spec sheet - Oslo Data Center Location

Transcription

spec sheet - Oslo Data Center Location
Oslo Data Center Location
DMS 60o12.1’N
10o14.3’E
Follummoveien, Hønefoss, Norway
www.oslodclo.com
Oslo Data Center Location at Hønefoss, Norway
– A part of the Oslo region.
Oslo Data Center Location
Hønefoss, Norway
DMS 60o12.1’N
10o14.3’E
Hydropower
17 MW
SITE
POWER LINES
E16 / HIGHWAY
SUBSTATION
HYDROPOWER
Hydropower
CONNECTIVITY
6 MW
COOLING WATER
25 km
Substation
300 kV OO 132 kV
Hydropower
28 MW
Cooling water
1 000 l / sec
3x Substations
132 kV OO 22 kV
C IT
Y 60 k
420 kV OO 132 kV
LO
OS
Substation
0 km L 7
OS
1 km / 0.621 miles
m
Oslo – 60 km
Hønefoss – 3 km
The location
O
 SITE CHARACTERISTICS.
 SITE ACCESS AND DISTANCES.
O Up to 100 ha of flat land on stable and well
drained compact gravel soil.
O Direct access from national highway E16 along
2-lane paved local road, 0 – 2 km.
O Zoned for industrial use.
O Oslo International Airport is 70 km /
60 minutes away.
O The site is largely greenfield with some internal
roads and infrastructure.
O New and extended zoning in progress to be
completed within 2017 in order to include new areas.
O Municipality offers fixed time plans for detailed
zoning and building permit approval.
O Oslo city is 60 km / 60 minutes away
(1 million inhabitants including suburbs).
O The town of Hønefoss is 3 km away
(19 000 inhabitants).
O Drammen harbour is 65 km / 60 minutes away.
 POWER SUPPLY.
 COOLING.
O Idle capacity of more than 100 MW is available
at 22 kV adjacent to site.
O Up to 1 000 l / sec of filtered river water
available for cooling.
O Additional dedicated 132 kV/200+MW substation can
be constructed on site.
O Excess heat dump to district heating grid
may be possible.
O 3 independent 132 kV substations 1 km away,
supplied from two High Voltage TSO substations,
420 kV and 300 kV.
O Cool Nordic climate.
O Additionally, 3 hydropower stations in river Begna
adjacent to site with an accumulated power of 50 MW.
O Redundant dark fibre available adjacent to site.
 CONNECTIVITY.
O Can be offered from several providers.
Space Power
O
O
O FOLLUMMOEN
O POWER SUPPLY
The land covers a total area of 130 Ha. Excluding the
necessary space for public roads, green belts, buffer
zones and the existing rail road and 300 kV power lines,
it is expected that the buildable flat area should be in
the order of 60 Ha on the upper level (155 ± 5 m.a.s.),
and 18 Ha on two separate lower levels (approx. 125
m.a.s.).
Oslo Data Center Location is located at a strong node
and interconnection point of the national (TSO/420 kV),
regional (DSO/132 kV, and local (22 kV) power grids. This
can be supplemented with approximately 50 MW of
local hydro power generation in adjacent river Begna.
The development is directed by the municipality, providing a generic industrial zoning plan which is taking into
account the specific needs of a typical hyper scale
datacenter.
O GEOTECHNICAL STATUS
The area consists of stable and dry gravel to a depth of
roughly 15–50 metres above solid bedrock.
Geotechnical analysis shows that the site is suitable for
industrial development.
Buildings with a ground pressure up to 200 – 300 kPa
can be constructed practically anywhere in the area.
O ENVIRONMENTAL IMPACT ANALYSIS
Onsite visits and public records show no environmental
issues in conflict with the purpose of building large
scale data centres.
The soil is well suited for surface water management
and drainage, even following extensive hard surface
construction.
No cultural heritage or archeological sites are recorded
in the area.
O ZONING PLAN
The borders of the zoning plan are according to the
map on page 2.
The further process will progress according to the
following milestones in the zoning plan preparation are
expected:
 Formal startup mid October 2016
Municipal Council
Municipal Council
Municipal Council
 First political evaluation January 2017
 Final approval June – Sept 2017
The local utility, Ringeriks-Kraft Nett AS, has permits and
ability to deliver up to 100 MW at the site within 12
months from order / investment decision.
O TECHNICAL PROPOSAL FOR 100 MW
A 2,6 km 22 kV cable can be constructed from the Follum
substation utilizing an idle 80 MVA transformer and
adjacent 80 + 60 MVA transformers to 100 MW capacity.
Power redundancy solutions can be provided as
indicated in the map to the right.
10 MW is already available at site to be provided during
construction.
O EXTENSIONS UP TO 300 MW
The power supply can be extended with an additional
200 MW by constructing a dedicated 132 / 22 kV substation at the site.
Such extensions will be established by the regional grid
operator (DSO / 132 kV) Glitre Energi Nett AS in collaboration with the national TSO Statnett SF (300 – 420 kV).
132 kV
80 MVA
132 / 22 / 5 kV
60 MVA
132 / 22 kV
22 kV
80 MVA
132 / 22 / 5 kV
New switchgear
New underground cables
80 MW
Overhead line / underground cables
20 MW
Hydroelectric
28 MW
Customer 100 MW
Hydroelectric
17 MW
Hydroelectric
6 MW
Connectivity
O
O DARK FIBRE MAP
Several dark fibre and wavelength carriers
are present at the Oslo Data Center Location
site or immediately adjacent to the site.
Easy Fibre is one of the companies present
with dark fibre capacity.
illustration / map: easyfibre.se
Ringerike
O
NATIONAL BUSINESS ENVIRONMENT
O THE MUNICIPALITY
OF RINGERIKE
adm. centre The town of Hønefoss
(19 000 inhabitants)
total area 1 970 km2
total population 43 000
country Norway
county Buskerud
Part of Oslo Business Region
O Norway is fully integrated in the EU single market by the European Economic Area agreement. National law is based on EU directives.
O Norway is a safe and business friendly country. According to the publication ”Ease of doing business 2014” from the IFC and World Bank, Norway ranks 7th among the 189 countries listed.
O The parliament holds a broad majority across the party spectrum in support
of the datacenter industry.
O The energy tax for datacentres is 0,0048 NOK / kWh, about 0,5 € / MWh,
the same as other strategic industries.
PUBLIC INFRASTRUCTURE
O Ringerike has large areas that are zoned for industry and a significant
local renewable energy generation
O Proximity to both Oslo City (60 km) and OSL, Oslo International Airport at
Gardermoen (70 km), ensures efficient access to workforce and supplies
O High quality hospital (9 km), police station (6 km) and fire department with
industrial capacity (8 km) all located in the vicinity of Oslo Data Center Location.
Ringerike
EDUCATION, SCIENCE AND RESEARCH
is a district in Norway,
O Norway has a vital and growing IT industry
O The University of Oslo is the largest and most diverse university in Norway
O The university campus in Hønefoss (University College of Southeast
consisting of the municipalities
Hole, Jevnaker and Ringerike
Norway) provides education and research locally
O Several secondary and vocational schools provide a highly competent and
dynamic workforce.
LOCAL GOVERNMENT
"In Ringerike we focus on facilitating for development and growth.
The district's mayors welcome new establishments to one of Norway’s
most expansive business regions. Basing your business in Ringerike
will give your company and employees great opportunities for
further growth and development."
ringerike kommune
mayor | Kjell B. Hansen
corporate partners
THE NORDIC
REGION
SWEDEN
FINLAND
NORWAY
Oslo International
Airport
RUSSIA
Oslo
ESTONIA
U.K.
NORTH
SEA
LAT VIA
DEN.
BALTIC
SEA
LITHUANIA
BELARUS
TECHNICAL / COMMERCIAL ISSUES:
BUSINESS / HOSPITALITY:
LOCAL GOVERNMENT:
Dr. Rolf Jarle Aaberg
Mr. Jørgen Moe Jr.
Mrs. Gunn Edvardsen
 (+47) 930 33 907
 (+47) 934 07 021
 [email protected]
 gunn.edvardsen@
ceo follum eiendom as
 (+47) 977 08 138

[email protected]
Postal address
ceo ringerike utvikling as/
director regional development
director general of
strategic development
ringerike.kommune.no
Oslo Data Center Location
C/O University College of
Southeast Norway,
PO BOX 164 Sentrum,
N-3502 Hønefoss
Mr. Pelle Gangeskar
Visiting address
Postal address
Visiting address
Visiting address
www.oslodclo.com
Follumveien 100,
N-3515 Hønefoss
chief business development
 (+47) 911 13 636
 [email protected]
Oslo Data Center Location
C/O University College of
Southeast Norway,
PO BOX 164 Sentrum,
N-3502 Hønefoss
Bredalsveien 14,
N-3502 Hønefoss
Postal address
Ringerike Kommune,
PO BOX 123 Sentrum,
N-3502 Hønefoss
Town Hall,
Osloveien 1,
N-3502 Hønefoss
Space Power Connectivity
o
o
o