KPG Engineering Sdn. Bhd.

Transcription

KPG Engineering Sdn. Bhd.
KPG Engineering Sdn. Bhd.
Company Registration No. 611747-X
TABLE OF CONTENTS
1. INTRODUCTION OF COMPANY
2
2. CORPORATE INFORMATION, FINANCIAL CAPABILITIES
AND BANKER
3
3. OUR SERVICES
4
4. CLIENTELE
5
5. PROJECT HIGHLIGHTS
6
6. LIST OF PREVIOUS & ONGOING PROJECTS UNDERTAKEN
10
7. CONTRUCTION EQUIPMENT & TOOLS LIST
19
Page 1 of 19
KPG Engineering Sdn. Bhd.
ABOUT US…
In the year 1995, with the innovative farsightedness and foresightedness, blooming out of the
minds of like minded people with technical and construction background, culminating into the
formation of core team, resulted in the incorporation of this company under the name and style,
KPG ENGINEERING & BUILDING CONSTRUCTION.
As the years rolled on, like saying goes on, “ROLLING STONE WILL GATHER MOSS”, our
company also gather mass of experience leading to excellence, started venturing into areas
ranging from erection of steel structure and piping works of oil & gas refinery and other related
heavy engineering works.
Following the principles of DEVELOP, PRESERVE and ENHANCE, this organization thrived on
challenges, with the motto to develop, imbibed in with professional approach and methods,
landing in excellence in all the achievements.
In true adherence of Management Science Theories, the company has started attracting more
professionally qualified people to stand grow, an efficient management team was formed and
started handling major projects in this country including chemical plants, oil & gas refinery,
HRSG boilers and various combined cycle power plant industries.
Our company has an experience General Manager supported by Project Manager and his team
of well trained work force to cater the “TOTAL ENGINEERING & CONSTRUCTION” which
have been the current adopt practice by major clients.
Our company never believes in that people in our organization are employed but actually been
given the equal opportunity to develop its own career and profit sharing as an incentive to them
for achieving targeted schedule and as a formed of job satisfaction towards our motto of
achieving the “ TOTAL CONSTRUCTION ” practice.
Page 2 of 19
KPG Engineering Sdn. Bhd.
CORPORATE INFORMATION…
1.
Registered Name
:
2.
Business Address :
KPG Engineering Sdn. Bhd.
No. 171, Jalan DS 1/12, Bandar Dataran Segar, Jalan
Seremban 71000 Port Dickson N. Sembilan.
Telephone
:
+ (606) 6515025
Facsimile
:
+ (606) 6515014
E-mail
:
[email protected]
Factory
:
Lot 4266 & 4267,
Jalan Seremban, 71000 Port Dickson,
Negeri Sembilan, Malaysia
Total area
3.
4.
:
4 acres
Authorized
:
RM 5,000,000.00
Paid-up
:
RM 1,000,000.00
Capital
Board of Directors :
1. Mr. Koh Peck Guan (50% shareholdings)
Contact No. : +6012 329 8880
2. Mr. Koh Teck Hing
(50% shareholdings)
Contact No. : +6012 606 0171
5.
Principle Banking Facilities

Maybank Berhad
Port Dickson Brach

Public Bank Berhad
Bintulu Sarawak Branch
Page 3 of 19
KPG Engineering Sdn. Bhd.
OUR SERVICES…
WHAT WE DO…

Construction of piping, storage tank and steel structures

Fabrication and installation of process piping, storage tank, steel structure, stack
ducting, acoustical enclosure

Rigging & Lifting of heavy equipment and machinery

Maintenance and overhaul of all kinds of plants

Blasting and Painting
SPECIALITIES…

Erection of Heat Recovery Steam Generators Boilers which cover the scope of
Heavy & Light Structure, Process & Pressure Piping, Mechanicals, Electrical,
Insulation and Painting Erection works.

Oil & gas refinery mechanical and piping erection works

Maintenance and Shutdown works

Provision of supervision and skilled labors for plant commissioning supports
To fulfill our existing obligations and future jobs, which are in the pipeline, we have a
network of suppliers to supply us with the necessary equipment for the projects
secured in Malaysia.
Page 4 of 19
KPG Engineering Sdn. Bhd.
LIST OF CLIENTS
1
Kejuruteraan QKS Sdn. Bhd.
2
UBF Maintenance Sdn. Bhd.
3
Titan Polyethylene Plant
4
Amalgamated Plant Services Sdn. Bhd.
5
Bennova Engineering Sdn. Bhd.
6
TEC Engineering Sdn. Bhd.
7
Tacam Technologies Sdn. Bhd.
8
Sukwon Idche Engineering Sdn. Bhd.
9
HL Engineering Sdn Bhd
10 CTCI Engineering & Construction Sdn Bhd
11 BWS Engineering Sdn Bhd
12 JGC Singapore (M) Sdn Bhd
13 AQEEL Engineering & Construction Sdn Bhd
Page 5 of 19
KPG Engineering Sdn. Bhd.
PROJECT HIGHLIGHTS…
Project
: Malaysia Olefin Project
Project Management Consultant : Optimal (M) Sdn Bhd
Main Contractor
: Samsung Engineering Co. Ltd.
Sub-Contractor
: Sukwon Idche Engineering (M) Sdn Bhd
Contract Value
: RM 4, 500 000.00
Duration
: May 2000 to June 2001
Location
: Paka, Terengganu
Scope of Work
: Piping and Supports Erection works of total 50, 000 dia. inch
which include Pressure, Process and Utilities Piping for
Furnace System, Water Quenching System and Air
Compressor System
Page 6 of 19
KPG Engineering Sdn. Bhd.
Project
: Panglima 720MW CCGT Power Plant Project
Project Management Consultant : Panglima Power Sdn Bhd
Main Contractor
: Siemens Power Generation
Sub-Contractor
: Sukwon Idche Engineering (M) Sdn Bhd
Contract Value
: RM 3, 500 000.00
Duration
: Jan 2002 to Nov 2002
Location
: Telukgong Melaka
Scope of Work
: Erection of 2 units Heat Recovery Steam Generator, piping
and support Erection works of total 25,000 dia. Inch which
include Pressure, Process and Utilities Piping for Boiler
System.
Page 7 of 19
KPG Engineering Sdn. Bhd.
Project
: MG 3 Lube Base Oil Project
Main Contractor
: KQKS - L&T - Lurgi consortium
Sub-Contractor
: Kejuruteraan QKS Sdn Bhd
Contract Value
: RM 15,000 000.00
Duration
: Nov 2006 to Dec 2008
Location
: Penapisan Petronas Melaka Sdn Bhd
Scope of Work
: Fabricate & Erection of Mechanical Piping works with a combined
total of 171,000 dia. inch including supports.
Page 8 of 19
KPG Engineering Sdn. Bhd.
Project
: MLNG & MLNG Dua New Common Reclaimer Project
Main Contractor
: JGC Sp (M) Sdn. Bhd.
Sub-Contractor
: BWS Engineering Sdn. Bhd.
Contract Value
: RM 19,100 000.00
Duration
: Oct 2012 to Aug 2013
Location
: MLNG Sdn Bhd Bintulu Sarawak
Scope of Work
: Fabricate & erection of steel structure ( 450 ton ), Mechanical
Rotating Equipment. Fabrication & erection of all process piping up
to pre commissioning assistant.
Page 9 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
Owner
Project Title
TEC Engineering Sdn Bhd
Genting Sanyen Industrial
Paper Sdn Bhd
Paper Mill 1-E Plant Expansion Project;
Kuala Langat, Selangor

Kejuruteraan QKS Sdn
Bhd
Titan Petrochemical
MTBE
Contract Amount
(RM)
Mar 96 – June 96
RM 600, 000.00
Mar 98 – Dec 99
RM 8, 500 000.00
Oct 99 – Apr 00
RM 1, 800 000.00
Titan Cracker 2 Project;
Pasir Gudang, Johore

Kejuruteraan QKS Sdn
Bhd
Piping and Supports Installation
of 20, 000 dia. Inch of Stainless
Steel Pipe
Duration
Piping Erection works of total
70,000 dia. inch that Involves
Pressure, Process and Utilities

Pipe supports Fabrication and
Installation (90 tons)

Supply of skilled manpower for
assistant in pre-commissioning
Propane Dehydrogenations Project;
Gebeng, Kuantan

2 km piping installation of 2” and
6” butane and 2” hydrogen line
include hydrotest and precommissioning
Page 10 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
Owner
Tacam Technologies Sdn
Bhd
1st Silicon Sarawak
Kejuruteraan QKS Sdn
Bhd
Petronas Gas Malaysia
Project Title

Main Contractor :
Samsung Engineering Co.
Ltd.
Installation of steel door frame,
panel and roller shutter
Dec 99 – July 00
RM 850, 000.00
Jun 00 –Sept 00
RM 1, 400 000.00
May 00 – June 01
RM 4, 500 000.00
HVGO System Expansion Project;
Tanjung Kling, Melaka

PMC : Optimal (M) Sdn
Bhd
Contract Amount
(RM)
1st Silicon Project; Kuching, Sarawak

Sukwon Idche
Engineering (M) Sdn Bhd
Duration
Piping fabrication and installation
of 6 500 dia. inch
Manpower supply of skilled
manpower for assistant in precommissioning
Malaysia Olefin Project; Paka,
Terengganu

Piping and Supports Erection
works of total 50, 000 dia. inch
that Involves Pressure, Process
and Utilities Piping for Furnace
System, Water Quenching
System and Air Compressor
System
Page 11 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
HL Engineering Sdn Bhd
Owner
PMC : Optimal (M) Sdn
Bhd
Main Contractor :
Samsung Engineering Co.
Ltd.
Sukwon Idche Engineering
(M) Sdn Bhd
Samsung Corning
Malaysia
Project Title
Panglima Power Sdn Bhd
Contract Amount
(RM)
Malaysia Olefin Project; Paka,
Terengganu

Supply of skilled manpower for
pre-commissioning
July 01 – Sept 01
RM 1, 200 000.00
SCM M3 Expansion-Shutdown Works;
Senawang, N. Sembilan

Sukwon Idche Engineering
(M) Sdn Bhd
Duration
Spading and modification works
of utilities and process piping
April 01
RM 140, 000.00
Panglima 720MW CCGT Power Plant;
Teluk Gong, Melaka
Main Contractor : Siemens
Erection of 2 Unit of Heat Recovery
Power Generation
Steam Generator
Sub-supplier : Doosan
 Mechanical
erection
which
Heavy Industries.
covers HRSG Casing & Super
Structure, Module and internal
accessories, Stack, Steam Drum
and other sub structure, boiler
platform,
handrail
and
accessories.
Jan 02 – Nov 02
RM 3, 500 000.00
Page 12 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
CTCI Engineering &
Construction Sdn Bhd
Owner
Panglima Power Sdn Bhd
Project Title

Piping and Supports of mainly
pressure piping that involves 9Cr
material of a combined total of 12
000 dia. Inch and field run small
bore piping of a combined total of
13 000 dia. Inch.

Painting works of all casing
structure and Stack

Assistance in Commissioning
Duration
Contract Amount
(RM)
Piping Erection & Dismantling Works for
Steam Blow Line At Panglima 720MW
CCGT Project Melaka ( Contract No :
01C3155M-A003 )

Construction, Testing, Inspection,
Jan 03 – Aug 03
Pre-commissioning and
Commissioning Assistance Of
Steam Blow Piping.

Supply Skill Worker to Carry Out
Commissioning Work.
RM 400,000.00
Page 13 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
Kejuruteraan QKS Sdn
Bhd
Owner
Polyethylene Malaysia
Sdn Bhd
Project Title
Optimal Chemical
(Malaysia) Sdn Bhd
MLNG Bintulu Sarawak
Undertake construction,
testing and commissioning of
the mechanical piping work
and associated works.
May 03 – July 03
RM 500, 000.00
Provision For Mechanical, E & I
Works At Optimal, Kertih For Optimal
Chemical (Malaysia) Sdn Bhd

Kejuruteraan QKS Sdn
Bhd
Contract Amount
(RM)
PEMSB Turnaround 2003 Defect
Works

Oil-Line Engineering &
Associates Sdn Bhd
Duration
Construction, Testing,
Inspection, Precommissioning And
Commissioning Assistance Of
Piping, Mechanical And Civil
Works.
Oct 03 – Dec 03
RM 350,000.00
MLNG Rejuvenation And MLNG /
MLNG 2 Revamp (MRR Project)

Undertake construction,
testing and commissioning for
piping work for Module 2 & 3.
Dec 03 – Oct 05
RM 7,400, 000.00
Page 14 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
Kejuruteraan QKS Sdn
Bhd
Owner
Petronas Penapisan
Melaka Sdn. Bhd.
Project Title
Duration
Contract Amount
(RM)
Nov 06 to July 08
RM 15,000, 000.00
April 08 to Dec 08
RM 11,000.000.00
EPCC of MG3 Lube Base oil Project


Piping and Supports
Fabrication and Erection
works of total 171,000 dia.
inch that Involves Pressure,
Process and Utilities Piping
for existing and new facilities.
Manpower supply for precommissioning and
commissioning activities.
Page 15 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
Amalgamated Plant Eng.
Services Sdn. Bhd.
Owner
Project Title
Duration
Contract Amount
(RM)
MLNG BINTULU
Module 5 & 6 Tie-in works & Module
5 EEFU MDD project
December 2008 To
May 2010
RM 5,750,000.00
December 2009 To
March 2010
RM 600,000.00
May 2010 To
September 2011
RM 6,200,000.00

Bennova Engineering
Sdn. Bhd.
Amalgamated Plant Eng.
Services Sdn. Bhd.
PPMSB PSR 2
Revamp project

SMDS BINTULU
Fabrication & erection of
piping & supports – 43,000
dia. inch that involved several
exotic materials.
To provide qualified manpower for piping fabrication &
erection works, dismantle
existing piping system and
Tie-in works.
Wax Plant project

Fabrication & erection of
piping - 46,000 dia.inch & 45
ton of pipe support & included
all tie-in works.
Page 16 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
Kejuruteraan QKS Sdn.
Bhd.
BWS Engineering Sdn.
Bhd.
Owner
PPMSB MELAKA
TOKUYAMA JAPAN
Project Title
New Bio Diesel Plant

Fabricate & erection of piping
& pipe support.

Fabricate & erection of tank
6102.
TMP Project Phase 1

Piping Fabrication Work For
Area B1,C1,D1 & U1A.
(Estimate 50,000 dia-inch)

Piping Erection Work For
Area A1 (Estimate 32,000.00
dia-inch) including 60 ton of
standard & special pipe
support.

To Provide Manpower For
Punch Killing, Hydrostatic
Test & Pre Commissioning
Work.
Duration
Contract Amount
(RM)
March 2011 To June
2011
RM 545,000.00
September 2011 To
December 2011
RM 265,000.00
September 2011
RM 24,000,000.00
To February 2013
Page 17 of 19
KPG Engineering Sdn. Bhd.
LIST OF PREVIOUS PROJECTS UNDERTAKEN
Client
JGC Sp (M) Sdn. Bhd.
Aqeel Engineering &
Construction Sdn Bhd
Owner
MLNG Bintulu Sarawak
Petronas Carigali Bintulu
Sarawak
Project Title
MLNG & MLNG Dua New Common
Reclaimer Project

Fabricate & erection of steel
structure ( 450 ton )

Mechanical Equipment
Rotating.

Fabrication & erection of all
process piping up to pre
commissioning assistant.
Dry Gas Diverter Manifold Project

Piping Installation. (36” Heavy
Wall Pipelines)
Duration
Contract Amount
(RM)
October 2012 to
August 2013
RM 19,100,000.00
August 2013 to
February 2014
RM 12,500,000.00
Page 18 of 19
KPG Engineering Sdn. Bhd.
Current Equipment List
No. Desription
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
Kato Rough Terrain 45 Ton Crane
Kato Rough Terrain 25 Ton Crane
Kobelco Rough Terrain 25 Ton Crane
Nissan Lorry CW 16 Ton Rigid Crane
Volvo Lorry CW 16 Ton Rigid Crane
Scania Lorry CW 12 Ton Rigid Crane
Scania 40 Ft Lorry Trailer
Dahatsu 5 Ton Lorry
Toyota Hiace 5 Ton Lorry
Toyota Hiace 1/1/2 Ton Lorry
Toyota 5 Ton Forklift
Toyota 3 Ton Forklift
Doosan 150kVA Power Generator
Miller 600X Diesel Welding Machine
Shidawa 400 A Diesel Welding Machine
Power Inverter Welding Machine
Portable Power Inverter Welding Machine
Double Cab 4wd
12 Seater Passenger Van
Saloon Car
4wd Car
BS Standard Scaffolding Material
Hydraulic Hole Punch
Qty
1
1
1
1
1
1
1
1
1
3
1
1
2
10
4
36
60
6
12
5
5
25000m3
2
Page 19 of 19

Similar documents

- Bee Automobile Parts

- Bee Automobile Parts Wenzhou BEE Automobile Parts Co.,LTD E-mail:[email protected] wbee.en.alibaba.com

More information