AFGHANISTAN Flood risk (est.) for the period 30/04/2015

Transcription

AFGHANISTAN Flood risk (est.) for the period 30/04/2015
AFGHANISTAN
Flood risk (est.) for the period 30/04/2015 to 06/05/2015
This map is compiled by iMMAP. Date created: 04/05/2015.
Administrative boundaries, settlements: AIMS. Snow water equivalent
data: FEWSNET (http://earlywarning.usgs.gov/fews/)
Datum/Projection: WGS-84/Geographic. iMMAP in Afghanistan is
funded by the United States Agency for International Development
(USAID) / Office of U.S. Foreign Disaster Assistance (OFDA). The data,
boundaries, names and the designations used on this map do not imply
official endorsement or acceptance by iMMAP and/or USAID/OFDA. All
information is the best available at the time this map was produced. For
information on methodology or copies: [email protected] ,
www.immap.org
Climate Prediction Center’s Central Asia Hazards Outlook
April 30 – May 6, 2015
Legend
Es.t settlements exposed to low flood
risk
Est. settlements exposed to medium
flood risk
Est. settlements exposed to no flood risk
NOHRSC est. water level in hydrological basins for the period 30/04
to 06/05 – current level compared to historical average