Varis Engineering Ltd.
•Design, Manufacture and
Installation of :-
•Pontoons
•Fingers
•Access Bridges
•Moorings
•Services
Anstruther Marina
Courtesy of Fife Council
Pontoons
•The main frame is a fully welded
steel fabrication with 180x75 PFC
side members with twin 70x70x5
SHS central torsional members and
160x60x5 RHS cross members.
•All steelwork is galvanised to
BS EN ISO 1461:1999 after
manufacture.
• Pontoons and Fingers can be fitted with
the following surfaces:-
•Hardwood
•Concrete
•GRP
•Composite Decking
•The fenders are either pressure treated
larch, hardwood , ‘D’ section rubber or
Wilks PVC bolted to the main members.
Composite Decked Pontoon
Concrete Decked Pontoons and Fingers
Clyde Marina - Ardrossan
Mooring Walkway Fingers
• 1metre wide with 2 metre lead in
and radiused ends
• PVC fenders
• 6 No mooring cleats.
• Hardwood, Composite,GRP or
Concrete Deck
• Designed for Live Load of 1.2 – 2
Kn/m2
Types
• MWF6/1/2PF Walkway Finger 6
metres long x 1 metre wide
• MWF8/1/3PF Walkway Finger 8
metres long x 1 metre wide
• MWF10/1/4PF Walkway Finger
10 metres long x 1 metre wide
• MWF12/1/4PF Walkway Finger
12 metres long x 1 metre wide
10 Metre Finger
Cameron House Marina - Loch Lomond
12 Metre Concrete Decked Finger
Clyde Marina - Ardrossan
Floats
• Rotationally moulded from
UV stabilised Medium Density
Polyethylene.
• This produces a one piece shell
which can be from 5mm – 10mm
thick which is virtually indestructible
and resistant to oil and chemicals.
• The floats are filled with polystyrene
beads which are steam injected
to form a solid mass.
• The floats are bolted through
stainless steel sleeves to the
underside of the pontoon frame.
Access Bridges
•26m Access Bridge
Warrenpoint Port Authority
Northern Ireland
•20m Access Bridge at Portmahomack
for Highland Council
•Access Bridges in Galvanised Steel or Aluminium
•Designed for Live loads between 2 - 5Kn/m
2
Access Bridges
•26m Bridge and Shore Frame at Port Edgar Marina
South Queensferry
Access Bridges
Kip Marina
Installed July 2005
Access Bridges
Tyne Gangway Bridge on Tayport (ideal for restricted widths)
Swivel Shore Frame
•Swivel Shore Frame allowing vertical and lateral movement
• - Warrenpoint Harbour Authority
Security Gates
•Anstruther Harbour
•Londonderry
•Security gates are manufactured at our Forres
workshop and galvanised to BS EN ISO 1461/1999.
•Various designs are available to suit the client.
Cleats
Cleats are manufactured in Cast Aluminium
PILE GUIDES
•Heavy Duty Pile Guides in Galvanised steel
and fitted with Nylacast Self Lubricating blocks.
Suitable for Circular or I beam piles
Surveys
•Where piles exist digital photographs can be taken where normal
surveying procedures are not practical and transferred on to AutoCAD
giving an accuracy of +/- 3mm.
Layouts

 
   
  



 
 


 



 

 










 









•Using the latest technology digital OS maps we can overlay and set
out various proposals using AutoCAD Release 2009.
•These drawings can also be forwarded for planning approval.
Services
RMCS (Rollins Marine &
Caravan Services)
•Electrical Supplies
•Water Supplies (WRAS
Approved)
•Lighting
•Metering (Including pre-payment
systems)
•Emergency Services
•Computer Controlled Services
•www.rmcs.co.uk
Services
Rolec Services
•Electrical Supplies
•Water Supplies (WRAS
Approved)
•Lighting
•Metering (Including pre-payment
systems)
•Emergency Services
•Computer Controlled Services
•www.rolecserv.com
Specialised Pontoons
Floating Fuelling Station
Specialised Pontoons
Pontoon for Latent Heat Exchanger – Tall Ship Glasgow
March 2010
Specialised Pontoons
Pontoon with Underwater Ramp Facility
Inverness Sea Scouts
Specialised Pontoons
New Facility for Loch Lomond Seaplanes
River Clyde Glasgow August 2007
Specialised Pontoons
New Facility for Loch Lomond Seaplanes
River Clyde Glasgow August 2007
At Night
At Low Tide
Anstruther Harbour August 1999
The Pontoons and Fingers sit on specially designed
Galvanised Sub-Frames as the harbour dries out.
Lossiemouth West Basin - February 2000
Kirkcudbright - 200 Metre Pontoon Run
Installed March 2000
Port Ellen - Isle of Islay
Opened by Sir Chay Blyth July 2002
Lossiemouth East Basin - May 2003
Londonderry 200 metre
Pontoon System
Installed July 2003
Cameron House Marina - Loch Lomond July 2003
Pilot Boat Berthing Pontoon, Clydeport, Greenock
Installed December 2003
80 Berth Marina for Oban Yachts Island of Kerrera by Oban
Installed June 2004
Tobermory Harbour Association - Installed July 2004
Edinburgh Quay - Installed September 2004
50 Metre Pontoon Run
Cromarty Harbour - Installed October 2004
Visitor Berthing Pontoons, Ballycastle - Installed October 2004
GRP Decked Pontoons - Rathlin Island, Installed November 2004
GRP Decked Pontoons - Rathlin Island, Installed November 2004
Whiterock Yachts,Sketrick Island, Northern Ireland, April 2005
Strangford Lough YC, Northern Ireland, April 2005
Anstruther Harbour Phase II - Installed April 2005
Anstruther Harbour Phase II
Installed April 2005
Anstruther Harbour Phase II
Installed April 2005
Anstruther Harbour Phases 1&II
Concrete Decked Pontoons Clyde Marina - Ardrossan
Installed May 2005
Concrete Decked Pontoons Clyde Marina - Ardrossan
Installed May 2005
Sea Scouts - Loch Eil
Installed July 2005
Glasgow River Festival
July 2005
Warrenpoint Harbour Authority
Northern Ireland December 2005
Warrenpoint Harbour Authority
Northern Ireland December 2005
Warrenpoint Harbour Authority
Northern Ireland December 2005
Portree Harbour Isle of Skye
April 2006
Plockton
April 2006
Portmahomack
June 2006
Portmahomack
June 2006
New Pontoon Landing Facility for
Newry & Mourne District Council Warrenpoint May 2007
New Pontoon Landing Facility for
Newry & Mourne District Council Warrenpoint May 2007
New Pontoon Facility for
Wick Harbour Authority June 2007
New Pontoon Facility for
Wick Harbour Authority June 2007
Additional Pontoon Extension for
Tobermory Harbour Association July 2007
Additional Pontoon Extension for
Tobermory Harbour Association July 2007
Renewal of Pontoons at Nairn Harbour
Highland Council
New Pontoons and Fingers
Hopeman Harbour on the Moray Firth
GRP Decked Pontoons Isle of Jura May 2008
GRP Decked Pontoons Isle of Jura May 2008
Lochranza Isle of Arran July 2008
GRP Decked Pontoons for the MOD with Jet Bike Dock
Pacific Quay Glasgow - Pontoon with Disabled Access
Pacific Quay Glasgow - Pontoon with Disabled Access
Hamnavoe Shetland January 2009
Pontoons at Seil Sound for Sealife Adventures February 2009
Pontoons at Kinlochbervie March 2009
150 Berth Facility for Inverness Marina Company Ltd, May 2009
150 Berth Facility for Inverness Marina Company Ltd
Inverness Marina with Kessock Bridge in background
Tayport Marina Installed June 2009
Tayport Marina Installed June 2009
Wick Marina Installed June 2009
Wick Marina Installed June 2009
Wick Marina Installed June 2009
Cruise Liner Tender Pontoons – Stornoway Port Authority
Cruise Liner Tender Pontoons – Stornoway Port Authority
Heavy Duty Pontoons and 35m Bridge, Clydebank, Glasgow, July 09
Heavy Duty Pontoons and 35m Bridge, Clydebank, Glasgow, July 09
Victoria Harbour Greenock July 2009
Victoria Harbour Greenock July 2009
Private Pontoon – Rhub’a Chruidh (off Kerrera) March 2010
Heavy Duty GRP Pontoons for the MOD June 2010
Disabled Crewlift
Varis Engineering supply and
install Crewlifts manufactured
by Caley Marina on Pontoons
and Harbour walls.
The Crewlift Davit System makes
boating accessible for wheelchair users
and provides a means for sailing clubs,
marinas and marine service providers to
achieve the level of access demanded by
disability discrimination legislation.
Features:
•Telescopic, extendable arm.
•Lifts up to 160kg.
•Marine grade hydraulic ram.
•Heavy duty stainless steel construction
•Rotates 360 degrees
•Hydraulic control system at accessible
heights.
•Fail-safe design.
•Two security levels.
Crewlift Operation
Step 1: Lower the boom and attach the sling to the lifting seat
Step 3: Swivel the davit to position the crew member over the boat
Step 2: Operate the pump handle and raise the boom
Step 4: Lower the boom, Safe and Simple!
Scottish Agents for EZ Dock and Airberth
M520 Airberth (Gosport)
Marina Division
Contact:
Calum MacDougall
Sales Director
Tel: 01309 671211
Fax:01309 671241
Mobile:07775 742523
E-mail:[email protected]
Website:www.varis-engineering.com