2015 Third Quarter - Sanctuary Belize Independent Owners

Transcription

2015 Third Quarter - Sanctuary Belize Independent Owners
 Dear Sanctuary Belize Owners,
Fall is here, and with it the rainy season has brought us much needed
rain. The rains, however, have not slowed progress and we continue to
move forward completing critical infrastructure and progressing on
projects within the Marina Village. On the residential front, we have seen
significant progress on existing builds, as well as new homes breaking
ground across Sanctuary Belize!
In our effort to continue to provide utility services throughout the
Development, additional water lines are on order that will allow us to
further expand our infrastructure into areas selected within various
subdivisions. These selected areas can be found on the Development
Progress Map and civil works are expected to commence closer to
the beginning of the dry season. After wrapping up the utility
underground works for the front row of the Sapodilla Ridge waterway
lots, our crews have moved over to the Marina Village, and have also
completed the laying of water lines and required work in preparation for
the electric company.
Electrical infrastructure of the final portions in phase one of the
Equestrian Estates has now been finalized by the electric company.
They have now moved on to the front waterway portion of Sapodilla
Ridge. Once finalized, they are scheduled to continue their work inside
the Marina Village, which will ultimately provide power to the Gas
Station/General Store and Marina docks.
Our road crews have improved drainage and the widening of a portion
Marina General Store and Gas Station
of the All Pines Road leading into the development as an additional
safety measure due to increased traffic. Final capping of all roads within
areas of completed utilities (Waterway Village and Sapodilla Ridge front
row) will commence as soon as the weather permits.
Marina Bar & Restaurant Design
BEL: High tension lines to Sapodilla Ridge Waterway front lots
are two thirds complete.
Beach Club Lounge Chairs
Sapodilla Ridge/Marina Electrical Components
At the Marina Village, the Sanctuary Park & Organic Farm continues to
take shape as landscaping progresses with the rains. Upon entering the
Marina Village, you will also notice that the grassing of hill one and
surrounding areas have made a positive impact. The General Store has
also made significant progress, with the roof, windows and lighting
installed as well as the painting of the building. Current work includes
the installation of the hardwood ceiling, air conditioning, followed by the
laying of tiles. The General Store and fuel docks are on schedule to
open for business in Spring 2016.
The marina bar & restaurant design has been progressing well, and we
are proud to present initial concept renderings. As the design is still in
progress, the renderings are subject to change. We hope to present the
final design and renderings by end of year! In addition to the bar &
restaurant, planning and preparation of the Marina Green area and hill
New foal born at Equestrian Center
two within the Marina Village continues. The fine-tuning of the building
concepts, additional utilities and general flow within this area is
underway. In addition, the Sundry building, located on the fuel dock, is
expected to break ground in the near future.
Additional Sapodilla Ridge/Marina Electrical Components
Over at the Beach Club, visitors and residents can now relax on our
elegant handcrafted hardwood chaise loungers, customized by our inhouse carpenters. After hour guests will also appreciate the newly lit
pathways, the completed parking area and landscaping.
On a final note, we are pleased to announce the birth of a new foal at
Sanctuary Belize. In early September, "Jilly" was born at the Equestrian
Center. She is growing up beautiful and strong, and loves to run and
play.
I thank all of you for your continued support as another successful
summer has come to a close. We are excited to focus more on the
Marina and expect much progress in this area. The staff and I take this
opportunity to wish everyone a wonderful Thanksgiving!
Sincerely,
Johnny Usher
Principal
Marina Village:
Click to view progress map
1. Fuel tanks and related components installation completed
pending permanent power
2. Yacht power pedestals tested and supplier selected
3. Marina electrical design streamlined and modified, pending final
approval from relevant Government Agency.
4. Gas Station and General Store structure complete
5. Marina pond and gardens established
6. Above and below ground utility civil works completed. Water
lines completed
Marina Gas Station and General Store
7. Completed first phase of underground drainage network for
Marina General Store and surrounding buildings.
Beach Club Lanterns
Underground Drainage Network for Gas Station
Other accomplishments:
1. Beach Club landscaping, parking, lighting and beach beds with
cushions completed
2. Widening of All Pines Road
3. Publishing of Street Names (right
Please zoom into streets to see names!
click to download)
4. Establishment of Security Command Post
5. First Aid & CPR Training for security personnel and Sanctuary
Staff
Beach Club Entrance Landscaping
6. Water lines inbound for selected areas shown in Red on the
Progress Map
7. Canal paths cleared and surface drains cut throughout front
row waterway North Ridge lots.
North Ridge Canal Clearing
Security Command Outpost
Coco Palm Drive into Equestrian Estates
Development Goals:
Marina Village:
1. Gas Station & General Store – (2nd quarter 2016)
a. Commence work on the Sundry building (Dec)
b. *BEL to energize selected area of Marina and SR front row Waterway
lots (Subject to BEL's installation schedule)
c. Ability to pump gas (Dec)
2. Complete boat slips – (2nd quarter 2016)
a. Approval of Marina dock electrical and commence decking and
staining of existing marina piers, starting with the fueling dock. (Dec)
Currently on the drawing board
b. Place order for marina electrical pedestals and all associated
electrical components for remaining slips. (Dec)
3. Establish Marina Green area within Marina Village
a. Landscape Gas Station and General Store and surrounding area
(Dec)
b. Complete Restaurant and Bar Design (Dec)
c. Continue work on Marina Green area design and finalize layout and
overall theme.
4. Hill two design and permanent layout (Dec)
Marina Village Hill 2 Concept 1
Marina Village Hill 2 Concept 2
Marina Village Hill 2
Current erosion seen on this hill is due to the modification and shifting of
this hill. Once the layout is finalized, the hill will be re-shaped and taken
to final grade.
5. Marina Pond Landscaping (Dec)
Finalize landscaping of Marina pond and future hotel site park area
6. Weather permitting...cap over all roads within Marina Village and
Marina Village Organic Farm and Pond
further establish permanent drainage.
7. Continue planning and design of the Marina Village wastewater
treatment network.
Click here to view
Click here to view floor plan
As development progress continues, home construction is picking up pace as owners get the itch to build.
Three new builders have entered the scene, eager to prove what they can do! Here is a breakdown of
progress from each of them:
Alliance Construction
Led by Carlos Garcia, Alliance Construction, located in Maya Beach,
has made significant progress on its first home at Sanctuary Belize on
Equestrian Estate Lot 215.
The single-story concrete home features 3-bedrooms and 2 bathrooms,
with a spa and pool. The residence will be off-grid, using roof-mounted
solar panels for power, and rain barrels for water.
Bamboo Works International
Bamboo Works International, led by Andrew Willis, has been working
hard on a 2-story residence on Estate Lot 117.
This 3-bedroom, 3-1/2 bath concrete and wood home features a
beautiful bamboo roof structure, as well as a screened-in outdoor living
room and stunning savannah views.
Dreamworks Design & Construction
Led by Rigel Mckoy, Dreamworks Design & Construction, located in
Belmopan, recently broke ground on their first home at Sanctuary Belize
on Estate Lot 31.
This 3-bedroom, 2-1/2 bath concrete home features a 2-car garage as
well as rooftop suite with great views.
Keystone Design & Construction
Management
Led by Margarito Ortiz, Keystone Design & Construction has been
working hard through the summer on the custom traditional concrete
home on Marina Island 12.
The boat house is nearing completion, while the main house is in full
swing, including a pool with infinity edge overlooking the waterway.
Southern Belize Home Construction
Led by Kevin Brodksy, Southern Belize Home Construction, located in
Maya Beach, recently broke ground on their first home at Sanctuary
Belize.
The 2-bedroom, 2-1/2 bathroom concrete spec home located on
Sapodilla Ridge Lot 183 features an open floor plan, screened in
terraces, a spa with lap pool, as well as a half basketball court.
Tata Duende Builders
Tata Duende Builders, led by Rich Caples, has made significant
progress on a 3-story residence on Northridge Lot 576. The concrete
and steel home features 4 bedrooms, 4 bathrooms, a large rooftop
terrace, as well as a pool with swim up bar & grill.
The home is slated for completion in January 2016. Also in Northridge,
Tata Duende has been building a custom 2-story modern residence on
lot 537. The concrete and steel 3-bedroom, 3-1/2 bath home features a
pool with infinity edge, an organic garden, and will be off-grid.
ABM Development & Design
ABM Development, led by Anthony Mock, has been making great
progress with the Marina General Store and Gas Station.
www.sanctuarybelize.com
Keep the Sanctuary BULLETIN Newsletter emails coming. Please add [email protected] to your address book or safe list now.
You may also be removed from this list by mailing your request and including your email address to remove to:
Sanctuary Belize
3333 Michelson Drive
Suite 500
Irvine, CA 92612