance "Title
Five- Sewers" that are connected to said sewer mains is not included because these laterals are owned and
maintained by the owners of the improved properties.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The Operating Standards require replacement and/or repair of any sanitary mains found to be defective when said
mains are located in a street that has been included the City 's annual Streets Program.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,800,000
300,000
200,000
320,000
2,750,000
$
2,750,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
130,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
$
$
$
2,750,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
275,000
275,000
275,000
275,000
275,000
1,375,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid (1)
275,000
275,000
275,000
275,000
275,000
1,375,000
Legally Mandated
(1) This an Administrative Order (AO) Project that will be funded by the City of Allentown
29
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Wastewater Treatment Plant (WWTP) Replacement of Motor
Control Centers
AD-S-5
Preparer:
JWP
8/26/15
Allentown
2. Location:
3. Description:
This Project will replace five aged motor control centers that provide power on a 24/7 basis to various parts of the
WWTP. Most of the electrical gear to be replaced is from 1968. Replacement parts are nearly impossible to find and
compliance with industry codes is a real concern.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The motor control centers are located in areas where they are exposed to corrosive wastewater gas and have
deteriorated considerably over their 50 year lifetime. Because of their age, replacement parts are nearly impossible to
find. This equipment is critical for the daily operation of the WWTP.
5. Status of Proposal:
Preliminary Estimate
x Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,975,710
210,273
20,000
126,017
2,482,000
$
682,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
150,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
161,460
161,460
$
161,460
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
1,800,000
682,000
-
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
1,800,000
682,000
-
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
Note: This a Required Capital Improvement as shown on Schedule 7 of the Agreement and will be funded by LCA
30
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
WWTP: Digester Cover Replacements
AD-S-7
Preparer:
PMD
7/31/15
Allentown
2. Location:
3. Description:
Phase 1 of this Project will replace the Secondary Digester Cover. Phase 2 will replace the Primary Digester No. 1 Cover.
Other miscellaneous work (piping, electrical , mixing) will also be included in the project.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The WWTP has two primary digesters and one secondary digester. In 2009, Primary Digester No. 2 cover failed and
caused major operational issues. The failed digester cover replacement work was completed in 2010. The remaining two
digester covers are nearing the end of their useful life and must be replaced before failure.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
2,411,000
116,000
10,000
50,000
2,747,000
$
2,584,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
160,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
178,700
178,700
$
178,700
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
163,000
1,292,000
1,292,000
$
$
$
$
$
$
$
-
Medium
X
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
163,000
1,292,000
1,292,000
-
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
Note: This a Required Capital Improvement as shown on Schedule 7 of the Agreement and will be funded by LCA
31
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Water Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Date:
Various Wastewater System Related Studies
AD-S-9
Preparer:
JWP
8/6/15
Allentown
2. Location:
3. Description:
As infrastructure ages and regulations become more stringent, there are periodic needs for professional services to
study the feasibility of changes, upgrades, etc. The following studies are requested in 2016: (1) WWTP Condition
Assessment - Some original components of the Allentown WWTP are bearing in on 90 years old. A general condition
assessment of the WWTP is long overdue and would be very similar to the type of study which is being implemented at
the Allentown Water Plant for the same reason. (2) WWTP Feasibility Study to use alternate disinfectant - There
many health and safety risks to using chlorine gas as the sewage plant disinfectant, and a feasibility study is needed to
determine the practicality of converting from chlorine gas to sodium hypochlorite or another disinfectant.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Engineering studies are periodically required to address feasibility of implementing new programs or changing existing
ones. Health and safety concerns with chlorine gas, plus increasingly stringent regulatory requirements have brought on
the need to consider alternatives.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
100,000
$
650,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
550,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
650,000
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
42,280
42,280
$
42,280
-
$
$
$
-
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
x
Need
200,000
50,000
50,000
50,000
50,000
250,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
200,000
50,000
50,000
50,000
50,000
250,000
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid
Legally Mandated
32
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
KG
8/20/15
Date:
WWTP Security Upgrades
AD-S-12
Preparer:
Allentown
2. Location:
3. Description:
Installation of upgrades and related equipment to the existing security system at the WWTP.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
Enhanced security would further reduce the risk of breaches that may have the potential to impair to the operation of the
facility.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
25,000
175,000
Total Operating Costs
5,000
20,000
225,000
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
$
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
-
$
$
$
225,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
$
$
$
$
$
$
$
225,000
Medium
X
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid (1)
225,000
Legally Mandated
(1) This an Uncompleted Work (UW) Project that will be funded by the City of Allentown
33
$
$
$
$
$
$
$
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
PMD
7/31/15
Date:
Sanitary Sewer Manhole Lining
AD-S-14
Preparer:
Allentown
2. Location:
3. Description:
This annual project will install lining in approximately 85 brick manholes to eliminate infiltration and provide structural
reinforcement. The City has directed LCA to bring the project to a bid ready stage each year, but not to bid unless
authorized to do so by the City.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
This work is a component of the work that will be necessary to comply with the EPA Administrative Order.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,770,000
456,000
404,000
600,000
3,428,000
$
2,950,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
198,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
-
$
$
$
3,428,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
478,000
295,000
295,000
295,000
295,000
295,000
1,475,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid (1)
478,000
295,000
295,000
295,000
295,000
295,000
1,475,000
Legally Mandated
(1) This is an Administrative Order (AO) Project that will be funded by the City of Allentown
34
$
$
$
$
$
$
$
X
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
PMD
7/31/15
Date:
Sanitary Sewer Manhole Collars & Water Tight Covers
AD-S-15
Preparer:
Allentown
2. Location:
3. Description:
This project involves affixing manhole frame and covers to approximately 80 aged brick manholes identified by previous City staff and current
LCA staff. Alternatives include installing aluminum straps and stainless steel bolts into existing concrete collars, replacing the existing frame
and cover with a watertight frame and cover, or pouring a five foot diameter concrete collar. This work will eliminate the potential for inflow
and infiltration (I/I) entering these manholes, thus eliminating the potential for sanitary sewer overflows (SSO’s) from these manholes.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
This work is a component of the work that will be necessary to comply with the EPA Administrative Order.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f. @
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,000
1,192,000
$
680,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
105,000
935,000
151,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
-
$
$
$
1,192,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
Need
512,000
340,000
340,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
Assess.,
Contr.-in-Aid (1)
$
512,000
$
340,000
$
340,000
$
$
$
$
Legally Mandated
(1) This is an Administrative Order (AO) Project that will be funded by the City of Allentown
35
$
$
$
$
$
$
$
X
Reserves
Project:
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
CAPITAL WORKS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
RJK
8/11/15
Date:
WWTP Interim Blending Pumping System
AD-S-16
Preparer:
Allentown
2. Location:
3. Description:
This project provides for the installation of 4 diesel power pumps and associated pipeline to increase the hydraulic capacity
of Kline's Island WWTP (KIWWTP) during significant wet-weather events which result from the remnants of hurricane and
tropical storms. Once installed blending of wastewater that has received primary treatment with fully treated plant effluent
will be made possible reducing environmental concerns related to the current practice of discharging raw sewage to the
Little Lehigh Creek during these extreme wet-weather events. Note: This Project is contingent upon PADEP approval of
the NPDES Permit renewal that includes blending.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The peak hydraulic capacity of KIWWTP is currently limited to 86 millions gallons per day (mgd) by a number of hydraulic
bottlenecks located throughout the facility. When the hydraulic capacity of the facility is exceeded, untreated sewage and
storm water from inflow & Infiltration (I&I) is bypassed to the Little Lehigh Creek through Outfall 003 located at the plant
headworks. The proposed project represents a portion of the scope of work necessary to increase the peak flow capacity of
the facility to 95 mgd. The 4 pumps and connected pipeline will provide for the blending of 10 mgd of primary settling tank
effluent with the fully treated plant effluent in the chlorine contact tank and discharge of a portion of this blended flow to the
Lehigh River.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Svcs
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equip.
Professional Services
Other
Contingencies
Total Project Cost
Requested in this
Capital Program
$
$
$
$
$
$
$
1,000,000
80,000
20,000
110,000
1,250,000
$
1,250,000
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-30yr.)
Sub-Total
40,000
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Grants & Other
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
$
$
-
$
-
-
-
$
$
$
1,250,000
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
1,250,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
$
$
$
$
$
$
$
Assess.,
Contr.-in-Aid (1)
1,250,000
Legally Mandated
(1) This an Administrative Order (AO) Project that will be funded by the City of Allentown
36
$
$
$
$
$
$
$
Reserves
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
DEPARTMENT:
City-Organizational Unit:
OPERATIONS
Wastewater Capital
1. Proposal Title:
Mobile Equipment
3. Description:
2016
2017
2018
Project:
Preparer:
1- Truck tractor,
1-Used tanker trailer
1-Vactor, 1 Dump Trk., 1 Gator-3,
1 SUV, 1 Pick-up Trk.
1 Backhoe, 1 Pick-up Trk.
KG
8/20/15
Date:
2. Location:
AD-S-17
Allentown
2019 1- Tri-axle & 1 Small Dump trk., 1 TV Van
1- Cement Mixer
2020 1- Gator
2021-2025 Undefined
Undefined
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
The pickup trucks are replacements for older equipment which will be traded in.
5. Status of Proposal:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
6. Cost of Land Rights:
ac. @
l.f.
@
Total:
$
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
9. Annual Oper. Cost Impact: Incr./(Decr.)
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Services
Other
Sub-Total
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equipment
Professional Services
Other (Labor)
Contingencies
Total Project Cost
$
$
$
$
$
$
$
Requested in this
Capital Program
$
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-20yr.)
Sub-Total
1,810,100
Total Operating Costs
10. Revenue Impact:
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Other
1,810,100
1,810,100
11. Source of Funds:
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
-
/acre
/lin ft.
$
$
$
$
$
-
-
$
$
$
145,250
145,250
$
145,250
$
$
$
66,400
Source
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
X
Need
148,000
505,300
168,000
523,800
15,000
450,000
Medium
$
$
$
$
$
$
$
Oper.
Revenues
$
$
$
$
$
$
$
Low
Borrowing
148,000
505,300
168,000
523,800
15,000
450,000
Assess.,
Contr.-in-Aid (1)
$
$
7,000
$
5,200
$
5,000
$
7,200
$
2,000
$
40,000
Legally Mandated
37
$
$
$
$
$
$
$
Reserves
Lehigh County Authority
ALLENTOWN DIVISION-CAPITAL PROGRAMMING PROJECT DETAIL
OPERATIONS
Wastewater Capital
DEPARTMENT:
Sub-Organizational Unit:
1. Proposal Title:
Project:
Preparer:
Date:
Facility Roof Replacements (Water & Wastewater Facilities)
2. Location:
AD-S-18
JWP
8/24/15
Allentown
3. Description:
Many roof systems at the water plant, wastewater plant, distribution/collection building and water system remote stations are in
various stages of disrepair. The distribution/collection offices have had two major instances of interior mold within the past 3
years, resulting in unsafe work environments and costly remediation. Other locations have had instrumentation and other
damages as a result of leaking roofs. Project costs will be apportioned between the applicable water and wastewater funds as
appropriate. Additional Phase II projects are required in 2016 to address engineering reports that list other deficiencies.
4. Justification (need, function, selection of time, specific relationship to any long-term work program):
49 different roof systems were evaluated in 2014. Many of them are the original slate roofs from as far back as 1916. In order to
keep safe and healthy work environments for all employees, not to mention keeping all operational equipment safe, dry and fullyfunctional, a remediation and/or replacement project is needed to protect the assets of both the City of Allentown and LCA. The
roof evaluations and condition assessments, performed by a consultant that specializes in roofs and buildings, has determined
5. Status of Proposal:
6. Cost of Land Rights:
X Preliminary Estimate
Plans and Specs Completed
Other (Specify)
ac.
l.f.
Total:
@
@
$
/acre
/lin ft.
-
9. Annual Oper. Cost Impact: Incr./(Decr.)
7. Status of Land Rights:
Not Yet Acquired
Partly Acquired
LCA Owned
X No Land Involved
8. Estimated Costs:
LCA Staff
Land Acquisition
Construction/Equipment
Professional Services
Other (Labor)
Contingencies
Total Project Cost
$
$
$
$
$
$
$
25,000
1,625,000
200,000
Requested in this
Capital Program
$
900,000
Add. Personnel Man-Hrs.
Personnel Services
Supplies & Equipment
Maintenance Services
Other
Sub-Total
$
$
$
$
$
Indirect Operating Costs:
Overhead Costs
Debt Service (5%-20yr.)
Sub-Total
$
$
$
152,460
152,460
$
152,460
Total Operating Costs
25,000
25,000
-
10. Revenue Impact:
1,900,000
Gain/Loss in Annual Revenue
Assessment, Contributionin-Aid-of-Construction
Other
11. Source of Funds:
$
$
$
-
Source
Oper.
Revenues
Need
Prior Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th thru 10th Years
$
$
$
$
$
$
$
1,000,000
900,000
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Borrowing
1,000,000
900,000
-
Assess.,
Contr.-in-Aid
$
$
$
$
$
$
$
12. Departmental Priority Rating:
High
-
x
Medium
Low
Legally Mandated
38