engineering service center

Transcription

engineering service center
PT. GUNUNG GARUDA
ENGINEERING SERVICE CENTER
DEPARTMENT
www.grdsteel.com
the introduction
th
Gunung Garuda, PT is a Steel Company established on July 18 , 1986. It is
the only one Indonesian Steel Company who is producing high quality
steels in various shape through Hot Rolled Process. All of Gunung
Garuda's products are certified by Indonesia Industrial Standard (SII) and for
international standard refer to Japanese Industrial Standard (JIS) and
equivalent with other international standards such as ASTM, BS, DIN, etc.
Gunung Garuda provides and serves started from raw materials supplying
up to steel structure providing by “From Scrap to Building”, where all of raw
material production processes till steel structure are provided in single roof
system, so for that purpose raw materials are provided in ready stock condition.
Gunung Garuda is supported by one department, i.e. Engineering Service
Center Department (ESC) , who is handling in steel structure engineering
for any kinds of steel structure from design till fabrication. The ESC
Department was established on 1997 to serve the customer in PreFabricated Steel Structure providing.
ESC Department provides component standard
For the above purpose,
products for steel structure standard, which is developed by Gaining
Garuda in Pre-Engineered Building (PEB) concept.
With our high quality products, ready stock a raw material, component
standard product, supporting professional engineering teams, Per
Engineered Building Concept and CNC machine facilities, the customer
can be satisfied by our services.
The increment of domestic and export demand proves that ESC Department
is ready to face up the free trade era, and in accordance with our mission " Being
Steel Manufacture who is applying the latest technology to get many
kinds of some steel products till steel structure and machinery."
company information
legal name and ownership
Company Name
Head Office & Factory
: GUNUNG GARUDA GROUP, PT
: Engineering Service Center
: Imam Bonjol 4, Warung Bongkok,
Suka Danau, Cibitung, Bekasi 17520,
West Java, Indonesia.
Phone
: (+62-21) 8910 7977 / 8910 7981
: (+62-21) 8900 111 ( Hunting)
ext.6177, 6181, 6184
Facsimile
E-mail
: (+62-21) 89108030 / 8910 8031
: [email protected]
: [email protected]
: http :// www.grdsteel.com
Website
Date of Establishment
PT. GUNUNG GARUDA
Engineering Service Center
TH
: July 18 1986
: September 28 1997
TH
Ownership
Board of Directors
: 100 % Indonesian Company
Owned by : Djamaluddin
Kamaruddin
DR. Chairuddin
And Brothers
Commercial Registration
: C2-260 H.T.01.01 Year 1987
Industrial Licences
Bank References
: C2-260 H.T.01.01 Dated April 1987
: Bank Mandiri ex Exim C.Q.ESC
Cab. JKT Wisma Metropolitan
organization and management team
organization chart
BOARD OF MANAGEMENT
ENGINEERING SERVICE CENTER DEPARTMENT
BOARD OF
DIRECTOR
GENERAL MANAGER
DEPUTY
GENERAL MANAGER
SECRETARY
HRD
MANAGER
CUSTOMER
SERVICE
MANAGER
SISTEM & GA
MANAGER
MRK & SALES
MANAGER
ESTIMATION
MANAGER
RECRUITMENT
SYSTEM &
PROCEDURE
MARKETING &
ADVERTISING
ESTIMATOR
ENGINEER
PROJECT
COORDINATOR
PROJECT
ENGINEERING
MATERIAL
PREPARATION
QUALITY
CONTROL
DEVELOPMENT
GENERAL
ADMINISTRATION
SALES
COSTING
ENGINEER
ADMINISTRATION
RESEARCH &
DEVELOPMENT
FABRICATION
CALIBRATION
QC
COSTING &
ACCOUNTING
AGENT
COORDINATOR
PACKING &
DELIVERY
ADM &
DOCUMENTATION
ADMINISTRATION
ENGINEERING
MANAGER
PPC
MANAGER
QC
MANAGER
organization and management team
Senior Management Team
President Director
General Manager
Deputy General Manager
DR. Chairuddin
Ir. Khenji Pangestu
Ir. Dwi Wahyu Pramono
Manager Team
Engineering Manager
P P C Manager
Q C Manager
Sales & Estimate Manager
System & Adm Manager
H R D Manager
Ir. Sukanta Saha
Ir. Herdin Ekalaksana
Subandi Ardani
Ir. Agus Hermawan, MT
Ir. Sondi Budiharjo
Humiras L. Tobing, SE
organization and management team
Senior Management Team
KEN PANGESTU
ESC General Manager
Mr. Ken Pangestu joined PT Gunung Garuda in June 1992. He has
architectural background from Catholic Saint Thomas Medan University. Mr.
Khenji Pangestu has had a long experience in the steel structure, machine
Design and Equipment Operation. Presently, Mr. Khenji Pangestu is as
Engineering Service Center General Manager.
AGUS HERMAWAN
Sales & Estimate Manager
Mr. Agus Hermawan joined PT Gunung Garuda in March 1999. Mr. Agus
Hermawan was graduated from Parahyangan University in Civil Engineering
and Master in Management Engineering from Bandung Institute Technology.
He has had experiences in civil engineering, sales and had skills in computer.
Presently, he is the Sales & Estimate Manager.
Ir. IKHSAN LUBIS
Planning Production Controlling Manager
Mr. Ikhsan Lubis joined PT Gunung Garuda in March 2004. He was
graduated from Gajah Mada University in Nuclear Engineering. Mr. Ir.
Ikhsan Lubis started with PT. Gunung Garuda as a Planning Production
Controlling Manager. Before joining, he has had experience as PPC
Manager of the many companies. Beside that, he has skills in the
Welding Works and Certified by Migas & Depnaker. Presently, he is the
Planning Production Controlling Manager.
organization and management team
Senior Management Team
SUKANTA SAHA
Engineering Manager
Mr. Sukanta Saha joined PT Gunung Garuda in September 1996. Mr. Sukanta
Saha was graduated from University of North Bengal, Derfeding, India. He has
many skills in the computer program like STAAD III, AUTOCAD, STEEL CAD,
Excell, Visual Basic ,and etc. Mr. Sukanta comes from Calcuta, India. Presently,
he is the Engineering Manager.
SUKANTA SAHA
Engineering Manager
Mr. Humiras Luman Tobing joined PT. Gunung Garuda in November
1996, he was graduated from University of US XII South Sumatera, With
Majored Sciences economi Management discipline and many
experience in steel industry. Mr. Humiras Limban Tobing have
experiences in qualitu control and presently he is the quality control
manager of Department Engineering Service Center
product and services
Engineering Service Center Product
ESC Department always gives the best
Product
and Services
to the
customer,
started from design,
fabrication till to the erection guidance.
ESC Department’s Products and
Services consist of :
Design
Shop Drawing
Fabrication
Galvanizing
APPLICATIONS
The application from the products and services are :
Factories
Warehouses
Distribution Center
Comercial Showroom
Sport Halls
Aircraft Hangers
Super Market
Workshops
Bridges
Restaurant
Office Building
Temple
Mosque
Church
High Rise Building
Transmission Tower
Telecommunication Tower /
Radio / TV Substation
product and services
Production Capacities
With the professional Engineering Team and sophisticated facilities, we
are always ready to handle all of the project, so our production capacity per
year is :
- Industrial & Commercial Building
- Bridges
- Steel Tower
- Galvanizing Facilities
=
=
=
=
+ 48.000 MT
+ 20.000 MT
+ 18.000 MT
+ 30.000 MT
facilities and equipment list
Engineering Facilities
For analyzing and designing all kind of steel structures such as
telecommunication or transmission tower, bridge and ware house.
ESC has been equipped by latest software to accelerate process.
3D software is used to detail and to draw. The facility will
automatically make cutting and drilling drawing, assembly drawing, bill
of material and erection drawing. Besides that We have nesting
drawing facility for profile and plate.
The engineering facilities consist of :
Main Power
General Manager
Division Manager
SPV Engineer
SPV Fabrication
SPV Assembling
Sales
Estimator
PPC
QC
Project Coordinator
Engineer
Checker
Drafter CAD
Drafter Detailing
Welder
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
1
6
6
10
5
4
5
10
10
5
20
10
8
10
12
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
( Personel )
Software / Program
- Design & Analysis : STAAD III Ver. 22.3
- Detailing : X-Steel Ver. 5.4 = 5 Licences
SteelCAD Ver. 4.1 = 6 Licences
- Nesting : - Bar Nesting
- Auto Nesting
engineering service center profile
12
facilities and equipment list
Plant Faciliities
Workshop Fabrication (SSC)
( Cutting, Drilling, Punching, Bending)
Space : + 40.500 sqm
Over head Crane 5 Ton : 18 Units
10 Ton : 6 Units
Workshop Assembly
Space
Over head Crane 5 Ton
10 Ton
25 Ton
: + 6.000 sqm
: 6 Units
: 2 Units
: 1 Unit
Workshop Trial Erection
Space
Over head Crane 5 Ton
10 Ton
25 Ton
: + 2.000 sqm
: 2 Units
: 2 Units
: 1 Unit
Workshop Painting & Packing
Space
Over head Crane 5 Ton
10 Ton
25 Ton
: + 6.000 sqm
: 3 Units
: 1 Unit
: 1 Unit
Workshop Galvanizing (Bukit Terang Galvanizing, PT)
Space
Over head Crane 5 Ton
10 Ton
For Klipt
Zinc Bath
: + 8.500 sqm
: 4 Units
: 2 Units
: 4 Units
:12,5m x 1,8m x 2,6 m
page 13
facilities and equipment list
Machineries and Equipment List
NO
NAME
TYPE
UNIT
CAPACITY
1
SCANNER
1. HP Scanjet 3200 C
2. UMAX Astra 6005
3. XEROX 7356
4. OCE 9400
1
1
1
1
Size : letter, B5, B4, A4
Size : letter, B5, B4, A4
Size : letter, B5, B4, A4, A3, A2, A1, A0
Size : letter, B5, B4, A4, A3, A2, A1, A0
2
PRINTER
1. HP (Hewlett Packard)
2. CANON BJC 4550
(Colour)
3. EPSON LX 800
(Dotmatrix)
4. LASERJET GL HP
5. XEROX DDS 8830
6. OCE 9400
7. CANON (Microfilm)
NP Printer 680
8. HP Laserjet 4V
9. HP Laserjet 4
1
Size : letter, B5, B4, A4, A3
1
Size : letter, B5, B4, A4, A3
1
1
1
1
Size : letter, B5, B4, A4
Size : letter, B5, B4, A4, A3
Size : letter, B5, B4, A4, A3, A2, A1, A0
Size : letter, B5, B4, A4, A3, A2, A1, A0
1
2
1
Size : letter, B5, B4, A4, A3
Size : letter, B5, B4, A4
Size : letter, B5, B4, A4
1. XEROX DDS 8830
2. OCE 9400
3. MUTOH XP 500
SERIES
4. ENCAD
(Novajet 4)
1
1
Size : letter, B5, B4, A4, A3, A2, A1, A0
Size : letter, B5, B4, A4, A3, A2, A1, A0
1
Size : letter, B5, B4, A4, A3, A2, A1, A0
1
Size : letter, B5, B4, A4, A3, A2, A1, A0
1. XEROX DDS 8830
2. OCE 9400
3. VIVACE 670
4. CANON NP 4050
5. CANON NP 6241
6. SHARP SF-8871
1
1
1
1
1
1
Size : letter, B5, B4, A4, A3, A2, A1, A0
Size : letter, B5, B4, A4, A3, A2, A1, A0
Size : letter, B5, B4, A4, A3
Size : letter, B5, B4, A4, A3
Size : letter, B5, B4, A4, A3
Size : letter, B5, B4, A4, A3
3
4
PLOTTER
PHOTO COPY
page 21
facilities and equipment list
Quality Control
Q.C. EQUIPMENT
NO
NAME
TYPE
1
Meter Roll 7.5 Meter
20 Meter
Merk :TAJIMA
Merk : ITO
2
Vernier Caliper
Merk : TRICLE BRAND
3
Coating Thickness Meter
Merk :ELCOMETER
4
Dye Penetrant Test
- Cleaner-Remover
- Penetrant
- Developer
Merk :MAGNAFLUX
5
Ultrasonic Equipment Test
- Calibration Block
- Probe Normal & Degree
- Main Equipment
Merk :CTS - 23
6
Welding Gauge
Merk :NIGARA SEIKI
7
Spectrometer Emission
25 Element Baird Spectrovac/USA
SN : 262477 - 1057 A
For Chemical Composition Test
Calibration July 5 2001,
By B4T Bandung
TH
8
Capacity 600 KN
Made in ACS, Australia
SN : 790139
For Mechanical Test
Calibration dated July 7 2001
Universal Machine Test
TH
engineering service center profile
22
facilities and equipment list
Machineries and Equipment List
NO
MACHINE
DESCRIPTION
1
CNC
CUTTING & SAWING
MACHINE
2
3
CNC
CUTTING & SAWING
MACHINE
CNC
CUTTING & SAWING
MACHINE
MACHINE NAME
AND TYPE
DAITO
ST. 5070 ( 45 o )
DAITO
o
ST. 6090 ( 90 )
TRANNJAEGER
PMC 12-N
( Two Units )
MACHINE CAPACITY
Square Bar
Round Bar
Plate
IWF/H-Beam
Rectangle
: 500 X 500 mm
: 500
mm
: 750 X 730 mm
: 750 X 730 mm
: 750 X 730 mm
Square Bar
Round Bar
Plate
IWF/H-Beam
Rectangle
: 500 X 500 mm
: 500
mm
: 750 X 730 mm
: 750 X 730 mm
: 750 X 730 mm
760 mm
MITER CUT AT 90O
height width
(mm) 235 1000
H-STEEL
ROUND BAR (mm) 235 1000
PLATE
(mm) 235 1000
800mm
910mm
height width height
width
250 1000 30~310
1000
250 1000 30~310
1000
250 1000 30~310
1000
800mm
910mm
O 760 mm
height width height width height
width
H-STEEL
(mm) - 30~310
700R-L
ROUND BAR (mm) - 30~310
700R-L
PLATE
(mm) - 30~310
700R-L
MITER CUT AT 45
4
CNC
CUTTING & SAWING
MACHINE
engineering service center profile
TRANNJAEGER
PMC 12-N
( Two Unit )
14
760 mm
MITER CUT AT 90O
height width
(mm) 235 1000
H-STEEL
ROUND BAR (mm) 235 1000
PLATE
(mm) 235 1000
800mm
910mm
height width height
width
250 1000 30~310
1000
250 1000 30~310
1000
250 1000 30~310
1000
760 mm
800mm
910mm
MITER CUT AT 45O
height width height width height
width
H-STEEL
(mm) - 30~310
700R-L
ROUND BAR (mm) - 30~310
700R-L
PLATE
(mm) - 30~310
700R-L
facilities and equipment list
Machineries and Equipment List
NO
MACHINE
DESCRIPTION
MACHINE NAME
AND TYPE
5
CNC
CUTTING & SAWING
MACHINE
6
CNC
CUTTING & SAWING
MACHINE
7
CNC
CUTTING & SAWING
MACHINE
EVERISING
H - 1060 S
8
CNC
CUTTING & SAWING
MACHINE
PEDDINGHOUSE
BS 38/18
9
CNC
DRILLING MACHINE
DAITO
DNF 1000
KALTENBACH
HDM.800A
WAGNER
KV.6
MACHINE CAPACITY
Cap. Material Process
Square Bar
Round Bar
Plate
IWF/H-Beam
P
L
T
760 mm
200
230
-
800 mm
220
250
500x170
500x500
910 mm
240
300
600x200
600x300
: 3280 mm
: 1250 mm
: 2000 mm
Cap 90 :
Cap 75 :
Cap 60 :
Cap 45 :
710mm, 1000x650mm
710mm, 900X700mm
710mm, 800X700mm
550mm, 550X700mm
Cutting Capacity
Plate
Overall Dimensions
WXH
WXH
WXH
WXH
: 37.4 " x 18.1 "
: 37.4 " x 6 "
: 150" x 52" x 85"
H-STEEL
: Max. H1010 X 400 mm
Min. 150 X 75 mm
JOINT PLATE : For Above said Steel
Max. lap thickness 55 mm
ANGLE
10
CNC
DRILLING MACHINE
WAGNER
B6
U-CHANNEL
H-STEEL
: Min
80 X 65 mm
Max 1000 X 450 mm
: Min
80 X 45 mm
Max 1000 X 450 mm
: Min
80 X 42 mm
Max 1000 X 450 mm
page 15
facilities and equipment list
Machineries and Equipment List
NO
MACHINE
DESCRIPTION
MACHINE NAME
AND TYPE
11
CNC
DRILLING MACHINE
WAGNER
B6
MACHINE CAPACITY
ANGLE
U-CHANNEL
H-STEEL
: Min
80 X 65 mm
Max 1000 X 450 mm
: Min
80 X 45 mm
Max 1000 X 450 mm
: Min
80 X 42 mm
Max 1000 X 450 mm
BEAMS :
Web Height
12
CNC
DRILLING MACHINE
FICEP
LFB-200.49
: Min 120 mm
Max 2500 mm
Flance Width : Min
55 mm
Max 1000 mm
U-CHANNEL
Web Height
: Min 120 mm
Flange Width : Max 2500 mm
EQUAL ANGLE & UNEQUAL ANGLE
Min 120 X 120 X 10 mm
Max 500 X 500 X 40 mm
PLATES
: Min 120 mm
: Max 1200 mm
Plate Thickness Max
75 mm
Hole Diameter
Max
45 mm
CNC
13 DRILLING & CUTTING
MACHINE
WAGNER
KL 38 & B 6
P
L
T
: 3280 mm
: 1250 mm
: 2000 mm
CNC
14 DRILLING & CUTTING
MACHINE
WAGNER
KL 38 & B 6
P
L
T
: 3280 mm
: 1250 mm
: 2000 mm
engineering service center profile
16
facilities and equipment list
Machineries and Equipment List
NO
MACHINE
DESCRIPTION
MACHINE NAME
AND TYPE
CNC
15 CUTTING, DRILLING &
MARKING
VERNET
BEHRINGER
HBP 360/704
16
CNC
DRILLING MACHINE
VERNET
BEHRINGER
FP, 600
17
OXY COPING
MACHINE
FICEP
LTT.B 200-61
18
OXY COPING AND
NOTCHING MACHINE
PEDDINGHHAUSE
ABCM-1250/3
19
BENDING MACHINE
HERKULESS
BO 233 K/1
TANAKA ASSEMBLING
20 WELDING MACHINE
TR-PRA-N4-600
MACHINE CAPACITY
Round at 90 (MM) HBP 360
at 90 (MM)
Square
HBP 340X340
Rectangular
HBP :700X340
at 45 Right WXH (MM) 400X340
:
at 45 Left WXH (MM) 400X340
Maximum Diameter
35 mm
Rotation Diameter 200 / 800 rpm
Useful Section
600 x 340 mm
Angles
50 - 300 mm
Ipe / Epn
80 - 600 mm
Beams
Min
Web Width
80
Flange Height
45
Angles
Flange Height 80x80x8
Max
2000
750
500x500x30
Minimum Beam Size Width 50"(1250 mm)
Block Maximum Length
Unlimited
Flange Thinning :
Maximum Length
Unlimited
Minimum Width
Web Thickness
Beams on flanges
Min. inner Diameter
Beams around the x-axis
Min. inner Diameter
1380
2000
1180
3000
15"x6"
80"
7"x4"
120"
Flange Width
125 - 600
mm
Web Heigth
400 - 3200
mm
Flange Thickness Min 9 - 50
mm
Web Thickness
Min 6 - 35
mm
Outline
1250 X1910 X 1224 mm
page 17
facilities and equipment list
Machineries and Equipment List
NO
21
22
23
MACHINE
DESCRIPTION
MACHINE NAME
AND TYPE
STRAIHGTENING
MACHINE
TANAKA
TR-50BV-600
AUTHOMATIC
SHOT BLASTING
MACHINE
OMSG
LOUCO 1500 NS
MACHINE CAPACITY
Flange Width
Flange Thickness
125 mm - 600 mm
9 mm - 50 mm
Max. 1600 X 2100 X 600 mm
AUTHOMATIC
PAINTING MACHINE
REXON
AUTHOMATIC
AG 1500
CNC ANGLE LINE
24 PUNCHING, SHEARING
AND MARKING
FICEP
LPA 15-34.N
Grade FE 41 Steel Min 35 x 35 3 mm
Suitable Of Engles Max 150 x 150 15 mm
Grade FE 41 Steel Min. UPN 100
Max.UPN 160
CNC ANGLE LINE
25 PUNCHING, SHEARING
AND MARKING
FICEP
LPA 15-34.N
Grade FE 41 Steel Min 35 x 353 mm
Suitable Of Engles Max 150 x 150 x15 mm
Grade FE 41 Steel Min. UPN 100
Max.UPN 160
26
27
CNC PUNCHING,
SHEARING &
MARKING
MACHINE
FICEP
LPA 15-B-36
CNC PLATE LINE
PUNCHING, CUTTING, PEDDINGHAUSE
FPB-1500/3
MARKING AND
PLASMA CUTTING
engineering service center profile
18
Max. 1600 X 2100 X 600 mm
Suitable of Engles
Grade FE 41 Steel
Suitable of Engles
Grade FE 41 Steel
Suitable of Engles
Grade FE 41 Steel
Min 35 x 35 x 3 mm
Max 150 x 150 x15 mm
Min UPN 100
Max UPN 160
Min 35 x 3 mm
Max 150 x15 mm
MAX. PUNCH. DIA. 1-3/4 "(44.5 mm)
MAX. PLATE SIZE 12192 X 508 mm
MAX. PLATE THICK. ( 31 mm)
MAX. Plasma Cutting Thickness 1-1/4 "( 31 mm )
facilities and equipment list
Machineries and Equipment List
NO
MACHINE
DESCRIPTION
AUTHOMATIC
28 BENDING, NOTCHING,
AND SHEARING
MACHINE
29
CNC PLATE LINE
PUNCHING
SHEARING
AND MARKING
MACHINE NAME
AND TYPE
KINGSLAND
85 X S
APS
H-1060S
MACHINE CAPACITY
PUNCHING
Rated Capacity
Max Capacity
Dia. X Thickness
Max. Stroke Length
Speed - 20 mm travel
Throath Depth Standard
Trhoath Depth XSD Model
Largest Hole
Working Height
Flange Punch
SHEARING
Flat Bar
Alternative
Blade Length
Angle Flange Trim
Working Height
ANGLE CUTTING
At 90 with non deform
At 45 Mitre
Working Height
SECTION CUTTING
Round/Square Bare
Channel Beam
Tee
NOTCHING
Material Thickness
Width
Depth : Vee-Rect
Angle Flange
Working Height
BENDING
Max. Bax Size
85 T
33x20
55x12
80
34 full cyucle
355
625
150
1050
305
380x20
480x15
485
120x 15
890
150x15
80x 10
890
50
160x90
100x12
13
52
70-100
100x13
890
250x50
500x3
Input Length
Max.6200 mm, min 1000 mm
Flat Steel
Max 400x20mm ( sT.37 )
Min 50x5 mm ( Standard )
Angle Steel
Max 150x150x15 ( sT.37 )
Min 50x50x5mm ( Standard )
page 19
facilities and equipment list
Machineries and Equipment List
NO
MACHINE
DESCRIPTION
MACHINE NAME
AND TYPE
30
CNC PLATE LINE
DRILLING MACHINE
JAMESON
G-509-NC
PUNCHING, DRILLING
31
AND MARKING
MACHINE
engineering service center profile
FICEP
LPP 803-2N
20
MACHINE CAPACITY
MAX. AREA COVERED BY SPINDEL:
6700MM X 4680 mm
VERT. TRAVEL OF SPINDEL SLIDE : 533 mm
PUNCHING
MAX. HOLE 32 mm
DRILLING
MAX. PLATE THICKNESS 40 mm
MAX. HOLE DIAMETER 40 mm
facilities and equipment list
Heavy Equipment and Transportation
NO
NAME
TYPE
CODE
1
CRAWLER CRANE
PH 440 S
CR 01
2
CRAWLER CRANE
PH 335
CR 02
3
CRAWLER CRANE
PH 335
CR 03
4
CRAWLER CRANE
DH 400
CR 04
5
CRAWLER CRANE
TATA
CR 10
6
CRAWLER CRANE
PH 5045
CR 07
7
CRAWLER CRANE
PH 335
CR 09
8
CRAWLER CRANE
PH 320
CR 06
9
CRAWLER PANCANG
D 207 C
CR 08
10
MOBILE CRANE
TADANO
CR 05
11
EXCAVATOR
K 907 B
BC 01
12
EXCAVATOR
K 907 B
BC 02
13
EXCAVATOR
R 909
BC 03
14
EXCAVATOR
K 904 C
BC 04
15
EXCAVATOR
K 904 C
BC 05
16
EXCAVATOR
K 904 C
BC 06
17
EXCAVATOR
K 904 C
BC 07
18
EXCAVATOR
K 904 C
BC 08
19
EXCAVATOR
PC 400
BC 09
20
EXCAVATOR
UH 07 LC
BC 10
21
EXCAVATOR
K 907 B
BC 11
22
EXCAVATOR
UH 07 LC
BC 12
23
EXCAVATOR
EX,200
BC 13
24
EXCAVATOR
EX 200
BC 14
25
EXCAVATOR
SK 200
BC 15
26
EXCAVATOR
SK 200
BC 16
27
EXCAVATOR
SK 200
BC 17
28
EXCAVATOR
SK 200
BC 18
29
EXCAVATOR
SK 200
BC 19
30
EXCAVATOR
SK 200
BC 20
page 23
facilities and equipment list
Heavy Equipment and Transportation
NO
NAME
TYPE
CODE
31
EXCAVATOR
K 907 B
BC 21
32
DUMP TRUCK
PS 190
DT 01
33
DUMP TRUCK
PS 190
DT 02
34
DUMP TRUCK
PS 190
DT 10
35
DUMP TRUCK
NISSAN CW 51
DT 03
36
DUMP TRUCK
NISSAN CW 51
DT 04
37
DUMP TRUCK
NISSAN CW 51
DT 05
38
DUMP TRUCK
NISSAN CW 51
DT 06
39
DUMP TRUCK
A CW 51
DT 07
40
DUMP TRUCK
MITSUBISHI 8D CG
DT 11
41
DUMP TRUCK
MITSUBISHI 8D CG
DT 12
42
DUMP TRUCK
NISSAN CW 52 H
DT 13
43
DUMP TRUCK
CW 53 H
DT 14
44
TANK AIR
MITSUBISHI PS 120
TA 02
45
TRUCK/TRONTON
PS 190
TRK 03
46
TRUCK/TRONTON
PS 190
TRK 04
47
TRAILER
PS 190
TL 02
48
TRUCK LOADER
D 75 S-3
SC 10
49
TRUCK LOADER
D 75 S-3
SC 11
engineering service center profile
24
project list
local and export
project list
project list 2000 - LOCAL
No
PROJECT NAME
1
2
3
KPI PROJECT BONTANG
TOWER - BRUNNEI DARUSSALAM
WARE HOUSE PROJECT –
BONTANG
“ EXPANSION STRUCTURE “
WARE HOUSE
ADDITIONAL WORK OF CPO
PROJECT
FACTORY “ TAPIOKA”
GANTRY BUILDING
WARE HOUSE
OFFICE AND FACTORY TAHAP I
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
VIHARA MAITREYA
TOWER
SHOW ROOM
TOWER 21 M
WARE HOUSE
WARE HOUSE
SHEET PILE FRAME (62 UNIT)
MUNICIPAL BUILDING
FACTORY
TOWER 20 M
SHEETING OFFICE & FACTORY
TOWER 32 M
FACTORY OF PT. PUNCAK ARDI
MULIA
WARE HOUSE
FACTORY PT. KAYU PERMATA
CAR SERVICE BUILDING
FRAME GIRDER
TELECOMMUNICATION TOWER
70 M
TOWER 30 & 36 M OF FEDERAL
MOTOR
SHOP HOUSE
BRIDGE
FACTORY BUILDING A & B
FACTORY BUILDING C & D
TELECOMMUNICATION TOWER
52 M
CIKEAS BRIDGE
BRIDGE
HOUSING
WARE HOUSE
WARE HOUSE
CAR GARAGE
WARE HOUSE
WARE HOUSE
WARE HOUSE OF PT. PENY JAYA
COMPRESSOR HOUSE
CLIENT
Weight
( Ton )
PT. CEMARA SEMITAMA
ALAN DICK & CO.
PT. CEMARA SEMITAMA
780
2
33
GEREJA METHODIST
PT. PASIFIC WIRA BERJAYA
PT. INDOMARINE
19
12
11
BP. AZIZ AMIR
18
11
144
300
HOEXT & THAIGOS (HONGKONG) LTD
PT. WERNER INDOPEX
TRISTAR GROUP
(PT. SANEX QIANJIANG MOTOR INT.)
YAYASAN SURYA BUDHI AGUNG
PT. TORAYA KESU ‘SANGGALANGI’
PT. KARYA BUDI MANDIRI
PT. CITRA SECTA PUTRA
PT. PAN RAMA VISTA GARMENT
PT. INDOMARINE
PT. ADHI KARYA
JEMAAT AHMADIYAH INDONESIA
PT. SELAMAT SEMPURNA
PT. CITRA SECTA PUTRA
PT. SANEX QIANJIANG MOTOR INT.
PT. CITRA SECTA PUTRA
PT. WIRA BUANA
1,200
45
14
2
27
35
8
84
1,600
3
407
4
150
BP. RUSLIN PRAWIRA
PT. TRIMATRA LIGUNA
PT. KARYA BUDI MANDIRI
PT. ADHI KARYA
PT. TORAYA KESU ‘SANGGALANGI’
24
46
5
5
25
PT. CITRA SECTA PUTRA
17
MR. F. MULIONO
PT. MODERN SURYA JAYA (SBY)
PT. BUMI SARIMAS KELAPA
PT. BUMI SARIMAS KELAPA
PT. CITRA SECTA PUTRA
20
12
25
23
5
PT. LIGHT INSTRUMENINDO
PT. MODERN SURYA JAYA (SMR)
BP. HUSEN TENGKONO
BP. HANDRYANTO
BP. IR. H.S.A. DAHLAN
BP. RIYANTO
PT. CIPTA GRAHA NATA KENCANA
PT. MANDALIKA SAPTA KARSA
PT. AUSTRA INDO GLOBAL
PT. MULTI FABRINDO GEMILANG
3
107
8
45
52
7
103
50
45
74
project list
continue (project list 2000 - LOCAL)
No
PROJECT NAME
CLIENT
45
46
47
48
49
50
51
52
CPO – PASAMAN
FACTORY
WARE HOUSE OF PT. PENI JAYA
SHEETING
WARE HOUSE
SUPPORTING LIFT
WARE HOUSE
CHURCH
CB INDUSTRIAL PRODUCT SDN BHD
PT. PANCARAN MULIA SEJATI
PT. AUTRA INDO GLOBAL
PT. PANCARAN MULIA SEJATI
BRIMOB
PT. SIMAXINDO PRIMADAYA
PT. DIMAS DRILLINDO
53
54
55
56
57
58
WARE HOUSE
OFFICE
CPO OF PT. SWAKARSA
CPO – LONGKALI
SHOW ROOM
WARE HOUSE
PT. YOLAPRA PUTRA UTAMA
PT. MANDALIKA SAPTAKARSA
PT. SRIWIJAYA PRIMA LESTARI
PT. REKAYASA INDUSTRI
PT. BERINGIN MAS JAYA
PT. YUDISTIRA BUMI BHAKTI
TOTAL
PANITIA PEMBANGUNAN GEREJA
MONUMENTAL TNI - AD
Weight
( Ton )
430
12
19
4
5
4
25
20
4
10
200
380
30
20
6,773
project list 2000 - EXPORT
No
1
2
3
4
5
PROJECT NAME
WARE HOUSE
WARE HOUSE
COLOMBO HARBOUR
WARE HOUSE
FACTORY
TOTAL WEIGHT 2000 = 7,556 Ton
CLIENT
Weight
( Ton )
MULTI BUILDING PRODUCT
RING SHINE TEXTILE
MAGA ENGINEERING
RING SHINE TEXTILE
PT. VIKING INDUSTRIES
TOTAL
19
230
225
293
16
783
project list
project list 2001 - LOCAL
No
PROJECT NAME
CLIENT
1
2
3
4
5
6
7
8
9
10
11
12
SUPPORTING LIFT
LATEX FACTORY
WARE HOUSE
WORK SHOP
WARE HOUSE
WARE HOUSE
WARE HOUSE
STRUCTURE AIRPORT
OFFICE 4 FLOOR
SUPPLY MATERIAL
ADDITIONAL FASCIA
TOWER OF CHURCH
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
WORK SHOP
TELECOMMUNICATION TOWER
SUPPLY MATERIAL
WARE HOUSE
PALM OIL MILL
WORK SHOP
RAK PALLET
FRAME PENYANGGA
CRANE GIRDER 22 M
WARE HOUSE
BRIDGE 24 M
WARE HOUSE
TOWER 42 M
WARE HOUSE
TRAIN BRIDGE
WARE HOUSE
PABRIKASI SIKU 200x200x20
WARE HOUSE
WARE HOUSE
PABRIKASI PENGGILINGAN PADI
PABRIKASI SIKU 200 x 200 x 20
SUPPORTING LIFT 23 M
CRANE GIRDER
TELECOMMUNICATION TOWER
BRIDGE B 75 M
TELECOMMUNICATION TOWER
TRADISIONAL MARKET
BRIDGE 20 M
RAK PALLET
RAK PALLET
TOWER 55 M
FLOORDECK & WIREMESH
engineering service center profile
PT. SELAMAT SEMPURNA
PT. SRIWIJAYA PRIMA LESTARI
PT. KING PERDANA SAKTI
CB INDUSTRIAL PRODUCT SDN BHD
PT. MANDALIKA SAPTAKARSA
PT. SIGMINDO BANGUN PERSADA
PT. TRIBAKTI SARIMAS
PT. ADHI KARYA
30
PT. ANEKA WARNA INDAH FOTO
PT. YUDISTIRA BUMI BHAKTI
PT. BAJA SEKAWAN INDAH ABADI
PANITIA PEMBANGUNAN GEREJA
MONUMENTAL TNI - AD
PT. KARYA BUDI MANDIRI
PT. DUTA SEMBILANTAMA KREASINDO
PT. YUDISTIRA BUMI BHAKTI
MR. IR. SAUT SIAGIAN
PT. MULTI MECHINDO INDONESIA
PT. SUMARA NIKARYA
PT. TRIBAKTI SARIMAS
AC & R
PT. REJEKI JAYA LESTARI
PT. NUSANTARA STEEL
PT. SINAR SAMA SEJATI
PT. CATUR NIKI
PT. AKSAN - TOKESAN
PT. BINA KERJA CEMERLANG
PT. ISTANA PUTRA AGUNG
PT. OLAGA FOOD INDUSTRI
PT. PERFECT CIRCLE ENGINEERING
PT. TIGA SAUDARA
PT. CAHAYA ETERNA
MR. ABU SOLEH
PT. PERFECT CIRCLE ENGINEERING
PT. SELAMAT SEMPURNA
PT. BUKIT TERANG
PT. BAHYUTAMA KERTA MUKTI
PT. KENCANA AGUNG UTAMA
PT. DUTA SEMBILANTAMA
MR. SYAFEI AMRI
PT. PARADISE PERKASA
PT. BUMI SARIMAS KELAPA
PT. COCOMAS INDONESIA
PT. BAHYUTAMA KERTA MUKTI
PANITIA PEMB. MASJID BAITURRAHMAN
Weight
( Ton )
156
17
63
33
50
90
12
55
68
28
5
9
20
478
30
10
275
15
4
5
3
68
33
7
12
11
50
104
250
72
20
7
95
27
6
40
31
16.8
27
30
16
8
54
8.3
project list
continue (project list 2001 - LOCAL )
No
PROJECT NAME
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
WORKSHOP
INDOFOOD FACTORY
TOWER 70 M
BRIDGE 30 M
ROOF FRAME
TOWER 40 M
NORTH DURI EXPANSION
SUBSTATION
WARE HOUSE
ADDITIONAL GPI POM
TOWER 70 M
WARE HOUSE
GALANGAN KAPAL
WARE HOUSE
WARE HOUSE
PALM OIL MILL
WARE HOUSE PERTAMINA - TUBAN
TOWER 40 M
62
63
64
65
66
SHOP HOUSE 3 FLOOR
LANTAI MEZZANINE
ROOF STRUCTURE FOR MOSQUE
TOWER 35M
TELECOMMUNICATION TOWER
67
68
69
RESTAURANT SUPER KITCHEN
WARE HOUSE
CPO PT. GUNUNG SAWIT
Weight
( Ton )
CLIENT
PT. NOJORONO
PT. ERA SANTAMA PERKASA
PT. BAHYUTAMA KERTA MUKTI
CV. SELINDUNG DELIMA
MR. VICTOR
PT. BAHYUTAMA KERTA MUKTI
PT. ANGKASA BUANA CIPTA
161
670
19.5
50
16
13.5
27.7
PT. KARYA BUDI MANDIRI
CB INDUSTRIAL PRODUCT
PT. BAHYUTAMA KERTA MUKTI
PT. TIGA SAUDARA
PT. PRABINA AULIA SARANA
PT. SAMA - SAMA
PT. PASIFIK WIRA BERJAYA
PT. VARITA MAJUTAMA
PT. BERKAT ANUGRAH AGUNG
PT. DUTA SEMBILANTAMA
KREASINDO
MR.. H. CAHYADI SUTANTO
49
5
19.7
23
70
15
10.5
281
14.5
15
40
11
4
14
16.54
PT. MEGA CIPTA BERSTARI PERSADA
MR. EFFENDI SUDARSONO
PT. GLOBAL REKAYASA INDONESIA
PT. DUTA SEMBILANTAMA
KREASINDO
PT. INTERDECO
PT. FIRGONIK DINAMIKA
CB INDUSTRIAL PRODUCT
25.73
45
500
TOTAL
3,834.50
project list 2001 - EXPORT
No
1
2
3
4
5
6
7
8
PROJECT NAME
WORK SHOP
WARE HOUSE
WORK SHOP
NAVO PALM OIL MILL
WARE HOUSE
WORK SHOP
FLEMINGTON PALM OIL MILL
JUDAN PALM OIL MILL
Weight
( Ton )
CLIENT
MAGA ENGINEERING
RING SHINE TEXTILE
MAGA ENGINEERING
CB INDUSTRIAL PRODUCT SDN BHD
RINGSHINE TEXTILE
MODERN ERECTION
CB INDUSTRIAL PRODUCT SDN BHD
CB INDUSTRIAL PRODUCT SDN BHD
TOTAL
163
158
46
300
225
72
298
191
1,453
TOTAL WEIGHT 2001 = 5,287.50 Ton
page 31
project list
project list 2002 - LOCAL
Weight
( Ton )
No
PROJECT NAME
CLIENT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
HOUSE & SHELTER BOILER
HOUSING
TOWER 35 M
PALM OIL MILL
CPO IN SAMPIT
WARE HOUSE
PABRIKASI L200, L150, & PELAT
TELECOMMUNICATION TOWER 40 M
TELECOMMUNICATION TOWER 40 M
ROOF STUCTURE FOR AUDITORIUM
ST. YOHANES BOSCO CHURCH
ADDITIONAL FACTORY
ROOF FRAME ISLAMIC CENTER
TOWER MONUMEN KAB. GORONTALO
OFFICE BUILDING
CPO PT. MULTRADA MULTI MAJU
HOUSING
WARE HOUSE
ELEVATED & BRIDGE PROJECT
FACTORY
BAITURRAHMAN MOSQUE (PHASE II)
9
15
13
130
360
16
145
15
30
6
95
10
61
330
18
266
7
41
69
51
10
22
23
24
25
26
ROOF STRUCTURE FOR HOUSING
SNF FLORINDO INDONESIA
WORKSHOP PEKAYON
TRAIN BRIDGE SEMARANG
TELECOMMUNICATION TOWER PT.
SATELINDO
BRIDGE
CV. LIMAN AGUNG
PT. LILIN CEMERLANG
PT. LILIN CEMERLANG
PT. AGRO BINTANG DHARMA NUS.
PT. KATINGAN INDAH UTAMA
PT. META FISIKATAMA
PT. KOKOH SEMESTA
PT. DUTA SEMBILANTAMA KREASINDO
PT. DUTA SEMBILANTAMA KREASINDO
POLRES METRO BEKASI
PANITIA PEMB. GEREJA SUNTER
PT. DIRADA META RANCANGBANGUN
YAYASAN AL -HARAMAIN
PD. PEDAGO
PT. CITRA SECTA PUTRA
PT. MULTI MECHSINDO INDUSTRIES
BP. WINARTO
PT. MULTI FABRINDO GEMILANG
PT. TOTALINDO BANGUN PERSADA
PD. SARI SEDAP INDONESIA
PANITIA PEMB. MASJID
BAITURRAHMAN
MR. SURYADI
PT. HARJAGUNA KURNIAMITRA
HENDRA TEKNIK
PT. ISTANA PUTRA AGUNG
PT. BAHYUTAMA KERTA MUKTI
PT. BAKRIE CORRUGATED METAL
INDUSTRY
PT. MELANIA INDONESIA
PT. KARYA MAKMUR ARMADA
PT. TRANS BAKRIE
PT. SAHITYA PRATISTA CIPTA
95
219
40
1,324
250
PT. AGRO BINTANG DHARMA NUS.
CBIP
PT. SALAWATI MOTOR IRJA
PT. BAHYUTAMA KERTA MUKTI
20
400
40
157
CBIP
PT. LIGHT INSTRUMENINDO
PT. SAHITYA PRATISTA CIPTA
PT. MULTIMAS NABATI ASAHAN
421
6
8
145
PT. SAMUDRA TEKNINDO
HYDRAUMATIC
142
27
28
29
30
31
32
33
34
35
36
37
38
39
40
FACTORY
ROOF STRUCTURE FOR VIHARA
STEEL DECK
TELECOMMUNICATION TOWER PT.
TELKOMSEL
LOADING RAMP
PT. MAS PALM OIL MILL
WORKSHOP
TELECOMMUNICATION TOWER PT.
SATELINDO
PT. MINAMAS PALM OIL MILL
CIKEAS BRIDGE 20 M
TOWER RATELINDO ROOF TOP SST 30 M
BUILDING CONSTRUCTION
STRUCTURAL STEEL
FACTORY
engineering service center profile
32
10
22
20
125
350
project list
continue (project list 2002 - LOCAL )
No
PROJECT NAME
41
42
OFFICE AND FACTORY PT. SAMWOO
BRIDGE
43
44
45
46
47
48
49
50
51
52
VIHARA AVALOKITESVARA
STEEL DECK
BRIDGE TYPE B-60M
OFFICE
MINI POM
BRIDGE B-40M
TELECOMMUNICATION TOWER PT.
SATELINDO
CHURCH HKBP
TENNIS HALL
WORK SHOP
53
54
55
56
57
58
59
60
61
WORSKHOP & WAREHOUSE
BRIDGE 40 M
TOWER 42 M
BRIDGE B-35M
BRIDGE B-55M
BRIDGE B-60M
BRIDGE TYPE C-45
FACTORY AMDK
TENNIS HALL II
Weight
( Ton )
CLIENT
PT. AGRABUDI KARYAMARGA
BAKRIE CORRUGATED METAL
INDUSTRY
YAYASAN SATYA GRAHA
PT. TRANS BAKRIE
PT. PERDANA PUTERA BAJATAMA
SCHALA SCHALIM & ASSOCIATES
CBIP
PT. PRESTASI KARYA MULIA
PT. BAHYUTAMA KERTA MUKTI
190
120
330
1,450
31
77
222
156
95
PT. ARCA BIMASAKTI
KODAM JAYA
PT. SAMUDRA TEKNINDO
HYDRAUMATIC
CV. BELAWAN INDAH
CV. ARSA KEMBANG
PT. INDOTECH JAYA LESTARI
BCMI
BCMI
PT. DIMAS ESA
PT. PERDANA PUTERA BAJATAMA
PT. KOKINDO TROPICAL SPRINGS
KODAM JAYA
27
36
31
49
78
495
39
99
1,100
54
18
43
TOTAL
10,231
project list 2002 - EXPORT
No
1
2
3
PROJECT NAME
OIL REFINERY BUILDING
WARE HOUSE
WARE HOUSE
Weight
( Ton )
CLIENT
CIDAR ENGINEERING
RINGSHINE TEXTILE LTD.
RINGSHINE TEXTILE LTD.
230
133
87
TOTAL
TOTAL WEIGHT 2002 = 10,681 Ton
page 33
450
project list
project list 2003 - LOCAL
No
PROJECT NAME
1
TELECOMMUNICATION TOWER PT.
SATELINDO
TELECOMMUNICATION TOWER PT.
SATELINDO
PALM OIL MILL
BRIDGE B-50M
SALURAN
STEEL DECK
STEEL DECK
TELECOMMUNICATION TOWER PT.
TELKOMSEL
BRIDGE B-60 M
BASE FRAME ROOF TOP
FACTORY
ROOF STRUCTURE FOR AUDITORIUM
BRIDGE B-20M & 30 M
ANGSANA P O M
SALURAN
ANCHOR BOLT
BRIDGE B-60 M
INCENERATOR BUILDING
TRANSMISSION TOWER
BAITURRAHMAN MOSQUE (PHASE III)
TELECOMMUNICATION TOWER PT.
SATELINDO
CPO PANGKALAN BUN
CPO TANJUNG PINANG
PALM OIL MILL
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
CLIENT
34
35
36
37
BRIDGE
GIRDER BRIDGE
TELECOMMUNICATION TOWER PT.
SATELINDO
TELECOMMUNICATION TOWER PT.
TELKOMSEL T-72 M
SCHOOL
BRIDGE B-40M
GIRDER BRIDGE B-20M & B-30M
JEMBATAN PENYEBRANGAN
KAPAL
TELECOMMUNICATION TOWER PT.
SATELINDO
POWER HOUSE
WARE HOUSE
STEEL BRIDGE DECK
TELECOMMUNICATION TOWER T 42M
38
39
40
TELECOMMUNICATION TOWER
GIRDER BRIDGE A-25M
WARE HOUSE
28
29
30
31
32
33
engineering service center profile
34
Weight
( Ton )
PT. BAHYUTAMA KERTA MUKTI
150
PT. DUTA SEMBILAN KARTIKA
130
PT. TIMAH INDUSTRI
PT. ANUGERAH MITRA SETIA
PT. CATUR BUMI PERTIWI
PT. TRANS BAKRIE
PT. TRANS BAKRIE
PT. INDOTECH JAYA LESTARI
227
96
14
13
16
492
PT. FLORIDA DUTA KARYA
PT. DUTA SEMBILAN KARTIKA
PT. BUKIT BAJA NUSANTARA
PT. PARAMA MATRA WIDYA
PT. GLOBAL ERA MILLENIUM
PT. CB. POLAINDO
PT. CATUR BUMI PERTIWI
PT. TIMAH INDUSTRI
PT. B C M I
PT. CAKRA NUSANTARA CILEGON
PT. PLN (PERSERO)
PAN. PEMB. MASJID BAITURRAHMAN
PT. BAHYUTAMA KERTA MUKTI
PT. ERACIPTA BINAKARYA
PT. ERACIPTA BINAKARYA
PT. CONARCO INDONESIA
ENGINEERING
CV. JASA UTAMA
PT. NUSANTARA DHARMA CIPTA
PT. BAHYUTAMA KERTA MUKTI
PT. DUTA SEMBILAN KARTIKA
PT. DIRADA META RANCANGBANGUN
PT. ANUGERAH MITRA SETIA
PT. AGRABUDI KARYAMARGA
PT. TENGAN PERDANA BHAKTI
PT. BAHYUTAMA KERTA MUKTI
PT. PUSAKA JAYA BARU
CV. RATU KRAKATAU
PT. B C M I
PT. WAHANA LINTASSENTRAL
TELEKOMUNIKASINDO
PT. TORAYA KESU ‘SANGGALANGI’
PT. HUTAMA KARYA BENGKULU
BP. NG BURHAN
62
214
130
52
76
493
642
8
112
33
14,000
9
61
170
150
125
72
51.33
187
23
10
71.20
99.80
50
90
495.90
10.50
19
52.70
117.97
37
170
project list
continue (project list 2003 - LOCAL )
No
PROJECT NAME
41
42
43
44
45
46
47
48
49
50
51
52
GIRDER BRIDGE B 28M
GIRDER BRIDGE B 30M
BRIDGE B 25 M
STEEL DECK
BRIDGE B-60M
HOUSE
GIRDER BRIDGE B 20M & B 30M
TELECOMMUNICATION TOWER T 25M
& T 32M
SIAK SRI INDRAPURA BRIDGE
BRIDGE C-30M
ROOF FRAME
FACTORY
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
TOWER T 48M
BRIDGE A-20M
POWER HOUSE & UNLOADING SHED
BRIDGE A-20M
PALM OIL MILL
BRIDGE B-60M
BRIDGE B-40M
BRIDGE C-15M & C-20M
BRIDGE TYPE C-45
STEEL DECK
BRIDGE TYPE C-40
BRIDGE CLASS C B-50M
OFFICE
EXTENTION FACTORY
STEEL DECK
POWER PLANT PROJECT
TOWER T-90M (HEAVY)
LOADING RAMP
JEMBATAN C -45M
SHOP HOUSE
ADDITIONAL WARE HOUSE
PALM OIL MILL
TOWER T-25M, 29M, & 35M
TOWER T-70M & 40M
Weight
( Ton )
CLIENT
CV. MULYA KARYA
PT. DEWISRI RAHAYU
CV. KARYA MAKMUR
PT. TRANS BAKRIE SUMURANJA
PT. HK – PT. WIKA JO.
PT. IHAKA SAKA NUSANTARA
PT. AGRABUDI KARYAMARGA
PT. WAHANA LINTASSENTRAL
TELEKOMUNIKASINDO
PT. HUTAMA KARYA PEKANBARU
PT. PERDANA PUTERA BAJATAMA
PT. FARIKA DUTA AGUNG
PT. MULTIPANEL INTERMITRA
MANDIRI
PT. CITRA SECTA PUTRA
PT. WIJAYA KARYA
PT. TIMAH INDUSTRI
PT. WIJAYA KARYA
PT. KARYA PUTRA NAGARI
PT. EKA PENDAWA SAKTI
PT. BINA MAJU TETAP JAYA
PT. BINA MAJU TETAP JAYA
PT. PERDANA PUTERA BAJATAMA
PT. WAAGNER BIRO
PT. PERDANA PUTERA BAJATAMA
CV. BRANTAS
PT. TRIMATRA LIGUNA
PT. BANGUN PRIMATAMA SEDAYA
PT. WAAGNER BIRO
PT. ASRIGITA PRASARANA
PT. BAHYUTAMA KERTA MUKTI
PT. AGRO BINTANG DHARMA NUS.
PT. CEMERLANG SAMUDRA KONTRINDO
MR. LIM BOK SAN
PT. MELANIA INDONESIA
PT. TIMAH INDUSTRI
PT. WAHANA LINTASSENTRAL T.
PT. BAHYUTAMA KERTA MUKTI
TOTAL
43
45
17
22.67
136.17
14
60.75
23
104.70
31.36
34
35
25.28
24.38
33.50
24.38
116
137.38
85.22
74.27
50
13.67
42
62.90
114
113
52.74
408.24
46.25
22
41
48.95
88
575
32
130.8
21,960
page 35
project list
project list 2003 - EXPORT
No
1
2
PROJECT NAME
SUNGAI DINGIN P O M
WORKSHOP
Weight
( Ton )
CLIENT
CB. INDUSTRIAL PRODUCT
OLIVER ROONEY
TOTAL
450
86
536
TOTAL WEIGHT TH 2003 = 22,496 Ton
(UNTIL 31st DECEMBER 2003)
project list
project list 2004 - LOCAL
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
PROJECT NAME
PALM OIL MILL
STEEL DECK
BRIDGE B-60 M
BRIDGE A-20 M
GOR PAMBUDI LUHUR
STEEL DECK
STEEL DECK
TOSERBA YOGYA
WORKOVER TRAILER
STEEL DECK
JEMBATAN B -60M
STEEL DECK
PINTU DOK KAPAL
STEEL DECK
Weight
( Ton )
CLIENT
PT. MULTI JAYA PERKASA
PT. WAAGNER BIRO
PT. RIAU SEPADAN
PT. OKA LINTAS MUARA
MR. DANA AMIN
PT. WAAGNER BIRO
PT. WAAGNER BIRO
PT. AKUR PRATAMA
PT. METALINDO PERKASA MANDIRI
MR. IR. HARYONO
PT. GANESHA CIPTA INFORMATIKA
MR. IR. HARYONO
PT. DOK DUASATU NUSANTARA
PT. WAAGNER BIRO
TOTAL
133
10.25
137.62
24.48
14.40
15.95
27.35
342
10.50
12.70
220
6.5
65
20.65
1,040.40
project list
project list
project list
project list 2010 - LOCAL
TOTAL WEIGHT 2010 = 3,235 Ton
company information
Head Office and Plant Information
engineering service center profile
2

Similar documents

Catalogue PT. Gunung Garuda

Catalogue PT. Gunung Garuda 800,000MT. Today, Gunung Garuda remains one of the largest and most dominant private steel manufacturer in South East Asia due to advanced technological and human investment made, starting from the...

More information