NOTICE OF MEETING Des Moines Metropolitan Wastewater
Transcription
NOTICE OF MEETING Des Moines Metropolitan Wastewater
NOTICE OF MEETING Des Moines Metropolitan Wastewater Reclamation Authority Board Tuesday, February 21, 2012 @ 1:30 P.M. METRO WASTE AUTHORITY 300 EAST LOCUST STREET, SUITE 100 DES MOINES, IOWA AGENDA ITEM 1: Call to Order ITEM 2: Roll Call ITEM 3: Approving Agenda, as Presented and/or as Amended ITEM 4: Public Comment * * * * * * * * * * * * * * * * * * * * * * * * * * * Note: These are routine items and will be enacted by one roll call vote without separate discussion unless someone, Board or public, requests an item be removed to be considered separately. ITEM 5: APPROVING CONSENT AGENDA – Items 5 through 26: ITEM 6: Consideration of the Minutes of the January 17, 2012, meeting of the WRA Board Action for Approval ITEM 7: Receipt of the Minutes of the January 10, 2012, meeting of the WRA Technical Committee – Action/Receive & File ITEM 8: Receipt of the Draft Minutes of the February 14, 2012, meeting of the WRA Technical Committee – Action/Receive & File LAND/PROPERTY TRANSACTIONS ITEM 9: Resolution Approving Construction Related Claim Settlement for the WRA Southwest Area Diversion Facility, Phase 22, Segment 2 Project (Environmental Solutions of Iowa, Contractor) ITEM 10: Resolution Establishing Fair Market Value of Property Interests for the WRA Southwest Area Diversion Facility, Phase 22, Segment 4 Project ITEM 11: Resolution Approving Payment of Administrative Settlements for the WRA Mud Creek Interceptor, Phase 19, Segments 1 – 4 (SR Holdings II, LLC; Darwin L. Boatwright Family Trust) APPROVING ITEM 12: Resolution Approving WRA Communities 2012 Populations and Population Weighted Voting Proportional Assignments ITEM 13: Resolution for the WRA Board’s Adoption of the WRA Unsolicited Proposals Policy ITEM 14: Resolution Approving WRA Transaction Register for January 2012 ITEM 15: Resolution Approving WRA/WRF Staff Travel/Training Request ITEM 16: Resolution Approving and Accepting the Bid from ABM Janitorial Services for an Annual Agreement to Provide Janitorial Services at an Estimated Annual Cost of $41,050.16 ITEM 17: Resolution for Shermco Blanket Increase ITEM 18: Resolution Declaring an Official Intent Under Treasury Regulation 1.150-2 to Issue Debt to Reimburse the Des Moines Metropolitan Wastewater Reclamation Authority for Certain Original Expenditures Paid in Connection with Proposed Project ITEM 19: Resolution Declaring an Official Intent Under Treasury Regulation 1.150-2 to Issue Debt to Reimburse the Des Moines Metropolitan Wastewater Reclamation Authority for Certain Original Expenditures Paid in Connection with Proposed Project ITEM 20: Resolution Reappointing Members of the WRA Finance Subcommittee ITEM 21: Resolution Setting Date of Hearing for Conveyance of a Portion of 3538 Easton Boulevard to the City of Des Moines PUBLIC IMPROVEMENTS ITEM 22: WRA Mud Creek Interceptor, Phase 19, Segment 2 A. Resolution Approving Design Flow for the WRA Mud Creek Interceptor, Phase 19, Segment 2 Project B. Resolution Ordering Construction of WRA Mud Creek Interceptor, Phase 19, Segment 2 Project and Fixing a Date for Receiving of Bids on March 6, 2012 and Public Hearing on March 19, 2012, Engineer’s Estimate is $6,354,731.00 ITEM 23: Resolution Accepting Completed Construction and Approving Final Payment for WRA Southwest Area Diversion Facility, Phase 22, Segment 1 Project, S.J. Louis Construction, Inc. ITEM 24: Resolution Accepting Completed Construction and Approving Final Payment for WRF Building 91, 92, & 96 HVAC Improvements, The Waldinger Corporation ITEM 25: Resolution Accepting Completed Construction and Approving Final Payment for WRA New Main Outfall Archaeological Assistance, Van Hauen & Associates, Inc. WRA DIRECTOR COMMUNICATIONS & REPORTS ITEM 26: Resolution to Receive and File the Following Reports from the WRA Director A. Change Order Register Report B. Consultant Contracts Under $100,000 Report C. Statement of WRA Budget & Actual Expenditures from July 1, 2010, through June 30, 2011 D. Archaeological Costs Associated with the WRA CSSSF and WRA New Main Outfall to Date * * * * * * * * * * * * END CONSENT AGENDA * * * * * * * * * * * HEARINGS ITEM 27: Resolution Approving Public Hearing to Review Anticipated Environmental Impact of the WRA Southwest Area Diversion Facility, Phase 22, Segments 4 & 5 Projects APPROVING ITEM 28: Resolution Regarding Public Hearing and Approval of Wastewater Reclamation Authority Amended Current Fiscal Budget 2011-2012 and Wastewater Reclamation Authority Fiscal Budget 2012-2013 OTHER ITEMS ITEM 29: Other Business ITEM 30: Adjourn The Des Moines Metropolitan Wastewater Reclamation Authority Board Meetings are open to all individuals regardless of disability. To better serve you, please notify us at least three business days in advance when possible at 515-323-8000 should special accommodations be required. ***Next Regular Meeting Scheduled for*** 1:30 PM, Monday, March 19, 2012 Location: Conference Room @ Metro Waste Authority Agenda Item 09 Staff Summary Agenda Date: 02/21/12 SUBJECT— Resolution Approving Construction Related Claim Settlement for the WRA Southwest Area Diversion Facility, Phase 22, Segment 2 Project (Environmental Solutions of Iowa, Contractor) RECOMMENDED ACTION— WRA Board approval FISCAL IMPACT—Southwest Diversion $18,740 – Southwest Area Diversion Facility, WRA 081 BACKGROUND— On November 20, 2007, by Resolution No. 07-171, the WRA Board approved the construction contract with S.J. Louis Construction, Inc. for said Project and construction began on April 13, 2008 and ended in March 2010. As part of the Project, the WRA acquired permanent and temporary easements from Alan R. and Dorothy A. Raun (Project Parcel No. 2700) and from Karen Ann Salmi, Ralph H. McRea and Roy H. McRea (Project Parcel No. 2701)(“the Property Owners”) pursuant to negotiations and Administrative Settlement. The WRA Southwest Area Diversion Facility, Phase 22, Segment 2 project is located west of Norwalk and north of County Road G14 through the aforesaid properties. The alignment of the sewer runs northerly through the subject properties. Following project construction, the WRA was contacted by the Property Owners indicating that the groundwater was no longer flowing through the newly constructed sewer trench as it did prior to the project, and was coming to the ground surface and causing extensive erosion. A site investigation confirmed the complaints. As part of a separate project, the WRA’s general contractor had hired Environmental Solutions of Iowa to install drainage tile to the south of the subject properties. Environmental Solutions of Iowa was also requested by the WRA to install the needed drainage tile on the subject properties. This resolution approves an administrative settlement and authorizes payment in the amount of $18,740 directly to Environmental Solutions of Iowa for the drainage tile installation work completed on the subject properties. The administrative settlement reflects a reasonable allocation of cost given the nature of the work performed. Pursuant to the WRA Construction-Related Claim Administration Policy, adopted by the WRA Board on October 19, 2010 by Resolution No. 10-162, “all construction-related claim settlements in a cumulative gross amount over $10,000.00 per property owner per project, regardless of funding source” unless paid by change order, are subject to WRA Board approval. The WRA is currently pursuing a release from the Property Owners of claims associated with the drainage. Approval of this settlement and authorization to pay Environmental Solutions of Iowa is not consistent with the adopted WRA policy insofar as the policy states that a settlement should be obtained from the property owners prior to WRA approval of the claim settlement; however, in this instance the work has been completed by Environmental Solutions of Iowa and payment to this contractor must be made. Agenda Item 10 Staff Summary Agenda Date: 02/21/12 SUBJECT— Resolution Establishing Fair Market Value of Property Interests for the WRA Southwest Area Diversion Facility, Phase 22, Segment 4 Project RECOMMENDED ACTION— Establish fair market value for the acquisition of property for the Project. FISCAL IMPACT— Southwest Diversion Approximately $200,700.00 plus closing costs, Southwest Area Diversion Facility, WRA 081 BACKGROUND— In accordance with WRA policy, this WRA Board action establishes the fair market value of property to be acquired for WRA projects. This action also allows the Operating Contractor to complete closing on acquisitions if the negotiated purchase price is based on the established fair market value. On June 19, 2007, by Resolution No. 07-68, the Des Moines Metropolitan Wastewater Reclamation Authority (WRA) set date of public hearing and authorized mailing and publication of notice of intent to commence a public improvement project to construct WRA Southwest Diversion Facility, Phase 22, Segment 4 and to acquire property including agricultural land for the project. On August 21, 2007, by Resolution No. 07-106, the WRA held its public hearing and authorized the acquisition of private property and all property interests needed for this Project, including acquisition by condemnation if necessary. In accordance with WRA policy, the WRA Board establishes the fair market value for the property interests to be acquired for the project, based on the appraised value of those interests. The following properties have been appraised by an independent appraisal firm and based upon the appraisals, the suggested fair market values of the property interests are as follows: Titleholder: Mid-American Development Company Property Interests to be acquired: Permanent Easement for Sanitary Sewer & Temporary Easement for Construction Suggested Fair Market Value: $17,700, plus closing costs Titleholder: Mid-Iowa Council Boy Scouts of America Property Interests to be acquired: Permanent Easement for Sanitary Sewer & Temporary Easement for Construction Suggested Fair Market Value: $25,600, plus closing costs Titleholder: Airport Development L.C. Property Interests to be acquired: Permanent Easement for Sanitary Sewer & Temporary Easement for Construction Suggested Fair Market Value: $17,600, plus closing costs Titleholder: Richard S. and Mary D. Toon Property Interests to be acquired: Permanent Easement for Sanitary Sewer & Temporary Easement for Construction Suggested Fair Market Value: $25,500, plus closing costs Titleholder: Siegwerk USA Company Property Interests to be acquired: Permanent Easement for Sanitary Sewer & Temporary Easement for Construction Suggested Fair Market Value: $60,700, plus closing costs Titleholder: Carol S. Mavrakis Irrevocable Trust, Susan G. Seidler Irrevocable Trust Property Interests to be acquired: Permanent Easement for Sanitary Sewer & Temporary Easement for Construction Suggested Fair Market Value: $53,600, plus closing costs Agenda Item 11 Staff Summary Agenda Date: 02/21/12 SUBJECT— Resolution approving payment of Administrative Settlements for the WRA Mud Creek Interceptor, Phase 19, Segments 1 - 4 Project (SR Holdings II, LLC; Darwin L. Boatwright Family Trust) RECOMMENDED ACTION— WRA Board approval FISCAL IMPACT— Expansion Project $35,438.00 (Increase of $21,938.00) and $25,110.85 (Increase of $17,620.85), Mud Creek Interceptor, WRA 099 BACKGROUND— On August 17, 2010, by WRA Resolution No. 10-126, the Des Moines Metropolitan Wastewater Reclamation Authority set date of public hearing and authorized mailing and publication of notice of intent to commence a public improvement project to construct WRA Mud Creek Interceptor, Phase 19, Segments 1 – 4 and to acquire agricultural land for the project. On October 19, 2010, by Resolution No. 10-177, the Des Moines Metropolitan Wastewater Reclamation Authority held the Public Hearing and Authorized the Public Improvement Project to Construct the WRA Mud Creek Interceptor, Phase 19, Segments 1 – 4 Project and further authorized acquisition of private property and all property interests needed for this Project, including acquisition by condemnation if necessary. The acquisition consultant settled the following property acquisitions by administrative settlement, which settlements are being presented to the WRA Board for review and approval in accordance with WRA policy: Titleholder: Property Interests to be acquired: Basis for Settlement: Established Fair Market Value: Administrative Settlement: SR Holdings II, LLC Permanent Easement for Sanitary Sewer & Temporary Easement for Construction Original fair market value determination understated the value of the parcel for the permanent easement. Crop damages were not included in the original fair market value determination. $13,500.00 $35,438.00 (Increase of $21,938.00) This Administrative Settlement makes two adjustments to the Fair Market Value determination for the acquisition. The original fair market value was determined by an appraisal undertaken by Commercial Appraisers of Iowa. The fair market value of $13,500 was established by the WRA Board based on the appraised parent tract value of $13,000 per acre. The Administrative Settlement increases the parent tract valuation used to calculate the fair market value of the permanent easement, for a negotiated acquisition amount of $18,330, as increased from $9,200. The second adjustment in the fair market value deals with the issue of the temporary easement compensation and crop damages. The WRA originally determined the fair market value of the temporary easement to be $4,300 based on the appraised parent tract value of $13,000 per acre. In addition the WRA offered crop damages of $8,606.70 based on its standard formula, which amount was not included in the original fair market value determination, but would be a part of an Administrative Settlement in accordance with standard WRA practice. The WRA’s original offer of compensation for the temporary easement including the crop damages was $12,906.00. The property owner requested $17,108 for the adjusted temporary easement based on the negotiated parent tract value and waiver of crop damages in the future. This portion of the Administrative Settlement effectively increased the combined compensation for crop damages and temporary easement from $12,906.70 to $17,108 primarily based on the adjustment of the land value used in the calculation of the temporary easement compensation. Titleholder: Property Interests to be acquired: Basis for Settlement: Established Fair Market Value: Administrative Settlement: Darwin L. Boatwright Family Trust Permanent Easement for Sanitary Sewer & Temporary Easement for Construction Crop damages were not included in the original fair market value determination. The original fair market determination used a lower land value determination for the permanent easement. $7,490.00 $25,110.85 (Increase of $17,620.85) This Administrative Settlement makes two adjustments to the fair market value established for the property. The property is primarily in agricultural production. The original fair market value did not include crop damages. Almost all of the 3.45 acre easement area is in crop production. In accordance with standard WRA practice the Administrative Settlement provides crop damage payment in accordance with the standard WRA formula. The crop damages are for a total area of 3.45 acres for the 2012 or 2013 crop season. In accordance with the standard WRA formula the total crop damage payment is $10,286.90. The second part of the Administrative Settlement adjusts the fair market value of the property. The WRAs original fair market value was based on a land value of $10,000 per acre with a temporary easement valued at 10% and the permanent easement valued at 50%. The review of land values and sales in the area supported the property owner’s indication of the sale of agricultural property at higher than typical agricultural values. The Administrative Settlement increases the value of the property for purposes of calculation of the easement compensation to approximately $19,950, resulting in an increase in the permanent easement compensation from $5,100 to $10,260 and an increase in the temporary easement compensation from $2,390 to $4,563.95. Agenda Item 12 Staff Summary Agenda Date: 02/21/12 SUBJECT— Approving WRA Communities’ 2012 Populations and Population Weighted Voting Proportional Assignments RECOMMENDED ACTION— Approval FISCAL IMPACT— None for this action. BACKGROUND— On January 10, 2012 the WRA Technical Committee reviewed and approved the Participating Communities’ 2012 populations and population weighted voting proportional assignments as listed below. The number of representatives entitled to each WRA Community is the same as 2011. 2012 Reported Community Population Altoona 14,541 Ankeny 45,582 Bondurant 3,860 Clive 15,447 Cumming 351 Des Moines 203,433 Johnston 17,278 Norwalk 8,945 Pleasant Hill 8,785 West Des Moines 56,609 Waukee 13,790 Polk City 3,418 Polk County 10,517 Warren County* 0 Greenfield Plaza/ Hills of 1,743 Coventry Sanitary District Urbandale Sanitary Sewer 34,780 District Urbandale-Windsor Heights 9,543 Sanitary District Total 448,622 *Indicates a non-voting member at this time Number of Entitled WRA Board Representatives Number of Appointed WRA Board Representatives Proportional Assignment to Each Appointed Board Representative 1 2 1 1 1 8 1 1 1 3 1 1 1 1 1 1 2 1 1 1 3 1 1 1 2 1 1 1 1 1 14,541 22,791 3,860 15,447 351 67,811 17,278 8,945 8,785 28,304.5 13,790 3,418 10,517 0 1,743 2 1 34,780 1 1 9,543 28 21 N/A Agenda Item 13 Staff Summary Agenda Date: 02/21/12 SUBJECT— Resolution for the WRA Board’s Adoption of the WRA Unsolicited Proposals Policy RECOMMENDED ACTION— WRA Board approval FISCAL IMPACT— None BACKGROUND— The WRA encourages the submission of new and innovative ideas in response to agency needs, WRAInitiated solicitations, or WRA Projects; however, when new and innovative ideas are brought to the Operating Contractor unsolicited, the proposals can take significant effort for the Operating Contractor’s staff to evaluate. The Operating Contractor would prefer that a set procedure be in place for unsolicited proposals to be considered, and at this time, the WRA does not have a set procedure for responding or evaluating unsolicited proposals. With the adoption of the WRA Unsolicited Proposals Policy, a set procedure which individuals and entities will follow in submitting such unsolicited proposals to the WRA, and how WRA will respond to the proposals, will be outlined for the unsolicited proposals. The WRA Technical Committee reviewed the policy at the February 14, 2012 WRA Technical Committee meeting and recommended that the WRA Board adopt the WRA Unsolicited Proposals Policy. Agenda Item Staff Summary Agenda Date: 14 2/21/12 SUBJECT— Resolution Approving WRA Transaction Register for January 2012 RECOMMENDED ACTION— WRA Board approval of the Transaction Register FISCAL IMPACT— The schedule of bills allowed totals $ 9,624,920.90 DETAILS— The transaction register summarizes expenditure activity of the Wastewater Reclamation Facility. January expenditures include payment for projects, payroll, contractual services, and commodities. The attached report shows the dollars for projects ($8,159,056), payroll and expenses ($1,465,865), debt service ($1,341,680) and transfers ($9,461,781) totaling $20,428,382. Please direct questions regarding the report to: Roxane Vaughan 323-8008 [email protected] Scott Sanders 283-4523 [email protected] WRA CIP Schedule of Bills Allowed for month of January 2012 Vendor Name CITY DM D L ANDERSEN ECHO VALLEY INV CO LC FOLEY CO FORESURE TRANSPORT LLC H R GREEN CO HDR ENGINEER INC MIDAMERICAN ENERGY PINE RIDGE RE LLC POLK CO REC PRIORITY EXCAV RACCOON VALLEY RICE LAKE CONTRAC RODNEY HUNT CO S M HENTGES S R WEIDEMA SNYDER & ASSOC STORY CONSTR SUMMIT INVESTORS LLC TEAM SERVICES UNIV IA VEENSTRA & KIMM W D BRICKER W L AND M K JOHNSON WALDINGER CORP Goods / Services Amount Eng serv Easements Easements Const contr pmt Easements Eng serv Eng serv Utility Easements Fees Const contr pmt Const contr pmt Const contr pmt Gate repair Const contr pmt Const contr pmt Eng serv Const contr pmt Easements Eng serv Archeology Eng serv Easements Easements Const contr pmt 31,185.53 1,557.40 19,500.00 564,669.55 19,120.53 9,429.76 76,715.16 2,126.99 54,211.20 480.00 2,311.96 379,719.37 1,851,123.25 62,375.00 4,708,549.53 15,514.41 16,867.67 37,667.50 28,992.78 2,574.39 52,194.98 180,741.70 15,000.00 17,402.53 9,025.00 CIP Total 8,159,056.19 DM Metro Wastewater Reclamation Authority WRA Schedule of Bills Allowed for month of January 2012 Notes N Vendor Name 3E A T & T ABC PEST CONTROL AIRGAS NO CENTRAL AIRPORT SIGNS & GRPH AM RED CROSS ARAMARK UNIFORM SERV ASSOC BOARDS CERTIFICTN AT&T MOBILE B MILLER BALDWIN SUPPLY BANKERS TRUST CDW GOV'T CENTURY LINK CH MCGUINESS CITY DM, OPERATING CONTRACTOR CITY DM, OPERATING CONTRACTOR CITY DM, OPERATING CONTRACTOR CITY DM, OPERATING CONTRACTOR COASTAL TRAIN TECH COMET SUPPLY CONLEY GROUP CONST AGG PRODUCTS CONSTELLATION NEWENERGY CRESCENT ELEC CULLIGAN WATER DEZURIK WATER DIAMOND OIL DM BOLT DM STEEL FENCE CO DM WATER WORKS DMR INC DOORS INC EMBARKIT EMC RISK SERV EMED CO ENVIRO‐LOGIC ENVIROSIM ASSOC EQUIP RELIABILITY SERV FCX PERFORMANCE FERRELL GAS FISHER SCIENTIFIC G & K SERV G & L CLOTHING GRAINGER GRAINGER GREAT AM OUTDOOR GREAT PLAINS LOCATE HACH HALL AND ASSOC HD SUPPLY WHITE CAP Goods / Services Elec suppl Utility Bldg maint Chemicals Equip maint Safety Uniform serv Training Utility Training Plumb suppl Bank chrg Supplies Utility Elec suppl Wages & benefits PILOT Indirect alloc pmt Intrnal serv & alloc Photo/video supplies Supplies Security serv Hardware Utility Elec suppl Utility Parts/equip Lubricants Hardware Fence repair Utility Lubricants Bldg maint Supplies Workers comp Elec suppl Chemicals Software maint Equip maint Elec suppl Supplies Supplies Floor cover rental Apparel Supplies Parts/equip Equip maint Consulting Equip maint Legal serv Safety DM Metro Wastewater Reclamation Authority Amount 510.46 569.35 138.24 977.30 143.50 14.00 1,681.87 600.00 39.02 1,386.44 1,006.49 1,108.82 468.40 1,294.62 213.95 640,022.38 98,599.00 73,256.08 138,613.95 526.91 102.09 3,287.50 380.28 1,355.71 4,537.24 69.90 924.00 3,948.07 213.72 2,480.00 111.75 945.00 284.00 4,484.00 195.98 127.91 229.60 500.00 2,850.57 1,504.02 201.00 820.19 848.40 223.99 493.43 12,217.36 342.41 4,000.00 1,863.29 3,778.81 405.96 Notes N N Vendor Name HD SUPPLY WW LTD HORIZON TECH HYDRO‐KLEAN HYVEE IDEXX LAB IND SUPPLY SOL INSIGHT PUBLIC SECTOR INT ALL BAT CTR JERICO SERV JESTER INS SERV JETCO JOHNSON CNTRLS JWC ENVIRON KECK INC KOCH BROTHERS L & L INSULTN SUPPLY MARSDEN BLDG MAINT MEAD O'BRIEN MELLEN & ASSOC MENARDS METRO WASTE AUTH METTLER TOLEDO MID IA ENVIRONMTL MID IA TOOL MID IND COMPONENTS MIDAMERICAN ENERGY MID‐STATES SUPPLY MIDWEST OFF TECH MINE SAFETY APPL MSC IND SUPPLY MUNICIPAL SUPPLY NAPA DISTRIB CTR NICHOLS CNTRLS SUPPLY OFFICEMAX PEARSON‐ARN TECH PETTY CASH POLYDYNE PRAXAIR DISTRIB PRINTS COPY CTR R S STOVER RUAN CTR CORP SCALE SOURCE SHERMCO IND SHERWIN WILLIAMS SINOR ENGINE SKOLD DOOR SMARTER COMMUNITY SMITH SEWERS SPRAYER SPEC SPRINT NEXTEL PTNRS TEST AMERICA LAB TOMPKINS IND TOTAL TOOL SUPPLY UNIV IA/HYGIENIC LAB UPS Goods / Services Plumb suppl Supplies Equip maint Food Supplies Equip maint Annual software renewal Elec suppl Equip maint Ins premiums DP serv Elec suppl Parts/equip Fuel Copier Equip maint Rug rent/clean Elec suppl Parts/equip Lumber prod Disposal Equip maint Equip install Equip maint Parts/equip Utility Parts/equip Copier Equip maint Hardware Parts/equip Parts/equip Parts/equip Supplies Elec suppl Reimb Chemicals Equip rent Print serv Elec suppl Equip rent Equip maint Equip maint Wood prod Parts/equip Bldg maint Training Bldg maint Institutional Utility Lab serv Parts/equip Equip Lab serv Shipping DM Metro Wastewater Reclamation Authority Amount 25.87 1,748.34 5,392.75 84.79 179.36 2,553.00 16,563.75 141.81 250.00 88,220.00 807.50 138.70 8,760.57 7,056.90 2,598.26 310.00 9,640.00 5,525.10 88.83 409.84 2,697.42 50.00 16,500.00 6,614.00 306.47 102,417.69 1,589.24 429.01 373.48 330.40 1,747.41 195.05 743.77 754.60 1,707.14 748.33 89,340.00 186.97 90.00 1,728.70 25.00 3,245.06 12,254.59 63.58 721.50 750.00 900.00 85.00 496.54 4,287.02 1,840.00 200.54 3,774.99 425.00 51.44 Notes N Vendor Name UPS FRT URB WATER UTILITY USA STAFFING UTILITY EQUIP VAN METER VAN METER VWR INT'L WATER ENVIRO FED ZEE MEDICAL ZIEGLER Goods / Services Amount Shipping Utility Temp serv Equip Elec suppl Equip maint Supplies Dues Safety Equip/veh maint 93.00 42.56 1,480.00 194.14 3,779.11 1,090.56 143.76 216.00 194.35 35,568.96 OPER TOTAL 1,465,864.71 Grand Total 9,624,920.90 N new vendor DM Metro Wastewater Reclamation Authority Agenda Item 15 Staff Summary Agenda Date: 02/21/12 SUBJECT— Resolution Approving WRA/WRF Staff Travel/Training Request RECOMMENDED ACTION— WRA Board approval. FISCAL IMPACT— William Stowe’s cost is $280 (Registration $180/ Travel expenses $100) BACKGROUND— William Stowe, WRA Director, travel to Omaha, NE to attend the 29th Annual Geotechnical Seminar, which includes presentations of a wide variety of geotechnical fields, designs, and construction-related topics. Agenda Item Staff Summary Agenda Date: 16 02/21/12 SUBJECT— Resolution Approving Janitorial services contract for the Wastewater Reclamation Facility. RECOMMENDATION— WRA Board approval FISCAL IMPACT— Total cost $41,050.16 BACKGROUND— The Operating Contractor has requested that the Procurement Division issue a purchase order for an annual agreement for janitorial services for Buildings 35, 91, 92, 93, and 96 at the Wastewater Reclamation Facility. Sealed bids were obtained and the low dollar compliant bid was from ABM Janitorial Services. The bid is for a one year agreement for janitorial services with two (2) additional twelve (12) month renewal periods. The Procurement Administrator and the Operating Contractor recommend approval of the agreement with ABM Janitorial Services at an estimated annual cost of $41,050.16. Agenda Item Staff Summary Agenda Date: 17 02/21/12 SUBJECT— Resolution Approving an Exception to the Procurement Ordinance Competitive Bidding Requirements for Good Cause Shown to Purchase On-Site Electrical Breaker and Switch Repairs from Shermco Industries Using a Blanket Purchase Order at a Total Cost of $60,000.00 RECOMMENDATION— WRA Board approval FISCAL IMPACT— Total cost of $60,000.00 budgeted in the WRF Maintenance Support budget BACKGROUND— The Wastewater Reclamation Facility (WRF) uses a Blanket Purchase Order with Shermco Industries to purchase troubleshooting and repair services of electrical switches and breakers. Shermco Industries is unique in that they perform on-site repairs which are timelier for returning key electrical systems to service than the typical process of shipping equipment off site. A short turnaround in repair is critical to returning full electrical capability quickly. Due to the higher number of other electrical contracts that require switching electrical sources inside the WRF, more defective breakers and switches were found than normal in Fiscal Year 2012. The open blanket Purchase Order with Shermco Industries for Fiscal Year 2012 was in the amount of $8,000 and because costs associated with finding more defective breakers and switches inside the facility have exceeded $25,000, the Operating Contractor needed to increase the blanket Purchase Order amount to $60,000. The Operating Contractor has requested the Procurement Division to issue a blanket purchase order for electrical breaker and switch repairs for Shermco and to waive the competitive procurement requirements as allowed by Des Moines City Code 2) 2-710(a) Waiver for Good Cause Shown. The Procurement Administrator and the Operating Contractor recommend approval of increasing the Blanket Purchase Order with Shermco Industries to $60,000. ITEM 17 MEMORANDUM TO: FROM: SUBJECT: DATE: Honorable Chair & WRA Board Members WRA Director Purchase of On-Site Electrical Breaker Repairs and Waiver of Competitive Procurement Requirements February 17, 2012 The Wastewater Reclamation Facility (WRF) uses a Blanket Purchase Order with Shermco Industries to purchase troubleshooting and repair of electrical switches and breakers. Shermco Industries is unique in that they perform on-site repairs which are more timely than the typical process of shipping equipment off site. Because of the nature of electrical repairs, a short turnaround is key to returning WRF to full electrical capability in a timely manner. In Fiscal Year 2013, WRF found more defective breakers and switches than usual due to other electrical contracts that require switching electrical sources inside the WRF. The Operating Contractor has requested the Procurement Division to issue a blanket purchase order for electrical breaker and switch repairs and to waive the competitive procurement requirements as allowed by Des Moines City Code 2) 2-710(a) Waiver for Good Cause Shown. The Procurement Administrator and the Operating Contractor recommend approval of increasing the Blanket Purchase Order with Shermco Industries to $60,000. Staff Summary Agenda Items: 18 & 19 Agenda Date: 02/21/12 SUBJECT— Resolutions Declaring an Official Intent under Treasury Regulation 1.150-2 to Issue Debt to Reimburse the Des Moines Metropolitan Wastewater Reclamation Authority for Certain Original Expenditures Paid in Connection with Proposed Projects RECOMMENDED ACTION— Approval FISCAL IMPACT— No direct impact. BACKGROUND— The WRA Board recently approved the following construction contract for WRA: November 15, 2011, Resolution 11-168/169, S.M. Hentges & Sons, Inc. to construct the WRA New Main Outfall, Phase 17, Segments 3 and 4 ($13,028,215.50) The above commitment has been made with the understanding that the SRF loan program will provide long term financing. WRA will not be ready to move forward in the SRF loan process until after February 21st, 2012. Interim funding will come from WRA Renewal & Replacement Reserve funds. Interim funding does not total enough to cover the entire contract amounts but should cover any amounts expected to be paid prior to loan closing (in March or April). By stating the amount and source of interim funding for the above project, the WRA is declaring an official intent under Treasury regulations and is allowed reimbursement for expenditures paid prior to loan closing. The WRA Board also approved reimbursement resolutions for the following contracts: Resolution 11-126 $800,000 for New Main Outfall, Phase 17, Segment 1B Resolution 11-148 $3,000,000 for WDM Outfall, Phase 13, Segment 6 The WRA Board approved a change order for New Main Outfall, Phase 17, Segment 1B bringing the contract amount over $1 million. The contractor has made sufficient progress on the above contracts such that WRA now estimates payments prior to obtaining the permanent financing on these projects need to be increased. The second resolution supplements the previous resolutions and increases the dollars allowed prior to obtaining the SRF loan this spring. Staff Summary Agenda Item 20 Agenda Date: 02/21/12 SUBJECT— Resolution Reappointing Members of the WRA Finance Committee RECOMMENDED ACTION— Approval FISCAL IMPACT— None BACKGROUND— The WRA Finance Committee was formed in 2004 to advise and assist the WRA in the issuance and sale of refunding bonds and the 2004B bonds for WRA improvements. The committee formed again in 2006 to review WRA’s participation in the SRF Loan Program. New members are needed when members retire and to keep current with community representatives. Tim Moerman will join the committee as a new member and Jody Smith will be the new Chair. Agenda Item 21 Staff Summary Agenda Date: 02/21/12 SUBJECT— Resolution setting date of hearing for conveyance of a portion of 3538 Easton Boulevard to the City of Des Moines. RECOMMENDED ACTION— WRA Board approval FISCAL IMPACT— None BACKGROUND— The City of Des Moines is constructing a public improvement project to widen City right-of-way known as the Easton Boulevard Over Four Mile Creek Bridge Replacement Project. For this project, the City requires a portion of WRA-owned property locally known as 3538 Easton Boulevard, Des Moines, to widen the Easton Boulevard right-of-way. The property at 3538 Easton Boulevard was purchased by the WRA in 2009 for the WRA Four Mile Interceptor Sewer, Phase 2, Segments 2 and 3 Project. The property is located in a flood plain district and the portion required by Des Moines for the project is in the south 60 feet of the lot and consists of approximately 1,980 square feet. There is no current or future WRA need for the requested portion of this property and the WRA will not be inconvenienced by this conveyance. If approved, the conveyance will be for no consideration for use of the property by the City of Des Moines for a public purpose in accordance with Iowa Code Section 364.7(3). This resolution sets a public hearing on the proposal to convey a portion of 3538 Easton Boulevard to the City of Des Moines for March 19, 2012, at 1:30 p.m. during the WRA Board meeting at the Metropolitan Waste Authority, 300 East Locust Street, Suite 100, Des Moines. This resolution further directs the WRA Board Clerk to publish notice consistent with Iowa Code requirements. Agenda Item Staff Summary Agenda Date: 22 A & B 02/21/12 SUBJECT— WRA Mud Creek Interceptor, Phase 19, Segment 2 A. Resolution Approving Design Flow for the WRA Mud Creek Interceptor, Phase 19, Segment 2 Project B. Resolution Ordering Construction of WRA Mud Creek Interceptor, Phase 19, Segment 2 and Fixing a Date for Receiving of Bids on March 6, 2012 and Public Hearing on March 19, 2012, Engineer’s Estimate is $6,354,731.00 RECOMMENDED ACTION— Approval FISCAL IMPACT—Expansion Project $6,354,731.00, Mud Creek Interceptor, WRA099 BACKGROUND— This improvement includes construction of a sanitary sewer including all labor, materials and equipment necessary for excavation and backfill, approximately 25,061 feet of sanitary sewer in open cut, 12-inch to 36-inch diameter, 705 feet of 36-inch sanitary sewer with trenchless installation at 7 locations, manholes, creek crossings, erosion control, surface restoration and miscellaneous associated work. The project is located in both unincorporated Polk County and the City of Altoona, Iowa, along Mud Creek from NE 27th Avenue northerly to Interstate 80. The engineer’s estimate for this project is $6,354,731 and bids will be taken on Tuesday, March 6, 2012. The bids will then be presented to the WRA Technical Committee at the March 13, 2012 meeting for review and recommendation to the WRA Board for consideration at the March 19, 2012 meeting. It is anticipated that construction of the project will be completed by March 1, 2013. The capacity and reversionary interest are as follows: Phase/Community Design Capacity Reversionary Interest Bondurant Altoona 6.67 MGD 12.61 MGD 34.60% 65.40% Total 19.28 MGD 100% Agenda Item 23 Staff Summary Agenda Date: 02/21/12 SUBJECT— Resolution Accepting Completed Construction and Approving Final Payment for WRA Southwest Area Diversion Facility, Phase 22, Segment 1, S.J. Louis Construction, Inc. RECOMMENDED ACTION— Approval FISCAL IMPACT— Final contract amount of $8,076,216.81 Change orders for the project amounted to $394,316.81 or 5.13% of the contract amount (see the change order report on the following page for more information) BACKGROUND— The project is now complete and is being presented to the WRA Board for final acceptance. This improvement included 15,940 LF of 72-inch sanitary sewer in open cut, excavation, backfill, 180 LF of 72-inch sanitary sewer tunneled in place, special manholes, special drop connection, pavement replacement, traffic control, erosion control, surface restoration and miscellaneous associated work. The capacity and reversionary interest are as follows: Phase/Community City of Des Moines City of West Des Moines City of Clive Urbandale – Windsor Heights Urbandale San. Sewer District City of Waukee Total Design Capacity 13.39 mgd 35.72 mgd 8.93 mgd 10.71 mgd 17.86 mgd 13.39 mgd 100.00 mgd Reversionary Interest(%) 13.39 35.72 8.93 10.71 17.86 13.39 100.00% Agenda Item 24 Staff Summary Agenda Date: 02/21/12 SUBJECT— Accepting Completed Construction and Approving Final Payment for WRF Building 91, 92, & 96 HVAC Improvements, The Waldinger Corporation RECOMMENDED ACTION— Approval FISCAL IMPACT— Final contract amount of $139,000.00 Change orders for the project amounted to $0 or 0% of the contract amount. BACKGROUND— The project is now complete and is being presented to the WRA Board for final acceptance. The modifications were brought about due to occupancy changes (the original lunch/conference room is now an office space, a lab space is now a lunch room, another lab is an office space, etc.) throughout Buildings 91, 92, & 96. The modifications were completed to increase occupancy comfort and included: A new humidification system due to the fact that the existing humidifier was only capable of providing half of the required capacity during peak conditions Exhaust duct work modifications Removal of pneumatic controls from the existing VAV boxes and installing direct digital control (DDC) for optimum capacity and energy consumption control Agenda Item 25 Staff Summary Agenda Date: 02/21/12 SUBJECT— Accepting Completed Construction and Approving Final Payment for WRA New Main Outfall Archaeological Assistance, Van Hauen & Associates, Inc. RECOMMENDED ACTION— Approval FISCAL IMPACT— Final contract amount of $18,045.73 Change orders for the project amounted to -$30,854.27 or -63.10% of the contract amount (see the change order report on the following page for more information) BACKGROUND— The project is now complete and is being presented to the WRA Board for final acceptance. This project included all labor, material, equipment and associated items necessary to assist archaeological crews on the WRA New Main Outfall project corridor, including trench excavation, asphalt removal, and other minor earthwork. WRA Board Resolution No. 12 - _______ Agenda Item Number Date: February 21, 2012 _______26__________ RESOLUTION TO RECEIVE AND FILE THE FOLLOWING REPORTS FROM THE WRA DIRECTOR BE IT RESOLVED BY THE WRA BOARD OF THE DES MOINES METROPOLITAN WASTEWATER RECLAMATION AUTHORITY: That the Board Clerk is hereby directed to receive and file the following attached reports from the WRA Director: A. Change Order Register Report B. Consultant Contracts Under $100,000 Report C. Statement of WRA Budget & Actual Expenditures from July 1, 2010, through June 30, 2011 D. Archaeological Costs Associated with the WRA CSSSF and WRA New Main Outfall to Date Moved by ____________________________ to adopt YEAS NAYS PASS ABSENT Sanders Hadden McKenna Moerman Arentsen Klein CERTIFICATE I, E.J. Giovannett i, Secreta ry of the Boa rd of the D e s Mo in es M etro po litan Wa st ewat er R eclamat ion Au tho r ity (WRA ), h e re by ce rt ify t hat at a me et ing of t he WRA Boa rd, held on t he above date, a mong ot her p ro ce ed ings th e a bove wa s a dopt ed . I N WITN ESS WHEREOF, I h a v e h er eun to s et m y h an d t h e day an d y ea r f i rst abo ve written. Becker ________________________________________, Secretary Coleman Moore McKinley Vander Waal Miller Sandor Mahannah Giovannetti Sassatelli Garvey Kooistra Schneider Smith AGENCY ACTION TOTAL MOTION CARRIED APPROVED James P. Sanders, Chair _______________________________________ ENGINEERING DEPARTMENT CITY OF DES MOINES DES MOINES METROPOLITAN WASTEWATER RECLAMATION AUTHORITY OPERATING CONTRACTOR - CITY OF DES MOINES WRA BOARD APPROVED CONSTRUCTION CONTRACT CHANGE ORDER TABULATION WASTEWATER RECLAMATION FACILITY 3000 VANDALIA ROAD DES MOINES, IOWA 50317-1346 Tabulated below are change orders (C.O.'s) approved during the period beginning 1/1/2012 and ending 1/31/2012. Project Name Contractor's Name C.O. Number Initiated By C.O. Executive Summary Activity ID 2 WRF Preliminary Treatment Building Bar Screen Replacement Story Construction Co. 04-2011-001 Engineering 2.01) Stainless steel discharge chute modifications and stainless steel plate cover for opening behind newly installed bar screen. 7 WRA Combined Sewer Solids Separation Facility Rice Lake Contracting Corp. dba Rice Lake 10-2010-001 Engineering Construction Group 7.1) Additional electrical conduit and wiring installation for overhead hoists that was not clear in the original drawings - $13,504 7.2) Additional items per MidAmerican Energy’s request and additional power for panel board heaters - $1,522 7.3) Installation of 144-inch influent sewer cap for future connection - $8,800 7.4) Additional Multivista documentation services for site utilities associated with CSSSF $14,740 Wednesday, February 15, 2012 C.O. Approval Amount Date $4,065.25 1/5/2012 $38,566.00 1/10/2012 Original Contract Amount $758,300.00 % C.O.'s to Original Contract 5.37% $2,855,456.00 $37,775,000.00 7.66% Total Previous C.O.'s $36,659.00 Page 1 of 1 ITEM 26 B WRA Director’s Consultant Agreement Report There were no new contracts under $100,000 entered into with consultants during the month of January 2012. This report is provided as a provision of the WRA Consultant Selection Policy. Name of Consultant Contract Amount Date of Contract Services Provided Staff Summary Agenda Item 26 C Agenda Date: 02/21/12 SUBJECT — Quarterly Report (for Q4) Statement of WRA Budget & Actual Expenditures from July 1, 2010, through June 30, 2011. RECOMMENDED ACTION— Receive and file. OVERVIEW— Community revenue has been received as budgeted. Other revenue is as follows: System/Pretreatment charges $4,020,645 Depreciation $374,745 WRF departmental charges $527,200 WRA dept. charges $214,753 Revenue, sale of gas $184,554 Other revenue compares favorably with the budget and is $184,285 more than last year’s amount. Operations, Maintenance, and Management Costs are under budget: Facility Expenses $ 15,035,899 Debt Servicing $ 14,723,581 Management Expenses $1,780,321 Equipment purchases $536,392 Operating and equipment charges through Qtr4 total $17,352,612 this year and $17,034,603 last year. The WRA has positive net revenue over expenditures due to expenditure payments at a level less than budgeted and revenues at a level more than budgeted. FISCAL IMPACT— No direct impact for this action. WASTEWATER RECLAMATION AUTHORITY STATEMENT OF REVENUE AND EXPENDITURES BUDGET AND ACTUAL (UNAUDITED) FOR THE PERIOD JULY 1, 2010 THROUGH JUNE 30, 2011 CODE FY2011 BUDGET DESCRIPTION 6/30/2011 ACTUALS % OF BUDGET GROSS REVENUE COMMUNITY REVENUE 251 271 265 259 OPERATIONS & MAINTENANCE DEBT SERVICING EQUIPMENT RESERVE REPAIR & REPLACEMENT 15,025,100 16,115,991 50,000 2,650,000 15,014,397 16,115,988 50,000 2,650,000 99.929% 100.000% 100.000% 100.000% TOTAL O&M credits Debt credits & Surchg Surchg/Resv adjust. net due 33,841,091 33,830,385 99.968% 3,101,300 150,000 170,010 355,000 729,010 3,832,974 184,554 186,669 454,260 742,955 123.592% 123.036% 109.799% 127.961% 101.913% 10,000 60,000 40,000 57,000 200,000 4,993 5,117 13,886 342,801 224,051 49.930% 8.528% 34.715% 601.405% 112.025% 4,872,320 5,992,259 122.986% $38,713,411 $39,822,644 102.865% 3,548,086 1,183,600 933,585 1,914,495 866,250 1,731,299 4,386,315 851,710 572,545 678,930 451,755 3,026,508 1,088,820 861,204 1,963,614 747,290 1,465,760 3,877,209 599,673 471,492 621,688 312,641 85.300% 91.992% 92.247% 102.566% 86.267% 84.662% 88.393% 70.408% 82.350% 91.569% 69.206% 17,118,570 15,035,899 87.834% 583,445 201,000 259,305 576,907 143,430 232,132 98.879% 71.358% 89.521% 33,841,091 -2,901,058 -24,895 -147,888 30,767,250 FY11 budget OTHER REVENUE SYSTEM REVENUES INDUSTRY & W.HAULER FEES UTILITY GAS SALES OTHER PRETREATMENT FEES 265 EQUIPMENT REPLACEMENT (DEPR/SALES) DEPARTMENTAL CHARGES & MISC INTEREST INCOME 251 OPERATIONS & EQUIP 252 OPERATING RESERVES 270 SURPLUS 271 BOND RESERVES 259 R & R INVESTMENTS TOTAL GROSS REVENUE EXPENDITURES OPERATING EXPENDITURES COST CENTERS FOR PLANT OPERATIONS 104 105 106 107 108 101 110 111 112 116 119 1 2 3 4 OPERATIONS ACC1 OPERATIONS ACC2 DEWATERING FIELD SERVICES OPERATIONS SUPPORT LEADERSHIP SUPPORT MAINTENANCE SUPPORT IT SUPPORT BUILDING MAINTANANCE PRETREATMENT LABORATORY SERVICES [ see detail on following pages ] COST CENTERS FOR WRA SYSTEM MGNT 154 163 100 2/15/2012 WRA PUMPING STATIONS WRA SEWER MAINTENANCE FISCAL SERVICES WASTEWATER RECLAMATION AUTHORITY STATEMENT OF REVENUE AND EXPENDITURES BUDGET AND ACTUAL (UNAUDITED) FOR THE PERIOD JULY 1, 2010 THROUGH JUNE 30, 2011 CODE DESCRIPTION 166 169 FY2011 BUDGET 6/30/2011 ACTUALS % OF BUDGET 584,915 428,185 533,878 293,974 91.274% 68.656% 2,056,850 1,780,321 86.556% 19,175,420 16,816,220 87.697% 640,000 16,172,991 0 60,000 40,000 -225,000 536,392 14,723,581 -76,453 60,000 40,000 -225,000 83.811% 91.470% 100.000% 100.000% 100.000% 16,687,991 15,058,520 90.236% TOTAL OPERATING EXPENSES $35,863,411 $31,874,740 88.878% OPERATING REVENUES OPERATING EXPENSES 35,863,411 -35,863,411 $0 36,948,594 -31,874,740 $5,073,855 103.026% 88.878% ENGINEERING FLOW MONITORING [ see detail on following pages ] TOTAL TRANSFERS FOR MONTHLY OBLIGATIONS OTHER COST CENTER APPROPRIATIONS 151 172 EQUIPMENT REPLACEMENT DEBT SERVICING / SINKING FUND rec'd from Waukee for Interest FUND BUILD UP - W/CAP RESV FUND BUILD UP - SURPLUS Use if FUND - EQUIP REPL ALLOC. 184 180 185 NOTES Community revenues are being collected according to the WRA budget approved for fiscal year 2011 except Norwalk's July payment was less than budget prior to connection. Revenues are comparable to budget except Hauled waste revenue is more than budgeted. Operating Expenditures: Both WRF/WRA operating expenses are less than budgeted. Plant Operations Notes: Note 1 104 The Operations ACC1 budget includes energy (Gas/Elec) cost Amended Budget $ 1,670,000 FY 2009 $ 1,155,446 69% percent of budget Amended Budget $ 1,690,000 FY 2010 $ 1,325,703 78% percent of budget Amended Budget $ 1,660,000 FY 2011 $ 1,231,819 74% percent of budget Note 2 107 The Field Services budget includes Maint, Deprec, & Fuel on rolling stock Amended Budget $ 641,440 FY 2010 $ 663,064 103% percent of budget Amended Budget $ 639,100 FY 2011 $ 679,607 106% percent of budget Note 3 101 The Leadership budget includes Indirect cost Amended Budget $ 935,000 FY 2010 $ Amended Budget $ 920,000 FY 2011 $ Note 4 Note 5 2/15/2012 110 The Maintenance budget includes PILOT charge Amended Budget $ 1,180,000 FY 2010 $ Amended Budget $ 1,190,000 FY 2011 $ 902,486 893,027 97% percent of budget 97% percent of budget 1,099,704 1,097,194 93% percent of budget 92% percent of budget The Insurance Reserve includes $145,000 for Work Comp Claims. The O/M budget includes a minimal amount with an understanding that reserve funds will be available if O/M funds are exhausted. No team has payments in FY2011 that will exceed their adopted budget. WASTEWATER RECLAMATION AUTHORITY STATEMENT OF REVENUE AND EXPENDITURES BUDGET AND ACTUAL (UNAUDITED) FOR THE PERIOD JULY 1, 2010 THROUGH JUNE 30, 2011 CODE DESCRIPTION FY2011 BUDGET 6/30/2011 ACTUALS % OF BUDGET OTHER REVENUE DETAIL REVENUE OFFSETS 251 SYSTEM REVENUES LICENSES AND PERMITS CONTRACTOR HAULER FEES CONTRACTOR ANALYSIS FEES HIGH STRENGTH SURCHG INDUSTRIAL ANALYSIS FEES AIRPORT ANALYSIS NPDES FOG INSPECTION FEES OTHER PRETREATMENT FEES 36,300 1,800,000 65,000 1,100,000 100,000 30,000 24,000 116,010 39,520 2,385,892 74,140 1,239,327 94,096 55,519 13,350 117,800 108.871% 132.550% 114.061% 112.666% 94.096% 185.065% 55.625% 101.543% 150,000 215,000 178,000 65,000 16,790 2,000 10,000 5,000 0 60,000 80,000 12,300 84,920 184,554 214,753 167,043 82,800 1,002 9,886 21,359 0 123.036% 99.885% 93.844% 127.385% 5.968% 494.300% 213.587% 0.000% 72,787 103,483 19,441 50,400 121.312% 129.354% 158.057% 59.350% 0 1,538 4,150,320 4,948,690 10,000 60,000 40,000 2,400 54,600 3,455 5,117 13,886 8,633 334,168 34.550% 8.528% 34.715% 359.708% 612.029% 50,000 150,000 13,012 211,039 26.024% 140.692% 355,000 374,745 79,516 5,992,259 105.562% NON-SYSTEM REVENUES GAS UTILITY SALES ENGINEER CHG TO CIP LAB CHG TO PRETREATMENT CURTAILMENT OTHER CHARGES CHG FOR SERV, NORWALK /Cumming CHG FOR SERV, CLEAN AIRPORT TANKS CHG FOR SERV, FLOW MONITOR CHG FOR SERV, AIRPORT PERMIT CHG FOR SERV, SNOW REMOVAL CHG FOR SERV, PUMPING STNS CHG FOR SERV, SEWERS SILT CHG FOR SERV, RENTAL & OTHER INTEREST INCOME 251,253,257 OPERATION & MAINTENANCE FUNDS SUBTOTAL INTEREST EARNINGS 265 EQUIPMENT RESERVES 252 INSURANCE & WORKING CAP RESERVES 270 SURPLUS OPERATING FUNDS 261 BOND SERVICING FUNDS 262 BOND RESERVES NON-OPERATING INTEREST 259 REPAIR & REPL. FUNDS 258 REPAIR & REPL. INVESTMENTS EQUIPMENT REPL. 265 EQUIPMENT REPLACEMENT (DEPR) SALES (151) TOTAL 2/15/2012 4,872,320 122.986% WASTEWATER RECLAMATION AUTHORITY STATEMENT OF REVENUE AND EXPENDITURES BUDGET AND ACTUAL (UNAUDITED) FOR THE PERIOD JULY 1, 2010 THROUGH JUNE 30, 2011 Detail of O/M Accounts: WRA770101 Note 3 100 210 290 300 400 WRA770104 Note 1 100 210 290 300 400 WRA770105 WRF OPERATIONS - ACC2 PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT 100 210 290 300 400 WRF DEWATERING PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT WRA770107 2/15/2012 WRF OPERATIONS - ACC1 PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT 100 210 290 300 400 WRA770106 Note 2 WRF LEADERSHIP SUPPT PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT 100 210 290 300 400 WRF PLANT FIELD SERVICES PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT Amended BUDGET 6/30/2011 ACTUALS 607,445 78,854 1,020,000 25,000 0 1,731,299 479,469 69,877 893,027 23,387 0 1,465,760 1,102,110 2,244,076 18,000 178,900 5,000 3,548,086 % BUDGET 6/30/2010 ACTUALS 6/30/2011 ACTUALS % last year 479,469 69,877 893,027 23,387 0 1,465,760 88.0% 96.9% 98.9% 110.8% 84.7% 544,953 72,076 903,064 21,100 0 1,541,193 1,086,501 1,785,098 684 154,225 0 3,026,508 98.6% 79.5% 3.8% 86.2% 0.0% 85.3% 983,300 1,741,439 499 112,762 0 2,838,000 1,086,501 1,785,098 684 154,225 0 3,026,508 110.5% 102.5% 137.1% 136.8% 106.6% 980,800 77,700 3,000 107,100 15,000 1,183,600 927,983 65,503 1,755 81,589 11,990 1,088,820 94.6% 84.3% 58.5% 76.2% 79.9% 92.0% 911,329 55,945 31,140 77,798 9,273 1,085,485 927,983 65,503 1,755 81,589 11,990 1,088,820 101.8% 117.1% 5.6% 104.9% 129.3% 100.3% 459,305 35,880 3,000 435,400 0 933,585 412,450 35,859 0 412,895 0 861,204 89.8% 99.9% 0.0% 94.8% 412,450 35,859 0 412,895 0 861,204 120.5% 131.3% 0.0% 121.3% 92.2% 342,299 27,306 33,185 340,345 0 743,135 1,088,180 759,065 3,500 43,750 20,000 1,914,495 1,093,906 830,633 3,074 16,541 19,460 1,963,614 100.5% 109.4% 87.8% 37.8% 97.3% 102.6% 1,021,902 789,980 41,567 15,930 0 1,869,379 1,093,906 830,633 3,074 16,541 19,460 1,963,614 78.9% 88.6% 87.6% 93.5% 95.1% 115.9% 107.0% 105.1% 7.4% 103.8% 105.0% WASTEWATER RECLAMATION AUTHORITY STATEMENT OF REVENUE AND EXPENDITURES BUDGET AND ACTUAL (UNAUDITED) FOR THE PERIOD JULY 1, 2010 THROUGH JUNE 30, 2011 Detail of O/M Accounts: WRA770108 100 210 290 300 400 WRA770110 Note 4 100 210 290 300 400 WRF MAINTENANCE SUPPT PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT 100 210 290 300 400 WRF IT SUPPT PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT 100 210 290 300 400 WRF BUILDING MAINT PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT WRA770111 WRA770112 WRA770116 100 210 290 300 400 2/15/2012 WRF OPERATION SUPPT PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT WRF PRETREATMENT PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT Amended BUDGET 6/30/2011 ACTUALS % BUDGET 6/30/2010 ACTUALS 6/30/2011 ACTUALS % last year 673,630 160,320 3,000 24,300 5,000 866,250 509,787 216,927 0 20,576 0 747,290 75.7% 135.3% 0.0% 84.7% 0.0% 86.3% 530,696 185,134 47 17,899 0 733,776 509,787 216,927 0 20,576 0 747,290 101.8% 2,137,180 425,135 1,198,000 569,700 56,300 4,386,315 1,763,155 403,157 1,098,552 582,484 29,861 3,877,209 82.5% 94.8% 91.7% 102.2% 53.0% 88.4% 1,744,286 322,271 1,122,849 544,891 15,862 3,750,159 1,763,155 403,157 1,098,552 582,484 29,861 3,877,209 101.1% 125.1% 97.8% 106.9% 188.3% 103.4% 349,810 294,050 1,000 147,600 59,250 851,710 342,507 154,228 0 65,287 37,651 599,673 97.9% 52.4% 0.0% 44.2% 63.5% 70.4% 388,675 210,208 0 151,046 56,629 806,558 342,507 154,228 0 65,287 37,651 599,673 88.1% 73.4% 362,045 114,340 2,000 44,160 50,000 572,545 271,588 119,559 500 31,225 48,620 471,492 75.0% 104.6% 25.0% 70.7% 97.2% 82.4% 406,026 84,975 968 23,670 0 515,639 271,588 119,559 500 31,225 48,620 471,492 66.9% 140.7% 51.7% 131.9% 435,475 217,555 1,300 12,100 12,500 678,930 416,163 194,543 0 10,982 0 621,688 95.6% 89.4% 0.0% 90.8% 0.0% 91.6% 398,505 204,696 1,451 7,698 13,695 626,045 416,163 194,543 0 10,982 0 621,688 104.4% 95.0% 0.0% 142.7% 0.0% 99.3% 96.1% 117.2% 0.0% 115.0% 43.2% 66.5% 74.3% 91.4% WASTEWATER RECLAMATION AUTHORITY STATEMENT OF REVENUE AND EXPENDITURES BUDGET AND ACTUAL (UNAUDITED) FOR THE PERIOD JULY 1, 2010 THROUGH JUNE 30, 2011 Detail of O/M Accounts: WRA770119 100 210 290 300 400 WRF LABORATORY PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT TOTAL WRA FACILITY OPERATIONS AND MAINTENANCE WRA770163 210 290 300 400 WRA SAN SEWER MAINTENANCE CONTRACTUAL SERVICES (locate cost) OTHER CHARGES COMMODITIES CAPITAL OUTLAY 210 290 300 400 WRA SEWER PUMP STATIONS CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT WRA770154 WRA770166 100 210 290 300 400 WRA MANAGEMENT PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT 100 210 290 300 400 WRA FLOW MONITORING PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT WRA770169 2/15/2012 Amended BUDGET 6/30/2011 ACTUALS % BUDGET 6/30/2010 ACTUALS 6/30/2011 ACTUALS % last year 214,405 164,650 1,000 51,300 20,400 451,755 179,783 95,770 0 37,088 0 312,641 83.9% 58.2% 0.0% 72.3% 0.0% 69.2% 180,377 99,163 0 46,050 0 325,590 179,783 95,770 0 37,088 0 312,641 96.0% 17,118,570 15,035,899 87.8% 14,834,959 15,035,899 101.4% 45,000 50,000 1,000 105,000 201,000 89,022 50,000 27 4,381 143,430 197.8% 100.0% 2.7% 4.2% 71.4% 23,413 0 13 95,512 118,938 89,022 50,000 27 4,381 143,430 380.2% 509,265 5,500 48,680 20,000 583,445 527,861 0 49,046 0 576,907 103.7% 0.0% 100.8% 0.0% 98.9% 507,148 0 28,439 6,423 542,010 527,861 0 49,046 0 576,907 104.1% 355,215 126,450 86,500 6,750 10,000 584,915 356,923 80,750 86,000 1,705 8,500 533,878 100.5% 63.9% 99.4% 25.3% 85.0% 91.3% 303,889 96,748 84,000 5,104 0 489,741 356,923 80,750 86,000 1,705 8,500 533,878 279,860 83,225 700 46,400 18,000 428,185 239,910 45,153 0 6,932 1,979 293,974 85.7% 54.3% 0.0% 14.9% 11.0% 68.7% 200,445 75,279 874 3,337 0 279,935 239,910 45,153 0 6,932 1,979 293,974 99.7% 96.6% 80.5% 207.7% 4.6% 172.5% 106.4% 117.5% 83.5% 102.4% 33.4% 109.0% 119.7% 60.0% 207.7% 105.0% WASTEWATER RECLAMATION AUTHORITY STATEMENT OF REVENUE AND EXPENDITURES BUDGET AND ACTUAL (UNAUDITED) FOR THE PERIOD JULY 1, 2010 THROUGH JUNE 30, 2011 Detail of O/M Accounts: WRA770000 100 210 290 300 400 WRA FISCAL SERVICES PERSONAL SERVICES CONTRACTUAL SERVICES OTHER CHARGES COMMODITIES CAPITAL OUTLAY / EQUIPMENT Amended BUDGET 6/30/2011 ACTUALS 201,505 54,405 500 2,895 0 259,305 200,428 30,790 0 914 0 232,132 TOTAL WRA NON-WRF OPERATIONS & MAINTENANCE 2,056,850 TOTAL WRA OPERATIONS & MAINTENANCE EXPENDITURES % BUDGET 6/30/2010 ACTUALS 6/30/2011 ACTUALS % last year 89.5% 188,780 36,013 0 1,015 0 225,808 200,428 30,790 0 914 0 232,132 102.8% 1,780,321 86.6% 1,656,432 1,780,321 107.5% 19,175,420 16,816,220 87.7% 16,491,391 16,816,220 102.0% 9,246,965 5,389,970 2,397,000 1,745,035 396,450 19,175,420 8,280,553 4,744,730 2,133,592 1,494,903 162,442 16,816,220 89.5% 88.0% 89.0% 85.7% 41.0% 87.7% 8,145,462 4,531,794 2,219,644 1,397,097 197,394 16,491,391 8,280,553 4,744,730 2,133,592 1,494,903 162,442 16,816,220 101.7% 104.7% 96.1% 107.0% 82.3% 102.0% 3,270,310 730,010 150,000 0 4,150,320 4,019,643 742,955 184,554 1,538 4,948,690 122.9% 101.8% 123.0% 4,019,643 742,955 184,554 1,538 4,948,690 109.5% 91.5% 65.8% 119.2% 3,671,561 812,143 280,595 106 4,764,405 103.9% NET OPERATIONS & MAINTENANCE COSTS 15,025,100 11,867,530 79.0% 11,726,986 11,867,530 101.2% COMMUNITY O&M EXP ALLOCATION, NET BUDGET 15,025,100 15,025,100 budget Ttl WRA OPERATIONS & MAINTENANCE by Major Cost Category 100 PERSONAL SERVICES 210 CONTRACTUAL SERVICES 290 OTHER CHARGES 300 COMMODITIES 400 CAPITAL OUTLAY / EQUIPMENT Ttl OPERATIONS & MAINTENANCE REVENUE OFFSETS SYSTEM REVENUES DEPARTMENT CHARGES UTILITY GAS SALES INTEREST EARNINGS 2/15/2012 99.5% 56.6% 0.0% 31.6% 106.2% 85.5% 90.0% ITEM 26 D MEMORANDUM TO: FROM: SUBJECT: DATE: Honorable Chair & WRA Board Members WRA Director Archaeological Costs Associated with the WRA CSSSF and WRA New Main Outfall to Date February 17, 2012 The Operating Contractor is presenting a tabulation of the costs to date associated with Archaeological Investigation, Archaeological Monitoring, and Contractor assistance for the WRA Combined Sewer Solids Separation Facility (CSSSF) and the WRA New Main Outfall (NMO) Projects. The following costs to date for work performed by contractors and the Office of the State Archaeologists (OSA): Archaeological Costs to Date Associated with the WRA CSSSF Original Agreement for Investigation & Monitoring with OSA First Supplemental Agreement for Investigation/Monitoring with OSA Second Supplemental Agreement for Data Recovery Third Supplement for Expanded Scope & Field Support Total Cost from OSA for CSSSF Project Total Cost of HDR Engineering Assistance with Archaeological Impacts Total Cost from Rice Lake Construction for Archaeological Impacts Archaeological Costs to Date for CSSSF Project $89,871 $98,359 $616,966 $197,726 $1,002,922 $57,974 $876,932 $1,937,828 Archaeological Costs to Date Associated with the WRA New Main Outfall Original Agreement for Investigation & Monitoring with OSA Proposed First Supplemental Agreement for Monitoring on Yaw Property Proposed Second Amendment for Investigation & Monitoring due to realignment along SE 2nd Street with OSA Total Cost from OSA for NMO Projects $174,037 Cost for Contractor Assistance on Yaw Property Total Cost from S. M. Hentges & Sons Construction Total Cost from Contractors for Archaeological Impacts $18,046 $194,872 $212,918 Archaeological Costs to Date for NMO Project $386,955 Grand Total of Archaeological Costs at CSSSF & NMO to Date $99,037 $25,000 $50,000 $2,324,783 Agenda Item 27 Staff Summary Agenda Date: 02/21/12 SUBJECT— Resolution Approving Public Hearing to Review Anticipated Environmental Impact of the WRA Southwest Area Diversion Facility, Phase 22, Segments 4 & 5 Projects RECOMMENDED ACTION— Approval FISCAL IMPACT— None BACKGROUND— On January 17, 2012, under WRA Resolution No. 12-05, the WRA Board set the time and place for a public hearing on February 21, 2012 at 1:30 p.m., to inform area residents of the proposed project, to discuss the potential environmental impact of the proposed project to the community as determined by the State’s DNR Environmental Review, and to address area residents’ concerns, if any, with the projects, which is to be known as the WRA Southwest Area Diversion Facility, Phase 22, Segments 4 & 5 projects. The project involves the construction of the WRA Southwest Area Diversion Facility, Phase 22, Segment 4 project and Segment 5 project. The WRA Southwest Area Diversion Facility, Phase 22, Segment 5 consists of a new 100 MGD storm pump station located south of the existing WRA Southwest Equalization Basin. The facility is located at approximately the 5800 of block Winona Avenue. The Segment 5 project includes a 42-inch sewer extending south from the pump station to the existing WRA West Des Moines Outfall. The project includes a 60-inch sewer extending northeasterly from the pump station across Walnut Creek to connect to the WRA Common Trunk and WRA Southwest Outfall. The two sewers associated with Segment 5 are located immediately adjacent to existing sewers. The WRA Southwest Area Diversion Facility, Phase 22, Segment 4 project consists of a 72-inch force main. The force main starts at the Segment 5 pump station and extends generally southerly across the Union Pacific Railroad right-of-way and the Raccoon River. The sewer continues south along the east side of the Union Pacific Railroad spur to Park Avenue. The sewer then continues southerly along SW 56th Street and southwesterly along a branch of Frink Creek to the east side of Highway 28 north of SW McKinley. A 72-inch force main connects to the existing WRA Southwest Area Diversion Facility, Phase 22, Segment 3 force main located on the east side of Highway 28. Before the WRA can proceed with the Project pursuant to the requirements of the State of Iowa Clean Water State Revolving Fund loan program, the WRA Board must hold a public hearing to inform area residents of the proposed project, to discuss the potential environmental impact of the proposed project to the community as determined by the State’s Department of Natural Resources (DNR) Environmental Review, and to address area residents’ concerns, if any, with the project. Staff Summary Agenda Item 28 Agenda Date: 02/21/12 SUBJECT— Resolution Regarding Public Hearing and Approval of Wastewater Reclamation Authority Amended Current Fiscal Budget 2011-2012 and Wastewater Reclamation Authority Fiscal Budget 2012-2013 RECOMMENDED ACTION— Approval FISCAL IMPACT— The cash collected from each community will change with the adoption of a new budget. SYNOPSIS— For Fiscal 2012-2013 the average flow used is 29264.0 MG which is less than last year and obtained from Technical sub-committee. FY2013 budget recommendation of $33,323,966 is to be collected from WRA participating communities. The budget includes the following: 1. Debt service in 2013 will increase to include interest on additional SRF borrowings. Gross debt service of $18,198,953 is 13.4% higher than last year. 2. R&R expenditure/CIP contribution of $3,300,000 is 16.9% higher than last year. 3. Equipment replacement contribution of $50,000 is less than last year. 4. Gross WRF operations budget (O&M) of $20,520,450 is higher than last year. 5. The net O&M budget for operating WRF after revenue offsets are applied increased 3.8%. 6. The unspent O&M budget collection from FY2011 of $3M is applied to FY2013. 7. Debt service credits/charges for FY2009, 2010, & 2011 totaling $1,814, 550 are included. 8. New collection for the Supplemental Insurance Reserve Fund. In the FY2011 Amended budget WRA collected $145,000 for Workers’ Compensation payments and the actual expense was $6,871. The approximate difference of $138,130 is included in the FY2013 budget to build a supplemental fund for workers’ compensation payments in excess of future budget amounts. This was discussed at the June Steering meeting and will be discussed again at a future board meeting. WRA’s Capital Improvements Program for 2013-2018 (CIP) totals $502,974,363 with $90,274,487 estimated for FY2013 and $138,607,584 estimated for the next six years. For Fiscal 2011-2012 Amended the average flow used is 30949.2 MG. The amount collected from WRA communities & districts is $32,568,088 (same as Adopted). Gross O&M Expense is $20,018,887 and Net O&M is $15,915,487 (same as Adopted). Expenses by account number have been reviewed and adjusted where needed such that the amended budget will align better with actual expenditures. A budget book will be distributed at the meeting. Final budgets have been posted to the website in the Financal Information area. Please email any questions to RJVaughan @ dmgov.org Des Moines Metropolitan Wastewater Reclamation Authority 2013+ Capital Improvements Program 1 Summary Wastewater Reclamation Authority Improvements FY2013+ Col. 1 2 3 4 5 6 TOTAL ESTIMATED COST COST THROUGH F11 REVISED ESTIMATE F12 TOTAL ESTIMATED COST THROUGH COST FOR SIX-YEAR PERIOD 502,974,363 184,169,561 86,463,875 270,633,436 0 0 76,412,120 0 Interest Earnings 3,701,477 3,533,846 77,658 3,611,504 89,973 9,973 Renewal & Replacement Fund 3,298,491 3,298,491 0 3,298,491 0 Communities 35,504,977 14,057,702 2,822,275 16,879,977 Future Funding 87,704,106 0 1,472,176 Bond Proceeds 71,687,052 71,687,052 268,740,385 Expenses, detail on following page 7 8 9 10 11 12 13 F18 COST BEYOND F18 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F13 138,607,584 F14 F15 F16 F17 90,274,487 26,038,097 6,160,000 9,345,000 3,170,000 3,620,000 93,733,343 52,845,134 (3,672,490) 3,000,000 0 325,000 325,000 0 10,000 10,000 20,000 20,000 20,000 0 0 0 0 0 0 0 0 18,625,000 3,300,000 3,200,000 3,000,000 3,000,000 3,000,000 3,125,000 0 1,472,176 12,498,587 475,000 5,523,587 0 6,500,000 0 0 73,733,343 0 71,687,052 0 0 0 0 0 0 0 0 164,729,565 56,799,780 221,529,345 47,211,040 29,589,040 17,622,000 0 0 0 0 0 32,337,875 3,275,025 1,725,000 5,000,025 7,337,850 382,850 6,355,000 150,000 150,000 150,000 150,000 20,000,000 502,974,363 260,581,681 139,309,009 323,478,570 85,762,450 86,601,997 29,038,097 6,160,000 9,670,000 3,495,000 3,620,000 93,733,343 Resources: Beginning Balance SRF Drawdowns Other Total Resources . g 2 2/7/2012 WASTEWATER RECLAMATION AUTHORITY COMPARISON OF LAST YEAR AND CURRENT YEAR CIP SHEETS FY2013-2018 6 Yr Plan Capital Improvement Projects by Type of Funding Core Projects wra 086 DM River Outfall / New Main Outfall wra 087 East 20th St. Connector wra 087 Combined Sewer Solids Separation Design wra 088 wra 080 wra 093 wra 084 wra 077 wra 074 wra 104 Ingersoll Run Sewer Westside Basin Interceptor Flow Monitoring System Emission Reduction Power Generation System Digester Gas System Equalization Basin Improvements (I-Jobs) P 17 * P 17 P 25 P 4 * Subtotal Core Projects [last year] [this year] Budget Amount for each project Budget Amount for each project Budget Amount for each project Past Amount 2012 BOOK 2013 FILE 47,502,119 6,467,046 52,316,995 47,502,119 106,286,160 2,707,069 6,648,068 5,946,782 6,039,734 4,225,052 24,315,000 1,336,450 4,225,052 24,315,000 1,336,450 4,700,052 24,315,000 1,736,450 157,504,315 Chg of Estimate 52,739,875 5,237,756 52,316,995 53,426,995 1,110,000 99,819,114 2,707,069 6,648,068 5,946,782 106,166,870 2,597,954 6,328,068 6,743,433 144,997,535 152,587,827 (109,115) (320,000) 796,651 475,000 400,000 7,590,292 Expansion Projects wra 085 wra 097 wra 095 wra 089 wra 090 wra 099 wra 100 wra 082 wra 092 Ankeny Four Mile Interceptor Ext. FourMi Interceptor Improv. Little Four Mile Int. South p15 Little Four Mile Int. Ext. P15 Middle Creek Trunk Sewer P20 Mud Creek Interceptor Corridor Preservation WDM Outfall WDM Outfall Ext. 20,790,917 29,081,865 4,265,631 2,720,978 7,449,522 19,422,436 400,000 17,628,594 10,998,042 20,790,917 29,081,865 20,750,917 27,133,564 (40,000) (1,948,301) 19,422,436 400,000 17,628,594 10,998,042 19,422,436 400,000 17,194,984 9,826,629 (433,610) (1,171,413) 112,757,985 98,321,854 94,728,530 (3,593,324) 85,986,885 12,710,400 85,986,885 12,710,400 94,874,885 15,548,290 8,888,000 2,837,890 98,697,285 98,697,285 110,423,175 11,725,890 33,338,242 8,192,700 17,200,000 10,200,000 24,828,971 10,373,430 33,338,242 8,192,700 17,200,000 10,200,000 0 0 24,828,971 10,373,430 33,338,242 8,192,700 0 20,000,000 7,300,000 6,500,000 24,828,971 7,373,430 Subtotal Future Projects 104,133,343 104,133,343 107,533,343 Total Project Costs (Bonded and Basins) less closed projects (87/95) above 473,092,928 -10,732,677 446,150,017 465,272,875 1,035,640 440,000 2,566,788 700,000 6,903,475 3,000,000 4,582,360 4,545,000 10,030,000 1,035,640 440,000 2,566,788 700,000 0 6,903,475 3,000,000 4,582,360 4,545,000 10,030,000 1,579,010 440,000 3,061,788 1,100,000 316,450 6,890,105 2,305,000 7,109,135 7,755,000 7,145,000 Total Non-Bonded Project Costs 33,803,263 33,803,263 37,701,488 WRA Total Expenses for Projects 496,163,514 479,953,280 502,974,363 P 24 P 23 * * * P 19 P 13 P 18 Subtotal Expansion Projects wra 081 South West Area Diversion Facilities wra 103a Southern Tier Improvements for SW Area Div P 22 P 10 South West Area Diversion Facilities Future Projects (Core, Expansion, Other) core core wra 102 wra 101 core core expan wra 103b Nutrient Removal Birdland Pump Stn Westside Supplemental Equalization Basin com Additional Equalization Basin Northwest bine WRF Flood Mitigation (I-Jobs) new Ankeny Equalization Basin Northeast new Common Trunk & Joint Trunk Southern Tier Improvements Western (expansion) (17,200,000) 9,800,000 7,300,000 6,500,000 (3,000,000) 3,400,000 19,122,858 Non-Bonded / Plant & System Projects wra 069 wra 096 wra 078 wra 083 wra xxx wra 070 wra 091 wra 098 wra 098a wra 1xx Facilities Plan Update Transition / RE Transfer Costs (see note below) Facilities Rehabilitation, including RE purchases Sewer Maintenance contract work WRF Energy Efficiency projects (I-Jobs) Process Equipment Replmt 2004-2009 Small CIP prior projects & Studies Small CIP projects & ProcEqRepl. 2010-2012 Small CIP projects & ProcEqRepl. 2013-2014 Small CIP future projects & future (three years) new 543,370 495,000 400,000 316,450 (13,370) (695,000) 2,526,775 3,210,000 (2,885,000) 3,898,225 23,021,083 RE = Real Estate (after 2004 WRA listed as title holder) * PROJECT CLOSED 2/7/2012 3 502,974,363 SUMMARY TOTAL CIP file rv Wastewater Reclamation Authority CIP Spending by Project and Category WRA 2013 subtotal Spending Expenditures from CIP sheets 2012 2013 2014 2015 2016 2017 2018 WRA Projects - Expansion Category 85 97 82 92 99 100 103 Ph 24 Four Mile Interceptor Ext. Four Mile Interceptor 1,701,002.0 $ 1,467,461.0 608,035.0 Ph 23 $ Ph 13 WDM Outfall 3,979,855.0 921,025.0 Ph 18 WDM Outfall Ext. 2,945,500.0 Ph 19 Mud Creek 4,109,791.0 b Southern Tier Improvements Expansion Funding Ttl 2,309,037.0 1,467,461.0 4,900,880.0 2,945,500.0 11,721,625.0 192,660.0 $ Corridor Preservation $ 3,580,910.0 19,412,326.0 50,000.0 242,660.0 - $ 14,396,269.0 $ 13,300,685.0 $ 3,580,910.0 $ - $ - $ - $ - $ 31,277,864.0 16,508,751.0 $ 6,058,746.0 $ 24,224,000.0 $ 7,242,900.0 $ 3,115,000.0 2,184,900.0 $ 22,567,497.0 $ 31,466,900.0 $ 5,299,900.0 $ $ 13,659,422.0 $ 19,117,280.0 19,860,800.0 $ 15,519,200.0 3,208,300.0 5,062,000.0 36,728,522.0 39,698,480.0 14,008,181.0 WRA Projects - SW Area Div. Category 81 103 P21,22 SW Area Diversion Project a Southern Tier for SW ADF SW Area Funding Ttl 43,847,751.0 15,486,546.0 - $ - $ - $ - $ 59,334,297.0 WRA Projects - Core Category 86 87 88 74 93 Ph 17 DM River Outfall / Main Outfall Ph 17 CSSS Facility Ph 25 Ingersoll Run CSO 15,243.0 15,000.0 Ph 1 Digester Improvements 8,798,381.0 3,994,400.0 1,215,400.0 Ph 25 Flow Monitoring Seg 3 1,303,665.0 300,000.0 4,000,000.0 30,243.0 1,303,665.0 Flood Mitigation at WRF (grant funded) 3,000,000.0 7,300,000.0 6,500,000.0 Ankeny Equalization Basin Improv 104 101 80 I Jobs Equalization Basin Improvements * Additional Equalization Basin North P4 Westside Basin Interceptor Seg 2 1,313,028.0 $ 6,500,000.0 311,587.0 1,624,615.0 - 74,996.0 74,996.0 $ 44,282,015.0 $ 2012 39,689,400.0 $ 13,797,287.0 $ 2013 2014 3,000,000.0 $ 2015 6,500,000.0 $ 2016 - $ 2017 - $ 107,268,702.0 2018 WRA Plant Projects - Annual Community Contributions 69 70 78 77 79 83 91 96 98 188,141.0 $ - 260,000.0 $ 150,000.0 $ 125,000.0 $ 125,000.0 $ 125,000.0 $ 125,000.0 Process Equipment Repl. (see 98) 1,098,141.0 - Facilities Rehabilitation 457,897.0 250,000.0 250,000.0 200,000.0 200,000.0 200,000.0 200,000.0 1,757,897.0 Power Generation System 400,000.0 600,000.0 325,000.0 650,000.0 1,975,000.0 Special Projects (grant funded) 150,000.0 Sewer Maintenance Contracts 159,672.0 150,000.0 150,000.0 150,000.0 150,000.0 150,000.0 150,000.0 1,059,672.0 Small CIP & Studies 367,277.0 125,000.0 50,000.0 40,000.0 30,000.0 30,000.0 30,000.0 Facility Plan update $ 99,341.0 $ Transition Costs Plant Projects, including Eq. Repl. $ Revised Estimate for F12 179,341.0 4,352,502.0 $ 2,760,000.0 $ 2,645,000.0 $ 2,340,000.0 $ 2,340,000.0 $ 2,465,000.0 20,298,268.0 5,218,094.0 $ 5,817,502.0 $ 3,360,000.0 $ 3,160,000.0 $ 2,845,000.0 $ 3,170,000.0 $ 3,620,000.0 $ 27,190,596.0 $ 86,463,875.0 $ 90,274,487.0 $ 26,038,097.0 $ 6,160,000.0 $ 9,345,000.0 $ 3,170,000.0 $ . . . . . . . . . . . . . . . . . . . . The construction of an EQ basin in the north is not anticipated until after January 1, 2024. 2/8/2012 CIP Recap 672,277.0 80,000.0 3,395,766.0 $ 2013 2014 2015 2016 2017 2018 Summary of Costs, Six-Year-Period . . . . . * 101 150,000.0 4 . . . . . . . . . . . . 3,620,000.0 . . . . . . $ 138,607,584.0 2013 Project Number WRA069 WRA070 WRA074 WRA077 WRA078 WRA079 WRA080 WRA081 WRA082 WRA083 WRA084 WRA085 WRA086 WRA087 WRA088 WRA089 WRA090 WRA091 WRA092 WRA093 WRA095 WRA096 WRA097 WRA098a WRA098b WRA099 WRA100 WRA101 WRA102 WRA103a WRA103b WRA104 WRA1xx WRA1xx WRA1xx WRA1xx WRA1xx WRA1xx List of WRA Projects / Numerical Project ID Phase 21,22 Phase 13 Phase 24 Phase 17 Phase 17 Phase 25 Phase 15 Phase 20 Phase 18 Phase 15 Phase 23 Phase 19 Phase 10 Phase 10 Project Name Funding Page # Facility Plan Update - WRA Process Equipment Replacement [thru 2009] Digester Improvements - WRF Power Generation System Facilities Rehabilitation - WRF Special Projects (using Grant money) West Side Interceptor Basin SouthWest Area Diversion Facilities West DM Outfall Contracted Sewer Maintenance Emission Reduction - WRF Ankeny N Four Mile Interceptor DM River Outfall / New Main Outfall Combined Sewer Solids Separation Ingersoll Run Overflow Little Four Mile Interceptor Extension Middle Creek Trunk Sewer Extension Small CIP [thru 2009] & Studies West DM Outfall Extension Flow Monitoring System Improvements Little Four Mile Intereceptor -South Branch Transition Costs - WRA Four Mile Interceptor Improvements Small CIP / Plant Improvement Projects to Small CIP / Plant Improvement Proj F13-F18 Mud Creek Interceptor Corridor Preservation Additional Equalization Basin in Northwest West Side Supplemental Equal. Basin Southern Tier (Pumping) Improvements Southern Tier Improvements (Western) Equalization Basin Utilization Improvements Ankeny Equalization Basin Flood Mitigation at WRF Common Trunk Joint Trunk Birdland Improvements Nutrient Removal - WRF annual contrib annual contrib Core Bond Funds annual contrib annual contrib I-Jobs Core Bond Funds Bond Funds / SRF Expansion Funds Operation funded Core Bond Funds Expansion Funds Core Bond Funds Core Bond Funds Core Bond Funds Expansion Funds Expansion Funds annual contrib Expansion Funds Core Bond Funds Expansion Funds annual contrib Expansion Funds annual contrib annual contrib Expansion Funds Expansion Funds Commty 28E / Core combined with 101 Bond Funds / SRF Expansion Funds Core Bond Funds Expansion Funds I-Jobs Expansion Funds Expansion Funds Core Bond Funds Core Bond Funds 7 11 12 13 14 15-16 17 18 19 20 closed 21 22 23 24 closed closed 25 26 27 closed 28 29 8 9-10 30 31 32 33 34 35 36 37 38 39 40 41 42 5 2013 Project Number WRA1xx WRA087 WRA074 WRA086 WRA104 WRA093 WRA088 WRA1xx WRA080 List of WRA Projects / Alpha by Category Project ID Funding Birdland Improvements Combined Sewer Solids Separation Digester Improvements - WRF DM River Outfall / New Main Outfall Equalization Basin Utilization Improvements Flow Monitoring System Improvements Ingersoll Run Overflow Nutrient Removal - WRF West Side Interceptor Basin Core Bond Funds Core Bond Funds Core Bond Funds Core Bond Funds Core Bond Funds Core Bond Funds Core Bond Funds Core Bond Funds Core Bond Funds WRA078 WRA069 WRA077 WRA070 WRA098b WRA098a WRA091 WRA096 Facilities Rehabilitation - WRF Facility Plan Update - WRA Power Generation System Process Equipment Replacement [thru 2009] Small CIP / Plant Improvement Proj F13-F18 Small CIP / Plant Improvement Projects to Small CIP [thru 2009] & Studies Transition Costs - WRA annual contrib annual contrib annual contrib annual contrib annual contrib annual contrib annual contrib annual contrib WRA1xx WRA079 WRA083 WRA103a WRA081 WRA101 WRA102 Flood Mitigation at WRF Special Projects (using Grant money) Contracted Sewer Maintenance Southern Tier (Pumping) Improvements SouthWest Area Diversion Facilities Additional Equalization Basin in Northwest West Side Supplemental Equal. Basin I-Jobs I-Jobs Operation funded Bond Funds / SRF Bond Funds / SRF Commty 28e / Core combined with 101 Ankeny Equalization Basin Common Trunk Corridor Preservation Four Mile Interceptor Extension Four Mile Interceptor Improvements Joint Trunk Mud Creek Interceptor Southern Tier Improvements (Western) West DM Outfall West DM Outfall Extension Expansion Funds Expansion Funds Expansion Funds Expansion Funds Expansion Funds Expansion Funds Expansion Funds Expansion Funds Expansion Funds Expansion Funds WRA1xx WRA1xx WRA100 WRA085 WRA097 WRA1xx WRA099 WRA103b WRA082 WRA092 Phase 25 3 Phase 17 Project Name Phase 17 Phase 25 2 Phase 25 1 Phase 10 Phase 21,22 Phase 24 Phase 23 Phase 19 Phase 10 Phase 13 Phase 18 6 Page # 41 23 12 22 36 27 24 42 17 14 7 13 11 9-10 8 25 28 38 15-16 20 34 18 32 33 37 39 31 21 29 40 30 35 19 26 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Facility Plan Update [ commty funded from WRA098 ] AG267 WRA990000 WRA069 TOTAL ESTIMATED COST COST THROUGH F10 1,579,010 Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other / commty funds 098 Total Resources ENDING BALANCE 342,651 ACTUAL COST IN F11 138,218 COST THROUGH F11 480,869 Revised BUDGET F12 ESTIMATED COST THROUGH F12 188,141 669,010 (1,859) RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 COST BEYOND F18 F18 260,000 150,000 125,000 125,000 125,000 125,000 28,370 15,000 13,370 28,370 450,640 330,640 120,000 450,640 190,000 190,000 260,000 150,000 125,000 125,000 125,000 125,000 1,579,010 345,640 133,370 479,010 188,141 669,010 260,000 150,000 125,000 125,000 125,000 125,000 0 2,989 (4,848) (1,859) 0 0 0 0 0 0 0 0 1,100,000 28,370 450,640 0 Description: This project provides for an update of the original ICA Facility Plan in anticipation of needs through the year 2020. Core projects and expansion projects are included in the facility plan. Funding in years F05 through F11 are discretionary for use in funding special studies and special assistance to the authority in implementing the facility plan including cost updates and bond projections. Funding in F07 and beyond includes financial planning and bond council. This project funds a new Facility Plan update for the WRA which will be completed in late 2013. Justification: The original 201 and 208 studies were completed in 1978 and 1982, respectively, and current growth levels are beyond the expectations of those studies. The study will identify the needs of the WRA through 2020. To evaluate growth, conveyance and wastewater treatment needs of the WRA past 2020. Scheduling: The WRA Facility Plan was approved by the WRA Board and submitted to IDNR in March, 2004. Plan implementation started in F04. Relationship to General Plan and Other Projects: Beginning F10 funding source will be a transfer from WRA098, R&R community funds. Operating Budget Effect: 7 WRA Flow Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Small Projects, & Process Equipment Repl for 2010, 2011, 2012 AG267 WRA990000 WRA98 1 TOTAL ESTIMATED COST COST THROUGH F10 7,109,135 Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other (tsfr out) Total Resources ENDING BALANCE 810,019 ACTUAL COST IN F11 900,848 COST THROUGH F11 1,710,867 25,000 7,357,360 ESTIMATED COST THROUGH F12 3,395,766 5,106,633 2,763,268 25,000 25,000 2,800,000 7,357,360 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 (110,000) (193,225) (80,000) 7,109,135 2,347,360 2,126,775 4,474,135 5,478,268 7,189,135 2,002,502 0 1,537,341 1,225,927 2,763,268 2,082,502 2,082,502 0 (83,225) F18 2,082,502 2,210,000 (83,225) COST BEYOND F18 2,002,502 2,347,360 (273,225) 4,557,360 Revised BUDGET F12 0 0 0 0 0 Description: Renewal and replacement of existing process equipment. Small plant projects and studies. Justification: Process equipment installed between 1987 and 1993 is nearing the end of its useful life and will require replacement. Other major replacements are budgeted individually. Scheduling: F10: Primary and final clarifier repairs, Server power replacement, PCS upgrade, B70 second floor lighting, CMMS modifications, W3 Pump station Imprv, Unanticipated needs. F11: Primary and final clarifier repairs, Server virtualization, IP camera deployment, Bar Screen #1 repl, Sump Pump repl, Main Pump motor rebuild, Unanticipated needs. F12+: Algae sweep at Final clarifiers, Grit chamber modifications. F13: CNG/CBG Fueling Station ($1 million) Relationship to General Plan and Other Projects: This project will be funded with interest earnings from R&R reserve fund and community contributions. Transfers out will provide funding to other R&R projects. Operating Budget Effect: This project will maintain the current level of service and reduce operations and maintenance costs. WRA Flow 8 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Small Projects, & Process Equipment Repl for 2013, 2014, 2015 AG267 WRA990000 WRA98 2 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other (tsfr out) Total Resources ENDING BALANCE COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 F13 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 7,755,000 2,350,000 2,760,000 2,645,000 30,000 10,000 10,000 10,000 9,500,000 3,300,000 3,200,000 3,000,000 (1,775,000) (960,000) (450,000) (365,000) 7,755,000 2,350,000 2,760,000 2,645,000 0 0 0 0 0 0 0 0 0 0 COST BEYOND F18 F18 0 0 Description: Renewal and replacement of existing process equipment, includes small plant projects. Justification: Annual plant maintenance over $5,000 in amount that reduces operating repair costs and extends the useful life of the asset. Scheduling: Bar screen replacement in F13 - F14 ($1,800,000) Also in F12 - F13: PFS storage shed, Biogas pipeline and burner upgrade W3 improvements in F13 - F14 ($1,000,000) FY14 Highvoltage testing of Bus A; Replace piping in Aeration Tank #2; Replace inefficient electric motors Relationship to General Plan and Other Projects: This project will be funded with interest earnings from R&R reserve fund and community contributions. Transfers out will provide funding to other R&R projects. Operating Budget Effect: This project will maintain the current level of service and reduce operations and maintenance costs. WRA Flow 9 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Studies, Small Projects, & Process Equipment Replacement AG267 WRA990000 WRA98 3 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other (tsfr out) Total Resources COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 COST BEYOND F18 F18 7,145,000 2,340,000 2,340,000 2,465,000 60,000 20,000 20,000 20,000 9,125,000 3,000,000 3,000,000 3,125,000 (2,040,000) (680,000) (680,000) (680,000) 7,145,000 2,340,000 2,340,000 2,465,000 0 0 0 ENDING BALANCE 0 0 0 0 0 0 0 0 0 Description: Renewal and replacement of existing process equipment, includes small plant projects. Justification: Scheduling: This sheet is for future WRF projects Relationship to General Plan and Other Projects: This project will be funded with interest earnings from R&R reserve fund and community contributions. Transfers out will provide funding to other R&R projects. Operating Budget Effect: This project will maintain the current level of service and reduce operations and maintenance costs. WRA Flow 10 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Process Equipment Replacement [ transferring to WRA098 in 2010 ] AG267 WRA990000 WRA070 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other, SALE of Equip Total Resources ENDING BALANCE COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 6,890,105 6,798,349 91,756 6,890,105 6,890,105 365,115 1,948,191 4,503,443 378,485 1,948,191 4,503,443 (13,370) 365,115 1,948,191 4,503,443 365,115 1,948,191 4,503,443 73,356 73,356 73,356 73,356 6,890,105 6,903,475 (13,370) 6,890,105 6,890,105 0 105,126 (105,126) 0 0 0 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 COST BEYOND F18 F18 final time in CIP 0 0 0 0 0 0 Description: Renewal and replacement of existing process equipment through F10 with projects completed in F11. Justification: Process equipment installed between 1987 and 1993 is nearing the end of its useful life and will require replacement. Other major replacements are budgeted individually. Projections beyond 2006 are second tier replacement as equipment wears out over typical fifteen year service life and the magnitude may increase with inflation. Scheduling: F08: Network replacement for process control system, Building 12 conveyors, Return sludge piping repairs. F09: Rebuild Clarifier Drives, Replace Return sludge Lines Joints 45-1, Blast and recoat final clarifiers. F10: Rebuild Final Clarifier Drives, Replace Return sludge Lines Joints 45-3, Primary Clarifier Drives 1 & 4 rebuild, Repair/repl Transformers. Relationship to General Plan and Other Projects: Process equipment replacements will be done in WRA098 after F10. Operating Budget Effect: This project will maintain the current level of service and reduce operations and maintenance costs. WRA Flow 11 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Digester Improvements AG267 WRA990000 WRA074 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other / from Small CIP Total Resources ENDING BALANCE COST THROUGH F10 ACTUAL COST IN F11 7,769,925 COST THROUGH F11 24,315,000 2,536,894 10,306,819 90,000 90,000 600,000 360,000 23,265,000 100,000 23,265,000 110,000 210,000 23,265,000 24,315,000 23,455,000 110,000 0 20,918,106 (7,659,925) 90,000 Revised BUDGET F12 8,798,381 ESTIMATED COST THROUGH F12 19,105,200 13,258,181 90,000 F13 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 3,994,400 1,215,400 4,734,800 1,215,400 125,000 150,000 125,000 360,000 23,265,000 475,000 23,565,000 13,533,181 23,840,000 5,209,800 1,215,400 13,258,181 4,734,800 4,734,800 1,215,400 0 0 0 COST BEYOND F18 F18 0 0 Description: F10 improvements will involve improving the mixing system, replacing the insulated covers with fixed concrete covers, and upgrading the digester gas system. Justification: Digester gas contains hydrogen sulfide which corrodes components necessitating replacement. The equipment must be replaced in order to maintain the current level of service and reduce maintenance costs. This project will result in delivery of higher quality gas to the engine generators. Some improvements are necessitated by the increase in gas production that will require larger piping and appurtenances. Scheduling: The study and design were completed in F09 with construction in F09 through F12. A study was done in F08 to investigate a method of increasing gas production and reducing solids with the results used in the design of these improvements. Change in estimate F10: Exhibit 31 estimates brought current. Relationship to General Plan and Other Projects: Included in 28E bonding schedule. F09 P&D Loan for Design ($3205,000 with $1,994,250 drawn). F10 SRF loan (series 2010C $2+21.5 million closed on 6/30/10). Operating Budget Effect: This project will result in a decrease in long term operations and maintenance costs with potential increased revenues. WRA Flow 12 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Power Generation System [ funded from WRA098 ] AG267 WRA990000 WRA077 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other / commty funds 098 Total Resources ENDING BALANCE COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 4,700,052 2,725,052 2,725,052 12,543 1,033,512 273,118 12,543 1,033,512 173,118 12,543 1,033,512 273,118 1,755,879 1,755,879 100,000 Revised BUDGET F12 400,000 350,000 1,755,879 1,625,000 ESTIMATED COST THROUGH F12 3,125,052 12,543 1,033,512 273,118 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 F18 F17 600,000 325,000 650,000 275,000 325,000 325,000 1,755,879 325,000 325,000 325,000 325,000 325,000 325,000 4,700,052 2,975,052 100,000 3,075,052 675,000 3,400,052 600,000 325,000 650,000 650,000 0 250,000 100,000 350,000 275,000 275,000 0 325,000 325,000 0 0 0 0 Description: F10 costs are for overhauling two generators. F12 costs are for a standard engine and generator rebuild plus replacement of one engine upper block. F14 costs are for two standard engine and generator rebuilds. Justification: The engines burn the by-product gas produced by the digesters to produce electricity saving more than $500,000 annually. New technology offers lower O&M cost and produce more electricity. Engine overhauls are required every 25,000 hours. For budgeting purposes, the overhauls occur every 4 years at a cost of $1,300,000. An annual collection assures adequate funds for overhauls. Scheduling: Past rebuilds were completed in F09-F10. Relationship to General Plan and Other Projects: Community funding thru WRA098 will provide funding after bond issue. Operating Budget Effect: This project will result in a decrease in long-term operations and maintenance costs. WRA Flows 13 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Facilities Rehabilitation [ funded from WRA098 ] AG267 WRA990000 WRA078 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other / commty funds 098 Total Resources ENDING BALANCE COST THROUGH F10 3,061,788 1,039,697 25,000 316,788 970,000 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 264,194 1,303,891 25,000 316,788 750,000 220,000 25,000 316,788 970,000 450,000 3,061,788 1,091,788 220,000 1,311,788 457,897 0 52,091 (44,194) 7,897 0 0 1,750,000 457,897 F13 COST BEYOND F18 F18 250,000 250,000 200,000 200,000 200,000 200,000 450,000 250,000 250,000 200,000 200,000 200,000 200,000 1,761,788 250,000 250,000 200,000 200,000 200,000 200,000 0 0 0 0 0 0 1,761,788 7,897 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 25,000 316,788 970,000 0 Description: These projects are for non-process repair and replacement projects at the WRF and off-site WRA facilities. Justification: As buildings and infrastructure age, capital projects will be required to preserve facilities in a serviceable condition. Scheduling: F09: Roof Replacement on Building 35, HVAC Improvements. F10: Roof Replacement on Buildings 70 & 94, HVAC Improvements. F11: Replace Air handling units in Buildings 12, 26, 27 & 28, HVAC Improvements. F13: Roof Replacement on Building 93; Building 12 Exhaust Air handling Modifications. Relationship to General Plan and Other Projects: Community funding thru WRA098 will provide future funding of WRA078 expense. Operating Budget Effect: These projects will reduce operations and maintenance costs in future years. WRA Flow 14 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements Special Projects [ commty funded portion from WRA098 ] AG267 WRA990000 WRA079 1 TOTAL ESTIMATED COST COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 Expenses 158,225 83,225 Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other / commty funds 098 158,225 83,225 158,225 83,225 0 0 Total Resources ENDING BALANCE 0 0 83,225 ESTIMATED COST THROUGH F12 75,000 158,225 83,225 75,000 158,225 83,225 75,000 158,225 0 0 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 0 0 0 0 COST BEYOND F18 F18 0 0 Description: WRA has received or expects to receive the above Grants from State and Federal programs. Justification: Scheduling: F11: Software updates F12: Software updates Relationship to General Plan and Other Projects: this project sheet and the following will fully fund the listed projects Operating Budget Effect: This project will increase the current level of service and reduce operations and maintenance costs. WRA Flow 15 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements Special Projects [ Grant Funded portion ] AG267 WRA990000 WRA079 2 TOTAL ESTIMATED COST COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 Expenses 158,225 83,225 Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other, Grant Money (Fed Stim) 158,225 83,225 158,225 83,225 0 0 Total Resources ENDING BALANCE 0 0 83,225 ESTIMATED COST THROUGH F12 75,000 158,225 83,225 75,000 158,225 83,225 75,000 158,225 0 0 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 0 0 0 0 COST BEYOND F18 F18 0 0 Description: WRA has received or expects to receive the above Grants from State and Federal programs. Justification: Scheduling: F11: Software updates F12: Software updates Relationship to General Plan and Other Projects: this project sheet and the previous wiill fully fund the listed projects Operating Budget Effect: This project will increase the current level of service and reduce operations and maintenance costs. WRA Flow 16 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA West Side Interceptor Basin & WSPS Mitigation AG267 WRA990000 WRA080 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities /pre 7/1/04 Future Funding Bond Proceeds SRF Drawdowns Other Total Resources ENDING BALANCE COST THROUGH F10 ACTUAL COST IN F11 1,199,920 COST THROUGH F11 6,328,068 5,053,152 6,253,072 118,369 118,369 118,369 23,141 23,141 23,141 4,889,658 1,296,900 5,389,658 6,328,068 0 Revised BUDGET F12 ESTIMATED COST THROUGH F12 74,996 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 COST BEYOND F18 F18 6,328,068 274,996 118,369 23,141 (300,000) 1,296,900 5,089,658 1,296,900 (200,000) 4,889,658 1,296,900 5,531,168 996,900 6,528,068 74,996 6,328,068 478,016 (203,020) 274,996 0 0 0 0 0 0 0 0 0 Description: Core project. The project will increase the capacity of the pump station from 20 mgd to 35 mgd and replace controls and associated equipment. F09 Expenditure amount does not include costs for flood damage/replacements that will be FEMA reimbursed or funded with insurance. F11 Expenditures are mitigation that will not be reimbursed by FEMA but will be required to protect the facility from flooding, which included a concrete flood wall and flood swing gates. Justification: The existing equipment is aging and has been exposed to harsh operating conditions. The capacity of the pump station needs to be increased to equal the capacity of the downstream sewer. Scheduling: Variable Frequency Drive replaced in F03, Increased pumping capacity design in F06, construction in F07 and F08. F11 Improvements will provide increased flood protection around the equalization basin, which included a concrete flood wall and flood swing gates. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. After flooding in 2008, additional mitigation projects were added. Operating Budget Effect: Increase revenues and operations and maintenance costs. 17 WRA Flow Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements Southwest Area Diversion Facilities Phase 21 and 22 AG267 WRA990000 WRA081 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Available Other / LOAN to WRA092 Total Resources ENDING BALANCE COST THROUGH F10 ACTUAL COST IN F11 17,367,602 COST THROUGH F11 94,874,885 33,659,532 1,281,000 1,280,963 1,280,963 (3,765,000) 25,473,085 71,885,800 25,623,085 24,769,800 25,623,085 34,273,800 9,504,000 51,027,134 Revised BUDGET F12 16,508,751 ESTIMATED COST THROUGH F12 F13 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 67,535,885 24,224,000 3,115,000 1,280,963 (373,037) 37 (1,835,000) (3,765,000) (150,000) 9,900,000 (3,765,000) 25,473,085 44,173,800 22,762,000 4,950,000 10,150,714 94,874,885 51,673,848 9,504,000 61,177,848 16,135,714 67,162,848 22,389,000 3,115,000 0 18,014,316 (7,863,602) 10,150,714 (373,037) (373,037) (1,835,000) 0 0 0 COST BEYOND F18 F18 0 0 0 Description: Core/expansion project. Two thirds of the facilities support core communities and one third supports expansion communities. This project will divert flows from the Southwest Outfall Interceptor Sewer during wet weather and store in an equalization facility. Peak wet weather flows will be stored and then treated during low flow periods. Equalization will reduce the impact of wet weather events at the WRF. This project will also provide a connection for the City of Norwalk. Phase 21, segments 1 and 2, North River Interceptor will convey wastewater from the Norwalk wastewater treatment plant to the Southern Tier pump station. Phase 22, segments 1 through 6, will pump, convey, and store wastewater from the westside of the WRA service area. Justification: This project is necessary to provide flow equalization for the central and western WRA conveyance system. Scheduling: The time sensitive reach was designed in F08 and constructed in F08/F09. The North River Intercepto (Phase 21) was constructed in F08, and F09. The diversion sewer will be will be constructed in F10, F11, and F12. The pump station, force main, flow equalization and interceptors will be constructed in F10, F11, and F12. Phase 22, Segment 1 - F10, P22seg. 2 - F08/09, P22seg. 3 - F11 Phase 22, Segment 4 - F12, P22seg. 5 - F12, P22seg. 6 - F11/12 Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. Two thirds of these facilities support core communities and one third supports expansion communities. Operating Budget Effect: This project will increase revenues and operations and maintenance costs. SW funding split 18 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements West Des Moines Outfall Phase13 AG267 WRA990000 WRA082 TOTAL ESTIMATED COST COST THROUGH F10 17,194,984 Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources ENDING BALANCE 11,776,624 ACTUAL COST IN F11 517,480 COST THROUGH F11 12,294,104 Revised BUDGET F12 ESTIMATED COST THROUGH F12 3,979,855 16,273,959 1,137,880 FY2015 921,025 118,045 118,045 100,000 1,168,394 15,808,545 1,168,394 12,145,545 1,168,394 12,145,545 3,663,000 100,000 1,168,394 15,808,545 17,194,984 13,431,984 13,431,984 4,900,880 17,194,984 921,025 0 1,655,360 1,137,880 921,025 921,025 0 100,000 F18 921,025 118,045 (517,480) 118,045 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 0 0 0 0 0 0 Description: Expansion Project.This project increases the capacity of the West Des Moines Outfall and provides service to new areas including the city of Waukee. The project will provide a connection to the Southwest Area Diversion Facility at it's east terminus and a connection to the West Des Moines Outfall Extension on it's west terminus. Justification: As service is provided to new customers the capacity of the sewer must be increased. This project will serve West Des Moines and Waukee and is necessary to increase conveyance capacity. Scheduling: F04:Construction from s 1st Street to S4th Street;F07:Design of entire project from Southwest Area Diversion Facility to South 60th Street;F08:Construction from S33rd street to S60th Street;F10:Construction from Southwest Area Diversion Facility to South 16th Street; Moved from F16 to F12 to take advantage of favorable bidding climate and avoid conflict with work planned at Raccoon River Park: Construction from South 16th Street to South 33rd Street. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. Bonding was scheduled for 2007,2010,2015. Operating Budget Effect: Revenues and operations and maintenance costs will increase as flows increase. 19 Expansion Flow Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Sewer Maintenance (Inspections & Repairs) AG267 WRA990000 WRA083 TOTAL ESTIMATED COST COST THROUGH F10 ACTUAL COST IN F11 1,100,000 Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Funding from O&M budget (16 Total Resources ENDING BALANCE 40,328 COST THROUGH F11 40,328 Revised BUDGET F12 ESTIMATED COST THROUGH F12 159,672 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F13 F14 F15 F16 F12 COST BEYOND F17 F17 200,000 150,000 150,000 150,000 150,000 150,000 150,000 9,672 1,100,000 50,000 50,000 150,000 200,000 150,000 150,000 150,000 150,000 150,000 150,000 1,100,000 50,000 50,000 159,672 200,000 150,000 150,000 150,000 150,000 150,000 150,000 9,672 9,672 0 0 0 0 0 0 0 0 0 0 0 Description: This project provides funding for annual engineering investigation for portions of the WRA interceptor sewer system and for specific maintenance/repairs of those sewers. Maintenance and repairs will include: Sewer televising, sewer cleaning, sewer lining, manhole rehabilitation and rebuilding, sewer spot repairs, sinkhole repairs, replacement of manhole lids and castings, etc. Justification: Portions of the WRA Conveyance system are over fifty years old and there is a need to investigate, evaluate and determine maintenance on the overall interceptor sewer system. This project sets aside funding for planned and unanticipated sewer repairs in the conveyance system. Scheduling: F12, Investigate the Westside/Beaver Creek interceptor sewer. F13, Investigate the western portion of the So Tier interceptor sewer. Relationship to General Plan and Other Projects: This project is funded with Operating Money. Operating Budget Effect: These investigations will identify repairs that will increase operating costs in future budgets on a proactive basis rather than reactive spending. WRA770163, Sewer Maintenance 20 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Four Mile Interceptor Extension Phase 24 AG267 WRA990000 WRA085 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other / POLK CO. Total Resources COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 ESTIMATED COST THROUGH F12 18,441,880 1,701,002 20,142,882 445,464 994,501 2,786 448,250 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 20,750,917 10,716,419 448,250 445,464 10,547,988 9,726,750 27,929 10,247,988 300,000 27,929 300,000 8,115,000 10,547,988 8,415,000 27,929 990,000 10,547,988 9,405,000 27,929 321,750 20,750,917 11,021,381 8,415,000 19,436,381 1,987,287 20,429,167 608,035 0 304,962 689,539 994,501 286,285 286,285 0 ENDING BALANCE 7,725,461 Revised BUDGET F12 COST BEYOND F18 F18 608,035 286,285 0 0 0 0 0 0 Description: Expansion Project. Segment 1: Construction of an interceptor sewer from Broadway to NE 29th Street south of Oralabor Road. Segment 2: Construction of an interceptor sewer from NE 29th Street south of Oralabor Road to Southeast Ankeny wastewater pollution control plant. Justification: This project is necessary to provide service to the City of Ankeny. Scheduling: Segment 1&2: Design-F04/05, Construction-F05/06. Segment 3&4: Design-F09/10, Construction-F10/13. Relationship to General Plan and Other Projects: The Four Mile Interceptor Extension will provide a full size downstream connection for Ankeny. This project is included in the WRA Facility Plan Update. Operating Budget Effect: Revenues and operations and maintenance costs will increase. Expansion Flow 21 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE Wastewater Reclamation Authority Improvements Expenses TOTAL COST ACTUAL COST Revised ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 12,380,281 375,156 337,356 3,631,072 16,011,353 814,600 Beginning Balance Interest Earnings Des Moines River Outfall / New Main Outfall ESTIMATED 52,739,875 ACCOUNT 13,659,422 29,670,775 8,402,592 337,356 37,800 AG267 WRA990000 WRA086 Phase 17 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F13 F14 F15 19,860,800 3,208,300 19,569,250 (58,700) F16 BEYOND F17 F18 F18 375,156 Repair and Replacement Fund Communities Future Funding 1,797,000 Bond Proceeds 11,703,279 11,813,279 (110,000) 11,703,279 SRF Drawdowns 38,501,100 1,461,720 10,781,100 12,242,820 363,340 130,490 52,739,875 13,742,845 11,485,700 24,413,945 0 1,362,564 7,854,628 8,402,592 Other / Utility credits, CDM Total Resources ENDING BALANCE 1,500,000 1,500,000 297,000 11,703,279 23,288,280 35,531,100 130,490 2,970,000 130,490 232,850 33,228,672 49,240,025 19,802,100 3,208,300 19,569,250 19,569,250 (58,700) 0 0 0 0 0 Description: Core Project. This project provides for construction of a large outfall sewer along the west side of the Des Moines River from 3rd Street and Watson Powell Drive to south of Elm Street and along the east side of the Des Moines River from Raccoon Street to the south side of Scott Avenue. This will help to meet the nine minimum requirements in the current NPDES permit. The Main Outfall project will begin at the newly constructed DM River Outfall sewer siphon structure and proceed east/southeasterly across the DM River and will continue in a southereasterly direction. It will replact the existing Main Outfall terminating upstream of the WRF at a proposed CSSSFacility (see WRA087). Justification: This project is included in the long term control plan presented to the IDNR. Scheduling: Stage 1: Design-F04, Construction F04/05. Stage 2: Design-F05, Construction-F06/09. Main Outfall Design: F08/09, Construction of six segments F10/13. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. Operating Budget Effect: This project will increase operations and maintenance costs. From the 2004B and 2006 bond issue proceeds, $3,600,000 have been reallocated to Flow Monitoring project WRA093. WRA Flow 22 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE Wastewater Reclamation Authority Improvements Expenses Combined Sewer Solids Separation Facility TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 53,426,995 4,515,043 9,213,472 54,995 54,995 54,995 550,000 550,000 550,000 550,000 49,797,000 3,600,000 47,322,000 47,322,000 53,426,995 4,204,995 43,722,000 47,926,995 34,223,480 47,951,995 15,106,200 5,062,000 0 (310,048) 34,508,528 34,198,480 15,106,200 15,106,200 (413,000) 0 13,728,515 19,117,280 32,845,795 34,198,480 Beginning Balance Interest Earnings ACCOUNT AG267 WRA990000 WRA087 Phase 17 COST BEYOND RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F13 F14 F15 15,519,200 5,062,000 15,106,200 (413,000) F16 F17 F18 F18 54,995 Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns 3,025,000 25,000 43,722,000 25,000 3,000,000 2,475,000 Other Total Resources ENDING BALANCE 0 0 0 0 Description: Core Project. This project provides for solids separation of wet weather combined sewer flow at the Wastewater Reclamation Facility. Flow will be discharged to the Des Moines River after primary treatment and disinfection. Justification: This project is included in the long term control plan presented to the IDNR and will be required to meet the nine minimum requirements in the long term control plan. Scheduling: Design-F08 through F10, Construction F10 through F13. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. Operating Budget Effect: This project will increase operations and maintenance costs. WRA Flow 23 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements Ingersoll Run Combined Sewer Overflow Phase 25 AG267 WRA990000 WRA088 Expenses TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 2,597,954 2,565,932 201,401 201,401 2,396,553 2,807,069 2,597,954 0 1,779 2,567,711 F13 2,582,954 30,243 Beginning Balance Interest Earnings 15,243 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 BEYOND F17 F18 F18 15,000 15,000 201,401 201,401 (410,516) 2,396,553 2,396,553 3,008,470 (410,516) 2,597,954 30,243 2,597,954 15,000 442,538 (412,295) 30,243 15,000 15,000 0 Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources ENDING BALANCE 0 0 0 0 0 Description: Core Project. This project provides for the relocation of a combined sewer overflow in the 2100 block of High Street in the Ingersoll Run Combined Sewer System. This will provide adequate sewer capacity in this reach of the combined sewer system to eventually eliminate the combined sewer overflow in the area of Eighth Street and Keo Way to help meet the minimum requirements included in the current NPDES permit. Justification: Needed to conform to NPDES requirements. Scheduling: Design-F06/F07, Construction-F07/F08, project being held open through F11. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. Operating Budget Effect: None. WRA Flow 24 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Small Capital Projects 2006-2009 & WRA Studies [ funded from WRA098 ] AG267 WRA990000 WRA091 TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 2,305,000 Expenses 1,603,140 29,583 1,632,723 367,277 COST F13 2,000,000 BEYOND RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F18 F18 125,000 50,000 40,000 30,000 30,000 30,000 1,217,277 Beginning Balance Interest Earnings Repair and Replacement Fund Communities 2,850,000 2,850,000 2,850,000 2,850,000 Future Funding Bond Proceeds SRF Drawdowns Other / WRA100 & WRA098 Total Resources ENDING BALANCE (545,000) (22,275) 22,275 (850,000) (850,000) 125,000 50,000 40,000 30,000 30,000 30,000 2,305,000 2,827,725 22,275 2,850,000 367,277 2,000,000 125,000 50,000 40,000 30,000 30,000 30,000 0 1,224,585 (7,308) 1,217,277 0 0 0 0 0 0 0 0 Description: This project funds process and safety improvement studies at the WRF and WRA conveyance system. Justification: These studies are necessary to reduce operations and maintenance costs and facilitate a safer working environment at the WRF. Scheduling: F07: Asphalt road work at west end of plant;Scum Valve Controllers;VFD's for PAB; Unanticipated needs. F08: Wireless system for operations control. F09: Automatic lubrication system, Bar screen, Motor modifications, W3 valve, Unanticipated needs. F10: Utility mapping, Building 35 blower drive installation; Unanticipated needs. F11: Bar Screen repairs moved to WRA098; Biosolids thermal drying evaluation; Unanticipated needs. F11-12: WRA Operating Plan development; WRF Flood Inundation study. F13-18: Studies, as needed Relationship to General Plan and Other Projects: Funds collected prior to F10 will be transferred to WRA098 to be used for Bar Screen Replacement Community funded thru WRA098 after FY11. Operating Budget Effect: WRA Flow 25 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements West Des Moines Outfall Extension Phase 18 AG267 WRA990000 WRA092 Expenses TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 6,881,129 2,945,500 9,826,629 9,826,629 6,877,074 250,000 250,000 250,000 4,055 F13 F14 F15 F16 BEYOND F17 F18 F18 324 Beginning Balance Interest Earnings COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD 250,000 Repair and Replacement Fund Communities Future Funding 2,945,176 Bond Proceeds 4,325,953 4,325,953 4,325,953 2,945,176 4,325,953 2,945,176 SRF Drawdowns 2,305,500 2,305,500 2,305,500 2,305,500 9,826,629 6,881,453 0 4,379 Other Total Resources ENDING BALANCE (4,055) 6,881,453 2,945,500 9,826,629 324 0 0 0 0 0 0 0 0 Description: Expansion Project. This project will increase the service area and capacity of the West Des Moines Outfall. Segment 1-South 60th Street to South 74th Street. Segment 2- South 74th Street to Sugar Creek. Segment 3 -Sugar Creek to Boonevill Road. Segment 4 -Booneville Road to Mills Civic Parkway. Segment 5 -Mills Civic Parkway to I-80 This project was done as Expedited project. Justification: This project will provide service to the cities of West Des Moines and Waukee. Scheduling: Segment 1: Design-F05, Construction-F06/F07. Segment 2,3,4: Design-F07. Segment 2: Construction-F07. Segment 3: Construction-F07. Segment 4: Construction F07/F08. Segment 5: Design-F07.F08, Construction F08/F09. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. Operating Budget Effect: Revenues and operations and maintenance costs will increase as flows increase. Expansion Flow 26 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Flow Monitoring System Improvements AG267 WRA990000 WRA093 TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds (reallocated) SRF Drawdowns Other Total Resources ENDING BALANCE COST THROUGH F10 6,743,433 5,010,991 168,969 161,969 700,000 5,874,464 5,624,464 6,743,433 0 ACTUAL COST IN F11 428,777 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 5,439,768 1,303,665 6,743,433 161,969 596,665 7,000 168,969 700,000 700,000 5,874,464 6,036,433 1,303,665 6,743,433 596,665 0 0 250,000 5,874,464 5,786,433 250,000 775,442 (178,777) RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 0 0 0 0 COST BEYOND F18 F18 0 0 0 Description: Core Project. This project will upgrade the existing system and implement new meters for flow metering and real time operational control. Flow meters will be used for flow allocation to communities and for operating the collection system during wet weather events. Flow meters will be installed to meter the majority of Des Moines flow into the conveyance system. Justification: Existing flow monitors will be in operation for fifteen years when replaced. New meters will be required as existing meters are not supported by the manufacturer. Scheduling: Design in F08/09, Replacement to begin in F09 and continue through F11. Installation continues through F13 as interceptor sewers are completed. This project is included in the WRA Facility Plan Update. Real time flow information will be required to operate the Southwest Outfall Diversion Facilities Relationship to General Plan and Other Projects: Operating Budget Effect: None. WRA Flow 27 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Transition Costs AG267 WRA990000 WRA096 Expenses TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 F14 251,104 10,000 10,000 10,000 10,000 430,000 430,000 430,000 430,000 (80,000) (80,000) 80,000 440,000 440,000 440,000 99,341 360,000 80,000 0 188,896 179,341 0 0 0 360,000 F15 F16 BEYOND F17 F18 F18 80,000 179,341 Beginning Balance Interest Earnings 99,341 F13 440,000 9,555 260,659 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources ENDING BALANCE (9,555) 0 0 0 0 0 Description: Core Project. Costs associated with property transfer to the Wastewater Reclamation Authority. These include all costs associated with transferring deeds, easements to the WRA and creating easements necessitated by the legal status change on July 1, 2004. Justification: The legal status of the WRA changed on July 1, 2004. The new status allows the WRA to own property. All past property interests held through the City of Des Moines and other communities must be transferred to the WRA. Scheduling: F05: Transfer of easements and WRF property. F06/F07/F08: Grant easement in public rights of way. Relationship to General Plan and Other Projects: Operating Budget Effect: WRA Flow 28 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements Four Mile Interceptor Improvements Phase 23 AG267 WRA990000 WRA097 Expenses TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 27,133,564 15,758,967 34,256 34,256 9,907,136 25,666,103 F13 F14 F15 F16 F17 F18 F18 27,133,564 2,067,461 Beginning Balance Interest Earnings 1,467,461 COST BEYOND RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD 34,256 34,256 Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other / CORE buy in collected Total Resources ENDING BALANCE (600,000) (600,000) (600,000) 1,326,283 1,026,283 300,000 1,326,283 1,326,283 23,463,000 16,038,000 7,425,000 23,463,000 23,463,000 2,910,025 1,642,582 1,267,443 2,910,025 27,133,564 18,741,121 8,992,443 27,733,564 1,467,461 27,133,564 0 2,982,154 (914,693) 2,067,461 0 0 2,910,025 0 0 0 0 0 0 Description: Expansion Project. Construction of a 72" sanitary sewer from the WRF to NE Broadway Avenue. Segment 1: WRF to Scott Avenue. Segment 2: Scott Ave. to University Ave. Segment 3: University Avenue to Easton Blvd. Segment 4: Easton Boulevard to Hubbell Ave. Segment 5: Hubbell Avenue to NE Broadway Avenue. Justification: This project will convey flow from Ankeny and Altoona to the WRF. Scheduling: Segment 1: Design-F08, Construction-F09/F10. Segment 2&3: Design-F08/F09, Construction-F10. Segment 4&5: Design-F09, Construction F10/F11. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update and must be completed prior to completion of the Four Mile Interceptor Extension (Phase 24). Operating Budget Effect: Revenues and operations and maintenance costs will increase. Expansion Flow 29 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements Mud Creek Interceptor P 19 AG267 WRA990000 WRA099 TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 4,109,791 4,119,901 19,422,436 Expenses 10,110 10,110 Interest Earnings F13 19,890 Beginning Balance COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD (64) F14 F15 11,721,625 3,580,910 11,512,599 (209,090) F16 BEYOND F17 F18 F18 (64) Repair and Replacement Fund Communities Future Funding 820,000 Bond Proceeds 30,000 820,000 30,000 30,000 30,000 17,572,500 14,602,500 14,602,500 Other, Altoona 1,000,000 1,000,000 1,000,000 Total Resources 19,422,436 SRF Drawdowns ENDING BALANCE 0 0 2,970,000 30,000 30,000 15,622,390 15,632,500 11,512,535 3,580,910 19,890 19,890 11,512,599 11,512,599 (209,090) 0 0 0 0 0 Description: Expansion project. This project will provide service to the Mud Creek area in Altoona and serve as the Bondurant connection to the WRA system. City of Altoona will provide funding to start the project Justification: Required to provide capacity for the Mud Creek area in Altoona and as an outlet for Bondurant. Scheduling: Phase 1: Design-F08 started under 28E expedite, Construction-F12/13. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. Construction begins spring 2012. Operating Budget Effect: Revenues and expenses will increase as flows increase. Expansion Flow 30 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Corridor Preservation AG267 WRA990000 WRA100 TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST F10 F11 F11 F12 F12 400,000 Expenses 81,209 76,131 157,340 F13 350,000 217,660 Beginning Balance Interest Earnings 192,660 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 BEYOND F17 F18 F18 50,000 50,000 2,725 2,725 2,725 22,275 22,275 22,275 Repair and Replacement Fund Communities Future Funding Bond Proceeds 375,000 375,000 375,000 375,000 SRF Drawdowns 22,275 (22,275) 400,000 22,275 352,725 375,000 242,660 400,000 50,000 0 (58,934) 276,594 217,660 50,000 50,000 0 Other / Small CIP Total Resources ENDING BALANCE 0 0 0 0 0 0 Description: Expansion project. Funds collected for Small CIP will be temporarily used to purchase easements and/or land needed to preserve right-of-way for future sewer projects that are scheduled in the facility plan in a future bond issue with construction after F09. Justification: Land acquisition in advance of projects will be required to reduce future costs and provide corridor preservation. Scheduling: Relationship to General Plan and Other Projects: Reimbursement from bonded project will be needed for any advance use of funds under this project number. Operating Budget Effect: Expansion Flow 31 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Additional Equalization Basin in the North West AG267 WRA990000 WRA101 TOTAL ESTIMATED COST COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 COST BEYOND F18 F18 Expenses 20,000,000 20,000,000 Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding (place holder) Bond Proceeds SRF Drawdowns Other / future 28E agreement 20,000,000 20,000,000 20,000,000 20,000,000 Total Resources ENDING BALANCE 0 0 0 0 0 0 0 0 0 0 0 0 Description: An additional equalization basin will be constructed in the Saylor Creek system to handle additional flows from growth in Polk County and Ankeny and also flow from Polk City when connected to the Saylor Creek Interceptor. A 28E agreement is anticipated to provide up to $20 million in funding; if final estimates are more than $20 million any additional amount will be allocated with Core Flow. Justification: This project is intended to provide relief to interceptor sewers downstream and to the WRF during wet weather flow conditions. The scope and location will become more apparent once the new Facility Plan update is complete. Scheduling: Study, Design and Construction for beyond FY17. Project will be designed and constructed past FY18. Relationship to General Plan and Other Projects: These improvements are not in the 2004 Facility Update. Operating Budget Effect: This project will be needed to reduce the load from the Northern area of the conveyance system; operations and maintenance costs will increase. Community Funds (28E) 32 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Westside Supplemental Equalization Basin Phase 5 segment 5 AG267 WRA990000 WRA102 TOTAL ESTIMATED COST COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 COST BEYOND F18 F18 see WRA 101 Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding (place holder) Bond Proceeds SRF Drawdowns Other, SALE of Equip Total Resources ENDING BALANCE 0 0 0 0 0 0 0 0 0 0 0 0 Description: This project will be combined with WRA101 Basin and scope will be determined after new Facility Plan is completed. This project sheet will be closed out. Justification: Scheduling: Relationship to General Plan and Other Projects: These improvements are not in the 2004 Facility Update. Operating Budget Effect: WRA Flow 33 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Southern Tier Improvements for SW Area Diversion AG267 WRA990000 WRA103 a TOTAL ESTIMATED COST COST THROUGH F10 15,548,290 Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds realloc 81 SRF Drawdowns Other Total Resources ENDING BALANCE 1,059 ACTUAL COST IN F11 60,685 COST THROUGH F11 61,744 Revised BUDGET F12 ESTIMATED COST THROUGH F12 6,058,746 6,120,490 (61,744) COST F13 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 7,242,900 2,184,900 (1,334,490) (2,072,100) 230,000 200,000 15,118,290 230,000 200,000 4,356,000 230,000 200,000 4,356,000 6,505,290 4,257,000 15,548,290 4,724,256 4,786,000 5,170,800 2,184,900 (1,334,490) (1,334,490) (2,072,100) 0 0 (1,059) (60,685) (61,744) 0 0 F18 0 FY2020 0 Description: Part of SWADF Project. This project will increase the capacity of the Southern Tier Interceptor. F12 improvements will increase the pipe line capacity from the Souther Tier pump station to the Area C equalization basin. This project also includes the construction of a high lift pump station at the existing Southern Tier pump station site. Justification: The high lift pump station and parrallel force main will be used to accommodate the flow from the SWADF Equalization Basin at the old Norwalk treatment plant site. Scheduling: This project has been re-scheduled to begin F11 from F19. Design in F11/12. Construction in F12/14. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update as an Expansion project but is now categorized as part of the SW Area Diversion Faciltiy (SWADF). Operating Budget Effect: This project will increase operations and maintenance costs. SW funding split 34 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Southern Tier Improvements - Western (Expansion Debt) AG267 WRA990000 WRA103 b TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources ENDING BALANCE COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 F18 FY2020 7,373,430 7,373,430 7,373,430 7,373,430 7,373,430 7,373,430 0 0 0 0 0 0 0 0 0 0 0 0 Description: Expansion Project. This project will increase capacity in the western portion of the Southern Tier Interceptor. Justification: To accommodate the flow in the western service area of the Southern Tier Interceptor. Scheduling: This project is scheduled to begin past FY18. The scope and schedule of the project will be better determined in the new Facility Plan update. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update and Ex31 March 2018 & March 2020. Operating Budget Effect: Expansion Flow 35 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Equalization Basin Improvements AG267 WRA990000 WRA104 TOTAL ESTIMATED COST COST THROUGH F10 1,736,450 Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other, Grant Money Total Resources 4,603 ACTUAL COST IN F11 107,232 COST THROUGH F11 111,835 2,347 523,587 710,516 ENDING BALANCE 0 (4,603) ESTIMATED COST THROUGH F12 1,313,028 1,424,863 598,681 2,347 2,347 212,000 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 710,516 500,000 500,000 710,516 710,516 1,313,028 1,424,863 603,284 598,681 0 0 COST BEYOND F18 F18 311,587 212,000 710,516 710,516 500,000 1,736,450 Revised BUDGET F12 311,587 311,587 0 0 0 0 0 0 Description: Improvements/Modifications/Abandonment of existing WRA equalization basins. This project will modify and upgrade the existing Area C and Beaver Creek Equalization Basins in order to begin utilizing these facilities in the conveyance system. Justification: An equalization utilization study was done in F09 indicating a benefit to WRA conveyance system would be achieved by utilizing Beaver Creek and Area C equalization basins. Scheduling: Improvements in AreaC: F11/12 Improvements in Beaver Creek: F11/12 Abandonment of Highland Hills: F14 Relationship to General Plan and Other Projects: These improvements will be funded from I-Jobs Grant $500,000 and Core bond funds. Operating Budget Effect: This project will increase revenues and operations and maintenance costs. WRA Flow 36 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Ankeny Equalization Basin - additional equalization in the North East AG267 WRA990000 WRA 1xx Expenses TOTAL COST ACTUAL COST Revised ESTIMATED ESTIMATED THROUGH COST IN THROUGH BUDGET COST THROUGH COST COST F10 F11 F11 F12 F12 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F13 F14 F15 F16 BEYOND F17 6,500,000 6,500,000 6,500,000 6,500,000 F18 F18 Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources 6,500,000 ENDING BALANCE 0 6,500,000 0 0 0 0 0 0 0 0 0 0 0 Description: This project will expand the existing Ankeny Equalization basin from 10 million to 20 million gallons of storage. The WRA will need to purchase four buildings at the Ankeny WWTP site from Ankeny for the construction of the expanded basin. Justification: To provide needed storage of flow from Ankeny in order to provide relief to interceptor sewer downstream and to the WRF during wet weather flow conditions. Scheduling: Design and construction in F16/17. Relationship to General Plan and Other Projects: These improvements are not in the 2004 Facility Update. Operating Budget Effect: Revenues and operations and maintenance costs will increase. WRA Core Flow 37 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Flood Mitigation - Grant funded AG267 WRA990000 WRA 1xx TOTAL ESTIMATED COST COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 7,300,000 Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other / Grant Money Total Resources F13 300,000 RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 4,000,000 3,000,000 (300,000) 3,000,000 1,095,000 1,095,000 6,205,000 6,205,000 7,300,000 7,000,000 3,000,000 3,000,000 0 ENDING BALANCE 0 0 0 0 0 0 (300,000) 0 COST BEYOND F18 F18 0 0 0 Description: A WRF Flood Mitigation Project will be constructed at the WRF to flood harden the facility. This project could include flood walls, raising of existing levee and flood protecting existing buildings. The exact scope will be determined once the Flood Inundation Study is complete. Justification: The WRA is applying for available funding from the Hazard Mitigation Grant Program. This grant has an 85/15 funding split. 15% would be the WRA's matching funds requirement. Scheduling: The Grant application is due in May 2012. Grant award would be late 2012. Design FY13, Construction FY13/14. Relationship to General Plan and Other Projects: These improvements are not in the 2004 Facility Plan Update. wra share 15% 1095000 Operating Budget Effect: This project will reduce the risk of flooding at the WRF which could effect the cost of flood insurance to the WRA. WRA Flow 38 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Common Trunk AG267 WRA990000 WRAXXX TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 F18 FY2019 9,262,840 9,262,840 9,262,840 9,262,840 9,262,840 ENDING BALANCE 0 9,262,840 0 0 0 0 0 0 0 0 0 0 0 0 Description: Expansion Project. This project will increase the capacity of the WRA common trunk. Justification: Scheduling: This project is scheduled for F20. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update and Ex31 March 2018. Operating Budget Effect: 39 Expansion Flow Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Clive / USSD Joint Trunk AG267 WRA990000 WRAXXX TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 F18 FY2021 15,566,131 15,566,131 15,566,131 15,566,131 15,566,131 ENDING BALANCE 0 15,566,131 0 0 0 0 0 0 0 0 0 0 0 0 Description: Expansion Project. This project will increase the capacity of the Clive/USSD joint trunk. Justification: Scheduling: This project is scheduled for F20. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update and Ex31March 2020. Operating Budget Effect: 40 Expansion Flow Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRA Birdland Pump Station AG267 WRA990000 WRAXXX TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 F18 FY2021 8,192,700 8,192,700 8,192,700 8,192,700 8,192,700 ENDING BALANCE 0 8,192,700 0 0 0 0 0 0 0 0 0 0 0 Description: Core Project. This project will eliminate the overflow at the birdland pump station. A feasibility study will need to be done in F18/F19. Justification: Scheduling: This project is scheduled for F21. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update and Ex31 March 2020. Operating Budget Effect: WRA Flow 41 0 Fiscal 2013/Fiscal 2018 Capital Improvements Program PROJECT CATEGORY PROJECT TITLE ACCOUNT Wastewater Reclamation Authority Improvements WRF Nutrient Removal P 1 AG267 WRA990000 WRAXXX TOTAL ESTIMATED COST Expenses Beginning Balance Interest Earnings Repair and Replacement Fund Communities Future Funding Bond Proceeds SRF Drawdowns Other Total Resources ENDING BALANCE COST THROUGH F10 ACTUAL COST IN F11 COST THROUGH F11 Revised BUDGET F12 ESTIMATED COST THROUGH F12 COST RECOMMENDED AND SCHEDULED FOR SIX-YEAR PERIOD F14 F15 F16 F17 F13 F18 FY2022 33,338,242 33,338,242 33,338,242 33,338,242 33,338,242 0 33,338,242 0 0 0 0 0 0 0 0 0 0 0 0 Description: Core Project. This project will involve removal of nutrients from the effluent as required by federal and state regulations. Justification: This project will be required to comply with federal regulations that limit the levels of nutrients(ammonia and phosphorous) in publicly owned treatment works effluent. Scheduling: As required by federal and state regulations. This project is scheduled for F20. Relationship to General Plan and Other Projects: This project is included in the WRA Facility Plan Update. 28E bond schedule was March 2012 but this Project has been pushed back to 2020. Operating Budget Effect: Operating and maintenance costs will increase with implementation of the facilities. 42 WRA Flow DES MOINES METROPOLITAN WASTEWATER RECLAMATION AUTHORITY Budget ALLOCATION Fiscal year 2012-2013 Agenda Item for 2/21/12 FY2013 February 17, 2012 To: Re: WRA Board Members: Wastewater Reclamation Authority Budget for Fiscal Year ending June 30, 2013 The Operating Contractor respectfully submits the fiscal year 2013 Wastewater Reclamation Authority (WRA) budget for your review. Detailed throughout these pages are all aspects of the budget. Each section supports the following areas being operations, debt service, surcharges/credits, and capital improvements. The WRA gross budget for fiscal year 2013 is $129,742,020 compared to the fiscal year 2012 gross budget of $150,980,249. Debt service increased $163,724 for payments on additional SRF draws. The operation and maintenance budget increased $501,563 primarily for Insurance, Contractual Labor, Chemicals and Personal Services. Reserve budget for fiscal year 2013 includes $110,000 to increase the working capital reserve and $138,130 to begin a supplemental insurance reserve for workers' compensation. The capital improvement program (CIP) decreased this fiscalyear after considerable progress was made in fiscal years 2010 and 2011. Several new projects and segments are planned for fiscal year 2013 but their magnitude is less than the large projects of prior years. Gross Budget Summary FY2012 Budget FY2013 Preliminary Capital Budget $ 20,018,887 18,035,229 300,000 650,000 39,004,116 111,976,133 $ 20,520,450 18,198,953 248,130 500,000 39,467,533 90,274,487 501,563 163,724 (51,870) (150,000) 463,417 (21,701646) Total Gross Budget $150,980,249 $129,742,020 (21,238,229) Operating Budget Operation, Mairit. & Insurance Debt Service Reserve increases Equipment Replacement Change The CIP total is $502,974,363 and includes construction past the year 2020. Cost of construction for FY2013 to FY2018 is estimated at $138,607,584; last year's estimate was $204,786,675. WRA began construction in 2011 on major core projects included in the long term control plan. Revised cost estimates and new projects have increased the CIP total $6,810,849. The WRA finances most improvements with the Clean Water State Revolving Funds Loan program. In calendar 2012, bond issues totalling more than $67 million are planned. Total operating offsets for fiscal year 2013 are $9,443,567 compared to the fiscal year 2012 offsets of $9,258,303. Revenues from the industrial pretreatment program, investment earnings, and other revenues will offset the WRA gross budget. The decrease in pretreatment offsets is attributed to a reduction in quantity of hauled waste loads to the WRF. The budget adjustments shown below include FY2013 February 17, 2012 operation/maintenance and debt services adjustments that represent the difference between actual costs and budgeted collections for prior years. Summary of Budget Offsets FY2013 Preliminary FY2012 Budget Operating Budget Pretreatment Revenues Other Operating Revenues Adjustment from prior years Reserve release, 2004A Reserve adjustment, Insurance Debt Reserve Earnings Equip Repl Earnings & Fund bal $ $ Change 580,000 450,000 (108,750) 8,750 2,429,633 (1,987,151) (7,318) (19,900) 130,000 9,258,303 9,443,567 185,264 3,272,400 830,000 2,526,534 1,987,151 7,318 54,900 3,163,650 838,750 4,956,167 35,000 Inclusion here is by direction from the Amended and Restated Agreement for the WRA [Article IX, Section 3 (i)]. The community contribution requirement is determined by the net budget and shared among the participating communities primarily by flows. For fiscal year 2013 the requirement is $33,323,966 compared to $32,568,088 in fiscal year 2012. The increase is attributed to increased operating costs at the WRF. Community Contribution Summary (Net Budget) FY2012 Budget FY2013 Preliminary Change Net Budget Operations, Maint. & Ins. Debt Service Operating Reserves Equipment Replacement Renewal & Replacement $ 13,382,635 15,993,178 300,000 70,000 2,822,275 $ Community Contributions $ 32,568,088 $ 33,323,966 13,376,433 16,349,403 248,130 50,000 3,300,000 (6,202) 356,225 (51,870) (20,000) 477,725 $ 755,878 This budget, as presented, will allow the WRA to meet its responsibilities of operating and maintaining a facility that continues to meet the wastewater treatment needs of participating communities. It allows the WRA to meet the federal and state mandates for pretreatment and effluent discharge standards. Respectfully Submitte , William G. St e WRA Directo Cc: Alternates, Operating Contractor staff 2 Final 3 Year Average Flows with Adjustments (2009-2011) Flows(Mgal) Community Altoona Ankeny Ankeny (WRF Flow) (1) (6) Bondurant Clive (2) Cumming Des Moines (1) (5) Greenfield Plaza/Hills of Coventry Johnston Norwalk (5) Pleasant Hill Polk County (6) Polk City Urbandale Sanitary Sewer District (2) Urbandale-Windsor Heights Sanitary District Warren County Waukee Waukee WRF Flows (3) West Des Moines (3) 3 Year Average Percentage of Total Adjusted WRF Flow 969.9 2193.8 36.6 193.7 889.0 2.7 18386.4 110.1 538.0 484.6 425.8 113.8 148.3 2011.4 447.1 0.0 491.6 2.2 3087.5 2011 901.6 1812.1 105.1 170.9 838.3 3.5 16216.9 123.0 530.0 425.9 341.4 104.0 128.3 1867.5 384.2 0.0 442.4 1.9 2821.5 2010 1126.0 2562.8 2.7 229.8 976.2 2.2 21047.3 127.3 577.9 540.6 447.4 148.1 187.5 2329.8 471.3 0.0 553.4 2.2 3393.1 2009 882.0 2206.5 2.0 180.5 852.5 2.6 17895.0 79.9 506.2 487.2 488.5 89.3 129.1 1836.8 485.8 0.0 479.0 2.4 3047.8 3 Year 3.697 N/A 0.139 N/A 3.389 N/A 65.252 0.420 2.051 1.847 1.623 0.434 N/A 7.667 1.704 N/A N/A 0.008 11.769 2011 3.829 N/A 0.446 N/A 3.560 N/A 64.143 0.522 2.250 1.808 1.450 0.442 N/A 7.930 1.632 N/A N/A 0.0081 11.981 2010 3.776 N/A 0.009 N/A 3.274 N/A 65.984 0.427 1.938 1.813 1.501 0.497 N/A 7.814 1.580 N/A N/A 0.007 11.380 2009 3.481 N/A 0.008 N/A 3.365 N/A 65.420 0.316 1.998 1.923 1.928 0.353 N/A 7.250 1.918 N/A N/A 0.009 12.030 Total (WRA Flows) 30532.5 27218.5 34725.7 29653.3 100.00 100.00 100.00 100.00 Total (WRF Flows) *Adjustment(I&I) (4) Adjusted WRF Flow (No I&I) Adjusted Des Moines Flow Adjusted WRA Flow 27502.3 1268.4 26233.8 17118.0 29264.1 24661.3 1111.5 23549.8 15105.5 26107.0 31189.9 1372.6 29817.3 19674.7 33353.1 26655.6 1321.2 25334.4 16573.8 28332.1 (1) Ankeny had 2.967 million gallons of flow through their Corporate woods connection. This flow will be deducted from Des Moines' total flow. (2) 44.071 million gallons of flow was added to Clive's flow and deducted from USSD's total flow. (3) 1.896 million gallons of flow from the Waukee Painted Woods Development has been deducted from West Des Moines' total flow. (4) 255 million gallons of extraneous flow from North River Interceptor has been added to the I & I adjustment flow number for 2009 only and as recommended by the Flow Subcommittee at its January 12, 2010 meeting. 125 million gallons of extraneous flow will be used for 2010 and 2011. (5) 12.604 million gallons of flow from the new Norwalk SE Ridge connection was not metered. 12.604 million gallons has been deducted from Des Moines' flow and added to Norwalk's Flow (6) 102.125 million gallons of Ankeny flow in the new Rock Creek sewer was allocated to Polk County. 102.125 million gallons has been deducted from Polk County's flow and added to Ankeny's Flow * I&I Adjustment is 4% of Total WRF Flow ** % Change in WRF and WRA Flows 2010 to 2011 is based on 3-Year Average flow percentages. **% Change in WRF Flow Percentage 2010 to 2011 -3.39% N/A 1547.34% N/A 2.41% N/A 0.08% 5.12% 6.52% 1.42% -9.58% 4.71% N/A 1.85% -4.07% N/A N/A -0.60% -1.84% Percentage of Total Adjusted WRA Flow 3 Year 3.314 7.497 0.125 0.662 3.038 0.009 58.495 0.376 1.839 1.656 1.455 0.389 0.507 6.873 1.528 0.000 1.680 0.007 10.550 2011 3.454 6.941 0.403 0.655 3.211 0.013 57.860 0.471 2.030 1.631 1.308 0.398 0.491 7.153 1.472 0.000 1.695 0.007 10.807 2010 3.376 7.684 0.008 0.689 2.927 0.006 58.989 0.382 1.733 1.621 1.341 0.444 0.562 6.985 1.413 0.000 1.659 0.007 10.173 2009 3.113 7.788 0.007 0.637 3.009 0.009 58.498 0.282 1.787 1.720 1.724 0.315 0.456 6.483 1.715 0.000 1.691 0.008 10.757 100.00 100.00 100.00 100.00 **% Change WRA Flow Percentage 2010 to 2011 -3.33% -0.90% 1548.36% 2.00% 2.48% 16.83% 0.14% 5.18% 6.58% 1.48% -9.52% 4.78% -7.58% 1.91% -4.01% N/A 2.46% -0.53% -1.78% Final 2011 WRA-WRF Monthly Flows Community Altoona Ankeny Bondurant Clive Cumming Des Moines Greenfield Plaza/Hills of Coventry Johnston Norwalk Pleasant Hill Polk County Polk City Urbandale Sanitary Sewer District Urbandale-Windsor Heights Sanitary District Warren County Waukee West Des Moines Total Total Flow Reported at WRF Flume Total Flow Reported from WRF Communities Total Flow Reported from All Communities January 1.816 4.505 0.348 1.685 0.006 32.203 0.199 1.340 0.784 0.710 0.179 0.237 4.052 0.533 0.000 1.043 6.320 February 2.125 5.001 0.434 1.955 0.008 36.250 0.300 1.418 1.022 0.727 0.218 0.275 5.174 0.647 0.000 1.192 7.208 March 2.375 5.286 0.539 2.039 0.005 38.495 0.318 1.397 1.090 0.703 0.434 0.286 5.618 0.868 0.000 1.302 7.519 April 3.447 6.297 0.847 2.733 0.012 56.449 0.539 1.689 1.556 1.093 0.838 0.355 7.425 1.586 0.000 1.565 10.006 May 3.841 6.745 0.835 2.954 0.019 63.421 0.618 1.746 1.871 1.401 0.935 0.565 7.080 1.791 0.000 1.540 10.632 June 5.333 7.872 0.833 4.208 0.039 91.778 0.735 1.927 2.627 2.760 1.158 0.753 9.056 3.266 0.000 1.982 14.160 July 2.634 4.885 0.443 2.399 0.004 50.738 0.380 1.515 1.123 1.218 0.662 0.431 5.349 1.183 0.000 1.091 8.929 49.823 49.823 55.962 57.046 57.046 63.956 60.856 60.856 68.274 87.362 87.362 96.438 96.291 96.291 105.995 137.007 137.007 148.486 76.131 76.131 82.985 Item 4 August September 1.981 1.606 3.938 3.744 0.319 0.277 1.788 1.591 0.002 0.004 38.192 32.447 0.183 0.150 1.367 1.255 0.811 0.728 0.660 0.507 0.509 0.427 0.338 0.247 4.060 3.620 0.601 0.564 0.000 0.000 0.947 0.895 6.230 5.460 56.382 56.382 61.926 48.356 48.356 53.523 October November December WRA Total 1.422 1.465 1.627 901.649 3.508 3.799 4.059 1,812.094 0.256 0.227 0.268 170.920 1.420 1.573 1.792 794.243 0.004 0.005 0.007 3.481 29.594 32.143 32.292 16,232.492 0.179 0.243 0.203 122.988 1.208 1.255 1.313 529.963 0.632 0.640 0.724 413.275 0.471 0.486 0.503 341.391 0.360 0.483 0.561 206.133 0.231 0.240 0.259 128.307 3.363 3.924 4.218 1,911.543 0.494 0.526 0.590 384.242 0.000 0.000 0.000 0.000 0.875 1.052 1.080 442.414 5.011 5.544 5.887 2,823.350 27,218.487 44.155 48.281 49.710 24,661.271 44.155 48.281 49.710 24,661.271 49.029 53.604 55.383 27,218.487 WRF Total WRA % 901.649 3.313 0.000 6.658 0.000 0.628 794.243 2.918 0.000 0.013 16,232.492 59.638 122.988 0.452 529.963 1.947 413.275 1.518 341.391 1.254 206.133 0.757 0.000 0.471 1,911.543 7.023 384.242 1.412 0.000 0.000 0.000 1.625 2,823.350 10.373 24,661.271 100.000 WRF% 3.656 0.000 0.000 3.221 0.000 65.822 0.499 2.149 1.676 1.384 0.836 0.000 7.751 1.558 0.000 0.000 11.449 100.000 WASTEWATER RECLAMATION AUTHORITY Net Budget Allocation Summary [C] Fiscal Year 2013 Budget Collections Fiscal Year 2012 Budget Fiscal Year 2013 Budget increase or (decrease) 32,568,088 33,323,966 755,878 Plant Operations 13,689,953 13,486,433 (203,520) Debt Service 15,993,178 16,349,403 356,225 CIP / R&R expendiures 2,822,275 3,300,000 477,725 Equipment replacement 70,000 50,000 Equip Resv & Ins Resv adjustments (7,318) Community Collections [see below] Budget Expenditures 0 7,318 0 138,130 138,130 32,568,088 33,323,966 755,878 Supplemental Ins. Reserve Total Budget Budget Alloc to each Commty (20,000) Last Yr This Yr increase or Budget Ttl Budget Ttl (decrease) Altoona 1,446,157 1,476,442 30,285 Ankeny 3,013,816 3,297,802 283,986 240,021 265,909 25,888 1,131,629 1,260,971 129,342 4,265 5,309 1,044 15,875,706 15,646,750 (228,956) GP HOC 113,820 100,927 (12,893) Johnston 443,489 495,529 52,040 Norwalk 851,371 884,754 33,383 Pleasant Hill 401,763 363,013 (38,750) Polk City 250,372 248,251 (2,121) Polk County 137,098 83,277 (53,821) 2,846,930 3,111,475 264,545 U W SD 516,022 527,811 11,789 Waukee 784,048 833,374 49,326 West Des Moines 4,511,581 4,722,372 210,791 Total Collections 32,568,088 33,323,966 Bondurant Clive Cumming Des Moines USSD WASTEWATER RECLAMATION AUTHORITY Allocation Percentages Based on WRA / WRF Flows Fiscal Year 2013 WRA WRF Operating and Reserve Flows: Average 2011* WRF Flow Community / District Altoona # F Ankeny Bondurant Clive # Cumming Des Moines # WRF Percentage A Flow Average 2011* WRA Flow WRA Percentage A Flow 969.9 3.697% 969.9 36.6 0.140% 2,230.4 3.314% 7.622% 0.0 0.000% 193.7 0.662% 889.0 3.389% 889.0 3.038% 0.0 0.000% 2.8 0.009% 17,118.0 65.251% 17,118.0 58.495% Greenfield P / HOC SS District # 110.1 0.420% 110.1 0.376% Johnston # 538.0 2.051% 538.0 1.839% Norwalk # 484.6 1.847% 484.6 1.656% Pleasant Hill # 425.8 1.623% 425.8 1.455% 0.0 0.000% 148.3 0.507% Polk County # 113.8 0.434% 113.8 0.389% Urbandale San Sewer District # 2,011.4 7.667% 2,011.4 6.873% Urb-Windsor Hts San District # 447.1 1.704% 447.1 1.528% 2.2 0.008% 493.8 1.687% 3,087.5 11.769% 3,087.5 10.550% 26,233.8 100.0% 29,264.0 100.0% Polk City F Waukee West Des Moines TOTAL # # Represents Communities fully connected to the WRA (WRF system). * Represents average flow based on flows from calendar years 2009,2010,2011. A WRF budget allocations are computed using these percentages. F Flow from Corp. Woods, Painted Woods, and now Rock Creek/West side of Ankeny included. Bonded Project Flows: Core Projects Expansion Projects: Altoona Ankeny Bondurant Clive Cumming Norwalk Polk City Urbandale S S D Waukee West Des Moines SW Diversion Project: Altoona Ankeny Bondurant Clive Cumming Des Moines Greenfield P / HOC SS District Johnston Norwalk Pleasant Hill Polk City Polk County Urbandale San Sewer District Urb-Windsor Hts San District Waukee West Des Moines assigned to communites based on the WRA flow percents above 969.9 2,230.4 193.7 889.0 2.8 484.6 148.3 2,011.4 493.8 3,087.5 9.227% 21.219% 1.843% 8.458% 0.026% 4.610% 1.411% 19.135% 4.698% 29.373% 10,511.3 100.0% 5.285% 12.154% 1.056% 2.025% 0.015% 38.995% 0.251% 1.226% 2.641% 0.970% 0.808% 0.259% 10.961% 3.838% 2.691% 16.825% 100.0% After a community fully connects, the WRF flow amount will change - it will increase to match the WRA flow. This will increase a community's contribution for monthly plant operations and maintenance. 2/14/2012 WASTEWATER RECLAMATION AUTHORITY Net Budget Allocation Summary [A] Fiscal Year 2013 Fiscal Year 2009 Amend Budget Community / District Fiscal Year 2010 Amend Budget Fiscal Year 2012 Budget * Fiscal Year 2013 Budget Percentage Change from F12 to F13 923,820 1,049,728 1,044,096 1,245,876 1,446,157 1,476,442 2.09% Ankeny # 1,944,099 2,039,527 2,026,041 2,605,594 3,013,816 3,297,802 9.42% Bondurant # 126,303 165,206 151,052 210,865 240,021 265,909 10.79% Clive # 922,109 897,792 893,367 1,027,819 1,131,629 1,260,971 11.43% Cumming # 4,249 4,129 4,072 4,763 4,265 5,309 24.49% 12,256,474 13,844,253 13,819,205 15,253,644 15,875,706 15,646,750 -1.44% Greenfield Plaza 117,074 124,251 124,096 121,695 113,820 100,927 -11.33% Johnston 483,928 449,152 448,142 431,421 443,489 495,529 11.73% 448,230 462,031 459,522 793,875 851,371 884,754 3.92% 479,861 506,187 505,479 466,078 401,763 363,013 -9.64% 0 250,325 247,830 250,372 248,251 -0.85% 456,219 437,351 437,419 340,291 137,098 83,277 -39.26% 2,207,961 2,221,251 2,208,594 2,495,231 2,846,930 3,111,475 9.29% 495,780 489,850 488,089 523,961 516,022 527,811 2.28% Norwalk Polk City # # Polk County Urbandale San Sewer District # Urb-Windsor Hts San District Waukee # 601,148 614,634 611,670 802,131 784,048 833,374 6.29% West Des Moines # 3,517,220 3,662,971 3,642,169 4,196,176 4,511,581 4,722,372 4.67% 24,984,475 26,968,314 27,113,338 30,767,250 32,568,088 33,323,966 2.32% TOTAL Denotes Expansion Community Budget * Represents allocation activity presented in previous budgets. Additionally, Waukee will pay WRA interest on Series 2008D ($80,000 annually) Polk City became a voting member of WRA on 7/1/10. c 2011 Budget * # Pleasant Hill # 2010 Budget * Altoona Des Moines c Recommended Norwalk was connecting at the start of fiscal year 2011 (7/11/10). 2012 Debt Serv 2008+ Debt Serv 2006 Debt Serv 2004B SRF & 2004A Oper & Maint (net) R&R/CIP Contrib. Other, Credits 6,980,000 2,522,900 4,223,888 2,321,290 15,916,487 2,822,275 (2,218,752) 32,568,088 2013 9,974,000 2,522,525 4,226,188 1,476,240 16,518,050 3,300,000 (4,693,037) 33,323,966 42.89% -0.01% 0.05% -36.40% 3.78% 16.93% 111.52% WASTEWATER RECLAMATION AUTHORITY Net Budget Allocation Summary [B] Fiscal Year 2013 Recommended Last Year's Change Budget Collections Fiscal Year 2011 Budget Fiscal Year 2012 Budget increase or (decrease) Current Year Change Fiscal Year 2012 Budget Fiscal Year 2013 Budget increase or (decrease) 30,767,250 32,568,088 1,800,838 32,568,088 33,323,966 755,878 Plant Operations [see below] 11,981,754 13,689,953 1,708,199 13,689,953 13,486,433 (203,520) Debt Service [see below] 16,177,695 15,993,178 (184,517) 15,993,178 16,349,403 356,225 CIP / R&R expendiures 2,650,000 2,822,275 172,275 2,822,275 3,300,000 477,725 Equipment replacement 50,000 70,000 20,000 70,000 50,000 Equip Resv & Ins Resv adjustments (5,600) (7,318) (1,718) (7,318) Community Collections [see below] Budget Expenditures Commty adjustments (86,599) 0 Supplemental Ins. Reserve Total Budget 30,767,250 32,568,088 0 (20,000) 7,318 86,599 0 0 0 0 0 138,130 138,130 1,800,838 32,568,088 33,323,966 755,878 Plant Operations & Maint Operations & Maintenance Costs 19,075,420 20,018,887 943,467 20,018,887 20,520,450 Revenue Offsets (4,050,320) (4,102,400) (52,080) (4,102,400) (4,002,400) Working Cap Resv adjustment 300,000 300,000 300,000 110,000 0 142,288 0 0 501,563 100,000 (190,000) 0 Surcharge credits (142,288) Prior year credits (2,901,058) (2,526,534) 374,524 (2,526,534) (3,141,617) (615,083) Plant Oper. subtotal 11,981,754 13,689,953 1,708,199 13,689,953 13,486,433 (203,520) (4,137) (656,500) 2,528,600 1,436,691 1,476,240 2,871,750 0 6,980,000 9,974,000 39,549 (2,871,750) 2,994,000 2,522,900 2,522,525 4,223,888 4,226,188 Debt Servicing SRF Debt (prior) 1,440,828 1,436,691 2004 A (refunding) 3,528,250 2,871,750 SRF Debt (new) 4,451,400 6,980,000 2006 Bonds 2,522,150 2,522,900 2004 Bonds 4,230,363 4,223,888 Interest adjustments Prior year adj / reduce Reserve Debt Service, Net subtotal (57,000) 61,704 16,177,695 (54,900) (1,987,151) 15,993,178 750 (6,475) 2,100 (2,048,855) (184,517) (375) 2,300 (54,900) (35,000) 19,900 (1,987,151) (1,814,550) 172,601 15,993,178 16,349,403 356,225 WASTEWATER RECLAMATION AUTHORITY Operations & Maintenance Budget Summary Fiscal Year 2013 F10 F11 F12 F12 AMENDED F13 ACTUAL ACTUAL BUDGET BUDGET BUDGET Total O&M Expenditures Personal Services 8,145,462 8,280,553 9,726,435 9,669,935 9,921,895 Contractual Services 3,567,498 3,737,214 4,566,370 4,641,000 4,751,450 905,106 935,860 956,250 979,320 1,032,930 Internal Services Other Charges 2,219,644 2,133,592 2,502,557 2,452,557 2,442,600 Commodities 1,397,097 1,494,903 1,814,275 1,823,075 1,906,575 Capital Outlays 197,393 162,442 333,000 333,000 345,000 Travel /Training 59,191 71,656 120,000 120,000 120,000 16,491,391 16,816,220 20,018,887 20,018,887 20,520,450 Total Expenditures Total O&M Revenue Offsets Licenses and Permits 32,070 39,520 35,200 35,200 33,400 High Strength Surcharge 1,228,187 1,239,326 1,200,000 1,200,000 1,200,000 Contract Hauler Fees 2,038,708 2,385,892 1,700,000 1,700,000 1,600,000 Industrial Analysis Fees 91,726 94,096 100,000 100,000 90,000 Contract Hauler Analysis Fees 73,770 74,140 70,000 70,000 70,000 207,100 187,671 167,200 163,700 170,250 Other Pretreatment Charges (3,671,561) (4,020,645) (3,272,400) (3,268,900) (3,163,650) Charges for Services (399,521) (360,157) (310,000) (313,500) (318,750) Interfund Charges (Lab) (170,233) (167,043) (175,000) (175,000) (175,000) Interfund Charges for CIP (242,389) (214,753) (220,000) (220,000) (220,000) Other Charges (Gas) (280,595) (184,554) (125,000) (125,000) (125,000) (106) (1,538) 0 0 0 (4,764,405) (4,948,690) (4,102,400) (4,102,400) (4,002,400) 11,726,986 11,867,530 15,916,487 15,916,487 16,518,050 Invested Operating Funds & Eqipment Sales Total Revenue Offsets Net O&M Exp to be allocated on WRF flows O&M Exp Collected from Communities O&M Expenditures less Revenue Offsets Remaining Credit for next Budget O&M Working Capital Reserve Calculation Cash balance available on 6/30/2012 for WC Reserve Increase needed to be compliant 2/16/2012 14,253,520 15,025,100 15,916,487 16,518,050 (11,726,986) (11,867,530) (15,916,487) (16,518,050) 2,526,534 3,157,570 0 0 6,890,060 7,061,408 6,951,408 110,000 WASTEWATER RECLAMATION AUTHORITY SRF Interest includes fees Debt Service Summary Fiscal Year 2013 Budget Princial Balance 2012 Principal Interest Budget Principal 2013 Interest 2011 New SRF Bond Issues 2010C1 2010C2 2011A 2,000,000 8,341,009 18,353,457 65,000 509,563 1,111,871 1,000 852,000 1,000 60,000 698,750 1,706,244 Core Subtotal 28,694,466 0 1,686,434 854,000 2,464,994 2008B 2008D 2009B 2009C 2010B 2011B 5,512,043 2,329,000 7,817,336 9,003,000 6,999,000 14,834,151 150,000 1,000 184,000 202,000 149,000 1,000 200,000 0 267,150 292,597 227,468 653,785 154,000 1,000 190,000 209,000 154,000 340,000 250,000 0 261,170 286,033 222,627 519,968 Expansion Subtotal 46,494,530 687,000 1,641,000 1,048,000 1,539,798 2008A 2010A 2011C 2011D 16,154,000 8,433,195 6,760,876 376,000 181,000 525,005 276,215 388,000 187,000 204,000 512,785 270,335 311,968 407,902 SW Subtotal 31,348,071 557,000 801,220 779,000 1,502,990 Future Core Issues Future Expan Issues Future SW Issues 1,068,079 1,000 389,566 2,000 1,214,780 2,000 3,000 1,000 700,006 579,202 500,010 Future Subtotal 1,068,079 3,000 1,604,346 6,000 1,779,218 107,605,146 1,247,000 5,733,000 2,687,000 7,287,000 61,245,000 675,000 371,000 174,000 1,479,300 1,038,703 485,885 700,000 385,000 180,000 1,455,675 1,025,718 479,795 61,245,000 1,220,000 3,003,888 1,265,000 2,961,188 35,795,000 212,000 254,000 344,000 446,885 534,220 731,795 219,000 261,000 360,000 438,935 524,695 718,895 35,795,000 810,000 1,712,900 840,000 1,682,525 (New) SRF Bond Issue Total 2004B Bond Issue Core 2004 Expan 2004 SW 2004 2004B Subtotal 2006 Bond Issue Core 2006 Expan 2006 SW 2006 2006 Subtotal Bond Issue Total for Projects 2004A Bond Issue Prior to 2004 refunding (Old) SRFBond Issues Prior to 2004 srf Ttl (Prior) Bond Issue Total Debt Bal, 6/30/11 204,645,146 3,277,000 10,449,788 4,792,000 11,930,713 2,735,000 2,735,000 136,750 7,373,000 1,285,000 151,691 1,289,000 187,240 10,108,000 4,020,000 288,441 1,289,000 187,240 214,753,146 Budget Debt Service 18,035,229 18,198,953 Wastewater Reclamation Authority Budget Allocation Implementing the Two-Tier System Fiscal Year 2013 Greenfield Altoona Ankeny Bondurant Clive Cumming Des Moines (Expansion) (Expansion) (Expansion) (Expansion) (Expansion) Plaza Johnston Norwalk (Expansion) Operations and Maintenance Budget WRF Flows Flow Percentage: 3.697% Gross O&M Expenses Less: Revenue Offsets 0.140% 0.000% 3.389% 0.000% 65.251% 0.420% 2.051% 1.847% 758,641 28,729 - 695,438 - 13,389,799 86,186 420,874 379,013 (147,969) (5,603) - (135,641) - (2,611,606) (16,810) (82,089) (73,924) - 559,797 - subtotal A Net O&M Allocation 610,672 23,125 10,778,193 69,376 338,785 305,088 Surcharge Allocation Reversionary Ownership % (from 28E @ 7/1/2004) Reversionary Ownership % (from update 7/1/2006) Reversionary Ownership % (from update 7/1/2007) Reversionary Ownership % (from update 7/1/2010) 0.50% 0.76% 1.58% Surcharge, per 28E scheduled Ankeny Norwalk Bondurant Surcharge, per 28E's new commty Cumming Waukee Polk City - 1,000,606 (12) (2,408) (1,366) 0.05% 68,221 (43) Conveyance Surcharge Distribution, see other sheet - C/W Conveyance Surcharge Distribution, see other sheet - PC 2011 Surcharge Allocation - 996,819 68,178 2.31% 2.30% 2.30% 2.26% 0.01% 71.08% 70.67% 70.48% 69.46% 0.53% 0.53% 0.53% 0.52% 0.79% 0.79% 0.78% 0.77% 0.72% 0.78% 0.80% 0.89% (23,114) (3,048) (1,576) - (711,231) (93,791) (48,491) (5,303) (699) (362) (7,905) (1,042) (539) (7,204) 131,002 (491) (57) (7,289) (1,954) 2,497 (9) (1,765) (223,349) (60,052) (13) (1,680) (450) (20) (2,472) (666) (19) (2,535) (769) (404) (24) (298) (188) 79 (8,373) (6,106) (238) (15) (101) (240) (37,524) 2,567 (1,153,158) (8,759) (12,984) 58.495% 0.376% 1.839% 1.656% 119,554 CIP/ R&R Reserve Contribution WRA Flows Flow Percentage: 3.314% Capital Projects: Collected for Plant Projects/non bonded improvements Facility Plan & Rehabititation, Power Generation 7.622% 0.662% 3.038% 0.009% 109,362 - 251,526 - 21,846 - 100,254 - 297 - 1,930,335 - 12,408 - 60,687 - 54,648 - 109,362 251,526 21,846 100,254 297 1,930,335 12,408 60,687 54,648 (1,983,942) (12,389) (64,495) (47,807) 2,023 1,822 subtotal C R&R Reserve/Annual Contribution Adjustment from prior year Operations & Maintenance - FY2011 Credits from Adjustment sheet - O&M Debt Service - FY2009 SRF collected vs. actuals Collection for Increase to Working Capital Reserve Debt Service - FY2009 SRF collected vs. actuals Debt Service - FY2010 SRF collected vs. actuals Debt Service - FY2011 SRF collected vs. actuals (123,662) (253) 3,645 8,384 728 (110,012) - 3,342 10 64,344 414 (3,980) 2,841 (84,756) (9,872) 6,232 (190,467) (667) 685 (16,894) (4,285) 4,941 (66,889) (12) (15) (236) 1,688 (99,010) (698,090) (9) (692) (4,355) 89 (3,692) (22,700) (2,080) 1,300 (40,038) (205,912) (185,976) (16,148) (172,903) (254) (2,715,010) (17,031) (88,775) (86,803) subtotal D Credits from prior year(s) Insurance Reserve Balance (reallocated) & New Suppl Resv funding WRF Flows Flow Percentage: Insurance Funds: Property Claim Reserve Catastrophic Work Comp Reserve Catastrophic Gen/Auto Liability Reserve Public Officials Liability Claim Reserve Work Comp Additional Collection for Suppl Reserve Insurance Resv Allocation 3.697% 0.140% 0.000% 3.389% 0.000% 65.251% 0.420% 2.051% 1.847% 18,485 40,667 5,546 924 700 1,540 210 35 - 16,945 37,279 5,084 847 - 326,255 717,761 97,877 16,313 2,100 4,620 630 105 10,255 22,561 3,077 513 9,235 20,317 2,771 462 5,107 193 - 4,681 - 90,131 580 2,833 2,551 70,728 2,678 - 64,836 - 1,248,336 8,035 39,238 35,336 3.314% 7.622% 0.662% 3.038% 33,140 76,220 6,620 30,380 33,140 76,220 6,620 30,380 Equipment Reserve Balance (reallocated) WRA Flows: Flow Percentage: Equipment Funds: Rolling Stock Replacement Reserve Equipment Resv Allocation 2/16/2012 0.009% 58.495% 0.376% 1.839% 1.656% 90 584,950 3,760 18,390 16,560 90 584,950 3,760 18,390 16,560 Pleasant Polk Polk Hill City County West (Expansion) 1.623% 0.000% UWHSD (Expansion) 0.434% 333,047 - 89,059 (64,959) - (17,370) - 71,688 268,088 USSD 7.667% 1,573,303 (306,864) 1,266,439 1.704% 349,668 (68,201) 281,468 Waukee Des Moines Budget (Expansion) (Expansion) Totals 0.008% 1,642 (320) 1,321 11.769% 2,415,052 (471,042) 1,944,009 2.15% 2.14% 2.13% 2.10% 5.44% 5.41% 5.39% 5.32% 6.25% 6.22% 6.20% 6.11% 2.63% 2.61% 2.60% 2.56% (21,513) (2,837) (1,467) (54,433) (7,178) (3,711) (62,538) (8,247) (4,264) (26,316) (3,470) (1,794) (53) (6,750) (1,816) 86,455 (135) (17,081) (4,599) (155) (19,648) (5,282) (65) (8,239) (2,213) 316,897 (398) (201) (25,447) (6,839) 10,703 (507) (2,021) (805) (1,225) (339) (214) 12,030 (9) (1,044) (661) 97,158 (89,666) (102,164) (42,651) 6.873% 1.528% - (34,436) 0.46% - 328,520 8.10% 8.05% 8.03% 7.91% (81,049) (10,688) (5,526) WRF Flows Flow Percentage 100.0% 20,520,450 - Gross O&M Expenses (4,002,400) - Revenue Offsets - O&M Exp Alloc 16,518,050 Reversionary Ownership % for Ank/Nor/Bond Reversionary Ownership % for Cumming Reversionary Ownership % for Waukee Reversionary Ownership % for Polk City 100.00% 100.00% 100.00% 100.00% - (1,000,606) (131,952) (68,221) (0) (0) (0) (2,497) (316,897) (86,455) 0 12,109 10,703 - (131,455) (0) 1.687% 10.550% 100.0% Scheduled surcharge from 28E 2004 Ankeny Norwalk Bondurant Surcharge for New Commty, winter flow Cumming, WRF Waukee, WRF Polk City, WRF conveyance from Cumming & Waukee conveyance from Polk City - current year (0) Surcharge Allocation WRA Flows percents for Capital project allocation 1.455% 0.507% 0.389% 48,015 - 16,731 - 12,837 - 226,809 - 50,424 - 55,671 - 348,150 - 3,300,000 - 48,015 16,731 12,837 226,809 50,424 55,671 348,150 3,300,000 - R&R Community Contribution Allocation (13,933) (245,463) (63,549) (412,658) (3,141,617) - WRF Flow based Credit for O&M Unspent Budget (63,139) 1,600 558 428 7,560 (316) 1,681 1,856 11,605 110,000 Plant Projects, Sm CIP & Proc. Eq. Repl. WRA098 WRA069, WRA077, WRA078 included w/above - 76 (3,302) (22,225) 658 676 (14,032) 34 (831) (4,901) (9,314) 5,789 (168,226) 73 (5,774) (30,852) (2,262) 1,362 (42,297) (14,910) 9,489 (282,817) (44,773) (80,003) (1,689,774) - (86,990) (12,140) (19,203) (409,653) (98,421) (41,658) (689,291) (4,846,168) - 1.623% 0.000% 0.434% 7.667% 1.704% 0.008% 11.769% 100.0% 8,115 17,853 2,435 406 - 2,170 4,774 651 109 38,335 84,337 11,501 1,917 8,520 18,744 2,556 426 40 88 12 2 58,845 129,459 17,654 2,942 2,242 - 599 10,590 2,354 11 16,257 138,130 - 8,303 146,680 32,600 153 225,156 1,913,130 1.455% 0.507% 0.389% 6.873% 1.528% 1.687% 10.550% 14,550 5,070 3,890 68,730 15,280 16,870 105,500 1,000,000 14,550 5,070 3,890 68,730 15,280 16,870 105,500 1,000,000 2/16/2012 100.00% Credit Carryovers & Adjustments WRF Flows Flow Percentage Insurance Funds: Property Claim Reserve Catastrophic Work Comp Reserve Catastrophic Gen/Auto Liability Reserve Public Officials Liability Claim Reserve 500,000 1,100,000 150,000 25,000 31,050 Charge for Lower earnings than budget Collect for Increase Work Cap Reserve Work Comp Supplemental Reserve Collection - Insurance Reserve Allocation WRA Flows Flow Percentage Equipment Funds: Rolling Stock Replacement Reserve Equipment Reserve Allocation Wastewater Reclamation Authority Budget Allocation Implementing the Two-Tier System Fiscal Year 2013 Greenfield Altoona Ankeny Bondurant Clive Cumming Des Moines (Expansion) (Expansion) (Expansion) (Expansion) (Expansion) Altoona Ankeny Bondurant Clive Cumming Plaza Johnston Norwalk (Expansion) Des Moines Greenfield Plaza Johnston Norwalk Debt Service Budget Principal and Interest on Debt: 2004 A Issue 2004 B Issue 2006 Issue 2011+ SRFs (loans thru SRF program) 2008-2010 SRFs (loans thru SRF program) SRFs (1995/1996) 248,252 153,067 288,216 287,925 - 570,905 352,007 662,827 662,141 - 49,589 30,575 57,575 57,514 - FY Surcharge for Cumming / Waukee/Polk City 04 FY Surcharge for Polk City 06 FY Surcharge for Polk City 08-9-10 (11,776) (1,747) (3,308) (27,068) (4,014) (7,599) (2,351) (346) (658) Gross Debt Serv Allocation 960,629 Interest Earnings on Bond Reserves (2004/2006) Interest Earnings on SRF Reserves (pre 2004) Interest Earnings on Sinking Fund Net Debt Serv Allocation 2,209,199 191,897 (1,389) (3,193) (277) (238) (546) (47) 959,003 2,205,460 191,572 207,736 109,453 224,026 225,082 51,442 437 806 821 (9,568) (1,163) (2,475) 804,533 660 (11) (23) 2,689 (1,040) (307) (199) 802,987 (4) (1) 2,684 1,552,471 809,697 1,964,923 1,479,916 937,591 (34,222) (4,122) (7,524) 6,698,729 (8,782) (3,033) (1,656) 6,685,258 9,982 5,206 12,635 9,516 6,652 (221) (24) (47) 43,699 (56) (19) (11) 43,613 48,795 25,449 61,775 46,515 9,915 (1,064) (123) (224) 191,039 (276) (29) (47) 190,687 124,032 76,475 144,012 143,854 9,036 (5,875) (866) (1,642) 489,027 (694) (26) (121) 488,186 Equipment Replacement Contribution and Resv Re-allocations WRA Flows: Flow Percentage: Equipment Replacement: Annual Contribution Work Comp Collection for Supplemental Reserve Insurance fund allocation fund balance last year Equipment fund allocation fund balance last year subtotal F Net Contribution Repl. / Re-allocation 3.314% 7.622% 0.662% 331 3.038% 0.009% 58.495% 29,248 0.376% 188 1.839% 920 1.656% 1,657 3,811 1,519 5 5,107 65,622 (67,929) 33,140 (34,280) 193 2,485 (142) 76,220 (75,720) 6,620 (6,490) 4,681 60,155 (58,735) 30,380 (29,640) 90 (80) 90,131 1,158,205 (1,157,282) 584,950 (584,120) 580 7,455 (7,082) 3,760 (3,580) 2,833 36,405 (34,169) 18,390 (17,250) 2,551 32,784 (32,323) 16,560 (16,320) 828 3,316 6,847 461 8,360 15 121,132 1,321 7,129 4,081 1,476,442 3,297,802 265,909 1,260,971 5,309 15,646,749 100,927 495,529 884,754 123,037 274,817 22,159 105,081 442 1,303,896 8,411 41,294 73,730 subtotal A+B+C+D+E+F Net F13 Budget Allocation Monthly Amount to Remit Altoona Ankeny Bondurant Clive Cumming Des Moines Green Plaza Johnston Norwalk THREE YEAR FLOW INFORMATION - for the above Budget WRA Flows: Jan-Dec 2009 Jan-Dec 2010 Jan-Dec 2011 total for 36 months Average for one year 882.0 1,126.0 901.6 2,910 969.9 2,208.5 2,565.5 1,917.2 6,691 2230.4 180.5 229.8 170.9 581 193.7 852.5 976.2 838.3 2,667 889.0 2.6 2.2 3.5 8.3 2.8 16,573.8 19,674.7 15,105.5 51,354 17118.0 79.9 127.3 123.0 330 110.1 506.2 577.9 530.0 1,614 538.0 487.2 540.6 425.9 1,454 484.6 % FLOW - WRA 3.314% 7.622% 0.662% 3.038% 0.009% 58.495% 0.376% 1.839% 1.656% 882.0 1,126.0 901.6 2,910 969.9 2.0 2.7 105.1 110 36.6 0.0 16,573.8 19,674.7 15,105.5 51,354 17118.0 79.9 127.3 123.0 330 110.1 506.2 577.9 530.0 1,614 538.0 487.2 540.6 425.9 1,454 484.6 3.697% 0.140% 0.000% 65.251% 0.420% 2.051% 1.847% WRF Flows: Jan-Dec 2009 Jan-Dec 2010 Jan-Dec 2011 total for 36 months Average for 12 months % FLOW - WRF 0.0 852.5 976.2 838.3 2,667 889.0 0.000% 3.389% - - Cumming Winter Flow (for new commty): November December January Annualized for surcharge calculation 2/16/2012 0.143 0.217 0.222 0.6 2.327 Pleasant Polk Polk Hill City County West (Expansion) Pleasant Hill Polk City USSD UWHSD (Expansion) Polk County USSD UWHSD Waukee Des Moines Budget (Expansion) (Expansion) Totals Waukee West Des Moines Budget Principal and Interest on Debt 38,614 20,139 48,876 36,809 26,984 (849) (101) (184) 170,288 44,077 36,166 23,139 43,525 146,907 (218) (78) (42) 169,949 1.455% (212) (36) 146,658 0.507% 728 254 10,321 5,383 13,062 9,838 68,275 (226) (29) (51) 106,573 (58) (197) (26) 106,291 0.389% 195 514,840 317,439 597,728 597,116 124,116 60,365 52,000 91,500 77,490 58,732 (24,420) (3,618) (6,857) (2,104) (539) (737) 2,116,344 (2,880) (681) (523) 2,112,260 6.873% 3,437 336,707 77,927 146,741 146,585 120,397 (883) (1,674) 489,093 (463) (351) (83) 335,810 (707) (121) 488,265 1.528% 1.687% 764 844 790,284 487,271 917,521 916,579 183,498 (37,480) (5,553) (10,520) 3,241,600 (4,420) (1,108) (802) 3,235,270 10.550% 5,275 18,198,953 18,163,953 50,000 599 7,704 (7,348) 3,890 (3,710) 10,590 136,089 (133,622) 68,730 (67,440) 2,354 30,246 (31,542) 15,280 (15,920) 11 142 (142) 16,870 (16,470) 16,257 208,900 (212,823) 105,500 (107,420) 138,130 1,775,000 (1,775,000) 1,000,000 (1,000,000) (1,613) (157) 1,329 17,784 1,182 1,255 15,688 188,130 363,013 248,251 83,277 3,111,475 527,811 833,374 4,722,372 33,323,965 30,251 20,688 6,940 259,290 43,984 69,448 393,531 6,355,651 Polk Co USSD UWHSD Waukee 129.1 187.5 128.3 445 148.3 89.3 148.1 104.0 341 113.8 1,836.8 2,329.8 1,867.5 6,034 2011.4 485.8 471.3 384.2 1,341 447.1 481.4 555.6 444.3 1,481 493.8 3,047.8 3,393.1 2,821.5 9,262 3087.5 1.455% 0.507% 0.389% 6.873% 1.528% 1.687% 10.550% 89.3 148.1 104.0 341 113.8 1,836.8 2,329.8 1,867.5 6,034 2011.4 485.8 471.3 384.2 1,341 447.1 2.4 2.2 1.9 7 2.2 3,047.8 3,393.1 2,821.5 9,262 3087.5 0.434% 7.667% 1.704% 0.008% 11.769% 0.0 1.623% Polk City 7.20 8.03 7.84 23.1 92.268 2/16/2012 Gross Debt Serv Allocation Interest Earnings on Bond Reserves Interest Earnings on SRF Reserves Interest Earnings on Sinking Fund (35,000) Net Debt Service Allocation - WRA Flows Flow Percentage Equipment Replacement Annual Contribution - Work Comp Supplemental Reserve Collection Insurance Re-allocation Insurance Re-allocation Equipment Re-allocation Equipment Re-allocation Net Contribution Repl. / Re-allocation - FY2013 Budget Allocation West DM 488.5 447.4 341.4 1,277 425.8 488.5 447.4 341.4 1,277 425.8 - 100.0% 5,070 (5,480) Polk City Surcharge for 2004 bonds Surcharge for 2006 bonds Surcharge for 2008-10 SRF (24,670) (5,830) (4,500) 2,242 28,808 (31,861) 14,550 (16,080) Pl Hill 2004 A 2004 B 2006 A 2011, 2012 & future SRF loans 2008, 2009, 2010 SRF loans SRFs (prior) 4,226,188 2,522,525 5,276,300 4,697,700 1,476,240 - Waukee 31.55 33.48 28.95 94.0 375.916 28,331.9 33,353.0 26,107.1 87,792 29,264.0 100.0% 25,334.2 29,817.3 23,549.9 78,701 26,233.8 100.0% 2009 Flow 2010 Flow 2011 Flow total for 36 months Annual Average 36 WRA Flow % 2008 Flow 2010 Flow 2011 Flow total for 36 months Annual Average WRF Flow % 36 WASTEWATER RECLAMATION AUTHORITY Debt Service for New Money / SRF Borrowings 2011-2013 Fiscal Year 2013 Debt Servicing Greenfield 2011+ / New Core SRF Percentage Principal Interest Gross Principal and Interest Estimate Net Debt Service 2011+ / New Expansion SRF Percentage Principal Interest Gross Principal and Interest Estimate Net Debt Service 2011+ / New SW Area SRF Percentage Principal Interest Gross Principal and Interest Estimate Net Debt Service Debt Service for SRF's Altoona Ankeny Bondurant Clive Cumming (Expansion) (Expansion) (Expansion) (Expansion) (Expansion) 3.314% 7.622% 0.662% 3.038% 0.009% 99 79,743 ________ 79,843 ________ 79,843 229 183,404 ________ 183,633 ________ 183,633 20 15,929 ________ 15,949 ________ 15,949 9.227% 31,649 101,420 ________ 21.219% 72,781 233,233 ________ 1.843% 5.285% 10,834 64,471 ________ 12.154% 24,916 148,264 ________ 1.056% 133,069 ________ 133,069 75,305 ________ 75,305 ________ 306,014 ________ 306,014 173,180 ________ 173,180 ________ 6,321 20,258 ________ 26,579 ________ 26,579 2,165 12,882 ________ 15,047 ________ 15,047 ________ 91 73,102 ________ 73,193 ________ 73,193 217 ________ 217 0.026% 2.025% 0.015% 4,151 24,703 ________ 28,854 ________ 28,854 ________ Plaza Johnston Norwalk (Expansion) 0 217 ________ 8.458% 29,011 92,968 ________ 121,979 ________ 121,979 Des Moines 89 286 ________ 375 ________ 375 31 183 ________ 214 ________ 214 ________ 58.495% 1,755 1,407,536 ________ 1,409,291 ________ 1,409,291 0.000% 0 0 ________ 0 ________ 0 38.995% 79,940 475,692 ________ 555,632 ________ 555,632 ________ 0.376% 11 9,048 ________ 9,059 ________ 9,059 0.000% 0 0 ________ 0 ________ 0 0.251% 515 3,062 ________ 3,576 ________ 3,576 ________ 1.839% 55 44,251 ________ 44,306 ________ 44,306 0.000% 0 0 ________ 0 ________ 0 1.226% 2,513 14,956 ________ 17,469 ________ 17,469 ________ 1.656% 50 39,848 ________ 39,897 ________ 39,897 4.610% 15,812 50,672 ________ 66,484 ________ 66,484 2.641% 5,414 32,217 ________ 37,631 ________ 37,631 ________ 288,216 662,827 57,575 224,026 806 1,964,923 12,635 61,775 144,012 288,216 662,827 57,575 224,026 806 1,964,923 12,635 61,775 144,012 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 288,216 662,827 57,575 224,026 806 1,964,923 12,635 61,775 144,012 Budget Adjustments (none) Estimate for 2011 and future issues Reserve Interest Earnings Core Expansion SW Net Debt Service or Surcharge 2/14/2012 Pleasant Polk Polk Hill City County West USSD UWHSD (Expansion) 1.455% 44 35,011 ________ 35,055 ________ 35,055 0.000% 0 0 ________ 0 ________ 0 0.970% 1,989 11,833 ________ 13,821 ________ 13,821 ________ 48,876 0.507% 15 12,200 ________ 12,215 ________ 12,215 1.411% 4,840 15,509 ________ 20,349 ________ 20,349 0.808% 1,656 9,857 ________ 11,513 ________ 11,513 ________ 44,077 0.389% 12 9,360 ________ 9,372 ________ 9,372 0.000% 0 0 ________ 0 ________ 0 0.259% 531 3,159 ________ 3,690 ________ 6.873% 206 165,382 ________ 165,588 ________ 165,588 19.135% 65,633 210,326 ________ 275,959 ________ 275,959 10.961% 22,470 133,711 ________ 3,690 ________ 156,181 ________ 156,181 ________ 13,062 597,728 1.528% 46 36,768 ________ 36,813 ________ 36,813 0.000% 0 0 ________ 0 ________ 0 3.838% 7,868 46,819 ________ 54,687 ________ 54,687 ________ 91,500 Waukee Des Moines (Expansion) (Expansion) Total $ 1.687% 10.550% 100.0% 51 40,593 ________ 40,644 ________ 40,644 4.698% 16,114 51,639 ________ 67,753 ________ 67,753 2.691% 5,517 32,827 ________ 38,344 ________ 317 253,859 ________ 254,176 ________ 254,176 29.373% 100,749 322,859 ________ 423,609 ________ 423,609 16.825% 34,491 205,245 ________ 38,344 ________ 239,736 ________ 239,736 ________ 146,741 917,521 Debt Issue 2011-2013 3,000 2,406,250 ________ 2,409,250 ________ 2,409,250 100.0% 343,000 1,099,170 ________ 1,442,170 ________ 1,442,170 100.0% 205,000 1,219,880 ________ 1,424,880 ________ 1,424,880 ________ 5,276,300 Core Borrowings Percentage Principal Interest & Servicing Gross Principal and Interest Net Debt Service Expansion Borrowings Percentage Principal Interest & Servicing Gross Principal and Interest Net Debt Service SW Area Borrowings Percentage Principal Interest & Servicing Gross Principal and Interest Net Debt Service Estimated Debt Service Budget Adjustments (none) 48,876 44,077 13,062 597,728 91,500 146,741 917,521 5,276,300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48,876 44,077 13,062 597,728 91,500 146,741 917,521 5,276,300 SRF Debt Service Collection 0 Ttl Interest Net Debt Service 551,000 Principal 4,725,300 Interest on New SRF 2/14/2012 WASTEWATER RECLAMATION AUTHORITY Debt Service for New Money / SRF Borrowings prior to Polk City joining WRA Fiscal Year 2013 Debt Servicing Greenfield 2008-2010 / New Core SRF Percentage Principal Interest Gross Principal and Interest Estimate Net Debt Service 2008-2010 / New Expansion SRF Percentage Principal Interest Gross Principal and Interest Estimate Net Debt Service 2008-2010 / New SW Area SRF Percentage Principal Interest Gross Principal and Interest Estimate Net Debt Service Debt Service for SRF's Polk City Altoona Ankeny Bondurant Clive Cumming Surcharge (Expansion) (Expansion) (Expansion) (Expansion) (Expansion) 0.507% 4,325 3,847 ________ 8,172 ________ 8,172 1.411% 9,990 14,390 ________ 24,380 ________ 24,380 0.808% 4,646 6,328 10,974 ________ 10,974 ________ 3.314% 28,268 25,145 ________ 7.622% 65,016 57,832 ________ 0.662% 5,647 5,023 ________ 3.038% 25,914 23,051 ________ 0.009% 9.227% 65,327 94,100 ________ 21.219% 150,231 216,398 ________ 1.843% 13,048 18,795 ________ 8.458% 59,883 86,257 ________ 0.026% 53,413 ________ 53,413 159,427 ________ 159,427 5.285% 30,389 41,388 ________ 71,777 ________ 71,777 ________ 122,848 ________ 122,848 366,628 ________ 366,628 12.154% 69,886 95,180 ________ 165,066 ________ 165,066 ________ 10,670 ________ 10,670 31,844 ________ 31,844 1.056% 6,072 8,270 ________ 14,342 ________ 14,342 ________ 48,965 ________ 48,965 146,140 ________ 146,140 2.025% 11,644 15,858 ________ 27,502 ________ 27,502 ________ Des Moines 77 68 ________ 145 ________ 145 184 265 ________ 449 ________ 449 0.015% 86 117 ________ 204 ________ 204 ________ Plaza 58.495% 498,962 443,831 ________ 0.376% 0.000% 0.000% 942,793 ________ 942,793 0 0 ________ 0 ________ 0 38.995% 224,221 305,378 ________ 529,599 ________ 529,599 ________ Johnston 3,207 2,853 ________ 6,060 ________ 6,060 0 0 ________ 0 ________ 0 0.251% 1,443 1,966 ________ 3,409 ________ 3,409 ________ 1.839% 15,687 13,953 ________ 29,640 ________ 29,640 0.000% 0 0 ________ 0 ________ 0 1.226% 7,050 9,601 ________ 16,651 ________ 16,651 ________ 43,525 284,617 654,542 56,855 222,607 798 1,472,392 9,469 46,291 43,525 284,617 654,542 56,855 222,607 798 1,472,392 9,469 46,291 Budget Adjustments (none) Net Debt Service or Surcharge 2/14/2012 Norwalk Pleasant Polk Hill County West USSD (Expansion) 1.656% 14,126 12,565 ________ 26,691 ________ 26,691 4.610% 32,639 47,014 ________ 79,653 ________ 79,653 2.641% 15,186 20,682 ________ 35,868 ________ 35,868 ________ 142,211 UWHSD (Expansion) 1.455% 12,411 11,040 ________ 23,451 ________ 23,451 0.000% 0 0 ________ 0 ________ 0 0.970% 5,578 7,596 ________ 13,174 ________ 13,174 ________ 36,625 0.389% 3,318 2,952 ________ 6,270 ________ 6,270 0.000% 0 0 ________ 0 ________ 0 0.259% 1,489 2,028 ________ 3,518 ________ 6.873% 58,627 52,149 ________ 110,776 ________ 110,776 19.135% 135,476 195,144 ________ 330,620 ________ 330,620 10.961% 63,026 85,838 ________ 3,518 ________ 148,864 ________ 148,864 ________ 9,787 590,259 1.528% 13,034 11,594 ________ 24,628 ________ 24,628 0.000% 0 0 ________ 0 ________ 0 3.838% 22,069 30,056 ________ 52,125 ________ 52,125 ________ 76,752 Waukee Des Moines (Expansion) (Expansion) 1.687% 14,390 12,800 ________ 27,190 ________ 27,190 4.698% 33,262 47,912 ________ 81,173 ________ 81,173 2.691% 15,473 21,074 ________ 36,547 ________ 36,547 ________ 144,911 10.550% 89,992 80,048 ________ 170,040 ________ 170,040 29.373% 207,961 299,555 ________ 507,516 ________ 507,516 16.825% 96,744 131,760 ________ 228,504 ________ 228,504 ________ 906,059 Total $ 100.0% 853,000 758,750 ________ 1,611,750 ________ 1,611,750 100.0% 708,000 1,019,830 ________ 1,727,830 ________ 1,727,830 100.0% 575,000 783,120 ________ 1,358,120 ________ 1,358,120 ________ 4,697,700 Debt Issue 2008-2010 Core Borrowings Percentage Principal Interest & Servicing Gross Principal and Interest Net Debt Service Expansion Borrowings Percentage Principal Interest & Servicing Gross Principal and Interest Net Debt Service SW Area Borrowings Percentage Principal Interest & Servicing Gross Principal and Interest Net Debt Service Estimated Debt Service Budget Adjustments (none) 142,211 36,625 9,787 590,259 76,752 144,911 906,059 4,697,700 Net Debt Service 2,136,000 Principal 2,561,700 Interest on New SRF 2/14/2012 WASTEWATER RECLAMATION AUTHORITY Debt Service and Surcharges for New Money / 2006 Issue Fiscal Year 2013 Debt Servicing Greenfield 2006 / New Core Money Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service 2006 / New Expansion Money Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service 2006 / New SW Area Money Percentage Principal Interest P City Altoona Ankeny Bondurant Clive Cumming Surcharge (Expansion) (Expansion) (Expansion) (Expansion) (Expansion) 0.507% 3.314% 0.662% 3.038% 0.009% 1,110 2,225 ________ 3,336 (8) ________ 3,328 1.411% 3,683 7,403 ________ 11,086 (18) ________ 11,068 7.622% 16,692 33,456 ________ 21,752 50,148 (120) ________ 50,028 9.227% 24,082 48,414 ________ 21.219% 55,382 111,335 ________ 72,496 (120) ________ 72,376 166,717 (276) ________ 166,441 1,450 2,906 ________ 4,356 (10) ________ 4,345 1.843% 4,810 9,670 ________ 14,480 (24) ________ 14,456 19,940 8.458% 22,075 44,379 ________ 66,454 (110) ________ 66,344 5.285% 19,026 37,994 12.154% 43,754 87,374 8,717 (45) ________ 8,672 ________ 57,020 (296) ________ 56,724 ________ 131,129 (681) ________ 130,448 ________ 11,393 (59) ________ 11,334 ________ 21,848 (113) ________ 21,734 ________ Subtotal Net Debt Serv or Surchg 23,068 150,852 346,917 30,136 108,019 Subtotal 2006 Issue 23,139 151,320 347,993 30,229 (8) (18) (45) (52) (120) (296) (120) (276) (681) (10) (24) (59) Net Debt Service Reserve Interest Earnings Core Expansion SW Net Debt Service or Surcharge 2/14/2012 23,068 150,852 346,917 1.056% 6,653 13,335 ________ 19,988 (48) ________ 2,909 5,809 Gross Principal and Interest Reserve Interest Income 0.808% 7,258 14,546 ________ 21,804 (52) ________ 3,802 7,592 30,136 2.025% 7,290 14,558 Des Moines 20 40 ________ 59 (0) ________ 59 0.026% 68 136 ________ 204 (0) ________ 204 0.015% 54 108 384,859 (918) ________ 383,941 0.000% 0 0 ________ 0 0 ________ 0 38.995% 140,382 280,333 Johnston 0.376% 1.839% 823 1,650 ________ 2,474 (6) ________ 2,468 0.000% 0 0 ________ 0 0 ________ 0 0.251% 904 1,804 4,027 8,072 ________ 12,099 (29) ________ 12,071 0.000% 0 0 ________ 0 0 ________ 0 1.226% 4,414 8,814 420,715 (2,184) ________ 418,531 ________ 2,708 (14) ________ 2,694 ________ 13,227 (69) ________ 13,159 ________ 424 802,472 5,162 25,229 108,290 425 805,574 5,182 25,327 (48) (110) (113) (0) (0) (1) (918) 0 (2,184) (6) 0 (14) (29) 0 (69) 108,019 162 (1) ________ 161 ________ 58.495% 128,104 256,755 ________ Plaza 424 802,472 5,162 25,229 Norwalk Pleasant Polk Hill County West USSD (Expansion) 1.656% 3,627 7,269 ________ 10,895 (26) ________ 10,869 4.610% 12,032 24,188 ________ 36,221 (60) ________ 36,161 2.641% 9,508 18,986 UWHSD (Expansion) 1.455% 3,186 6,387 ________ 9,573 (23) ________ 9,550 0.000% 0 0 ________ 0 0 ________ 0 0.970% 3,492 6,973 0.389% 852 1,707 ________ 2,559 (6) ________ 2,553 0.000% 0 0 ________ 0 0 ________ 0.259% 6.873% 15,052 30,168 ________ 45,220 (108) ________ 45,112 19.135% 49,942 100,400 ________ 1.528% 3,346 6,707 ________ 10,053 (24) ________ 10,029 0.000% 0 0 ________ 0 0 ________ 0 150,343 (249) ________ 150,094 932 1,862 10.961% 39,460 78,798 3.838% 13,817 27,591 0 Waukee Des Moines (Expansion) (Expansion) 1.687% 3,695 7,405 ________ 11,099 (26) ________ 10.550% 23,105 46,308 ________ 11,073 69,412 (166) ________ 69,247 4.698% 12,262 24,650 ________ 29.373% 76,664 154,119 ________ 36,912 (61) ________ 36,851 2.691% 230,782 (382) ________ 230,400 9,688 19,345 16.825% 60,570 120,954 Total $ Debt Issue 2006 100.0% 219,000 438,935 ________ 657,935 (1,570) ________ 656,365 100.0% 261,000 524,695 ________ 785,695 (1,300) ________ 784,395 100.0% 360,000 718,895 ________ Gross Principal and Interest Reserve Interest Income Net Debt Service Expansion Borrowings Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service SW Area Borrowings Percentage Principal Interest 28,494 (148) ________ 28,346 ________ 10,465 (54) ________ 10,411 ________ 2,794 (15) ________ 2,780 ________ 118,258 (614) ________ 117,644 ________ 41,408 (215) ________ 41,193 ________ 29,033 (151) ________ 28,882 ________ 181,524 (942) ________ 180,582 ________ 75,376 19,961 5,333 312,850 51,222 76,806 480,229 2,514,055 Subtotal Net Debt Service 75,610 20,038 5,354 313,820 51,461 77,044 481,718 2,522,525 Subtotal Debt Service 2006 Issue (26) (60) (148) (23) 0 (54) (6) 0 (15) (108) (249) (614) (24) 0 (215) (26) (61) (151) (166) (382) (942) (1,570) (1,300) (5,600) 75,376 19,961 5,333 312,850 51,222 76,806 480,229 1,078,895 (5,600) ________ Core Borrowings Percentage Principal Interest 1,073,295 ________ 2,514,055 Gross Principal and Interest Reserve Interest Income Net Debt Service 8,470 Ttl Interest Net Debt Service 840,000 Principal 1,682,525 Interest on 2006A 2/14/2012 WASTEWATER RECLAMATION AUTHORITY Debt Service and Surcharges for New Money / 2004 Issue Fiscal Year 2013 Polk 2004 B / New Core Money Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service 2004 B / New Expansion Money Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service 2004 B / New SW Area Money Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service Greenfield Cumming Waukee City Altoona Ankeny Bondurant Clive Surcharge Surcharge Surcharge (Expansion) (Expansion) (Expansion) (Expansion) 0.009% 63 131 ________ 194 (1) ________ 193 0.026% 100 267 ________ 367 (1) ________ 365 0.015% 27 72 ________ 99 (0) ________ 99 ________ 1.687% 11,809 24,557 ________ 36,366 (134) ________ 36,232 4.698% 18,087 48,188 ________ 66,276 (263) ________ 66,012 2.691% 4,844 12,911 ________ 17,755 (72) ________ 17,683 ________ 0.507% 3,549 7,380 ________ 10,929 (40) ________ 10,889 1.411% 5,432 14,473 ________ 19,905 (79) ________ 19,826 0.808% 1,454 3,877 ________ 5,331 (22) ________ 5,310 ________ 3.314% 23,198 48,241 ________ 71,439 (263) ________ 71,176 9.227% 35,524 94,643 ________ 130,167 (517) ________ 129,650 5.285% 9,513 25,357 ________ 34,870 (141) ________ 34,729 ________ 7.622% 53,354 110,952 ________ 164,306 (604) ________ 163,701 21.219% 81,693 217,647 ________ 299,340 (1,188) ________ 298,152 12.154% 21,877 58,314 ________ 80,191 (325) ________ 79,867 ________ 0.662% 4,634 9,637 ________ 14,271 (52) ________ 14,218 1.843% 7,096 18,904 ________ 26,000 (103) ________ 25,896 1.056% 1,901 5,067 ________ 6,967 (28) ________ 6,939 ________ Des Moines 3.038% 21,266 44,223 ________ 65,489 (241) ________ 65,248 8.458% 32,563 86,755 ________ 119,319 (474) ________ 118,845 2.025% 3,645 9,716 ________ 13,361 (54) ________ 13,307 ________ 58.495% 409,465 851,497 ________ 1,260,962 (4,639) ________ 1,256,323 0.000% 0 0 ________ 0 0 ________ 0 38.995% 70,191 187,096 ________ 257,287 (1,041) ________ 256,246 ________ Plaza 0.376% 2,632 5,473 ________ 8,105 (30) ________ 8,076 0.000% 0 0 ________ 0 0 ________ 0 0.251% 452 1,204 ________ 1,656 (7) ________ 1,649 ________ Subtotal Net Debt Serv or Surchg 657 119,928 36,025 235,556 541,720 47,054 197,400 1,512,569 9,725 Subtotal 2004 B Issue 660 120,397 36,166 236,476 543,837 47,238 198,169 1,518,249 9,761 (1) (1) (0) (134) (263) (72) (40) (79) (22) (263) (517) (141) (604) (1,188) (325) (52) (103) (28) (241) (474) (54) (4,639) 0 (1,041) (30) 0 (7) Reserve Interest Earnings Core Expansion SW Net Debt Service or Surcharge 2/14/2012 657 119,928 36,025 235,556 541,720 47,054 197,400 1,512,569 9,725 Debt Servicing Johnston Norwalk Pleasant Polk Hill County West USSD (Expansion) 1.839% 12,873 26,770 ________ 39,643 (146) ________ 39,497 0.000% 0 0 ________ 0 0 ________ 0 1.226% 2,207 5,882 ________ 8,089 (33) ________ 8,056 ________ 1.656% 11,592 24,106 ________ 35,698 (131) ________ 35,567 4.610% 17,749 47,286 ________ 65,034 (258) ________ 64,776 2.641% 4,754 12,671 ________ 17,425 (71) ________ 17,355 ________ UWHSD Des Moines (Expansion) 1.455% 10,185 21,180 ________ 31,365 (115) ________ 31,250 0.000% 0 0 ________ 0 0 ________ 0 0.970% 1,746 4,654 ________ 6,400 (26) ________ 6,374 ________ 0.389% 2,723 5,663 ________ 8,386 (31) ________ 8,355 0.000% 0 0 ________ 0 0 ________ 0 0.259% 466 1,243 ________ 1,709 (7) ________ 6.873% 48,111 100,049 ________ 148,160 (545) ________ 147,615 19.135% 73,670 196,271 ________ 269,941 (1,072) ________ 268,869 10.961% 19,730 52,590 ________ 1,702 ________ 72,320 (293) ________ 72,027 ________ (Expansion) 1.528% 10,696 22,243 ________ 32,939 (121) ________ 32,818 0.000% 0 0 ________ 0 0 ________ 0 3.838% 6,908 18,415 ________ 25,323 (102) ________ 10.550% 73,850 153,574 ________ 227,424 (837) ________ 226,587 29.373% 113,086 301,284 ________ 414,370 (1,645) ________ 412,725 16.825% 30,285 80,726 ________ 25,220 ________ 111,011 (449) ________ 110,561 ________ Total $ Debt Issue 2004 100.0% 700,000 1,455,675 ________ 2,155,675 (7,930) ________ 2,147,745 100.0% 385,000 1,025,718 ________ 1,410,718 (5,600) ________ 1,405,118 100.0% 180,000 479,795 ________ 659,795 (2,670) ________ 657,125 ________ Core Borrowings Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service Expansion Borrowings Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service SW Area Borrowings Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service 47,553 117,697 37,624 10,057 488,511 58,038 749,874 4,209,988 Subtotal Net Debt Service 47,732 118,157 37,765 10,094 490,421 58,262 752,804 4,226,188 Subtotal Debt Service 2004B (146) 0 (33) (131) (258) (71) (115) 0 (26) (31) 0 (7) (545) (1,072) (293) (121) 0 (102) (837) (1,645) (449) (7,930) (5,600) (2,670) 47,553 117,697 37,624 10,057 488,511 58,038 749,874 4,209,988 16,200 Ttl Interest Net Debt Service 1,265,000 Principal 2,961,188 Interest on 2004B 2/14/2012 WASTEWATER RECLAMATION AUTHORITY Operations & Maintenance Budget Summary Fiscal Year 2013 last year F11 Actual WRA770101 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges (Indirect Allocations) 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Leadership Total WRA770104 510 Personal Services 521 Contractual Services (Utilities) 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Op Area Control Center One Total WRA770105 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Op Area Control Center TwoTotal WRA770106 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Dewatering Total next year F12 Budget F12 Amended F12 Proposed 479,469 31,854 20,332 893,027 23,387 0 17,691 509,845 41,156 18,690 1,031,057 25,000 0 16,500 535,245 39,156 21,735 1,031,057 22,500 0 16,500 544,545 39,456 23,331 1,031,000 23,500 0 17,000 1,465,760 1,642,248 1,666,193 1,678,832 1,086,501 1,746,225 33,576 684 154,225 0 5,297 1,422,910 2,242,807 35,940 8,000 178,900 5,000 12,500 1,429,910 2,266,457 33,508 8,000 194,900 5,000 12,500 1,500,110 2,323,081 34,782 8,000 199,900 5,000 11,000 3,026,508 3,906,057 3,950,275 4,081,873 927,983 39,128 16,690 1,755 81,589 11,990 9,685 924,300 70,679 15,220 3,000 107,100 5,000 8,500 932,300 70,679 16,553 3,000 91,100 5,000 8,500 984,715 56,067 16,722 3,000 91,850 5,000 10,000 1,088,820 1,133,799 1,127,132 1,167,354 412,450 4,095 31,764 0 412,895 0 0 478,905 9,765 25,230 3,000 475,400 0 3,000 479,905 9,765 29,281 3,000 472,800 0 3,000 482,250 9,565 31,901 3,000 495,000 0 3,000 861,204 995,300 997,751 1,024,716 WASTEWATER RECLAMATION AUTHORITY Operations & Maintenance Budget Summary Fiscal Year 2013 last year F11 Actual WRA770107 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Plant Field Services Total WRA770108 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Operation's Support Total WRA770110 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges (PILOT) 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Maintenance Support Total WRA770111 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF IT Support Total next year F12 Budget F12 Amended F12 Proposed 1,093,906 134,552 685,322 3,074 16,541 19,460 10,759 1,140,180 112,659 669,980 3,500 43,750 10,000 6,500 1,126,915 144,159 691,105 3,500 35,250 10,000 6,500 1,177,710 178,224 743,644 3,500 34,900 5,000 6,500 1,963,614 1,986,569 2,017,429 2,149,478 509,787 161,079 55,524 0 20,576 0 324 606,630 99,501 58,280 3,000 24,300 5,000 3,000 581,630 146,501 56,226 3,000 32,500 5,000 3,000 644,270 131,301 54,013 3,000 37,700 5,000 3,000 747,290 799,711 827,857 878,284 1,763,155 349,720 41,569 1,098,552 582,484 29,861 11,868 2,235,580 435,548 65,960 1,169,500 607,440 91,500 25,000 2,221,130 437,548 56,911 1,129,500 627,940 91,500 25,000 2,436,170 494,866 55,849 1,120,000 704,890 90,000 25,000 3,877,209 4,630,528 4,589,529 4,926,775 342,507 148,156 2,548 0 65,287 37,651 3,524 350,210 291,166 2,760 500 147,600 60,000 9,000 350,630 281,866 5,260 500 144,800 60,000 9,000 365,360 231,466 6,560 500 144,100 40,000 9,000 599,673 861,236 852,056 796,986 WASTEWATER RECLAMATION AUTHORITY Operations & Maintenance Budget Summary Fiscal Year 2013 last year F11 Actual WRA770112 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Building Maintenance Total WRA770116 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Industrial Pretreatment Total WRA770119 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRF Laboratory Total WRA770163 590 Other / Contract Sewer Maintenance 521 Contractual Services 529 Other Charges 530 Commodities 540 Capital Outlays WRA Sanitary Sewer Maintenance Total next year F12 Budget F12 Amended F12 Proposed 271,588 105,441 14,118 500 31,225 48,620 0 321,845 83,281 0 500 24,700 0 0 286,845 84,361 6,307 500 25,200 0 0 0 85,361 0 100 0 0 0 471,492 430,326 403,213 85,461 416,163 174,047 16,537 0 10,982 0 3,959 556,575 185,849 21,670 1,800 12,100 24,500 7,500 558,670 185,849 19,349 1,800 11,100 24,500 7,500 567,075 185,949 19,644 1,800 11,000 20,000 7,500 621,688 809,994 808,768 812,968 179,783 92,530 2,351 0 37,088 0 889 229,905 155,157 2,460 1,000 53,800 42,000 10,300 229,905 140,857 2,460 1,000 50,800 27,000 10,300 233,980 143,257 2,460 1,000 50,800 30,000 10,300 312,641 494,622 462,322 471,797 0 89,022 50,000 27 4,381 0 63,000 180,000 1,000 55,000 0 68,000 175,000 1,000 35,000 0 83,200 150,000 1,000 50,000 143,430 299,000 279,000 284,200 WASTEWATER RECLAMATION AUTHORITY Operations & Maintenance Budget Summary Fiscal Year 2013 last year F11 Actual WRA770154 510 Personal Services 521 Contractual Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRA Pumping Station Total WRA770166 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRA Management Total WRA770169 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training WRA Flow Monitoring Total next year F12 Budget F12 Amended F12 Proposed 0 527,861 0 49,046 0 0 0 543,720 5,500 49,040 20,000 500 0 549,460 500 49,040 20,000 500 0 593,049 500 54,940 20,000 0 576,907 618,760 619,500 668,489 356,923 69,418 7,172 86,000 1,705 8,500 4,160 391,115 109,043 10,520 90,500 9,050 0 9,500 400,115 99,043 11,132 90,500 9,050 0 9,500 411,440 97,543 11,360 115,500 8,650 0 9,500 533,878 619,728 619,340 653,993 239,910 34,076 7,577 0 6,932 1,979 3,500 354,930 72,377 12,800 1,200 51,700 15,000 6,000 325,730 67,377 12,013 1,200 51,700 15,000 6,000 360,800 50,977 12,100 1,200 45,250 25,000 6,000 293,974 514,007 479,020 501,327 WASTEWATER RECLAMATION AUTHORITY Operations & Maintenance Budget Summary Fiscal Year 2013 last year next year F11 Actual WRA770000 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training F12 Budget F12 Amended F12 Proposed 200,428 30,010 780 0 914 0 0 203,505 66,592 810 500 3,395 0 2,200 211,005 66,592 810 500 3,395 35,000 2,200 213,470 67,842 810 500 3,095 50,000 2,200 232,132 277,002 319,502 337,917 Total O&M Expense 510 Personal Services 521 Contractual Services 528 Internal Services 529 Other Charges 530 Commodities 540 Capital Outlays 560 Travel/Training 8,280,553 3,737,214 935,860 2,133,592 1,494,903 162,442 71,656 9,726,435 4,582,300 940,320 2,502,557 1,814,275 333,000 120,000 9,669,935 4,657,670 962,650 2,452,557 1,823,075 333,000 120,000 9,921,895 4,771,204 1,013,176 2,442,600 1,906,575 345,000 120,000 Total O&M Expense 16,816,220 20,018,887 20,018,887 20,520,450 16,816,220 (4,948,690) 20,018,887 (4,102,400) 20,018,887 (4,102,400) 20,520,450 (4,002,400) WRA Fiscal Services Total Gross Operations Expense Revenue Offsets Net O/M, to be Allocated using WRF flow Operating Reserve needed $ 11,867,530 $ 15,916,487 6,890,060 $ 15,916,487 6,890,060 $ 16,518,050 7,061,408 Wastewater Reclamation Authority Fiscal Year 2013 WRA/WRF Totals by Account (line item budget) Account # 511010 511030 511050 511070 511080 511090 511120 511140 511160 511170 511175 511240 511801 511802 511190 511300 Account Name F11 Actual Personal Services Salaries of Regular Employees Longevity Overtime IPERS - City's Share FICA - City's Share FICA Medicare - City's Share Deferred Compensation - City's Share Health and Dental Insurance Separation Payouts Flexible Spending Account - City PEHP - City's Share Workers' Comp -Salary Replacement Tuition Allowance Clothing / Cell Allowance Personnel Charge-outs Wages - Casual & Part-time Employees Subtotal Personal Services 521010 521020 521022 521030 521035 521045 522300 521060 521070 521075 521160 521180 521200 521220 521250 521320 521330 522010 522020 522030 522070 523010 523020 523030 523070 Contractual Services Accounting and Clerical Consultants and Prof. Services ROW Acq Consultants ROW Legal Fees ROW Legal Misc Right-of-way Acquisition Consult Mgnt Fee Legal Fees Protection / Security Laboratory Oil Analysis Service Outside DP Services /Consulting City Labor and Equip. Charges Contracted Snow Removal Service City Staff Charges on CIP Projects Inspection Services and Appraisals Contracted Mowing/Spraying Service Contracted Labor - Nonclerical Contract Carriers Local Transportation Postage Tuition & Interview Reimb Advertising / Publish Meetings Photocopy and Reproduction Expense Printing Services Contracts Photographic/Microfilming 523080 524010 524030 524050 524150 524060 524070 524110 524130 524160 Marketing/Public Relations Property Insurance reclass Surety Tort Liability Insurance Enterprise Liability Ins /Flood Insurance Workers' Compensation Excess Insurance Premiums Unemployment Compensation Payments Life Insurance Premiums Long-term Disability Insurance Premiums Insurance Agent/Broker Service Fee 525010 525020 525030 525050 525040 525140 525150 525155 525185 525195 Gas Electric Light and Power Storm Water Charges Water Use Cablevision Services Telephone Equipment Telephone - Cell Service Telephone Service - Plant & Meters Data Circuit Contract Software License 2/16/2012 new F12 Adopted F12 Amended F13 Proposed F13 Budget Inc (Dec) F12 5,403,057 154,869 110,900 401,196 371,065 86,952 126,101 1,302,289 185,923 35,897 98,152 826 11,080 (42,496) 34,742 8,280,553 6,401,450 185,415 125,000 530,000 424,390 99,150 137,970 1,422,765 124,000 39,320 107,700 11,000 10,775 12,500 95,000 9,726,435 6,381,450 185,415 118,000 530,000 429,390 99,150 137,970 1,420,765 124,000 39,320 107,700 11,000 10,775 15,000 60,000 9,669,935 6,474,600 175,000 125,000 582,000 428,300 100,000 143,500 1,480,000 124,000 39,320 107,700 11,000 10,975 15,500 105,000 9,921,895 73,150 (10,415) 52,000 3,910 850 5,530 57,235 200 3,000 10,000 195,460 2.0% 11,103 94,837 254 16,015 27,516 249,943 1,012 16,456 337,680 20,540 1,340 6,115 74,141 2,723 160 205 3,877 12,044 2,828 - 7,000 126,000 1,500 500 2,500 300 50,000 18,000 297,100 64,100 330,000 300 10,000 8,450 7,500 10,000 5,000 5 430 5,600 15,950 6,800 50 7,000 126,000 1,500 500 2,500 300 40,000 30,000 297,100 1,000 64,100 330,000 300 10,000 8,450 34,000 50,000 6,500 5 430 5,600 14,950 6,300 50 7,000 132,000 500 500 600 300 40,000 30,000 297,100 10,000 34,100 340,000 300 10,000 4,500 40,000 45,000 6,500 5 430 5,600 14,550 4,300 - 6,000 (1,000) (1,900) (10,000) 12,000 10,000 (30,000) 10,000 (3,950) 32,500 35,000 1,500 (1,400) (2,500) (50) 248,583 1,933 88,740 101,836 10,320 7,481 43,979 3,079 600 260,800 1,933 107,730 108,861 10,736 7,500 8,128 46,302 4,500 600 350,000 1,933 88,380 74,041 12,836 7,500 8,128 46,302 2,500 600 370,800 1,933 90,056 80,585 13,736 7,500 8,128 46,302 4,500 110,000 (17,674) (28,276) 3,000 - 265,228 1,189,079 53,756 106,362 773 1,585 29,275 28,003 6,757 10,874 435,000 1,505,000 50,000 84,000 840 800 31,380 30,000 8,000 10,000 425,000 1,490,000 50,000 84,000 840 800 31,245 30,000 8,000 10,000 415,000 1,570,000 55,000 84,000 840 800 31,780 30,000 8,000 10,000 (20,000) 65,000 5,000 400 - 1 of 3 Wastewater Reclamation Authority Fiscal Year 2013 WRA/WRF Totals by Account (line item budget) Account # 525200 526010 526011 526020 526030 526040 526050 526060 526070 526090 526100 526110 526120 526150 526160 527040 527090 527110 527500 527510 527520 527620 527680 527700 527800 528020 528515 528525 528545 528550 528555 528560 528575 528580 528585 528590 529410 529300 529500 529630 529730 529810 529950 531010 531020 531030 531035 531040 531045 531050 531060 531090 532010 532020 532030 532040 532050 532060 532080 532090 2/16/2012 Account Name Hardware Maint Contract Repair & Maintenance - Buildings Repair & Maintenance - Buildings/Floor covering Repair & Maintenance - City-owned Capital Improv. Repair & Maintenance - Fixed Plant Equipment Repair & Maintenance - Automotive Repair & Maintenance - Operating and Construction Repair & Maintenance - Office Equipment Repair & Maintenance - Plumbing Repair & Maintenance - Miscellaneous Equipment Repair & Maintenance - Data Processing Equipment Repair & Maintenance - Mechanical Equipment Repair & Maintenance - Software Contractual Maint. Repair & Maintenance - Fences Repair & Maintenance - Cabling Rent - Machinery and Mechanical Equipment Uniform Rental and Cleaning Rent - Non-City Radio and Electronics Licenses and Permits Cleaning and Painting Dues and Membership Restaurant Foods Landfill Dump Fees Recycling Services & Disposals Bank Charges F11 Actual 18,275 60,661 24,730 2,331 156,801 10,596 3,165 887 12,785 627 6,436 45,865 78,368 1,580 8,644 14,105 17,245 479 2,838 54,755 33,097 109 86,032 5,057 750 - F12 Adopted 19,100 75,000 21,000 2,500 269,000 5,000 600 850 19,100 4,000 40,600 180,700 6,000 5,000 14,000 22,505 7,600 4,980 61,200 33,240 4,100 75,000 14,100 1,000 F12 Amended 19,100 70,000 26,000 2,500 256,000 5,000 600 850 19,100 4,000 40,600 180,700 6,000 5,000 22,000 22,505 7,600 5,115 61,200 33,240 4,100 75,000 14,100 1,000 F13 Proposed 19,100 65,000 26,000 2,500 240,000 55,000 600 800 19,100 4,500 48,600 160,000 6,000 5,000 27,000 19,600 2,600 4,415 68,200 34,240 2,500 80,000 5,100 950 F13 Budget Inc (Dec) F12 (10,000) 5,000 (29,000) 50,000 (50) 500 8,000 (20,700) 13,000 (2,905) (5,000) (565) 7,000 1,000 (1,600) 5,000 (9,000) (50) Service Awards & Incentives Print Shop Telephone - Basic Line Service Vehicle Maintanence - Internal Service Radio Maintenance - Internal Service Vehicle Depreciation - Internal Service Radio Depreciation - Internal Service Fuel Purchases from Central Garage Forestry - Internal Service Courier - Internal Service Postage - Internal Service Subtotal Contractual Services 43 36,450 308,351 14,632 374,245 2,872 212,715 1,116 4,673,074 1,000 38,220 298,800 16,560 399,400 2,900 200,370 5,522,620 1,000 38,220 295,624 16,560 398,400 2,900 227,616 5,620,320 1,800 38,220 320,400 16,560 395,600 2,900 259,250 5,784,380 800 21,600 (3,800) 58,880 261,760 4.7% Other Charges Legal Settlements and Awards - Tort Fines Contract Maintenance of Sewers Police and Fire Service Fee Indirect Cost Allocation Workers' Compensation - Payments Allocation of Charges (PStn) Subtotal Other Charges 500 50,000 1,183,194 893,027 6,871 2,133,592 2,000 180,000 1,250,000 920,000 145,557 5,000 2,502,557 2,000 175,000 1,210,000 920,000 145,557 2,452,557 2,000 100 150,000 1,225,000 920,000 145,500 2,442,600 100 (30,000) (25,000) (57) (5,000) (59,957) -2.4% 20,026 9,026 831 9,842 42,846 4,087 2,943 33 3,221 1,806 654,334 11,489 103,300 8,156 6,628 18,540 9,245 3,150 99,250 52,050 7,600 1,900 11,000 5,000 691,300 9,700 13,000 146,200 8,550 9,510 18,540 9,245 3,150 99,250 52,050 7,600 1,900 11,000 5,000 721,300 10,200 13,000 136,200 8,550 9,510 18,240 9,145 3,150 10,000 101,750 41,050 7,600 1,400 11,000 5,000 768,300 13,200 13,000 130,700 9,100 9,510 (300) (100) 10,000 2,500 (11,000) (500) 77,000 3,500 (15,500) 550 - cip resv Commodities General Office Magazines, Maps, Reference Books Photographic and Video Supplies Computer Equipment Computer (Data Processing) Hardware under $4000 Computer Software less than $4000 Copier Supplies Print Shop Office Supplies StoresB Materials Agricultoral & Horticultural Asphalt and Asphalt Products Chemicals and Gases for Operations Cleaning, Janitorial, and Sanitation Concrete and Clay Products Electrical Supplies and Parts Food Fuel (Non-motor vehicle) 2 of 3 Wastewater Reclamation Authority Fiscal Year 2013 WRA/WRF Totals by Account (line item budget) Account # 532100 532110 532130 532140 532150 532160 532170 532180 532190 532200 532210 532230 532240 532250 532260 532320 532330 532370 Account Name Hardware Items Household and Institutional Lubricants (Non-motor vehicle) Lumber, Wood Products, and Insulation Parts - Machinery and Equipment Medical and Laboratory Minor Equipment and Hand Tools Motor Vehicles - Fuels and Lubricants Motor Vehicles - Parts and Supplies Wood Finish Products Plumbing, Sewage, and Drain Cleaning Steel, Iron, and Related Metals Traffic and Street Sign Material Wearing Apparel Safety and Protective Equipment and Clothing Library Processing Materials Data Processing Materials Power Hand Tools and Equipment Subtotal Commodities 543040 543080 544060 544080 544090 544100 544110 544200 544220 544250 544260 Capital Outlay Sanitary Sewers & Repairs over $4000 Other Improvements Medical, Surgical, and Laboratory Office & Household Plant Equipment Production and Construction Radio and Communication Electrical Equipment, Radio & Nonradio Data Processing Hardware over $4000 Data Processing Software more than $4000 Data Processing Software payments to CDM Subtotal Capital Outlay 562040 562050 Travel and Training Travel Training Subtotal Travel and Training Change from Prior Budget 2/16/2012 new F11 Actual 18,908 4,884 47,045 F12 Adopted 30,200 9,450 31,100 F12 Amended 30,200 9,450 41,100 F13 Proposed 29,650 9,350 52,000 F13 Budget Inc (Dec) F12 (550) (100) 20,900 8,976 357,526 45,022 59,265 601 2,551 19,505 7,125 6,909 2,246 35,772 - 7,500 384,500 53,050 43,850 1,250 3,100 19,500 11,600 7,800 2,950 117,130 800 2,000 2,500 8,000 404,500 53,050 43,850 1,250 3,100 19,500 12,000 7,800 9,800 2,950 64,730 800 2,000 2,500 7,700 434,500 53,550 42,850 1,250 3,500 19,500 15,000 7,400 10,000 2,950 62,730 2,500 200 50,000 500 (1,000) 400 3,400 (400) 10,000 (54,400) (800) (2,000) - 1,494,903 1,814,275 1,823,075 1,906,575 92,300 5.1% 4,381 37,217 83,193 26,741 10,910 162,442 50,000 5,000 66,500 116,500 6,000 4,000 25,000 45,000 15,000 333,000 30,000 5,000 51,500 116,500 6,000 4,000 25,000 45,000 15,000 35,000 333,000 50,000 50,000 120,000 6,000 4,000 25,000 30,000 10,000 50,000 345,000 (5,000) (16,500) 3,500 (15,000) (5,000) 50,000 12,000 30 71,626 71,656 120,000 120,000 200 119,800 120,000 200 119,800 120,000 200 (200) - 16,816,220 20,018,887 20,018,887 20,520,450 501,563 - - 102.5% 501,563 3 of 3 Wastewater Reclamation Authority Budget Surcharge Computation Fiscal Year 2013 history of winter flow and amount paid Surcharge 2005 2006 2007 2008 2009 2010 2011 2012 2013 Budget Year 2010 adjust 10 2011 2012 2013 Cumming 1.001 1.018 1.036 1.054 1.073 2,344 2,408 2,652 2,592 2,264 2,522 1,924 2,327 Nov 220.0 219.0 214.0 213.0 160.0 210.0 166.0 143.1 Dec Jan 163.0 174.0 222.0 221.0 142.0 219.0 145.0 217.0 203.0 209.0 227.0 214.0 264.0 201.5 170.0 221.7 Waukee 0.818 0.824 0.830 0.837 0.843 280,592 276,384 341,584 390,548 396,000 482,696 381,044 375,916 Nov Dec 23370 21343 25664 30420 38550 41876 34292 31547 winter flows / actuals Jan 23994 24007 27347 33285 24615 36805 30391 33484 22784 23746 32385 33932 35835 41993 30578 28948 0.903 0.914 0.925 0.937 140,048 116,344 95,884 92,268 Nov 12116 10267 8895 7196 winter flows / actuals 2,377 72.4 0.032 2,264 338,580 12,276.0 0.031 396,000 2,696 2,091 $2,576 83.2 63.5 79.1 0.033 0.033 0.034 2,522 1,924 2,327 flow 415,601 330,746 $328,927 14,963.6 11,812.4 12,029.3 0.031 0.031 0.032 482,696 381,044 375,916 flow Cumming Amount Due Polk City Waukee Amount Due Dec Jan 11494 8675 7729 8029 11402 10144 7347 7842 winter flows / actuals 142,289 119,602 99,719 $97,158 15,825.4 13,263.2 11,026.7 10,703.1 Polk City Amount Due 0.113 0.114 0.115 0.116 140,048 116,344 95,884 92,268 flow Wastewater Reclamation Authority Budget Surcharge Computation Fiscal Year 2013 cash distribution others Des Moines Surcharge Allocation Clive Cumming Des Moines Greenfield Plaza Johnston Norwalk Pleasant Hill Polk County USSD UWHSD West Des Moines Waukee Reversionary Ownership % (from 28E @ 7/1/2004) Phase 3 Segment 4 Phase 10 Segment 6 payment from Winter Flow for Cumming payment from Winter Flow for Waukee P3S4 P3S4 c/yr c/yr payment from Winter Flow for Cumming payment from Winter Flow for Waukee P 10 S 6 P 10 S 6 c/yr c/yr payment from Winter Flow for Polk City payment from Winter Flow for Polk City payment from Winter Flow for Polk City 21 3256 3 458 3,738.00 23.40 3,502.50 4.38% 51.84% 91.32% 1.00% 3.20% 1.49% 1.67% 5.48% 7.46% 11.83% 4.98% 15.35% 2 296 23 3504 0 68 1 101 1 113 3 504 5 800 2 337 7 1037 32 4814 1 169 298 8372 238 101 52 61 11 64 322 464 101 758 15 18 21 4 22 31.60 4,813.50 8,371.00 P3S1 P3S2 P3S3 P3S4 c/yr c/yr c/yr c/yr 542 633 116 713 322.80 464.06 101.27 757.59 P5S1 P5S2 P 5 S 3,4 P7S3 P7S4 c/yr c/yr c/yr c/yr c/yr 366 115 885 511 716 4,597.00 351.10 330.24 3,688.40 90.51 0.03 6,106.00 Fiscal Year 2013 352 331 3688 91 188 Polk City C/W SUM OF ABOV SUM OF ABOV 0 188 298 0 2 289 34.60 507 805 339 1044 24 89 103 19 109 141 165 30 173 59 69 13 73 183 214 39 224 127 40 307 511 716 192 60 464 2021 1225 214 9 2021 507 1225 805 214 339 9 47 15 114 15 240 24 6106 8373 15 238 240 101 24 404 44.40 6,758.50 5,271.50 404 6104 100.00% 100.00% 0 9 12,109.00 864.80 1,097.06 217.27 1,470.59 717.10 445.24 4,573.40 601.51 716.03 661 10,703.00 661 to ALLOC 1044 to ALLOC Wastewater Reclamation Authority Budget Adjustment Computation Fiscal Year 2013 / 2011 Altoona Ankeny Clive Des Moines (Expansion) (Expansion) (Expansion) Greenfield PHOCSD Johnston Norwalk (Expansion) Operations and Maintenance WRF Flows: Flow Percentage: Budget: Collected in FY2011, Budget O&M Deducted from Norwalk as not connected 7/1/10 Actual: Credit for July1-July 11 not connected (Norwalk) Gross O&M Expense (less W/Comp Insurance) Revenue Offsets Unspent O&M Budget 3.92% 0.01% 3.49% 62.94% 0.39% 2.05% 1.85% (589,435) (1,202) (524,376) (9,456,497) (59,049) (307,414) (278,415) 15,953 210 659,700 (194,137) 1,345 (396) 187 586,886 (172,709) 3,367 10,583,793 (3,114,607) 21 66,088 (19,448) 109 344,060 (101,250) (5,250) 311,605 (91,699) (123,661) (253) (110,012) (1,983,944) (12,388) (64,495) (47,807) 465,773 949 414,364 7,472,553 46,660 242,919 214,655 O&M Credit Computation Amount Due from above actuals Amount applied during Budget preparation Monthly Revenue from Commty's in 2011 (113,431) (476,004) (1,202) (121,265) (403,111) (1,722,647) (7,733,848) (12,185) (46,864) (74,268) (233,146) (17,987) (244,475) Unused Credits from Commty (123,662) (253) (110,012) (1,983,942) (12,389) (64,495) (47,807) Fiscal 2011 / Audited revenue for O&M Cumming Waukee Altoona Ankeny Bondurant Clive CDM GPHOC Johnston Norwalk P Hill Polk CITY Polk Co USSD UWHSD WDM Net Collected Collected for O 1,503 476,004 1,202 403,111 7,733,848 46,864 233,146 244,475 239,511 47,844 903,108 236,702 1,540,771 12,108,089.0 1,503 476,004 1,202 403,111 7,733,848 46,864 233,146 244,475 239,511 47,844 903,108 236,702 1,540,771 - 15,025,100 2011 Oper net (2,901,058) 2011 Oper cred (15,953.00) 12,108,089.0 Norwalk short July Pleasant Hill Polk Country USSD UWHSD Waukee (Expansion) West Des Moines Budget (Expansion) Totals 2.00% 0.44% 7.79% 2.02% 0.01% 13.09% 100.00% (300,953) (66,411) (1,170,005) (302,906) (1,503) (1,966,936) (15,025,100) 15,953 107 336,829 (99,122) 24 74,328 (21,873) 417 1,309,479 (385,354) 108 339,015 (99,766) 1,682 (495) 700 2,201,411 (647,833) 16,816,220 (4,948,690) (63,139) (13,932) (245,463) (63,549) (316) (412,657) (3,141,617) 237,814 52,478 924,542 239,357 1,187 1,554,278 11,867,530 (61,442) (239,511) (18,567) (47,844) (266,897) (903,108) (66,204) (236,702) (1,503) (426,165) (1,540,771) (2,901,058) (12,108,089) (63,139) (13,933) (245,463) (63,549) (316) (412,658) (3,141,617) &M - Flow Percentage: O&M Expense Budget not collected from Norwalk Norwalk 1/3 month alloc O&M Expense Actual Revenue Offsets - O&M Exp Unspent O&M to be Collected Prior year credit applied Current Payments applied - Unused Credit WASTEWATER RECLAMATION AUTHORITY Debt Service Adjustments for New Debt 2008-2010 Fiscal Year 2013 Reconciliation Debt Servicing of Debt Greenfield Service SRF / New Core Money Percentage in 2010 Budget Principal Interest * collected from all commty collected from all commty Altoona Ankeny Bondurant Clive Cumming (Expansion) (Expansion) (Expansion) (Expansion) (Expansion) 0.640% 3.630% 8.100% 0.648% 3.330% 0.010% 0 832 _________ 832 Principal and Interest Collected 2010 Percentage in 2011 Budget Principal collected from all commty Interest collected from all commty 0.579% * Polk City / Bondurant use Amended Flows Amount Paid * 7,849 0.640% Amount Due for 2011 Core Amount Due Core only Over (Under) Paid SRF / New Money for Expansion Percentage in 2011 Budget Principal collected from Expansion Interest collected from Expansion Principal and Interest Collected 2009 SRF / New Money for SWADF Percentage in 2011 Budget Principal collected from all commty Interest collected from all commty Principal and Interest Collected 2011 Amount Paid Final Percentage for 2011 Amount Due for 2011 Expansion Final Percentage for 2011 Amount Due for 2011 SW Loans Amount Due Expansion & SW Over Paid 7.858% 47,103 105,769 8.053% 0 3.497% 0 842 ________ 842 0.697% 79 95,160 ________ 95,239 0 0.579% 0 10,530 ________ 10,530 35 42,349 ________ 42,384 3.613% Amount Due for 2010 Core Final Percentage for 2011 0 4,719 ________ 4,719 3.497% 6 7,012 ________ 7,017 Principal and Interest Collected 2011 Final Percentage for 2010 P City (Expansion) 3.110% 7 8,441 ________ 8,448 9,290 0.648% 134 0.011% Johnston 54.190% 0.370% 2.030% 0 70,447 ________ 70,447 750,306 0 0.010% 0 481 ________ 481 0.350% 561 679,298 ________ 679,859 53.872% 0 3.110% Plaza 56.094% 0 121 ________ 121 42,022 0 0.697% 0 13 ________ 13 0.010% 31 37,662 ________ 37,693 3.313% 0 7.858% 0 4,329 ________ 4,329 Des Moines 1.824% 4 4,239 ________ 4,242 4,723 0.369% 18 22,089 ________ 22,107 24,746 2.016% 0 56.094% 0 2,639 ________ 2,639 0 0.350% 0 1.824% 1,007 6,079 13,661 1,212 5,407 17 97,517 608 3,171 1,007 6,843 6,079 41,023 13,661 92,108 1,212 8,078 5,407 36,616 17 117 97,517 652,789 608 4,115 3,171 21,575 Polk City Altoona Ankeny 1.533% 9.261% 46,398 126,459 ________ 172,857 20.813% 104,273 284,202 ________ 388,475 1.846% 0.897% 5.418% 19,830 54,554 ________ 74,384 12.176% 44,564 122,600 ________ 167,164 1.080% 7,680 20,933 ________ 28,613 3,283 9,032 ________ 12,315 40,928 1.533% 247,240 9.261% 23,369 0.897% 141,174 5.418% 555,639 20.813% 317,271 12.176% Bondurant 9,248 25,207 ________ 34,456 3,953 10,875 ________ 14,827 49,283 1.846% 28,140 1.080% Clive Cumming DM GP HOC Johnston 8.238% 41,272 112,490 ________ 153,762 0.025% 0.000% 0.000% 0.000% 2.074% 0.015% 37.397% 136,873 376,550 ________ 513,423 0.233% 1.216% 7,591 20,883 ________ 28,474 125 341 ________ 467 55 151 ________ 206 182,236 8.238% 673 0.025% 125,579 2.074% 0 0 ________ 0 513,423 0.000% 381 0.015% 0 0 ________ 0 853 2,346 ________ 3,199 3,199 0.000% 0 37.397% 0 0 ________ 0 4,451 12,244 ________ 16,694 16,694 0.000% 0 0.233% 0 1.216% 9,539 57,614 129,478 11,485 22,055 160 397,675 2,478 12,931 32,908 8,021 198,788 48,452 446,750 108,889 39,625 9,658 147,634 34,602 541 132 397,675 115,748 2,478 721 12,931 3,764 Norwalk Pleasant Polk Hill County West USSD (Expansion) UWHSD (Expansion) 1.660% 1.820% 0 2,158 ________ 2,158 1.652% 0.470% 0 2,366 ________ 2,366 1.786% 18 21,628 ________ 21,646 22,180 24,012 1.810% 0 1.652% 0 611 ________ 611 0.394% 17 20,006 ________ 20,022 1.653% 7.550% 0 9,815 ________ 9,815 6.940% 4 4,771 ________ 4,775 5,386 0.470% 1.796% Total (Expansion) (Expansion) $ 1.810% 12.440% 100.0% 0 2,353 ________ 2,353 1.745% 0 16,172 ________ 16,172 11.668% 17 21,132 ________ 21,149 117 141,299 ________ 141,416 93,928 24,186 23,502 157,588 1.850% 1.803% 0 6.940% 12.373% 0 1.796% 0 1.745% Core Borrowings Percentage for 2010 0 130,000 (107) 100.0% 18 21,750 ________ 21,768 0 0.394% 0 2,418 ________ 2,418 Des Moines 69 84,043 ________ 84,113 7.506% 0 1.786% 1.860% Waukee 1,000 1,211,000 1,342,725 0 0 100.0% 685 12,065 3,122 3,034 20,284 173,847 2,872 19,308 3,105 20,907 685 4,701 12,065 81,863 3,122 21,063 3,034 20,469 20,284 137,304 173,847 Polk Co 4.375% 21,919 59,741 ________ 81,659 0.000% 0.000% 2.559% 1.190% 9,366 25,767 ________ 35,133 116,792 4.375% 0 0 ________ 0 4,355 11,982 ________ 16,338 16,338 0.000% 66,692 2.559% USSD 0 0 ________ 0 0.262% 959 2,638 ________ 3,597 3,597 0.000% 0 1.190% 0.262% Waukee 18.383% 92,099 251,020 ________ 343,119 0.000% 10.755% 39,363 108,292 ________ 147,655 3.944% 14,435 39,712 ________ 54,147 490,774 18.383% 0 UWHSD 0 0 ________ 0 54,147 0.000% 280,229 10.755% 2.704% 18.080% 66,173 182,048 ________ 248,220 100.0% 366,000 1,006,900 3.944% 70,457 2.704% Amount paid to IFA in 2011 0 173,847 Actual Core Budget Needs Over (Under) Payment of Debt Service WDM 100.0% 501,000 1,365,500 4.622% 0 1,168,879 30.904% 154,829 421,994 ________ 576,823 123,393 0 0 Amount paid to IFA in 2010 - 4.622% 23,156 63,113 ________ 86,270 9,897 27,227 ________ 37,123 Total Amount Collected for Core Debt S 10 & 11 Percentage for 2011 Core 3,105 Pl Hill Percentage for 2011 Principal Interest Percentage for 2010 Core 2,872 Norwalk Principal and Interest Collected Principal and Interest Collected 100.0% 11.668% Principal Interest 825,043 30.904% 471,098 18.080% Percentage for 2011 Expansion Principal Interest Principal and Interest Collected Percentage for 2011 SW Principal Interest Principal and Interest Collected 3,239,400 100.0% Total Amount Collected for FY11 Debt Serv Percentage for 2011 Expansion 1,524,391 100.0% Amount paid to IFA in 2011 Percentage for 2011 SW 27,212 12,654 2,786 114,367 41,940 28,754 192,261 1,063,389 93,904 22,888 12,654 3,683 2,786 811 394,596 96,178 41,940 12,207 99,211 24,181 663,358 161,685 2,587,780 Amount paid to IFA in 2011 522,000 1,002,391 366,000 697,389 - 651,620 Actual Expan & SW Budget Needs Over (Under) Payment of Debt Service WASTEWATER RECLAMATION AUTHORITY Debt Service Adjustments for New Debt 2008-2010 Fiscal Year 2013 Reconciliation of Debt Greenfield Service SRF / New Expansion Money Percentage in 2009 Budget Principal Interest * collected from Expan Commty collected from Expan Commty Principal and Interest Collected 2009 Percentage in 2010 Budget * Principal collected from Expan Commty Interest collected from Expan Commty Principal and Interest Collected 2010 Polk City collected in 28E * Amount Paid Final Percentage for 2009 * P City Altoona Ankeny Bondurant Clive Cumming Surcharge (Expansion) (Expansion) (Expansion) (Expansion) (Expansion) 1.550% 8.370% 20.930% 1.380% 8.960% 0.030% 1,550 _________ 1,550 1.615% 8,046 ________ 8,046 9,596 9,596 1.550% Amount Due for 2009 * Amount Due for 2010 Amount Due Expansion only Over (Under) Paid SRF / New Money for SWADF Percentage in 2009 Budget Principal collected from all commty Interest collected from all commty * Percentage in 2010 Budget Principal collected from all commty Interest collected from all commty * Polk City collected in 28E * Amount Paid * Amount Due for 2010 Amount Due SWADF only Over Paid 63,102 12,912 145,286 20.610% 1.636% 2,389 5,762 ________ 8,151 10,957 1.360% 32,336 20.329% 179 18,037 ________ 18,216 8.480% 12,381 29,868 ________ 42,249 1.636% 44 106 ________ 149 0 0 ________ 0 0 0 ________ 0 0 0 ________ 0 210 0 0 47 0 0 0.030% 13,838 8.363% 0 0 ________ 0 0.030% 60,466 8.820% 2,134 1 60 ________ 61 0.028% 58,099 129,492 10,421 53,271 178 0 0 12,719 (3,123) 71,012 (7,909) 161,828 (16,543) 12,555 (1,598) 67,109 (6,644) 225 (15) 0 0 0 0 Polk City Altoona Ankeny Bondurant Clive Cumming DM GP HOC 0.942% 5.070% 12.680% 0.840% 2.450% 0.020% 34.700% 0.250% 5.500% 12.270% 0.977% 2.220% 0.020% 36.120% 0.250% 0.967% 10,596 10,596 0.942% 0 23,692 ________ 23,692 55 33,551 ________ 33,606 57,299 5.012% 4,476 * 20.620% 30,105 72,628 ________ 102,733 28 2,778 ________ 2,806 Plaza 10,287 Amount Due for 2009 Final Percentage for 2010 9.250% 13,505 32,580 ________ 46,085 9.121% 5,896 ________ 5,896 Principal and Interest Collected 2010 Final Percentage for 2009 1.615% 4,700 ________ 4,700 Principal and Interest Collected 2009 419 42,134 ________ 42,553 8.230% 2,432 Final Percentage for 2010 167 16,850 ________ 17,017 Des Moines 0.965% 23,817 5.449% 0 59,254 ________ 59,254 123 74,850 ________ 74,973 134,227 12.542% 0 3,925 ________ 3,925 10 5,960 ________ 5,970 9,895 0.827% 59,599 12.145% 0 11,449 ________ 11,449 22 13,543 ________ 13,565 0.977% 0 122 ________ 122 25,014 2.429% 3,930 0 93 ________ 93 216 0.020% 11,542 2.208% 0 162,154 ________ 162,154 361 220,341 ________ 220,702 382,856 34.479% 95 0.017% 0 1,168 ________ 1,168 3 1,525 ________ 1,528 2,696 0.244% 163,842 35.914% 1,159 0.246% 5,163 29,152 64,975 5,227 11,813 91 192,139 1,316 9,639 957 52,969 4,330 124,574 9,653 9,157 738 23,355 1,658 186 30 355,981 26,875 2,476 220 Debt Servicing Johnston 0 0 ________ 0 Pleasant Polk Hill County West (Expansion) (Expansion) (Expansion) (Expansion) Total $ 4.390% 19.700% 4.760% 31.480% 100.0% Norwalk 88 8,837 ________ 8,925 USSD 0 0 ________ 0 0 0 ________ 0 394 39,658 ________ 40,052 0 0 ________ 0 0 0 ________ 0 0 0 ________ 0 19.220% 28,061 67,697 ________ 95,758 0 0 ________ 0 4.230% 0 0 ________ 0 0 6,176 14,899 ________ 21,075 30,000 0 0 4.320% 0 UWHSD 0 0 4.174% Des Moines 95 9,582 ________ 9,678 4.620% 135,810 0 19.400% 6,778 Waukee 6,745 16,273 ________ 23,018 32,695 4.690% 30,438 0 18.949% 630 63,372 ________ 64,002 2,000 201,309 31.690% 46,267 111,619 ________ 157,886 100.0% 146,000 352,220 221,888 710,009 30.990% 7,358 4.551% Expansion Borrowings Percentage for 2009 48,622 31.234% Principal and Interest Collected (1,116) 100.0% 156,895 100.0% 0 0 120,702 0 28,989 198,955 636,983 0 0 33,366 (3,366) 0 0 0 0 151,140 (15,330) 0 0 36,347 (3,652) 247,577 (25,690) 793,879 Pl Hill Polk Co USSD UWHSD Waukee WDM 1.490% 2.660% 1.200% 0.370% 11.940% 4.360% 2.890% 19.080% 0 6,963 ________ 6,963 1.350% 14 8,235 ________ 8,249 15,212 1.484% 0 12,430 ________ 12,430 2.520% 25 15,373 ________ 15,398 27,828 2.630% 7,052 1.345% 0 5,608 ________ 5,608 1.210% 12 7,381 ________ 7,393 13,001 1.196% 12,498 2.494% 0 1,729 ________ 1,729 0.310% 3 1,891 ________ 1,894 3,623 0.371% 5,683 1.207% 0 55,796 ________ 55,796 11.440% 114 69,787 ________ 69,901 125,697 11.805% 1,763 0.313% 56,097 11.320% 0 20,374 ________ 20,374 4.070% 41 24,828 ________ 24,869 45,243 4.303% 20,448 4.021% 0 13,505 ________ 13,505 2.750% 28 16,776 ________ 16,803 30,308 2.854% 13,562 2.719% 0 89,161 ________ 89,161 18.860% 189 115,051 ________ 115,239 204,401 18.862% 89,631 18.660% Principal and Interest Collected Total Amount Collected for Expansion Debt Serv Amount paid to IFA in 2009 Percentage for 2010 26,588 Norwalk Percentage for 2010 Principal Interest Percentage for 2009 0 Johnston Principal Interest Amount paid to IFA in 2010 1,000 155,895 4,000 632,983 - (83,870) 100.0% 0 467,303 Actual Expansion Budget Needs Over (Under) Payment of Debt Service Percentage for 2009 Principal Interest Principal and Interest Collected 100.0% 1,000 610,025 (813) 1,088,111 100.0% Percentage for 2010 Principal Interest Principal and Interest Collected Total Amount Collected for SW Debt Serv Percentage for 2009 475,194 100.0% Amount paid to IFA in 2009 Percentage for 2010 7,196 13,343 6,457 1,675 60,562 21,512 14,547 99,830 534,997 14,248 964 25,840 1,988 12,141 860 3,438 186 116,658 9,039 41,960 3,283 28,109 2,200 189,461 14,939 1,010,191 Amount paid to IFA in 2010 0 475,193 1,000 533,997 - 77,921 Actual SW Budget Needs Over (Under) Payment of Debt Service WASTEWATER RECLAMATION AUTHORITY Debt Service for pre 7/1/04 Commitments Fiscal Year 2013 SRF & 2004 A Debt Issue 2004A (refunding) Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service SRF 06 1995 Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service SRF 07 1996 Percentage Principal Interest Gross Principal and Interest Reserve Interest Income Net Debt Service Polk Warren County West Clive Des Moines Johnston Hill County USSD UWHSD Greenfield Norwalk Des Moines Total $ $ $ $ $ $ $ $ $ $ $ ________ ________ Net Debt Service SRF 04 1995 Percentage Principal Interest Pleasant 0 ________ ________ ________ ________ 0 0 10.15% 20,503 1,947 ________ 20.57% 41,551 3,946 ________ 22,227 45,045 2.31% 16,771 2,188 ________ 71.08% 516,041 67,336 ________ 583,377 (1,635) ________ 5,735 748 ________ 6,484 (18) ________ 18,906 581,742 6,466 22,450 (223) ________ 18,959 (53) ________ 2.31% 45,498 (453) ________ 8,339 1,694 ________ 71.08% 256,599 52,117 ________ 10,002 ________ 307,771 ________ 10,033 (31) ________ 308,716 (945) ________ ________ ________ 0.00% 0 0 ________ 0 0 ________ 0 0.00% 0 0 ________ 0 0 ________ 0 0.79% 0.79% 2,852 579 ________ 3,431 (11) ________ 3,421 ________ ________ ________ 0 0 0.00% 0 0 ________ 0 0 ________ 0 ________ ________ ________ ________ 0 0 20.65% 41,713 3,962 ________ 11.63% 23,493 2,231 ________ 45,220 25,468 45,675 (454) ________ ________ ________ 25,724 (256) ________ 0 0.00% 0 0 ________ 0 0 ________ 5.44% 39,494 5,153 ________ 6.25% 45,375 5,921 ________ 2.63% 19,094 2,491 ________ 21,585 (60) ________ 3,848 502 ________ 4,350 (12) ________ 17,596 44,523 51,152 21,525 4,338 7,762 1,576 ________ 5.44% 19,638 3,989 ________ 6.25% 22,563 4,583 ________ 9,309 ________ 23,555 ________ 27,062 ________ 2.15% 9,338 (29) ________ 44,648 (125) ________ 23,627 (72) ________ 51,296 (144) ________ 27,145 (83) ________ 2.63% 9,494 1,928 ________ 11,423 (35) ________ 11,388 ________ 0 0.00% 0.53% 0.53% 1,913 389 ________ 2,302 (7) ________ 2,295 ________ ________ ________ 0 ________ ________ 0 2004A (refunding) Percentage Principal Interest Net Debt Service SRF 04 1995 Percentage Principal Interest 3% 37.00% 74,740 7,098 ________ 100.00% 202,000 19,185 ________ 81,024 218,985 8.10% 58,806 7,673 ________ 100.00% 726,000 94,733 ________ 5,893 66,293 818,433 2,599 528 ________ 8.10% 29,241 5,939 ________ 100.00% 361,000 73,322 ________ 434,322 (1,330) ________ Gross Principal and Interest Reserve Interest Income 3,118 ________ 35,072 ________ 432,992 ________ Net Debt Service 0 0 ________ 0 0 ________ 0 2.15% 15,609 2,037 ________ 17,646 (49) ________ ________ ________ Debt Issue 0 0.72% 5,227 682 ________ 5,909 (17) ________ 0.72% 3,127 (10) ________ 81,838 (814) ________ 66,479 (186) ________ 35,180 (108) ________ 221,185 (2,200) ________ 820,733 (2,300) ________ 0 0 0 0 0 0 0 0 0 0 0 51,135 934,558 9,886 26,906 68,078 123,434 58,380 6,633 9,010 182,390 1,470,410 0 51,442 0 937,591 0 9,915 0 26,984 0 68,275 0 124,116 0 58,732 0 6,652 0 9,036 0 183,498 0 1,476,240 Gross Principal and Interest Reserve Interest Income Net Debt Service SRF 06 1995 Percentage Principal Interest 3% Gross Principal and Interest Reserve Interest Income Net Debt Service SRF 07 1996 Percentage Principal Interest 3% Net Debt Service to Communities for Existing Debt Subtotal 2004 A Subtotal SRF Subtotal Debt Service Re Subtotal Debt Service SRF 2/14/2012