business activities
support you in
engineering
prefabrication in
our workshop
on-site assembly of the technological systems
industrial activities
brewery
dairy
energy
pharmacy
food
nuclear
cosmetics
chemistry
biotechnology
environmental
protection
construction
our business philosophy
quality
safety
important figures
employment
(people)
turnovers
(mln PLN)
contribution of industrial activities
the standards and certificates
the standards and certificates
the standards and certificates
our workshop
land area
6.925 m2
height of the
production hall
10,06 m
gantry frames
2 x 12,5 T
1 x 2,0 T
production hall area
2.775 m2
what we manufacture in our workshop
tanks and reactors
pipe fences and flow plates
elements of process pipelines
with diameters from
DN 10 to DN 1200
pilot plants
service skids – a pump
system
what we manufacture in our workshop
complete process
systems – SKIDs
special process piping
(for a nuclear power
station)
heat exchangers,
evaporators
piping systems,
tunnels, ducts
storage and process
tanks
what we manufacture in our workshop
platforms,
steelworks
manifolds
ducts
mobile process
arrangements
SKIDs and manifolds
what we do at construction sites
pressure tanks
complete process
installations
orbital welding
process and media
piping
supporting structures,
platforms, stairs,
railings
heat and cold
insulation
pipe bridges
our main clients
awards and honours
our primary goal is to support the client in achieving success
selected projects in the years 2007-2015
selected projects in the years 2007-2015
selected projects in the years 2007-2015
GEA TBS / HEINEKEN
Sevilla 2005-2007
Buyer:
GEA Tuchenhagen Brewery Systems and GEA HUPMANN AG
Scope of work:
Assembly of complete process system and brewery plant.
Assembly, welding and thermal insulation of process plants
in fermentation cellars, CIP, fermentation and storage
stations.
Turnkey project.
Moving of tanks, equipment into the hall, prefabrication of
carrying structures under pipelines, laying and welding of
pipelines.
Trials, participation in commissioning.
105 000 hours.
selected projects in the years 2007-2015
TOOTHPASTE FACTORY COLGATE
Świdnica 2006-2013
Buyer:
Colgate – Palmolive Mfg (Poland) Sp. z o.o.
Scope of work:
Building and installation work at the toothpaste site.
Process plants and utility media.
Construction and as-built documentation.
Validation of toothpaste manufacturing plant.
Extension of the piping system.
Supply of a complete CIP unit including automation and
control systems.
selected projects in the years 2007-2015
UNILEVER POLSKA S.A.
Poznań 2007
Buyer:
Unilever Polska S.A.
Scope of work:
Process plant for soup manufacture in Unilever Polska S.A.
Manufacturing Site in Poznań.
Delivery together with installation and commissioning of the
process plant and preparation of thermal insulation on
process lines.
selected projects in the years 2007-2015
PROCESSING OF FRUIT AND VEGETABLES PLANT
Mogielnica 2007
Buyer:
Holvrieka Ido BV
Scope of work:
Manufacturing and installation of 6 tanks 1000m3
selected projects in the years 2007-2015
PROCTER&GAMBLE POLSKA SP. Z O.O.
Aleksandrów Łódzki 2007-2014
Buyer:
Procter & Gamble Polska Sp. z o.o.
Scope of work:
Assembly, welding and installation of pipelines and hook up
facilities, process plants and utility media.
CIPs and SKIDs
selected projects in the years 2007-2015
LECH BROWAR WIELKOPOLSKI S.A.
Poznań 2008
Buyer:
Holvrieka Ido BV
Scope of work:
Assembly, welding, installation and insulation of
32 fermentation tanks V = 5500 hl
selected projects in the years 2007-2015
MBEYA BREWERY (SAB MILLER)
Tanzania 2009
Buyer:
Krones AG
Scope of work:
Assembly, welding, CIP, filtration, fermentation, filling plants;
Utility pipelines (steam, condensate, cooling water) thermal
insulation.
Turnkey project.
selected projects in the years 2007-2015
MONDELEZ INTERNATIONAL
Skarbimierz 2009 - 2014
Buyer:
Cadbury Wedel
Line of: Crunchy, FCCW, Turkish, Double Decker, Picnic
Scope of work:
Process hot water; design, manufacture, delivery, installation and
commissioning of hot process water system 80°C on Crunchy line
including fittings, placed on Skid frame, unloading and assembly
of process equipment.
Design, manufacture, delivery, installation and commissioning of
low temperature hot water exchangers (LTHW) including pipelines
and fittings, supports for LTHW pipelines, access platforms and
process media systems; unloading and assembly of process
equipment.
selected projects in the years 2007-2015
WATER TREATMENT STATION
Bochnia 2009/2010
Buyer:
Veolia Water Systems Sp. z o.o.
Scope of work:
Modernization, extension and installation works.
selected projects in the years 2007-2015
WASTE WATER TREATMENT PLANT CZAJKA
Warszawa 2009-2013
Buyer:
Veolia Water Systems Sp. z o.o.
Scope of work:
Assembly of process plant. Prefabrication of the pipelines.
Assembly of equipment, participation in commissioning.
STUOŚ-CZAJKA:
Thermal Effluent Sediment Disposal Station: Documentation,
prefabrication, delivery and assembly of ducts.
Thermal protection insulation.
selected projects in the years 2007-2015
FRUIT JUICES PRODUCTION PLANT
WESERGOLD DODOW
Germany 2010/2011
Buyer:
Ziemann International GmbH
Scope of work:
Manufacturing and installation of 8 tanks 1500m3
selected projects in the years 2007-2015
KASZTELAN Brewery
Sierpc 2013 - 2014
Buyer:
Krones Sp. z o.o.
Scope of work:
9 CCT Ø6800mm including walkway, ladder, connecting walkway
Premanufacture of elements of the tanks
Assembly and welding of the tanks
Pressure tests
Documentation UDT / TUV
selected projects in the years 2007-2015
KASZTELAN Brewery - Brewhouse
Sierpc 2013 - 2014
Buyer:
Ziemann International GmbH
Scope of work:
Placing and installation of brewing vessels
Assembly of pumping systems, pipe bridges, piping,
Assembly of ”dry part”
Tests and start-up
selected projects in the years 2007-2015
UNILEVER BYDGOSZCZ
Bydgoszcz 2013, 2014
Buyer:
GEA Polska S.A./ GEA PE United Kingdom
Scope of work:
Process system for manufacturing and distribution of creams and gels:
Skids and valve block prefabrication;
Piping system;
Prefabrication and assembly of CIP station with piping;
Product transfer installation with recovery system (PIG stations).
selected projects in the years 2007-2015
Catalysts factory BASF
Środa Śląska 2013-2015
Buyer:
MOSTOSTAL ZABRZE S.A.
Scope of work:
Process installation for production of catalysts for a mobile
NOx reduction system
Technological and utilities installations
Premanufacture of the valve blocks;
Premanufacture and assembly of the pipelines
Building and system works
Construction and as-built documentation
Start-up of the system
Project value:
6.800.733,08 Euro
selected projects in the years 2007-2015
Vreugdenhil Dairy Foods Nederland
Görinchem 2014 - 2015
Buyer:
GEA Process Engineering Nederland BV & GEA Nu-Con Ltd
Scope of work:
Process, technological and utilities installations
Premanufacture and TIG welding of the valve blocks
Premanufacture of SKIDs
Premanufacture and assembly of the pipelines
Building and system works
Construction and as-built documentation
Start-up of the system
Project value:
2.488.771,02 Euro
selected projects in the years 2007-2015
Royal Friesland Campina
Borculo 2014 - 2015
Buyer:
GEA Process Engineering Nederland BV, GEA Nu-Con Ltd
GEA France, GEA Denmark
Scope of work:
Process, technological and utilities installations
Premanufacture and welding of the valve blocks
Premanufacture of SKIDs
Premanufacture and assembly of the pipelines and service platforms
Construction and as-built documentation
Start-up of the system
Project value:
3.228.600,00 Euro
selected projects in the years 2007-2015
Paulaner Germany
Münich 2014 - 2015
Buyer:
KRONES AG
Scope of work:
Process, technological and utilities installations
Premanufacture and welding of the valve blocks
Premanufacture of SKIDs
Premanufacture and assembly of the pipelines and service platforms
Construction and as-built documentation
Start-up of the system