KPG Engineering Sdn. Bhd.
Transcription
KPG Engineering Sdn. Bhd.
KPG Engineering Sdn. Bhd. Company Registration No. 611747-X TABLE OF CONTENTS 1. INTRODUCTION OF COMPANY 2 2. CORPORATE INFORMATION, FINANCIAL CAPABILITIES AND BANKER 3 3. OUR SERVICES 4 4. CLIENTELE 5 5. PROJECT HIGHLIGHTS 6 6. LIST OF PREVIOUS & ONGOING PROJECTS UNDERTAKEN 10 7. CONTRUCTION EQUIPMENT & TOOLS LIST 19 Page 1 of 19 KPG Engineering Sdn. Bhd. ABOUT US… In the year 1995, with the innovative farsightedness and foresightedness, blooming out of the minds of like minded people with technical and construction background, culminating into the formation of core team, resulted in the incorporation of this company under the name and style, KPG ENGINEERING & BUILDING CONSTRUCTION. As the years rolled on, like saying goes on, “ROLLING STONE WILL GATHER MOSS”, our company also gather mass of experience leading to excellence, started venturing into areas ranging from erection of steel structure and piping works of oil & gas refinery and other related heavy engineering works. Following the principles of DEVELOP, PRESERVE and ENHANCE, this organization thrived on challenges, with the motto to develop, imbibed in with professional approach and methods, landing in excellence in all the achievements. In true adherence of Management Science Theories, the company has started attracting more professionally qualified people to stand grow, an efficient management team was formed and started handling major projects in this country including chemical plants, oil & gas refinery, HRSG boilers and various combined cycle power plant industries. Our company has an experience General Manager supported by Project Manager and his team of well trained work force to cater the “TOTAL ENGINEERING & CONSTRUCTION” which have been the current adopt practice by major clients. Our company never believes in that people in our organization are employed but actually been given the equal opportunity to develop its own career and profit sharing as an incentive to them for achieving targeted schedule and as a formed of job satisfaction towards our motto of achieving the “ TOTAL CONSTRUCTION ” practice. Page 2 of 19 KPG Engineering Sdn. Bhd. CORPORATE INFORMATION… 1. Registered Name : 2. Business Address : KPG Engineering Sdn. Bhd. No. 171, Jalan DS 1/12, Bandar Dataran Segar, Jalan Seremban 71000 Port Dickson N. Sembilan. Telephone : + (606) 6515025 Facsimile : + (606) 6515014 E-mail : [email protected] Factory : Lot 4266 & 4267, Jalan Seremban, 71000 Port Dickson, Negeri Sembilan, Malaysia Total area 3. 4. : 4 acres Authorized : RM 5,000,000.00 Paid-up : RM 1,000,000.00 Capital Board of Directors : 1. Mr. Koh Peck Guan (50% shareholdings) Contact No. : +6012 329 8880 2. Mr. Koh Teck Hing (50% shareholdings) Contact No. : +6012 606 0171 5. Principle Banking Facilities Maybank Berhad Port Dickson Brach Public Bank Berhad Bintulu Sarawak Branch Page 3 of 19 KPG Engineering Sdn. Bhd. OUR SERVICES… WHAT WE DO… Construction of piping, storage tank and steel structures Fabrication and installation of process piping, storage tank, steel structure, stack ducting, acoustical enclosure Rigging & Lifting of heavy equipment and machinery Maintenance and overhaul of all kinds of plants Blasting and Painting SPECIALITIES… Erection of Heat Recovery Steam Generators Boilers which cover the scope of Heavy & Light Structure, Process & Pressure Piping, Mechanicals, Electrical, Insulation and Painting Erection works. Oil & gas refinery mechanical and piping erection works Maintenance and Shutdown works Provision of supervision and skilled labors for plant commissioning supports To fulfill our existing obligations and future jobs, which are in the pipeline, we have a network of suppliers to supply us with the necessary equipment for the projects secured in Malaysia. Page 4 of 19 KPG Engineering Sdn. Bhd. LIST OF CLIENTS 1 Kejuruteraan QKS Sdn. Bhd. 2 UBF Maintenance Sdn. Bhd. 3 Titan Polyethylene Plant 4 Amalgamated Plant Services Sdn. Bhd. 5 Bennova Engineering Sdn. Bhd. 6 TEC Engineering Sdn. Bhd. 7 Tacam Technologies Sdn. Bhd. 8 Sukwon Idche Engineering Sdn. Bhd. 9 HL Engineering Sdn Bhd 10 CTCI Engineering & Construction Sdn Bhd 11 BWS Engineering Sdn Bhd 12 JGC Singapore (M) Sdn Bhd 13 AQEEL Engineering & Construction Sdn Bhd Page 5 of 19 KPG Engineering Sdn. Bhd. PROJECT HIGHLIGHTS… Project : Malaysia Olefin Project Project Management Consultant : Optimal (M) Sdn Bhd Main Contractor : Samsung Engineering Co. Ltd. Sub-Contractor : Sukwon Idche Engineering (M) Sdn Bhd Contract Value : RM 4, 500 000.00 Duration : May 2000 to June 2001 Location : Paka, Terengganu Scope of Work : Piping and Supports Erection works of total 50, 000 dia. inch which include Pressure, Process and Utilities Piping for Furnace System, Water Quenching System and Air Compressor System Page 6 of 19 KPG Engineering Sdn. Bhd. Project : Panglima 720MW CCGT Power Plant Project Project Management Consultant : Panglima Power Sdn Bhd Main Contractor : Siemens Power Generation Sub-Contractor : Sukwon Idche Engineering (M) Sdn Bhd Contract Value : RM 3, 500 000.00 Duration : Jan 2002 to Nov 2002 Location : Telukgong Melaka Scope of Work : Erection of 2 units Heat Recovery Steam Generator, piping and support Erection works of total 25,000 dia. Inch which include Pressure, Process and Utilities Piping for Boiler System. Page 7 of 19 KPG Engineering Sdn. Bhd. Project : MG 3 Lube Base Oil Project Main Contractor : KQKS - L&T - Lurgi consortium Sub-Contractor : Kejuruteraan QKS Sdn Bhd Contract Value : RM 15,000 000.00 Duration : Nov 2006 to Dec 2008 Location : Penapisan Petronas Melaka Sdn Bhd Scope of Work : Fabricate & Erection of Mechanical Piping works with a combined total of 171,000 dia. inch including supports. Page 8 of 19 KPG Engineering Sdn. Bhd. Project : MLNG & MLNG Dua New Common Reclaimer Project Main Contractor : JGC Sp (M) Sdn. Bhd. Sub-Contractor : BWS Engineering Sdn. Bhd. Contract Value : RM 19,100 000.00 Duration : Oct 2012 to Aug 2013 Location : MLNG Sdn Bhd Bintulu Sarawak Scope of Work : Fabricate & erection of steel structure ( 450 ton ), Mechanical Rotating Equipment. Fabrication & erection of all process piping up to pre commissioning assistant. Page 9 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client Owner Project Title TEC Engineering Sdn Bhd Genting Sanyen Industrial Paper Sdn Bhd Paper Mill 1-E Plant Expansion Project; Kuala Langat, Selangor Kejuruteraan QKS Sdn Bhd Titan Petrochemical MTBE Contract Amount (RM) Mar 96 – June 96 RM 600, 000.00 Mar 98 – Dec 99 RM 8, 500 000.00 Oct 99 – Apr 00 RM 1, 800 000.00 Titan Cracker 2 Project; Pasir Gudang, Johore Kejuruteraan QKS Sdn Bhd Piping and Supports Installation of 20, 000 dia. Inch of Stainless Steel Pipe Duration Piping Erection works of total 70,000 dia. inch that Involves Pressure, Process and Utilities Pipe supports Fabrication and Installation (90 tons) Supply of skilled manpower for assistant in pre-commissioning Propane Dehydrogenations Project; Gebeng, Kuantan 2 km piping installation of 2” and 6” butane and 2” hydrogen line include hydrotest and precommissioning Page 10 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client Owner Tacam Technologies Sdn Bhd 1st Silicon Sarawak Kejuruteraan QKS Sdn Bhd Petronas Gas Malaysia Project Title Main Contractor : Samsung Engineering Co. Ltd. Installation of steel door frame, panel and roller shutter Dec 99 – July 00 RM 850, 000.00 Jun 00 –Sept 00 RM 1, 400 000.00 May 00 – June 01 RM 4, 500 000.00 HVGO System Expansion Project; Tanjung Kling, Melaka PMC : Optimal (M) Sdn Bhd Contract Amount (RM) 1st Silicon Project; Kuching, Sarawak Sukwon Idche Engineering (M) Sdn Bhd Duration Piping fabrication and installation of 6 500 dia. inch Manpower supply of skilled manpower for assistant in precommissioning Malaysia Olefin Project; Paka, Terengganu Piping and Supports Erection works of total 50, 000 dia. inch that Involves Pressure, Process and Utilities Piping for Furnace System, Water Quenching System and Air Compressor System Page 11 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client HL Engineering Sdn Bhd Owner PMC : Optimal (M) Sdn Bhd Main Contractor : Samsung Engineering Co. Ltd. Sukwon Idche Engineering (M) Sdn Bhd Samsung Corning Malaysia Project Title Panglima Power Sdn Bhd Contract Amount (RM) Malaysia Olefin Project; Paka, Terengganu Supply of skilled manpower for pre-commissioning July 01 – Sept 01 RM 1, 200 000.00 SCM M3 Expansion-Shutdown Works; Senawang, N. Sembilan Sukwon Idche Engineering (M) Sdn Bhd Duration Spading and modification works of utilities and process piping April 01 RM 140, 000.00 Panglima 720MW CCGT Power Plant; Teluk Gong, Melaka Main Contractor : Siemens Erection of 2 Unit of Heat Recovery Power Generation Steam Generator Sub-supplier : Doosan Mechanical erection which Heavy Industries. covers HRSG Casing & Super Structure, Module and internal accessories, Stack, Steam Drum and other sub structure, boiler platform, handrail and accessories. Jan 02 – Nov 02 RM 3, 500 000.00 Page 12 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client CTCI Engineering & Construction Sdn Bhd Owner Panglima Power Sdn Bhd Project Title Piping and Supports of mainly pressure piping that involves 9Cr material of a combined total of 12 000 dia. Inch and field run small bore piping of a combined total of 13 000 dia. Inch. Painting works of all casing structure and Stack Assistance in Commissioning Duration Contract Amount (RM) Piping Erection & Dismantling Works for Steam Blow Line At Panglima 720MW CCGT Project Melaka ( Contract No : 01C3155M-A003 ) Construction, Testing, Inspection, Jan 03 – Aug 03 Pre-commissioning and Commissioning Assistance Of Steam Blow Piping. Supply Skill Worker to Carry Out Commissioning Work. RM 400,000.00 Page 13 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client Kejuruteraan QKS Sdn Bhd Owner Polyethylene Malaysia Sdn Bhd Project Title Optimal Chemical (Malaysia) Sdn Bhd MLNG Bintulu Sarawak Undertake construction, testing and commissioning of the mechanical piping work and associated works. May 03 – July 03 RM 500, 000.00 Provision For Mechanical, E & I Works At Optimal, Kertih For Optimal Chemical (Malaysia) Sdn Bhd Kejuruteraan QKS Sdn Bhd Contract Amount (RM) PEMSB Turnaround 2003 Defect Works Oil-Line Engineering & Associates Sdn Bhd Duration Construction, Testing, Inspection, Precommissioning And Commissioning Assistance Of Piping, Mechanical And Civil Works. Oct 03 – Dec 03 RM 350,000.00 MLNG Rejuvenation And MLNG / MLNG 2 Revamp (MRR Project) Undertake construction, testing and commissioning for piping work for Module 2 & 3. Dec 03 – Oct 05 RM 7,400, 000.00 Page 14 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client Kejuruteraan QKS Sdn Bhd Owner Petronas Penapisan Melaka Sdn. Bhd. Project Title Duration Contract Amount (RM) Nov 06 to July 08 RM 15,000, 000.00 April 08 to Dec 08 RM 11,000.000.00 EPCC of MG3 Lube Base oil Project Piping and Supports Fabrication and Erection works of total 171,000 dia. inch that Involves Pressure, Process and Utilities Piping for existing and new facilities. Manpower supply for precommissioning and commissioning activities. Page 15 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client Amalgamated Plant Eng. Services Sdn. Bhd. Owner Project Title Duration Contract Amount (RM) MLNG BINTULU Module 5 & 6 Tie-in works & Module 5 EEFU MDD project December 2008 To May 2010 RM 5,750,000.00 December 2009 To March 2010 RM 600,000.00 May 2010 To September 2011 RM 6,200,000.00 Bennova Engineering Sdn. Bhd. Amalgamated Plant Eng. Services Sdn. Bhd. PPMSB PSR 2 Revamp project SMDS BINTULU Fabrication & erection of piping & supports – 43,000 dia. inch that involved several exotic materials. To provide qualified manpower for piping fabrication & erection works, dismantle existing piping system and Tie-in works. Wax Plant project Fabrication & erection of piping - 46,000 dia.inch & 45 ton of pipe support & included all tie-in works. Page 16 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client Kejuruteraan QKS Sdn. Bhd. BWS Engineering Sdn. Bhd. Owner PPMSB MELAKA TOKUYAMA JAPAN Project Title New Bio Diesel Plant Fabricate & erection of piping & pipe support. Fabricate & erection of tank 6102. TMP Project Phase 1 Piping Fabrication Work For Area B1,C1,D1 & U1A. (Estimate 50,000 dia-inch) Piping Erection Work For Area A1 (Estimate 32,000.00 dia-inch) including 60 ton of standard & special pipe support. To Provide Manpower For Punch Killing, Hydrostatic Test & Pre Commissioning Work. Duration Contract Amount (RM) March 2011 To June 2011 RM 545,000.00 September 2011 To December 2011 RM 265,000.00 September 2011 RM 24,000,000.00 To February 2013 Page 17 of 19 KPG Engineering Sdn. Bhd. LIST OF PREVIOUS PROJECTS UNDERTAKEN Client JGC Sp (M) Sdn. Bhd. Aqeel Engineering & Construction Sdn Bhd Owner MLNG Bintulu Sarawak Petronas Carigali Bintulu Sarawak Project Title MLNG & MLNG Dua New Common Reclaimer Project Fabricate & erection of steel structure ( 450 ton ) Mechanical Equipment Rotating. Fabrication & erection of all process piping up to pre commissioning assistant. Dry Gas Diverter Manifold Project Piping Installation. (36” Heavy Wall Pipelines) Duration Contract Amount (RM) October 2012 to August 2013 RM 19,100,000.00 August 2013 to February 2014 RM 12,500,000.00 Page 18 of 19 KPG Engineering Sdn. Bhd. Current Equipment List No. Desription 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) 20) 21) 22) 23) Kato Rough Terrain 45 Ton Crane Kato Rough Terrain 25 Ton Crane Kobelco Rough Terrain 25 Ton Crane Nissan Lorry CW 16 Ton Rigid Crane Volvo Lorry CW 16 Ton Rigid Crane Scania Lorry CW 12 Ton Rigid Crane Scania 40 Ft Lorry Trailer Dahatsu 5 Ton Lorry Toyota Hiace 5 Ton Lorry Toyota Hiace 1/1/2 Ton Lorry Toyota 5 Ton Forklift Toyota 3 Ton Forklift Doosan 150kVA Power Generator Miller 600X Diesel Welding Machine Shidawa 400 A Diesel Welding Machine Power Inverter Welding Machine Portable Power Inverter Welding Machine Double Cab 4wd 12 Seater Passenger Van Saloon Car 4wd Car BS Standard Scaffolding Material Hydraulic Hole Punch Qty 1 1 1 1 1 1 1 1 1 3 1 1 2 10 4 36 60 6 12 5 5 25000m3 2 Page 19 of 19
Similar documents
- Bee Automobile Parts
Wenzhou BEE Automobile Parts Co.,LTD E-mail:[email protected] wbee.en.alibaba.com
More information