WATER WORKS
Januar y 2013
TABLE OF CONTENTS
 1.- Company Presentation.
 2.- Contractos Classification.
 3.- Quality Certifications.
 4.- Most important projects information.
1.- Company Presentation.
Avda. Juan Carlos I nº55
Edificio JC1 – Planta 16
30100 Murcia (Spain)
Tf: +34 968235337
[email protected]
Dear Sirs,
It is our pleasure to introduce to your Excellency our company to offer all our
services as a construction company for all those projects you consider could match
with our profile and experience .
Our companies group raised to the 27th position in the ranking of
construction companies in Spain, having carried out some of the most important
projects developed in our country. I am proud to say that our company is financially
provided and dispose of the bank guarantees that could be required to undertake
these projects. At the same time, our company is provided with first line technology
and our own equipment that allows us to undertake the most complex tasks.
Our workforce formed by more than 200 people, counts with more than 50
university graduates, including Architects, Building Engineers, Civil Engineers,
Telecommunications Engineers, Mining Engineers, Economists and Industrial
Engineers.
We have experience in almost all construction activities and we have already
done projects of the following various sectors:
•
Houses. Elderly homes and hall of residences.
•
Hotels and Office Buildings.
•
Malls.
•
Parkings.
•
Auditoriums and business centers.
•
Museums, concert halls and libraries.
•
Penitentiary.
•
Schools, colleges and research centers.
•
Hospitals and health care centers.
Page 1
Avda. Juan Carlos I nº55
Edificio JC1 – Planta 16
30100 Murcia (Spain)
Tf: +34 968235337
[email protected]
•
Electric Power and Wind Generation Stations.
•
Roads and highways.
•
Bridges and intersections.
•
Water and wasting conductions. Hydraulic facilities.
•
Stadiums and sports facilities. Pools and sport centers.
•
Urbanizations and residencial areas. Golf Resorts.
•
Waste treatment plants and rubbish dump.
•
Water Treatment Plant.
•
Desalination Plant.
•
Railway facilities.
•
Cemeteries.
•
Warehouses.
•
Ports and y promenades.
•
Historic Building Remodeling.
•
Channeling and supplying works, oil-bearing and gas facilities.
We are looking forward to share our experiences in developing your
region for better and successful projects.
Yours faithfully.
Eduardo Pérez García
Chairman
AQUILINE FOR PROJECTS AND CONTRACTS S.L.
Page 2
Company information
Proyect Managing Company name: Aquiline For Projects and Contracts S.L.
Construction Company name:
CR number:
Nationality:
Street:
Infraestructuras Terrestres S.A. (Intersa)
B30553358
Spanish
Avenida Juan Carlos I nº55 – Edf. JC1 – Planta 16
Zip Code: 30100
City: Murcia
Country: Spain
Website: www.aquiline.es
Chairman / President: Eduardo Pérez García
CEO: Eduardo Pérez García
Country Operations Manager: Ernesto Ruiz Hernández
Main activities:
Civil Works: Roads and highways, water treatment, watercourse channels, coastline
works, harbors, hydro/electric works, housing developments, seaside works,
winds farms…
Buildings: Hospitals, universities, schools, sport complex, shopping malls, business
auditoriums, residential constructions, monument rehabilitation …
CONSOLIDATED ANNUAL STATEMENTS
2007
2008
2009
2010
2011
2012
Permanent employees:
233
272
268
240
200
147
Total employees:
542
601
624
496
352
324
Sales volume (million €):
390
390
299
234
149
154
Gross profit (million €):
34
36
32
9
-24
7
World activities/offices  Yes  No
Countries: Spain,Saudi Arabia, Qatar, Brazil, Iraq.
Contact information
Company Contact: Ernesto Ruiz Hernández
Company Contact Title: Chief Operating Officer
Phone: 0034 968 235337
Fax: 0034 968 274509
Mobile: 0034 620 994503
E-mail: [email protected]
ORGANIZATION CHART
INTERNATIONAL PROJECTS
2.- Contractor Classification.
2. Contractor Classification
2.1. Public Works Contractor
2.2. Public Services Contractor
2.3. Adif
2.4. Repsol
2.1. Public Works Contractor
Plaza de Valparaiso number 4
28016 Madrid
Tel: 91 - 4430950
Fax: 91 – 4586453
MINISTRY OF ECONOMY AND FINANCE
____________
GOVERNMENT PROCUREMENT
ADVISORY BOARD
File num.: 32353 R/
Company:
Tax ID:
Address:
City:
Province:
INFRAESTRUCTURAS TERRESTRES S.A
A30300818
Avda Mariano Rojas 26
3009 Murcia
Murcia
THE SUBDIRECTOR GENERAL OF CONTRACTOR CLASSIFICATION AND CONTRACT
REGISTRATION
CERTIFIES that the company whose data is indicated above, as a WORKS CONTRACTOR, in the
Official Register of Classified Companies with the classifications listed below.
GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG.
A
01
F
A
02
F
A
03
F
A
04
F
B
--
E
B
C
C
D
E
E
G
I
J
K
K
01
01
06
01
01
07
02
01
01
02
07
F
F
F
D
F
F
F
E
E
E
D
B
C
C
D
E
E
G
I
J
K
K
02
02
07
02
03
02
03
05
02
03
08
F
F
F
C
F
F
F
E
E
E
E
B
C
C
D
E
E
G
I
J
K
K
03
03
08
03
04
07
04
06
04
04
09
F
F
F
C
F
F
F
E
E
E
E
B
C
C
D
E
G
G
I
J
K
04
04
09
04
05
-05
08
05
05
E
F
F
C
F
F
F
D
E
E
C
C
D
D
E
G
G
I
K
K
-05
-05
06
01
06
09
01
06
F
F
C
F
F
F
F
E
E
E
It is declared for the purposes in the legislation on Public Sector Contracts that I hereby issue this
certification in Madrid on 27 january 2009.
(signature and stamp)
Signed: José Luis Cueva Calabia.
2.2. Public Services Contractor
Plaza de Valparaiso number 4
28016 Madrid
Tel: 91 - 4430950
Fax: 91 – 4586453
MINISTRY OF ECONOMY AND FINANCE
______________
GOVERNMENT PROCUREMENT
ADVISORY BOARD
File num.: 52076 R/
Company:
Tax ID:
Address:
City:
Province:
INFRAESTRUCTURAS TERRESTRES S.A
A30300818
Avda Mariano Rojas 26
3009 Murcia
Murcia
THE SUBDIRECTOR GENERAL OF CONTRACTOR CLASSIFICATION AND CONTRACT
REGISTRATION
CERTIFIES that the company whose data is indicated above, as a SERVICES CONTRACTOR, in the
Official Register of Classified Companies with the classifications listed below.
GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG. GROUP SUBGROUP CATEG.
O
P
01
02
D
B
O
02
D
O
03
D
O
04
D
P
It is declared for the purposes in the legislation on Public Sector Contracts that I hereby issue this
certification in Madrid on 24 February 2009.
(signature and stamp)
Signed: José Luis Cueva Calabia.
01
B
2.3. Adif
ADIF
Procurement and Contracting
INFRAESTRUCTURAS TERRESTRES S.A
(INTERSA)
D. Alberto G. Martin Recio
Avda Mariano Rojas 26
3009 Murcia
Madrid 09/06/2009
Ref: DCC-MGH-JLR-8-10-0119
RE: ADIF Supplier Classification System (SCP)
Having reviewed and evaluated the Classification File sent by this company for
inclusion in the Classified Companies Register, an in application of the provisions of
the the SCP Procedures, the Classification Committee constituted for the purpose has
adopted the following agreements:
First – the CLASSIFICATION of INFRAESTRUCTURAS TERRESTRES, S.A.
(INTERSA) with Tax ID A30300818, in the following activity subsectors:
SUBSECTOR
NAME
OAFA
OAFB
OAFD
OAG
OAKA
OAKB
REHAB METAL BRIDGES AND OVERPASSES
REHAB NON METAL BRIDGES/OVERPASSES
BRIDGE BUILDING
TREATMENT OF ROAD INSFRASTRUCTURES
BUILDING OF OVERPASSES
BUILDING OF UNDERPASSES
CATEGORY
D
C
C
A
D
D
The resolution of this notification brings the administrative procedure to an and this
decision may be appealed, within two months of the day following reception of this
document, before the Central Courts of the Jurisdiction of the Litigant.
Notwithstanding the foregoing, an appeal for reversal may optionally be lodged
within one month before the same body that pronounced the resolution hereby
notified, as per the provision of articles 116 and 117 of Law 30/1992 of 26 November,
of the Legal Regime of the Public Administration and of the Common Administrative
Procedures, or lodge any other appeal deemed appropriate.
Likewise and as per the provisions of Law 31/2007 of 30 October, and under the
procedure provided in articles 103 and following, an objection may be lodge with the
Secretary of State for Infrastructures within 10 working days of the day following
reception of this notification.
DIRECTOR OF PROCURMENT AND CONTRACTING
(SIGNATURE – ILLEGIBLE)
Jesus Mª Campo Campo
(Official Stamp of Dept of Infrastructures – Railways before and after the text)
2.4. Repsol
REPSOL LOGO
Director of the Cartagena Refinery
General Downstream Directorate
INFRAESTRUCTURAS TERRESTRES S.A (INTERSA)
Avda Mariano Rojas 26
3009 Murcia
Cartagena, 10 February 2009
Re: Classification of Contractors
Dear Sirs
It is our pleasure to inform you that having carried out the visit to your offices and
facilities and completed the process of Approval, you are now included in Repsol's
Approved Supplier List.
This Approval process took account of all your capacities as a contracting company
(safety management, quality, training, resources etc.), and therefore to maintain its
validity you must inform us of any change that might have a significant impact on
these aspects.
The approval awarded will be valid for a maximum of 3 (three) years, and covers
activity in the activity area: Civil Engineering Work.
This approval is reserved exclusively for the internal work of our organization, which
involves a commitment to guaranteeing confidentiality of the information we provide
to your company.
With nothing further to add in this matter, we congratulate you for exceeding the
minimum requirements established for the execution of work in our plants and
facilities and we would like to use this opportunity to send our kindest regards.
Yours truly,
(Signature)
José Francisco Vázquez González
Director of the Cartagena Industrial Complex
Valle de Escombreras, s/n. 30350 Cartagena Spain
Tel. +34 968 129 300. Fax +34 968 167 155
3. Certificates of quality, safety
and environment
4. Most important projects
information
EXPERIENCE IN WATER WORKS
PROJECT
Completion of the modernization of water
infrastructure sector VIII of the irrigated areas of
Lorca and Guadalentin Valley (Murcia)
Writing Project and execution of services in
support of sanitation and wastewater
treatment plant Alcazares (Murcia)
Denitrification plant of L'Eliana, Valencia.
CLIENT
M. MEDIO AMBIENTE. DG AGUA
M. MEDIO AMBIENTE. DG HIDRÁULICAS
M. MEDIO AMBIENTE. ACUAMED
BUDGET
(EUROS)
20.013.767,25
17.188.759,78
13.747.996,89
START DATE
sep-07
dec-06
jun-08
TERMINATION
DATE
mar-10
may-09
**In progress
DESCRIPTION
Transport network and sector primary irrigation VIII, sub
II, Cazalla-Tamarchete, for irrigable area of 2341.10 Ha
with the execution of the following lines: 2.113 ml tube Ø
HACC between 1000 and 1300 mm, 6044 ml FRP pipe
between 500 and 900 mm diameter and 21,506 ml
oriented PVC pipe between 200 and 400 mm diameter.
Other actions: 3 hincas low road Ø 161 ml HA 1200,
1300 and 1600 mm tubing murky armbands with 14,013
ml HA with Ø from 800 to 1500 mm, 2 careada masonry
dams, paving roads and replacement service affected
service.
Construction of a sewage treatment plant in Los
Alcazares (Murcia) and ancillary works. Designed to
serve a population of 28,400 population equivalent
120,000 in low season and high season population
equivalent, with flow rates of 9,000 and 22,500 debug
m3/day respectively. The new WWTP has 3 lines with
tertiary biological treatment by filtration and ultraviolet
reuse of treated water for irrigation, with enough room to
expand to a fourth line in the future. Includes
enforcement of sanitation ancillary works a drain and a
water collection basement to prevent the introduction of
brackish water in the main sanitation. The implementation
of the new WWTP is performed on existing impoundment
facilities, transforming one of the rafts in treated water
tank. The new design reduces the environmental impact
by placing the equipment likely to generate bad odors in
closed and equipped with anti-odor filters.
Denitrification plant construction on a plot of 10544.85 m2
with connecting to the same of the four water supply
wells present. The whole facility has: Arrival Deposit raw
water; deposits treated water quality 1 and 2 and 11,024
m denitrification plant iron pipe in different diameters.
EXPERIENCE IN WATER WORKS
PROJECT
WWTP Valley even collectors Baños and
Mendigo (Murcia)
Design, writing, design and construction of
WWTP of Jumilla (Murcia)
La Torre WWTP even collectors TorrePacheco (Murcia)
Design, writing, design and construction of
the WWTP of Caravaca de la Cruz (Murcia)
CLIENT
EL VALLE GOLF RESORT, S.L.
CARM. C. AGRICULTURA Y AGUA
LA TORRE RESORT DEVELOPMENT, S.L.
(POLARIS WORLD)
CARM. C. AGRICULTURA Y AGUA
BUDGET
(EUROS)
10.542.070,50
9.855.826,27
9.839.287,04
8.543.182,52
START DATE
nov-04
nov-04
jan-05
dec-02
TERMINATION
DATE
sep-06
jun-07
jun-07
juni05
DESCRIPTION
WWTP new plant with a flow of 1,400 m3/day, with a
debugging system using biological treatment with
ultrafiltration equipment with membrane technology.
Works factory, concrete tanks, membrane tanks,
concrete pipes and other electromechanical installations.
Use in sewage purification Golf urbanization of 60.2
hectares Works include water collection sump sanitation
and transport to WWTP (2.9 km approx) and treated
water flow regulating reservoir for distribution irrigation
(4.8 km approx).
WWTP new plant for a population of 125,000 and a flow
rate equivalent to treat 12,000 m3/day, with treatment
system using biological treatment and extended aeration
activated sludge with nitrification-denitrification and
dephosphatation with tertiary treatment and UV
disinfection , which allows the reuse of treated water. The
facilities are of advanced design in terms of both organic
contaminant removal, such as nitrogen, phosphorus and
pathogens, exceeding the levels set by the EU for water
clarity. The works have been designed to minimize the
impact on the landscape and environment in the area,
with several items enclosed buildings and deodorized.
WWTP new plant with a flow of 8,500 m3/day, with a
debugging system using biological treatment with
ultrafiltration equipment with membrane technology.
Works factory, concrete tanks, membrane tanks,
concrete pipes and other electromechanical installations.
Use in wastewater treatment of development with golf
course. Works include water collection sump sanitation
and transport to WWTP (4.9 km approx) and discharge of
treated water for irrigation distribution swamp (7.1 km
approx).
WWTP new plant for a population of 86,272 inhabitants
at a rate equivalent to treat 8,000 m3/day. The treatment
system is designed biological treatment of activated
sludge with tertiary treatment carousel for disinfection by
ultraviolet radiation and mechanical sludge dewatering by
gravity sludge thickener.
EXPERIENCE IN WATER WORKS
PROJECT
WWTP of Abarán (Murcia)
WWTP Condado de Alhama, Alhama de Murcia.
Channelling Benipila Rambla de Cartagena
(Murcia)
CLIENT
CARM. C. AGRICULTURA Y AGUA
POLARIS WORLD
M. MEDIO AMBIENTE. ACUASEGURA
BUDGET
(EUROS)
7.959.580,32
7.548.884,61
7.094.980,11
START DATE
may-00
jun-07
oct-02
TERMINATION
DATE
may-02
feb-09
mar-04
DESCRIPTION
WWTP new plant with a flow of 4,500 m3/day, with a
debugging system using activated sludge biological
treatment without tertiary treatment. Works factory,
concrete tanks, concrete pipes and other
electromechanical installations.
New WWTP plant treatment system using activated
sludge biological treatment with BRM type membrane
technology for a population equivalent of 36,000
inhabitants and a flow of 9,000 m3/day. Works factory,
concrete tanks, bioreactor, membrane tanks, rolling well
and pumping treated water reservoir, sludge treatment,
pretreatment and service buildings and other electrical
and electromechanical. Reuse of treated water for
irrigation.
Channelling 1.554m of Rambla de Benipila (last 525m
MD only) by trapezoidal section 1.6 H/1V slope (base:
27m and h = 4.25 m) embankment core formed by
HA-20 +0.25 m +0.4 m masonry. (Q500 = 586 m3/sg).
Forwarding Rambla Quarry 278m, connected upstream
of the gazebo with Benipila Rambla. (Q500 = 260 m3/
sg). Glorieta Paules: (Rint: Rext 32.1 m and 50.1 m)
high on the Rambla Benipila c / 2 structures: Two
batteries on the display lights continuously and 12 m;
Board inverted T beams prefabricated edge 45cm, 5.5
m above floor of the channel; Channelling low
rectangular structure c / drywall. Service roads on foot
slope: 5m 1.072m wide. Margins Drainage: Slope wells
up every 75m c / Tube H ø400 + flap, three wells
interconnected c / H ø200; manual valve c / pit in well +
low esplanade football field c / HA Ø1000 tube.
Footbridge: demolition of existing e inst. a metal,
adapted to the new channeling.
EXPERIENCE IN WATER WORKS
PROJECT
Construction, commissioning, maintenance of
the wastewater treatment plant of urbanization
Mar Menor Golf Resort Torre Pacheco. Water
supply Mar Menor. (Murcia)
Improvement and modernization of irrigation in
the Community Irrigation Canal del Páramo.
Sectors V and VII. Headworks and pumping
station Sector VII (Leon)
Execution of works of water supply project
reusable water irrigation for the town of Getafe
(Madrid)
Construction Project of the transfers authorized
by Art. 13 of Law 10/2001 of July 5, National
Hydrological Plan. Section 41, subsection 1:
Siphon End Home Segura Aqueduct Campos
del Rio (Murcia)
Waste water collector and Senda de Granada
Guadeloupe in Murcia.
Hydroelectric Power in Berberin, Calasparra
(Murcia)
CLIENT
MAR MENOR GOLF RESORT
JCYL. ITACYL
CAM. CANAL DE ISABEL II
TRASAGUA
AYTO. MURCIA. EMUASA
MITYC. IDAE
BUDGET
(EUROS)
5.951.966,46
5.137.426,45
4.346.657,90
4.328.323,73
4.002.782,79
3.831.654,67
START DATE
may-08
dec-07
dec-06
mar-04
jul-05
sep-04
TERMINATION
DATE
oct-09
may-09
dec-07
mar-05
jul-06
jul-05
DESCRIPTION
WWTP for a flow of 1,880 m3/day, with a debugging
system using activated sludge biological treatment with
extended aeration system and tertiary treatment BRM
ultrafiltration membranes for water reuse for irrigation.
Gravity thickener sludge. Works factory, concrete tanks,
concrete pipes and other facilities electromecánicas.Red
supply to urbanization Mar Menor II, consisting of 1,200
ml of ductile iron pipe D = 400 mm. 770 ml of D = 300
mm. and 1.147 ml of D = 250 mm. Booth and pumping
installations and replacement of affected services
The work consists in breaking the raft and the execution
of an intake with a filter station, then mounted a GRP
pipe of Ø 2000 mm and a length of 1800 m to the
pumping station. This is a building with all the facilities
required for pumping.
Red for the reuse of water for irrigation. He built a tank
and other facilities run existing two. Each tank will have a
water distribution network, a total of 37,227 m iron pipe
between 100 and 300 mm in diameter. Affected will be
reset and paving services
Regrown channel over a length of 6500 meters and a
height of 1.20 meters on both sides of the channel,
means of mass concrete executed slipform machine.
Replacement 10 overpasses over the channel.
Waste water collector with a length of 4.2 km in 90 class
pipe and cement HA SR, ø 600, 800 and 1000mm and
corrugated PE 700 and 930mm dia, two pumping stations
remotely controlled a 70m jacking with tube Steel ø 1600
for the passage of the A-30. It entubará 420 ml of HA
Alfatego ditch class Ø1000 SR 90 and cement. Includes
the replacement of 1,485 ml of water supply pipe in FD ø
100 ø 150 and 160mm PE.
Headworks, canal approx. 1500ml inner section 7.5 * 3.2
m and thickness 0.25 m in HA, with spillway forebay side
turbine building of the plant, access road to it and
discharge chamber
EXPERIENCE IN WATER WORKS
PROJECT
Works for irrigation use of treated water from
the WWTP Orgegia, Pantanet-Etasa stretch.
Mutxamel municipal Terms and Alicante.
Improvement and modernization of irrigation
of the dimension 120 of the Community of
Irrigators of Campo de Cartagena and rural
roads Conditioning TM service Albudeite.
(Murcia)
Construction of wastewater tank Alguazas.
(Murcia)
Tank Construction storms for the Cañares
and Real Tertia, the Tertia (Murcia)
CLIENT
BRAVO MEDITERRANEA, S.L.
CARM. C. AGRICULTURA Y AGUA
CARM. C. AGRICULTURA Y AGUA
UNITED GOLF RESORT
BUDGET
(EUROS)
START DATE
3.502.528,78
apr-04
3.010.962,65
2.898.833,36
2.745.375,63
apr-08
nov-08
dec-06
TERMINATION
DATE
aug-05
nov-09
oct-09
may-07
DESCRIPTION
Pressure pipe, Civil engineering, Electromechanical
equipment.
The works seek to modernize the irrigation of the
Irrigation Area Cota-120, covering the tt.mm. Cartagena,
Murcia, Torre Pacheco, San Javier and San Pedro del
Pinatar
(not
affected
by
the
works).
The
relationship
of
actions
is:
- Execution of pumping station "Canal Cola". 3 groups
are
installed
345
kW.
- Driving to "Drive Aljorra" of 5,753 m in length, 800 mm
in
pipe
Ø
HACC.
- Conduit in "Channel Aljorra" of 3,565 ml, Ø 400, 600
and
700
mm
in
FRP
pipe.
- Execution of main driving unfolding 4.326 ml PVC pipe,
Ø
315
mm.
- Execution of piping to existing service reservoir of 577
ml
GRP
pipe
Ø
400
mm.
- Execution of chests of service (6), rush (3), sectioning
(1), for installation of suction cups 4 "(26), and to install
drainage
(5).
- Installation of two output ultrasonic flowmeters to
Pumping
Station
and
bypass
valve
box.
- Replacement of affected services and corrective
measures
environmental
impact.
Earthworks.
Construction of reservoir with a capacity of 8,466 m3 for
rainwater storage for later driving to the treatment plant.
The foundation is done through screen walls and piles
HA ICC of an approximate length of 17 m with sludge
ventoníticos and a slab of 1.5 m thick. They share 15
pumps for cleaning and water oxygenation funds, and 4
breast pumps for emptying
Storms tank of 7,250 m3 concrete building (725 m2 in
plan and 10 m high) built by foundation slab 50 cm deep
and 45cm screen walls and 15m deep with bombs
building structure reinforced concrete waffle slab,
grinding equipment equipped with self-cleaning bars, flow
meters, aeration system with submersible pump and
cleaning and deodorizing biological system to 12,000 m3/
hr
EXPERIENCE IN WATER WORKS
PROJECT
General collector roof drainage Vinalopó
River in Elche (Alicante)
Distribution network sprinkler in the land
consolidation II Soto de Cerrato (Palencia)
Rolling Reservoir tank storms and ultraviolet
disinfection channel of the WWTP of Yecla.
Building Deodorization alivaiadero dehydration
and storm tank in WWTP (Murcia)
Potable water tank for Construction "Condado
de Alhama". Alhama de Murcia
(Murcia)
Supply to Aledo. (Murcia)
CLIENT
BUDGET
(EUROS)
START DATE
AYTO. ELCHE
2.732.515,05
aug-01
JCYL. ITACYL
2.580.677,80
aug-09
CARM. C. AGRICULTURA Y AGUA
ALHAMA GOLF RESORT, S.L.
M. MEDIO AMBIENTE. MCT
2.475.074,08
2.434.211,02
2.368.720,35
mar-08
jan-08
sep-04
TERMINATION
DATE
DESCRIPTION
Faug-02
Manifolds with concrete pipe diameters 2.00 and 2.50
with a section dug into mine and another 600 ml portion
executed by jacking 1,100 ml
**In progress
may-09
sep-08
jan-06
The work consists of the irrigation pipeline and pvc frp
pipe diameter 800 mm maximum
The works consist of:
- The execution of a casket delivery to storm tank and
another tank rolling
- Executing a rolling tank 30x18x3x75 m (2,000 m3)
before entering the raw water well.
- Building a storm tank of 3,000 m3 capacity in total
comprising three channels 30x9, 66x3, 75 m with
overflow between.
- The execution of a pumping pit emptied. - The
construction of a covered reservoir tertiary lamination
20x10x4, 3 ​m with a useful capacity of 860 m3.
- Installing a disinfection treatment by ultraviolet lamps at
the output of treated water. The team consists of 5
modules with 8 lamps w 250 each.
- The intalacion centrifuge sludge new addition to the
existing one.
The work is completed with urbanization, several studies
in the former waterworks, electrical installation and
installation of control and automation, and the installation
of emergency power.
Construction of a drinking water reservoir for the urb.
Condado de Alhama. The structure consists of
prefabricated prestressed concrete beams and slab of
concrete prefabricated honeycomb plate. Impervious
coatings are formed of two-component epoxy resins.
Protection-component epoxy paint walls
Resupply Aledo (50 l / sec) by ditch driving helical weld
steel pipe: ø 2.999 ml 12'' (323.9 mm) + 5.461 ml ø
8'' (219.1 mm), pumping station w / 2 pumps of 245 kW
and 380 mca + HA cylindrical tank and cover 5000m3 +
junction Hollowcore ASAT, CT & LSBT.
EXPERIENCE IN WATER WORKS
PROJECT
Proposed solution sewage disposal - rain
collector Ha-1600 mm (s2) along the general
system gg-ss4 to Reguerón channel and its
connection with the S1. (Murcia)
Sewage outfall of the WWTP of Jumilla
(Murcia)
Calasparra supply expansion. (Murcia)
New channel to the hydroelectric central in
Hoya Garcia, Cieza (Murcia)
Expansion tank connection with branches
Aljorra Campo de Cartagena. (Murcia)
CLIENT
BUDGET
(EUROS)
START DATE
TERMINATION
DATE
URDECON
2.024.247,80
april-09
**In progress
CARM. C. AGRICULTURA Y AGUA
1.967.023,79
dec-05
M. MEDIO AMBIENTE. MCT
1.678.928,97
nov-01
NUEVOS RIEGOS "EL PROGRESO", S.A.
1.505.895,93
nov-99
M. MEDIO AMBIENTE. MCT
1.397.474,45
aug-02
Extending south supply network, 3000m3
Carrascoy deposits, Alhama de Murcia
AYTO. ALHAMA DE MURCIA
1.306.317,47
jul-04
Cortao Cabezo Espinardo Collector. (Murcia)
CARM. C. AGRICULTURA Y AGUA
1.306.041,37
apr-97
dec-06
apr-03
feb-00
sep-03
nov-04
jan-98
DESCRIPTION
Connection Emissary town of Jumilla with the new
WWTP, using class THA 135 Ø 1,000 mm, with a length
of 5,495 ml. Works manufactures: collector connecting
Arqueta existing outfall manhole entry and two rainwater
overflows one before delivery to the WWTP and one in
the middle.
Running piling 35 ml Ø 1,000 rd junction with. Jumilla
ring.
Conditioning access to the WWTP with the improvement
or creation of roads with gravel layer of 20 cm and 5 cm
of MBC.
Ventilation elements each 250m, consisting of brickwork
with metal grilles and air entry HDPE pipe ø 315 and air
outlet chimney with tapered galvanized pipe ø zero 200 150mm for exhaust.
The works consist primarily of installing buried in trench
18 kilometers of ductile iron pipe with diameter: 13.1 km
DN 300 mm and DN 200 mm 5.0.
Construction of approx. 1 km concrete channel open
rectangular section.
Earthworks, carbon steel pipes with 1500 mm diameter
helical welding. Groups pumping concrete structures.
Valves and special items.
Deposit HA "in situ" of 3000 m3, valves and 4,495 ml
HDPE pipe ø 155mm, PN16, including valves, meters,
elbows, tees and other hydraulic parts
Sanitation collectors with mass concrete pipes and armed
various diameters. Horizontal Jacking under the highway.
Resetting services firm.
EXPERIENCE IN WATER WORKS
PROJECT
General collectors in the Albujón and Aljorra,
TM Cartagena (Murcia)
Mozoncillo. Emissary and WWTP. (Salamanca)
Modernizing irrigation irrigation community
"Baroness" in Orihuela (Alicante)
Modernizing irrigation irrigators heredamiento
Molina de Segura, E. reservoir area (Murcia)
Expansion tank Mazarrón (Murcia)
Supply tailings Valley. Phases II, III and IV,
Cartagena (Murcia)
Making drinking water from pooling Taibilla and
delivery channels to drive deposit PEI Alhama
de Murcia for residential water supply pp Sector
US140201
"Condado de Alhama" (Murcia)
Emergency works to save water by
waterproofing performances in some sections of
the valley ditches high. Broken ditch. (Murcia)
Supplying the valley and San Jose
Obrero, Cartagena. (Murcia)
CLIENT
CARM. C. AGRICULTURA Y AGUA
BUDGET
(EUROS)
1.242.340,80
FECHA INICIO
aug-06
jul-07
**In progress
DESCRIPTION
The work is divided into the following actions: - Section 1:
From the end point of the Albujón sanitation and Las
Lomas to the WWTP 1. Reinforced concrete pipe Ø 500
mm and 125 m in length. - WWTP 1: It has 3 submersible
pumps 22 kw-Section 2: Driving Ebara pressure from 1 to
Las Lomas, based on HDPE Ø 315 mm and 1,590 ml.Section 3: Section in severity from the previous drive to
old WWTP Aljorra concrete pipes of 500 and 800 mm,
and a length of 2,041 ml. - Section 4: In half the gravity
from sanitation to the old Aljorra WWTP with concrete
pipe Ø 600 mm length and 520 ml. - Spillway to be
constructed in the junction point of the section 3 with
section 4.
Construction of WWTP outfall and Mozoncillo (Segovia).
The project consists of civil works of the WWTP, building,
electrical and mechanical. The pipes are mostly PVC.
JCYL. C. MEDIO AMBIENTE
1.241.723,45
SEIASA MESETA SUR
1.163.053,12
apr-04
jan-05
Modernization of irrigation
CARM. DG REGADÍOS
1.157.400,98
jul-01
aug-02
Reservoir for water supply, pressure pipes, pumps,
automation and remote mechanisms irrigation.
M. MEDIO AMBIENTE. MCT
1.060.350,20
AQUAGEST LEVANTE
1.026.923,15
ALHAMA GOLF RESORT, S.L.
1.006.906,83
M. MEDIO AMBIENTE. CH SEGURA
999.325,15
AQUAGEST LEVANTE
865.040,18
sep-09
TERMINATION
DATE
sep-02
feb-06
nov-08
nov-08
jul-04
sep-03
jun-06
Pipeline, water tank, and urbanization.
Pipeline, water tank, and urbanización.Colocación of
2,336 meters FD pipe Ø 500 mm and 1,223 ml FD pipe Ø
250 mm, including valves and accessories. Implantation
consumption control system along the entire network.
oct-09
mar-10
nov-04
The channel has a length of 0.5 km rectangular section.
The foundation is solved with a slab of 30 cm. thick with a
width of 2.50 m and two walls 20 cm thick light of 2.00 m
between them. and 2.00 m high. A gate is placed for
taking water to facilitate control thereof.
3106 meters FD pipe ø 100 to 500mm including valves,
Woltman meters, elbows, tees and other hydraulic parts
EXPERIENCE IN WATER WORKS
PROJECT
Rainwater collector Calle Real de
Cartagena. (Murcia)
External drainage of rainwater CTCC AES,
tailings, Cartagena. (Murcia)
Large surface drainage on the embankment
on the right side of the Oak Tunnel.
(Alicante)
Potable water tank of 5,000 m3 in the
"Aigua Rius" in Elda. (Alicante)
Project 05/03 Variant new Channel Alicante,
section III, Part 1, in Elche (Alicante)
Channelling Rambla del Derramador in Elda.
(Alicante)
Renewal messed networks in the City center
of Torre Pacheco. (Murcia)
Deposit and Drive for drinking water Cotillas
Towers. (Murcia)
Extension of Supply to Fortuna
(Murcia)
Collector Ronda Avenue. (Alicante)
Supply and distribution pipes Tallante bulges
and Ports, Cartagena. (Murcia)
Renewal arterial pipe DN 800 DN 600 matubo
with fair stretch Paterna cemetery. (Valencia)
1,000 m3 tank park in Paterna pigeon shooting.
(Alicante)
Driving water transport between the tank and
Sucina Trajectum Meuse. (Murcia)
System expansion Lorca Puerto Lumbreras and
Eagles. Expanding the starter elevation (Murcia)
Channelling Canyon Phase I La Cala Finestrat
(Alicante)
CLIENT
BUDGET
(EUROS)
START DATE
AQUAGEST LEVANTE
852.600,00
jun-03
INITEC
826.438,75
apr-04
M. FOMENTO. DG FERROCARRILES
813.683,47
GENERALITAT VALENCIANA
TERMINATION
DATE
oct-03
DESCRIPTION
Demolition firm, trench excavation, with exhaustion,
shoring and piling where necessary to pipe fitting ø HA
300-2000, HDPE, PVC and Ductile Iron in the town.
may-04
Stormwater network outside the Power Plant, by HA pipe
ø 180 1500 class
jan-02
may-02
Earthworks, drainage networks concrete channels.
Gabion walls and breakwaters.
777.263,26
may-01
may-02
M. MEDIO AMBIENTE. MCT
716.532,00
may-03
AYTO. ELDA
702.538,81
mar-99
AYTO. TORRE PACHECO
671.524,07
CARM. C. AGRICULTURA Y AGUA
668.751,25
M. MEDIO AMBIENTE. MCT
666.380,50
AYTO. ELDA
626.978,11
AQUAGEST LEVANTE
dec-03
Earthworks, reinforced concrete structures. Supply pipes,
boilers and valves. Waterproofing.
Jacking made ​with reinforced concrete pipe 3000 mm
diameter Class IV, interior treatment and injection of
joints with cement mortar and dismantling of all the above
and even demolition of reinforced concrete parts,
completely finished, clean and ready to house inside
steel pipe.
sep-98
Earthworks, Channelling promenade with gabion factory
works.
Replacement of 7,280 ml ​PE pipe ø 90 and 200, PN 16
and FD 125
Water tanks. Ductile iron pipe discharge
nov-03
Conduit casting, pump and water tank
mar-99
sep-99
Manifolds with mass concrete pipes. Drive and sewage
pumping. Resetting services firm.
579.884,42
jul-04
nov-04
2800 meters FD pipe ø 100 to 300mm including valves,
meters, elbows, tees and other hydraulic parts
AGUAS DE VALENCIA
499.944,92
apr-10
**In progress
AQUAGEST LEVANTE
489.693,95
sep-04
dec-97
sep-02
Pending
sep-99
feb-05
**
AYTO. MURCIA. EMUASA
488.674,14
aug-06
mar-07
M. MEDIO AMBIENTE. MCT
470.894,31
feb-02
aug-02
GENERALITAT VALENCIANA
455.670,18
oct-00
jul-01
Driving buried in trench 6225 meters FD pipe ø 300 mm
k-9, which runs largely on the service road of the C-3319,
not including supply of pipe.
installation of potable water pumping with powerful
pumps
Earthworks, roadworks. Masonry walls, irrigation network.
EXPERIENCE IN WATER WORKS
PROJECT
Potable water tank of 6000 m3 in Altea
(Alicante)
Abanilla siphon Extension on Canal del Segura
(Murcia)
Collector and WWTP Homes Galiana. Hondon
de los Frailes. (Alicante)
Channel utilization Hydraulic and
Hydroelectric San Diego, municipality of Isso
(Albacete).
Channelling Rambla La Melva. (Alicante)
Channelling and right bank stabilization Jalon
town of Benichembla Tranche (Alicante)
Water Supply District of St. Joseph the
Worker. (Murcia)
New tank Rojales (Alicante)
Local improvement. Replacement pipes 0 and
1 section of the motorway Murcia - Alicante.
(Murcia)
Channelling boulevard "El Sapo" from the
Railways Alicante-La Encina P.E.R.I. Elda
Vinalopó River. (Alicante)
Improving Network potable water Hondon de
las Nieves. (Alicante)
Improved supply network in districts of
Alhama de Murcia
Fitness and slope protection against
erosion in the Jewish Rambla Abarán
Barranco. (Murcia)
Expansion tank Guardamar del Segura.
(Alicante)
Emergency works to repair damage from
flooding in the Rambla de Benipila in
Cartagena. (Murcia)
Red Gold Jug supply-Path of the Turkeys,
Alhama de Murcia. (Murcia)
CLIENT
BUDGET
(EUROS)
GENERALITAT VALENCIANA
438.111,38
M. MEDIO AMBIENTE. MCT
419.689,88
START DATE
nov-98
aug-02
nov-01
TERMINATION
DATE
jun -99
aug-03
Earthworks, reinforced concrete structures. Supply pipes,
boilers and valves. Waterproofing.
Helicosoldado steel pipe of large diameter. Concrete
structures. Valves and special items
Earthworks, reinforced concrete pipes. Wastewater
treatment station (flow = 210 m3 / d). Sewerage and
collector, drive existing network, reactor - separator,
pumping house and grounds.
DIP. ALICANTE. PROAGUAS COSTABLANCA
401.149,44
ELECTRO SAN DIEGO, S.A.
390.660,87
jun-00
dec-00
AYTO. ELDA
374.075,94
mar-01
oct-01
GENERALITAT VALENCIANA
373.923,29
apr-98
nov-98
AYTO. CIEZA
354.441,38
mar-99
dec-99
M. MEDIO AMBIENTE. MCT
349.611,45
aug-96
dec-97
M. FOMENTO. DG CARRETERAS
346.063,51
AYTO. ELDA
345.263,29
mar-98
dec-98
DIP. ALICANTE
325.343,48
jun-98
oct-98
AYTO. ALHAMA DE MURCIA
322.563,81
jul-04
nov-04
6500 meters of 160mm dia HDPE pipe, PN16,
including valves, counters, elbows, tees and other
hydraulic parts
CARM. C. AGRICULTURA Y AGUA
322.432,66
feb-00
nov-00
Channelling promenade with reinforced concrete
caissons, replacement services and urbanization
M. MEDIO AMBIENTE. MCT
304.911,40
jun-96
jul-97
M. MEDIO AMBIENTE. CH SEGURA
300.469,99
mar-01
jun-01
AYTO. ALHAMA DE MURCIA
275.181,90
jul-04
dec-94
jun-02
DESCRIPTION
sep-95
nov-04
Canal Refurbishment concrete and conditioning in power
plant.
Earthworks, Channelling boardwalk with concrete walls.
Earthworks, reinforced concrete walls and precast.
Supply and sewage pipelines. Gardening.
Demolition firm with cobblestone sidewalks pavements,
supply replenishment.
Pipeline pressure pipe welded steel helical ø 1500 mm.
Concrete structures. Valves and special parts.
Supply lines. Casting pipes Ø 700 and Ø 350 and Ø 700
Fiberglass. Horizontal Jacking Ø 1000 mm, under the
highway A-7
Excavations and large diameter pipe and concrete
frames.
Cast iron pipes, valves and special pieces.
Pipeline pressure pipe welded steel coil. Concrete
structures. Valves and special parts.
Earthwork, masonry walls, replacement of
services
3264 meters of 160mm dia HDPE pipe, PN16,
including valves, meters, elbows, tees and other
hydraulic parts
EXPERIENCE IN WATER WORKS
PROJECT
CLIENT
BUDGET
(EUROS)
START DATE
TERMINATION
DATE
DESCRIPTION
Construction of a reservoir, reinforced concrete
rectangular and 3,000 cubic meters capacity and
connecting the pipes helicosoldado steel pressure.
New deposit Cox (Alicante)
M. MEDIO AMBIENTE. MCT
273.018,12
Supply Expanding the Vega Baja del Segura.
New deposit Callosa de Segura. (Alicante)
M. MEDIO AMBIENTE. MCT
271.434,16
GENERALITAT VALENCIANA
232.883,33
Extension of supply to Ceuti. (Murcia)
M. MEDIO AMBIENTE. MCT
223.367,98
Construction project 01/08 flow measuring
uptake of ETAP balsón campotejar in Molina
de Segura. (Murcia)
M. MEDIO AMBIENTE. MCT
219.153,16
apr-10
M. MEDIO AMBIENTE. CH SEGURA
215.361,32
mar-00
District Collector Raft General Lino spillway in
Molina de Segura. (Murcia)
CARM. C. AGRICULTURA Y AGUA
211.975,15
feb-00
may-00
Manifolds with PVC pipes large diameter factory Works,
firm demolition, excavation and shoring.
Connections between the pumping stations of
the emissaries head North in La Manga.
(Murcia)
CARM. C. AGRICULTURA Y AGUA
179.283,11
feb-99
apr-99
Polyethylene Pipes. Excavations in trench systems
water table reduction. Boiler installations and fittings.
AYTO. ELDA
178.712,15
sep-98
POLARIS WORLD
172.351,03
Pending
**
0
AYTO. ZUERA
142.372,32
Pending
**
0
Automation drinking water network, Phase II in
the Port of Cartagena. (Murcia)
M. FOMENTO. AUTORIDAD PORTUARIA DE
CARTAGENA
125.825,79
feb-01
may-01
Repair of infrastructure between PK13, 150 and
16,500 Crevillente channel. Municipality of
Crevillente. (Alicante)
M. MEDIO AMBIENTE. CH SEGURA
125.742,00
AYTO. MOLINA DE SEGURA
123.988,80
GENERALITAT VALENCIANA. EPSAR
123.532,14
Construction of new reservoir and water
supply improvement Ondara. (Alicante)
Arroyo's Gollizo Conditioning Riopar.
(Albacete)
Enhanced channeling of Rambla del
shedder in Elda. (Alicante)
Replacing dn 80 mm pipe for drinking water in
Torre Pacheco. (Murcia)
Improving the supply network and improving
sanitation network C / Huerta Zuera girl.
(Zaragoza)
General Networking Replacement of drinking
water in the hamlet of Comala of Molina de
Segura. (Murcia)
Emergency Works for the construction of a new
collector output of Alzira-Carcaixent Edar.
(Valencia)
aug-96
sep-00
jan-01
sep-94
nov-00
feb-98
dec-08
jul-97
jul-01
Concrete structures. Valves and special parts
Earthworks, reinforced concrete structures. Supply
pipes, boilers and valves. Waterproofing.
Earthworks, reinforced concrete structures. Supply
pipes, boilers and valves. Waterproofing.
mar-95
Excavation in trenches. Supply line. Fibrocement Ø
350. Reinforced concrete manholes and valves.
oct-01
**In progress
oct-00
jan-99
dec-00
jun-98
apr-09
Situ concrete manhole 8.5 x 5 x 4.1 m, equipped with
lighting and flow measurement equipment, valves and
a dismantling, everything in diameter 1500 mm.
Channelling promenade with masonry. Works factory
and street furniture.
Earthworks, Channelling promenade with gabion
factory works.
Excavations in trench, iron pipes, valves and automation
Infrastructure repair, by digging, sanitizing,
waterproofing and concrete slab replacement.
Red water supply districts with PE pipe High Density
0
EXPERIENCE IN WATER WORKS
PROJECT
CLIENT
BUDGET
(EUROS)
START DATE TERMINATION
DATE
Drinking water redotación lower area of ​
Tertia-Lorca (Murcia)
AYTO. LORCA
122.147,84
Bending the Major Azarbe Zarandona.
(Murcia)
AYTO. MURCIA
114.433,49
CARM. C. AGRICULTURA Y AGUA
99.882,63
M. VIVIENDA. SEPES
96.560,83
apr-01
jun-01
AYTO. MURCIA
57.302,98
jul-99
aug-99
M. MEDIO AMBIENTE. CH SEGURA
48.080,97
M. MEDIO AMBIENTE. CH SEGURA
30.050,61
UNIVERSIDAD DE MURCIA
21.936,94
M. MEDIO AMBIENTE. CH SEGURA
19.304,75
M. MEDIO AMBIENTE. CH SEGURA
18.336,88
Forward Rambla Cañadica in Aledo. (Murcia)
Forward irrigation pipe located on the
northwestern edge of the AI "West" Sewer.
(Murcia)
Channelling promenade in University
Campus area. (Murcia)
Court of reeds and weeds, and conditioning
in several wadis. (Murcia)
Platform Conditioning and aqueduct pipe
replacement in the Sierra of Water (Albacete).
Upgrade and refurbishment of channels in
Espinardo. (Murcia)
Condictioning several on-site reservoir Mayes,
Municipal District of eyes (Murcia)
Sewerage of runway, gutters and sidewalks in
the section III, the main channel of the righthand margin of Alhama de Murcia. (Murcia)
may-95
dec-96
nov-01
jul-01
oct-97
nov-01
jan-01
DESCRIPTIONN
FEaug-97
Pressure Pipe Conduit.
oct-95
Concrete structures and slabs.
dec-97
dec-01
aug-01
nov-97
dec-01
feb-01
Sanitation collectors with mass concrete pipes and
armed various diameters. Resetting services firm.
Earthworks and pipes with PVC pipes
Reinforced concrete pipes Ø 1500. Works factory
and earthmoving
Clearing, clearing of vegetation, clearing drag
materials.
Channelling masonry platform and pipeline.
Earthworks, roadworks
Repair walls and various fittings.
Clearing and preparation of curbs and sidewalks.
CLIENT: AGUAS DE LA CUENCA DEL SEGURA, S.A.
WORK: Channelling Benipila Rambla de Cartagena. Murcia
CLIENT: NUEVOS RIEGOS “EL PROGRESO” S.A.
PROJECT: New channel for Hoya Hydroelectric Garcia. Murcia
CLIENT: AYTO. ELDA
WORK: Channelling boulevard "El Sapo" from the Railways Alicante-La Encina P.E.R.I.
Vinalopó River. Alicante
CLIENT: TRASAGUA
WORK: channel screed Tajo - Segura River Fields. Murcia
CLIENT: MINISTERIO DE MEDIO AMBIENTE - MANCOMUNIDAD DE LOS CANALES DEL TAIBILLA
WORKS: Expansion tank Guardamar del Segura. Alicante
CLIENT: REGIÓN DE MURCIA, CONSEJERÍA DE MEDIO AMBIENTE - D.G. DEL AGUA
PROJECT: Deposit and Drive for drinking water supply "Cotillas Towers". Murcia
CLIENT: RIEGOS DEL VINALOPÓ, S.L.
WORK: Hydropower in the Acequia de Berberin, Calasparra. Murcia
CLIENT: MINISTERIO DE MEDIO AMBIENTE -DG. AGUA
WORK: Infrastructure Modernization hydraulic sector of Lorca and Valle VIII Guadalentin
CLIENT: MINISTERIO DE MEDIO AMBIENTE - ACUAMED
PROJECT: Plant denitrification of L'Eliana, Valencia
CLIENT: JUNTA DE CASTILLA Y LEON
WORK: Modernization Channel Paramo, sections V and VII
CLIENT: MINISTERIO MEDIO AMBIENTE. ACUAMED.
WORK: Section 41 of the NHP. Cumulated 1: Start End Sifon Segura Aqueduct Campos del Rio
CLIENT: AYUNTAMIENTO DE ALHAMA DE MURCIA
WORK: Supply Network Expansion. Carrascoy deposit 3,000 m3 in Alhama de Murcia
CLIENT: REGIÓN DE MURCIA, - D.G. DE REGADIOS
WORK: Modernization irrigated areas irrigators heredamiento Molina de Segura. Reservoir Area E.
CLIENT: AYTO. ELDA
WORK: Channelling Ramble The Melva in Alicante
CLIENT: GENERALITAT VALENCIANA
WORK: Potable water tank of 6000 m3 in Altea. Alicante
CLIENT: MINISTERIO DE MEDIO AMBIENTE D. G. O. HIDRÁULICAS
WORK: WWTP of Los Alcazares. (Murcia)
CLIENT: MINISTERIO DE MEDIO AMBIENTE D. G. O. HIDRÁULICAS
WORK: WWTP of Los Alcazares. (Murcia)
CLIENT: LA TORRE RESORT DEVELOPMENT, S.L. (POLARIS WORLD)
WORK: WWTP of La Torre, Torre Pacheco. (Murcia)
CLIENT: LA TORRE RESORT DEVELOPMENT, S.L. (POLARIS WORLD)
WORK: WWTP of La Torre, Torre Pacheco. (Murcia)
CLIENT: EL VALLE GOLF RESORT, S.L.
WORK: WWTP of El Valle, Baños y Mendigo. (Murcia)
CLIENT: EL VALLE GOLF RESORT, S.L.
WORK: WWTP of El Valle, Baños y Mendigo. (Murcia)
CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA
WORK: WWTP of Jumilla. (Murcia)
CLIENT: POLARIS WORLD
WORK: WWTP of Condado de Alhama, Alhama de Murcia (Murcia)
CLIENT: POLARIS WORLD
WORK: WWTP of Condado de Alhama, Alhama de Murcia
(Murcia)
CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA
WORK: WWTP of Caravaca de la Cruz. (Murcia)
CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA
WORK: WWTP of Caravaca de la Cruz. (Murcia)
CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA
WORK: WWTP of Caravaca de la Cruz. (Murcia)
CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA
WORK: WWTP of de Abarán. (Murcia)
CLIENT: REGIÓN DE MURCIA CONSEJERÍA DE MEDIO AMBIENTE. D.G. DEL AGUA
WORK: WWTP of Abarán. (Murcia)
CLIENT: ESAMUR
WORK: Adaptation and improvement Abanilla WWTP. (Murcia)
CLIENT: GENERALITAT VALENCIANA
WORK: Improving WWTP Hondon de las Nieves. (Alicante)
CLIENT: GENERALITAT VALENCIANA
WORK: Improving WWTP Hondon de las Nieves. (Alicante)