Bridge Division Brochure
Transcription
Bridge Division Brochure
ES Fox Ltd. Bridge Division E.S. FOX LTD. A Company of Unique Abilities - Since 1934 COMPANY CONTACTS: Steve Matthews, G.S.C. Area Manager - Structural Steel Division [email protected] Cell 905-380-1219 Roger Van Dun, G.S.C. Division Manager - Structural Steel Division [email protected] Gerry Campbell Construction Manager - Structural Steel Division [email protected] Cell 905-359-8326 Hannah Deacon Sales & Estimating Coordinator [email protected] AFFILIATIONS: 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com ES FOX LTD. BRIDGE DIVISION The Bridge Division of E.S. Fox Ltd. manages & executes both the field erection of a wide variety of bridge structures along with the fabrication and field erection of structural steel. E.S. Fox is the leader in Ontario (for 7 consecutive years) in providing the most union man-hours. Employing more than any Ontario contractor helps us keep and pool the key personnel to achieve success in this highly schedule driven market. Our Bridge Division management team provides cost-effective and efficient control of a project from the initial tender stage through to project completion. We employ experienced and highly skilled Unionized steel erection field crews who are mandated to provide a safe working environment on each of our project sites. In the early planning stages, our management team can work closely with architects, engineers and owners to assist in the design and budgeting of projects. Although we have completed many projects involving relatively simple bridge installations, most of our larger commercial and industrial projects have demanded a level of managerial and field execution performance which is far above the ordinary. These projects usually involve complex or unique structural systems erected on a fast-track schedule, normally precluding the owner’s use of less competent steel erectors. In addition to the on-site field erection E.S. Fox can provide all the engineered lift plans along with the Quality Verification Engineering (if required). We have worked with a variety of Engineering firms depending on the location and type of project. In the field, E.S. Fox employs highly qualified and fully trained “Union” erection crews. Our field supervisors have many years of experience working on bridge projects along with industrial and commercial projects. E.S. Fox maintains a $40 million inventory of construction tools and equipment which is available for use by the bridge division. Every project requires a wide variety of cranes and man-lifts, which we maintain and update on a continual basis. We also maintain close working relationships with major crane rental firms in the province to access equipment that is not cost-effective for inclusion in our own inventory. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com ES FOX LTD. BRIDGE DIVISION Market diversity is one of our main assets. Although heavily involved in the erection of bridge projects, we are also involved in a wide range of structural projects which require a good measure of agility and ingenuity in order to meet owner’s expectations. For example: Bridge repair and maintenance Shut downs in rail or road bridge settings Launching bridges Jacking of bridges Jack & Slide techniques Rapid Bridge Replacement (RBR) Bridge rehabilitations Bridge removals Canal & Seaway repairs Existing structure reinforcements Fast track projects on logistically sensitive sites and locations Erection in occupied structures E.S. Fox Ltd., established in 1934, is one of Canada’s largest industrial and commercial multi-trade union contractors specializing in bridge and structural steel erection. We are CWB [Canadian Welding Bureau] and ISO 9001 – 2000 edition certified. We are also a member of the CISC [Canadian Institute of Steel Construction], with bridge erection certification. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Current & Completed Bridge Projects Road Bridges Location Aberdeen Ave. Underpass……………………………………………………….. Hamilton, ON Bay St. Bridge……………………………………………………………………. Hamilton, ON Belfast Bridge, Hwy 417………………………………………………………….Ottawa, ON Bell Blvd. Bridge …………………………………………………………………Belleville, ON Centennial Parkway Bridge……………………………………………………….Hamilton, ON Coldwater Bridge …………………………………………………………………Coldwater, ON Gardiner Expressway Underpasses………………………………………………. Toronto, ON Grand River Bridge …………………………………………………………….... Kitchener, ON Humber River Bridges …………………………………………………………....Toronto, ON Hunt Club Bridge………………………………………………………………….Ottawa, ON Hurdman Bridge, Hwy 417………………………………………………………..Ottawa, ON Hurontario Rd. Bridge …………………………………………………….…..…..Mississauga, ON Ferguson St. Bridge …………………….………………………..………..………Hamilton, ON Lees Ave. Bridge, Hwy 417 ……………………………………………………..Ottawa, ON Main St. Underpass …………………………………..………………….………..Hamilton, ON McLaughlin Rd. Bridge ………………………………………….……….……..Mississauga, ON McKenzie River Bridges ……………………………………………….…………Thunder Bay, ON One Mile House Viaduct Superstructure…………………………….……………St. John, NB Riverside Bridge, Hwy 417………………………………………………….……Ottawa, ON Steel River Bridge ……………………..……………………………….………....Terrace Bay, ON Winston Churchill Bridge Hwy 403………………………………………………Mississauga, ON 407 ETR Bridges ………………………………………………………….……...Burlington, ON 16th Ave. Bridge (Rouge River) ………………………………………….…….....Toronto, ON Pedestrian Bridges Atlantis Water Park …………………………………………………………….…Niagara Falls, ON Concord Adex (Rail Lands) …………………………………………………...….Toronto, ON East Hamilton Recreation Trail & Waterfront Link …………………….…..…....Hamilton, ON Hilton / Renaissance / Casino ……………………………………………..….…..Niagara Falls, ON Table Rock Upper Level, Additions & Renovations ……..………………….…...Niagara Falls, ON 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Current & Completed Bridge Projects Rail Bridges Location Blair St. Bridge…………………………………………………………………….Toronto, ON Bloor St., Lansdowne Ave., Queen St., Brock Ave., Dupont St. …………………Toronto, ON Brock Road Bridge ..………………………………………………….………….. Pickering, ON Centennial Parkway Bridge………………………………………………………. Hamilton, ON Eglinton Ave. Bridge ……………………………………………………………...Toronto, ON Green Road Bridge ……………………………………………………………….. Bowmanville, ON Humber River Bridges …. ………………………………………………………...Toronto, ON Lansdowne Ave. Rail Bridge………………………………………………………. Toronto, ON Main St. Bridge…………………………………………………………………….Milton, ON Martingrove Bridge……………………………………………………………...…Scarborough, ON Weston Rd Bridge………………………………………………………………….Toronto, ON Bridge Removals Humber River Rail Bridge…………….………………………………….……….. Toronto, ON Lansdowne Ave. Rail Bridge……………………………………………………….Toronto, ON Industrial Bridges Arcelor Mittal Dofasco PCI Facility ………..…………………………….……... Hamilton, ON Portlands Energy Center, Pipe Racking …………………………………………..Toronto, ON Cytec Utility Racks ……..………………………………………….…………...…Niagara Falls, ON Eastern Ave. Utility Structure ……..……………………………………….……...Toronto, ON Bridges Rehabilitation / Maintenance Birch Ave., Emergency Repairs ……………………………….…………..……... Hamilton , ON Credit River Bridge, Launch, jack & reinforce …………………..………..………Mississauga, ON Highland Creek Bridge ……..……….…………………………..………………... Toronto, ON Hurontario Ave. @ Hwy 401, Damage repair ……………………....……..……... Mississauga , ON St. Lawrence Seaway, Sheave Replacement ………………….…….……..………Thorold (Bridge #11) , ON St. Lawrence Seaway, Counterweight Supports ……………….…………..............Welland (Bridge #17) , ON 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Hunt Club Bridge (Ottawa, ON) Orthotropic steel deck cable stayed bridge built on ES Fox falsework. Fully field welded deck joints partially built over live traffic. Highly architectured bridge. Contract also included miscellaneous railings. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Burlington Skyway (Hamilton, ON) Repairs were required after a traffic accident involving a truck which collided with the bridge. This project required complex heat straightening & jacking procedures. Trusses & braces were replaced on full QEW bridge closures at night. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Main Street CPR Rail Bridge (Milton, ON) 8 new rail bridges, 110’ long, 88 ton 12’ deep plate girders. Fully stick built in place working around live traffic lanes. Fully painted structure required a more complex erection procedure to protect the paint system. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Hurdman Bridge LTR Hwy 417 (Ottawa, ON) Erected 144 girders during 4 hour highway closures with two cranes. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Process Expansion Project Utility Racks at Cytec Inc. (Niagara Falls, ON) Supply & erection of 66 Utility Racks, 17 Towers, 29 “Piggy Back” Racks and miscellaneous steelwork throughout an existing and in-use facility. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Highland Creek Bridge Rehabilitation (Toronto, ON) Rehabilitation of an in-use rail bridge over a creek. Includes jacking of existing bridge for bearing replacement, removing rivets and replacement of existing steel. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 New steel was installed in phases to maintain the integrity of the bridge. Work done during shutdowns due to live rail traffic. 905-354-3700 www.esfox.com Credit River Bridge Rehabilitation (Mississauga, ON) Erection of 2000 ton, 990 foot long bridge under the existing QEW. The structure was launched from one side of the Credit River to the other. It was then jacked up into its final location with 20 strand jacks. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 This project was featured on The Discovery Channel! 905-354-3700 www.esfox.com One Mile House Viaduct Deck & Superstructure (St. John, NB) Erection of two curved span structures over top of rail traffic, the Trans Canada Highway and a river. Very complex erection procedures. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Georgetown South Bridge Expansion (Toronto, ON) Erection of 5 rail structures adjacent to existing structures over functioning roadways. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com City Place Bridge (Toronto, ON) Erection of a signature pedestrian bridge complete with all art elements, cable railing, etc. over a busy train switching area. Assembly took place adjacent to their final location, with erection taking place during 16-hr shutdowns. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Recreation Trail & Waterfront Link - Pedestrian Bridge (Hamilton, ON) A new pedestrian bridge (two spans over the QEW and one over the Red Hill Creek). Consists of parallel tub girder sections, complete with a single leaning arch span profile. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Steel River Bridge (Terrace Bay, ON) A new road bridge for Hwy 17. The span consists of 25 plate girders, 80’ above the Steel River. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com McKenzie River Bridges (Thunder Bay, ON) Two new road bridges for Hwy 11/17N. Each span consists of 25 plate cantilevered girders (parabolic shaped at the piers) up to 15’ deep. Three crane operations were utilized at times. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Aberdeen Ave Underpass (Hamilton, ON) Preassembly of 4 spans. The abutment sections were assembled on slide tracks for a jack slide R.B.R method. S.P.M.T. hydraulic trailers set the 2 center span bridges. In a 2 day shut down, all 4 spans were changed. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Hwy #8 Bridge - Grand River (Kitchener, ON) A new road bridge (twinning the existing one) over the Grand River. Consists of 72 girders (80’ wide x 900’ long). A causeway in the river was constructed for crane access. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com McLaughlin Road Bridge (Toronto, ON) A new road bridge over Hwy 401. Consisted of 20 tub girder sections (4 wide x 5 long). The 4 center drop-in spans were erected in one five-hour full-closure window. They were 115’ long and weighed approximately 50 tons. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Ferguson St. Road Bridge (Hamilton, ON) Assembly in the air of 9 girders on 3 piers using 250t, 350t and 550 ton cranes. Erection took place over an active rail line. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Sheave Replacement (Allanburg, ON) Replacement of damaged sheave. This necessitated the support and jacking of a 3 piece 500 ton counterweight. The sheave in the picture being hoisted is 15 tons. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com Atlantis Water Park Pedestrian Bridges (Niagara Falls, ON) Two aerial pedestrian bridges (92’ – 88 tons and 146’ – 99 tons). Erected in one piece (each) complete with deck, concrete and glazing. In 7 days the ridge sections were decked, had concrete poured, glazed and erected. No damage to the new structure during erection occurred. 9127 Montrose Road Niagara Falls, Ontario L2E 7J9 905-354-3700 www.esfox.com