CITY OF CHESAPEAKE PPEA PROPOSAL:
CONCEPTUAL PHASE FOR THE DESIGN, CONSTRUCTION
& OPERATION OF A
RECREATIONAL
FACILITY
TABLE OF CONTENTS
I
Executive Summary
Qualifications and Experience
1.a Organization
1.b Experience
1.c Points of Contact
1.d Financial Statement
1.e Conflicts of Interest
2
Project Characteristics
2.a Description of Project
2.b Proposed Project Schedule
2.c Work to be Performed
2.d Permits and Approvals
2.e Adverse Impacts
2.f Positive Impacts
2.g Proposed Schedule
2.h Timely Completion
2.i Assumptions Related to Ownership and Use
2.j Phased Openings
2.k Other Applicable Standards
3
Project Financing
3.a Estimate
3.b Project Plan
3.c Assumptions
3.d Proposed Risk Factors
3.e Resources
3.f Revenue Sources
3.g Tax-Exempt Financing
4
Project Benefit and Compatibility
4.a Project Beneficiaries
4.b Project Support
4.c Public Outreach
4.d Compatibility
4.e Compatibility with Other Plans
5
Other Factors/Appendices
5.a The Proposed Cost of the Qualifying City Project
5.b The General Reputation, Industry Experience, and Financial Capacity of the Private
Entity
5.c The Proposed Design of the Qualifying Project
5.d The Eligibility of the Project for Accelerated Documentation, Review and Selection
5.e Local Citizen and Government Comments
5.f Benefits to the Public
5.g Minority Business Enterprise Participation Plan or Good Faith Effort
5.h The Private Entity’s Plan to Employ Local Contractors and Residents
EXECUTIVE SUMMARY
Background
Our team, led by The YMCA of South Hampton Roads, is pleased to present to the City of Chesapeake this
conceptual PPEA proposal for the design, construction and operation of a public recreation facility with a
competition swimming pool. We propose to construct the project adjacent to the existing Greenbrier YMCA.
By building on the City owned Greenbrier Sports Park, our development benefits from numerous synergies
and economies associated with the proximity and connection to an existing, complimentary facility. The Y is a
national and regional leader in the development and operation of pool facilities, and as a charitable not for profit
organization, it’s the ideal partner for the City of Chesapeake. Currently operating 14 fully equipped family centers in
Southside Hampton Roads, along with many other facilities, camps and programs, The Y has unparalleled experience
in the development and management of family recreation facilities and the ability to serve Chesapeake’s residents
with a commitment to quality service and fiscal responsibility.
SummaryofYMCAProposalvs.PreviouslyProposedCityFacility
YMCAProposal
PreviouslyProposedCity
Facility(150,000SF)
˜‡•–‡–„›–Š‡‹–›‘ˆ
Š‡•ƒ’‡ƒ‡
”‹˜ƒ–‡‡…–‘”˜‡•–‡–
—ƒŽ‡„–‡”˜‹…‡ȋȌ
‡•–‹ƒ–‡†ƒ–ͷΨ
‘–ƒŽ‡„–‡”˜‹…‡
—ƒŽ’‡”ƒ–‹‘ƒŽ
š’‡•‡•ƒ‹†„›–Š‡‹–›
‘ˆŠ‡•ƒ’‡ƒ‡
‹•ˆ‘”††‹–‹‘ƒŽ
’‡”ƒ–‹‘ƒŽš’‡•‡•
—ƒŽƒ‹–‡ƒ…‡
‡•’‘•‹„‹Ž‹–›
—„Ž‹………‡••
̈́ͳͷǡͲͲͲǡͲͲͲ
̈́͵͸ǡͲͲͲǡͲͲͲ
̈́ͷǡͺͲͲǡͲͲͲ
̈́ͳǡʹͲͲǡͲͲͲ
ǦͲǦ
̈́͵ǡͷͲͲǡͲͲͲȋ‡š…Ž—†‡†
‘’‡”ƒ–‹‘ƒŽ‡š’‡•‡•Ȍ
̈́ͷ͵ǡͺͷʹǡͶͲͲ
‹‹—̈́ͳǤ͵‹ŽŽ‹‘–Šƒ–
…‘—Ž†„‡‘ˆˆ•‡–„›‘”‡
‡„‡”•Š‹’†—‡•Ǥ
‹–›‘ˆŠ‡•ƒ’‡ƒ‡
‹–›‘ˆŠ‡•ƒ’‡ƒ‡
̈́ʹ͵ǡ͹ͷͺǡͶͲͲ
̈́͵ͲͲǡͲͲͲ
‡•
•Ž‘™ƒ•̈́ͳͺȀ‘–Š’‡”
ˆƒ‹Ž›™‹–Š
ˆ‹ƒ…‹ƒŽƒ••‹•–ƒ…‡
ͷͲ‘’‡–‹–‹‘‘‘Ž
…Ž—†‡†
‹–‡••”‡ƒ•
š‹•–‹‰ƒ…‹Ž‹–‹‡•
ƒ”’‘‘Ž
š‹•–‹‰†‘‘”
‘‘Ž
ƒ–‡”ƒ”
—–†‘‘”ȋ’”‹˜ƒ–‡Ž›
ˆ—†‡†Ȍ
Ž‹„‹‰ƒŽŽ
‘–…Ž—†‡†
›ƒ•‹—•
‘–…Ž—†‡†
‡‹‘”‡–‡”
…Ž—†‡†
ˆˆ‹…‡‡˜‡Ž‘’‡–
…Ž—†‡†ȋ’”‹˜ƒ–‡Ž›
Ǧ‡ƒ†“—ƒ”–‡”• ˆ—†‡†Ȍ
ǦŠ‡•ƒ’‡ƒ‡ƒ”•Ƭ
‡…”‡ƒ–‹‘
—–—”‡…‘‘‹…
…Ž—†‡†
‡˜‡Ž‘’‡–’’‘”–—‹–›
‡•
̈́ͷͲȀ‘–Š’‡”ˆƒ‹Ž›
…Ž—†‡†
‡™
‡™
†‘‘”
…Ž—†‡†
…Ž—†‡†
‘–…Ž—†‡†
‘–…Ž—†‡†
‘–…Ž—†‡†
EXECUTIVE SUMMARY
Team
The YMCA of South Hampton Roads
The YMCA of South Hampton Roads is the 20th largest YMCA in North America with an annual operating budget
exceeding $45.0 million serving over 200,000 citizens within our region. As of April 2011, the YMCA membership served
35,409 households in our service area. The active membership within the YMCA is 101,557 people.
Over the course of the past 125 years in Hampton Roads, the Y has grown and evolved, but one thing has remained
constant: our mission. It is our reason for being a YMCA, and it is a driving force behind our cause of strengthening the
foundation of community through youth development, healthy living and social responsibility.
The lead editorial in The Virginian-Pilot on January 27, 2011 stated “For more than 125 years the YMCA has filled a critical
role in South Hampton Roads, helping children and adults alike to stay fit, have fun and live well.
It also has been a substantial contributor to the local economy. The nonprofit has an annual payroll of $22 million
and 2,300 employees at facilities stretching from the Outer Banks to the Eastern Shore. It boasts the ninth-largest Y
membership.
The Y has long been known for its dedication to our communities, including its willingness to subsidize memberships for
the needy. The cost to the organization was $5.7 million in last year alone.
The YMCA of South Hampton Roads is governed by a Board of Directors of leading community citizens who are
dedicated to enhancing the quality of life for all our citizens. The management of the YMCA has established a track
record of community impact and financial accountability that is highly regarded within our community.”
MEB General Contractors
MEB will provide general contracting services for this project. Established in 1982, MEB enjoys a nearly 30 year history of
successfully completing work throughout the Hampton Roads region. Headquartered in Chesapeake, Virginia, MEB is
proud to have been recognized in 2002 by the Chesapeake Industrial Development Authority as “Business of the Year”
for outstanding service to the City of Chesapeake. With revenues exceeding $190 million, MEB was ranked among the
“Top 300” largest contractors in the United States by Engineering News Record (ENR) magazine in 2009 and 2010. As
well, Virginia Business magazine has recently ranked MEB as the 9th largest contractor in Virginia and the 2nd largest
based in Hampton Roads. Their portfolio is diverse and includes a wide variety of award winning projects completed
throughout the region. Included in this portfolio is the only indoor, Olympic size, competition pool in Hampton Roads,
the Brittingham-Midtown Recreation Community Center in Newport News. They have constructed numerous other
indoor and outdoor pools and their portfolio includes other specialized experience in a range of project types that involve
complex water piping, storage and filtration, including two recent projects at the Virginia Zoo in Norfolk with large water
park features.
Clark Nexsen
Clark Nexsen is a full-service architecture, engineering, planning and interior design firm headquartered in Norfolk,
Virginia, with branch offices in Roanoke and Richmond, Virginia, Charlotte and Raleigh, North Carolina and Washington,
DC. Founded in 1920, today the firm has nearly 500 employees and a list of projects that covers the entire United States
and 41 countries around the world. The firm has designed major projects for the federal government, state and local
governments, as well as major corporations and all markets in the private sector. We offer full-service design in all aspects
of architecture, including building design, master planning, feasibility studies, facilities management, landscape architecture, interior
EXECUTIVE SUMMARY
design, and construction administration. Our in-house engineering services include civil, environmental, transportation and traffic,
mechanical, electrical, plumbing, structural, and fire protection design. This full-service, in-house capability increases our ability to
respond to client schedule and service needs while allowing increased quality control.
Scope
A proposed development on approximately 12.3 acres to include an approximately 50,000 SF natatorium and multipurpose senior/family center connected to the existing Greenbrier Y with an outdoor water spray park and a 30,000 SF
office complex.
Natatorium
The proposed natatorium will house an 8 lane, 50 m x 25 yd competition swimming pool with a consistent 2 m depth
and spectator capacity of nearly 1000. Supporting the pool will be locker rooms, offices, storage and mechanical
rooms. A connection to the existing Y facility will provide significant benefits including use of the existing pool for
competition warm up, increased staffing and management efficiency, and access to amenities for visitors and parents
during events and practices.
Multi-Purpose Senior & Family Center
Proposed in association with the natatorium structure and includes flexible spaces available for public use for a variety
of community activities and gatherings. Dedicated space for senior citizens will better position the City to meet the
unique needs of this important and growing segment of our population.
Spray Park*
An outdoor, interactive and dynamic water park feature that would be accessible through either a daily guest pass or Y
membership, located adjacent to the existing Greenbrier Y outdoor pool facilities.
Office Building*
The proposed 17,000 to 32,000 SF Class B office facility would house the new headquarters for the YMCA of South
Hampton Roads. Space would be available for lease to the City of Chesapeake Parks and Recreation Department.
The YMCA is working with representatives of the Field House Facility in Virginia Beach, an indoor athletic field
competition facility. The proposed site plan provides for the future development of such a facility that would add a
major new feature to the City of Chesapeake. In the event the development is not feasible to build, the proposed
site plan would support up to 60,000 square feet in new construction that could serve future economic development
opportunities for the City of Chesapeake.
* Construction of the Spray Park and Office Building would be financed by the YMCA.
Project Costs and Investment
The estimated project costs funded by the City for design and construction of the 50,000 Aquatic and Community
Center are $15,000,000. This includes all projected site development work, design fees, engineering, furnishings,
fixtures, and equipment.
The estimated project costs funded by the YMCA for design and construction of the Spray Park and 32,000 SF Office
Building are $5,800,000.
EXECUTIVE SUMMARY
The YMCA Team Advantages
»
The YMCA of South Hampton Roads possesses unmatched experience in the development and operations of
community recreation and pool facilities.
»
The project’s proposed location adjacent to the existing Greenbrier Y facilities significantly reduces initial
development costs.
»
The projects proposed connection to the existing Greenbrier Y facilities reduces operating, staff and management
expenses.
»
The project includes a privately financed spray park, accessible to the public.
»
A local team with a history of commitment to the City of Chesapeake.
»
The YMCA has a strong established membership base of Chesapeake residents currently serving 36,177 members
who live in the City.
»
The YMCA’s Open Doors Program provides financial assistance to those families and individuals who cannot afford
to pay the full fee. Currently, 5,581 Hampton Roads households receive $107,434 in monthly financial assistance to
insure everyone is welcome at a YMCA.
»
The existing Greenbrier Family YMCA already includes most of the features and facilities that were recommended
in the previous proposal before City Council. Other than the new facilities included in our response to the RFP, the
YMCA network of Family Centers can substantially meet the health, wellness, and recreational needs of the citizens
of Chesapeake. By working together with the City to promote the YMCA’s financial assistance and guest pass
programs, all of the City’s families and children can gain affordable access to the YMCA.
»
Programs and services offered at the Aquatic Center, Senior Center, and Outdoor Spray Park do not require YMCA
membership. .
Qualifications and Experience
PART I
QUALIFICATIONS AND EXPERIENCE
a. Identify the legal structure of the firm or consortium of firms making the proposal (i.e.,
corporation, partnership, joint venture, limited liability company). Identify the organizational
structure for the Project, the management approach, and how each principal (i.e., major
shareholder, member, partner) and major subcontractor in the structure fit into the overall
team.
The YMCA of South Hampton Roads, hereafter YMCA, has extensive experience in the design, construction, and
operation of recreation facilities and is the community’s largest operator of indoor aquatic facilities. Founded in 1885,
the YMCA has over 125 years of service to South Hampton Roads. Our proposal project team includes Clark – Nexsen
Architecture and Engineers and Mid Eastern Builders on the design and construction of the Indoor Aquatic and
Community Center and the site development for the entire project. Woodard Architecture and Sussex Development
will provide the design and construction for the proposed office building and spray park.
Management Approach
The YMCA has demonstrated the ability to work collaboratively with local governments and school systems to insure
that project objectives and operating needs are met. Our management approach in project planning and development
is locally inclusive involving key stakeholders throughout the design and development process. During the planning for
the School of Nursing at the College, our team met individually with each individual nursing department to insure the
facility would operate cost effectively and meet the academic needs of the nursing students. Our approach is project
specific and does not include any “cookie cutter” solutions.
PART I
QUALIFICATIONS AND EXPERIENCE
Project Organization Chart
YMCA of South Hampton Roads
William George
Chief Operating Officer
W O O D A R D
D
Contractor
Key Personnel
Designer
Key Personnel
Mark Olmstead, LEED
AP, DBIA
Senior Vice President
David Keith, AIA, LEED AP
Lead Designer
Wesley Bynum
Chief Cost Estimator
Anne Urbi, AIA, VCH,
LEED AP
Project Architect
E
S I
P. C.
G
N
Designer
Key Personnel
Contractor
Key Personnel
Mark Woodard, AIA
Principal-in-Charge
Harry Davis, III
President
Andrew Gautier
Project Manager
Mike Spicer
Project Manager
Danielle Hangen
Project Engineer
Jeff Ocker
Project Superintendent
PART I
QUALIFICATIONS AND EXPERIENCE
b. Describe the experience of the firm or consortium of firms making the proposal and the key
principals involved in the proposed Project, including experience with projects of comparable
size and complexity. Describe the length of time in business, business experience, public sector
experience, and other engagements of the firm or consortium of firms. Include the identity of
any firms that will provide design, construction and completion guarantees and warranties, and
a description of such guarantees and warranties. Provide resumes of the key individuals who
will be involved in the Project.
Developer
YMCA of South Hampton Roads
Since 1991, the YMCA has completed the design and construction of five new family
centers, has purchased and renovated three additional facilities, and developed and
constructed our community’s finest resident camping facility. The YMCA has currently
under construction a new YMCA Family Center and Community Recreation and Senior
Center in Currituck County. The $13.4 million project is scheduled to be completed in
December 2011 and includes a 55,000 square foot YMCA family center; a 10,000 square
foot County operated Senior Center, Park and Recreation offices and new a 8,000
square foot county operated gymnasium. Currituck County is providing the funding
for the entire project. The County and the Y put into place a thirty year operating
agreement that has an unlimited number of ten year renewal options. In 2003, the YMCA
completed construction on a 60,000 square foot facility with the College of Albemarle.
The building, built on the College campus, includes a 40,000 square foot YMCA family
center and the College’s 20,000 square foot School of Nursing at the College of the
Albemarle. The YMCA provided the funding for its share of the facility and pro-rata
share of the site development costs. Both North Carolina projects were design-build
projects managed by the YMCA and its development team and received exemption by
the North Carolina Legislature from the public procurement act. Additionally, the YMCA
operates the Virginia Preschool Initiative for both the City of Chesapeake and the City
of Virginia Beach and operates over 40 school based after school child care programs in
Chesapeake, Norfolk, Portsmouth and Suffolk Public Schools.
PART I
QUALIFICATIONS AND EXPERIENCE
William George
Chief Operations Officer
Mr. George has designed, built, and managed over 40 construction projects
totaling over $60,000,000 in capital development and has substantial expertise
with the successful completion of over 20 indoor and outdoor pool construction
projects including the following YMCA branches:
Greenbrier Family Outdoor Pools
Greenbrier Family Spray Park
Education
Bachelor of Science
Recreation Administration
Virginia Commonwealth
University
1980
Experience
30 Years of Experience
Great Bridge Indoor/Outdoor Pools
Taylor Bend Outdoor Pools
Effingham Outdoor Pool
Suffolk Outdoor Pool
Suffolk Indoor Pool
Suffolk Spray Park
Eastern Shore Indoor Pool
Norfolk Indoor Pool
Albemarle Indoor Pool
Outer Banks Indoor/Outdoor Pools
Hilltop Indoor Pool
Indian River Indoor Pool
Mt. Trashmore Outdoor Pools
Mt. Trashmore Spray Park
Camp Silver Beach Outdoor Pools
Camp Arrowhead Outdoor Pool
PART I
QUALIFICATIONS AND EXPERIENCE
YMCA Company Relevant Experience
PART I
QUALIFICATIONS AND EXPERIENCE
Contractor
Mid Eastern Builders, Inc.
MEB General Contractors was established in 1982 and enjoys a nearly 30 year history of
successfully completing work throughout the Hampton Roads region. With revenues
approaching $200 million, MEB was ranked among the “Top 300” largest contractors
in the United States by Engineering New Record (ENR) magazine in 2009 and 2010. As
well, Virginia Business magazine has recently ranked MEB as the 9th largest contractor in
Virginia and the 2nd largest based in Hampton Roads.
MEB’s portfolio is diverse and includes a wide variety of award winning projects
completed throughout the region. Included in this portfolio is the only indoor, Olympic
size, competition pool in Hampton Roads, the Brittingham – Midtown Recreation
Community Center in Newport News. We’ve constructed numerous other indoor and
outdoor pools in recent years. Our portfolio also includes other specialized experience
in project types that involve various aspects of complex water piping, storage and
filtration, including two recent projects at the Virginia Zoo in Norfolk with large water
features.
Headquartered in Chesapeake, Virginia, MEB is proud to have been recognized in
2002 by the Chesapeake Industrial Development Authority as “Business of the Year”
for outstanding service to the City of Chesapeake. In 2007, the American Public Works
Association (APWA) recognized MEB as “Contractor of the Year”. As a leader in the
successful execution of design/build projects, MEB recently received the distinguished
HRACRE “Excellence in Development Design Award” for design/build work on the
BLACKHAWK! Products Group Corporate Headquarters Facility. In many cases similar
to this, MEB leads the effort from start to finish, assembling design teams, managing
design and preconstruction activities, securing all approvals and permits and following
through on all construction, commissioning and close-out phases. Our clients include
municipalities, state agencies, the federal government and private industry.
A full-time safety staff employed by MEB manages and maintains our high safety
standards on all job sites. The safety of employees and site workers is not only the
backbone of a successful contracting company as a whole, but also an imperative factor
for the completion of a successful project. By conducting random site inspections,
having a solid safety plan of action, as well as keeping all supervising staff OSHA and
CPR certified, MEB remains a safety leader in the construction industry.
PART I
QUALIFICATIONS AND EXPERIENCE
Mark Olmstead, LEED AP, DBIA
Senior Vice President/Senior Project Manager
Mr. Olmstead is a graduate of Virginia Tech and began working at Mid
Eastern Builders (MEB) in 1982 performing as a quality control representative
on contracts for the Navy and Corp of Engineers. He served as a project
manager until 1989 and became Vice President for MEB in 1994. His current
duties include the oversight of project managers, estimating, scheduling, and
strategic planning for MEB’s goals, management, administration & protocol.
Mark has extensive experience in municipal, commercial, industrial, & specialty
construction.
Education
Bachelor of Science
Environmental Science
Virginia Tech
1981
Professional Organizations
Designated Design-Build
Professional (DBIA)
LEED Accredited Professional
President Tidewater
Associated General
Contractors Association
Construction Experience
29 Years of Experience
Brittingham-Midtown Community Center, Newport News, VA
Currently housing the only 50m competitive indoor pool in the Hampton Roads
region, the Midtown Community Center has hosted numerous National events
such as the National Senior Games and the Special Olympics. The 79,500 SF
facility includes an indoor aquatic center, gymnasium, multipurpose rooms, open
air pavilion, administrative offices, computer learning center, as well as a café/
restaurant with complete food service facilities. The aquatic center incorporates
a 14’ deep diving well with a 3 meter and (2) 1 meter diving boards, a moveable
bulkhead for sectioning a variety of activities, a retractable roof for natural
lighting and ventilation, and seating for 500.
Ocean Beach Club Tower Phase II, Virginia Beach, VA
127,396 sf, 20-floor framed residential tower with cast in place concrete exterior
walls, EIFS accent bands, aluminum storefront and curtain wall system, metal
roofing and thermoplastic membrane roofing. All units contained a living suite,
2-bedrooms, full kitchen. Top 4-floors are 2-level penthouse suites. Project
completed on original schedule completion date. $26,000,000.00.
Norfolk Police Department Fire Arms Range, Norfolk, VA
Construction of new 7,000SF, one story masonry structure and adjoining site
improvements to parking lot and utilities. Includes partially enclosed shooting
range with automatic targeting system. Project completed ahead of original
schedule. $4,875,000.00.
Commander Corporate Center, Norfolk, VA
Design/Build of a Class A Headquarters Office/Administrative Building.
Projects consists of two (2) buildings: Building 1 will be three (3) stories
totaling approximately 63,000SF and Building 2 will be four (4) stories totaling
approximately 84,000SF. All associated site work and interior design of common
spaces included. Project completed on original schedule completion date.
$22,000,000.00. HRACRE Excellence in Development Design Award – Best
Office Building (75,000SF).
PART I
QUALIFICATIONS AND EXPERIENCE
Wesley Bynum, LEED AP, DBIA
Chief Estimator
Mr. Bynum graduated from East Carolina University in 2000 with a degree
in Construction Management and joined MEB in 2004. As the firm’s Chief
Estimator, he is responsible for project bids and assembling budget pricing
information on all MEB projects. Mr. Bynum maintains relationships with a
variety of subcontractors and vendors throughout the region and keeps current
on recent historical data with regard to all aspects of construction costs. He is
a Designated Design-Build Professional (DBIA) as well as a LEED Accredited
Professional (LEED AP).
Education
Bachelor of Science,
Construction Management,
East Carolina University
2000
2011
Professional Organizations
Designated Design-Build
Professional (DBIA)
Indian Head River Water Pipe Repairs ≈ $6,300,000 – Hard Bid Design/Build
LEED Accredited Professional
Construction Experience
11 Years of Experience
Zion Crossroads WWTP ≈ $10,000,000 – Hard Bid
Caroline County WWTP ≈ $16,500,000 – Design/Build PPEA
Lynchburg WWTP ≈ $6,000,000 – Hard Bid
2010
ODU Women’s Crew Facility ≈ $2,000,000 – Hard Bid
37th Street WWTP ≈ $8,600,000 – Hard Bid
First Naval Ops Facility ≈ $10,300,000 – Hard Bid Design/Build
POL Upgrades at Eglin AFB ≈ $19,000,000 – Hard Bid
Annapolis WWTP ≈ $14,000,000 – Hard Bid
Ocean Beach Club Phase III ≈ $32,200,000 – Negotiated
Bldg 220 Washington Navy Yard ≈ $7,000,000 – Hard Bid Design/Build
2009
James River WWTP ≈ $24,000,000 – Hard Bid
Smithfield North Consolidation ≈ $7,000,000 – Negotiated Design/Build
Wilderness WWTP ≈ $14,000,000 – Hard Bid
Craney Island Fuel Tanks ≈ $37,000,000 – Hard Bid
Proctors Creek WWTP ≈ $38,000,000 – Hard Bid
Jacksonville Fuel Tanks ≈ $22,000,000 – Hard Bid
Nansemond TP – Ostara Addition ≈ $2,200,000 – Negotiated Design/Build
2008
Southampton WWTP ≈ $27,000,000 – Design/Build PPEA
Virginia Zoo – Trail of the Tiger Exhibit ≈ $14,500,000 – Hard Bid
DECA at Ft. Lee ≈ $21,300,000 – Hard Bid
York River TP ≈ $49,800,000 – Hard Bid
CBN Office Building ≈ $4,300,000 – Negotiated Design/Build
PART I
QUALIFICATIONS AND EXPERIENCE
MEB Relevant Experience
BRITTINGHAM - MIDTOWN COMMUNITY CENTER
NEWPORT NEWS, VIRGINIA
Currently housing the only 50m competitive indoor pool in the Hampton
Roads region, the Midtown Community Center has hosted numerous National events such as the National Senior Games and the Special Olympics.
The 79,500 SF facility includes an indoor aquatic center, gymnasium, multipurpose rooms, open air pavilion, administrative offices, computer learning
center, as well as a café/restaurant with complete food service facilities. The
aquatic center incorporates a 14’ deep diving well with a 3 meter and (2) 1
meter diving boards, a moveable bulkhead for sectioning a variety of activities, a retractable roof for natural lighting and ventilation, and seating for 500.
The Center uses a Colorado timing system, land and water fitness equipment
and is U.S. Water Fitness Certified. The tournament quality gymnasium houses a full length, wood floor basketball court encircled by a walking track as
well as a performance stage and seating for 200. The 14,000 SF open air pavilion includes (2) full size basketball courts with tennis capabilities. Ranging in capacity from 30 – 80 seats, the (8) flexible use multi-purpose rooms
are equipped with (2) demonstration kitchens, mirrored dance rooms, (2)
mini stages, and instructional computer labs. Pool filtration systems were
installed to Department of Environmental Health standards. Construction
consisted of a structural steel frame with a masonry and brick veneer and
a standing seam metal roof. The aquatic center includes a retractable roof
and the building’s HVAC systems were designed and installed to condition
the natatorium space with the roof closed as well as with the roof opened.
Construction Cost
$9,125,641.00
Size
79,500 SF
Owner Reference
Mr. Dave Callahan
City of Newport News
2400 Washington Ave
Newport News, VA 23607
Ph: 757.926.8611
Project Manager:
Mr. Mark Olmstead
PART I
QUALIFICATIONS AND EXPERIENCE
MEB Relevant Experience
OCEAN BEACH CLUB TOWER, PHASE II
VIRGINIA BEACH, VIRGINIA
MEB General Contractors provided negotiated general contracting services
on this twenty story, 127,000 SF, reinforced concrete tower in Virginia Beach.
The highly visible project along the beach’s resort strip includes both indoor
and outdoor pools with a variety of water features. As construction began, the
owner directed nearly complete redesigns for the entire ground floor, including
a significantly larger pool, redesigned penthouse units and ADA revisions,
and MEB managed the process to have minimal impact on the budget and no
impact on the schedule. The complex project is a twin addition to Phase 1,
which is similar in size and scope and was fully occupied during the entirety
of the construction process. The sensitivity to construction activity included
not only the connection to the existing building, but also significant work on
the ground level, both inside and outside. Renovations to the existing facility
included a redo of the existing Tortuga’s Restaurant kitchen while operational,
work in existing units on occupied floors and the addition of new elevators in
the existing building core. This resort facility is highly dependant on satisfied
customers, and it was critical that MEB not disrupt the activities of the guests,
either in the existing tower or on the ground floor amenities such as the lobby,
pools, restaurants and bars. Construction operations were maintained in a
densely developed section of the oceanfront, with minimal construction lay
down and storage areas available. The oceanfront high rise is enclosed in a glass
curtainwall system and comprised of one, two and three bedroom apartments, as
well as luxury duplex penthouse suites. The poured in place concrete structural
is built on a pile foundation. The project includes both indoor and outdoor pool
with fountains and spray park features. Both indoor and outdoor pools use a
common disinfection and filtration system and the indoor pool makes use of
a state-of-the-art dehumidification system.
Construction Cost
$25,919,223.95
Size
127,000 SF
Owner Reference
Mr. Bryan Cuffee
Development Manager
Gold Key / PHR Hotels & Resorts
932 Laskin Rd.
Virginia Beach, VA 23451
Ph: 757.213.4340
Project Manager:
Mr. Mark Olmstead
PART I
QUALIFICATIONS AND EXPERIENCE
MEB Relevant Experience
THE VIRGINIA ZOO - TRAIL OF THE TIGER EXHIBIT
NORFOLK, VIRGINIA
This 10 acre outdoor exhibit included complex earthwork, underground utility,
and other specialized sitework construction. Underground construction of two
concrete pile supported artificial rockwork moats included mass excavation,
sheet piling and well point dewatering. Site construction also included earthen
walkways, concrete pavement and sidewalks, perimeter fencing, manual and
electrical gates for active and passive barriers, irrigation systems, wooden
boardwalks, significant landscaping, as well as the routing, extending and new
installation of all utilities including stormwater, water, and sanitary sewer. MEB
General Contractors maintains the required equipment and site crews to self
perform these critical sitework activities. Buildings were constructed on concrete
masonry, structural steel and suspended slabs. The various facilities include
administrative offices, animal housing, labs, and public exhibits. Specialized
interior construction included caging systems, specialty hardware, special
coatings, complex HVAC and electrical systems, and extensive site lighting.
Included in the project are (3) natural environment swimming ponds treated
with both chlorine and U/V disinfection systems to maximize water clarity.
Based upon the outdoor environment and use of the systems by animals, the
filtration systems are designed to surpass the typical standards of a common
public pool. Also included in the project are (2) interactive spray parks for
young park visitors that include fountains and other features
Construction Cost
$14,715,188.62
Owner Reference
Greg Bockheim
Virginia Zoological Park
3500 Granby Street
Norfolk, VA 23504
(757) 441-2371
Project Manager:
Mr. Mark Olmstead
PART I
QUALIFICATIONS AND EXPERIENCE
MEB Relevant Experience
OSCAR SMITH MIDDLE SCHOOL
CHESAPEAKE, VIRGINIA
MEB constructed this 245,000 SF middle school in Chesapeake, VA, that
required extensive sitework on the 11 acre parcel including demolition of
existing structures for construction of the athletic fields, parking and significant
underground site utilities. This state-of-the-art facility contains a competition
quality gymnasium with bleacher seating for 600, a wide variety of classrooms,
labs and multi-purpose areas, administrative offices, large locker rooms, a
professional full service kitchen and cafeteria, as well as outdoor recreational
areas. Although not LEED certified, the construction incorporates numerous
aspects of LEED NC sustainable practices, including rainwater harvesting with
four (4) exterior underground 65,000 gallon tanks to collect building runoff
for use on site. The interior layout includes light harvesting practices that bring
natural light into internal areas of the building. Numerous other sustainability
aspects were designed into the building systems such as motion sensor lighting
controls that help meet energy goals. Constructed using a variety of structure
types, the facility is built primarily of a concrete block and steel frame, a brick
masonry exterior with both low slope and standing seam metal roofing. The
existing middle school remained occupied during construction of the new
school and tie-in to existing utilities was coordinated in and around the daily
activities of the more than 1,000 students.
Construction Cost
$41,450,080.00
Size
245,000 SF
Owner Reference
Dr. Len Wright
Chesapeake Public Schools
Ph: 757.547.0013
Project Manager
Mr. Stefan Artis
PART I
QUALIFICATIONS AND EXPERIENCE
MEB Relevant Experience
BLACKHAWK! CORPORATE HEADQUARTERS
NORFOLK, VIRGINIA
MEB was the Design-Builder for this 65,000 SF, Class A, 4-story, corporate
headquarters facility for Blackhawk Products Group in Norfolk, VA. MEB
and HBA Architects worked closely with the owner to develop a design that
portrayed the unique image of its occupants while maintaining a strict budget
and schedule. The project includes a gym with locker room, an employee café,
a retail showroom as well as design features such as a sloped stone pier entry,
a hand worked copper lobby wall and a forth floor exposed structure executive
board room overlooking the airport and golf course. Acting as the Owner’s
agent, MEB’s preconstruction team managed a complex approval process that
involved private land owners, numerous attorneys, the US Navy, the Federal
Aviation Administration (FAA), the Bay Coast Railroad, Lake Wright Golf
Course and many departments within the City of Norfolk. MEB’s estimating
and project management team was involved in all phases of design from
original conception to details, providing constant feedback on the budget while
recommending design alternatives and constructability reviews. Significant
utility challenges that threatened job progress were managed and overcome after
construction had begun, including the late requirement of a pump station and
installation of nearly one mile of direct bury force main under Lake Wright Golf
Course, connecting to an HRSD line. Numerous early permits were obtained to
accelerate the schedule and MEB took significant risk to assure progress while
site plan approval was completed.
Recipient of HRACRE Excellence in Development Design Award of
Merit – Best Office Building, AIA Excellence in Design Award, and Metal
Architecture Magazine, September 2008, Market Feature.
Construction Cost
$14,690,726.00
Size
66,000 SF
Owner Reference
Mr. Mike Noell
BlackHawk Products, Inc.
6160 Commander Pkwy.
Norfolk, VA 23502
Ph: 757.436.3101
Project Manager:
Mr. Mark Olmstead
PART I
QUALIFICATIONS AND EXPERIENCE
Designer
Clark Nexsen Architecture and Engineering
Clark Nexsen is a full-service architecture, engineering, and interior design firm headquartered in
Norfolk, Virginia. Founded in 1920, today the firm has nearly 500 employees and a list of significant
projects in the Southeast and Mid-Atlantic States and 32 countries around the world. The firm
has designed major projects for the Federal government, state and local governments, as well as
major corporations and all private sector markets.
We offer full-service design in all aspects of architecture. Our in-house engineering services include
civil, environmental, transportation and traffic, mechanical, electrical, structural, fire protection
as well as plumbing design. This full-service, in-house capability increases our ability to respond
to our client’s schedule and service needs while allowing us to increase quality control. Given
today’s litigious society, it is notable that we have never been to court as a litigant with a client or
contractor. We have never missed a client’s deadline for beneficial occupancy of a project.
Clark Nexsen is a service-oriented design firm. We assure our clients of Principal involvement and
commitment on every project. Every member of our staff undergoes training in communication,
team building, and conflict resolution skills. We have a very low employee turnover rate, assuring
our clients of continuity throughout the life of a project.
Clark Nexsen has long been an advocate of ecologically sustainable design. The incorporation
of sustainable building ideas, such as green building, intelligent building and energy efficiency,
has been an integral part of our design excellence. Clark Nexsen has 168 LEED Accredited
Professionals among our design staff.
PART I
QUALIFICATIONS AND EXPERIENCE
David Keith, AIA, LEED AP
Lead Designer
Mr. Keith, Director of Architecture, has 24 years of experience with the planning,
programming and design of various facilities. A gifted designer that maintains
involvement in all phases of his projects, Mr. Keith will ensure overall design excellence
and that the designers working on the project contribute positively to your goals and
needs. David’s works have been recognized at local, state, national and international
levels in publications such as Global Architecture, Architecture Magazine, and Inform
Magazine.
Wellness Center - Hampton, Virginia
Education
Bachelor of Architecture
Virginia Tech
1987
Registration
Registered Architect
Virginia
North Carolina
Ohio
Professional Organizations
American Institute of
Architects
Design Experience
24 Years of Experience
This center is a 3-story, 72,735 SF outpatient services facility, and is home to a
hospital-based physical therapy/rehabilitation program and a specialty physician
practice that serves Bariatric patients. The building’s anchor tenant, Sentara
Health System, developed a 35,000 SF wellness/fitness center that includes a
number of elements to support the facility’s “wellness” focus, such as a large
gym area for exercise, encompassed by a barrier-free walking track.
The facility also houses two pools - one for therapy and one for exercise. Several
private “studios” are included adjacent to the gym area to provide classroom
space for wellness and fitness programs. Other amenities at the facility include
a grouping of conference/meeting rooms accessible from the main lobby to
support “after-hours” access, as well as a covered drop-off canopy and vestibule
at the main entry.
Ocean Beach Club - Virginia Beach, Virginia
The Ocean Beach Club consists of a multi-phased development for Gold
Key Resorts located at Atlantic Avenue and 34th Street at the Virginia Beach
oceanfront. NCG Architects of Atlanta, Ga developed the initial master plan,
in August 2002 and then Clark Nexsen took up the task to bring the dreams to
reality. The Design Continuum was brought on board to provide Interior Design
services and together the Team developed the dramatic redevelopment of this
once “tired” block. Phase 1 of the multi - phased, contemporary beach resort
architecture, consists of a 98 unit, stand alone, timeshare tower of eighteen
floors and 137,200 square feet.
Other Relevant Experience (while employed elsewhere):
Meadowbrook High School Recreation Center, Chesterfield County, Virginia
Student Activities Center, The College of William and Mary, Williamsburg,
Virginia
Charlotte Knights Stadium, Charlotte, North Carolina
North Carolina State Centennial Center Arena, Charlotte, North Carolina
University of North Carolina Arena and Activities Center, Charlotte, North
Carolina
PART I
QUALIFICATIONS AND EXPERIENCE
Anne Urbi, AIA, VCH, LEED AP
Project Architect
Ms. Urbi has more than 28 years of architectural experience. She is experienced
in all phases of architecture, including programming, design, and construction
documents. She is proficient in landscape architecture and site analysis. Ms.
Urbi is experienced with renovation of structures including historic designation
and new construction at any scale. She has developed programming studies,
prepared cost estimates, plans, and specifications for a wide range of building
types.
Camelot Recreation Center - City of Chesapeake, Virginia
Education
Master of Architecture
Washington University, St.
Louis
1983
Bachelor of Arts
Art History
College of William & Mary
1979
Registration
Registered Architect
Virginia
LEED Accredited Professional
Certified Horticulturist
CDT
Design Experience
28 Years of Experience
Work includes the construction of a 1800 SF Club Room Addition and a 1000
SF Weight Room addition to the existing Camelot Recreation Center and the
renovation of the existing toilet facilities, meeting room and adjacent corridors,
related to those additions to the buildings. The project is designed to be
energy utilizing LEED principals but no LEED certification will be obtained.
Cultural Center Evaluation - City of Chesapeake, Virginia
Our research and evaluation looked at the demand for arts and cultural
performance venues, Our assessment of the market revealed a latent demand
for family-oriented activities given the overwhelming percentage of households
with children (nearly 47% of Chesapeake households).
Old Dominion University Women’s Crew Facility - Norfolk, Virginia
The Women’s Crew Facility is located in Lakewood Park, Norfolk, VA, and
contains storage space for boats and equipment, locker and shower facilities
for team members, offices and toilets for coaches and staff, and an open activity
space. The facility is a two-story, pre-engineered metal building with exterior
finish materials matching the existing crew facilities located on the adjacent site
(split face CMU, hardy plank siding and asphalt shingle roof).
Ocean Beach Club - Virginia Beach, Virginia
The Ocean Beach Club consists of a multi-phased development for Gold
Key Resorts located at Atlantic Avenue and 34th Street at the Virginia Beach
oceanfront. NCG Architects of Atlanta, Ga developed the initial master plan,
in August 2002 and then Clark Nexsen took up the task to bring the dreams to
reality. The Design Continuum was brought on board to provide Interior Design
services and together the Team developed the dramatic redevelopment of this
once “tired” block. Phase 1 of the multi - phased, contemporary beach resort
architecture, consists of a 98 unit, stand alone, timeshare tower of eighteen
floors and 137,200 square feet.
PART I
QUALIFICATIONS AND EXPERIENCE
Clark Nexsen Relevant Experience
Ray’s Splash Planet-
Charlotte, North Carolina
Construction Cost
$6,385,671
Completion Date
2002
Owner
Mecklenburg County
Parks and Recreation
Ray’s Splash Planet is a significant addition to the County’s public park and greenway
system. The major component of this project was the addition of a new 33,000 SF
indoor recreation center with an indoor “attraction” pool as its focus. The project also
incorporates an extensive 1.5 mile greenway trail system.
The building itself is carved from the site that supports it. Masses of rock were
excavated to create a sense of erosion that reveal the smooth, more polished mass of
the building. A story and a half curved glass wall runs the length of the building further
creating the sense of water penetrating and eroding the massive volumes that crest the
site. Smaller masses are created as the water continues to erode and break down the
mass of the building and its site leaving the entry to the building at a human scale.
Awards
ASHRAE Regional Technology Award, First Place- Category V, New Public Assembly
PART I
QUALIFICATIONS AND EXPERIENCE
Clark Nexsen Relevant Experience
Mallard Creek Recreation CenterConstruction Cost
$2,400,000
Completion Date
1999
Owner
Mecklenburg County, NC
Charlotte, North Carolina
The program for this 20,050 SF project included a multi-purpose gymnasium with
a high school regulation basketball and volleyball court and two additional cross
courts; associated bleacher seating for a capacity of 300; an exercise room with both
cardiovascular and weight equipment; a child play area featuring a modular climbing
apparatus for both toddlers and young children; a meeting/dining area subdividable
into three individual rooms with a catering kitchen; a computer room; a lounge with
space for television, reading, and vending; a police courtesy office; and a public lobby
with a reception control desk and an administrative suite. The design for this project
provided the children’s climbing apparatus inside a separate structure at the entrance
of the building to act as a visual focal point.
PART I
QUALIFICATIONS AND EXPERIENCE
Clark Nexsen Relevant Experience
Flightline Fitness Center
Construction Cost
$2,400,000
Completion Date
2000
Owner
NAVFAC
-
Aviano Air Base, Aviano, Italy
This project consists of a 54,400 SF (5,055 m2) fitness center with a large aerobics room,
weight room, cardiovascular room, locker rooms, six racquetball courts, and a gym
capable of supporting one basketball game with 1,700 spectators or two separate
games with 300 spectators each. The exterior was designed in the Italian vernacular
which includes concrete framing, masonry walls, clay tile roofing, cement stucco,
and stone tile accents. Areas in this fitness center include a large open lobby and
reception area for check-in and merchandise sales, central atrium at intersection of
corridors with natural lighting from above, weight and cardiovascular rooms with large
exterior windows with views, gymnasium capable of supporting two basketball games
simultaneously, bleacher seating for approximately 1,600 spectators, and two male and
female locker rooms for opposing teams.
PART I
QUALIFICATIONS AND EXPERIENCE
Clark Nexsen Relevant Experience
Wellness Center
-
Hampton, Virginia
Construction Cost
$11,062,564
Completion Date
2007
Owner
Sentara
This center is a 3-story, 72,735 SF outpatient services facility, and is home to a hospitalbased physical therapy/rehabilitation program and a specialty physician practice that
serves Bariatric patients. The building’s anchor tenant, Sentara Health System, developed
a 35,000 SF wellness/fitness center that includes a number of elements to support the
facility’s “wellness” focus, such as a large gym area for exercise, encompassed by a
barrier-free walking track.
The facility also houses two pools - one for therapy and one for exercise. Several private
“studios” are included adjacent to the gym area to provide classroom space for wellness
and fitness programs. Other amenities at the facility include a grouping of conference/
meeting rooms accessible from the main lobby to support “after-hours” access, as well
as a covered drop-off canopy and vestibule at the main entry.
Awards
2007 Hampton Renaissance Award- Best Design and Construction 2007
PART I
QUALIFICATIONS AND EXPERIENCE
Clark Nexsen Relevant Experience
Powhatan Sports Center
Construction Cost
$19,260,000
Size
58,000 SF
Completion Date
2008
Owner
Old Dominion University
-
Old Dominion University, Norfolk, Virginia
Powhatan Sports Center houses Old Dominion University’s new football team’s practice
quarters and is home to the field hockey and women’s lacrosse programs. The 58,000
SF facility was constructed adjacent to existing Powhatan Field, the home field for the
Maury and Granby High School football teams.
The football side of the L-shaped structure borders Powhatan Avenue and has a 6,500
SF weight room, a 3,000 SF training room, football offices, meeting rooms, and locker
rooms. There is a 100-yard practice field and a 60-yard practice field.
The centerpiece of the Powhatan Sports Center is a field hockey and lacrosse field with
seating for 1,500 and a second-story balcony area off the main building overlooking the
field. There is also room for 1,500 temporary seats when needed.
PART I
QUALIFICATIONS AND EXPERIENCE
W O O D A R D
D
E
S I
P. C.
G
N
Designer
Woodard Design, PC
Formerly established as Walker Woodard Architects in 1992, the design firm was
reorganized in 2002 as Woodard Design, P.C. and resides in the City of Norfolk. Mark
Woodard, President of the firm, has over 30 years of experience in a wide range of
Architectural and Interior Design projects and has been very successful in producing
quality projects on time and within budget. Our firm has a long history of project design
and a successful record of managing all phases of project design. Our team members
all have AUTOCAD 14 and later capabilities as well as the latest technology for meeting
project schedule requirements. Our CADD Manager, Andy Gautier oversees all CADD
operations and manages our AUTOCAD DRAWING production. Our Office Manager,
Charlotte Stoneman, has extensive experience in word processing, bookkeeping,
proposal and contract production as well as specifications production. We have the
expertise and ability to bring together and coordinate a design team capable of
addressing the full range of our clients’ architectural and facilities challenges. Our
team has continually demonstrated the ability to design, communicate, coordinate,
meet demanding project schedule, provide quality construction documents and control
construction costs for all of our projects.
Woodard Design, P.C. leads a team of talented and experienced design professionals.
Our project experience along with our history of successful project delivery qualifies our
team for all phases of work anticipated for this annual contract with the City of Franklin.
Woodard Design, P.C. has worked with a top quality group of professionals in the
successful completion of various types of projects. We have extensive experience in the
planning and design of new construction and additions, renovations, and alterations to
existing facilities, architectural inspections and/or evaluations and prepare inspection
reports. We provide architectural design for projects which include scope studies and
cost studies. Our firm will provide construction administration services which include bid
review, shop drawing review, issuing change orders, and holding on-site meetings with
the contractor including periodic visits to the site to review progress of the work and
make final and warranty inspections.
The projected workload for our current projects is moderate and would NOT adversely
impact our capability to perform the services required by the City of Franklin. We
believe in “doing what it takes to get the job done.” Our collaborating architectural firm
is also immediately available to participate in significant new projects.
Our success is directly related to the repeat client business established since 1992. The
following is a list of our repeat clients:
1.
S. Hampton Roads YMCA
Over 25 projects completed
1992-2009
2.
City of Norfolk
10 projects completed
1998-2009
3.
4.
The Environmental Co.
Atlantic Builders
Over 30 FCA’s completed
8 projects completed
1995-2004
2000-2009
5.
Kimley –Horn & Asso.
4 projects completed
2008-2011
PART I
QUALIFICATIONS AND EXPERIENCE
W O O D A R D
D
E
S I
P. C.
G
N
Mark Woodard, AIA
Principal-in-Charge
Mark Woodard, a firm principal with 30 years of experience, has a broad range
of experience in Corporate, Institutional, Governmental, Commercial and
Residential projects, both new construction and repairs/renovations. His project
skills include programming and project scope development, facility planning
and feasibility studies, project management and contract administration. Mr.
Woodard will assure that our design team’s ability to provide quality design and
responsive service will be maintained, even with fast-track projects and multiple
tasking.
Education
Bachelor of Architecture
Virginia Tech
1979
Registration
Registered Architect
Virginia
North Carolina
New Great Bridge Family YMCA, Chesapeake, VA
Professional Organizations
American Institute of
Architects
National Council of
Architectural Registration
Boards
Design Experience
30 Years of Experience
Franklin Light House, Franklin, VA (Kimley-Horn)
Suffolk YMCA Reno. & Additions, Suffolk, VA (Kimley-Horn)
Portsmouth YMCA Reno. & Pool Enclosure, Ports., VA
Hilltop Family YMCA Addition, Virginia Beach, VA
W O O D A R D
D
E
S I
P. C.
G
Education
Associates Degree
CAD Operator/Mechanical
Drafter
Woodrow Wilson School of
Drafting
1986
Design Experience
22 Years of Experience
N
Andrew Gautier
Project Manager
Andy Gautier has been the CAD Department Manager for our firm for over 15 years
with over 22 years of CAD experience. His vast experience includes coordinating
work schedules with other office personnel, maintaining and correcting any software
or hardware related problems, as well as generating final construction documents
and being responsible for all deadlines to be met by the CAD department. Andy has
also managed the production and coordination of 90% of our YMCA projects from
design through construction documents.
New Great Bridge YMCA, Chesapeake, VA
New Northern Suffolk YMCA, Chesapeake, VA
New Outer Banks YMCA, Nags Head, NC
Suffolk YMCA Community Center, Suffolk, VA (Kimley-Horn)
Chesapeake YMCA Addition/Renovation, Ches., VA
Eastern Shore YMCA Campground, Onley, VA
Indian River YMCA, Chesapeake, VA
Franklin High School Gym Addition, Franklin, VA (Kimley-Horn)
PART I
QUALIFICATIONS AND EXPERIENCE
Woodard Relevant Experience
06011.01
Greenbrier YMCA – New Pump House
08011.05
Greenbrier Primary School Gymnasium
06011.02
Suffolk YMCA – New Pump House
08011.06
Downtown Norfolk Renovations
06011.03
Camp Silver Beach Shelters
08011.07
Downtown Norfolk YMCA- AZARS
06011.04
Mt. Trashmore – Childcare location
08011.08
Franklin YMCA - Renovations
06011.05
Suffolk Existing YMCA - Renovation
09011.01
NW River Day Camp – Assembly Bldg.
06011.06
Northern Suffolk – Pool House
09011.02
River Day Camp – Group Shelters
06011.07
Northern Suffolk – CAD Rendering
09011.03
NW River Day Camp – Program Lodge
06011.08
Batten family YMCA - Norfolk
09011.04
NW River Day Camp - Pavilion
06011.09
06011.10
Downtown YMCA – Bute St. Entrance
Downtown YMCA – Light Rail
09011.05
NW River Day Camp – Bath House
09011.06
NW River Day Camp – Pool Bath House
06011.11
Camp Silver Beach – as built cabins
09011.07
Suffolk – Sentara Expansion
06011.12
Great Bridge – Remote Fitness Center
09011.08
Hilltop – Expansion with Sentara
06011.13
06011.14
06011.15
Camp Silver Beach – Program Lodge add.
Camp Silver Beach – Dining Hall add.
Suffolk – Mezz. Addition to exist. gym
09011.09
Indian River – Interior Pool
09011.10
Downtown Norfolk – Dumpster Enclosure
06011.17
07011.01
Suffolk YMCA – OBICI Health Care Add.
Va. Beach – YMCA Day camp
09011.11
Currituck - New YMCA
07011.02
1st. Tee of H.R. – Upshur Golf Facility
09011.12
09011.13
Suffolk YMCA – Outdoor Center
Mt. Trashmore Bath House
07011.03
Camp Young - Chesapeake
10011.01
Culpepper Landing
07011.04
Princess Anne YMCA - New
10011.02
Hilltop Cardio Expansion – Existing Pool
07011.05
Northwest River Day Camp
Gym Addition & Renovation to Greenbrier
07011.06
Chesapeake – Taylor Bend Mezz add.
10011.03
North
07011.07
Taylor Bend – Bath House/Equip. room
10011.04
Youth Center
New Pavilion / Bath House to Suffolk
07011.08
Princess Anne – New YMCA
10011.05
New Princess Anne YMCA
07011.09
Virginia Wesleyan Camp
10011.06
New Hilltop Bath House
08011.01
Addition
Suffolk YMCA – Childcare Reno &
10011.07
Franklin YMCA
08011.02
Design #2
Upshur Neck – 1st. TEE Clubhouse
11011.01
Suffolk Pavilion Bath House
11011.02
Suffolk Shelters
08011.03
Renovations
Great Bridge – Gym Addition &
11011.03
Suffolk Pump House
11011.04
Suffolk Amphitheater
08011.04
Eastern Shore-Dining Hall
11011.05
Greenbrier Family Master Plan
PART I
QUALIFICATIONS AND EXPERIENCE
Contractor
Sussex Development Corporation
Founded:
May 20, 1990
Main Office Location:
1604 Hilltop West Executive Center, Suite 300
Virginia Beach, Virginia 23451
Principals:
Harry L. Davis, III, President
Mike Spicer, Vice President
Employees:
Twenty Five total employees including 4 Project
Management staff personnel, 10 Superintendents,
2 Carpenters, 1 Accountant, and necessary Office Support
staff.
Project Types:
Commercial construction project types including stand alone
commercial, institutional, and industrial facilities as well as
interior upfit.
Preconstruction Services:
Project development budgeting to include conceptual hard
cost and soft cost estimating, project scheduling, and value
engineering analysis.
Computer Based
Systems and Reports:
Project estimating, construction scheduling, and monthly job
cost accounting.
Bonding Capacity:
$15,000,000.00, on a per project basis.
Bonding Agent:
Hampton Roads Bonding
1080 Laskin Road, Suite 204
Virginia Beach, Virginia 23451
Bonding Company:
Unites States Surety Company
Safety:
Sussex Development employs a third party safety
management firm that provides regular project
inspections, training and consulting services. The following
are part of our safety program: Company Safety Manual;
Weekly “Toolbox” safety talks on every project;
OSHA training for all project staff; first aid training for
all project staff; MSDS compliance; a drug-free workplace
policy with random drug testing.
Work Performed by
Our Own Forces:
Sussex Development self performs approximately 12% of the
work of any project, on average. We self perform field
engineering layout, concrete demo and replacement, rough
carpentry, installation of doors & hardware,and installation of
finish carpentry trim.
PART I
QUALIFICATIONS AND EXPERIENCE
Harry Davis, III
President
Mr. Davis, a 1978 graduate of Virginia Polytechnic Institute and State University
with a Bachelor of Science in Building Construction, has over 25 years of proven
experience to lead a design build/construction management entity. Before
forming Sussex Development, Mr. Davis worked with a combination of General
Construction and Real Estate Development firms in the region. He possesses
considerable knowledge in institutional, commercial, industrial and medical
arenas.
Education
Bachelor of Science
Building Construction
Virginia Tech
1978
Construction Experience
25 Years of Experience
Mike Spicer
Project Manager
Mr. Spicer, a member of the Sussex Team since its inception, has almost 40 years
of proven experience with multi-million dollar projects. His experience has been
in medical, commercial buildings, institutional facilities and industrial facilities.
His dedication to excellence has been exemplified in the multiple repeat
projects for our existing clientele.
Notable projects include:
YMCA Downtown Norfolk Renovation, Norfolk, Virginia
Construction Experience
40 Years of Experience
Colonial Inn Hotel, Virginia Beach, Virginia
Rivers Edge Building, Virginia Beach, Virginia
YMCA Indian River Road, Chesapeake, Virginia
YMCA Elizabeth City, Elizabeth City, North Carolina
Long & Foster Realtors, Virginia Beach, Virginia
Towne Bank Portsmouth Boulevard, Chesapeake, Virginia
Currituck YMCA & Community Center, Currituck, North Carolina
PART I
QUALIFICATIONS AND EXPERIENCE
Sussex Relevant Experience
The YMCA / Sussex Team have developed a number of successful projects together over the last twelve (12)
years. A select list of those projects is delineated below:
YMCA ONLEY – A new stand alone facility of 18,500 square feet completed in 1999. The facility has an EIFS exterior
with aluminum storefront punch type windows and a flat single ply membrane roof. The facilities include an interior pool
and a gymnasium.
YMCA NAGS HEAD – A new stand alone facility of 30,000 square feet completed in 2001. The facility has a
combination masonry / vinyl siding exterior with a pitched shingle roof. The facilities include an interior pool, a
gymnasium, an outdoor water park, and a skate park.
YMCA GREAT BRIDGE – A new stand alone facility of 45,000 square feet constructed in a number of projects with the
last work completed in 2009. The facility has an EIFS exterior with storefront punch type windows and a flat single ply
membrane roof. The facilities include an interior pool, a gymnasium, a mezzanine area, an outdoor water park, and
sublet medical offices.
YMCA ELIZABETH CITY / COA SCHOOL OF NURSING – A new stand alone facility of 62,000 square feet completed
in 2003. The facility has a brick veneer exterior, aluminum storefront windows, and a single ply membrane flat roof. The
facilities include an indoor pool, an indoor gymnasium, sublet medical office, and a classroom facility for College of the
Albemarle.
YMCA CURRITUCK / CURRITUCK SENIOR CENTER – A new stand alone facility of 74,000 square feet currently under
construction in Currituck, North Carolina. The facility has a brick veneer exterior, aluminum storefront windows, and
a standing seam metal roof. The facilities include an indoor pool, an outdoor pool, two indoor gymnasiums, sublet
medical office, and a Senior Center for the County of Currituck.
YMCA EXPANSION PROJECTS – We have constructed expansion projects at the Suffolk Branch, the Nags Head
Branch, the Greenbrier Branch, and the Great Bridge Branch.
YMCA RENOVATION PROJECTS – We have performed significant renovations of the Taylor Bend Branch, the Indian
River Branch, and the Norfolk Branch.
PART I
QUALIFICATIONS AND EXPERIENCE
c. Provide the names, addresses, and telephone numbers of persons who may be contacted
for further information.
Developer
Contractor
YMCA South Hampton Roads
Sussex Development Corporation
William H. George, Chief Operating Officer
Harry L. Davis, III, President
250 W. Brambleton Ave, Suite 100
1604 Hilltop West Executive Center, Suite 300
Norfolk, VA 23510
Virginia Beach, VA 23451
Ph: 757.622.7524
Ph: 757.422.2400
Contractor
Designer
Mid Eastern Builders, Inc
Woodard Design, PC
Mark F. Olmstead, LEED AP, DBIA, Senior Vice President
Mark K. Woodard, AIA, Principal in Charge
4016 Holland Boulevard
1100 Granby Street, Suite 201
Chesapeake, VA 23323
Norfolk, VA 23510
Ph: 757.487.5858
Ph: 757.466.1400
Designer
Clark Nexsen Architecture and Engineering
Benjamin W. Hatcher, AIA, LEED AP, Managing Principal
6160 Kempsville Circle, Suite 200A
Norfolk, VA 23502
Ph: 757.455.5800
PART I
QUALIFICATIONS AND EXPERIENCE
d. Provide a current or most recently audited financial statement of the firm or firms and
each partner with any equity.
The YMCA’s most recently completed audited financial statement is included in Part V of this proposal.
e. Identify any persons known to the proposer who would be obligated to disqualify
themselves from participation in any transaction arising from or in connection to the project
pursuant to Virginia State and Local Conflict of Interest.
The YMCA of South Hampton Roads is unaware of anyone on our team who would be obligated to disqualify
themselves from participation in any transaction arising from or in connection to the project pursuant to the Virginia
State and Virginia State and Local Conflict of Interest Act.
Project Characteristics
PART II
PROJECT CHARACTERISTICS
a. Provide a description of the Project including the conceptual design. Describe the
proposed Project in sufficient detail so that type and intent of the Project, the location, and
the communities that may be affected are clearly identified.
Project Definition
The YMCA is proposing to partner with the
City of Chesapeake to develop Greenbrier Park
located adjacent to the Greenbrier Family Center
located at 1033 Greenbrier Parkway. This project
would construct a public facility which will benefit
both the citizens and the regional population.
It will feature an aquatic center, a senior center,
spray park, office complex and leasable parcel
for future use. The new construction will not only
operate in conjunction with the existing YMCA
of Greenbrier, but create a new identity for the
complex, one which is more inviting.
The facility is prominently visible from Greenbrier
Parkway. Activity from the spray park will
purposely catch the attention of passers- by. Its
main entrance takes advantage of an existing
signalized entry point/curb cut and will fit in with
the current traffic pattern.
PART II
PROJECT CHARACTERISTICS
The focal point of the site is a sweeping lobby and reception area paralleling the main road, with a
cantilevered canopy marking the entrance. Both physical and visual access to the existing YMCA and
proposed public facilities is maintained through this link. It will have curtain wall exterior closure with
terrazzo flooring, and contain casual seating along the circulation path, giving users a pleasant place
to wait or socialize with others while watching the kids in the spray park.
Spray Park
Entry Lobby
PART II
PROJECT CHARACTERISTICS
The main element of the master plan is a 27,000 sf natatorium featuring a 50-meter competition pool with a minimum
depth of two meters as recommended by USA Swimming. There will be tiled locker rooms and stadium style
poolside bleachers with spectator seating for 960 persons to view indoor events and the spray park beyond. With a
construction budget of up to 1,000,000 funded by the YMCA, the spray park will cover 8500 sf of land and be made
available to the public by a specific number of day passes (500 passes daily).
Connected to the aquatic center is 11,000 sf of space for a Senior Center including community rooms,
concessions, offices and storage to serve the general community.
PART II
PROJECT CHARACTERISTICS
The exterior of both the Aquatic Center and Senior Center will be CMU bearing walls with brick and metal panel
accents. Sloped standing seam metal roofing and pvc roofing over flat areas complete the exterior envelope to
compliment the existing facilities.
Proposed
Headquarters
Building
Development Plan
Two office buildings with supporting parking are planned for the east side of the property, sited against the wooded
backdrop of the Greenbrier Country Club’s golf course. The YMCA would construct up to a 17,000 sf office building that
would house the relocated Corporate Offices of the YMCA of South Hampton Roads, currently based in Norfolk. The
YMCA would build and lease a second 15,000 sf office building to the City’s Parks and Recreation Department.
A valuable parcel containing 3.6 acres on the north end of the property has been preserved for future development. It
has excellent visibility and access from Greenbrier Parkway. The YMCA is working with the Field House in Virginia Beach
to expand its operation to the City of Chesapeake by constructing an approximately 60,000 sf facility including four indoor
competition athletic fields with parking per zoning.
PART II
PROJECT CHARACTERISTICS
Project Ownership
Our proposal calls for the new indoor pool and community center to be owned by the City of
Chesapeake. The YMCA would retain ownership of the proposed Office Building and Spray Park. The
proposed site would be subdivided or turned into a commercial condominium that would include the
Aquatic/Community Center Unit, YMCA Spray Pool Unit, YMCA Office Unit and would have one or two
remaining development opportunities in the event the Indoor Athletic Facility chose not to exercise
the option to develop.
Operation of Project
The YMCA would be responsible for the management and operation of the Aquatic Center and work
collaboratively with the City’s Tourism Department to attract regional swim competitions to increase
weekend revenue for area hotels, restaurants, and retail establishments. Unlike the previous proposal,
the YMCA’s plan is to maximize swim meet opportunities and would not be restricted by a membership
base operation. The design of the facility promotes use of the aquatic center for weekend meets
while operating the YMCA Family Center and use a regional parking strategy of public facilities where
necessary. This would include the middle school across the street and City Park if necessary. The YMCA
would use its existing fleet of buses where necessary to provide transportation to and from remote
parking locations. The YMCA would provide all of the required operation funding in addition to the
$300,000 annual facility management fee provided by the City. Ongoing maintenance to the facility
and equipment would be the responsibility of the YMCA. Equipment replacement including pool
pump, motors, pool dehumidification, HVAC equipment, roof replacement, main utilities feeding the
facility, and major structural repairs would be the responsibility of the City.
Technology
The new indoor aquatic center will be equipped with a Colorado Scoring System, the industry’s finest
timing and scoring system. Our proposal includes starting blocks, tough pads, professional sound
system and scoreboard. The filtration system will be automated.
PART II
PROJECT CHARACTERISTICS
YMCA OF SOUTH HAMPTON ROADS
CORPORATE HEADQUARTERS FACILITY
CHESAPEAKE, VIRGINIA
OPTION: PARKS AND RECREATION OFFICES
PROJECT NARRATIVE
Project - Up to a 32,000 square foot class B office Building- Twelve (12) month timeline
Masonry- Face veneer brick; mate 2” thick.
Interior Walls- Walls shall be a combination of exposed masonry units and 5/8” drywall on metal studs, both to receive a
painted finish.
Ceilings- interior ceilings shall be a combination of 2x2 standard acoustical tile & grid.
Interior Tenant Upfit- An allowance of $50.00 per square foot has been included for all interior upfit within the shell
building.
Elevator- a 4500 pound capacity hydraulic passenger elevator with a 150 fpm travel speed shall be furnished. The car
platform shall be 6’0” wide x 9’4” deep. The interior of the cab shall be finished with plastic laminate panels and standard
acrylic diffuser ceiling panels.
Heating, Ventilation, & Air Conditioning- the system shall consist of a zoned Trane Variable Air Volume system with
a rooftop package unit and individual fan power boxes throughout the interior space. A guideline of one ton of
conditioning per 350 square feet has been assumed.
Fire Sprinkler- the building shall be protected with a fire sprinkler protection system.
Electrical- a complete electrical installation for the shell building. Site has been included as an allowance of $25,000.00.
PART II
PROJECT CHARACTERISTICS
b. Location of the proposed site identified by tax map and parcel.
Tax Map and parcel is included as required at the end of Part II.
c. Identify and fully describe work to be performed by the City or any other private entity.
The City will perform work in the TIF district to include Greenbrier park- all other work described in the proposal will be
completed by the project team.
d. Include a list of all federal, state and local permits and approval required for the Project
and a schedule for obtaining such permits and approval.
A site plan will be submitted to the City of Chesapeake for review and approval. The City will review the plans for
conformance to the City’s Zoning Ordinance and Public Facilities Manual, which includes regulations pertaining to the
Chesapeake Bay Preservation Act and state regulations governing erosion and sediment control. Before construction
can begin, the contractor shall prepare a stormwater pollution prevention plan (SWPPP) and submit the Virginia
Stormwater Management Permit (VSMP) to the Department of Conservation and Recreation (DCR). A permit shall
be obtained from the State Health Commissioner through the Virginia Department of Health before the pool can be
construction. The Contractor will also acquire a right-of-way permit, building permit, and land disturbance permit
from the City. Upon completion of the project, the Engineer will have to submit a site plan certification letter before a
certification of occupancy will be issued.
PART II
PROJECT CHARACTERISTICS
e. Identify any anticipated adverse social, economic, and environmental impacts of the
Project. Specify the strategies or actions to mitigate such impacts of the Project.
The YMCA does not anticipate any adverse social, economic, and environmental impacts of the Project.
f. Identify the projected positive social, economic, and environmental impacts of the Project.
The YMCA of South Hampton Roads has adopted a strategic plan that has the following Vision statement: “The Y
is committed to strengthening the foundations of our community by significantly increasing the number of healthy
families through nurturing the potential of every child and teen, improving the community’s health and well being, and
giving back and providing support to our neighbors.”
The proposed aquatic center will be an additional “tool” available to the YMCA to impact youth. The YMCA’s goal is
to expand leadership program opportunities and experiences for teenagers and provide a comprehensive network of
youth sports and aquatic programs to teach children core values and strengthen self esteem and build self confidence.
The aquatic center will expand our efforts to build strong families by enhancing the healthy living goals of the Y. The
highly regarded Y-change program motivates healthy living and life style adjustments for children and adults. In
addition, this effort will expand opportunities for health seekers to engage in a more active and healthy lifestyle.
The social impact of the over-all community will promote healthy living among all populations in the city.
The YMCA’s proposal has reduced the projected construction and development of a 50-meter competition pool project
by over $20,000,000 and reduced the annual operating commitment from the TIF by $2,000,000 per year than previously
proposed. More importantly, the annual operating risk has been capped at $300,000 per year while still preserving
and enhancing the economic development benefits of hosting sports team competitions. The YMCA’s investment
in relocating its Corporate Offices and construction of a public access spray park further strengthen the economic
development benefits of higher retail and restaurant use in the Greenbrier District.
Additionally, locating the proposed project in Greenbrier Park provides multiple cost effective benefits including:
The existing indoor and/or outdoor YMCA pools will be used during swim meets for athletes to warm up prior to
scheduled heats, which is a critical facility requirement of all championship meets. The financial benefit of using existing
facilities reduces the total project costs by over $2,500,000.
Management and operational expenses are significantly reduced by utilizing the existing YMCA management structure.
This reduces operating expenses by hundreds of thousands of dollars annually by eliminating the need to hire an
additional Center Director, Aquatic Director, and Property Manager. Hourly wages for service desk, lifeguards, and
supervisory personnel are also reduced by operating in conjunction with an existing YMCA where the infrastructure
exists.
Existing security systems, maintenance programs, and custodial services can easily be expanded providing the highest
level of cost effectiveness.
The YMCA’s Open Doors Program provides financial assistance to those families and individuals who cannot afford
to pay the full fee. Currently, 5,581 households receive $107,434 in monthly financial assistance to ensure everyone is
welcome at a YMCA.
The existing Greenbrier Family YMCA already includes most of the features and facilities that were recommended
in the previous proposal before City Council. Other than the new facilities included in our response to the RFP, the
YMCA network of Family Centers can substantially meet the health, wellness, and recreational needs of the citizens of
Chesapeake. By working together with the City to promote the YMCA’s financial assistance and guest pass programs,
all of the City’s families and children can gain affordable access to the YMCA.
PART II
PROJECT CHARACTERISTICS
g. Identify the proposed schedule for the work on the Project, including the estimated time
for completion.
The proposed schedule for the design and construction of this project is outlined on the following pages.
Activity
ID
Activity
Description
RESPOrig % Early
DurComp Start
Predecessors
Successors
Early
Total
M
Finish
Float
JUN
JUL
AUG
2011
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2012
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013
MAY
JUN
JUL
AUG
S
Design Phase
Conceptual
Postings, Hearings, and Selection of Proposals
10
Postings, Hearings, and Selection of Proposals
30
05-20-11
07-01-11
0
20
Detailed Phase Proposals Acceptance and Review
10
07-05-11
07-18-11
0
30
Selection of Fianl Proposal
10
07-19-11
08-01-11
0
40
Negotiation of Comprehensive Agreement
20
08-02-11
08-29-11
0
50
Posting of Draft Comprehensive Agreement
10
08-30-11
09-13-11
0
60
Public Hearing of City Council's Considertion
10
09-14-11
09-27-11
0
Public Hearing of City Council's Considertion
70
Final Selection and City Coucil's Approval
10
09-28-11
10-11-11
0
Final Selection and City Coucil's Approval
D10
Design Development 35%
35
10-12-11
11-30-11
0
D20
Environmental & Geotechnical Study
15
10-12-11
11-01-11
0
D30
Site Design 35%
35
10-12-11
11-30-11
0
D40
35% Site Design Review
10
12-01-11
12-14-11
0
D50
Chesapeake Review 35% Design
15
12-01-11
12-21-11
7
D60
Site Design 90%
35
12-15-11
02-06-12
0
D70
Design Development 90%
40
12-22-11
02-20-12
7
Design Development 90%
D80
90% Site Design Review
10
02-07-12
02-20-12
0
90% Site Design Review
D90
Final Site Design
10
02-21-12
03-05-12
0
Final Site Design
D100
90% Design Review
15
02-21-12
03-12-12
7
D110
Final Site Approval
10
03-06-12
03-19-12
0
Final Site Approval
D120
Land Disturbance Permit
2
03-06-12
03-07-12
17
Land Disturbance Permit
D130
Final Site Permit
2
03-20-12
03-21-12
0
Final Site Permit
D140
Obtain Sitework Permit
0
03-21-12
0
D150
Prepare Final Design
20
03-22-12
04-18-12
0
D160
Final Design Review
10
04-19-12
05-02-12
0
Final Design Review
D180
Obtain Building Permits
1
05-03-12
05-03-12
0
Obtain Building Permits
D190
Prepare Construction Drawings
5
05-03-12
05-09-12
76
Detailed Phase Proposals Acceptance and Review
Selection of Fianl Proposal
Negotiation of Comprehensive Agreement
Posting of Draft Comprehensive Agreement
Design
Design Development 35%
Environmental & Geotechnical Study
Site Design 35%
35% Site Design Review
Chesapeake Review 35% Design
Site Design 90%
90% Design Review
Obtain Sitework Permit
Prepare Final Design
Prepare Construction Drawings
Construction Phase
Pool Building Construction
100
Mobilization
4
03-22-12
03-27-12
7
110
Excavate for Pool
20
03-28-12
04-24-12
7
120
Install Pool Shell
30
05-04-12
06-15-12
0
130
Install Pool Building Foundation
20
06-18-12
07-16-12
0
140
Install Pool Building Walls
30
07-17-12
08-27-12
0
150
Install Structural Support & Roof System
45
08-28-12
10-30-12
0
Mobilization
Excavate for Pool
Install Pool Shell
Install Pool Building Foundation
Install Pool Building Walls
Install Structural Support & Roof System
Pool Building Buildout & Finishes
Pool Mechanical & De-humidification Systems
200
Pool Mechanical & De-humidification Systems
35
10-31-12
12-19-12
0
210
Install Pool Tile & Finishes
40
12-20-12
02-15-13
0
220
Install Electrical, Plumbing & Bldg HVAC Systems
50
12-20-12
03-01-13
10
Install Electrical, Plumbing & Bldg HVAC Systems
230
Buildout Locker Rooms, Mech Room & Office
40
01-21-13
03-15-13
0
Buildout Locker Rooms, Mech Room & Office
240
Install Pool Electronic Equipment
20
02-18-13
03-15-13
5
Install Pool Electronic Equipment
250
Install Bleachers
15
02-18-13
03-08-13
5
Install Pool Tile & Finishes
Install Bleachers
Sheet 1 of 2
Early Bar
Progress Bar
Critical Activity
© Primavera Systems, Inc.
YMCA Addition
Greenbrier, Chesapeake
Design & Construction
Summary Schedule
Activity
ID
Activity
Description
RESPOrig % Early
DurComp Start
Predecessors
Successors
Early
Total
M
Finish
Float
JUN
JUL
AUG
2011
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2012
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013
MAY
JUN
JUL
AUG
S
Senior Citizen/Multipurpose Construction
300
Install Senior Citizen/Multipurpose Foundation
20
07-17-12
08-13-12
50
310
Construct Senior Citizen/Multipurpose Building
60
08-14-12
11-06-12
50
320
Buildout Senior Citizen/Multipurpose Building
40
11-07-12
01-04-13
50
Install Senior Citizen/Multipurpose Foundation
Construct Senior Citizen/Multipurpose Building
Buildout Senior Citizen/Multipurpose Building
Connector Construction
400
Install Connector Foundation
10
09-26-12
10-09-12
65
410
Install Connector Walls & Roofing
20
10-10-12
11-06-12
65
420
Install Connector Curtain Wall System & Doors
15
11-07-12
11-28-12
65
430
Install Connector Interior Finishes
10
11-29-12
12-12-12
65
Install Connector Foundation
Install Connector Walls & Roofing
Install Connector Curtain Wall System & Doors
Install Connector Interior Finishes
Sitework & Parking Lot
S100
Install Utilities to Buildings
15
06-18-12
07-09-12
5
S110
Install Storm Sewer System
30
07-10-12
08-20-12
5
S120
Install Splash Pond
40
08-21-12
10-16-12
5
S130
Install Curb,Gutters & Sidewalks
30
10-17-12
11-28-12
5
S140
Construct Asphalt Parking Lot
40
11-29-12
01-25-13
5
S150
Install Parking Lot Striping & Signage
10
01-28-13
02-08-13
5
S160
Landscaping
20
02-11-13
03-08-13
5
03-15-13
0
Install Utilities to Buildings
Install Storm Sewer System
Install Splash Pond
Install Curb,Gutters & Sidewalks
Construct Asphalt Parking Lot
Install Parking Lot Striping & Signage
Landscaping
Project Closeout
C10
Substantial Completion
0
C20
YMCA Prepare Punchlist
5
03-18-13
03-22-13
0
C30
Prepare O&M's & As-built Drawings
15
03-18-13
04-05-13
10
C40
Complete Punchlist Work
20
03-25-13
04-19-13
0
C50
Project Complete
0
04-19-13
0
Substantial Completion
YMCA Prepare Punchlist
Prepare O&M's & As-built Drawings
Complete Punchlist Work
Project Complete
Sheet 2 of 2
Early Bar
Progress Bar
Critical Activity
© Primavera Systems, Inc.
YMCA Addition
Greenbrier, Chesapeake
Design & Construction
Summary Schedule
YMCA CORPORATE HEADQUARTERS
PROJECT SCHEDULE
ID
Task Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
BUILDING PAD
FOOTINGS
INTERIOR MASONRY
STRUTURAL STEEL
FLOOR SLABS
PERIMETER METAL STUDS
ROOF
EXTERIOR SKIN
ELEVATOR
INTERIOR METAL STUDS
PME ROUGHIN
DRYWALL
PRIME APINT
CEILING GRID
PME TRIMOUT
ELEVATOR STARTUP
CEILING TILE
FLOORING
FINAL PAINT
FINAL INSPECTIONS
FINAL CLEAN
OWNER OCCUPANCY
Project: YMCA CORPORATE HQ
Date: Fri 5/13/11
Duration
20 days
18 days
15 days
25 days
15 days
15 days
20 days
30 days
22 days
32 days
30 days
25 days
17 days
15 days
20 days
10 days
10 days
20 days
15 days
10 days
5 days
1 day
Start
January
Jan
February
Feb
March
Mar
April
May
Apr
May
June
Jun
Mon 1/2/12
Mon 1/30/12
Thu 2/23/12
Thu 2/23/12
Thu 3/29/12
Thu 4/19/12
Thu 5/10/12
Thu 5/10/12
Thu 6/7/12
Thu 6/7/12
Thu 6/21/12
Thu 6/21/12
Thu 7/26/12
Mon 8/20/12
Mon 9/10/12
Mon 9/10/12
Mon 10/8/12
Mon 10/22/12
Mon 11/19/12
Mon 12/10/12
Mon 12/24/12
Mon 12/31/12
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 1
July
Jul
August
Aug
September
Sep
October
Oct
November
Nov
December
Dec
RENDERING
City of Chesapeake - Aquatic Center
Chesapeake, VA
May 20, 2011
©2011 All Rights Reserved
MASTER PLAN
City of Chesapeake - Aquatic Center
Chesapeake, VA
May 20, 2011
©2011 All Rights Reserved
LANDSCAPE PLAN
City of Chesapeake - Aquatic Center
Chesapeake, VA
May 20, 2011
©2011 All Rights Reserved
PERSPECTIVES
City of Chesapeake - Aquatic Center
Chesapeake, VA
May 20, 2011
Graphic Scale and North Arrow Here
PERSPECTIVES
City of Chesapeake - Aquatic Center
Chesapeake, VA
May 20, 2011
©2011 All Rights Reserved
PART II
PROJECT CHARACTERISTICS
h. Proposed allocation of risk and liability for work completed beyond the Project
completion date, and assurances for timely completion of the Project.
No “liquidated damages” are proposed for the project. The risk, liability and assurance for timely completion of the
project will be the responsibility of the an effective and reliable team of professionals working together in a design/
build environment. From a construction perspective, MEB General Contractors will be responsible for completing
the project’s construction on time, and MEB will have every incentive to do so. As a local contractor in business since
1982, MEB has a history of on-time construction and their reputation relies on successful management of the project
schedule. Equally important, the project’s profitability relies on timely completion
i. State assumptions related to ownership, legal liability, law enforcement and operation of
the Project and the existence of any restrictions on the City’s use of the Project.
Our proposal calls for the new indoor pool and community center to be owned by the City of Chesapeake. The YMCA
would retain ownership of the proposed Office Building and Spray Park. The proposed site would be subdivided or
turned into a commercial condominium that would include the Aquatic/Community Center Unit, YMCA Spray Pool Unit,
YMCA Office Unit and would have one or two remaining development opportunities with the viable opportunity of
housing indoor competition fields.
The YMCA would be responsible for the management and operation of the Aquatic Center and work collaboratively
with the City’s Tourism Department to attract regional swim competitions to increase weekend revenue for area hotels,
restaurants, and retail establishments.
Management and operational expenses are significantly reduced by utilizing the existing YMCA management structure.
This reduces operating expenses by hundreds of thousands of dollars annually by eliminating the need to hire an
additional Center Director, Aquatic Director, and Property Manager. Hourly wages for service desk, lifeguards, and
supervisory personnel are also reduced by operating in conjunction with an existing YMCA where the infrastructure
exists.
Existing security systems, maintenance programs, and custodial services can easily be expanded providing the highest
level of cost effectiveness.
j. Provide information relative to phased or partial openings of the proposed Project prior to
completion of the entire work.
The project is proposed as a single phase to be completed in its entirety prior to any occupancy or access by the public.
PART II
PROJECT CHARACTERISTICS
k. Describe any architectural (including, where appropriate, historic district considerations),
building, engineering, or other applicable standards that the proposed Project will meet.
Applicable A/E standards to date for the project will be:
State
Virginia Uniform State Building Code which references
»
2009 International Building Code
»
2009 International Plumbing Code
»
2009 International Mechanical Code
»
2009 International Fire Code
»
2008 National Electrical Code
Local
»
Chesapeake City Code of Ordinances
»
Chesapeake Zoning Ordinances
»
Landscape Ordinance & Landscape Specifications
»
Public Facilities Manual
»
Greenbrier Planned Unit Development District
»
Department of Development & Permits
PART II
PROJECT CHARACTERISTICS
Real Estate Property Details
Page 1 of
Real Estate Property Information
• General Information
• Assessment Values
• Land Information
• Structure Information
Tax ID
Borough Tax Rate per $100
0370000001221 WASHINGTON
$1.05
Property Address
Subdivision
Legal Description
01009 GREENBRIER PKY
PAR 5 CITY OF CHESAPEAKE CITY PARK 11.94 AC
Purchase Date Sale Price Remarks
01/09/1981
$0.00
Deed Book -- Page Map Book -- Page
Property Type
1908 -- 392
0097 -- 56
COMMERCIAL IMPROVED
Current Assessment Value
Tax Year
Current
Land Value
$2,268,600.00
Improvement Value
$151,500.00
Total Assessed Value
$2,420,100.00
Tax Year
2009-2010
2008-2009
2007-2008
2006-2007
2005-2006
Land Value
$2,268,600.00
$2,089,500.00
$1,791,000.00
$1,432,800.00
$1,014,900.00
Improvement Value
$151,500.00
$151,500.00
$151,500.00
$151,500.00
$151,500.00
Total Assessed Value
$2,420,100.00
$2,241,000.00
$1,942,500.00
$1,584,300.00
$1,166,400.00
Historical Assessment Values
Zoning Acreage Land Square Footage
PUD
12.000
522720
Water Sewer
NO
NO
Improvement Type Exterior Year Built Square Footage of Living Area*
UTILITY BUILDING
1980
384
Attached Garage Square Footage Square Footage with Finished Attic All Porch Square Footage(inclusive) All Deck Square Footage(inclusive)
0
0
0
0
Interior Number of Stories Total Number of Rooms
1
Number of Bedrooms Number of Baths with Tub Number of Baths with Shower Only Number of Half Baths
Central Air Type of Heat
NO
Detached Garage Fireplace Pool Other Improvements
NO
NO
NO
NO
* -- Does not include finished attic over attached garage
Search Again
While the City of Chesapeake has attempted to ensure that the data contained in this file is accurate and reflects the property's characteristics, the City of Chesapeake makes no warranties,
expressed or implied, concerning the accuracy, completeness, reliability, or suitability of this data. The City of Chesapeake does not assume any liability associated with the use or misuse of
this data.
© Copyright 1996 - 2009 • City of Chesapeake • All rights reserved
PART II
PROJECT CHARACTERISTICS
Real Estate Property Details
Page 1
Real Estate Property Information
• General Information
• Assessment Values
• Land Information
• Structure Information
Tax ID
Borough Tax Rate per $100
0370000001222 WASHINGTON
$1.05
Property Address
Subdivision
Legal Description
01033 GREENBRIER PKY
PAR 13C RESUB 13A & 13B GRNBR PUD ZN 5 SEC C 4.017
Purchase Date Sale Price Remarks
05/11/1983
$0.00
Deed Book -- Page Map Book -- Page
Property Type
1986 -- 398
0145 -- 28
COMMERCIAL IMPROVED
Current Assessment Value
Tax Year
Current
Land Value
$843,600.00
Improvement Value
$2,740,600.00
Total Assessed Value
$3,584,200.00
Tax Year
2009-2010
2008-2009
2007-2008
2006-2007
2005-2006
Land Value
$843,600.00
$803,400.00
$703,000.00
$482,000.00
$381,600.00
Improvement Value
$2,740,600.00
$2,729,900.00
$2,729,900.00
$2,020,000.00
$1,906,400.00
Total Assessed Value
$3,584,200.00
$3,533,300.00
$3,432,900.00
$2,502,000.00
$2,288,000.00
Historical Assessment Values
Zoning Acreage Land Square Footage
PUD
4.017
174981
Water Sewer
YES
NO
Improvement Type Exterior Year Built Square Footage of Living Area*
FITNESS CENTER
1985
28560
Attached Garage Square Footage Square Footage with Finished Attic All Porch Square Footage(inclusive) All Deck Square Footage(inclusive)
0
0
0
0
Interior Number of Stories Total Number of Rooms
1
Number of Bedrooms Number of Baths with Tub Number of Baths with Shower Only Number of Half Baths
Central Air Type of Heat
NO
Detached Garage Fireplace Pool Other Improvements
NO
NO
NO
NO
* -- Does not include finished attic over attached garage
Search Again
While the City of Chesapeake has attempted to ensure that the data contained in this file is accurate and reflects the property's characteristics, the City of Chesapeake makes no warranties,
expressed or implied, concerning the accuracy, completeness, reliability, or suitability of this data. The City of Chesapeake does not assume any liability associated with the use or misuse of
this data.
© Copyright 1996 - 2009 • City of Chesapeake • All rights reserved
Project Financing
PART III
PROJECT FINANCING
a. Provide a preliminary estimate and describe the estimating methodology of the cost of
the work by phase, segment or both.
Estimated Cost
The estimated total project costs include:
1. Construction cost estimates provided by Mid Eastern Builders for the Aquatic/Community Center.
2. All associated site development costs
3. Construction cost estimates provided by Sussex Development for the Office Building and Spray Park
4. Design Development fees from Clark Nexsen and Woodard Design
5. Furnishing, fixtures, and equipment budget.
6. Construction management fees.
The total projected project is $15,000,000.
Impact on Debt and Debt Burden
The proposed project is estimated to cost the TIF up to $15,000,000 in new construction and site development costs
that would have an estimated annual debt impact of $1,050,000 annually based on a 3.5% interest rate with a 20-year
amortization schedule. Additionally, including the $300,000 annual operation assistance, the annual financial impact to
the City would be $1,350,000 annually.
b. Submit a plan for the development, financing, and operation of the Project showing the
anticipated schedule on which funds will be required. Describe the anticipated costs of and
proposed sources and uses for such funds.
The estimated annual operating budget is attached. The annual operating deficit project for the aquatic center is
expected to range between $175,000 and $250,000 annually. These costs will be underwritten by the YMCA.
ChesapeakeAquaticandCommunityCenter
ProjectedDesign/ConstructionCashflow
JulͲ11
AugͲ11
SepͲ11
NovͲ11
$200,000.00
$200,000.00
$400,000.00
$ 410,000.00
DecͲ11
$210,000.00
JanͲ12
$210,000.00
FebͲ12
$35,000.00
MarͲ12
$475,000.00
AprͲ12
$825,000.00
MayͲ12
$950,000.00
JunͲ12
$1,400,000.00
JulͲ12
$1,400,000.00
AugͲ12
$1,750,000.00
SepͲ12
$1,650,000.00
OctͲ12
$1,500,000.00
NovͲ12
$1,300,000.00
JanͲ13
$950,000.00
FebͲ13
$835,000.00
MarͲ13
$300,000.00
Total
$15,000,000.00
PART III
PROJECT FINANCING
c Include a list and discussion of assumptions underlying all major elements of the plan.
The normal useful life of the proposed aquatic facility is 40 years. Based on the proposed terms of the operational plan,
the City anticipated capital reinvestment during this cycle would include:
1. Pool motor and filter replacement: $150,000
2. Dehumidification equipment replacement: $800,000
There is no expected replacement or upgrades to site utilities or structural repairs.
d. Identify the proposed risk factors and methods for dealing with these factors, including
the posting of any required bonds.
The YMCA does not anticipate any proposed risk factors or the posting of any required bonds for this Project.
e. Identify any local, state or federal resources that the proposer contemplates requesting
for the Project. Describe the total commitment, if any, expected from governmental sources
(and identify each source) and the timing of any anticipated commitment.
The YMCA does not contemplate any local, state or federal resources other than those previously stated in this
proposal.
f. Identify the amounts and the terms and conditions for any revenue sources, including
any third parties that the proposer contemplates will provide financing for the Project, and
describe the nature and timing of each such commitment.
The YMCA uses a bank group to provide its project financing that includes Bank of America, Towne Bank, Sun Trust and
BB&T. For an investment of this scope, the YMCA would use tax exempt bond financing based on the best business
option to a RFP process amongst participating financial institutions.
g. Identify any aspect of the Project that could disqualify the Project from eligibility for tax-exempt
financing.
At this time, we are unaware of any items that would disqualify the project from obtaining tax exempt financing.
Project Benefit and Compatibility
4
PART IV PROJECT BENEFIT AND COMPATABILITY
a. Describe the anticipated benefits to the community, region, or state, including anticipated
benefits to the economic condition of the City and identify who will benefit from the Project
and how they will benefit.
The YMCA’s proposal has reduced the projected construction and development of a 50-meter competition pool project
by over $20,000,000 and reduced the annual operating commitment from the TIF by $2,000,000 per year than originally
proposed. More importantly, the annual operating risk has been capped at $300,000 per year while still preserving
and enhancing the economic development benefits of hosting sports team competitions. The YMCA’s investment
in relocating its Corporate Offices and construction of a public access spray park further strengthen the economic
development benefits of higher retail and restaurant use in the Greenbrier District.
Additionally, locating the proposed project in Greenbrier Park provides multiple cost effective benefits including:
1. The existing indoor and/or outdoor YMCA pools will be used during swim meets for athletes to warm up prior to
scheduled heats, which is a critical facility requirement of all championship meets. The financial benefit of using existing
facilities reduces the total project costs by over $2,500,000.
2. Management and operational expenses are significantly reduced by utilizing the existing YMCA management
structure. This reduces operating expenses by hundreds of thousands of dollars annually by eliminating the need to
hire an additional Center Director, Aquatic Director, and Property Manager. Hourly wages for service desk, lifeguards,
and supervisory personnel are also reduced by operating in conjunction with an existing YMCA where the infrastructure
exists.
3. Existing security systems, maintenance programs, and custodial services can easily be expanded providing the
highest level of cost effectiveness.
b. Identify any anticipated public support or opposition as well as any anticipated government support or
opposition, for the Project support .
The proposal addresses many of the comments raised in both support and opposition during the extensive public
comment period of the originally proposed project. These include:
1. Preserving the 50 meter competition pool.
2. The economic development benefits of athletic competition have been enhanced since the project design will not
restrict the potential number of meets.
3. Public access has been preserved.
4. Reducing the proposed construction cost by over $20,000,000.
5. Reducing the annual TIF contribution by $2,000,000 per year.
6. Mitigating the annual operating risk by capping the annual commitment at $300,000 per year.
7. Preservation of City Park as an open space venue for concerts and other community events.
8. Offices for the Parks and Recreation Department that were omitted in the original proposal have been addressed.
9. Additional community space and a senior citizen activities area have been addressed.
10. Relocation of the YMCA’s Corporate Office will enhance the economic development benefits of the project.
PART IV PROJECT BENEFIT AND COMPATABILITY
c. Explain the strategy and plans that will be carried out to involve and inform the general
public, business community, and governmental agencies in areas affected by the Project.
The project development team will work collaboratively with the City’s staff in the final project design and specifications.
Throughout the development of the project, public information meetings will be held with the public as necessary
and the YMCA will meet regularly with businesses located in the Greenbrier TIF to keep them informed of plans
and progress. The YMCA will develop and maintain current information on its website to keep all interested citizens
informed of current plans and schedule.
d. Explain whether the Project is likely to attract or maintain industries and businesses to the
City or the surrounding region and, if so, explain how.
All recreational facilities add quality of life benefits to local communities. The addition of a 50 meter pool facility to the
City will add a unique benefit to the City’s array of recreational activities.
e. Explain whether the Project is compatible with the City’s comprehensive plan, infrastructure
development plans, capital improvements budget, or other government spending plan and, if so,
explain how.
The proposed Aquatic Center is unique and will not be in conflict with any existing facility. The YMCA’s proposal will
also not compete with established health and fitness facilities as would have occurred in the original proposal.
Other Factors/Appendices
PART V OTHER FACTORS
a. The proposed cost of the qualifying Project.
Please refer to Part III section a for the proposed cost of this project.
b. The general reputation , industry experience, and financial capacity of the private entity.
The YMCA of South Hampton Roads is the 20th largest YMCA in North America with an annual operating budget
exceeding $45.0 million serving over 200,000 citizens within our region. As of April 2011, the YMCA membership served
35,409 households in our service area. The active membership within the YMCA is 101,557 people.
Over the course of the past 125 years in South Hampton Roads, the Y has grown and evolved, but one thing has
remained constant: our mission. It is our reason for being a YMCA, and it is a driving force behind our cause of
strengthening the foundation of community through youth development, healthy living and social responsibility.
The lead editorial in The Virginian-Pilot on January 27, 2011 stated “For more than 125 years the YMCA has filled a
critical role in South Hampton Roads, helping children and adults alike to stay fit, have fun and live well.
It also has been a substantial contributor to the local economy. The nonprofit has an annual payroll of $22 million
and 2,300 employees at facilities stretching from the Outer Banks to the Eastern Shore. It boasts the ninth-largest Y
membership.
The Y has long been known for its dedication to our communities, including its willingness to subsidize memberships
for the needy. That cost the organization $5.7 million in South Hampton Roads last year alone.
The YMCA of South Hampton Roads is governed by a Board of Directors of leading community citizens who are
dedicated to enhancing the quality of life for all our citizens. The management of the YMCA has established a track
record of community impact and financial accountability that is highly regarded within our community.”
The most recent financial audit performed by McGladrey & Pullen provided the YMCA and “unqualified” opinion as to
the financial health and performance of the organization. “In our opinion, the financial statements referred to above
present fairly, in all material respects, the financial position of the Young Men’s Christian Association of South Hampton
roads as of December 31, 2009, and the results of its operations and its cash flows for the year then ended in conformity
with accounting principles generally accepted in the United States of America.” Total liabilities and net assets for the
year 2009 were $63,686,474. A complete copy of the annual is available for review.
The YMCA of South Hampton Roads is a member in good standing with the United Way and complies with all required
governmental filings as a 501(c)(3) organization.
c. The proposed design of the qualifying Project.
Please refer to Part II section a for the proposed design of this project.
PART V OTHER FACTORS
d. The eligibility of the Project for accelerated documentation, review, and selection.
This Project is eligible for accelerated documentation, review, and selection.
f. Benefits to the public.
The YMCA of South Hampton Roads has adopted a strategic plan that has the following Vision statement: “The Y
is committed to strengthening the foundations of our community by significantly increasing the number of healthy
families through nurturing the potential of every child and teen, improving the community’s health and well being, and
giving back and providing support to our neighbors.”
The proposed aquatic center will be an additional “tool” available to the YMCA to impact youth. The YMCA’s goal is
to expand leadership program opportunities and experiences for teenagers and provide a comprehensive network of
youth sports and aquatic programs to teach children core values and strengthen self esteem and build self confidence.
The aquatic center will expand our efforts to build strong families by enhancing the healthy living goals of the Y. The
highly regarded Y-change program motivates healthy living and life style adjustments for children and adults. In
addition, this effort will expand opportunities for health seekers to engage in a more active and healthy lifestyle.
The social impact of the over-all community will promote healthy living among all populations in the city. The 50 meter
pool will add a unique feature for aquatic training by encouraging a higher level of competition.
The dedicated Senior Center will provide recreational, educational and wellness activities for seniors helping them
engage, enrich and empower their lives.
g. The private entity’s compliance with a minority business enterprise participation plan or
good faith effort to comply with the goals of such plans.
The YMCA of South Hampton Roads is committed to an inclusion and diversity model in all aspects of its business and
operations. The goal of YMCA membership is to model the demographics of the primary service area of each family
center. The employment practices of the YMCA also reflect the social demographics of the service area.
The Y makes accessible the support and opportunities that empower people of all ages and backgrounds to reach their
personal potential and life to the fullest. To fully realize our mission and cause, we ensure that people feel welcome as
participants, members, staff and volunteers.
The YMCA is an equal opportunity employer and adheres to all Federal and local anti-discrimination laws.
h. The private entity’s plans to employ local contractors and residents.
The YMCA of South Hampton Roads uses a “team YMCA” approach for all facility construction projects throughout
our region. This approach utilizes known contractors and sub-contractors with a proven track record of on time and on
budget construction practices. This approach assures quality design and construction. All of our qualified construction
partners employ local tradesmen and local labor as available and qualified. Mid Eastern Builders, a local Chesapeake
firm has been chosen to build the proposed Aquatic and Community Center.