LPM of Hydrochina Dawood

Transcription

LPM of Hydrochina Dawood
Cc
1:13 ‘tA
crawmgro
HYDROCHINA
HYDROCHINA DAWOOD POWER (PVT) LIMITED
At
.vt. FA. W.. Y7 =1""
18th Floor, B.R.R. Tower, Hassan All Street, Off : I.I. Chundrigar Road,
Karachi 74000 Pakistan. Tel: +92 21-35878240-41 Fax : +92 21-35878243
Email : [email protected]
December 5, 2014
HDPPL-1 (NEPRA-GL)/2014
The Registrar
National Electric Power Regulatory Authority
NEPRA Tower, Attaturk Avenue (East)
Sector G-5/1
Islamabad
c
Application Under Regulation 10 Read With Other Enabling Provisions Of The
Subject:
National Electric Power Regulatory Authority Licensing (Application & Modification Procedure)
Regulations, 1999 For Modification Of The Generation License No. WPGL/05/2006 Of
HYDROCHINA Dawood Power (Pvt) Limited.
1, Jiang Li, Company Secretary, being the duly authorized representative of HYDROCHINA
Dawood Power (Pvt) Limited by virtue of Board Resolution dated November 21, 2014 attached as
Annex 1, hereby apply to the National Electric Power Regulatory Authority for the grant of
modification of the Generation License No. WPGL/05/2006 to HYDROCHINA Dawood Power
(Pvt) Limited pursuant to Regulation 10(2) of the Licence Application & Modification Procedure
Regulations, 1999.
I certify that the documents-in-support attached with this application are prepared and submitted in
conformity with the provisions of the National Electric Power Regulatory Authority Licensing
(Application and Modification Procedure) Regulations, 1999 and undertake to abide by the
terms and provisions of the above-said regulations. I further undertake and confirm that the
information provided in the attached documents-in-support is true and correct to the best of my
knowledge and belief and have attached an affidavit in support as Annex 2.
A bank draft in the sum of Rupees 276,032/- being the licence modification application fee
calculated in accordance with Schedule 11 to the National Electric Power Regulatory Authority
Licensing (Application and Modification Procedure) Regulations, 1999 i5 also attached herewith.
Jiang Li
Company Secretary
Encl : As stated
Its much cheaper to save a watt than to generate a watt
Cava Emarav — Sava 144 emvItomootard
.,4414_e_x-
Cc
HYDROCHINA DAWOOD POWER (PVT) LIMITED
7 71c. IN 1
cruiopm
POWERCHINA
1
MIL
Nk,
18th Floor, B.R.R. Tower, Hassan Ali Street, Off : 1.1. Chundrigar Road,
Karachi 74000 Pakistan. Tel: +92 21-35878240-41 Fax : +92 21-35878243
Email : [email protected]
HYDROCHINA
EXTRACT OF THE RESOLUTIONS PASSED BY THE BOARD OF DIRECTORS OF
HYROCHINA DAWOOD POWER (PRIVATE) LIMITED ON NOVEMBER 21, 2014.
Mr. Wang Yongiang - Chief Executive and Mr. Jiang Li - Company
"RESOLVED THAT
Secretary are hereby authorized to file in person or through a duly appointed legal
council (i) an application for the grant and/or modification of a Generation License
including any review petitions; (ii) any documents in support thereof and/or to make any
oral/written representations on behalf of HYDROCHINA Dawood Power (Private )
Limited before the National Electric Power Regulatory Authority (NEPRA); and (iii) to
engage a legal counsel to represent the Company before NEPRA in relation to
Hydrochina Dawood Power (Private) Limited's 50 MW wind power project at Bhanbore,
District Thatta, Sindh, Pakistan and to undertake any matters necessary or incidental
thereto."
Mr. Wang Yongiang - Chief Executive and Mr. Jiang Li "FURTHER RESOLVED THAT
Company Secretary are also authorized to make the appropriate amendment in the
EPA and IA, if any and sign the supplemental /revise documents on behalf of the
Company.
Further Resolved that Mr. Tahir Mehmood, Deputy Company Secretary be and is
hereby authorized to issue the certified true copy of these resolutions for the submission
to NEPRA or any other Authority.
Certified that the above resolutions (i) were duly passed on November 21, 2014 in
Karachi at a meeting of the Board of Directors of Hydrochina Dawood Power (Private)
Limited at which a quorum of directors ware present; and (ii) have not been rescinded
and are in operation and that this is a true copy of the said resolutions.
CERTIFIED TO BE A TRUE COPY
Specimen Signature
Tahir Mehmood
Deputy Company Secretary
HYDROCHINA Dawood Power (Private) Limited
Zatgd: 0 5//2/ 20/1/
It's much cheaper to save a watt than to generate a watt
Sava &orgy — Sava Ma emvirommomi
Mr Jiang Li
Company Secretary
•
113 Eg
POWERCHINA
HYDROCHINA DAWOOD POWER (PVT) LIMITED
M
amougo
HYDROCHINA
FX
51r
18th Floor, B.R.R. Tower, Hassan Ali Street, Off : I.I. Chundrigar Road,
Karachi 74000 Pakistan. Tel: +92 21-35878240-41 Fax : +92 21-35878243
Email : [email protected]
Text Of The Proposed Modification Under Regulation 10 (2)(a) & The
Reasons For The Change Under Regulation 10 (2)(b) Of The Licensing
(Application & Modification Procedure) Regulations, 1999 For Modification Of
The Generation License Of HYDROCHINA Dawood Power (Private) Limited
(HDPPL).
Respectfully sheweth,
The text of the current Generation License to be modified has been struck
through and the proposed text has been written in red and attached hereto.
The full text incorporating the modified changes is further attached as Annex G.
1. Proposed Amendment
Page 1 of 1 line 5 :
timite' may be changed to "Limited" as per the attached Annex A.
Reasons For Amendment
Typo error.
2. Proposed Amendment
Page 9 of 12 of Schedule I, (Revised) Modification II
Page 9 of 12 may be deleted in its entirety and replaced by Annex "B" attached
hereto.
Reasons For Amendment
The proposed Interconnection Document is the latest updated study jointly
submitted to NEPRA in August, 2013 by NTDC and Power Planners
International.
3. Proposed Amendment
Pages 10 through 12 of Schedule I, (Revised) Modification II
Pages 10 through 12 may be deleted to the extent of the proposed mark-up in
red contained in Annex C.
It's much cheaper to save a watt than to generate a watt
Save emaroy — Savo Me &win:mom:at
Cc
113 g EPS
POWERCHINA
HYDROCHINA DAWOOD POWER (PVT) LIMITED
71t. fai FX 41/19K off
ammou
HYDROCHINA
18th Floor, B.R.R. Tower, Hassan Ali Street, Off : I.I. Chundrigar Road,
Karachi 74000 Pakistan. Tel: +92 21-35878240-41 Fax : +92 21-35878243
Email : [email protected]
Reasons For Amendment
The proposed amendments in Schedule I are due to the change of the
manufacturer and equipment from Goldwind to Mingyang. Literature on the
proposed Mingyang turbines to be used are attached as Annex D. The key
reasons for the changes being that these WTG's are widely used in the coastal
regions of China due to their high resistance to the corrosive salt wind air,
similar to the conditions found in the marshy land at Bhambore, Sindh. The low
voltage ride through LRVT is also particularly suited to the weak HESCO
network in the Gharo area and from the raw data from the site much higher
extreme wind conditions can be expected during the term of the Project and
the proposed new WTG MY1.5 MW-82 are the best Chinese WTG's capable of
standing up to extreme winds of up to 59.5 m/sec. A detailed study conducted
by Power China Xeibi Engineering Corporation in November, 2014 sets out a
detailed evaluation of these WTG's and can be found attached as Annex E.
4. Proposed Amendment
Page 2 of 3 of Schedule II, (Revised) Modification II
Pages 2 may be deleted to the extent of the proposed mark-up in red
contained in Annex F.
Reasons For Amendment
The proposed amendments in Schedule I are due to the change of the
manufacturer and equipment from Goldwind to Mingyang. Literature on the
proposed Mingyang turbines to be used are attached as Annex D. The key
reasons for the changes being that these WTG's are widely used in the coastal
regions of China due to their high resistance to the corrosive salt wind air,
similar to the conditions found in the marshy land at Bhambore, Sindh. The low
voltage ride through LRVT is also particularly suited to the weak HESCO
network in the Gharo area and from the raw data from the site much higher
extreme wind conditions can be expected during the term of the Project and
the proposed new WTG MY1.5 MW-82 are the best Chinese WTG's capable of
standing up to extreme winds of up to 59.5 m/sec. A detailed study conducted
by Power China Xeibi Engineering Corporation in November, 2014 sets out a
detailed evaluation of these WTG's and can be found attached as Annex E.
Yours sincerely,
Jiang Li
Company Secretary
HYDROCHINA Dawood Power (Private) Limited.
It's much cheaper to save a watt than to generate a watt
Sava energy — Save tlia eavirosuoind
A
National Electric Power Regulatory Authority
(NEPRA)
Islamabad — Pakistan
MODIFICATION
GENERATION LICENCE
WPGU05/2006
In exercise of the Powers conferred upon the National Electric Power
Regulatory Authority (NEPRA) under Section-26 of the Regulation of
Generation, Transmission and Distribution of Electric Power Act 1997, the
Authority hereby modifies the GeneraticiaiAippnce granted to
HYDROCHINA Dawood Power (Pvt.) .61mite (forrrierly Dawood Power
(Private) Limited (No. WPG1J05/2006 dated December 29, 2006 and
expiring on June 29, 2028), to the extent of changes mentioned as here
under:(i).
Name of the Licensee in the Original Face Sheet is changed
to HYDROCHINA Dawood Power (Private) Limited;
(ii). The Installed Capacity mentioned on the Face Sheet may be
read as 49.50 MW instead of 50.00MW;
(iii). The Expiry Date of the Generation Licence in the Original
Face Sheet is changed to June 29, 2034;
(iv). Changes in Articles of the Generation Licence as Revised
Articles of Generation Licence;
(v). Changes in Schedule-I attached as Revised Schedule-I; and
(vi). Changes in Schedule-II attached as Revised Schedule-II.
This Modification-II Is given under my hand this
Two Thousand & Thirteen
Registrar
v
ATikiay of June
FIGURE
#4:
Interconnection Schemes For Power Evacuation of
19 No. WPPs at Jhimpir Cluster Sr. 6 No. WPPs at Gharo/Bhambore Cluster
(STAGE - 4: With 220/132kV Jhimpir-New and 220/132kV Gharo-New Substations ) and 2x250MW WPP by NBT
HALA
A
I
LAKHRA
P/H
SAKRAND
DADU NEW
QASIMABAD-II
QASIMABAD
JAMSHORO
MATIARI
HALA
ROAD I
-- -TT
7
YAR
--
------
NKI
NBT
2X250 MW
TANDO
JAM
MIRPUR
KHAS
NEW
1Qkh
ZEAL
PAK C/F
T.P.S
1C
JHM-VVPP #14-15r71-1
1.4 --I-- 11,
JHM-WPP #10-11r -M---11 1,
Metro re8771-- 7. -1
-1 tl
„ It ,
Sachal 'rim-) " IIII11t Master
le---F"-Il i t
_
.
1
--)I t 1 ti..7.:-..-S
JHM-WPP #131--?...-lot
Le 7-'
JHM-WPP #12[:;:r.' I I " 11 FFCEL
,.,-' ,13 It; 1, II\
_,_ 1 I 'i 'III i
... 1.---L-...---, SapphireL4,
II1
n.3 1 I
1 1 II I
-- --,:-"5-) TGFP37
Le--1-, I illn
--.4_,
1I \ II I It I
-----'-----___\ I I \ \ II \
.., I-4-
K.D.A-33
10 MW
T.B.KHAN
20 MW_ KALU
KOHAR
D.B. C/F T-SONEX
MATLI
TALHAR
B.S.
KARIM
tilt; I
It
t 11
J 111
JHIMPIR
NEW t"\\\
11
1\
I1\
ES A C/F
T.M..KHAN
TANDO
BAGO
BADIN
-Le_ _I
WPP #16-19
THATTA
KADHAN
SUJAWAL
75km:
GOLARCHI
LADIUN
THATTA
C/F
220kV Jhimpir New Grid Station with 3x250 MVA 220/132kV T/Fs
//
PIR
PATHO
GHR-WPP
ZEPHYFF-7m-
// oi
_) \
/ / //////
////
/1/1
/
may/
//
/
///
1 , r__,,_ 7km _/ /
I, I Le,
_J- - - - - --) (
/
1'I FWEL-1
, L----4-71
L.4,
I-- ---k:L.-1 F
Le- TENAGA FWEL-II
DAWOOD,--7t______) \
-1\
H/CHINA Lef -tGHARO
\\
,._„,
\\'
Ntyv
V>-:\/
rr------
I
GHARO
CLUSTER
220kV Gharo New Grid Station with 2x250 MVA 220/132kV T/Fs
220kV Jhimplr New - T.M.Khan Road D/C T/L (70km)
220kV Gharo New - Jhimpir New D/C T/L (75km)
132kV T/Ls for Interconnection of WPPs with 132kV Jhimpir New (65km)
132kV T/Ls for Interconnection of WPPs with 132kV Gharo New (20km)
132kV Jhimpir New - T.M.Khan D/C T/L (82km)
Addition of 3rd 500/220kV 450 MVA T/F at 500kV Jamshoro
220kV D/C T/L for In-out of Jamshoro-KDA S/C at NBT WPP
ESTIMATED COST = 122 MUSD (STAGE - 3 & 4)
LEGEND
EXISTING
MIRPUR
SAKRO
GLSTN
T/L
PROPOSED
GLSTN
T/L
r
500kV
220kV
132kV
66kV
Power Plants
VI
r-71
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
Detail of
Generation Facility/
Wind Farmt
(A).
General Information
0).
Name of
Applicant/Company
(ii).
Registered/Business
Office
(iii).
Plant Location
Near Port Qasim, Bhambore, G1
District Thatta, Sindh
(iv).
Type of Generation
Facility
Wind Power
(B).
HYDROCHINA Dawood Power (Pvt.) Limite
/2/7, i /cc. , fi, k' 10' / (: ,,, ri fitZ Sit= ,t. /41/
I i
,
,
A,...t.t'i.,
,1-_ , i
A,- , ,,
• e e :, .• ; --;
,
-Karachi=74000,Pakistan
.
,
- - • •,;,::
P .'
o
Wind Farm Ca • acit & Confi • uratio
(i).
Wind Turbine type,
Make & Model
(ii).
Installed Capacity of
Wind Farm (MW)
..• •A5; . -:," ,'' .
••
t
•
IIIN,
e.
,Nt iy
ct
Drivc
a iy, A'1 , I,S/elii,--?
',
1,11P6'
09.50 MW,
Number of
Wind
Tu'r ins.
4
Units/Spe ,of.., each
Unit (MN
,
3 x 1.50MW
WindFurbine Details
'44k
,,,\
Tprbine
a
(i),
8thtity
411
33
(ii).
''Rated Power
1.5MW
(iii).
Number of Blades
3
ft-
As provided by HYDROCHINA Dawood Power (Pvt.) Limited
A1-11
(3
REGISTRAR
• ,-;7 77,-T-- ??,,
Page 10 of 12 of Schedule-1
Modification-11
6
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
(iv)
Diameter of Blades
82 m
(v).
Rotor Swept Area
5390m2
(vi).
Cut-in Wind Speed
3m/s
(vii).
Rated Wind Speed
11m/s
IC e( ) ))0
(viii).
Cut-out Wind Speed
22m/3
") 1; ),/..
(ix).
Survival Wind Speed 52.5m/s
(x).
Hub Height
-79m
(xi).
Rotational Speed
9-17.3 rad/s
(b).
Generator Capacity
(0.
i
Power Factor
Generators
(iii).
Rated Voltage
Quantity
(ii).
Voltage Lev
132
e
(e).
1500 kW
of 0.9k,
ct*
•
620
,
((/( V
33 ,
2kV
S bstation
*
-,,,:rx
Transformer
.0%
i
yy )
Compact Pre Fabrica edkSubstation
g.
..,
(i).
(d).
,)
Generator
(i).
(c).
I, '7, 4; >,)A
2
SZ10-40000/132 ,3civivA H2/2) kv(ivitA) IA/I/ A/
).WTGs Foundation
(i).
Quantity
33
(ii).
Type
Borehole pile
00.
Natural Foundation Offshore tidal f
Features
depth from 0
'
eNt ..:10* ro,
nd water at shallow j
to 1.08 q lensists of clay, nd q
1_, REUSTRAr-?
1611
:2_
Page 11 of 12 of SchediileModification-II
(I
'IC
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
fine grained sand.
(f).
Compact Pre Fabricated Substation Foundation
(i).
Quantity
33 Each
(ii).
Type
Shallow foundation on natural ground
iil
(iii).
II.
Offshore tidal flats with ground water at shat w
Natural Foundation
depth from 0.43m to 1.03m consists of clayka •
Features
fine grained sand.
(g).
Wind Resource
(11'
)0(r)-)
Annual
Average
7.05 m/s (-7-Gni height)
Wind Speed
(ii).
Prevailing Winds
\
(iii).
/. C. 324 PV/7
Annual Benchmark
130.13GWh
Energy
il
(D).
f'
\I
'S
\414.
‘QE
SW
Other Details
(i).
Project
Commissioning date
(Anticipated)
(ii).
Expected Life of the
Project from
Commercial
Operation date
(COD)
2616
June 30, 2014
20 Years
Page 12 of 12 of Schedule-I
Modification-II
4/19r-e >e
MINGYANG WIND POWER
PERFORMANCE BY NATURE
Mingyang 1.5MW Series Wind Turbine Generator
High Output Wind Turbine Generator
Ming Yang Wind Power Industry Group
01
The MY 1 r; Serer. Wind Tii-hirie Generator was iormiy develoried by pioneers in the riectr.r.. and wind turbine serions Miegong Eiechir and aerodyn neemesysteme (3mbH n 27(17 Win, mere
Pun 50 years of combined erpenerice .n electrical and wind turbine design great care was !alien rd ensure Met utmcst quality and attenbce went .rite even, e.t.a.. of the MY I 5 Series Wino Turbine
ittei,erat-e- Gei-inar sifre,Loyd S .SSU.ng !CAM ve,•'•ed erememaily tnat at cor.,cs1rx-nls ■
•1tie CY:4,7n of tr)3af a MY 1 5 MW WTG were In
to none The MY r 5 MA, WIG in designed to
Product Introduction
rcnmtions and lei...T.-v
7 iete come. vice The result is perion,
ance and quail
n alp w.nd regimes
03
piacranc re men
NW MI BEI 151 all
'too
Wind Turbine Structure
02
i— 71
_
Ma,nratiires
I 5 tot
51-11911oliii[12,
•
Hubcap
Pitch Bearing
Rotor Hub
■
An up wind three blades independent electrical pitch control
double fe0 variable-speed wind turbine generator
i Bearing Housing
Hydraulic Station
Offering multiple platforms like the MY1 5s rTypriooll Rated withstandeig
■
winds up to 70ms) MY1 See (Cold Weather Design opecaeng in temperatures
to -301.) MY1 5Su (withstanding exuenie low temperature to -45 1.1 and
MY 1 5Sh (high elevation attitude design operating above 4000m) MOM;
UUI CUSIOMVI lo apply renewable energy sokrbons to all climactic condierins
Main Shaft
Nacelle Crane
Gearbox Support Frame
■
Speualiy designed blade Uldlda.lutISIN,S optimize enter re per ha mai rue
in all wind regimes 1 he 1 5s typhoon rated wind turbine uses a 37 5m
blade while the 1 55e cold weather design uses a 40 3m blade
The 1 5 Series Wind Turbine out performs others rip to 10tt., meaning
more generated power for your investment
Hydr aulic Brake Assembly
• Shaft
S ha C
Coupling
upa
mln
stg
Generator
Weather
■
The two bearing design offers a more robust platform to reduce the
gearbox wear due to unplanned thrust and impact loads Protecting
the gearbox means more performance and life to the investment
I Slip Ring System
Control Cabinet
Generator Cooling Fan
■
Ming Yang Wind Power's commitment to (matey is second to none
Rigorous testing criteria goes in to every machine we se Each
Machine Is load tested before leaving Our factory by our tOp
engineers The result is superior performance at the customers site
■
A hermetically sealed nacelle option protects vital parts from corrosion
and wear Increasing the pressure in the nacelle above ambient keeps
elemental concerns outside the machine allowing for longer me and
better performance
Transformer
Wafer Cooler
04
V..finr1 Turbine
MP*6111111Pm
0.10,11.
AI&
Pcwde:
Curve.
MY,
D' , .Lfea:ed.
MY, 5. 62 town uove
'0- • 725ktve
The Mingyang wind turbines ware installed and put into operation at Zhantiang Xuwon Damaogi Duceun Tiering
Xiangyeng Shangdu. Memos! Oangxiaogou wind farms etc moreover. two of Mingyang wind turbines have
connected to the grid successfully at China s first offshore wind farm which located in intertidal zone
•At I
sprieelYs.yi
•
105
Main Data
Chrscnidion
Speciflcatann
Und
blYI.SSu
MYI5StI
I
Unit data
I., .•tt
4.4t..,4t..-- • ..'..-•1 40:.-..-..4,
'.--.Itt ..,,,. 4,r.::' e.r.:t• :1
,
..-
•
r-. •
•
•
1
I
1
'::4 r. : -7.
11-4F—.11.i.;..--•37.,
•
•_ ...•_• • .
• • .
1,,, lio-..; ■
; ,0. II ;•t- ' .'It
I r'
104.... :' ....404....:Iiii ...-tt.:41. ,..eilt I ••:...r.*,2 17 1
r•rov ,.,Irr- ...,.....? ,..ri,t.1.:r
, 7:-... 7",•••-,:',
1
1
.1 •
I
Rotor and blade
. --,r.i-..,-):::F
I ,.,,,t.,. ]: ....,-,1=
''
I
fq•-:•7;.....r1....-;_r
r. 10-. , e-'11..1.!
•_ ,-4 1-, :-- 1,7 '.
1 :7:ti:- ,,,,, r kr r ...1.4"..• ' I..:r -..? Iltry.'”.-1,4-t.t.
rr
-_.;..,--.-,1
kr.:.,-. o..,r i '1;113I1r:1 1. -.,- •-.
I ;_rr
i
I
1
F._ ,i..-; -. , - ,':-.1":ili-1-1 • ■
*-:
PA:I),
: •1 Litt
I
i
I
,., r,..,• 1-0.11.- '
-.-.I
I
F.• .rd-. r rr..1Lrr.:-.
•
.
.....7.
LW, .4, lid
1
I
I
I-
•
I
fr•-.1o,,1
....,...10-0•-.,--,r,-11', ,4 ....., -. ..p..- 45."4,1'', .
• N, I
•
•
1-4:)(.., :7, 61,,,,-;,,. :Jr. li Aro I ;.•,.,:F. !,..,...-.: ..... ,, t 1117,; !
■
i1.1
••• . 4-1)11.4.;4; ■
`:.:1-1., !1...1.. •■
.' ..o
. .r.'
Generator
7 ,1r.
F
1
V
Gairbox
F, 11::: 10.'71 r
1 *-01..
!
'',
I
1
I
.
ii-
•
! Ir.,
tg•■
•.t I
:;t1ttn
'A:
;
I
;CY ,'
system
▪
rret, 1-11:1
•):•0.
•i:
It' .:•■
•
•
Pitch ystein
Ire
t. •-,
Control system
.
,.-_-,,:, ■
._, .,1,1.--;i!1
I raw- '.: .
F
r
!
;
_ '41. r •qr., . l'r■
I •1-.7.-1
l'•-•:1- '■
.,.:.rc.:1•11.:r-rt-
I
I
' • /•III•
• Lightning protection
A.1%1r,
1-.• t.,011
• ,,,, r-,..it ir.”-r". iI•
I •1.:• ■
1,,,,I• .; roll --.•••......):,,-.., ,...
7
i
in t.- r r.7. .. .;-. Ti 14.';‘; ....... ' r.rr; , , nu re.'1, I,:
jt-'•
I ,-. I', . ..11- •11111-. .. : 1:1•• I : v.'. .II•.1•11" ..,:--"I .U..I■
-:
I
TOW'S'
•7-1•.. -.or rir,...-,1 Iell-fri, 1"
''
r1 I..., CI. . ;.11'; ,,
111; . •
te
.
I
••
t
:1t.1
t
...
..,:;' i, . 10011
eVelght
1'.1.1-, -.!: ::, .
• P: ;1.■
1..r,
4.f.
•
...II
Survival and Operation temperature
'X
1-
I
• f!-1
• *41:
t
••
•
4•11'.;
..-•
Although the wind power industry develops at a fast pace, low average wind speed and high maximum wind
speed in many regions around world makes it difficult to choose a suitable type for alt those different conditions
Besides, low utilization hour of most wind turbines causes high electricity cost from wind power generation
The MY1.5MW series wind turbines are specialty optimized to answer these challenges Large diameter rotor
increases the wind swept areas. which in turn improves power output even under low wind speed Reenforcement of certain components enables the MY1 5MW Series wind turbines to have higher equivalent
utilization hours, and it can survive and perform well even under complex climate conditions The MY1 5MW
Series wind turbine alms at market for turbines suitabte for lower average Wind speed and high maximum wind
speed We are striving to provide high quality, high efficiency, and high return wind turbines for domestic and
international wind power operators
Guangdong Ming Yang Wind Power Industry Group.,Ltd
Adciresstling Yana Industrial Park, Huoiu Road.National H—Tech Industrial
Devebprnent Zone, Znongshan, Guangdong, P R.China
Phone. +86 760 2813 8512
F s x : +86 760 2813 8511
HIlp://www.nlywinci.corr
Wind Turbine Evaluation Report
for
I IYDROCI-I INA DaN\ ood Power (P‘t) Ltd.
goo
*4
44
••
POWERCI [INCA XIBEI ENGINEERING CORPORATION LIMITED
November, 2014
lahoriied
Appro\ Ld
l)ong Uelan
Ji Chaoving
\Vei
'I
Veri ['KAI
1 Li Chan.u.. Wanu I laihtla t"*.ja-
i
Kai
31;;V:if
Ming Yang Wind Turbine Evaluation Report —November 2014
Contents
1.
Basic information of HDPPL Wind Power Project
1
2.
Preamble
1
3.
Objective
2
4.
Main Conclusions
2
5.
Short Introduction of Ming Yang MY1.5MW Series of Wind Turbines
2
6.
Salient Technical Features of MY1.5MW-82 WTG
3
6.1
Turbine Features
3
6.1.1 Doubly-fed induction generator
3
6.1.2 Double-bearing support structure
4
6.1.3 Gear box
4
6.1.4 Yaw system
5
6.1.5 Control system
5
6.1.6 Brake system
5
6.1.7 Bearing system
5
6.2
5
Grid adaptability features
6.2.1 LVRT Function
5
6.2.2 Grid adaptability
6
6.2.3 The power quality
6
6.3
Design Features for Corrosion Protection (specially salt mist prevention)
7
6.4 The high temperature operation feature
8
6.4.1 Pitch system
8
6.4.2 Drive train
8
6.4.3 Gear box
8
6.4.4 Generator
8
6.4.5 Nacelle control cabinet and tower base control cabinet
9
6.4.6 Inverter
9
6.4.7 Control scheme of safety and protection operation
9
6.5 Rigid tower design
9
6.6
Independent intellectual property right of control system
9
7.
Comprehensive analysis and evaluation
12
POWERCHINA XIREI ENGINEERING CORPORATION LIMITED
4
Ming Yang Wind Turbine Evaluation Report — November 2014
8 Annexure
8.1 MY1.5MW-82 Design Certification
8.2 MY1.5MW-82 Type Certification
8.3 Ming Yang WTGS Grid Adaptability Report
8.4 Ming Yang WTGS LVRT Test Report
8.5 Ming Yang WTGS Power Quality Report
8.6 Acoustic noise measurement report
8.7 MY1.5MW Product Brochure - International Version
8.8 Reference List
8.9 Customer tracking letters
ii
POWERCHINA XIBEI ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report—November 2014
1. Basic information of HDPPL Wind Power Project
HDPPL project is located in Pakistan's southern province of Sindh, southeast of
city Karachi. 80km from port Karachi, 55km from port Qasim, 5-6km form the
coastal line. Geographic coordinate: east longitude 67°28'12"---67°30'22", north
latitude 24°39'30"---24°40'58". Site area is tidal-flat area, about 6.6km2.The terrain
of the wind farm is flat, altitude is about 2.0m-5.0m, relative altitude difference is
about 3m. From wind farm to city Karachi is about 75km by national high way, the
road enter into the site is tidal-flat road, convenient in transportation.
The quality of the wind is good, prevailing wind is steady, wind source is worth to
develop as a wind farm.
The capacity of HDPPL wind farm is 50MW, consisting 33 sets of 1.5MW WTGS.
A new 132kV substation and monitoring center will be constructed. The whole
construction period is 18 months.
The location map of HDPPL wind farm is shown in figure 1.1
A ra bian
Figure 1.1 Location map of HDPPL Wind Power Project
2. Preamble
In June 2013, HYDROCHINA DAWOOD POWER (PVT) LIMITED (HDPPL)
had obtained the power generation license for a 50MW WPP with 33 Nos. 1.5MW
Goldwind WTGs.
Based on the new data available from HDPPL site near Gharo having inter-tidal
1
POWERCHTNA XIBET ENGINEERING CORPORATION LIMITED
-4e
Ming Yang Wind Turbine Evaluation Report — November 2014
environment and possible extreme wind conditions, a re-tendering for a suitable
WTG became necessary.
Further, in order to confirm that the new WTG meets the special environmental
condition of HDPPL site and to make sure that the new selected turbine can
provide a stable and safe performance for the term of the Project, HDPPL delegated
POWERCHINA Xibei Engineering Corporation Limited (hereafter "XIBEI") to
conduct an analysis of the WTGs available in the Chinese market.
After a three month in-depth research of the Chinese wind turbine manufacturers,
"XIBEI" experts and engineers decided that the WTG of Guangdong Mingyang
Wind Power Group Co. Ltd. is best suited to meet the HDPPL site and NTDC
network requirements. The XIBEI report submitted to HDPPL is being enclosed
for ready reference.
3. Objective
As required by HDPPL, XIBEI conducted an independent evaluation of
Guangdong Mingyang WTG Model MY1.5MW-82, to check its suitability based
on practical performance of several costal wind farms in China (including the wind
farms in Dongfang Gancheng, Hai'nan), operation at high temperatures and in high
salt mist conditions. Emphasis was also given to network compatibility and safety
requirements.
4. Main Conclusions
1) MY1.5MW-82 has the required design characteristic to withstand high
temperatures and corrosive costal area environment. The WTG has proven
performance capability in salt mist conditions similar to HDPPL site
conditions.
2)
MY1.5MW-82 meets all the NEPRA Grid Code requirements and IEC/NTDC
standards.
3)
MY1.5MW-82 has a robust design for extreme wind conditions which can be
expected in the coastal areas of Sindh during the term of the Project.
Based on above requirements, the selection of MY 1.5MW-82 for HDPPL is
appropriate.
5. Short Introduction of Ming Yang MY1.5MW Series of Wind Turbines
Ming Yang MY1.5MW series of wind turbines is a product jointly designed by
Ming Yang Wind Power Industry Group Company and the German Aerodyn,
based on state of the art technology.
2
POWERCHINA XIBEI ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report — November 2014
The MY1.5MW is specially designed for different wind and climatic conditions,
including salt mist, dust, typhoon, humidity, low temperature, high temperature,
and other harsh environments.
HDPPL wind farm will be supplied with MY1.5MW-82 wind turbine (rotor
diameter: 82m, hub height: 80m). This turbine is widely used in IEC Class III wind
regimes. As the main model of Ming Yang Wind Power Company, the
MY1.5MW-82 turbine has obtained the Type Certification from China General
Certification Center (CGCC).
In China MY1.5MW-82 has been extensively used in the coastal regions. Over
3000 MY1.5MW-82 units are currently installed and in operation.
1. Blades 2. Pitch bearing 3. Main shaft
4. Nacelle lifter 5. Gearbox
6. Braking system 7. Generator
8. Cooling system
9. Main frame
10. Collector Ring 11. Yaw bearing 12. Yaw drive 13. Rotor hub
6. Salient Technical Features of MY1.5MW-82 WTG
6.1 Turbine Features
6.1.1 Doubly-fed induction generator
MY1.5MW-82 is equipped with doubly-fed induction
generator-converter system which is widely used for megawatt-level
WTGs. The system is designed for high reliability, low noise and
enhanced grid adaptability. Converter size is 30% of the WTG rated
power.
3
POWERCHINA XTBEI ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report — November 2014
6.1.2 Double-bearing support structure
Double-bearing support structure is adopted. Auxiliary flexible
support is designed for the two torque arms of gearbox. Front bearing
as the floating end is designed to sustain radial load while the rear
bearing as the fixing end sustains axial load. Double bearings of main
shaft sustain and directly transfer bending moment, axial force and
radial force from rotor to rigid frame. Flexible support on torque arm
effectively reduces the impact of the whole system due to torque
variation while the gear box only bears partial weight and torque,
eliminating potential risk of step-up gear box fault and ensuring more
reliable operation of the gearbox.
6.1.3 Gear box
The gearbox is manufactured by Nanjing Gearbox Company (NGC)
which is the largest and best gearbox manufacture in China. Gearbox is
designed with two-stage planetary and one-stage parallel structure that
is connected to the main shaft (3017mm Length) with clamping
sheath. Gearbox torque arm is connected to frame with elastic
components, effectively reducing vibration and noise. Gearbox
high-speed shaft end is equipped with a braking device that is
connected to generator with a yaw-control coupler. The coupler is
equipped with torque limiter which is designed to prevent the gearbox
from being damaged when instantaneous peak torque hits the gearbox
in case of generator fault. The gear box support is designed in such a
way that it can take both axial and radial shifts and dissipate it without
causing internal damage.
4
POWERCHINA XIBEI ENGINEERING CORPORATION LIMITED
.4(
Ming Yang Wind Turbine Evaluation Report — November 2014
6.1.4 Yaw system
Four yaw motors accurately drive the yaw gear through a control
system. The yaw encoder keeps the yawing accurately thus
maximizing the use of wind energy and improving the efficiency of the
generator to ensure high energy output.
6.1.5 Control system
All of WTG functions are operated by control system that is provided
with operating system. Communication between nacelle control
cabinet and tower base control cabinet is performed via optic fibers.
WTG operation state, external environment and power grid etc. are
monitored by SCADA system that automatically processes WTG
operation data. Operation alarm signals are sent by the annunciater to
ensure safety of the WTG and its components. This minimizes the
WTG downtime and maximizes the machine availability.
6.1.6 Brake system
MY1.5MW-82 braking is performed by main and auxiliary brakes.
Main brake is operated on the principles of aerodynamics. Braking is
achieved through feathering. The auxiliary brake is a mechanical brake
which is installed on high-speed shaft of the Gearbox and is operated
by hydraulic system. The two-stage brakes ensure quick response, and
a safe, soft and reliable action.
6.1.7 Bearing system
MY1.5MW-82 is designed with elastic support connections at five
positions (i.e. wheel hub and electric control pitch system, gearbox and
stand, generator and frame, nacelle cover and frame, gearbox high
speed output shaft and generator input shaft). These configurations
maximally reduce WTG vibration and noise. The bearing selection is
optimized to take care of the axial & radial play.
6.2 Grid adaptability features
6.2.1 LVRT Function
Wind turbine should stay connected to the network and keep operating
following voltage dips caused by imbalances on any or all phases,
while the voltage measured at the HV terminals of grid connected
transformer should remain within the predefined limits.
5
POWERCHINA XIBET ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report - November 2014
MY1.5MW-82 is equipped with an excellent LVRT functionality. If the
voltage at the point of common coupling with the Grid remains above
the contour line shown below (figure 1), the wind turbine keeps
operating. If the voltage at the point of common coupling falls below
the contour line shown below (figure 1), the wind turbine is allowed to
trip.
a) The Wind turbine is able to ride through a voltage dip of 0.2 pu at
the generator terminals for 625msec. The Grid Code in Pakistan
asks for LVRT at 0.3 pu at the generator terminals for 180msec
only. The LVRT performance of MY1.5MW-82 WTG is very
much required for HESCO network at Gharo.
b) The voltage of the grid connecting point recovers to 90% of the
rating voltage in 2s after a drop and the wind turbine is able to
keep operating.
- voltage dips caused by short-circuit
keep
operati on
t4-T-
Time
wind turbines
are allow to cut —
out
—
—
( ,)
Figure 1: Accomplishing stability in weak grids.
6.2.2
Grid adaptability
When the voltage at the point of common coupling with the grid has a
deviation between -10% to +10%, wind turbines will keep operating
normally. When the deviation is above +10%, the wind turbines will
keep operating for at least 30min. When the voltage at the point of
common coupling is 90% of the rated voltage, the wind turbines will
meet the LVRT requirements.
6.2.3 The power quality
The power quality of MY1.5MW-82 meets the requirement of
IEC61400-21 standard. (The reports are shown in the annex No8.5.)
6
POWERCHTNA XIBEI ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report — November 2014
6.3 Design Features for Corrosion Protection
(specially salt mist prevention)
(1)
HDPPL WPP is located in a coastal area. The geographical conditions
lead to a high air humidity and salt concentration in the area. To
overcome corrosion, all the components used in MY l .5MW-82 are
coated with corrosion resistance paint.
(2)
Various anti-corrosion technologies are used for various parts
including blades and towers during the WTG manufacturing. Hot dip
galvanizing, thermal spray, zinc composite anticorrosion coating and
Dacromet treatment are accordingly adopted.
(3)
The electrical equipment is specially designed to resist salt mist
corrosion. Stainless steel cabinet in 1P54 design is used to house the
pitch system. The cabinet is provided with a radiator fan and heating
element as well as temperature and humidity transducers. The heater
and radiator fan can be regulated by setting relevant parameters to
eliminate interior humidity and prevent salt mist corrosion.
(4)
The generator enclosure is in IP54 design, while, air/air cooling mode
is applied for the generator during which the internal cycle is
completely isolated from the environment and the heat in the generator
is dissipated through external cycle. The cooling mode can effectively
protect the generator rotor and interior components from salt mist
corrosion. All internal control circuit boards of the transducer are
applied with coating which is of good salt mist corrosion resistance.
The minimum IP grade of the control cabinet is IP54. The control
cabinet is provided with heater element and radiator fan as well as
temperature and humidity transducers.
(5)
As for components and parts requiring short-term corrosion protection
during storage and transportation process, the surface of components
and parts is applied with preservative oil (wax) or lubricant grease. In
addition, the surface without anti-corrosive treatment shall be wrapped
up with antirust membrane (preservative film or anti-tarnish paper to
enhance the corrosion resistance of components and parts during
storage and transportation process. Measures mentioned above can be
used as short-term protection for components and parts surface without
corrosion protection painting during storage and transportation process
of the WTGS.
Ming Yang has special knowledge in corrosion prevention gained from
its extensive offshore experience.
POWERCHINA XIBEI ENGINEERING CORPORATION LIMITED
4
Ming Yang Wind Turbine Evaluation Report — November 2014
6.4 The high temperature operation feature
The ambient temperature range of MY1.5MW-82 is from -10 Deg C to 40 Deg
C. From 40 Deg C to 45 Deg C, the WTG can operate with reduced output. The
survival temperature range of MY1.5MW-82 is form -20 Deg C to 50 Deg C.
The temperature control zone of MY1.5MW-82 can be divided into three parts:
hub, nacelle and tower base. It is further divided into nine subsystems. The
detailed design requirements and schemes are as below.
6.4.1
Pitch system
For high temperature operation, the pitch system of MY1.5MW-82
model has additional cooling fan to prevent high temperature damage
to the electrical components. Dehumidification system also is provided
to prevent high humidity damage. The operation range of pitch system
is as below.
Operation temperature range
-10 °C to + 45 °C
Storage temperature range
-20°C to + 50°C
average humidity density
85%
Max. humidity
95% (condensation)
6.4.2 Drive train
The temperature control of main shaft bearings is achieved by grease
lubrication. The seal system of the main shaft bearings of
MY1.5MW-82 is optimized to fulfill high temperature operation
requirement. Suitable grease is also chosen for lubrication.
6.4.3 Gear box
The heat dissipating surface, the air flow and motor power are
increased to improve the gearbox cooling efficiency.
6.4.4 Generator
Air to air cooler is used in the generator. The air flow is speeded to
improve generator cooling efficiency by increasing the power of fan
motor. In addition, the central lubrication system is provided for the
8
POWERCHTNA XTBEI ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report—November 2014
rotor shaft bearings.
6.4.5 Nacelle control cabinet and tower base control cabinet
A/C is used in both nacelle and tower base control cabinets to reduce
the temperature.
6.4.6
Inverter
The max. ambient temperature of the inverter (located at the tower base)
for the HDPPL project is 45 Deg C.
6.4.7 Control scheme of safety and protection operation
Control scheme of safety and protection operation of MY1.5MW-82 is
designed to fulfill the HDPPL site requirements.
6.5 Rigid tower design
Rigid tower design has been adopted for MY1.5MW WTG. This design has
high intrinsic frequency which avoids the rotating frequency and the flap wise
frequency of the blade. The rigid tower can avoid the tower resonance without
changing the rotating speed, therefore, it extends the operation speed range of
the generator and keep optimized tip speed ratio and maximum Cp within the
whole operation range of the generator. The power generation efficiency and
production of the WTG /wind farm can thus be maximized.
Ming Yang tubular tower has complete safety protections for human beings.
The tower is designed to suit all adverse site operating conditions.
6.6 Independent intellectual property right of control system
Ming Yang owns the IP rights of the entire control system including the source
code. This advantage allows the engineers to adjust and optimize the wind
turbine parameters according to the wind regime and weather conditions,
improving the overall wind power efficiency by maximizing the power
generation efficiency of the wind farm.
9
POWERCHINA XIBET ENGINEERING CORPORATION LIMITED
A/e
Ming Yang Wind Turbine Evaluation Report — November 2014
Table 6.1 MY1.5MW-82 Technical Parameters
Technical description
MY 1.5/82
Rated power (kW)
1500
Rotor diameter (m)
82
Hub height (m)
80
Rated wind speed (m/s)
10.8(Standard)
Cut-in speed (m/s)
3
Cut-out speed (m/s)
25
Power adjustment
Speed regulation through variable pitch
Generator
Double-fed induction generator
Operation temperature
-10—+45°C
Anti-salt mist design
Available
Tower weight
(Foundation
ring
not
140.834 tons
included)
12.965 tons
Foundation ring
Extreme wind speed (m/s)
(m/s)
IEC Class
59.5
IEC Class S
Notes: the air density is 1.17/m3
10
POWERCHTNA XIBEI ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report — November 2014
Chart 6.1 Power Curve MY1.5MW-82
Power curve MYI.5-82
( p=1. 225kg/m3 )
1800
1500
1200
900
600
300
0
0. 0
5. 0
1. 0.0
15. 0
20.0
25. 0
Vwind (m/s)
Chart 6.1 Thrust Curve MY1.5MW-82
Thrust coefficient MY1.5-82
p =1. 225kg/m3 )
1. 200
1. 000
0. 800
:a:,
0. 600
<7.)
O. 400
8
E.
O. 200
0. 000
0. 0
5. 0
15. 0
10.0
Vwind (m/s)
20. 0
25. 0
11
POWERCHTNA XTBET ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report — November 2014
7. Comprehensive analysis and evaluation
MY 1.5MW-82 is a upwind, variable pitch controlled, equipped with doubly-fed
induction generator-converter system which was jointly developed by Ming Yang
and Aerodyn of Germany.
MY1.5MW-82 equipped with 82.6m rotor diameter, 80m hub height, the range of
rotation rate is from 9.7-19.5rpm, rated rotation rate is 17.4rpm, 5320m2 wind
swept area, rate rotation rate is 10.5m/s, cut in wind speed is 3m/s, cut out wind
speed is 25m/s, survival temperature form-20 Deg C—+50 Deg C, operation
temperature from -10 Deg C^+45 Deg C and the design life span is 20 years.
MY1.5MW-82 meets the IEC-61400-1 standard and also conducted a grid
adaptability test, including voltage deviation, frequency deviation, three-phase
voltage and harmonics. The results show MY 1.5MW-82 meets all the
interconnection requirements.
During the evaluation process, a study of several costal wind farms has been
conducted which also includes a case study of Dongfang Gancheng Wind Farm in
Hai'nan Province. (an area having similar environmental conditions like HDPPL
Wind Farm.) It shows that the Dongfang Gancheng Wind Farm has a excellent
performance in power generation, operation and maintenance, which also
experienced the Typhoon Rammasun (the strongest typhoon in southern China in
41 years) during the summer this year (2014). It shows that the Dongfang Wind
Farm has a outstanding performance comparing to the other similar wind farms in
China. Therefore, it concludes that MY 1.5MW-82 is suitable for hostile conditions
such as typhoons, high temperature and salt mist, having a capability of survival in
a 50 years extreme wind speed of 59.5m/s at hub height 80m.
MY1.5MW-82 has a good power generation track record because of its mature
technology specially in coastal areas in China similar to the conditions of HDPPL
wind farm. It has the design characteristics for high temperatures, coastal and
anti-salt mist, which is a suitable design for HDPPL Wind Farm.
Based on the conditions above MY 1.5MW-82 is appropriate for HDPPL wind
farm.
12
POWERCHTNA XTBEI ENGINEERING CORPORATION LIMITED
Ming Yang Wind Turbine Evaluation Report — November 2014
8 Annexure
8.1 MY1.5MW-82 Design Certification
8.2 MY1.5MW-82 Type Certification
8.3 Ming Yang WTGS Grid Adaptability Report
8.4 Ming Yang WIGS LVRT Test Report
8.5 Ming Yang WTGS Power Quality Report
8.6 Acoustic noise measurement report
8.7 MY1.5MW Product Brochure - International Version
8.8 Reference List
8.9 Customer tracking letters
13
POWERCHINA XIBEI ENGINEERING CORPORATION LIMITED 20
..4{/
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
SCHEDULE-II
(Revised)
Modification-II
al Annual Full
The Total Installed/Gross ISO Capacit
G) Availability,
Load Hours, Average Wind Turbine Ge
cility/Wind Farm (in
Total Gross Generation of the Gewatto
Availability Losses
GWh), Array & Miscellaneous Los,Ses,
(GWh), Balance of Plant Losses (04/h) and Annual Energy
Generation (GWh) of the Cpeneration FaCility /Wind Farm of Licensee
is given in this Schedule
Page 1 of 3 of Schedule-II
Modification-II
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
SCHEDULE-II*
1.
Total Installed Gross ISO Capacity of the 49.5 MW
Generation Facility /Wind Farm (MW/GWh)
it
2.
Total Annual Full Load Hours
3.
Average Wind
Availability
4.
Total Gross Generation of thez,iGenertioil 41387trsvith_
Facility/Wind Farm (in GWh)
Turbine
,,,
2641,ra
Generator
WT .Q
6 ?).-')i-11-
'6-,,,
5, 0/0
5.
Array & Miscellaneous Lbss,eS:G
-7 MIL
23 , Ik; (
G.35GWh
6.
Availability Losses GWh
/2, 92(7k1/114.
1-278Wiv
67.
7.
8.
9
BalaNe o rPlan
An
r
aIJ'E
v -,,,
EP) GWh
656 kVA,
9752.Gw4
sSes GWh
,,
apacity Factor
As provided by HYDROCHINA Dawood Power (Pvt.) Limited
3o. 3
eneration (20 year equivalent
1
30.01 ok
ri§)
RaG1STRAR
Page 2 of 3 of Schedule-II
Modification-II
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
Detail of
Generation Facility/
Wind Farm
(A). General Information
1.1
‘11 *
..
OIL
Name of
Applicant/Company
Registered/Business
Office
(iii ) .
Plant Location
)
(iv '
Type of Generation
Facility
HYDROCHINA Dawood Power (Pvt.) Limited
18° Floor, B.R.R. Tower, Hassan All Street, off: I.I.
Chundrigar Road Karachi 74000
Near Port Qasim, Bhambore, Gharo Creek
District Thatta, Sindh
Wind Power
(B). Wind Farm Capacity & Configuration
(i).
(ii).
(iii).
Wind Turbine type,
Make & Model
Installed Capacity of
Wind Farm (MW)
Number of
Wind Turbine
Unit/Size of each
Unit (MW)
Type 3, Ming Yang, MY1.5MW-82
49.5MW
33 x 1.50MW
(C). Wind Turbine Details
(a).
Wind Turbine
(i).
Quantity
33
(ii).
Rated Power
1.5MW
(iii).
Number of Blades
3
-4
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
(iv).
Diameter of Blades
82 m
(v).
Rotor Swept Area
5390m2
(vi).
Cut-in Wind Speed
3m/s
(vii).
Rated Wind Speed
10.8m/s
(viii)
Cut-out Wind Speed
25m/s
(ix)
Survival Wind Speed
59.5m/s
(x)
Hub Height
80m
(xi)
Rotational Speed
9-17.3 rad/s
(b).
Generator
(i)
Generator Capacity
1500 kW
oil
I
Power Factor of
Generators
0.982
(iii)
Rated Voltage
690V
(c).
Compact Pre Fabricated Substation
(i)
Quantity
33
(ii)
Voltage Level
22kV
(d).
132kV Substation
(i)
Main Transformer
2
(ii)
Type
50MVA 132/22 KV ONAN WITH OLTC
(e).
WTGs Foundation
(I)
Quantity
33
(II)
Type
Borehole pile
oil
(iii)
Natural Foundation
Features
Offshore tidal flats with ground water at shallow
depth from 0.43m to 1.03m consists of clay and
fine grained sand.
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
(f).
Compact Pre Fabricated Substation Foundation
(I)
Quantity
33 Each
(II)
Type
Shallow foundation on natural ground
ow
Natural Foundation
Features
Offshore tidal flats with ground water at shallow
depth from 0.43m to 1.03m consists of clay and
fine grained sand.
'
(g).
Wind Resource
(I)
Annual Average
Wind Speed
7.05 m/s (80m height)
(II)
Prevailing Winds
SW
III
Benchmark
'
Energy
130.33GWh
(0). Other Details
(i).
(ii).
Project
Commissioning date
(Anticipated)
Expected Life of the
Project from
Commercial
Operation date
(COD)
June 30, 2016
20 Years
Generation Licence
HYDROCHINA Dawood Power (Pvt.) Limited
Near Port Qasim-Bhambore
Gharo Creek
District Thatta
Sindh
SCHEDULE-II
1'
Total Installed Gross ISO Capacity of the Generation
Facility / Wind Farm (MW/GWh)
49.5 MW
2.
Total Annual Full Load Hours
2633 Hrs
3.
Average Wind Turbine Generator (WTG) Availability
95%
Total Gross Generation of the Generation
Facility/Wind Farm (in GWh)
175.86 GWh
5.
Miscellaneous Losses GWh (Wake, Turbulence)
23.46 GWh
6.
Availability Losses GWh
12.42 GWh
7.
Balance of Plant Losses GWh
9.65 GWh
Annual Energy Generation (20 Year Equivalent Net
AEP) GWh
130.33 GWh
Net Capacity Factor
30.06%
•
9.
Cc
El)
POWERCHINA
woverNIE
HYDROCHINA
HYDROCHINA DAWOOD POWER (PVT) LIMITED
,
Kb. /ffli
X.
7 581. FA 42: le
ft 111
18th Floor, B.R.R. Tower, Hassan All Street, Off : I.I. Chundrigar Road,
Karachi 74000 Pakistan. Tel: +92 21-35878240-41 Fax : +92 21-35878243
Email : [email protected]
A Statement Of The Impact On The Tariff, Quality Of Service And The
Performance By The Licensee Of Its Obligations Under The License Under
Regulation 10 (2) (c) Of The NEPRA Licensing (Application & Modification
Procedure) Regulations, 1999.
Respectfully sheweth,
The Project is an upfront wind tariff project and therefore assumes the wind
risk of any decline in output. No adverse impact on the tariff is foreseen by the
change in equipment rather the assumption of wind risk by the power producer
will facilitate a move towards market based mechanisms & away from public
subsidies given in the cost plus tariff. Payment being only for electricity
produced is the proper way forward for the electricity sector in Pakistan. Both
the quality and the performance of the licensee is expected to improve with the
proposed induction of the new wind turbines from Mingyang MY1.5 MW-82
which are widely used in the coastal regions of China due to their high
resistance to the corrosive salt wind air, as found in the marshy land at
Bhambore, Sindh. The low voltage ride through LRVT is also particularly suited
to the weak HESCO network in the Gharo area and from the raw data from the
site much higher extreme wind conditions can be expected during the term of
the Project and the proposed new WTG MY1.5 MW-82 are the best Chinese
WTG's capable of standing up to extreme winds of up to 59.5 m/sec. A detailed
study conducted by Power China Xeibi Engineering Corporation in November,
2014 sets out a detailed evaluation of these WTG's and can be found
attached as Annex E to s10 (2) (b) reasons in support.
This change of equipment is also reasonably necessary to ensure the
continuous, safe and reliable supply of electric power during the license period
to the consumers keeping in view the financial and technical viability of the
licensee. The tariff will not be changed, the quality will be improved and there
will not be any adverse effect the performance by the licensee of its obligations
under the License and is likely to be beneficial to the consumers.
Dated: 05.12.2014