JSC “Technopromexport”
Founded in 1955
Mezhdunarodnaya TPP
Commissioning in 2007-2008
2
3
We are proud
of technical solutions
and perfect structures
when a creative view
catches
irreproachability
of lines
5
6
7
8
9
10
11
Laconism
Purity
Lightness
13
14
15
16
17
18
Chaos
Potential
Harmony
20
21
22
23
Man
City
Power
25
26
27
28
29
30
Shape
Color
Space
32
onstruction of a unique Moscow City International
cycle technology and elaborated configuration of the main
Business Center is carried out in Moscow. It
equipment allow to reach efficiency up to 54%.
C
is planned that the area of 100 hectares will
The first unit of the power plant is constructed on the
accommodate up to 5 mln sq. m. of offices, hotels, stores,
basis of two SGT-800 gas turbines produced by Siemens with
recreational areas. For the first time in Russia and Eastern
electric capacity of 45,6 MW each, steam turbine MP-16DH
Europe the business zone combining business, residential and
with capacity of 30 MW (Siemens), as well as busy and back-
recreational activities is created. Moscow’s primary task is to
up water boiler KVGM-151,2-150 with capacity of 130 Gcal/hr
provide supply of electric power for this grand project.
manufactured by ZAO “Energomach” (Belgorod). The second
Under Moscow authorities’ initiative the first investment
IPP project in Russia’s capital was launched.
Technopromexport as a construction investor of
unit is identical to the first one as far as the main equipment is
concerned with a slight difference in capacity of gas turbines
(116 MW total) and the boiler output (120 Gcal/hr).
Mezhdunarodnaya TPP for the first time not only in Moscow
Technical parameters of the first unit: Electric
but also in Russia built the power plant under BOO (Build-Own-
capacity operation – 8150 hrs., Annual electric power output
Operate) scheme.
– 932,46 mln kW·hr, thermal capacity operation – 2629 hrs.,
In 2007 the first generating unit was put into operation
in a record time for this kind of projects – 18 months. With
Annual heat output – 539,00 thousand Gcal, Annual fuel
consumption – 271,95 thousand tons.
completion of the second unit by the end of 2008 the power
The main building of the first unit is characterized by
plant will start operating as an unified power generating facility.
space-saving placement of the main and auxiliary equipment.
The power plant with electric capacity of 236 MW and thermal
Dry air coolers to feed out the excess heat as well as cooling
energy of 490 Gcal/h will allow to sufficiently provide Moscow
systems of various equipment such as oil systems of gas
City Business Centre with power and heat supply.
turbines, steam turbines, boosters are located on the roof of
The design of Mezhdunarodnaya TPP is provided for the
most cut-edge solutions in electric power sector. Combined-
the turbine room.
33
34
2008 © фото и дизайн: griffel.ru
ry air cooler is equipped with automatic
operations are required during the start-up and operation of
turning blinds controlling a flow of cooling
the plant. The management and control over the equipment is
air against the temperature of cooling water.
done through computer network by operators from the main
D
These design and technical solutions helped to significantly
decrease a number of circulation system pipes, cables, as well
as reduce the noise.
control room.
Due to the hard construction conditions in a densely
built-up urban area Technopromexport had to face a number
The electro-mechanical equipment at the power plant
of difficulties such as lack of on-site storage facilities, handling
is controlled by frequency control system allowing to increase
of the oversize loads. Technopromexport introduced an hourly
operation period and reduce auxiliaries power consumption.
equipment delivery schedule and carried out installation of the
The up-to-date water treatment membrane technology
provides the sufficient quality of water considering the spacesaving size of the power plant’s treatment unit.
equipment under just-in-time system.
Mezhdunarodnaya TPP is the best possible solution for
utility power sector of big cities and regional centers as the
The electric power transmission voltage is 20 kV and
construction site space meets the most demanding require-
110 kV. The complete SF6 breaker switchgear is one of the
ments of urban densely built-up area. The 120 MW power plant
latest and requires very small operational costs. For the first
construction site and facilities occupy the area of 1.11 and 0.635
time small-size solid three-phase polymeric filler buslines
hectares correspondingly which is comparable with a regional
were installed at Mezhdunarodnaya TPP.
thermal power plant for a big residential area. The important
The plant’s main equipment has local control systems
thing is that CCGT-120 can be installed in a direct vicinity of the
united in one control system. Due to the high automation level
consumers and be part of new residential areas. The ecological
of the main and electro-technical equipment very few manual
indices of the power plant meet the strictest world standards.