PRELIMINARY PRELIMINARY
Transcription
PRELIMINARY PRELIMINARY
PRELIMINARY CITY OF ROLLA 10 YEAR CAPITAL IMPROVEMENT PLAN PRELIMINARY DRAFT Public Works Department August, 2007 Prepared and Produced by: 1 Department of Public Works CITY OF ROLLA 10 YEAR CAPITAL IMPROVEMENT PLANNING and FINANCING for CAPITAL IMPROVEMENTS Financing is often thought of as the beginning and end of capital improvement planning. An accurate statement but CIP is more than financing. CIP is also: • Engagement – The City Council must be actively involved in planning • Empowerment – The Community must be involved in the visioning & planning process • Goal Oriented – Must be achievable and sustainable; think big but realistic • Simple – not intended to be a technical exercise; must be understandable for ownership Key Steps in CIP: • Develop and compile an inventory/list of capital replacement items and a list of new projects Perform financial analysis on wants/needs to determine funding impact (debt limits; debt to • operating expenses) • Strategically identify and pursue grants/funding partners • Define and obtain new sources of revenue Forecast of revenues and expenditures to determine funds needed for operations and • available for capital improvements ALTERNATIVE FUNDING SOURCES Local option sales taxes continue to be the highest generator of municipal revenue (52%) and that number continues to trend upward. In Missouri there are six sales tax options available to cities: General Revenue (RSMo 94.500) Generates approximately $3.8 million for Rolla’s General Fund Capital Improvements (RSMo 94.577) Generates approx. $1.9 million for Street/Cap Imp Fund (1986) Transportation (RSMo 94.700) Generates approximately $1.9 million for Street/Cap Imp Fund (1996) Parks/Storm Water (RSMo 644.032) Generates approx. $1.9 million for Rec Center (“at a minimum”) (1999 – Sunsets on 12/2013) Fire Protection (RSMo 321.242) Up to ¼ percent deposited in a special fund Economic Development (RSMo 67.1305) Up to ½ percent deposited in a special fund [County Law enforcement Tax] Up to ½ percent; Phelps County’s rate is 3/8 percent - Animal Control? Other Funding Options: Local Use Tax (RSMo 144.757) – over 80 MO Cities have passed this tax on transactions that individuals and businesses conduct with out-of-state vendors, including catalog and direct market sales (levels the playing field for physically placed businesses). Revenue projections of $200,000+ per year. Municipal Property Tax – Generates approximately 15% of municipal revenue ($792,000 in Rolla) Business Licenses – Applies to occupation, merchant and manufacturers’ licenses that can be based on a percentage of gross receipts, number of employees, square footage of business or a flat rate depending on the type of business. Generates approximately 3% of municipal revenues though much less in Rolla (flat rate for processing cost). Could generate $150,000+. Special Assessments/Improvement Districts – A variety of statutory authorities ranging from assessments on existing properties including downtown, neighborhood, community and transportation districts - assesses the cost of capital improvements to the developments and areas deriving the most significant benefit. Impact Fees – Fees that can be assessed on new developments to cover the cost or “impact” on existing infrastructure (i.e. transportation, parks and storm water). CITY OF ROLLA TAX RATE SETTING 8 YEAR COMPARISON General Municipal Purposes Public Library Purposes Public Park Purposes Rate per $100.00 $ $ $ $ 2000 0.6743 0.2818 0.1711 1.1272 City Valuation Personal Property $ $ 96,458,768 35,291,532 $ 108,974,370 $ 37,897,158 $ 112,041,719 $ 39,806,111 $ 114,327,809 $ 39,348,218 $ 117,468,783 $ 35,657,164 $ 122,012,140 $ 35,569,140 $ 126,343,343 $ 41,446,648 $ 186,530,545 $ 43,414,509 Total Current Valuation $ 131,750,300 $ 146,871,528 $ 151,847,830 $ 153,676,027 $ 153,125,947 $ 158,709,746 $ 167,789,991 $ 229,945,054 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Distributed Assessed Valuation General Library Parks 650,421 271,821 165,041 1,087,283 $ $ $ $ 2001 0.6574 0.2747 0.1668 1.0989 716,398 299,353 181,769 1,197,519 $ $ $ $ 2002 0.6574 0.2747 0.1668 1.0989 736,562 307,779 186,886 1,231,226 $ $ $ $ 2003 0.6596 0.2756 0.1674 1.1026 754,106 315,087 191,385 1,260,578 $ $ $ $ 2004 0.6745 0.2818 0.1712 1.1275 792,327 331,027 201,107 1,324,461 2005 0.6745 0.2818 0.1712 1.1275 822,972 343,830 208,885 1,375,687 $ $ $ $ 2006 0.6267 0.2614 0.1543 1.0424 791,794 330,261 194,948 1,317,003 $ $ $ $ 2007 0.4443 0.1853 0.1094 0.7390 828,755 345,641 204,064 1,378,461 CITY OF ROLLA 15 YEAR SALES TAX ANALYSIS 1 cent General Fund FISCAL YEAR 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 (est) AMOUNT % CHANGE $ 2,075,506 $ 2,215,310 $ 2,295,939 $ 2,438,958 $ 2,465,849 $ 2,619,314 $ 2,769,066 $ 2,952,726 $ 3,137,814 $ 3,257,101 $ 3,257,428 $ 3,456,877 $ 3,547,319 $ 3,622,085 $ 3,712,637 6.61% 6.74% 3.64% 6.23% 1.10% 6.22% 5.72% 6.63% 6.27% 3.80% 0.01% 6.12% 2.62% 2.11% 2.50% 15 year avg. DRAFT Public Works Department $ $ $ $ 4.42% 2 CITY OF ROLLA 10 YEAR CAPITAL IMPROVEMENT DRAFT DOCUMENT AUGUST 2007 SUMMARY PART A – FUNDED PROJECTS 10 YEAR STREET IMPROVEMENTS 10 YEAR BIKEPATH / SIDEWALK IMPROVEMENTS 10 YEAR STORM SEWER IMPROVEMENTS FLOOD CONTROL IMPROVEMENTS – 2007 THROUGH 2009 10 YEAR AIRPORT IMPROVEMENTS 10 YEAR RECYCLING CENTER IMPROVEMENTS PROPOSED HYPOINT INDUSTRIAL PARK ROUNDABOUT TOTAL $23,547,017.50 PART B – UNFUNDED PROJECTS CENTRALIZED PUBLIC FACILITIES RPW BUSINESS PARK EXPANSION OF HYPOINT INDUSTRIAL PARK 10 YEAR FIRE DEPARTMENT IMPROVEMENTS 10 YEAR POLICE DEPARTMENT IMPROVEMENTS 10 YEAR PARK IMPROVEMENTS 10 YEAR RECREATION CENTER IMPROVEMENTS COMPREHENSIVE PLAN – MAJOR THOROUGHFARES ROLLA WEST IMPROVEMENTS CITYWIDE WIRELESS INTERNET SERVICE UNIVERSITY TECHNOLOGY PARK $ 6,100,000.00 $ 870,000.00 $ 2,100,000.00 $ 9,579,977.00 $ 530,000.00 $ 4,790,000.00 $20,600,000.00 $25,120,000.00 $36,000,000.00 $ 1,000,000.00 $ 3,000,000.00 TOTAL $109,689,977.00 DRAFT Public Works Department $14,415,185.00 $ 1,720,771.50 $ 2,516,061.00 $ 435,000.00 $ 4,110,000.00 $ 200,000.00 $ 150,000.00 3 PART A – FUNDED PROJECTS DRAFT Public Works Department 4 10 YEAR STREET IMPROVEMENTS Construction Season 2007 Reconstructs Overlays Construction Season 2008 Reconstructs Overlays Construction Season 2009 Reconstructs Overlays Construction Season 2010 Reconstructs Overlays Construction Season 2011 Reconstructs Overlays Construction Season 2012 Reconstructs Overlays Construction Season 2013 Reconstructs Overlays $1,101,500.00 $ 355,860.00 $1,457,360.00 $ 769,905.00 $ 670,155.00 $1,440,060.00 $ 641,500.00 $ 687,075.00 $1,328,575.00 $ 578,665.00 $ 767,890.00 $1,346,555.00 Traffic congestion and street maintenance are issues consistently mentioned by Rolla residents in attitude surveys as areas of concern. The 2005 Comprehensive Planning Survey indicated: “citizens were least satisfied with traffic flow and the condition of city streets”. Efforts to improve and maintain our streets will not end with the 8-Year Plan. A bond totaling $4,000,000 for street improvements enabled several needed enhancements. Signal and interchange enhancements at Highway 63 and Interstate 44, completed in 2006, have greatly reduced traffic congestion and improved access to our community. Lions Club Drive, a two mile thoroughfare proposed since the implementation of the 1975 Comprehensive Plan has also been constructed and provides a much needed east-west route through the south side of Rolla. Remaining projects to be funded by this bond are currently under construction and include: • Southview Drive - from Highway 72 to Lions Club Drive, to serve future needs and developments. • Rolla Street – from Lariat Drive to Little Oaks Road to bring the existing street to city standards to meet future needs and growth. The new plan proposed for the next ten years also includes funds to ensure that improvements made over the last eight years will be properly maintained. Transportation and Capital Sales Tax revenues totaling $14,415,185 will fund $4,591,545 in major reconstructs and $9,823,640 in overlays. $ 426,225.00 $ 956,060.00 $1,382,285.00 $ 543,750.00 $ 931,440.00 $1,475,190.00 $ 530,000.00 $1,010,830.00 $1,540,830.00 Construction Season 2014 Overlays $1,444,330.00 Construction Season 2015 Overlays $1,500,000.00 Construction Season 2016 Overlays $1,500,000.00 NTS TOTAL 10 YEAR BUDGETED STREET IMPROVEMENTS - $14,415,185.00 -Reconstructs -Overlay DRAFT Public Works Department 5 10 YEAR BIKEPATH/SIDEWALK IMPROVEMENTS SIDEWALKS Calendar Year 2007 Audubon Trail – 1,181 lf Northside Park Trail – 1,238 lf Tenth Street Bike Trail from Forum Drive to Lovers Lane Southview Drive Rolla Street (north of Lions Club Drive) El Bosa Nova/White Columns Drive Calendar Year 2008 Deible Loop Bikepath Phase I from Oak Knoll South II Subdivision to Acorn Trail trailhead on Highway “O” Deible Loop Bikepath Phase II from Oak Knoll South II Subdivision to Ramsey Place Subdivision Coventry Trail Phase I from Pinetree Road to Coventry Lane Rolla Street (south of Lions Club Drive) Little Oaks Road Sidewalk improvements – 1,105 lf Calendar Year 2009 Deible Loop Bikepath Phase III from Wyman School to Green Acres Park Osage Drive Sidewalk improvements – 1,459 lf Calendar Year 2010 Deible Loop Bikepath Phase IV from Ramsey Place to Wyman School Sidewalk improvements – 2,372 lf Calendar Year 2011 Coventry Trail Phase II from Phase I to east side of park Sidewalk improvements – 2,089 lf Calendar Year 2012 Sidewalk improvements – 2,062 lf The Public Works Department has been engaged in a plan to build a citywide sidewalk network for pedestrian and bicycle use. The goal of the plan was to provide a main sidewalk network to connect all of the major pedestrian traffic generators across the city, providing safe and easy access to shopping, recreation, government, and medical sites all over Rolla. The Proposed Capital Improvement Plan provides for continued enhancements to this network with the construction of an additional 4.70 miles of sidewalk over the next eight years. $ 12,000.00 $ 20,000.00 $339,132.00 $ 34,290.00 $ 26,305.00 $ 9,851.00 $441,578.00 BIKEPATHS 2007 $160,000.00 $155,500.00 $ 26,305.00 $ 35,438.00 $ 13,812.50 $511,056.50 According to the Parks Master Plan, “68% of households want the trail system to be expanded”. The community attitude and interest citizen survey conducted for the Parks Master Plan indicated that 45% of the respondents listed paved walking/biking trails as the number one most important park facility to their household. 42% of the respondents stated that they would be willing to fund more walking/biking facilities with their tax dollars. 2014 $120,000.00 2013 2007 NTS 2008 2007 $240,200.00 $ 54,537.50 $ 18,237.00 $312,974.50 $179,950.00 $ 29,650.00 $209,600.00 $116,000.00 $ 26,112.50 $142,112.50 2010 2012 2011 2011 $ 25,775.00 2009 Calendar Year 2013 Sidewalk improvements – 2,219 lf $ 27,737.50 Calendar Year 2014 Sidewalk improvements – 3,995 lf $ 49,937.50 2008 2007 2007 TOTAL 10 YEAR PLANNED BIKEPATH/SIDEWALK IMPROVEMENTS - $1,720,771.50 2009 2009 2008 The existing pedestrian/biking facility has become extremely popular with the citizens of Rolla over the last several years and sees a constant stream of pedestrians, cyclists and in-line skaters. The City of Rolla has been fortunate enough over the last eight years to have received several ISTEA and TEA21 grants from the Missouri Department of Transportation (MoDOT) and has utilized them to fund a multi-phase project intended to provide a comprehensive bike and pedestrian trail network for the citizens of the area. Communities receiving these grants are typically responsible for providing a percentage of matching funds. The Ten Year Capital Improvement Plan provides funding for an additional 5.63 miles of trail to be constructed in two locations over the next five years; Deible Trail on the south side of town and Coventry Trail on the east central side of Rolla. This would result in a total of 14.9 miles of recreational trails within the City of Rolla. In addition, the Ten Year Plan provides for the development of several new parks in the south side area, each of which would be accessible by the Deible Loop Pedestrian Bikepath. These trails will be very similar in nature to the ACORN Trail and will incorporate both areas into the existing facility thereby providing an alternative means of transportation to local amenities and reducing motorized travel. All sidewalks and trails will be fully accessible to those with disabilities. -Bikepath -Sidewalk improvements DRAFT Public Works Department 6 Calendar Year 2007 Project 212 – Phase I – Southview (Lions Club to Hihgway 72) Project 212 – Phase II – Rolla Street, White Columns, El Bosa Nova Calendar Year 2008 Eighteenth and Farrar (Area 13) Winchester Drive (Area 22) Spillman Avenue (Area 6) Rolla Street (Area 4) Calendar Year 2009 Rolla Street (Area 4) Forum Drive (Area 14) Calendar Year 2010 Rolla Street (Area 4) Forum Drive (Area 14) Calendar Year 2011 Johnson Street (Area 19) Great Oaks (Area 30) Fox Creek (Area 27) Bryant Drive (Area 24) Campus Apartments (Area 3) Calendar Year 2012 Thirteenth and Elm (Area 12) Poole and Kingshighway (Areas 1 & 2) Maple and Twelfth (Area 11) Calendar Year 2013 Lincoln Lane (Area 15) Columbia Avenue (Area 26) Black Street (Area 5) Maple and Twelfth (Area 11) Greenbriar Drive (Area 16) Poole and Kingshighway (Areas 1 & 2) Calendar Year 2014 Redbud Drive (Area 17 & 18) Oak Street south of Sixth (Area 8) Poole and Kingshighway (Areas 1 & 2) Calendar Year 2015 Poole and Kingshighway (Areas 1 & 2) Oak Street south of Sixth (Area 8) Calendar Year 2016 Poole and Kingshighway (Areas 1 & 2) Oak Street south of Sixth (Area 8) 10 YEAR STORM SEWER IMPROVEMENTS $107,000.00 $160,000.00 $267,000.00 $ 24,067.00 $ 57,641.00 $ 45,223.00 $123,069.00 $250,000.00 $123,509.00 $130,000.00 $253,509.00 STORM WATER SYSTEM The focus over the last eight years has primarily been on the city’s street system. While the streets will continue to be a maintenance priority, the Public Works Department will be shifting focus in a major effort to improve our storm water system. As Rolla continues to grow, the Public Works Department faces many challenges if it is to provide the city with a first-class infrastructure on which to build. We have implemented new storm water management regulations that will guide the city in the area of storm water runoff. They include the adoption of Chapter 15 of the Rolla City Code entitled “Storm Water and Flood Control”(Ord. 2517; Ord. 3500, §2) and the implementation of Land Disturbance Permits that establish minimum storm water improvement requirements to control flooding, erosion and sedimentation occurrences in new land development projects. We have also recently partnered with others in building three major storm water detention facilities and have completed a long-range plan to update and upgrade our storm sewer system, which has not seen major improvements since the Works Progress Administration (WPA) era of the late 1930’s and early 1940’s. Improvements to the storm sewer system will total $2,516,061.00 over the next ten years and will be funded by the Capital Sales Tax. $123,000.00 $133,302.00 $256,302.00 $ 31,638.00 $ 94,716.00 $ 86,559.00 $ 2,861.00 $ 22,935.00 $238,709.00 $ 62,664.00 $120,000.00 $ 67,000.00 $249,664.00 NTS $ 1,614.00 $ 9,431.00 $ 64,370.00 $ 67,686.00 $ 6,205.00 $100,694.00 $250,000.00 $ 61,014.00 $140,000.00 $ 48,986.00 $250,000.00 $110,000.00 $140,000.00 $250,000.00 $109,007.00 $141,870.00 $250,877.00 TOTAL 10 YEAR PLANNED STORM SEWER IMPROVEMENTS - $2,516,061.00 DRAFT Public Works Department 7 FLOOD CONTROL FLOOD CONTROL IMPROVEMENTS - 2007 THROUGH 2009 Another issue consistently mentioned by Rolla residents as an area of concern is storm water flooding, therefore the April 6th election also included a No Tax Increase Bond Issue for Flood Control Improvements. This proposed project would remove approximately 200 homes and businesses from the 100-year flood plain, keep our transportation and utility infrastructure safe from flood damage and improve the water quality of our streams. Improvements would include: RCDC •6 new storm water detention facilities - These facilities will be similar to the flood control/ball field facility built at the corner of Holloway and Tenth Street. •9 box culvert improvements – Improvements will reduce the risk of streets being flooded and impassable during heavy storms. Forum Lakes West •120 acres of open green space and conservation areas - In addition to the flood control benefits, some of this land will ultimately be developed into active park facilities including playing fields, picnic areas and playgrounds. Forum Lakes East White Columns NTS •Citywide creek and erosion control improvements - These improvements will increase the capacity and water quality of our streams. Vichy Road The total cost for these improvements, $3,180,000.00, will be paid for utilizing a bond that will be retired with capital sales tax revenues and a MoDOT Bridge Replacement Grant for $180,000.00. Most of these flood control improvements were completed during 2005 and 2006. Forum Cinema Schuman Pond Highway Patrol/ University of Missouri BerJuan North BerJuan South Timber Creek Centre Facility Bray Detention Junior High Blues Lake Detention Calendar Year 2007 Rolla Street Bridge Highway Patrol/UMR Detention Facility Dutro Carter Creek Sewer Bridge Elimination Blues Lake Detention Facility $200,000.00 $ 10,000.00 $ 15,000.00 $160,000.00 $385,000.00 Calendar Year 2008 Pauline Lane Box Culvert Frisco Branch Gabion $ 20,000.00 $ 10,000.00 $ 30,000.00 Calendar Year 2009 Forum Drive Gabion $ 20,000.00 TOTAL $435,000.00 -Box culvert improvements -Erosion control improvements Veteran’s Memorial Park -Creek channel improvements -Existing detention facility Taylor/Anderson -New detention facility DRAFT Public Works Department 8 10 YEAR AIRPORT IMPROVEMENTS NTS Rolla National Airport “A mile of road will take you a mile. A mile of runway will take you any where in the world.” 22 The Rolla National Airport is a General Aviation Airport located 15 minutes by auto north of Rolla on U. S. Highway 63. Originally constructed to train pilots during World War II, it was later converted to a general aviation airport and turned over to the City of Rolla in the late 1950’s. Rolla National Airport has seen many upgrades over the last decade. These enhancements were primarily funded through Missouri Department of Transportation grants. Past improvements include runway reconstruction, new runway lights, construction of an apron area with a t-hanger, and the installation of a new fueling station. The state, city and our consultant are working together to develop a new master plan for the airport. This document will investigate and recommend the improvements needed over the next two decades. This document is scheduled to be completed in early 2008 and will be included with the citywide Capital Improvement Plan at that time. 13 Projects already in progress or nearing completion include: Addition of a second t-hangar and apron Runway 4-22 lighting improvements New Master Plan $500,000.00 $400,000.00 $140,000.00 Known projects for future years include: Seal and stripe Runway 13-31 and t-hangar apron Aeronautical survey Overlay Runway 4-22 Modify parallel taxiway, Runway 4-22 and overlay main apron area New terminal building Storm sewer improvements TOTAL $220,000.00 $ 50,000.00 $750,000.00 4 $750,000.00 $300,000.00 $1,000,000.00 $4,110,000.00 The city currently receives $150,000.00 per year in federal entitlements that can be utilized for capital improvements. In addition, funding can be obtained through the Missouri Department of Transportation. Until further work is done on the Master Plan and it is ultimately approved by the Federal Aviation Administration, staff recommends planning for an average $30,000.00 funding per year for capital improvements to meet our ten percent match. 31 DRAFT Public Works Department 9 10 YEAR RECYCLING CENTER IMPROVEMENTS 2012 – The Recycling Center, located at 2141 Old St James Road was constructed in 1993. The north warehouse addition was added in 1996. The baling system at the Recycling Center was installed during the original construction. The system consists of a Selco single-ram horizontal baler with automatic wire ties and a conveyor system. This baler is or has been used to compact nearly all of the recyclables processed at the Recycling Center. The materials processed through this system include all paper and cardboard products, all plastic containers, steel and aluminum cans. The baler operates every day, Monday through Friday. In FY 2012-13 the baling system will be twenty years old. Due to equipment advances and improvements, the baler has already begun to become obsolete and replacement parts are becoming more difficult to find. During the past couple of years, some major overhauls/repairs costing thousands of dollars have been needed on the baler due to wear and tear. When the system is replaced, upgrading to a high compaction double-ram baler is recommended. This would allow for more compacation, resulting in heavier bales and therefore more weight being placed on each tractor-trailer load. The estimated cost for replacement of the baling system in the year 2012 is approximately $200,000. Existing Selco Single-ram Horizontal Baler DRAFT Public Works Department City of Rolla Recycling Center 10 Proposed Roundabout Proposed Signal NTS The Public Works Department is currently developing a cost share project for new signals at the ramps for the “V” Highway interchange. In addition, a roundabout is being considered at the intersection of Highway “V” and Hypoint Boulevard. Total match money by the city is estimated at $150,000 with the remainder of the money being acquired through State Transportation Program Entitlement Funds. DRAFT Public Works Department 11 NORTHSIDE PARK IMPROVEMENTS NTS Picnic Table (typical) Lan ds E nd R oad Playground 8’wide Biketrail Basketball Court TOTAL IMPROVEMENTS $20,000.00 $40,000.00 lade 2008 – INSTALLATION OF PLAYGROUND EQUIPMENT $20,000.00 Ros eg INSTALLATION OF BASKETBALL COURT Roa d 2007 – CONSTRUCTION OF BIKEPATH Vienna Road DRAFT Public Works Department 12 PART B – UNFUNDED PROJECTS DRAFT Public Works Department 13 Future Public Services Park CENTRALIZED PUBLIC FACILITIES Phase 1 Solid Waste Shop Vehicle Maintenance Employee Support Total Phase 1 NTS $1,250,000.00 Phase 2 Park Shop Street Shop Paint Shop Heated Wash Bay Welding Shop Traffic Shop Carpenter Shop Outside Wash Bays Top Soil Storage Salt Storage Employee Support Subtotal 1 Animal Shelter Subtotal 2 Total Phase 2 $1,950,000.00 $550,000.00 $2,500,000.00 Phase 3 Administration Total Phase 3 Future Phases Total Future Phases Total All Phases $850,000.00 $1,500,000.00 $6,100,000.00 Field operations for the City of Rolla are wide and varied, from Animal Control to Sanitation. Currently, these different entities are housed in several locations throughout the community. The largest of these facilities is located at the northern end of Sharp Road adjacent to the intersection of U.S. Highway 63 and I-44. Developed in the early 1960’s, this location is home to the Street and Traffic Departments, Sanitation and the Animal Shelter, but space is limited. A recent agreement between the City of Rolla and the Missouri Department of Transportation (MoDOT) to make improvements to the intersection of U.S. Highway 63 and the Interstate 44 interchange has presented an extremely beneficial opportunity to the City. The property located on Sharp Road has been identified as an area with potential for commercial development. Improvements to the 63-44 interchange will greatly increase the efficiency of traffic movement in turn making the possibility of redevelopment of the area more attractive to potential commercial developers. The City will benefit initially by selling this nine-acre tract for commercial development. In anticipation of this sale, plans must be made for the resulting move of several public facilities. This provides the opportunity to centralize the bulk of Public Works activities into a single, more efficient location. Functions located at this “Public Works Yard” would include Vehicle Maintenance, Parks, Recycling, Engineering, Sanitation, Street, Traffic and Animal Control. Following is an estimate of expected costs and a timeline for completion. DRAFT Public Works Department 14 RPW Business Park (draft proposal 8/20/07) TOTAL COST TO CITY - $870,000.00 In early Spring of 2007 the Rolla City Council Authorized the RREC to sell approximately 65 acres located on City property adjacent to the Rolla Public Works Yard for $13,000 per acre. The RREC is proposing to name and market this area as the RPW Business Park. This area located between the BNSF rail lines and the Rolla Public Works Yard/Rolla Recycling Center would be mostly divided into 4+ acre lots for industrial use. This area would be available for the placement of new and expanding industrial, distribution and maintenance businesses which do not require or desire a high visibility location. Per the directive of the council, the lots will be sold for $13,000 per acre. There are three possible points of access to this park; connecting west to Twitty Industrial Park, connecting south from McCutchen Street and connecting east to Rolla Industrial Park (Cantex). East point of access, however, ultimately puts traffic onto Old St. James Road. The firm sale price for lots 1, 2, 3 and 4 is $13,000 per acre. The development should start with Lot 1 to facilitate the extension of the road from Twitty Industrial Park. Lots 9, 10, 11 and 12 would require Army Corps of Engineers permission to move the creek. The site is already served with basic water, sewer and electrical service lines. The cost to actually extend lines into the property would be the responsibility of the buyer. Road construction costs are estimated to be roughly $870,000 if the construction is done “in house”. Private development of the entire proposed road system (providing basic access to the obvious connection points at Twitty Industrial Park, Cantex and McCutchen) would cost roughly $1,305,000. These City expenditures may be offset by the availability of Community Development Block Grants (CDBG) which could return as much as $10,000 per new job to the City of Rolla for infrastructure costs. If there is an assumption of a .25 footprint for new industry then a 5 acre lot would provide space for a building which would be about 50,000 s.f. If this tenant of the building were to employ 40 people (a conservative scenario currently being entertained at Hypoint) then the City would possibly recover $400,000 to offset development costs from only one business in the RPW Park. There are several factors dictating eligible costs, but that is the basic idea behind the use CDBG to subsidize job creation in Rolla DRAFT Public Works Department 15 EXPANSION OF HYPOINT INDUSTRIAL PARK (CUNNINGHAM PROPERTY-118 ACRES); $2.1 MILLION ESTIMATE NTS CUNNINGHAM PROPERTY (118 ACRES) EXISTING INDUSTRIAL PARK Extension of city infrastructure, construction entrance and access road into the property. Roughly half of the jobs created at this site will likely be available to CDBG eligible employees so anticipate a cost offset of roughly $400,000. DRAFT Public Works Department 16 20 YEAR FIRE DEPARTMENT IMPROVEMENTS – THIRD FIRE STATION STAFFING AND EQUIPMENT 20 Year Capital Improvement Plan 3rd Station within first 3 years (2011) Total first 10 years $9,579,977.00 12 Personnel Capital Costs/Debt Services Operations Apparatus Total Expenses Revenues Year End Total Fund Balance 2009-2010 $0 $150,000 $0 $0 $150,000 $925,000 $775,000 $775,000 2010-2011 $0 $150,000 $0 $0 $150,000 $952,750 $802,750 $1,577,750 2011-2012 2012-2013 $642,000 $667,680 $90,000 $90,000 $450,000 $145,000 $165,000 $165,000 $1,347,000 $1,067,680 $981,333 $1,010,772 -$365,668 -$56,908 $1,212,083 $1,155,175 2013-2014 $694,387 $90,000 $147,900 $165,000 $1,097,287 $1,041,096 -$56,192 $1,098,983 2014-2015 $722,163 $90,000 $150,858 $165,000 $1,128,021 $1,072,329 -$55,692 $1,043,291 2015-2016 $751,049 $180,000 $153,875 $165,000 $1,249,924 $1,104,498 -$145,426 $897,865 12 Personnel Capital Costs/Debt Services Operations Apparatus Total Expenses Revenues Year End Total Fund Balance 2019-2020 $878,621 $180,000 $166,559 $0 $1,225,181 $1,243,123 $17,942 $478,526 2020-2021 $913,766 $180,000 $169,891 $0 $1,263,657 $1,280,416 $16,760 $495,285 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 $950,317 $988,330 $1,027,863 $1,068,977 $1,111,736 $1,156,206 $1,202,454 $1,250,552 $180,000 $180,000 $180,000 $180,000 $180,000 $180,000 $180,000 $180,000 $173,288 $176,754 $180,289 $183,895 $187,573 $191,324 $195,151 $199,054 $0 $0 $0 $0 $0 $0 $0 $0 $1,303,605 $1,345,084 $1,388,152 $1,432,872 $1,479,309 $1,527,530 $1,577,605 $1,629,606 $1,318,829 $1,358,394 $1,399,145 $1,441,120 $1,484,353 $1,528,884 $1,574,751 $1,621,993 $15,224 $13,310 $10,994 $8,248 $5,044 $1,354 -$2,854 -$7,613 $510,509 $523,819 $534,813 $543,060 $548,104 $549,458 $546,604 $538,991 Salaries based on 2007-2008 figures with annual increases. Construction cost – 20 year lease purchase/bond 2016-2017 $781,091 $180,000 $156,953 $165,000 $1,283,044 $1,137,633 -$145,411 $752,455 2017-2018 $812,335 $180,000 $160,092 $165,000 $1,317,427 $1,171,762 -$145,664 $606,791 2018-2019 $844,828 $180,000 $163,294 $165,000 $1,353,122 $1,206,915 -$146,207 $460,584 Firestation #1 District Firestation #2 District In the last 10 years the City of Rolla has grown by approximately 1,500 acres. In 2006 the City of Rolla Fire & Rescue was audited by the Insurance Service Office and was informed that for proper fire coverage of the City of Rolla, the Fire Department needed to be expanded to three stations. Additionally in a city survey conducted in 2005 69% of those surveyed indicated they would support building a third fire station. To achieve the necessary dollars needed to support this project, a ¼ cent sales tax is needed. In the first two 2) years proceeds from the tax will need to be put in escrow while building plans, engineering studies, equipment bidding and a hiring of personnel was completed. All salaries are based on 2007-2008 figures with annual cost of living increases. The construction of the fire station will be funded through a 20 year lease purchase. The third station will be situated in the area of Southview and Lion’s Club Drive and be manned 24 hours per day, 365 days a year beginning in 2011. By placing this fire station in this area, the department will be able to reduce response times to south side home owners and help solidify our ISO Class 3 rating. The above listed spreadsheet shows how these associated costs would be expended over a 20 year cycle for the building of the station and major equipment purchases. Proposed Firestation #3 District DRAFT Public Works Department 17 TEN YEAR CAPITAL IMPROVEMENT PLAN EMERGENCY OPERATION CENTER/CENTRAL COMMUNICATIONS EXPANSION/VOLUNTEERS IN POLICE SERVICE OFFICE SPACE Volunteers in Police Service Fiscal Year 2008-2009 Replace Police Station Roof Move into and renovate VIPS area: Construction/Renovation cost Equipment/furniture cost $125,000.00 $ 28,000.00 $ 19,000.00 $172,000.00 Fiscal Year 2010-2011 Communication Improvements Construction /renovation cost Equipment VIPS work area In order to get the needed space to conduct this program and to maintain reasonable security for the Police Department, I recommended that we have Channel 16 vacate their current location and this be utilized for the VIPS program. This is the perfect area to locate such an operation, as it’s already attached to the Police Department and would be a small financial cost to renovate. $ 26,000.00 $ 67,000.00 $ 93,000.00 *Possible partial funding with 911 funds Fiscal Year 2011-2012 Emergency Operations Center relocation/updates Construction cost Equipment cost $220,000.00 $ 45,000.00 $265,000.00 Total I believe that the future in policing is to work alongside the community. With that being said, we need a Volunteers in Police Service (VIPS) program. The volunteers would work with the police on a daily bases, through a VIPS coordinator. Having a strong and active volunteer force is essential for any law enforcement agency struggling to meet the ever-increasing needs of the community it serves. Volunteers activities would include; Administrative Duties such as; enter data, help telephone reporting units take reports of minor and "no suspect" crimes, type reports, file, answer phones, and perform other office tasks, citizen patrols; provide bike patrols in community parks, patrol shopping centers during the holiday season to assist stranded motorists or lost children, write citations for violations of handicapped parking restrictions, home vacation checks, Community Liaison activities, and Youth-Related activities. Volunteers with special skills can serve in several ways to include Neighborhood Watch and numerous other activities to free up officers to handle the more serious law enforcement activities. Communications Improvements $530,000.00 *Partial funding on certain aforementioned EOC equipment may be available through an “Interoperability” grant with the Federal Emergency Management Agency or through funding available through the Regional Homeland Security Oversight Committee (RHSOC). *If we merge and make this a county wide EOC, possible funding shared with Phelps County. Communications Improvements The call volume handled by Rolla Central Communications continues to increase yearly. 2005 saw the largest increase in calls in the past 5 years with an increase of over 10,000 calls for service recorded by the communications division. Manpower has been increased in the communications division facilitating better coverage of peak periods. When fully staffed we utilize all 4 consoles on a regular basis to provide optimum service to fire, EMS and law enforcement personnel. During critical incidents, extra manpower is needed. Yet we only have console space for 4 workers and one additional phone. We already ran into problems with space during the ice storm this year. Along with call volume increase, several agencies have expressed procedures they wish to implement in their departments that will require future growth and personnel in the communications division. Additional consoles will be needed to perform adequately. History proves call volumes will continue to increase, and agencies will continue to increase manpower to meet those calls. Expectations of citizens and emergency personnel regarding standard of care and performance will continue to increase. This will directly impact the communications center, and it will have to grow to facilitate these demands. This expansion would cause a need to vacate the current Rolla Police Department EOC and Training room. Emergency Operation Center Updates Along with expanding the Communication Center, we need to look at moving the EOC room. And in order to complete the updates and improvements to the Emergency Operations Center, it will be necessary to re-locate the EOC to the unfinished portion of the lower level of the Rolla Police Department. The intended location is larger and better suited to house the necessary components of an efficient, user-friendly EOC. We would like to make the new EOC a county-wide facility and possibly a district-wide location for a back up plan for those areas. EOC Work Room/Training Room DRAFT Public Works Department 18 EXCERPT FROM PARKS, RECREATION AND OPEN SPACE MASTER PLAN FOR THE PARKS & RECREATION DEPARTMENT BY BUCHER, WILLIS & RATLIFF EXECUTIVE SUMMARY At 21 years of age, the Department of Parks and Recreation is a mere infant as compared with the older park systems in America. The most notable park in the world, Central Park in New York City, recently celebrated its 150th birthday. Great parks and great park systems evolve over a number of decades and Rolla has an excellent start with building its park system. During its lifetime, the park system boasts of a modern recreation center, contemporary outdoor family aquatic center, skatepark, community and neighborhood parks, and trails. These improvements provide valuable connections within the community and fulfill citizen aspirations for a better quality of life. In this way, the park system becomes integral in creating a vibrant and dynamic city. In recognition of the importance of the park system to the future of the community, city leaders endorsed the development of a long range master plan – a plan that would provide clarity of direction for the next 10 years. The completed plan would need to articulate future capital needs based upon an evaluation of existing conditions and define the strategies for meeting the needs of the community based upon the values expressed through extensive community and stakeholder involvement. The result of the planning process is a master plan based upon community needs. The approach to this plan was organized to address three critical questions: What is the Rolla Park System today? What should the Rolla Park System be in the future? How do we get there? The future park system also honors the values expressed by the citizens of Rolla. Their expressed values of equity, engagement, sustainability and sound economics have been transformed into several goals as the critical question of how do we get there is defined. The critical question of how do we get there is defined by the following goals: The Rolla Park System today is one of 219 acres of parks at 28 different locations. In individual interviews with elected officials and stakeholders, public meetings, focus groups and a statistically valid citizen survey, citizens have expressed support for their park system and share basic values which the plan needs to address as they work hand in hand to improve upon the existing system. The values which surfaced in a number of different meetings are: 1. To acquire park land in the south and growth areas of the community. Although the City is not deficient in its overall park land inventory, it does need to acquire land in areas where citizens do not currently have equitable access to the system. 2. To link parks and other points of interest by developing a greenway and trail system. The existing trail system of 7.2 miles has been well received and well thought out by city staff and stakeholders. A continuation of the trail system by the development of the greenway system is strongly supported by citizens and will meet the need of the most popular activity in America according to research completed by the National Sporting Goods Association. Equity in facilities and services – the application of equally high standards of quality construction, programs and maintenance across the city; and equal access to open space and facilities. Engagement of the community – citizens want to be involved in the planning of their park system. Sustainable environment – citizens want their park system’s physical resources to be adequately maintained. 3. To continue strong support of strategic partnerships. Existing and developing partnerships have been very successful; namely, the Audubon Society and Lion’s Club Park. Clearly, the Lion’s Club Park was the most appreciated facility that elected officials and stakeholders spoke about during the planning process. The Audubon Society is off to a good start and will soon be another destination point attraction for the community. Sound economics – citizens expect realistic and sustainable economic practices which target operating and capital dollars to maintain the system. Economic practices should include new partnerships, an examination of fees and charges, and new revenue sources. The future park system in Rolla should be one which broadens the current definition of parks and recreation. First, it should expand the range of public spaces that function as parks, providing citizens with maximum choice and opportunities for access, as well as a rich menu of experiences that respond to neighborhood needs as well as emerging leisure trends. 4. To recognize and respond to the need for adequate funding for operations and capital improvements. As quantified in this report, the City will be challenged by the funding requirements to increase its level of maintenance and capital improvements as it deals with a host of other high priorities within the community. Second, it broadens the definition of parks and public spaces across a range of scales, from the front yard to neighborhood to community and connects this system physically to a degree not yet experienced or imagined. 5. To embrace the expanded definition of parks and recreation by continuing efforts with other city departments, ACORN, and others, to beautify entryways into the community, to line streets with trees and sidewalks and to identify and beautify street corridors which connect parks with points of interest. These improvements will provide a great deal of value to citizens and distinguish Rolla from other communities as it strives to solidify its position as a very special place. DRAFT Public Works Department 19 10 YEAR PARK IMPROVEMENTS UNFUNDED PARKS CAPITAL IMPROVEMENTS The process of planning for park improvements began in early 2002 when the Mayor’s Park Planning Committee convened to discuss and examine Rolla’s various parks. In October 2003, the consulting firm of Bucher, Willis & Ratliff Corporation utilized this information as well as numerous citizens meeting and attitude surveys to develop the “Parks, Recreation and Open Space Master Plan for the Parks & Recreation Department for the City of Rolla.” This plan has provided guidance in developed the capital improvement plan for the parks department by outlining the direction the City of Rolla should take in improving its parks system to meet the current and future needs and desires of the citizens of Rolla. Total Project Costs All playgrounds within park system update safety surface at all playgrounds to meet 2005 CPSC and ADA requirements $400,000.00 Ber Juan improvements grading, erosion control, construction control, seeding, sewer, water, electric, utility lines disc golf course Half-pipe at Skate Park fencing & backstops, parking, storm water & roadway concession/restrooms/storage building athletic field lighting playground improvements tennis court resurfacing $225,000.00 $25,000.00 $25,000.00 $200,000.00 $210,000.00 $350,000.00 $200,000.00 $150,000.00 Breuer Park improvements upgrade playground $100,000.00 Forest Service Park improvements thru road for turn around, park parking area, playground, & interpretive signs develop trail system, Civil War trenches & park grounds $150,000.00 $50,000.00 Buehler Park improvements dog park, restrooms $150,000.00 Coventry Park improvements additional playground (across creek) $100,000.00 Green Acres Park improvements playground improvements $200,000.00 Holloway House new roof and HVAC NTS Tory Schuman $95,000.00 New park purchases & development $400,000.00 New Park Shop at Central Public Works Yard $400,000.00 Pave existing parking areas Holloway House, Acorn Trail, North & South Ber Juan, Engine 1501, etc. $200,000.00 Ponzer Park improvements playground, parking lot, drinking fountain, picnic tables & Landscaping $200,000.00 Ridgeview Park improvements upgrade park & playground $100,000.00 Schuman Park improvements lake rehabilitation playground improvements $200,000.00 $100,000.00 Southview Park improvements bleachers, sand volleyball, seeding water line, parking lot, sewer, grass, irrigation, Soccer fence, ballfield fence, goals, grass, water restroom/storage/utility building athletic field lighting $20,000.00 $125,000.00 $50,000.00 $200,000.00 Holloway House Breuer Buehler Tory Park improvements soccer goals, reseeding, soil & grade work Bridge School Ridgeview Green Acres Southview Coventry Ponzer $25,000.00 Veterans Park improvements playing field, fencing & picnic tables, restrooms, drinking fountain & utilities $300,000.00 TOTAL Veterans Memorial $4,930,000.00 DRAFT Public Works Department Ber Juan 20 14th Street BER JUAN PARK IMPROVEMENTS NTS Farrar Drive Softball Field 10th Street Concession Restrooms Multi-purpose playfield DRAFT Public Works Department TOTAL IMPROVEMENTS $1,385,000.00 21 BRIDGE SCHOOL PARK IMPROVEMENTS NTS shig King Proposed Playground y hwa Proposed Trail Proposed Parking (typical) Picnic Table (typical) ool Road Bridge Sch DRAFT Public Works Department TOTAL IMPROVEMENTS $200,000.00 22 COVENTRY PARK IMPROVEMENTS NTS Proposed Playground Existing Playground Basketball Court Softball field (typical) Multi-use Field Funded Coventry Trail Phase I Picnic Table (typical) Future Bikepath DRAFT Public Works Department TOTAL IMPROVEMENTS $100,000.00 23 PONZER PARK IMPROVEMENTS Parking NTS Turkey Run Road Sycamore Drive Softball/Multi-use Field Multi-use Field Highway O Parking Playground Li o D lu b C s n rive Deible Loop Phase I Pedestrian Bikepath TOTAL IMPROVEMENTS DRAFT Public Works Department $200,000.00 24 SOUTHVIEW PARK IMPROVEMENTS Restrooms Southview Drive NTS Parking Multi-use Field Softball field Pavilion ACORN Trail Hutchinson Drive DRAFT Public Works Department TOTAL IMPROVEMENTS $400,000.00 25 TORY PARK IMPROVEMENTS NTS 18th Street Tory Avenue LaJolla Court Multi-use Field (typical) DRAFT Public Works Department TOTAL IMPROVEMENTS $25,000.00 26 VETERAN’S MEMORIAL PARK IMPROVEMENTS Picnic Table (typical) NTS Deible Loop Phase II Pedestrian/Bikepath Lio C ns lub Dri ve Softball/Multi-use Field Pavilion (typical) iew v h ut So Restrooms (typical) ive Dr Parking Playground Southview Drive Basketball Court DRAFT Public Works Department TOTAL IMPROVEMENTS $300,000.00 27 10 YEAR RECREATION CENTER IMPROVEMENTS FY 1/2 cent 3% growth 98-99 99-00 00-01 01-02 02-03 03-04 04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 Sales Tax Revenue 565,999 1,477,121 1,571,040 1,628,715 1,615,106 1,757,493 1,738,382 1,843,625 1,867,500 1,923,525 1,981,231 2,040,668 2,101,888 2,164,944 2,229,893 574,197 Rec Center Debt Service (1,108,569) (1,109,175) (1,228,150) (1,175,595) (1,340,313) (1,333,112) (1,324,038) (1,338,038) (1,324,038) (1,371,640) (1,385,040) (1,367,240) Depreciation Contribution (600,000) (300,000) (300,000) (300,000) (300,000) (300,000) (300,000) (300,000) (300,000) (300,000) (300,000) (300,000) (300,000) (300,000) Annual Sales Tax Surplus (137,529) 219,540 86,956 281,898 98,069 210,513 243,462 285,487 357,193 369,028 416,848 497,704 1,929,893 274,197 Sales Tax Account Capital & Depreciation Operations Account Balance Balance Equip 600,000 900,000 1,214,398 1,394,172 1,405,226 1,775,044 2,246,392 2,636,248 3,041,698 3,463,365 3,901,900 4,357,976 4,832,295 5,325,587 565,999 1,627,768 1,819,048 1,813,038 202,202 399,853 322,904 377,789 507,000 392,697 396,671 412,598 466,824 598,533 2,161,382 2,100,421 (106,643) (61,830) (81,688) (54,500) (72,000) (140,000) (85,000) (85,000) (90,000) (90,000) (95,000) (100,000) (449,946) (147,481) (82,024) (164,881) (139,382) (150,000) (175,000) (180,000) (180,000) (185,000) (190,000) (190,000) (200,000) Fund Balance 1,162,476 1,650,171 1,563,249 2,152,833 2,753,392 3,028,945 3,438,368 3,875,964 4,368,724 4,956,509 6,993,677 7,426,008 Tuesday, August 4, 1998 Shall the City of Rolla, Missouri, for the purpose of providing local park funds to accomplish at minimum an Indoor Walking Track, Indoor Swimming Pool/Aquatic Center, Outdoor Aquatic Facility, and an Indoor Recreation Center impose a sales tax of 1/2 of one percent for 15 years? Approved 63% DRAFT Public Works Department 28 Unfunded Centre Capital Improvements 10 YEAR RECREATION CENTER IMPROVEMENTS Section 13-31 (b)The principal and interest of this account (depreciation reserve and equipment replacement account) shall not be drawn upon nor spent without City Council authorization as to the purpose and need of the expenditure. Such funds are intended to be used for the capital replacement of major fixtures, furniture and equipment, the upgrade or expansion of the facilities, and the repair of major building components (i.e.: roof, HVAC) to ensure the long term viability of the Health and Recreation Center as well as the Outdoor Aquatic Facility. (d) Any remaining sales tax proceeds, beyond the prescribed debt service schedule and the depreciation reserve and equipment replacement account deposit prescribed herein, will remain in the recreation center and pool fund until released by formal Council action or a future vote of the citizens of Rolla. Fitness Center Expansion Additional Gymnasium Deep Water/Diving Well SplashZone Expansion Indoor Sportsplex TOTAL IMPROVEMENTS $1.2 million $1.4 million $1.8 million $1.2 million $15 million Fitness Center Expansion $20,600,000.00 Indoor Sportsplex Splashzone Expansion Additional Gymnasium DRAFT Public Works Department Deep Water / Diving Well 29 COMPREHENSIVE PLAN MAJOR THOROUGHFARES AREA 1 - EAGLESON DRIVE EXTENSION AREA 2 - WHITE COLUMNS DRIVE EXTENSION AREA 3 – BLUES LAKE EXTENSION AREA 4 - ROLLA STREET EXTENSION AREA 5 - LOVERS LANE EXTENSION AREA 6 - 18TH STREET EXTENSION AREA 7 - LIONS CLUB DRIVE EXTENSION TOTAL DRAFT Public Works Department $ $ $ $ $ $ $ 1,110,000.00 1,500,000.00 960,000.00 8,860,000.00 2,000,000.00 3,210,000.00 7,480,000.00 $25,120,000.00 30 DRAFT Public Works Department 31 DRAFT Public Works Department 32 DRAFT Public Works Department 33 DRAFT Public Works Department 34 DRAFT Public Works Department 35 DRAFT Public Works Department 36 DRAFT Public Works Department 37 ROLLA WEST IMPROVEMENTS; $36 MILLION ESTIMATE Possible Projects Kingshigway Upgrade to 5 lanes (Rolla Maintained) North Loop South Loop Hwy 72 Extension Interchange Bridge School Extension Project Cost $ 1,000,000 $ 5,000,000 $ 5,700,000 $ 12,600,000 $ 8,700,000 $ 3,000,000 Cumulative Total $ 1,000,000 $ 6,000,000 $ 11,700,000 $ 24,300,000 $ 33,000,000 $ 36,000,000 Possible Funding Sources* City Wide 1/4 cent Economic Development Sales Tax 1/2 cent TDD Sales Tax ($300,000,000 ultimate sales) 1/4 cent CID Sales Tax ($200,000,000 ultimate sales) Existing Trans/Capital Bond Refinancing (2010) MoDOT Participation in Hwy 72 Extension MoDOT Participation in the 5th Interchange MoDOT Participation in Bridge School Road Extension Total Revenue Bonding Capacity Cumulative Total $ 962,500 $ 12,000,000 $ 12,000,000 $ 1,500,000 $ 18,750,000 $ 30,750,000 $ 500,000 $ 6,500,000 $ 37,250,000 $ 3,000,000 $ 40,250,000 $ 6,300,000 $ 46,550,000 $ 4,350,000 $ 50,900,000 $ 1,500,000 $ 52,400,000 * Does not include an additional $4,000,000 annual increase from existing sales tax (2 cent) revenue streams. DRAFT Public Works Department 38 CITYWIDE WIRELESS INTERNET SERVICE; $500,000 TO $1 MILLION ESTIMATE DOWNTOWN ONLY - $50,000 Widely available, wireless internet service would be a great step forward for the community and a great marketing tool for downtown. Full access could be password protected with billing handled through the utility company. DRAFT Public Works Department 39 UNIVERSITY TECHNOLOGY PARK (50 ACRES) $3 MILLION ESTIMATE Build the main street bisecting the property and extension of infrastructure. Engineering and excavation for drainage issues. The University and City will be requesting special appropriations to offset the initial development costs. DRAFT Public Works Department 40