Contents ƒ Introduction ƒ Company Information ƒ Management Structure ƒ Work Profile ƒ Annual Turnover ƒ Sustainability Policy ƒ Health & Safety Policy Statement ƒ Contract Types ƒ Insurance Details ƒ Training Statement ƒ Accreditations ƒ Referees ƒ Appendices (Examples of Experience within Relevant Sector) Introduction We would like to take the opportunity to introduce Performance Electrical Ltd. We are a team of enthusiastic engineers determined to deliver the best service on time catering to various organisations, large and small. Established in 1978, we are currently the largest electrical contractor in Bury and one of the leading contractors in the North West. Under the directive of it’s principals, the company has risen to it’s current stature and we directly employ ten staff and approximately fifty operatives including ten apprentices. Over 60% of the management and operatives have been with the company for over ten years. The success of the company is a measure of the quality and craftsmanship which it applies to all works, large or small. We are pleased to boast that we are on many commercial frameworks and have a number of partnership schemes in place, with local authorities and main contractors, universities, colleges etc. Please take a moment to peruse the enclosed documentation. Signed: Michael Corris Managing Director Date: 30th June 2011 Company Information Name: Performance Electrical Limited Address: 123 Radcliffe Road Bury BL9 9LD 0161 797 3476 0161 764 2903 Website: www.performanceelectrical.co.uk Directors: Michael Corris (Managing) Darren Jones Company Reg. No: 01404578 9271756 06 51210 90075 001 Tel: Fax: VAT No: Unique Tax Reference: Bankers: Barclays Bank Plc 1 Central Street, The Rock Bury BL9 0JN RSM Tenon Clive House Clive Street Bolton BL1 1ET Legal Advisors: Kippax Beaumont Lewis 28 Mawdsley Street Bolton BL1 1LF Insurance Brokers: Jelf Manson Kabel House 15 Quay Street Manchester M3 3HN Auditors: Operational Structure Work Profile Performance Electrical has become a highly successful company and is recognised by a string of high profile organisations putting the company’s best assets to use. The main business activity is to provide electrical engineering and contracting services (and more recently Mechanical Services) to the commercial and industrial markets, these include: Since April 2008, we have focused on a variety of changes and would like to raise your awareness to the services that we provide. Although North West based, Performance Electrical is by no means local. The company’s depth of field is called upon Nationally and provides an invaluable service to the Industry. We have carried out mechanical contracts internally, but we have also sub‐contracted major projects to suit our client’s needs. In house we employ a mechanical engineer as a contracts manager who is qualified with a building services degree. We undertake a whole range of electrical associated installations in values ranging from £100 ‐ £2million. In many cases included the following installations; Distribution, Lighting, Small Power, Fire Alarms, Emergency Lighting, Earthing, Periodic Inspections, Testing & Commissioning, Intruder Alarms, CCTV, Door Access, External Lighting, Public Address, Class Change, Class Registration Systems, Air Conditioning, Ventilation. Annual Turnover Sustainability Policy This policy sets out the framework for the implementation of sustainability across the company. This framework, and associated strategy, is based around three main areas; Profitable Markets, Healthy Communities and Environmental Limits. Performance Electrical Limited (PEL) believe that these three spheres are interconnected and by undertaking a collective approach, our sustainability objectives will be embedded throughout the business and beyond our customers, suppliers and stakeholders. We are committed across the company to continued progress in the following target areas: ƒ
Customers – Ensuring that sustainability deliveries are understood and managed throughout all projects. ƒ
Influence – Taking the lead in influencing industry and our customers by incorporating within project budgets, sustainable and innovative solutions into our designs, project sites and workplaces. ƒ
Our people – Work towards our Zero Harm targets and increase employee engagement, through providing learning opportunities, valuing diversity and developing our personnel. ƒ
Values – Implementing the PEL values programme throughout the business. ƒ
Our Supply Chain – Working in partnership with all our suppliers and sub‐contractors to drive sustainability objectives throughout the entire supply chain. ƒ
The communities we serve – Playing an active role in charitable giving and building long‐term partnerships with the communities in which we operate. ƒ
Environmental impacts – Preserving the environment by managing our activities in order to minimise the risk of pollution, energy use, waste, water, materials and nuisance to neighbours and ecology. The PEL Management Team has agreed and committed to this policy. In addition, they will determine associated objectives and the PEL Sustainability implementation plan and will ensure that regular review is undertaken. The Sustainability Management Team is responsible for driving the implementation and monitoring of the PEL sustainability strategy and closing the loop by feeding progress back to the Management Team. M.A.CORRIS IEng MIET Managing Director Health & Safety Policy Statement ƒ
It is our policy to perform work in the safest practicable manner, consistent with good practice. The health, safety and welfare of our employees and all those likely to be affected by our operations is the responsibility of management, and as a priority it ranks equally with our business objectives. Adequate resources will be made available to ensure the success of this policy. ƒ
It is the duty of management to provide safe systems of work and do everything practicable to prevent injury and ill health by controlling the risks arising out of our work activities. Equally it is the duty of each employee to exercise personal responsibility for his or her own safety and that of others and co‐operate with his or her employer in matters of health, safety and welfare. ƒ
The company will provide and maintain safe plant and equipment and ensure the safe handling and use of hazardous substances. Management will provide the necessary information, instruction and training and will ensure the competence of all employees and contractors. ƒ
All employees are to be aware that, in the event of any conflict between the demands of business and safety, they will receive management support if they reasonably choose the safety of employees or third parties as the priority. ƒ
It is our policy to adhere completely to the requirements of the Health and Safety at Work etc. Act 1974; the Electricity at Work Regulations 1989, the Management of Health and Safety at Work Regulations 1999; the Construction Regulations and all other Acts, Regulations and Codes of Practice, which affect our operations. ƒ
The attention of all employees is directed to this Safety Policy and its Appendices. Any revisions will be incorporated when necessary, and these will also be brought to the attention of all personnel. Signed by the Executive with Overall Responsibility for Health & Safety: Michael Corris Managing Director Date: 30th June 2011 Contract Types Forms of Contract we have worked on in the past. We participate in numerous pre‐qualification questionnaires in order to be added to commercial frameworks and partnership schemes with local authorities and main contractors. Our client base includes but not limited to:‐ ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
NHS North West Consortium Ministry of Defence Manchester Schools for the Future Urban Vision Rochdale MBC Metropolitan Borough of Bury, Regeneration Department Oxfam, Oxfam Surveyors Office Wigan Council NPS Stockport NPS Wigan Manchester City Council Lancashire City Council Salford Diocese Bury College Manchester University Framework Salford University Framework Insurance Details Training Statement Performance Electrical Limited recognises that its most important resource is it workforce and is committed to providing continuous training and career development opportunities to improve the skills of all employees. The company aims to ensure that all employees are given the necessary help to develop the knowledge and skills that they require to carry out their work efficiently and safely and to therefore provide a specialised and high quality service to our client base. The company will comply with the following statements: •
Provide Induction Training to all new Employees joining the company. •
Monitor individual performance and on‐going training requirements as part of the Company Appraisal Programme. •
Maintain records of all Employees in the form of a Training Matrix. •
Monitor training requirements and objectives and revise as necessary in order to meet the changing business needs. •
Provide adequate financial and physical resources to enable statutory requirements to be met. The Company Directors are responsible for ensuring total management commitment to continual performance improvement and will ensure this policy is reviewed annually or whenever legislative requirements dictate. Signed: Michael Corris Managing Director Date: 30th June 2011 Accreditations Referees NHS Sector Client / Company Name Contact Name Contact Number Contact Address Value of Works Commercial Sector Client / Company Name Contact Name Contact Number Contact Address Value of Works Education Sector Client / Company Name Contact Name Contact Number Contact Address Value of Works Industrial Sector Client / Company Name Contact Name Contact Number Contact Address Value of Works Leisure Sector Client / Company Name Contact Name Contact Number Contact Address Value of Works Living Sector Client / Company Name Contact Name Contact Number Contact Address Value of Works Galliford Try Construction Neil Peagram
[email protected] 01925 881 900 Innovation House, Daten Park, Birchwood, Warrington WA3 6UT £1.85million (2009)
Higham Construction Ltd Colin Higham
[email protected] 0161 928 7171
2nd Floor, 1 Ashley Road, Altrincham, WA14 2DT
£300k (2008)
Bury College
Eva Ainscough
[email protected] 0161 280 8280
Bury College, Woodbury Centre, Market Street
Bury, BL9 0BG £50k (approx per annum) Russells Ltd
Jonathan Rhodes
jrhodes@russells‐construction.co.uk 0161 868 4310
13 Westpoint Enterprise Park, Clarence Avenue
Trafford Park, Manchester, M17 1QS £450k (2009)
H.H. Smith & Sons Limited Rob Smith [email protected] 0161 280 3509
Smith’s Yard, Rear of 95 Bury Old Road
Whitefield, Manchester, M45 7AY £500k (2009/10)
John Turners & Sons Ltd Robert Day
[email protected] 01772 794 830
Suite 7A, Trafford Plaza, Seymore Grove, Old Trafford, M16 0LD £680k (2008)
APPENDICES OF EXPERIENCE WITHIN RELEVANT SECTOR EDUCATION SECTOR EDUCATION SECTOR STATEMENT OF CAPABILITY AND EXPERIENCE RECENTLY COMPLETED PROJECTS Project Value
Duration
Main Contractor
WOODLAND C.P. SCHOOL, HEYWOOD, ROCHDALE 975K 6 MONTHS SANDBROOK C.P. SCHOOL 235K 6 MONTHS RAVENSFIELD SCHOOL 450K 18 MONTHS ST. PETER’S R.C. PRIMARY SCHOOL 347K 10 MONTHS ST. CHRISTOPHER’S SCHOOL 253K 7 MONTHS STOCKPORT MBC PROSPECT VALE SCHOOL 198K 4 MONTHS TURTON HIGH SCHOOL ARTS AND MEDIA CENTRE 250K 6 MONTHS ST. PETER AND ST. PAUL R.C. HIGH SCHOOL, LIVERPOOL R.C. DIOCESE 555K 9 MONTHS PARRENTHORN HIGH SCHOOL 670K 6 MONTHS RIBBLE DRIVE SCHOOL 120K 3 MONTHS BLUECOATS SCHOOL, OLDHAM 110K 6 MONTHS CARDINAL LANGLEY SCHOOL 2 PHASES 260K 3 MONTHS BROADFIELD SCHOOL 110K 4 MONTHS GALLIFORD TRY CONSTRUCTION BIRSE CONLON CONSTRUCTION LIMITED MORGAN ASHURST PARKINSON CONSTRUCTION LTD PERFORMANCE ELECTRICAL LIMITED ALLENBUILD NORTH WEST LIMITED KIER NORTH WEST LIMITED CRUDEN CONSTRUCTION LIMITED H.H. SMITH & SONS H.H. SMITH & SONS ROCHDALE MBC BARNES CONSTRUCTION SHAWCLOUGH C.P. SCHOOL 120K 2 MONTHS G.E. GRIFFITHS Parrenthorn High School
The £7.5M Scheme included both a
New 2 Storey Extension and
refurbishment programme of existing
Secondary School predominantly
throughout the Summer Shutdown of
2008. The school remained occupied
at all times and the programming of
the many phases was critical to the
schools day to day operation. The
Electrical Services installation
consisted new Mains Upgrade,
Intelligent Lighting Schemes for energy
Efficiency, Cat 6 Cabling
System, and full Security Package.
Contract Title
-
Parrenthorn High
School, Prestwich
Contract Duration
-
48 Weeks
Value
-
£670k
Main Contractor
-
Cruden
Construction
Consultant
-
Martin Mulryan
& Associates
www.performanceelectrical.co.uk Ravensfield Primary School
A new build, 2 storey primary
school in Dukinfield, Manchester.
The scheme consisted, Mains
Distribution, Lighting and Control
Systems including Daylight Sensing
and Absence Detection,
Comprehensive Sound Systems,
Security Systems, Fire Alarm
System, and CAT6 Data Cabling.
Due to delays in the ground, we had
to assist Conlon’s re-programme all
M&E services to achieve Target
Completion.
Contract Title
-
Ravensfield Primary
School
Contract Duration
-
50 weeks
Value
-
£450k
Main Contractor
-
Conlon Construction
Consultant
-
Halcrow Yolles
www.performanceelectrical.co.uk Sandbrook Primary School
Subcontracted to Birse Build Ltd
to carry out the complete
electrical services installation.
This included a full range of
services including Distribution
Lighting, Power, Fire Alarms,
Security etc. The works were
carried out in accordance with the
specification prepared by
Rochdale MBC.
Contract Title
-
Sandbrook
Primary School
Contract Duration
-
26 Weeks
Value
-
£235k
Main Contractor
-
Birse Build Ltd
Consultant
-
Rochdale MBC
www.performanceelectrical.co.uk St Peters RC School Recently completed new Roman
Catholic Primary School including
Child Care Centre in Mill Hill,
Blackburn. The installation consists
intelligent lighting systems
including daylight sensing, CAT 6
Cabling including Wireless
Technology, Wind Turbine, Small
Power, Door Access, CCTV, Intruder
and Fire Alarm Systems. This
project is our first with the newly
named Morgan Ashurst (formally
Bluestone.)
Contract Title
-
St Peters RC
School, Blackburn
Contract Duration
-
28 Weeks
Value
-
£347k
Main Contractor
-
Morgan Ashurst
Consultant
-
DC Associates
www.performanceelectrical.co.uk Woodland Community C.P. School
We carried out the complete
mechanical and electrical services installation
including sprinklers. The
scheme was a successful partnership
project (ppc2000) which involved some
comprehensive design involvement from
very early on in the build process. The
building was designed to a carbon
friendly specification including, natural
ventilation and solar-panels ,etc.
Contract Title
-
Woodland Community
School
Contract Duration
-
30 Weeks
Value
-
£975k
Main Contractor
-
Galliford Try
Construction
Designers
-
N.P.S. Wigan
www.performanceelectrical.co.uk
INDUSTRIAL SECTOR INDUSTRIAL SECTOR STATEMENT OF CAPABILITY AND EXPERIENCE RECENTLY COMPLETED PROJECTS Project Value
Duration
Main Contractor
MAN TRUCKS UK LTD TRAFFORD PARK, MANCHESTER 375K 3 MONTHS DUPONT LB EUROPE WYTHENSHAWE 535K 6 MONTHS DUERES JAM WYTHENSHAWE 109K 4 MONTHS RUSHOLME T.A. GARAGES 115K 2 MONTHS BLACKBURN T.A. GARAGES AND HEAD QUARTERS 575K 9 MONTHS BOLTON T.A. GARAGES AND HEAD QUARTERS 420K 7 MONTHS WALKER PARK UNITS A, B & C 258K 4 MONTHS RUSSELL CONTRACTORS AND DEVELOPERS HANTALL DEVELOPMENTS RUSSELL CONTRACTORS AND DEVELOPERS M.O.D. DIRECT CONLON CONSTRUCTION CONLON CONSTRUCTION J. SISK & SONS LTD WALKER PARK UNITS D, E 110K 3 MONTHS BOLTON TOWN HALL KITCHENS REFURB 55K 3 MONTHS BASF CHEMICALS 280K 4 MONTHS TITAN TYRES & CORAL BUILDINGS HAYDOCK 106K 2 MONTHS BARNFIELD CONSTRUCTION ELLESMERE ENGINEERING LTD H.H. SMITH & SONS PERFORMANCE ELECTRICAL LIMITED BASF Chemicals
A difficult project as the plant
and associated offices were still in
operation throughout the duration
of this project. Whilst phased,
numerous LV and ELV diversions
were required in order to achieve
sectional completion. The
complete installation consisted
but not limited to, Mains upgrade,
dali lighting, small power and
plant supplies, fire and security
and testing and commissioning
Contract Title
-
BASF Chemicals
Contract Duration
-
16 weeks
Value
-
£280k
Main Contractor
-
HH Smith
Consultant
-
RPS Gregory
www.performanceelectrical.co.uk
DuPont LB Europe
Renovation of Bays 5 & 6 of
existing Industrial Unit in South
Manchester to the requirements of
the new European Production &
Packaging Tenant. The 5000m²
Warehouse/Production Facility is
equipped a 1600m2 single storey
office accommodation which
includes a HV Substation,
Lighting, Small Power, Security, IT
Infrastructure and a complex LV
System to all Production Plant.
Contract Title
-
Project Taurus
Contract Duration
-
18 Weeks
Value
-
£535k
Main Contractor
-
Hantall
Developments
Consultant
-
Hannan
Associates
www.performanceelectrical.co.uk
MAN TRUCKS UK LTD
We carried out the complete design and
build electrical services installation. The
scheme was a successful partnership
project with Russell Contractors and
Developers which involved some
comprehensive design involvement from
very early on in the build process. The
building was deigned to include
Distribution, specialist power, Lighting and
specialist controls, fire alarms, CCTV and
security systems, etc.
Contract Title
-
Man Trucks UK
Limited
Contract Duration
-
16 Weeks
Value
-
£375k
Main Contractor
-
Russell Contractors
and Developers
Limited
Designers
-
Performance
Electrical Ltd
www.performanceelectrical.co.uk
Titan Tyres
Employed as the Principle
Contractor, we undertook the
partial refurbishment of the 8000m²
Warehouse, which was fully
operational throughout the
contract; placing programming
constraints in line with health &
safety. The works consisted of High
bay lighting was installed on the
larger warehouse and low bay
lighting in the smaller warehouses.
A new fully addressable Fire Alarm
System was installed throughout, as
well as new distribution and general
power.
Contract Title
-
Titan Tyres &
Coral Buildings,
Haydock
Contract Duration
-
8 Weeks
Value
-
£106k
Client
-
Cheshire &
District Properties
Consultant
-
Performance
(Design and Build)
www.performanceelectrical.co.uk
LEISURE SECTOR LEISURE SECTOR STATEMENT OF CAPABILITY AND EXPERIENCE RECENTLY COMPLETED PROJECTS Project Value
Duration
Main Contractor
VINCENT HOTEL 680K 7 MONTHS BOLTON WANDERERS CORE AREAS 50K 2 MONTHS MIDDLEBROOK ARENA 1.2 MILLION
10 MONTHS YMCA ST. HELENS 580K 6 MONTHS FLORAL MARKET HALL SOUTHPORT 125K 3 MONTHS BAND ON THE WALL 197K 14 MONTHS JONGLEURS COMEDY CLUB AND BAR RISA LEEDS 110K 3 MONTHS JONGLEURS COMEDY CLUB AND BAR RISA READING 140K 3 MONTHS JONGLEURS COMEDY CLUB AND BAR RISA BRISTOL 165K 3 MONTHS PRESTWICH CRICKET CLUB SUNNY BANK COMMUNITY CENTRE 49K 3 MONTHS ALLENBUILD NORTH WEST WATES BALLAST WILTSHIRE MORRISON CONSTRUCTION DIRECT FOR LORD STREET PROPERTIES NAYLOR & WALKDEN WOODS LTD WOODS LTD MULTIBUILD H.H. SMITH & SONS 55K 3 MONTHS H.H. SMITH & SONS Band on the Wall
The project consisted of a full
refurbishment/upgrade of a grade
2 listed Building in City Centre
Manchester. The redevelopment
provides a platform for the
development of local talent with
state-of-the-art technology and
new facilities for performances,
education, recording and an audio
and audio-visual music archive.
Contract Title
-
Band on the Wall
Contract Duration
-
40 weeks
Value
-
£197k
Main Contractor
-
Naylor & Walkden
Consultant
-
PSD Services
www.performanceelectrical.co.uk
Prestwich Cricket Club
A full refurbishment including new
Extension for Changing Rooms and
Lounge Area. A local design &
build project which required full
liaison and approval from the end
user,
consisted daylight sensing
(dimmable) lighting, Bar Supplies,
Fire Alarm, Mechanical Controls
Wiring , External Lighting and
testing and Commissioning.
Contract Title
-
Prestwich Cricket
Club
Contract Duration
-
12 weeks
Value
-
£49k
Main Contractor
-
HH Smiths
Consultant
-
Performance
Electrical Ltd
www.performanceelectrical.co.uk
Sunny Bank Community Centre
A Local Authority project
requiring refurbishment to a local
community centre on the outskirts
of Bury. Close liaison with the REC
were required in order to achieve
a SP&N to TP&N upgrade within a
tight timescale. Generally
consisted Lighting, Power,
Security Package , Fire Alarms and
Testing and Commissioning.
Contract Title
-
Sunny Bank
Community
Centre
Contract Duration
-
12 weeks
Value
-
£55k
Main Contractor
-
HH Smiths
Consultant
-
Bury MBC
www.performanceelectrical.co.uk
The Vincent Hotel
New Build 60 Luxury Suites over 6
floors, located on Southport’s
prestigious Lord Street. The hotel
offers a fresh, stylish and
contemporary interior, together
with state of the art technology.
The installation consists Intelligent
Lighting, Small Power, Security, IT
Infrastructure, EPOS and
Generator Back Up Systems.
Contract Title
-
The Vincent Hotel
Contract Duration
-
30 Weeks
Value
-
£680k
Main Contractor
-
Allenbuild
Northwest
Consultant
-
KGA Associates
Liverpool
www.performanceelectrical.co.uk
Y.M.C.A
YMCA Development St Helens.
Multi-purpose facility including sports
hall, crech, Surestart, four storey
offices on two wings. The offices
included the latest energy efficient
Lighting designed to LG3/7 cibse
code. Other services included,
distribution, power, I.T. Fire alarms,
Emergency lighting and sophisticated
security systems.
Contract Title
-
YYMCA St Helens
Contract Duration
-
30 Weeks
Value
-
£580k
Main Contractor
-
Morrison
Construction
Designers
-
Performance
Electrical Ltd
www.performanceelectrical.co.uk
LIVING SECTOR LIVING SECTOR STATEMENT OF CAPABILITY AND EXPERIENCE RECENTLY COMPLETED PROJECTS Project Value
Duration
Main Contractor
IDEALSITE LIMITED 62 APARTMENTS, 1/2 BED, PICCADILLY MANCHESTER WOODTHORPE HOMES LIMITED 20 APARTMENTS, 1/2 BED, LONDON ROAD, LIVERPOOL COTTONFIELDS BARLOW MOOR ROAD, DIDSBURY, MANCHESTER, 18 APARTMENTS BRECKLANDS DRIVE, BOLTON 420K 5 MONTHS ALLENBUILD NORTH WEST LIMITED 120K 6 MONTHS J. P. HOMES LIMITED 148K 5 MONTHS H.H. SMITH & SONS 185K 6 MONTHS WILLOWTREE HALE BARNES 78K 4 MONTHS 40 HOUSES, GORTON MANCHESTER CITY COUNCIL 110K 4 MONTHS TORKINGTON HOUSE STOCKPORT COUNCIL 110K 8 MONTHS MARPLE DALE NURSING HOME 675K 10 MONTHS 79 PICCADILLY APARTMENTS MANCHESTER CHORLTON MILL 290K 7 MONTHS BLAKELEY TONGE & PARTNER BLAKELEY TONGE & PARTNER DIRECT H.H. SMITH & SONS JOHN TURNER LIMITED HIGHAM CONSTRUCTION 875K 20 MONTHS ARMITAGE CONSTRUCTION 79 Piccadilly
26no. High Spec Apartments in a
distinctive Victorian Grade 2 Listed
Building. All Apartments are fully
Part L compliant, complete with
Video Access Systems and Sky +
ready TV Installations. Landlords
areas include Fire Alarms,
Emergency Lighting, Door Access
Systems, Distribution and General
Power. This Project has been
awarded the “Built In Quality
Awards 2009” for the Greater
Manchester Region.
Contract Title
-
79 Piccadilly
Contract Duration
-
30 Weeks
Value
-
£290k
Main Contractor
-
Higham
Construction
Designer
-
Performance
Electrical
www.performanceelectrical.co.uk
Chorlton Mill
A complete new fit out of a disused
mill complex into a contemporary
apartment block of 82no. Units
including circulation and
communal spaces and car parking.
Infrastructure to future shop units
and general electrical services such
as Distribution, Lighting , Power,
Heating, Small Power, IT Cabling,
Fire Alarms and Testing and
Commissioning.
Contract Title
-
Chorlton Mill
Contract Duration
-
84 weeks
Value
-
£875k
Main Contractor
-
Armitage
Construction
Designers
-
Parker Wilson
Associates
www.performanceelectrical.co.uk
Marple Dale Hall Marple Dale Hall is an elderly people’s
retirement home with 24hour care. It is a
two storey building with 64 en-suite
bedrooms. The project incorporated a
separate building with the main supply
and a standby generator with an
automatic change over panel. The
heating was an under floor piped system
with manifolds dotted around the
building controlled via thermostats in all
bedrooms, corridor areas and lounges.
The works consisted Lighting & Power,
Emergency Lighting, L1 Fire Alarm
System, Nurse Call, TV and Satellite,
Mechanical Control Wiring and wiring to
Arjo Baths.
Contract Title
-
Marple Dale
Nursing Home
Contract Duration
-
34 Weeks
Value
-
£675k
Main Contractor
-
John Turner
Construction
Consultant
-
DSSR
www.performanceelectrical.co.uk The Cottonfields
The Cottonfields, 66/78 Barlow
Moor Road Didsbury ,Manchester.
This project is a multi-storey high
specification residential block
including underground car
parking, 14No. two bed
apartments & 3No. Third floor
penthouses. The apartments
include all the latest in modern
technology including; video door
entry, Plasma screen sky plus tv
network, Security systems, etc.
Contract Title
-
The Cottonfields
Contract Duration
-
12 Weeks
Value
-
£148k
Main Contractor
-
H.H.Smith & Sons
Limited
Designers
-
Performance
Electrical Ltd
www.performanceelectrical.co.uk
No.4 Brecklands Drive
The £2.5M Scheme included 3 floors
of executive accommodation to a
very high standard. The design
included start of the art LED Lighting
controlled by a Lutron system linked
to the BMS System. Services
included but are not limited to
CCTV, Intruder alarm, access
control, electrical gates, external
feature lighting to decking large
pond area, external sauna, jacuzzi
and many more
Contract Title
-
N.4 Brecklands
Drive, Bolton
Contract Duration
-
20 Weeks
Value
-
£175k
Main Contractor
-
Blakely Tongue
Partnership
Consultant
-
D.C. Associates
www.performanceelectrical.co.uk NHS SECTOR NHS SECTOR STATEMENT OF CAPABILITY AND EXPERIENCE RECENTLY COMPLETED PROJECTS Project Value
Duration
Main Contractor
BLUE BELL LANE HEALTH CENTRE HUYTON 400k 5 MONTHS 1.5 MILLION
6 MONTHS CHURCH STREET MEDICAL CENTRE SOUTHPORT 350K 6 MONTHS EARLE ROAD HEALTH CENTRE 400K 6 MONTHS LIVERPOOL HEALTH AUTHORITY LONGVIEW HEALTH CENTRE 250K 6 MONTHS LIVERPOOL HEALTH AUTHORITY BURNLEY LIFT PROJECT 110K 6 MONTHS BURNLEY HEALTH AUTHORITY BURNLEY LIFT PROJECT 200K 6 MONTHS ROYAL OLDHAM HOSPITAL NEW LAUNDRY 130K 3 MONTHS LIVERPOOL HEALTH AUTHORITY TOWER HILL HEALTH CENTRE 400K 9 MONTHS GALLIFORD TRY CONSTRUCTION GALLIFORD TRY CONSTRUCTION GALLIFORD TRY CONSTRUCTION GALLIFORD TRY CONSTRUCTION MORRISON CONSTRUCTION MORRISON CONSTRUCTION ERIC WRIGHT LTD JOHN TURNERS MORRISON CONSTRUCTION PENNINE HEALTH TRUST RENAL UNIT ROCHDALE INFIRMARY 129K 6 MONTHS PENNINE ACUTE NHS HOSPITALS TRUST ROYAL OLDHAM HOSPITAL STROKE 150K 6 MONTHS BLACKBURN HEALTH AUTHORITY MENTAL HEALTH UNIT QUEEN’S PARK HOSPITAL 700K 9 MONTHS HALTON GENERAL HOSPITAL MENTAL HEALTH UNIT 700K 9 MONTHS LOWE HOUSE HEALTH CENTRE ST. HELENS A.TRAIN & SONS LTD RICHARDSON PROJECTS ALLENBUILD NORTH WEST LIMITED HBG CONSTRUCTION Blue Bell NHS LIFT Completed in June 2010, this is the
latest in a series of Community Health
Centres successfully carried out in
partnership with Galliford Try
Construction. The centre, located in
Huyton boasts a sustainable design
including RainWater Harvesting, Air
Source Heat Pumps, Solar Hot Water,
Energy Monitoring, Lighting Control and
Occupancy Detection. In addition, the
scheme consisted CCTV, Access Control
and Intruder Detection all linked to a
central monitoring facility.
Contract Title
-
Blue Bell NHS
LIFT Scheme
Contract Duration
-
26 Weeks
Value
-
£400k
Main Contractor
-
Galliford Try
Construction
Consultant
-
TACE
www.performanceelectrical.co.uk
Earle Road NHS LIFT
Performance Electrical Limited have
provided and continue to provide
Electrical Services to LIFT Schemes
(Local Improvement Finance Trust)
throughout the Northwest. Design
involvement is usually required/
working closely with consultant on
Thermal Modelling and Sustainability.
The installation consists Lighting &
Medical Lighting, Small Power &
Dentistry Installations, Fire Alarm,
CHP Units, Security, IT Infrastructure,
Mechanical Controls, Staff Call,
Disabled Refuge Alarm and Audiology
Systems.
Contract Title
-
NHS Medical
Centre
Contract Duration
-
26 Weeks
Value
-
£400k
Main Contractor
-
Galliford Try
Construction
Consultant
-
Clancy Consulting
www.performanceelectrical.co.uk
Healthcare Refurb Works 09 Refurbishment of 4no. Health Centres in
Liverpool—Norris Green, Abercromby,
Wavertree & Hartington Road sites.
Works included M&E Upgrade Services to
the Roll Out Scheme managed by
Galliford Try Construction, which were
predominantly based around the
installation of a new Fire Alarm System.
Other works included, New Boiler
Systems, TRV’s, TMV’s, Air
Conditioning Units, Sterilization &
Chlorination, PIR Controlled Lighting,
Fixed Wiring Tests, Mains Upgrades,
Emergency Lighting, Small Power and
Examination Lamps.
Contract Title ‐ Healthcare Refurb Works 2009 Contract Duration ‐ 20 Weeks Value ‐ £320k (M&E) (in total) Main Contractor ‐ Galliford Try Construction Consultant ‐ Contractor Design www.performanceelectrical.co.uk
Lowe House NHS LIFT A new modern, state of the art, 3 Level,
Community Health Centre located in St
Helens, covering an area of 3600m². With
a BREEAM rating of ’Very Good,’ for best
practice in sustainable design, the
Engineering Services sets a benchmark,
higher than regulation.
Performance
Electrical are proud to partner Galliford
Try Construction on this award winning
project which consisted Electrical,
Mechanical and Public Health
Services over a period of 6 months.
Contract Title
-
Lowe House NHS
LIFT Scheme
Contract Duration
-
34 Weeks
Value
-
£1.5M (M&E)
Main Contractor
-
Galliford Try
Construction
Consultant
-
TACE
www.performanceelectrical.co.uk
Oriel Drive NHS LIFT The smallest of the latest tranche of LIFT
Schemes undertaken by PEL covering both
Mechanical and Electrical Services. The
overall project was to demolish the
existing Health Centre, whilst the existing
surgery operated from SIBCAS Units in the
Car Park and deliver a brand new £1million
LIFT Scheme which completed in June
2010. Services included Air Conditioning,
Ventilation, GSHP, Underfloor Heating,
Lighting, Small Power, Nurse/Staff Call
Systems, Fire Alarm Systems, testing and
commissioning and a visually recorded
demonstration of services.
Contract Title
-
Oriel Drive NHS
LIFT Scheme
Contract Duration
-
12 Weeks
Value
-
£160k(M&E)
Main Contractor
-
Galliford Try
Construction
Consultant
-
Paul Moy Associates
www.performanceelectrical.co.uk
COMMERICAL SECTOR COMMERCIAL SECTOR STATEMENT OF CAPABILITY AND EXPERIENCE RECENTLY COMPLETED PROJECTS Project Value
Duration
Main Contractor
BURY COLLEGE ENGINEERING BUILDING 151K 4 MONTHS HOLY CROSS 6TH FORM COLLEGE, MARY KELLY BUILDING 250K 6 MONTHS HOLY CROSS 6TH FORM COLLEGE, SUMMERFIELD BUILD REFURB 160K 3 MONTHS HOLY CROSS 6TH FORM COLLEGE, MAIN BUILDING REWIRE 120K 3 MONTHS BURY COLLEGE WOODBURY 130K 3 MONTHS ST. JAMES HOUSE OFFICE REFURB 380K 11 MONTHS NO. 15 – 17 KING ST. OFFICE REFURB 260K 12 MONTHS THOMAS WINSTANLEY ALLENBUILD WARDEN CONSTRUCTION PERFORMANCE ELECTRICAL PERFORMANCE ELECTRICAL HIGHAM CONSTRUCTION HIGHAM CONSTRUCTION MATRIX PARK D & B 3 OFFICE BLOCKS PLOT 1100 240K 4 MONTHS MATRIX PARK PLOT 1200 3 OFFICE B1 185K 4 MONTHS MATRIX PARK PLOT 1300 4 OFFICE BLOCKS 196K 4 MONTHS SOUTHPORT BUSINESS PARK UNITS 1 & 3 610K 8 MONTHS 1.2 MILLION
24 MONTHS 265K 3 MONTHS OLDHAM POLICE STATION 13 PHASE REFURB UNIVERSITY OF MANCHESTER SAMUAL ALEXANDER BUILDING KIER NORTH WEST LTD POCHIN CONSTRUCTION POCHIN CONSTRUCTION FELTON CONSTRUCTION MANSELL CONSTRUCTION MANSELL CONSTRUCTION 15-17 King St. Offices
11580sq/ft of High Spec office
space—Grade 2 Listed Building. In
the heart of the busy shopping
district of St Anne’s square. All
open plan offices with the latest
energy efficient Lighting designed
to LG3/7 of the CIBSE Guide.
Other services included distribution, I.T., Fire alarms, Emergency
lighting and sophisticated security
systems. Awarded the “Built In
Quality Awards 2007” for the
Greater Manchester Region.
Contract Title
-
15-17 King St,
Manchester
Contract Duration
-
50 Weeks
Value
-
£260k
Main Contractor
-
Higham Construction
Designers
-
Hannan Associates
www.performanceelectrical.co.uk
Oldham Police Station
We were employed by Mansell
Construction to completely
refurbish Oldham Police Station.
The contract value was £1.25m. It
was a very challenging project
which was successfully completed in
13 phases with the station being
occupied throughout. We carried
out the complete installation
including, Distribution, Lighting,
Power, Fire Alarms, cell call,
security, etc.
Contract Title ‐ Oldham S.D.H.Q. Contract Duration ‐ 110 Weeks Value ‐ £1.25m Main Contractor ‐ Mansell Construction Limited Designers ‐ Rob Whetham Associates www.performanceelectrical.co.uk
Southport Business Park
Units 1&3 were completed
concurrently but with the
exception of Unit 3 Fit Out in
readiness for the Insurance
Company ‘Paymentshield’.
The shell works contained
basic systems in preparation
for a Tenant. Paymentshield
required Generator Back Up
Systems, UPS Systems,
Underfloor Power Track, CAT6
Structured Cabling System,
LED Lighting including
Intelligent Control, Testing &
Commissioning.
Contract Title
-
Southport Business
Park, Units 1 & 3
Contract Duration
-
32 Weeks
Value
-
£610k
Main Contractor
-
Felton Construction
Designers
-
KGA
www.performanceelectrical.co.uk
St James House
St James House, Charlotte
Street, Manchester. 74658sq/ft
of High Spec office space.
Including underground parking.
All open plan offices with the
latest energy efficient Lighting
designed to LG3/7 of the CIBSE
guide. Other services included
distribution, I.T., Fire alarms,
Emergency lighting and
sophisticated security systems.
Contract Title
-
St James House,
Manchester
Contract Duration
-
45 Weeks
Value
-
£380k
Main Contractor
-
Higham Construction
Designers
-
Hannan Associates
www.performanceelectrical.co.uk
MINOR WORKS SECTOR MINOR WORKS SECTOR STATEMENT OF CAPABILITY AND EXPERIENCE RECENTLY COMPLETED PROJECTS Organisation BURY COLLEGE Description
Value (£)
Type of Work
PERIODIC TESTING WOODBURY CENTRE 6,200 TESTING 2,087 NEW INSTALLATION 550 TESTING 5,086 NEW INSTALLATION 245 NEW INSTALLATION 8,910 NEW INSTALLATION 3,610 NEW INSTALLATION 2,951 NEW INSTALLATION 625 NEW INSTALLATION 2,700 REFURB 92 REPAIRS 750 NEW INSTALLATION 275 NEW INSTALLATION 970 REPAIRS 570 NEW INSTALLATION 1,200 NEW INSTALLATION 8,000 REFURB 4,500 REFURB BURY COLLEGE PROJECTOR POWER & DATA BURY COLLEGE INVESTIGATE FAULTY CIRCUITS BURY COLLEGE LIGHTING UPGRADES TO 3NO. CLASSROOMS BURY COLLEGE POWER SUPPLY FOR FIRE ALARM SIGNAL BURY COLLEGE PARRENTHORN HIGH SCHOOL POWER & DATA REQUIREMENTS FOR SMART DESKS ADDITIONAL POWER POLES IN ICT ROOMS PARRENTHORN HIGH SCHOOL POWER & DATA IN APPLE MAC SUITE PARRENTHORN HIGH SCHOOL POWER SUPPLIES FOR PLASMA SCREENS ST. MONICA’S HIGH SCHOOL REPLACEMENT LUMINAIRES ST. MONICA’S HIGH SCHOOL REPAIR TO SWITCH URBAN VISION POWER SUPPLIES TO ELECTRIC DOORS URBAN VISION NEW EXTERNAL BULKHEAD LUMINAIRE BURY GYMNASTICS CLUB REPAIRS TO HIGH LEVEL FANS BURY GYMNASTICS CLUB INSTALLATION OF 3NO. HAND DRYERS DU PONT LB EUROPE MACHINE POWER SUPPLIES PRESTWICH ARTS COLLEGE REPLACEMENT CEILING GRIDS / TILES PRESTWICH ARTS COLLEGE LED LIGHTING TO FOOD TECH ROOM Minor Works Client Base How to find us www.performanceelectrical.co.uk 123 Radcliffe Road, Bury, BL9 9LD z Telephone: 0161 797 3476 z Fax: 0161 764 2903