MassimoMarianiStudio.com

Transcription

MassimoMarianiStudio.com
MASSIMO MARIANI
Engineer and Architect
Via Armonica, 6/B
Tel. e fax +39 075 5730640
06123 P E R U G I A
Fiscal code: MRN MSM 48 E 31 H 501 K
VAT entry n°: 01527930547
E-mail:
[email protected]
Web site:
www.massimomarianistudio.com
CURRICULUM
VITAE
MASSIMO MARIANI
EN GIN EER AN D ARCHIT ECT
Principal works
1968 - 2014
November 2014
INDEX
INDEX ................................................................................................................ 2
PROFESSIONAL TEACHING BACKGROUND ......................................................... 4
PARTECIPATION IN NATIONAL AND INTERNATIONAL CONVENTIONS............... 9
PUBLIC POSITIONS HELD ................................................................................ 11
PERSONAL PUBLICATIONS............................................................................... 12
PUBLICATIONS WITH OTHER AUTHORS ........................................................... 14
SCIENTIFIC CONTRIBUTIONS TO SPECIALIZED MAGAZINES OR CONFERENCE
PROCEEDINGS .............................................................................................. 18
PROFESSIONAL REGISTERS AND MEMBERSHIP OF PUBLIC BODIES ................ 23
COMPETITIVE EXAMINATIONS......................................................................... 24
PROJECTS ........................................................................................................ 30
A) CONSOLIDATION AND RESTORATION OF BUILDINGS AND
IMPROVEMENT T O HISTORICAL CENTRES ............................................ 30
B) CONSOLIDATION OF HYDROGEOLOGICAL INSTABILITY .......................... 62
C) LARGE STRUCTURES ................................................................................ 74
SITE ENGINEERING AND TECHNICAL DIRECTIONS .......................................... 76
SAFETY COORDINATION IN THE PROJECTING AND EXECUTION PHASES ......... 87
ACCEPTANCE OF WORKS .................................................................................. 98
Nas1: 20141111 Inglese Curriculum per settori
2
MASSIMO MARIANI
Born in Rome on 31 May, 1948
Tax Identification N°: MRN MSM 48E31H501K
Resident in Via Roscetto 14, Perugia, Italy
Graduate in Civil Engineering at the University "La Sapienza" in Rome on 18.12.1978
(Mark: 105/110) and Construction Engineering - Architecture at the University Politecnica
delle Marche in Ancona on 10/20/2006 (Mark: 110/110);
Acquired Chartered Engineer status at the University of Rome in 1979 and Chartered
Architect status at the University of Chieti – Pescara in 2006;
Member of the Order of Engineers of the Province of Perugia since 18 June, 1985 (ref.
A837) (previously Member of the Order of Engineers in the Province of Rome from 18
January, 1980 to 18 June, 1985);
Member of the Order of Architects, Planners, Landscapers and Conservationists of the
Province of Ascoli Piceno since 28 January, 2010 (Ref, 899).
Free Professional
Social Security - INARCASSA, n. 303243 since 26 January 1985.
Knight of the “Order of Merit of the the Italian Republic”
Office “Studio for Applied Research” Via Armonica, 6/B – 06123, Perugia, Italy;
VAT N.: 01527930547
Tel. and fax +39 075 5730640 – Cell. +39 338 7855328
e-mail: [email protected]
Website: www.massimomarianistudio.com
Nas1: 20141111 Inglese Curriculum per settori
3
PROFESSIONAL
BACKGROUND
Academic Years
2013/2014
2012/2013
2011/2012
2010/2011
TEACHING
Professor of "Applied Geology and
Geotechnical Engineering Works" (42
hours) Masters Course in Science and
Geological Technologies, Faculty of
Mathematical, Physical and Natural Sciences,
Perugia.
Chieti, June 24, 2011
Professional Updating Course
Engineering of Structures: Existing
Constructions - Masonry Buildings (8 hours).
An initiative promoted by the Order of
Engineers, Province of Chieti.
Fiuggi, June 18, 2011
Course:
Architectural heritage and seismic risk. Methods
and tools from prevention to interventions on
historic and monumental buildings (2.5 hours).
An initiative of ASS.I.R.C.CO, Italian Association
for the Recovery and Consolidation of Buildings.
Academic Year 2009/2010
Lecturer Masters Course (second level)
Seismic improvement, restoration and
consolidation of historic and monumental
buildings - Fourth Edition - Course on
"Structural problems of historical and
monumental buildings" (60 hours), University of
Perugia, Faculty of Engineering.
Gubbio, 20 March, 2010
Seminar
The Restoration of “Palazzo Bargello” in Gubbio
and experiences of recovery and preservation of
civil architecture of the Fourteenth and Fifteenth
Century (3 hours). An initiative of the
Municipality of Gubbio.
Teramo, July 30, 2009;
Pescara, July15, 2009;
Ascoli Piceno, May 8, 2009
Nas1:\20141111 Inglese Curriculum per settori
Lecturer NTC Course 2008
Supplementary Seminar: Consolidation and
restoration of masonry buildings - Actions on
structures in elevation: analysis of failures,
temporary work, renovation and consolidation,
(8 hours) for the Order of Engineers of the
4
Provinces indicated.
Perugia, May 15, 2009
Course on Recovery and Conservation of
Buildings I and II:
Architectural ideation in the recovery of
monumental buildings (3 hours), University of
Perugia, Degree in Civil and Environmental
Engineering.
Academic Year 2007/2008
Lecturer - Masters Course (second level)
Seismic improvement, restoration and
consolidation of historic and monumental
buildings - Third Edition - Course on "Structural
problems of historical and monumental
buildings" (60 hours), University of Perugia,
Faculty of Engineering.
Perugia, June 25, 2008
Seminar:
The pleasure of drawing (4 hours). An initiative
by the University of Perugia, Faculty of
Engineering.
Spoleto (PG)
September 22, 2007
Seminar:
Scientific research in the design of post-seismic
strengthening and restoration work, (3 hours).
An initiative promoted by the Umbria Region
and the Marche Region.
Perugia, May 22, 2007
Seminar:
The quality of building between innovation and
protection of architectural and landscape
heritage (2 hours). An initiative promoted by
the Region of Umbria, the Municipality of
Perugia and by the Professional Associations.
Rome, January 31, 2008
Seminar:
Consolidation and restoration of masonry
buildings. An initiative by ASS.I.R.C.CO,
Italian Association of Recovery and
Consolidation Construction.
Perugia, 15 and 16 March
2007
Lecturer
“Guidelines for the assessment and reduction of
seismic risk of cultural heritage with reference
to technical standards for construction” (8
hours), Study Centre "Mastrodicasa Sisto."
Foligno, 2006
Lecturer
“Project: perform – path building renovation” (4
hours) at the Institute for Industrial and
Nas1:\20141111 Inglese Curriculum per settori
5
Technical Surveyors', Leonardo da Vinci ",
Foligno.
Academic Year
2005/2006
Lecturer - Masters Course (second level)
Seismic improvement, restoration and
consolidation of historic and monumental
buildings - Second Edition - Course on
"Structural problems of historical and
monumental buildings" (60 hours), University of
Perugia, Faculty of Engineering.
Years 2005/2006
Lecturer
Course: “Seismic classification, vulnerability of
buildings and standards for construction in
seismic areas”, for the Umbria Region.
Perugia, 2005
Lecturer
Course: “ Seismic classification, vulnerability
of buildings and technical regulations for seismic
constructions” (24 hours) for the School of
Public Administration Villa Umbria.
Year 2005
Lecturer
"Technical measures of intervention for floors
and trusses in wood and metal construction:
increased stiffness in the plan, restoring the
original conditions, treatment of premises ,
increased resistance, changing constraints and
connections: materials, calculation procedures,
construction details, examples " during the
course on Safety in masonry buildings,
diagnosis, degradation, interventions,
representative examples of interventions for the
Study Centre" Mastrodicasa Sisto. "
Chieti, in 2005
Lecturer Professional Refresher Course
Technical standards for the design and sismic
adaptation- retrofitting of buildings (4 hours), of
the Order of Architects, Planners, Landscapers
and Conservationists of the Province of Chieti.
Ancona and Perugia, in
July 2005
Lecturer
Professional Refresher Course
The new text on Sismic Ordinance: changes to
existing masonry buildings (8 hours), Study
Centre "Mastrodicasa Sisto," Centers of Perugia
and Ancona.
Perugia, 11 December,
2004
Lecturer
Professional Refresher Course
Nas1:\20141111 Inglese Curriculum per settori
6
Diagnosis and safety of masonry buildings, with
particular reference to the new seismic code (1
hour), University of Perugia, Faculty of
Engineering.
Florence, October, 2004
Lecturer
Professional Refresh Course
Safety of masonry buildings, diagnosis,
degradation, interventions, examples of
representative work (4 hours) at the INAIL
Regional Office.
Lanciano, Chieti, 2004
Lecturer
Diagnosis and safety of masonry buildings (3
hours) for the Study Centre "Mastrodicasa
Sisto," located in Lanciano and Chieti.
Academic Year 2003/2004
Lecturer: Masters Course (second level)
Seismic improvement, restoration and
consolidation of historic and monumental
buildings – Third Edition - Course on "Structural
problems of historical and monumental
buildings" (60 hours), University of Perugia,
Faculty of Engineering.
Perugia, 2003
Lecturer: Professional Updating Seminar
Redevelopment, hydraulic protection and
environmental restoration of river banks (4
hours) - 1 st and 2 nd form, the Province of
Perugia.
Viterbo, July 2, 2003;
Chieti, June 17, 2003;
Pisa, April 15, 2003;
Pesaro, March 12, 2003;
Trento, February 27, 2003,
Cremona, January 21,
2003;
Lecturer: Professional Refresher Course
Securing and strengthening of masonry
buildings: considerations and analysis of
technical interventions (1 hour each session) of
the Order of Engineers of the Provinces
indicated.
Gubbio, March 29, 2003
Lecturer
Company Training Project (3 hours) at the Art
Institute of Gubbio.
Syracuse, January 11,
2003
Lecturer
Contemporary consolidation techniques:
building yard experience (5 hours) for the Board
Nas1:\20141111 Inglese Curriculum per settori
7
of Surveyors of the Province of Syracuse.
Chieti, November 20,
2002;
Florence, June 26, 2002;
Offida (AP), June 5, 2002;
La Spezia, May 23, 2002;
Perugia, March 22, 2002
Lecturer
Itinerant Professional Refresher course.
Diagnosis and security of masonry buildings and
Consolidation and restoration of masonry
structures (1 hour each session), Study Centre
"Mastrodicasa Sisto" at the Professional
Associations of Architects and Engineers of the
Provinces indicated.
Perugia, 2002
Lecturer
Course for maintenance technicians for the
consolidation of unstable areas (10 hours),
Agency for Vocational Training "Smile –
Innovative Systems and Methods for work and
education."
Rieti, November 12, 2002
Lecturer: Professional Refresher Course
Securing and strengthening of masonry
structures: considerations and analysis of
intervention (1 hour) of the Order of Engineers
of the Province of Rieti.
Nas1:\20141111 Inglese Curriculum per settori
8
PARTECIPATION IN NATIONAL
AND INTERNATIONAL
CONVENTIONS
Tbilisi (Georgia),
May 30, 2014
Ferrara, March 27, 2010
Bastia Umbra (Perugia),
March 12, 2010
ECCE-GSCE-WCCE International Conference
Seismics-2014
"Seismic
design
and
rehabilitation of buildings" organized by the
European Council of Civil Engineers (ECCE),
the Georgian Society of Civil Engineers
(GSCE), the World Council of Civil Engineers
(WCCE) and the Ministry of Regional
Development and Infrastructure of Georgia:
“Seismic Structural Consolidation of
Historical and Monumental Buildings
Using
Steel:
Interventions
on
Foundations and Elevations”.
Topic of the meeting:
"Considerations on damage mechanisms
and possible restoration interventions on
historic buildings one year after the
earthquake in Abruzzo."
Convention:
Umbrian Architecture 2010 signs of the
contemporary.
Foligno, January 30, 2010
Urban Regional Review:
"From Integrated Recovery Programs to
the" new town ".
Reconstruction after earthquakes.
Comparing experiences."
The Eagle, December 3,
2009
EUCENTRE - General Assembly Committee
and Professional Supporters Group – Topic:
"Consolidation and restoration of
buildings in seismic areas."
Rome, December 15, 2009
Topic of the meeting:
"Strengthening of structures with steel."
Bastia Umbra (Perugia),
November 27, 2009
Bologna, October 31, 2009
Nas1:\20141111 Inglese Curriculum per settori
Coordinator of the workshop "House Steel
House."
Meeting on the topic:
"The earthquake in Abruzzo on 6 April
9
2009: reflections on damage mechanisms
on historical buildings and experiences
on emergency safety interventions."
Corciano (PG), April 4,
2009
Convention:
"Corciano (and Perugia): City without
measure?"
Perugia, January 30, 2009
Convention:
"Architectural barriers and accessibility."
Bath (GB), July 2-4, 2008
Assembly Rooms:
"Sahco 08 - 6th International Conference
of Structural Analysis of Historic
Constructions".
Perugia, May 24, 2007
Conference:
"The Nameless City. An Architecture in
search of urban environment."
Florence,
February 22-27, 2005
Perugia, June 26, 2003
Perugia, December 7-14,
2002
Nas1:\20141111 Inglese Curriculum per settori
International Conference:
"Conservation of historic wooden
structures."
National Forum:
"The consolidation of historical buildings
reasons for safety and conservation
requirements."
Safety measures versus conservation
requirements.”
National Forum:
"Lignea 2002 - The wooden structures
from past to future. Art, History, Design,
Technology, Restoration."
10
PUBLIC
Year 2014
POSITIONS
HELD
President Elect of the Board of ECCE, European Council of
Civil Engineers.
Years 2011/2014
Member of the Executive Board of the Consiglio Nazionale
degli Ingegneri, in charge of the sector “Culture”.
Years 2012/2014
Member of Board of the Scuola Superiore Ingegneri
(Engineers’ Higher School).
Years 2012/2014
Member of the Board of ECCE, European Council of Civil
Engineers.
Years 2011/2013
Member of the Board of Directors ASS.I.R.C.CO - Italian
Association of Recovery and Consolidation of
Constructions
Years 1996/2010
President of the Order of Engineers of the Province of
Perugia (In office until 2013)
Years 2011/2013
Regional Delegate ASS. I. R. C. CO - Italian Association
of Recovery and Consolidation of Constructions.
Years 2007/2010
Member of the National Committee of Professionals
EUCENTRE - European Centre for Training and Research
in Earthquake Engineering.
Year 2003
Academic of Merit of the Academy of Fine Arts "Pietro
Vannucci" in Perugia.
Year 2002
Honorary Academic of Fine Arts "Pietro Vannucci" in
Perugia.
Years 2000/2005
Member of the Board of Directors and Deputy Secretary
of the Academy of Fine Arts "Pietro Vannucci" in Perugia.
Years 1995/2002
Member of the C.C.R.T. - Regional Advisory Committee
for the Territory - Umbria Region.
Years 1995/2009
President, Member of the Board of Directors and the
Technical Committee of the Health Consortium of Umbria.
Interventions on hospital building in Umbria
Nas1:\20141111 Inglese Curriculum per settori
11
PERSONAL
PUBLICATIONS
Construction details in consolidation and
restoration, Rome, Dei, Tipografia del Genio
Civile, 2014.
Treatise on consolidation and restoration
of masonry buildings, Rome, Dei, Tipografia
del Genio Civile, 2012.
Nas1:\20141111 Inglese Curriculum per settori
12
The restoration of the Church of
Sant’Ercolano 1999-2006, Perugia,
Volumnia Ed., 2007.
Treatise on consolidation and
restoration of masonry buildings, Rome,
DEI - Genio Civile Printers, 2006.
Volume I: Interventions on the ground and
the foundations
Volume II: Interventions on raised
structures
Nas1:\20141111 Inglese Curriculum per settori
13
Consolidation of wooden structures with
steel, Rome, DEI - Genio Civile Printers, 2004
Nas1:\20141111 Inglese Curriculum per settori
14
PUBLICATIONS
AUTHORS
WITH
OTHER
The Practical Construction and the Rural
Architecture - Summary of Professor
Guglielmo Calderini's lectures at the
University of Pisa during the Academic
Year 1885-1886, Paolo Belardi and Massimo
Mariani Ed, Il Formichiere, Foligno, 2013.
"Introduction to the Study of the Rural
Architecture."
Structural analysis of historic construction
- preserving safety and significance, Dina
D'Ayala and Enrico Fodde Ed., 2008.
Nas1: 20141111 Inglese Curriculum per settori
15
The water project –The cisterns of Todi:
archaeology, architecture, engineering,
QuattroEmme Ed., 2007.
“The Engineering and architecture of cisterns”.
Wooden material: studies in the
conservation and restoration of artistic
wooden heritage, QuattroEmme Ed., 2006.
The Albornozian Fortress of Spoleto:
studies and reflections on restoration,
B.P.S. Ed., 2005
“The Leoncilli Massi group project for the
restoration of the Fortress of Spoleto: the
origins in what is to become”.
Nas1:\20141111 Inglese Curriculum per settori
16
Conservation of historic wooden
structures, International Conference, Gennaro
Tampone Ed., 2005
“Broms theory of load limit extended to
connections with steel pegs in wood”;
“Sliding Insulator for supporting beams
and trusses”;
“Provisional reinforcement work on beams
and trusses with steel bands and cables”.
Treatise on Consolidation, Rome, Mancosu
Ed., 2003.
The Etruscans, Master plumbers, Perugia,
Electa Ed., Umbri, 1991.
"Use of the underground for an urban
expansion of Todi: hydraulic and structural
systems".
Nas1:\20141111 Inglese Curriculum per settori
17
When Spoleto was Romanesque, Rome,
Multigrafica Ed., 1984.
Towards a museum of the town –Todi
Municipality, 1982;
"Analyses of construction methods of the
Etruscan wall- North-east side.”
Nas1:\20141111 Inglese Curriculum per settori
18
SCIENTIFIC CONTRIBUTIONS
SPECIALIZED MAGAZINES OR
CONFERENCE PROCEEDINGS
TO
The search for a perfect arch. From Morandi
to Nervi, Proceedings: “A Day of Study”, Assisi,
March 25, 2008 in "Bulletin - Cultural Heritage of
Umbria" No. 4, year III/2010, Paper (first issue),
Viterbo, BetaGamma publishing, 2010.
"Large arched wooden structures."
Hidden harmony - The Landscape from project
and to territorial government, Proceedings from
the 3rd International Convention on Cultural
Heritage, Urbino, in October 2006.
"The Temple of S. Herculaneum: anthropogenic
degradation, restoration and enhancement of
cultural property in the historic center of Perugia
(Umbria). "
Nas1: 20141111 Inglese Curriculum per settori
19
Artetregiorni - Art, Architecture, Urban Design
and Literature, Proceedings from International
Convention, Academy of Fine Arts Foundation
"Pietro Vannucci" Perugia, 2004.
"A Center for Art."
Magazine "B.I.T.
Bulletin on technological
innovation ",
No. 2, September 2001
"The new rules of arbitration in public works"
December 1998
" Measurable qualities or non measurable
qualities?"
No. 2, May 1998
"Empiricism or science in reconstruction"
No. 1, February 1998
"An order for consolidation in saving"
Magazine "B.I.T.
Bulletin on technological
innovation ",
No. 4, October 1997
"European Social Fund: Making the best use"
No. 1, February 1997
"Open Distance Learning - A possible way to train
or retrain company staff"
No. 4, October 1996
"Health Authority Buildings in Umbria"
Magazine "The Umbrian
Engineer ",
No. 9, year XV, September 2007, Progr. No. 62
"Dedicated to Professor Leoncilli Massi - The
Legend of composing."
No. 6, yearXIV, June 2006, Progr. No. 57
"Studies on the church of San Costanzo in
Nas1:\20141111 Inglese Curriculum per settori
20
Perugia."
Magazine "The Umbrian
Engineer ",
No. 9, the thirteenth year, in September 2005,
Progr. No. 54
"Beauty is the limit of a critical state - The Future
of Man remains to be accomplished."
No. 12, year XII, December 2004, Progr. No. 51
"If triangles had invented a God they would have
been of three sides."
No. 6, Year XII, June 2004, Progr. No. 49
"Ethics in design – Ethics in business and in
professional activities while approaching the third
millennium."
No. 9, eleventh year, in September 2002, Progr.
No. 42
""Infinities"Infinite knowing."
No. 3, year XI, March 2002, Progr. No. 40
"The scattered light of any thought."
No. 12, year X, December 2001, Progr. No. 39
"Arbitration in public works – A further reflection
on this new discipline."
No. 3, Year X, March 2001, Progr. No. 36
"An insult to culture - The lobby of graduates."
No. 12, year IX, December 2000, Progr. No. 35
"Engineers and arbitration."
No. 6, ninth year, in June 2000, Progr. No. 33
"Legislation on public works."
No. 6, Year VIII, June 1999, Progr. No. 29
"Assisi 99 international seminar".
No. 3, Year VII, March 1998, Progr. No. 24
“Consolidating saving policy– The Story of a 2000
billion Euro quake and an about-face policy
No. 6, Year VI, June 1997, Progr. No. 21
"Foundation micropoles - a bit 'of peace."
Micropali di fondazione
No. 3, Year VI, March 1997, Progr. No. 20
"Science, Pseudoscience and Metaphysics."
Nas1:\20141111 Inglese Curriculum per settori
21
Magazine "The Umbrian
Engineer ",
No. 6, the fifth year, in June 1996, Progr. No. 17
"The limits in the search for value - Mathematical
concept and philosophical concept of function";
"Project financing".
No. 12, year IV, December 1995, Progr. No. 15
"Italy: employment to 2000";
"The state of the art in our profession."
No. 9, Year IV, September 1995, Progr. No. 14
"Analysis of truth and truth of analysis. Debating
with the philosopher Aldo Stella."
No. 7, Year IV, June 1995, Progr. No. 13
"Time".
No. 3, Year IV, March 1995, Progr. No. 12
"Engineers in Europe."
No. 10, year III, November 1994, Progr. No. 11
"Geotechnics to engineers. Geology to
geologists';
"Mathematical calculations and philosophical
inquiry."
No. 3, Year IV, April 1994, Progr. No. 10
"Luca Pacioli and the birth of algebra";
"Geotechnics to engineers."
No. 7, year III, October 1993, Progr. No. 8
"Girolamo Cardano and" the art of meeting ";
"The graduate degree in engineering."
No. 4, Year III, June 1993, Progr. No. 7
"Limitations of the professional skills of
surveyors."
No. 3, Year III, May 1993, Progr. No. 6
"The birth of infinitesimal calculus";
"Geologists and geotechnics"
New series No. 4, September 1992 Progr. No. 4
"Just buy a computer and become an engineer?"
new series No. 3, June 1992, Progr. No. 3
"Real seismic risk of our region."
No. 2 new series, March 1992, Progr. No. 2
"The mortars in the restoration of these unknown
...."
Nas1:\20141111 Inglese Curriculum per settori
22
Journal "buildings, roads,
construction sites,"
No. 1 new series, November 1991, Progr. No. 1
"Archaeological Recovery of Todi."
No. 5, March 1990
"Small diameter poles in cohesive soils. Lateral
resistance, comparison between real and
theoretical carrying capacity"
No. 29, March 1987
"A contribution to the design criteria for
embankments using a reinforced soil system."
Nas1:\20141111 Inglese Curriculum per settori
23
PROFESSIONAL REGISTERS AND
MEMBERSHIP OF PUBLIC BODIES
-
List of Regional technical-administrative Inspectors of the Region of
Umbria.
LR 70/1981 by 2004.
-
Professional List as per Ministerial Decree 25.03.1985 referring to Law
818/1984 (Fire prevention) Ministry of the Interior Order No.
PG00837I00436 issued by The Order of Engineers of the Province of
Perugia on 13.09.2006.
-
Register of Technical Consultants and Surveyors of the Court of Perugia
since 28.10.1993.
-
Award for the Coordination of design safety and execution of work.
Legislative Decree 494/1996 Article No. 10 issued by the Provincial
Building School 16.01.2000.
-
List of Structural inspectors of the Order of Engineers of the Province of
Perugia since 1993.
-
List of Environmental Experts in Environmental and Architectural Heritage
(Section A) of the Umbria region in 2010.
-
EUCENTRE European Centre for Training and Research in Earthquake
Engineering.
-
ASS. I. R. C. CO. Italian Association of Recovery and Consolidation
Construction.
-
A. G. I. Italian Association of Geotechnical Engineering.
Nas1:\20141111 Inglese Curriculum per settori
24
COMPETITIVE
EXAMINATIONS
- Competitive examination for the assignment of the task of projecting the
CONSOLIDATION OF THE BUILT UP AREA OF SCILLA – MAIN TOWN, run
by Scilla town Council (RC), 2000.
(1° place)
Group members participating:
Dr. Eng. Massimo Mariani (Group leader)
Dr. Eng. Berardino Buonforte
Dr. geol. Benedetta Chiodini
Dr. geol. Maria Rita Fiorucci
Surveyor: Roberto Caratozzolo
- Competitive examination for the assignment of the task of projecting the
RESTORATION AND CONSOLIDATION OF PALAZZO MONALDI BARNABÒ
IN FOLIGNO (PG), run by Foligno town Council (PG), 2002.
(6° place)
Group members participating:
Dr. Eng. Massimo Mariani (Group leader)
Dr. arch. Massimo Pica Ciamarra – PCA int. Srl - Napoli
Dr. arch. Aroldo Bargone
Dr. arch. Federico Bargone
Dr. Eng. Niccolò De Robertis (A&I Ingegneri Associati) – Florence
Dr. Eng. Bruno Rocchegiani (Termostudi Associati) – Ancona
Dr. arch. Francesco Bartolucci
Dr. arch. Rita Allegrini
Dr. geol. Umberto Lenzi (Lenzi Cavazzana Associati) – Ancona
- Competitive National examination: CONTEST FOR DESIGNING A VISITORS’
CENTRE- ANTIQUARIUM- INFORMATION CENTRE IN THE “SALA DEGLI
ARCHI” [ROOM OF ARCHES] IN CORCIANO, run by the Corciano town
council (PG), 2002.
(6° place)
Group members participating:
Dr. Eng. Massimo Mariani (Group leader)
Studio Bargone Architetti Associati
- Competitive examination for the assignment of the task of projecting THE
CONSTRUCTION OF A RURAL VILLAGE AND INTERNATIONAL CENTRE
FOR RESEARCH, DOCUMENTATION, TRAINING AND COOPERATION FOR
RURAL DEVELOPMENT, INSIDE THE CASALINA FORTRESS IN PERUGIA,
run by the Perugia Agrarian Foundation, 2002.
Group members participating:
Dr. arch. Eng. Philippe Samyn – Samyn and Partners – Brussels
Dr. Eng. Massimo Mariani
Dr. arch. Federico Bargone
Nas1:\20141111 Inglese Curriculum per settori
25
Dr. arch. Francesco Bartolucci
Dr. arch. Benedetto Calcagno – Brussels
Dr. Eng. Bruno Rocchegiani (Termostudi Associati) – Ancona
Dr. geol. Umberto Lenzi (Lenzi Cavazzana Associati) – Ancona
- Competitive national examination: CONTEST IN TWO PHASES FOR THE
RECOVERY AND RESTRUCTURING OF THE EX FILANDA MERONI
COMPLEX IN SONCINO, run by Soncino town Council (CR), 2002.
Group members participating:
Studio Bargone Architetti Associati – Rome (Group leader)
Dr. Eng. Massimo Mariani
- Competitive examination for the assignment of the task of projecting THE
EXPANSION OF THE EXHIBITION AREA OF THE ROOMS IN THE
NATIONAL GALLERY OF UMBRIA ON THE 3RD FLOOR AND ON OTHER
UPPER FLOORS OF PALAZZO DEI PRIORI IN PERUGIA, run by the
Superintendence for Architecture, the Countryside and the Artistic,
Demographic, Ethnic and Anthropologic Heritage of Umbria, 2003.
(1° place)
Group members participating:
Ediltecnica S.r.l. - Foligno
Dr. arch. Mauro Severi
Dr. arch. Mario Ferrara
Dr. Eng. Massimo Mariani
Dr. Eng. Gianni Drisaldi
Dr. Eng. Mario Lucarelli
- Competitive International examination for projecting the CONSTRUCTION OF
A NEW TOWN STADIUM IN SIENA in two phases, run by Siena Town
Council, 2004.
Group members participating:
Studio Bargone Architetti Associati – Rome (Group leader)
Dr. Eng. Massimo Mariani
Proger S.p.A. – Rome
Cost of work € 25.000.000,00
- Competitive International examination for projecting the RECOVERY AND
IMPROVEMENT OF THE ROYAL VILLA OF MONZA AND ITS GARDENS,
run by the Lombardy Regional Council (MI), 2004.
(4° place)
Group members participating:
Hopkins Architects – London (Group leader)
Dr. Eng. Massimo Mariani
Studio Bargone Architetti Associati – Rome
Dr. Ada Segre
Dr. arch Filippo Pizzoni
Dr. arch. Marco Antonini
Dr. arch. Simone Quilici
Cost of work € 106.000.000,00
Nas1:\20141111 Inglese Curriculum per settori
26
- Competitive International examination for the assignment of the task of
ENGINEERING THE STRUCTURAL RESTORATION OF THE CHAPEL OF
THE HOLY SHROUD run by the Regional Office for Cultural and natural
Heritage of Piedmont, Turin, 2005.
(5° place)
Group members participating:
RPA – Perugia (Group leader)
Dr. Eng. Massimo Mariani
Studio Bargone Architetti Associati – Rome
Cost of work € 11.700.000,00
- COMPETITIVE EXAMINATION FOR THE PRESENTATION OF A PRELIMINARY
PROJECT FOR THE NEW SCHOLASTIC CENTRE OF LIDO ADRIANO, run
by the Town Council of Ravenna, 2005.
Group members participating:
Studio Bargone Architetti Associati (Group leader)
Dr. Eng. Massimo Mariani
Dr. arch. Francesco Lejeune
Dr. arch. Niccolò De Robertis
Dr. Raffaella Rubinetti
Cost of work € 12.450.000,00
- PROGRAMME FOR URBAN DEVELOPMENT – “ASSE V CITTÀ”: ASSIGNMENT
OF THE TASK OF DEFINITIVE PROJECTING, IMPLEMENTATION, WORKS
MANAGEMENT AND SAFETY COORDINATION FOR THE RECOVERY AND
RESTORATION OF PALAZZO GAGLIARDI, run by the Town Council of Vibo
Valentia, 2005.
(2° place)
Group members participating:
RPA – Perugia (Group leader)
Dr. Eng. Massimo Mariani
Studio Bargone Architetti Associati
- Competitive International examination for the IMPROVEMENT OF THE
MAUSOLEUM OF AUGUSTO AND OF PIAZZA AUGUSTO IMPERATORE, run
by the Town Council of Rome, 2006.
(4° place)
Group members participating:
Prof. arch. Salvador Perez Arroyo e Prof. arch. Peter Cook (Group leaders)
Prof. arch. Paolo Fancelli (special functions)
Dr. Eng. arch. Massimo Mariani
Studio Bargone Architetti Associati
Dr. arch. Paolo Martellotti
Dr. arch. Pia Pascalino
Dr. arch. Alberto Mancini
Prof. arch. Eugenio Vassallo
Nas1:\20141111 Inglese Curriculum per settori
27
Dr. arch. Giorgio Galletti
Dr. arch. Camillo Nucci
Dr. arch. Francesco Bianchi
Dr. arch. Francesco Cocco
Dr. arch. Domenica Maria Teresa Abbate
Dr. arch. Flavia Brenci
Dr. arch. Lucia Nucci
Dr. arch. Ilaria Pecoraro
Dr. arch. Andrea Piero Donaof lo
Consultants:
Archaeology:
Pierre Gros
Wolf Dieter Heilmeyer
Art History:
Alessandro Viscogliosi
History of Architecture:
Arnaldo Bruschi
Restoration:
Ottorino Nonfarmale
Giorgio Torraca
Peter Rockwell
Landscape:
Paola Lanzara
Mobility:
Domenico Colasante
- Competitive examination of ideas for BUILDING A NEW HEADQUARTERS
FOR THE ASSOCIATION OF MANUFACTURERS OF THE PROVINCE OF
PERUGIA IN THE MUNICIPALITY OF PERUGIA, IN PISCILLE, AND
ARRANGING THE EXTERNAL AREAS, run by Confindustria Perugia –
Association of Manufacturers of the Province of Perugia, 2007.
Group members participating:
Dr. Eng. arch. Massimo Mariani
Studio Bargone Architetti Associati
Prof. arch. Fabrizio Rossi Prodi
Maragna Inc.
Hariri – Pontarini Architects
- Competitive European examination for projecting the NEW TOWN THEATRE
OF VERBANIA (1ST PHASE), run by the town of Verbania, 2007.
(Through to 2nd phase)
Group members participating
Prof. arch. Salvador Perez Arroyo (Group leader)
Prof. arch. Peter Cook
Garcia-BBM: Vicente Mestre, Rancho (legal representative)
Dr. Eng. arch. Massimo Mariani
Dr. arch. Federico Bargone
Dr. arch. Aroldo Bargone
Nas1:\20141111 Inglese Curriculum per settori
28
Dr. arch. Francesco Bartolucci
Dr. arch. Flavia Brenci
Dr. arch. Enrico Auletta
Dr. arch. Riccardo Bianchini
Dr. arch. Federica Luisardi
Dr. arch. Linda Di Muzio
Dr. Eng. Alessandro Sanof ewski
Consultants:
Paola Lanzara
Filippo Francesco Buzzanca
- Competitive examination for projecting the IMPROVEMENT
GABELLUCCIA AREA, run by the Town Council of Crotone, 2007.
(1° place)
Group members participating
Dr. arch. Luca Zevi (Group leader)
Dr. Eng. arch. Massimo Mariani
Studio Bargone Architetti Associati
Dr. arch. Maximiliano Pintore
Dr. arch. Stefano Tonucci
Prof. arch. Rosario Pavia
Dr. arch. Enrico Auletta
Dr. arch. Matteo Di Venosa
Dr. arch. Nicoletta Omicioli
Dr. arch. Flavia Brenci
OF
THE
- Competitive examination for projecting the IMPROVEMENT OF THE
HISTORICAL TOWN CENTRE OF CASTELFRANCO EMILIA, run by the Town
Council of Castelfranco Emilia (MO), 2007.
(2° place)
Group members participating
Studio Bargone Architetti Associati (Group leader)
Prof. arch. Salvador Perez Arroyo
Prof. arch. Peter Cook
Dr. Eng. arch. Massimo Mariani
Dr. arch. Flavia Brenci
Bianchini and Lusiardi Associati
Dr. arch. Massimo Mortelliti
Dr. arch. Alessandro Fontani
Prof. arch. Francesco Bianchi
Dr. arch. Alberto Rossi
Cost of work € 3.450.000,00
- Competitive International architecture examination BACK IN THE GAME, run
by the Town Council of Rome, 2007.
(through to second phase)
Group members participating
Prof. arch. Salvador Perez Arroyo (Group leader)
Nas1:\20141111 Inglese Curriculum per settori
29
Prof. arch. Peter Cook
Prof. arch. Paolo Fancelli
Dr. Eng. arch. Massimo Mariani
Dr. arch. Federico Bargone
Dr. arch. Aroldo Bargone
Dr. arch. Francesco Bartolucci
Dr. arch. Flavia Brenci
Dr. arch. Riccardo Bianchini
Dr. arch. Federica Luisardi
Dr. arch. Enrico Auletta
Prof. arch. Francesco Bianchi
Prof. arch. Alessandro Viscogliosi
Prof. arch. Camillo Nucci
Dr. arch. Lucia Nucci
Prof. Eng. Francesco Filippi
- Competitive examination to project THE CONSTRUCTION OF UNIVERSITY
RESIDENCES
WITH
CONNECTED
FACILITIES
IN
PERUGIA
MONTELUCE,
- run by the ’Agenzia per il Diritto allo Studio Universitario, Perugia, 2007.
Group members participating
Studio Bargone Architetti Associati (Group leader)
Dr. Eng. arch. Massimo Mariani
Dr. arch. Nicoletta Omicioli
Dr. arch. Flavia Brenci
Prof. arch. Luciana De Rosa
Cost of work € 9.500.000,00
Nas1:\20141111 Inglese Curriculum per settori
30
PROJECTS
Only the most significant works are included in this list
a) C
R
A
H
O N S O L I D A T
E S T O R A T I O
N D I M P R O V
I S T O R I C A L
Years 2013 2014
Years 2012-2013
I O N A N D
N OF B U I L D I N G S
E M E N T TO
C E N T R E S
University of Perugia
Piazza Università, 1 – PERUGIA
SEISMIC VULNERABILITY ANALYSIS OF THE BIOLOGICAL
INSTITUTES' HEADQUARTERS BUILDINGS IN PERUGIA.
Parish of St. Bartolomeo in Solomeo
Piazza Carlo Alberto Dalla Chiesa, 1 Solomeo - Corciano (PERUGIA)
RESTORATION OF THE CHURCH OF ST. BARTOLOMEO IN SOLOMEO
Cost of work: € 383.977,27
Nas1: 20141111 Inglese Curriculum per settori
31
Anni 20122013
Anni 20122013
University of Perugia
Piazza Università, 1 – PERUGIA
SEISMIC VULNERABILITY ANALYSIS OF THE BUILDING
"ACCADEMIA ANATOMICO-CHIRURGICA" IN PERUGIA.
CALLED
Municipality of Perugia
Department of Government and Development of Economy and Territory.
RESTORATION AND VALORIZATION OF THE ETRUSCAN ARCH OF
PERUGIA
Preliminary and executive design, consultancy for the site management,
design of post-intervention surveys and monitoring systems.
Nas1:\20141111 Inglese Curriculum per settori
32
Total cost of work: € 1.100.000,00
Year 2012
Superintendence for Architectural Heritage and Landscape of Umbria
TEMPORARY PROPPING SYSTEMS AND VERIFICATION STUDIES OF THE
ARCHAEOLOGICAL AREA UNDER THE SAN LORENZO CATHEDRAL OF
PERUGIA.
STRUCTURAL VERIFICATION OF THE ARCHAEOLOGICAL AREA OF THE
CATHEDRAL OF PERUGIA.
Year 2012
Superintendence for Architectural Heritage and Landscape of Umbria
ST. NICOLÒ'S CHURCH - STRUCTURAL VERIFICATION. SPINA,
MUNICIPALITY OF MARSCIANO (PG).
Structural analysis and study of the causes of the collapse of the Church in
relation to the seismic phenomenon, 15.12.2009.
Nas1:\20141111 Inglese Curriculum per settori
33
Cost of work: € 89.272,85
Years 2011-2012
United Nations Educational, Scientific and Cultural Organization
(UNESCO)
Contact: Mr. Mourad Zmit
UNESCO IRAQ OFFICE
9, Yocoub Ammari Street, Abdoun,
P.O. Box 2270
Amman 11181 JORDAN
STUDIES FOR THE STABILIZATION OF THE ERBIL CITADEL SLOPE
AND THE PERIMETER FACADES (in team with Ars Progetti S.P.A. –
Environment-Resources-Development)
Nas1:\20141111 Inglese Curriculum per settori
34
Years 2009 2010
Town Council of Ascoli Piceno
FINAL,
EXECUTIVE,
STRUCTURAL
DESIGN
AND
SAFETY
COORDINATION DURING THE DESIGN PHASE RELATIVELY TO THE
REPAIR OF THE “ARENGO PALACE”
Cost of work: € 495.000,00
Year 2009
Town Council of Umbertide (PG)
FINAL AND EXECUTIVE PROJECT FOR THE RESTRUCTURING AND
IMPROVEMENT OF THE BUILDING - FORMER “TABACCHI” TO BE
USED AS A MULTI-PURPOSE ROOM. CONSTRUCTION OF A
SERVICE BUILDING ADJACENT TO THE MULTI-PURPOSE ROOM
AND “PIAZZA DEL FORUM URBANO". PUBLIC INTERVENTION FOR
THE IMPLEMENTATION OF THE URBAN PROGRAMME - SECOND
GENERATION COMPLEX "PUC2" CALLED "THE URBAN FORUM IN
THE PARK" OF UMBERTIDE (PG) in team with SAB Ltd (Parent
Company). Architects: Nicoletta Omicioli and Francesco Raschi
Nas1:\20141111 Inglese Curriculum per settori
35
Agreement: Rep. 3762 dated 19.10.2010;
Total cost of work (preliminary project according to tender):
€.1.579,982,00;
Total work and Agreement: €.1.730.000.00.
Year 2009
Town Council of Perugia
Social, Cultural and Sporting Services Sector
U.O. School buildings
Piazza Morlacchi, 23 - Perugia
P. VAT 00218180545
EXECUTIVE PROJECT, SUPERVISION WORKS AND COORDINATION
OF SECURITY DURING DESIGN AND IMPLEMENTAZIONE OF WORK
FOR ADAPTATION TO SAFETY STANDARDS OF PRIMARY
SCHOOLS IN SANTA LUCIA IN PERUGIA (in team with Nicoletta
Omicioli (Architect) and Stefano Berrettini (Engineer)
Contract specification task: Collection No. 1 of 12.01.2009
Validation of Executive Project of 23/03/2009.
Approved with D.G.C. No. 128. 09/04/2009.
Commencement of works: 09.07.2009
Duration of work: 168 (onehundredandeighty-six) days divided into 82
(eighty-two) for the first phase and 86 days (eighty-six) for the second
phase
Minutes suspension of works: 11.09.2009
Minutes resumption of works: 16.06.2010
Certificate completion of works: 06.09.2010
Date advice requested: VV.F. of 03.03.2009
Approval Stamp VV.F. of 02.07.2009
Amount of project work: € 273,252.25
Amount final work: € 289,269.61 of which € 17,161.76 for security
costs and € 16,326.47 security fees.
Year 2008
Town Council of Verbania (Province of Verbano Cusio Ossola)
Valgrande Brigade Road, 8 - VERBANIA
PRELIMINARY AND FINAL PROJECT FOR THE REALIZATION OF
THE NATIONAL THEATRE WITH RECOVERY AND IMPROVEMENT OF
THE BUILDING CALLED "EX CAMERA DEL LAVORO" (in "Stones"
team with Salvador Perez Arroyo (Professor and Architect) Head of Group
- Peter Cook (Professor and Architect) Garcia-BBM, SBarch (Architect),
Brenco Flavia (Architect), Henry Auletta (Achitect), Riccardo Bianchini
(Architect), Federica Luisardi, Linda Di Muzio, Sandelewski Alexander
(Engineering)
Nas1:\20141111 Inglese Curriculum per settori
36
Discipline of appointment of 10.03.2008
Determination No. 472 of 23.04.2008
Preliminary Project Approval – Minutes of the Resolution of the Board Town Council of Verbania No. 10 of 11.01.2008.
Final Project Approval - Resolution of the Board -Town Council of
Verbania No. 199 of 25.09.2008.
Contract value: € 9,999,824.98
Preliminary Project Approval:
Minutes of the resolution of the board of the Town Council of Verbania
No. 10 of 11/1/2008
Subject: New City Theatre, preliminary progect, reof building former
“camera del lavoro”, Approval of Preliminary Project, Redevelopment of
square (amount of contract work € 9,872,500.00).
Final Project Approval:
Minutes of the resolution of the board - Town Council of Verbania Ranked
n. 199 of 25/09/2008
Subject: New City Theatre, preliminary project, improvement of building
former “camera del lavoro”, Approval of Preliminary Project,
Redevelopment of square (amount of contract work) €13,600,000.00)
Year 2008
City of Perugia
C.so Vannucci, 19 - Perugia
VAT: 00163570542
PRELIMINARY AND EXECUTIVE PROJECT, SUPERVISION WORKS
AND COORDINATION OF SAFETY DURING DESIGN AND
IMPLEMENTATION PHASE FOR THE COMPLETION OF REPAIR,
IMPROVEMENT AND RESTORATION OF THE MONUMENTAL
COMPLEX OF “ST FRANCESCO AL PRATO” IN PERUGIA, DAMAGED
DURING THE 1997 EARTHQUAKE
Phase 4 °
Det. Dir U.O. Cultural Heritage Policy No. 9 of 22/04/2008
Approval of the Project with Det. Dir N ° 4158 of 19.05.2009
Commencement of work: 04.05.2009
Expected date of work: 15.09.2010
Amount of works: € 714,000.00
Year 2007
City of Otricoli (TR)
Via Vittorio Emanuele III, 11
PRELIMINARY, FINAL and EXECUTIVE DESIGN, COORDINATION
OF SECURITY DURING THE DESIGN AND IMPLEMENTATION
PHASE FOR THE CONSERVATIVE RESTORATION, RECOVERY AND
SECURING OF THE THEATRE IN THE ARCHAEOLOGICAL SITE
CALLED “OCRICULUM”
Nas1:\20141111 Inglese Curriculum per settori
37
Manager Assessment: No. 14 of 23.04.2007.
Works completed on 18.10.2008
Amount of works: € 164,784.00
Year 2007
Mr. Ottaviano Barboni
Via delle Fornacette, 1 - Fraz Padule
06024 Gubbio (PG)
DAMAGE REPAIR AND SEISMIC IMPROVEMENT OF BUILDING,
ACCORDING TO LAW N ° 30/98 AND AID APPLICATION UNDER
THE DGR 5180/98 AND SUBSEQUENT AMENDMENTS AND
ADDITIONS - Building No. 2293 located in the Municipality of
Gubbio, Fraz. Padule (Sheet 262. Part 79)
Building permission: No. 32/2008 issued by the Town Council of Gubbio Sector Planning and Construction - Housing Service on 04.03.2008.
Planning permission No. 88/2009 issued by the Town Council of Gubbio Sector Planning and Construction - Housing Service on 04.05.2009.
Amount of works: € 561,812.85
Year 2007
Dr. Maria Teresa Severini
Via the Brozzo, 9
San Proto - PERUGIA
CONSOLIDATION OF EXISTING STRUCTURAL DAMAGE TO
PROPERTY
Amount of works: € 70.000,00
Year 2007
“La Consolazione ETAB
Piazza Umberto I, 6
Todi (PG)
MAINTENANCE HYPOTHESIS OF THE TEMPLE OF OUR LADY OF
CONSOLATION IN TODI (PG)
Year 2007
Town Council of Bassano del Grappa (VI)
Area Public Works
Via Matteotti, 39
EXECUTIVE PROJECT OF RESTORATION WORK OF THE HISTORIC
CITY BELT, AND “CASTELLO DEGLI EZZELINI” AND “TORRE DELLE
GRAZIE” (team Sab, Mariani, VS Associates).
Determining Position with Leadership Prot No. 1703 of 09.11.2007
Validation of the final project for counter-Minutes of 31/07/2008.
Delivery of Works of 14.01.2009
Amount of works: € 1,725,000.00
Year 2006
Tecnostrade S.r.l.
Via del Filosofi, 47
06126 Perugia
PRELIMINARY, FINAL AND EXECUTIVE DESIGN FOR THE
RECOVERY OF THE WALLS OF AMELIA (TR). STATIC
CONSOLIDATION AND RESTORATION FROM THE ROMAN TOWER
ELEVATOR TO THE ROMAN POSTERN AFTER THE COLLAPSE OF A
STRETCH OF WALL ON 18.01.2006
Assigned to Massimo Mariani (Achitect and Engineer) and Fattorini
Engineering of 06.02.2006
Preliminary and final amount of works: € 3,162,651.00
Nas1:\20141111 Inglese Curriculum per settori
38
Executive Project Amount of works: € 1,137,646.00
Year 2006
Parish of St. Costanzo (PG)
Via San Costanzo, 3 (PG)
CONSOLIDATION AND RESTORATION OF PARISH CHURCH
First phase
Amount of works: € 200.000,00
DIA n.3873 / Protocol 173097 16/10/2006; Authorization Government
Authority N. 21902 of 28/10/2005.
Year 2006
Town Council of Ghedi (BS)
Piazza Roma, 45 Ghedi (BS)
RESTRUCTURING AND IMPROVEMENT OF THE “ARCIONI”
REALIZATION NEW BUILDING TO HOUSE A MUSIC ANE
ENTERTAINMENT THEATRE EXTERNAL ARRANGEMENT
Amount of works: € 3,100,000.00
Year 2006
Azienda Agraria San Rocco A.r.l.
Torgiano (PG).
PRELIMINARY AND EXECUTIVE PROJECT FOR THE STRUCTURAL
CONSOLIDATION OF AN AGRICULTURAL ANNEX TO BE USED AS
PREMISES FOR THE SALE OF FARM PRODUCTS IN THE
MUNICIPALITY OF TORGIANO, IN “VOCABOLO CASA BRUCIATA”
(PG);
Amount of works: € 21,000.00
Year 2006
Town Council of Castiglione del Lago (PG)
Piazza Gramsci, 1
Castiglione del Lago (PG)
EXECUTIVE PROJECT, SUPERVISION WORKS, COORDINATION OF
SAFETY DURING DESIGN AND IMPLEMENTATION PHASE,
ACCOUNTING AND MEASUREMENT FOR THE RECOVERY OF
Nas1:\20141111 Inglese Curriculum per settori
39
MONUMENTAL COMPLEX “ROCCA DEL LEONE”: TRIANGULAR MAST
(Resolution . GR 1559/04)
Architectural designers: Massimo Mariani (Engineer and Architect) Antonio Corradi (Architect)
Structural engineers: Massimo Mariani (Engineer and Architect) - Paul
ANDERLINI (Engineer)
Director of Works: Massimo Mariani (Engineer and Architect)
Coordination of Safety: Massimo Mariani (Engineer and Architect)
Letter of Appointment Prot 6266 23.02.2005
Net amount of work € 112,233.47 net of fall auction (equal to 17.75%)
including fees for Security amounting to € 17,254.95
Total works: € 200.000,00
Approval of the First Examination of Variation: City Council Resolution No.
105 of 29.04.2008;
Final SAL, including the fall auction (equal to 17.75%) is equal to €
143,923.49;
Start of work: 19.02.2007
Completion of work: 25.08.2008
Gross Total works: € 200.000,00
Report on final bill and Certificate of full Performance: 30.10.2008
Year 2005
Ministry of Heritage and Culture
Superintendence for Archaeological Heritage of Umbria
Piazza Partigiani, 11
PERUGIA
COMPLETION OF RECOVERY, AND CONSTRUCTION OF THE
ANTIQUARIUM EX COUNTRY HOUSE OF “SAN FULGENZIO” AND
THE REALIZATION OF A DEPOSIT FOR ARCHAELOGICAL FINDS IN
THE ARCHAELOGICAL AREA OF “OCRICULUM” IN THE
MUNICIPALITY OF OTRICOLI (Terni)
Note Superintendent prot. No 5728 of 14.06.2005
Amount of works: € 137,668.71
Nas1:\20141111 Inglese Curriculum per settori
40
Years 2005-2007
Town Council of Todi (PG)
Policies Unit for School and Public Housing
EXECUTIVE PROJECT PLANNING AND COORDINATION OF
SECURITY DURING THE DESIGN AND IMPLEMENTAQTION OF
EMERGENCY WORK AND CIVIL PROTECTION - CONSOLIDATION
AND REORGANIZATION OF THE NURSERY SCHOOL OF PIAN DI
SAN MARTINO - COMPLETION
2nd phase
Det. Director of the Heritage Service - Environment - Cemeteries
Regulation No. 170 of 31.08.2005 Reg. Gen. 983.
Agreement Coll. No. 4779, 22.12.2005
Det. Director of the Heritage Service - Environment - Cemeteries,
23.11.2005 Reg No. 240 Reg. Gen N ° 1351.
Agreement Coll. No. 4865 of 01.03.2006
Approval of the project with Del. City Council No. 225 of 18.10.2005
Start of work: 23.01.2006
Completion of work of 03.11.2006
Report on final bill and Certificate of full performance of 10.04.2007
Amount of works: € 124,225.21
Years 2004-2009
Town Council of Castiglione del Lago (PG)
Technical Department of Public Works and Heritage
Piazza Gramsci, 1 Castiglione del Lago (PG)
EXECUTIVE PROJECT, SUPERVISION WORKS, COORDINATION OF
SAFETY DURING DESIGN AND IMPLEMENTATION PHASE,
ACCOUNTING AND MEASUREMENT OF RECOVERY OF
MONUMENTAL COMPLEX OF “PALAZZO DELLA CORGNA”, CITY
WALLS, COMMUNICATION TRENCH AND GARDENS – PART OF
COMMUNICATION TRENCH
Architectural designers: Massimo Mariani (Engineer and Architect) Antonio Corradi (Architect)
Structural engineers: Massimo Mariani (Engineer and Architect) - Paul
Anderlini (Engineer)
Director of Works: Massimo Mariani (Engineer and Architect)
Coordination of Safety: Massimo Mariani (Engineer and Architect)
Appointed with letter prot. 39698 of 16.12.2004
Net amount of work € 402,544.63 of the fall auction (equal to 16.132%)
including charges for Security amounting to € 23,770.09
Total work: € 780,000.00
Start of work: 12.03.07
Completion of work: 12.07.08
Nas1:\20141111 Inglese Curriculum per settori
41
Prior Approval of Variant Expertise: Determination No. 816 of
31.12.2007;
SAL Finals, including the fall auction (equal to 16.132%), amounting to €
432,054.98;
Gross Total of work: € 780,000.00
Final approval of the State of Works and Set Design with the Certificate of
Municipal Council Resolution No. 26 of 17.02.2009
2004-2006
Town Council of Todi (PG)
Policies Unit for School and Public Housing
GEOLOGICAL SURVEY, GEOGNOSTIC, GEOLOGICAL REPORT,
EXECUTIVE PROJECT PLANNING, COORDINATION OF SAFETY
DURING EXECUTION OF THE WORK OF CONSOLIDATION AND
RESTRUCTURING OF THE NURSERY SCHOOL PIAN DI SAN
MARTINO
(Team: Massimo Mariani (Engineer and Architect), Fabrizio Gentile
(Engineer), Luke Venanti (Geologist).
1 ° phase
Det. Head of Sector T.U.P. No. 1069 of 10.09.2004
Agreement Coll. No. 4539 of 15.12.2004
Approval of the project with Managerial Determination No. 306 of
30.12.2005
Completion of the work of 21.01.2006
Report on the final bill and certificate of full performance, 15.12.2006
Amount of works: € 120,904.33
Year 2004
Dr. Ruggero Ranieri di Sorbello
P.zza Piccinino, 9 - PERUGIA
CONSOLIDATION OF ATTIC PAVEMENT ON THE III FLOOR OF
“PALAZZO BOURBON – RANIERI DI SORBELLO” IN PERUGIA
Cost of work: €. 40.000,00
Year 2004
Dr. Giuseppe Severini
Viale Indipendenza, 33 - PERUGIA
STRUCTURAL CONSOLIDATION OF PRIVATE BUILDING
Year 2004
Mrs. Maria Grazia Lungarotti
Corso Garibaldi - PERUGIA
STRUCTURAL CONSOLIDATION OF PRIVATE BUILDING
Year 2004
GIOFI Society S.r.l.
Viale Indipendenza, 33 - PERUGIA
RESTRUCTURING OF APARTMENT ON SECOND FLOOR OF
BUILDING IN VIA BAGLIONI, PERUGIA
Year 2004
Archaeological Sopraintendence Authorities for Umbria
P.zza Partigiani, 11 - PERUGIA
CONSOLIDATION WORK OF THE UPPER CISTERN IN CARSULAE
(TR) USED AS AN ANTIQUARIUM
Cost of work: €. 80.000,00
Nas1:\20141111 Inglese Curriculum per settori
42
Year 2003
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
CONSOLIDATION WORK IN THE UPPER CLOISTERS AND
“ARCHAEOLOGICAL HALL” OF THE NATIONAL ARCHAEOLOGICAL
MUSEUM OF UMBRIA, DAMAGED BY THE EARTHQUAKE
Cost of work: €. 100.000,00
Year 2003
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
SPECIFIC WORK FOR THE CONSERVATION AND IMPROVEMENT OF
THE ARCHAEOLOGICAL HERITAGE BELONGING TO THE COUNCIL
OF CORCIANO
Cost of work: €. 1.962.536,22
Year 2003
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STRUCTURAL PROJECT FOR EXPANDING THE DISPLAY AREA ON
THE THIRD FLOOR OF THE NATIONAL GALLERY OF UMBRIA,
PALAZZO DEI PRIORI (PG)
Cost of work: €. 2.109.062,52
D.S.R. dated 16/07/2004
Years 2002-2006
Town Council of Castiglione del Lago (PG)
Piazza Gramsci, 1 Castiglione del Lago (PG)
EXECUTIVE PROJECT, SUPERVISION WORKS, COORDINATION OF
SAFETY DURING DESIGN AND DURING IMPLEMENTATION,
ACCOUNTING AND MEASUREMENT DURING CONSOLIDATION
WORK AND RECOVERY OF “ROCCA DEL LEONE”, AND MASTS AND
TOWERS
Architectural designers: Massimo Mariani (Engineer and Architect) Antonio Corradi (Architect)
Structural Engineer: Massimo Mariani (Engineer and Architect)
Collaboration: Paul ANDERLINI (Engineer)
Supevision works: Massimo Mariani (Engineer and Architect)
Nas1:\20141111 Inglese Curriculum per settori
43
Coordination of Safety: Massimo Mariani (Architect)
Executive Project Approval: City Council Resolution No. 171 of
01.07.2002
Amount of work subject to downward auction of € 540,214.42
Total work: € 665,497.53
Approval of Supplementary Examination of Alternative and Varied
Distribution of expenditure: Determination No. 180 of 21.12.2004;
Final SAL, net amount of work € 532,309.90;
Start of work: 30.06.2003
Completion of work: 14.06.2005
Report of Relations between the Region and the City Council: 21.03.2006
Years 2002-2006
City of Perugia
Cultural and Recreational Services Sector - Policy Unit of Cultural
Heritage
C.so Vannucci, 19 - Perugia
VAT: 00163570542
EXECUTIVE PROJECT, SUPERVISION WORKS , COORDINATION OF
SECURITY, AND ACCOUNTING AND MEASUREMENT OF REPAIR,
IMPROVEMENT AND RESTORATION OF THE COMPLEX OF “ST
FRANCESCO AL PRATO” IN PERUGIA DAMAGED BY SEISMIC
EVENTS OF 1997
1° and 3° Phase
Regulations 2002.
Det. Dir of Cultural Policies Unit No. 64 of 23/04/03
Amount of works: € 1,697,901.85
Total work: € 2,220,764.42
Start of work 30.04.03
Completion of work : 06.03.06
Final amount of work: € 1,846,388.31
Gross Total of work: € 2,220,764.42
Report on the final bill: 20.07.06
Technical-administrative certificate of acceptance of work: 04.12.06
Nas1:\20141111 Inglese Curriculum per settori
44
Years 2002-2006
City of Perugia
Cultural and Recreational Services Sector
Unit of Cultural Policies
EXECUTIVE PROJECT, SUPERVISION WORKS , COORDINATION OF
SECURITY, AND ACCOUNTING AND MEASUREMENT OF
RESTORATION OF THE HYDROGEOLOGICAL DAMAGE OF THE
MONUMENTAL COMPLEX OF “ST. FRANCESCO AL PRATO” IN
PERUGIA
2° Phase
Regulations on 02.03.02
Amount of work: L. 1,930,726,800
Total work: L. 2,500,000,000
Start of work: 27.06.02
Completion of work: 16.06.03
Final amount of work: € 1,060,324.03
Gross Total of work : € 1,291,142.25
Report on the bill: 22.10.03
Technical-administrative certificate of acceptance of work: 13.12.03
Year 2002
Gerolamo Gaslini Foundation
C.so Italia, 26 - GENOVA
EXECUTIVE PROJECT FOR STATIC STRUCTURAL RECOVERY WORK
AND DIRECTION OF WORKS AT THE ABBEY COMPLEX OF SANTA
MARIA DI VALDIPONTE – 2° phase
Cost of work: €. 700.000,00
Year 2002
San Martino Association
Via G.B. Pontani, 15 - PERUGIA
VAT number: 00162940548
EXECUTIVE PROJECT, SUPERVISION OF WORKS, ACCOUNTING
AND SECURITY COORDINATION IN DESIGN PHASE OF REPAIR,
IMPROVEMENT AND RECONSTRUCTION OF THE TEMPLE OF
“SANT’ERCOLANO” IN PERUGIA DAMAGED DURING EARTHQUAKE
OF 26.09.1997
Agreement of 19.07.2000 REP. 50
Approval of executive project with Resolution Board of Directors of the
San Martino Association n. 87 dated 16/04/2003
Authorization according to article 151 of the D.LGS 29/10/1999 Building
Licence from the Town Council of Perugia dated 26/08/2002 Prot. 1586
Nas1:\20141111 Inglese Curriculum per settori
45
Authorization Government authority dated 22/08/2002
Costruction permit dated 7/09/2005 Prot. 1701
Certificato di collaudo dated 20/04/2006
Cost of work: €. 1.049,257.59
Year 2002
Town Council of Castiglione del Lago
Castiglione del Lago (PG)
VAT number: 00366960540
EXECUTIVE PROJECT FOR STRUCTURAL WORK AND
ARCHITECTURAL RESTORATION OF THE FAÇADE, AND
INSTALLATION OF FITTINGS
Agreement of 30.06.1998
Cost of work: €. 671.393,96
Year 2001
Samuele Pelucca Company S.r.l.
Via of le Marmore, 95 - PG
VAT number: 01145590541
SUPERINTENDENCE OF ARCHAEOLOGICAL HERITAGE OF UMBRIA
EXECUTIVE PROJECT FOR STRUCTURAL WORK IN THE
ARCHAEOLOGICAL AREA OF OTRICOLI
Cost of work: €. 137,668,71
Year 2001
Samuele Pelucca Company S.r.l.
Via of le Marmore, 95 - PG
VAT number: 01145590541
EXECUTIVE PROJECT FOR STRUCTURAL CONSOLIDATION WORK
ON THE ARCH AND ROOF OF THE SACRISTY IN THE CHURCH OF
SAN DOMENICO IN PERUGIA
Cost of work: €. 100.000,00
Year 2001
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL WORK IN THE EAST WING
OF THE SANTA CATERINA COMPLEX IN PERUGIA
Cost of work: €. 84.957,00
Year 2001
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR STRUCTURAL RESTORATION WORK AND
IMPROVEMENT OF THE ARCHAEOLOGICAL AREA OF THE ROMAN
TOWN OF OCRICULUM (TR)
Off.lett.prot. n° 16112 of 30.12.2000
Cost of work: €. 25.000,00
Nas1:\20141111 Inglese Curriculum per settori
46
Year 2001
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL WORK ON THE CHURCH
OF SANTA MARIA DELLA CONSOLAZIONE IN TODI (PG)
Contract n° 2579 of 09.11.1999
Cost of work: €. 650.000,00
Year 2001
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL WORK ON THE SAN
DOMENICO COMPLEX IN PERUGIA
Contract n° 2577 of 09.11.1999
Year 2000
Perugia State Archives
PERUGIA
VAT number: 80002230540
EXECUTIVE PROJECT FOR CONSOLIDATION OF PART OF THE
BUILDING CONTAINING THE STUDY ROOM
prot. n° 6512/III.1 of 22.10.1999
Year 2000
Gerolamo Gaslini Foundation
C.so Italia, 26 - GENOVA
VAT number: 00269520102
Contract: Regione of Umbria
EXECUTIVE PROJECT FOR STATIC RECOVERY AND SITE
MANAGEMENT TO BE CARRIED OUT IN THE EAST WING OF THE
BUILDING COMPLEX OF THE ABBEY OF SANTA MARIA DI
VALDIPONTE IN THE MUNICIPALITY OF PERUGIA
Inc. Prof. Of 30.03.2000 lett. Prot. n° 198/200 LL/am
Cost of work: €. 645.571,12
Year 2000
San Martino Association
Via G.B. Pontani, 15 - PERUGIA
VAT number: 00162940548
SCIENTIFIC STUDY OF THE STATIC GEOLOGICAL AND
ARCHITECTURAL CONDITIONS OF THE TEMPLE OF
SANT’ERCOLANO IN PERUGIA
Agreement of 19.07.2000 REP. 50
Cost of work: L. 50'000'000€. 25.823
Year 2000
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR THE CONSOLIDATION OF THE CHURCH
OF SANTA MARIA MAGGIORE IN ASSISI
contract n° 96/99 of 25.09.1999
Cost of work: €. 80.000,00
Nas1:\20141111 Inglese Curriculum per settori
47
Year 2000
Superintendence for BB.AA.AA.AA. and SS. of the Provinces of
Pisa, Livorno, Lucca, Pisa
MEDICEI ARSENALS – STRUCTURAL PROJECT
Official letter of 30.06.2000 n° 7553
Cost of work: €. 1.549.370,69
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR PROVISIONAL WORK ON ROMAN
BRIDGE AT VILLA SCIRCA - SIGILLO (PG)
Cost of work: € 24.000,00
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL CONSOLIDATION OF THE
CHURCH OF SANTA CROCE DELLA FOCE - GUBBIO, TECHNICAL
CONSULTANCY, STATISTICAL RESEARCH, SURVEYING, AND
STRUCTURAL AND PARTICULAR DETAILS
Inc. Prof. N° 2561 of 04.11.1999
Cost of work: € 30.000,00
Nas1:\20141111 Inglese Curriculum per settori
48
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR CONSOLIDATION AND RESTORATION
OF THE CHURCH OF SANTA MARIA ASSUNTA IN SELLANO (PG)
Inc. n° 2490 reg, mail of 02.09.1999
Cost of work: € 624.912,84
Year 2000
Superintendence for the Environment and Architecture of the
Marches
P.zza of Senato ANCONA
VAT number: 80000650426
EXECUTIVE PROJECT FOR CONSOLIDATION OF THE CHURCH OF
SAN FRANCESCO IN PERGOLA (PESARO)
contract n° 6662 of 02.03.1999
Cost of work: €. 700.000,00
Year 1999
Perugia State Archives
PERUGIA
VAT number: 80002230540
PROJECTING NEW STRUCTURES FOR DISPLAYING THE CONTENTS
OF THE MONUMENTAL COMPLEX OF SAN DOMENICO IN PERUGIA
Agreement of 28.05.1998
Cost of work: €. 650.735,69
Year 1999
Town Council of Castiglione of Lago (PG)
Castiglione del Lago (PG)
VAT number: 00366960540
EXECUTIVE PROJECT FOR ARCHITECTURAL RECUPERATION,
RESTORATION OF THE FACADE, INSTALLATION OF SYSTEMS AND
SAFETY PLANNING IN PALAZZO DELLA CORGNA, WITH
COORDINATION DURING PROJECTING
Agreement of 30.06.1998
Cost of work: €. 671.000,00
Year 1999
Town Council of Castiglione of Lago (PG)
Castiglione of Lago (PG)
VAT number: 00366960540
EXECUTIVE PROJECT FOR ARCHITECTURAL RECUPERATION AND
REPAIR OF THE SEMI-UNDERGROUND FLOOR OF PALAZZO DELLA
CORGNA FOR OFFICE USE AND SAFETY PLANNING
Agreement of 16.06.1998 - REP. AP521
Cost of work: €. 300.000,00
Year 1999
Town Council of Castiglione of Lago (PG)
Castiglione of Lago (PG)
VAT number: 00366960540
EXECUTIVE PROJECT FOR ARCHITECTURAL RECUPERATION,
RESTORATION AND MONITORING OF NORTHERN WALL OF THE
ROCCA DEL LEONE FORTRESS
Nas1:\20141111 Inglese Curriculum per settori
49
Agreement of 07.08.1998 - REP. AP529
Cost of work: €. 50.000,00
Year 1999
Town Council of Monte Castello di Vibio (PG)
Monte Castello di Vibio (PG)
VAT number: 00470100546
EXECUTIVE PROJECT FOR COMPLETION WORKS OF TOWN
FOOTBALL PITCH, EXECUTIVE PROJECT, SITE MANAGEMENT,
ACCOUNTANCY AND ESTIMATES FOR MODIFICATION.
Year 1999
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
STATISTICAL TECHNICAL CONSULTANCY, CONSERVATION AND
IMPROVEMENT WORK ON FUNERAL MONUMENT - CORTACCIONE SPOLETO
Inc. Prot. 4463/98
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL CONSOLIDATION OF THE
CHURCH OF BUON GESÙ - MAGGIORE ISLAND - TUORO SUL
TRASIMENO
Nas1:\20141111 Inglese Curriculum per settori
50
Agreement of 10.02.1999 – D.L.vo 494/96
Cost of work: €. 200.000,00
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL WORK AND
CONSOLIDATION OF EARTHQUAKE DAMAGE CAUSED 26.09.1997
AND LATER PALAZZO DEI PRIORI DI PERUGIA
Nas1:\20141111 Inglese Curriculum per settori
51
Agreement of 22.10.1999 n° Reg. 2552
Cost of work: €. 1.807.599,14
Nas1:\20141111 Inglese Curriculum per settori
52
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL CONSOLIDATION WORK
ON THE SAN DOMENICO BUILDING COMPLEX IN PERUGIA
Inc. n° Reg. 2577 of 09.11.1999
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STATISTICAL RESEARCH AND RESTORATION WORK AT THE
NATIONAL GALLERY OF UMBRIA- SOUTHERN WING
Cost of work: €. 300.000,00
Year 1998
Town Council of Castiglione of Lago (PG)
Castiglione del Lago (PG)
VAT number: 00366960540
PRELIMINARY EXECUTIVE PROJECT FOR THE CONSOLIDATION
AND RESTORATION OF THE STRETCH OF WALL FROM PORTA
PERUGINA TO PORTA ROSSA, NEAR THE TOWER OF
SANT’ANGELO, AND PROJECT COORDINATION
Cost of work: €. 200.000,00
Year 1998
Town Council of Todi (PG)
Todi (PG)
VAT number: 00316740547
PREPARATION OF STUDY FOR A HISTORICAL-ARCHAEOLOGICAL
ITINERARY AND PRELIMINARY PROJECT FOR THE RECOVERY AND
IMPROVEMENT OF THE EXISTING ETRUSCAN-ROMAN REMAINS IN
TODI
Nas1:\20141111 Inglese Curriculum per settori
53
Of . G.C. n° 386 of 09.04.1997
Cost of work: €. 50.000,00
Year 1998
Spinosa General Construction Company S.r.l.
Via R. Iorio, 36/A - ISERNIA
Contract: IESI Town Council - ANCONA
EXECUTIVE PROJECT FOR RESTORATION AND CONSERVATION AT
THE SAN FLORIANO BUILDING- MESTICA - IESI (AN)
Cost of work: €. 440.000,00
Year 1998
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR PROVISIONAL WORK ON THE
ETRUSCAN CISTERN IN VIA CAPORALI A PERUGIA
Off. letter 10.01.1998 – Reg n°04/98
Cost of work: €. 30.000,00
Nas1:\20141111 Inglese Curriculum per settori
54
Year 1998
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
PALAZZO DEI PRIORI IN PERUGIA - EXECUTIVE PROJECT FOR
EMERGENCY WORK ON DAMAGE CAUSED BY THE EARTHQUAKE OF
26.09.1997 AND THOSE FOLLOWING.
Inc. Prof. N° 1642 reg. 10.10.1997
Cost of work: €. 206.582,75
Year 1998
Superintendence for the Environment and Architecture Marche
Region
P.zza of Senato ANCONA
VAT number: 80000650426
PESARO CATHEDRAL, EXECUTIVE PROJECT FOR STRUCTURAL
WORK TO THE PAVEMENT OF THE CATHEDRAL
Estimate n° 2599/95 of 28.03.1993 - estimate n° 2600/95 - estimate n°
2344/93
Cost of work: L. 2'500'000’000 €. 1.291.142
Year 1997
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR STRUCTURAL AND FUNCTIONAL
ADJUSTMENTS TO THE NATIONAL ARCHAEOLOGICAL MUSEUM OF
PERUGIA
Contract Reg. 100/95
Year 1997
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR STRUCTURAL WORK TO REPAIR AND
IMPROVE THE TERRACING WALL IN VIA OF LE CANTINE PERUGIA
for. N° 43/96 of 12.12.1996 inc. Prot. n° 13.433 of 17.12.1996
Cost of work: €. 40.000,00
Year 1997
Superintendence for the Environment and Architecture of the
Regione Marche
P.zza del Senato - ANCONA
VAT number: 80000650426
EXECUTIVE PROJECT FOR THE CONSOLIDATION OF THE PORTAL
OF SAN FRANCESCO DELLE SCALE IN ANCONA
Nas1:\20141111 Inglese Curriculum per settori
55
Cost of work: €. 300.000,00
Year 1996
Dr. Riccardo Pongelli
Via of Poggio 4/A - Saragano (PG)
C.F.: PNGRCR59A02H501O
EXECUTIVE PROJECT FOR THE CONSOLIDATION AND
RESTORATION OF PALAZZO PONGELLI IN TODI (PG)
Cost of work: €. 250.000,00
Year 1996
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR THE STRUCTURAL CONSOLIDATION OF
THE LAMBARDI TOWER IN MAGIONE (PG)
Inc. Prof. N° 1290 Reg. 30.12.1995
Cost of work: €. 200.000,00
Nas1:\20141111 Inglese Curriculum per settori
56
Year 1996
Impresa Rotoloni Roberto
Via Santa Petronilla, 5 ROMA
Proposal Town Council of Passignano (PG)
STRUCTURAL DESIGN OF RECONSTRUCTION OF ROOFING
MUNICIPALITY PREMISES IN PASSIGNO SUL TRASIMENO
Total amount: €.180,000.00
Year 1995
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR CONSOLIDATION WORK AND DRAINING
OF THE WATERS IN THE ROMAN FUNERARY ENCLOSURE NEAR
CORTACCIONE OF SPOLETO (PG)
Es. Fin. 1995 - Cap. 8005 - contr.reg.. 34/95 on 26.06.1995
Cost of work: €. 125.000,00
Year 1995
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR STRUCTURAL ADJUSTMENTS TO THE
NATIONAL MUSEUM OF PERUGIA
Letter confirming contract. n° 10648 estimate n° 2/94 of 02.03.1995
Cost of work: €. 150.000,00
Year 1994
Pecci Building Company S.r.l.
Via Flaminia - Gualdo Tadino (PG)
VAT number: 01805330543
Superintendence Contract for BB.AA.AA.AA.SS. of Umbria
EXECUTIVE PROJECT FOR THE CONSOLIDATION AND
RESTORATION OF THE ROOMS IN THE CHURCH OF SANTA MARIA
IN CAMMUCIA IN TODI
n° 207 of 31.12.1990
Year 1994
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR THE CONSOLIDATION OF THE BELL
TOWER OF THE ABBEY OF MONTELABATE IN PERUGIA
Prof. Inc n° 1028 Registered 10.11.1994
Year 1994
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR CONSOLIDATION WORK IN THE ABBEY
OF MONTELABATE
Nas1:\20141111 Inglese Curriculum per settori
57
Conv. N° 795 of 26.11.1993
Year 1992
I.E.R.P. Institute for Public Residential Building
Via M. Polo, 4 - PERUGIA
VAT number: 00161080544
EXECUTIVE PROJECT FOR THE RECOVERY OF A BUILDING
COMPLEX BELONGING TO THE COUNCIL OF TODI IN VIA DI
MEZZO MURO
Year 1992
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
PALAZZO DEI PRIORI IN PERUGIA – STRUCTURAL PROJECT
OFFICES AND ROOF
Estimated expenses n° 100/92
Year 1991
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT AND CALCULATIONS FOR THE WALL
STRUCTURES IN PIAZZA DEL MERCATO VECCHIO IN TODI –
PERUGIA
Year 1991
Dr. Ezio Mammoli & C. S.n.c.
Via Valle Inf. 27 – TODI (PG)
Vat number: 00292030541
Superintendence for BB.AA.AA.AA.SS of Umbria
EXECUTIVE PROJECT FOR THE CONSOLIDATION OF THE TEMPLE
SANTA MARIA DELLA CONSOLAZIONE IN TODI
Nas1:\20141111 Inglese Curriculum per settori
58
Year 1990
Superintendence for BB.AA.AA.AA.SS. of Umbria
PROJECT FOR CONSOLIDATION OF THE TEMPLE OF
CONSOLAZIONE IN TODI
1° and 2° phase . Law 545/87
Cost of work L. 2'000'000'000 €. 1.032.914
Year 1990
Pecci Company of Gualdo Tadino (PG), on behalf of the
GOVERNMENT
AUTHORITIES FOR BB.AA.AA.AA.SS. OF UMBRIA
PROJECT FOR CONSOLIDATION OF THE CHURCH OF SANTA MARIA
IN CAMUCIA IN TODI (PG)
Law 545/87
Cost of work L. 250'000'000 €.129.114,00
Year 1989
Superintendence of Archaeological Heritage
ARCHAEOLOGICAL SURVEYS IN TODI - MONUMENTAL
STRUCTURES
Year 1988
Town Council of Castiglione del Lago (PG)
CONSOLIDATION, RESTRUCTURING AND RESTORATION OF THE
PALAZZO DUCALE DELLA CORGNA, THE FORTRESS AND THE
ENTIRE SURROUNDING CITY WALLS
Cost of work L. 4'500'000'000 €. 2.324.056
Nas1:\20141111 Inglese Curriculum per settori
59
Year 1988
Superintendence of Archaeological Heritage
PROJECTING CONSOLIDATION WORK FOR PART OF THE ANCIENT
CITY WALL OF SAN FORTUNATO IN TODI (PG). Law 545/87.
Cost of work L. 350'000'000 € 180.760
Year 1987
Augusto Mecocci Company of Perugia on behalf of the Town
Council of Spello (PG)
RECOVERY OF BUILDING COMPLEX FOR NURSING HOME IN THE
EX VILLA FANTOZZI
Cost of work L. 800'000'000 €. 413.165
Year 1987
Superintendence for BB.AA.AA.AA.SS. of Umbria
CONSOLIDATION OF PALAZZO SANTI - CASCIA (PG)
Cost of work L. 150'000'000 €. 77.468
Year 1987
Samuele Pelucca Company of Perugia, on behalf of the
Superintendence of Archaeological Heritage
CONSOLIDATION OF ROMAN CISTERNS - RIPABIANCA (PG)
Cost of work L. 100'000'000 €. 51.646
Year
1987-1990
Samuele Pelucca Company of Perugia, on behalf of the
Superintendence for BB.AA.AA.AA.SS. of Umbria
STRUCTURAL CONSOLIDATION AND RECONSTRUCTION OF THE
COVERING OF THE BASILICA OF SAN DOMENICO (PG)
Cost of work L. 400'000'000 €. 206.583
Year 1986
Samuele Pelucca Company of Perugia, on behalf of the
Superintendence for BB.AA.AA.AA.SS. of Umbria
PROJECT FOR CONSOLIDATION OF WALLS AND NEW STRUCTURES
AT THE SACRED CONVENT OF ASSISI - PERKINS GALLERY
Cost of work L. 500'000'000 €. 258.228
Nas1:\20141111 Inglese Curriculum per settori
60
Year 1986
Superintendence for BB.AA.AA.AA.SS. of Umbria
CONSOLIDATION OF THE CHURCH OF SAN PELLEGRINO IN
GUALDO TADINO (PG)
Cost of work L. 150'000'000 €. 77.468
Year 1986
Town Council of Todi (PG).
CONSOLIDATION AND RESTORATION OF COUNCIL BUILDING IN
VIA DI MEZZO MURO
Cost of work L. 650'000'000 €. 335.697
Year 1985
Filippucci Company of Spoleto, on behalf of the Superintendence
for BB.AA.AA.AA.SS. of Umbria
CONSOLIDATION OF THE BASILICA OF ST.S SIMONE AND GUIDA
IN SPOLETO
Cost of work L. 150’000’000€. 77.468
Year 1985
Company Filippucci di Spoleto, on behalf of the Superintendence
for BB.AA.AA.AA.SS. of Umbria
CONSOLIDATION OF THE STRUCTURE OF THE ABBEY OF
SASSOVIVO
Foligno (PG)
Cost of work L. 200'000'000€. 103.291
Year 1985
Superintendence of Archaeological Heritage
PROJECT FOR CONSOLIDATION WORK FOR ANCIENT CITY WALL
OF PIAZZA DEL MONTARONE IN TODI (PG)
Law n° 230/78.
Cost of work L. 300'000'000€. 154.937
Year 1985
Superintendence of Archaeological Heritage
PROJECT FOR CONSOLIDATION WORK FOR PART OF THE ANCIENT
CITY WALLS NEAR VIA DI MEZZO MURO IN TODI (PG)
Cost of work L. 200’000'000€. 103.291
Years
1985-1994
Superintendence of Archaeological Heritage
PROJECT FOR CONSOLIDATION WORK FOR PART
OF THE SURROUNDING ETRUSCAN CITY WALLS NEAR THE
LUCREZIE MOAT IN TODI (PG) Law 230/78.
Cost of work L. 500'000'000€. € 258.228
Years
1981-1982
Town Council of Monteleone of Spoleto (PG)
STRUCTURAL CONSOLIDATION FOR SEISMIC DAMAGE OF
THE ENTIRE HISTORICAL CENTRE
Cost of work L. 4'000'000'000€. 2.065.827
Year 1980
Town Council of Todi (PG)
CONSOLIDATION, RESTRUCTURING AND RESTORATION OF
PALAZZO DEI PRIORI
Nas1:\20141111 Inglese Curriculum per settori
61
Cost of work: L. 1'000'000'000 € 516.456
Year 1980
Town Council of Todi (PG)
CONSOLIDATION, RESTRUCTURING AND RESTORATION OF
THE LUCREZIE COMPLEX
Cost of work L. 800'000'000€. 413.165
Nas1:\20141111 Inglese Curriculum per settori
62
B) C O N S O L I D A T I O N O F
H Y D R O G E O L O G I C A L
I N S T A B I L I T Y
Years 2011-2012
United Nations Educational, Scientific and Cultural Organization
(UNESCO)
Contact: Mr. Mourad Zmit
UNESCO IRAQ OFFICE
9, Yocoub Ammari Street, Abdoun,
P.O. Box 2270
Amman 11181 JORDAN
STUDIES FOR THE STABILIZATION OF THE ERBIL CITADEL SLOPE
AND THE PERIMETER FACADES (in team with Ars Progetti S.P.A. –
Environment-Resources-Development)
Anno 2007
Town Council of Foligno (PG)
P.zza della Repubblica, 1
VAT number: 00166560540
IMPLEMENTATION OF THE FIRST ANNUAL PLAN FOR THE
MITIGATION OF THE HYDROGEOLOGICAL RISK.
CONSOLIDATION OF THE LANDSLIDE OF PALE
IV phase
(Team: Eng. Arch. Massimo Mariani (50%), Eng. Sergio Salvatori (50%) and
Geol. Oliviero Lolli (100% Geologic Relation)
Cost of works: € 762.800
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi
Consolidation work of Todi hill (D.M. 719/97 e L. 242/97, D.G.R.
2354/2005: (Use of residual funds)
CONSOLIDATION AND HYDRO-GEOLOGICAL REPAIR WORK ON THE
ROAD OF THE EX ABATTOIR
Cost of work: € 228.629,54
Nas1:\20141111 Inglese Curriculum per settori
63
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi
Consolidation work of Todi hill (D.M. 719/97 and L. 242/97, D.G.R.
2354/2005: (Use of residual funds)
REPAIR AND CONSOLIDATION WORK OF HYDRO-GEOLOGICAL
DETERIORATION ALONG THE SLOPE OF THE LUCREZIE MOAT:
VIADUCT SLOPE AND NIDO DI AQUILA SLOPE
Cost of work: €. 681.058,35
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi (PG)
Consolidation work of Todi hill (Ordered by the Mayor of Todi, n°39
of 14.03.2006, L. 242/97, D.G.R. 2354/2005 Use of residual funds)
EMERGENCY CONSOLIDATION WORK ON THE LANDSLIDE IN THE
PARK OF THE FORTRESS, NEAR THE OBERDAN GARDENS ENTRANCE
Cost of work: €. 149.578,14
Year 2006
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STRUCTURAL PROJECTING AND SAFETY COORDINATION FOR
RESTORATION AND CONSOLIDATION OF THE TOWN WALLS OF TODI
2° phase
Cost of work: €. 178.824,03
Year 2006
Town Council of Giano dell’Umbria (PG)
Giano dell’Umbria (PG)
VAT number: 00470070541
COMPLETION OF LAND RECLAMATION OF THE HYDROGEOLOGICAL
DAMAGE IN FRACTION OF BASTARDO
III phase
Cost of works: € 312.873,46
Nas1:\20141111 Inglese Curriculum per settori
64
Year 2004
Superintendence of Archaeological Heritage
P.zza Partigiani, 11 - PERUGIA
CONSOLIDATION WORK OF THE UPPER CISTERN OF CARSULAE (TR)
USED AS AN ANTIQUARIUM
Cost of work: €. 80.000,00
Year 2004
Town Council of Todi
Political Operational Unit for residential, Public and Scholastic Buildings
CONSOLIDATION FOUNDATION WORK AND RESTRUCTURING OF THE
INFANTS’ SCHOOL OF PIAN DI SAN MARTINO
Cost of work: €. 120.480,73
Year 2004
Mr. Carlo Orsini
Loc. Duesanti di Todi- PERUGIA
CONSOLIDATION WORK AND HYDROLOGICAL RE-ORDERING OF
LANDSLIDE MOVEMENT IN THE LAND CONNECTED TO THE PROPERTY
Year 2004
Town Council of Todi (PG)
P.zza of Popolo – Todi (PG)
Cod. Fisc.: 00316740547
PROJECT FOR PRELIMINARY CONSOLIDATION WORK AND HYDROGEOLOGICAL RE-ORDERING ON THE ABATTOIR ROAD IN THE
MUNICIPALITY
Order n° 77 of 09.08.2004
Year 2003
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STRUCTURAL PROJECT AND SECURITY COORDINATION FOR
RESTORATION AND CONSERVATION WORK ON THE TOWN WALLS OF
THE TOWN OF TODI
Cost of work: €. 323.964,27
Year 2002
Town Council of Monte Castello di Vibio (PG)
Monte Castello di Vibio (PG)
VAT number: 00470100546
EXECUTIVE PROJECT FOR EMERGENCY INTERVENTION TO REPAIR
AND RE-ORDERING OF STRETCH OF ROAD IN MACCI ALTO
Contract with act n.13 of 17.01.2002.
Cost of work: € 13.863,08
Year 2002
Town Council of Panicale (PG)
Panicale (PG)
VAT number: 00449310549
EXECUTIVE PROJECT FOR SAFETY WORK AND INTERVENTION ON
LANDSLIDE MOVEMENT, AND RE-ORDERING OF EQUIPPED OUTDOOR
AREA IN VIALE REGINA MARGHERITA
Cost of work: €. 40.000,00
Year 2002
Town Council Giano del Umbria (PG)
Giano del Umbria (PG)
VAT number: 00470070541
EXECUTIVE PROJECT FOR INTERVENTION TO HYDRO-GEOLOGICAL
DETERIORATION NEAR BASTARDO
2° phase
Contract with council act n° 120 of 27.07.2000
Nas1:\20141111 Inglese Curriculum per settori
65
Year 2002
Town Council of Gualdo Cattaneo
Gualdo Cattaneo (PG)
VAT number: 82001410545
EXECUTIVE CONSOLIDATION OF LANDSLIDE NEAR LE CORONE
2° phase
D.G.R. 1686 19.12.2001.
Year 2002
Town Council of Foligno
P.zza of la Repubblica, 1
LANDSLIDE EXCAVATION - EXECUTIVE PROJECT FOR INTERVENTION
ON HYDRO-GEOLOGICAL DETERIORATION- 3° phase
Year 2001
Town Council of Foligno
P.zza of la Repubblica, 1
VAT number: 00166560540
LANDSLIDE EXCAVATION – EXECUTIVE PROJECT FOR
INTERVENTION ON HYDRO-GEOLOGICAL DETERIORATION - 2° phase
Cost of work:
€. 1.100.000,00
Year 2001
Town Council of Perugia
C.so Vannucci, 19 - PERUGIA
VAT number: 00163570542
PRELIMINARY AND EXECUTIVE PROJECT AND SAFETY
COORDINATION DURING THE PLANNING PHASE OF INTERVENTIONS
TO REPAIR AND RESTORE THE SAN FRANCESCO AL PRATO COMPLEX
A PERUGIA - 2° phase
Of . G.M. n° 148 of 23.02.2000 - Of . G.M. n° 519 of 27.07.2000
Cost of work:
€. 996.761,81
Year 2000
Umbria Region
Operational area for organization of theTerritory
P.zza Partigiani, 1 - PERUGIA
VAT number: 01212820540
EXECUTIVE PROJECT FOR INTERVENTION TO EMERGENCY
INFRASTRUCTURE AND HYDRO-GEOLOGICAL EMERGENCY REPAIR REPAIR OF SHEET LANDSLIDE MOVEMENT IN NEGRONE IN THE
MONTONE MUNICIPALITY.
Order G.R. n° 279 of 22.121998
Cost of work: L. 1'300'000'000
€. 671.394
Year 2000
Town Council of Scilla - Reggio Calabria
EXECUTIVE PROJECT FOR INTERVENTION OF RESIDENTIAL CENTRE
Nas1:\20141111 Inglese Curriculum per settori
66
Professional Contract D.G.M. n° 107 of 03.09.1999 Conv. Of 13.12.1999
Cost of work: L. 580'000'000
€. 299.545
Year 2000
Town Council Gualdo Cattaneo
Gualdo Cattaneo (PG)
VAT number: 82001410545
EXECUTIVE PROJECT FOR INTERVENTION OF LANDSLIDE NEAR
BIVIO SARAGANO ROAD NUMBER 423 n° Civ. 26, IN THE
MUNICIPALITY OF GUALDO CATTANEO
Ord. Comm. n° 18 of 07.08.1997
Year 2000
Town Council of Gualdo Cattaneo
Gualdo Cattaneo (PG)
VAT number: 82001410545
EXECUTIVE PROJECT FOR CONSOLIDATION OF LANDSLIDE NEAR "LE
CORONE" – URGENT INTERVENTION PLAN
Conv. of 23.03.2000 Rep. N° 867
Year 2000
Town Council of Perugia
C.so Vannucci, 19 - PERUGIA
PROFESSIONAL CONSULTANCY REGARDING LANDSLIDE IN PIAZZA
SAN FRANCESCO AL PRATO – BUILDING HOUSING THE ACADEMY OF
FINE ARTS OF PERUGIA
Professional Contract n° Reg.. 164/99 of 22.06.1999
Year 1999
Town Council of Foligno
P.zza of la Repubblica, 1
VAT number: 00166560540
EXECUTIVE PROJECT FOR INTERVENTION IN URGENT HYDROGEOLOGICAL DETERIORATION ACCORDING TO THE LAW OF
30.03.1998 n° 61 - D.G.R. n° 4568 OF 05.08.1999 FIRST
ASSIGNMENT OF FUNDS FOR LANDSLIDE EXCAVATION
Year 1998
Umbria Region
Operational area for organization of the Territory
Nas1:\20141111 Inglese Curriculum per settori
67
P.zza Partigiani, 1 - PERUGIA
VAT number: 01212820540
EXECUTIVE PROJECT FOR INTERVENTION TO RE-ADJUST LANDSLIDE
MOVEMENT FOUND IN MONTE LADRONE IN THE MUNICIPALITY OF
TODI (PG)
Order n° 18 of 07.08.1997
Year 1998
Town Council of Monte Castello di Vibio
Monte Castello di Vibio (PG)
VAT number: 00470100546
DEFINITIVE EXECUTIVE PROJECT FOR CONSOLIDATION AND REPAIR
TO THE NEW TOWN FOOTBALL PITCH
Nas1:\20141111 Inglese Curriculum per settori
68
Year 1997
Geognostica Umbra
Ponterio di Todi - PERUGIA
VAT number: 00439930546
EXECUTIVE PROJECT FOR CONSOLIDATION OF BULKHEAD- SECOND
PART OF SHOPPING CENTRE NEAR COLLESTRADA - PERUGIA
Year 1996
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR CONSOLIDATION OF EMBANKMENT ABOVE
THE BRIDGE NEAR PONTEFONNAIA - MASSA MARTANA (PG)
Off.lett.. n° 6729 of 04.07.1996
Year 1996
Company G.LI.COS. S.r.l
Via Vivenza, 92 - PERUGIA
VAT number: 00658000542
Contract A.N.A.S. Comp. ANCONA
STRUCTURAL EXECUTIVE PROJECT FOR URGENT WORKS FOR
SAFEGUARDING TRAFFIC AROUND FALLEN ROCKS
Year 1995
Geognostica Umbra Company
Ponterio di Todi (PG)
VAT number: 00439930546
EXECUTIVE PROJECT FOR CONSOLIDATION OF BRIDGE IN AULLA
Year 1995
Geognostica Umbra Company
Ponterio di Todi (PG)
VAT number: 00439930546
Contract A.N.A.S. Comp. of UMBRIA
EXECUTIVE PROJECT FOR CONSOLIDATION OF LANDSLIDE NEAR
SAN GEMINI
Year 1995
Geognostica Umbra Company
Ponterio di Todi (PG)
VAT number: 00439930546
Contract STATE RAILWAY Comp. of PESCARA
EXECUTIVE PROJECT FOR INTERVENTION- INDENTATIONS IN
RAILWAY TUNNEL ON THE SULMONA – TERNI LINE
Year 1994
Perugia Province
Nas1:\20141111 Inglese Curriculum per settori
69
P.zza Italia, 11 - PERUGIA
VAT number: 00443770540
EXECUTIVE PROJECT FOR CONSOLIDATION OF LANDSLIDE NEAR
VALSORDA - GUALDO TADINO (PG)
Year 1992
Geognostica Umbra Company
Ponterio di Todi (PG)
VAT number: 00439930546
Contract PROVINCIE of GROSSETO
EXECUTIVE PROJECT BULKHEAD ON ROAD N° 66 - PORTO ERCOLE
Year 1992
S.E.A.S. - Soc. Edile Acquedotti e Strade Company S.p.a
Via Rome 107 Umbertide (PG)
VAT number: 01163650540
CONSOLIDATION OF MONTONE - EXECUTIVE PROJECT
4°phase - 2° allotment
Cost of work: L. 1'500'000’000
Year 1992
Geognostica Umbra Company
Ponterio di Todi (PG)
VAT number: 00439930546
Contract STATE RAILWAY Comp. of PESCARA
EXECUTIVE PROJECT FOR INDENTATIONS IN TUNNEL AND
WIDENING OF BRIDGE OF PONTICELLO –PESCARA RAILWAY LINE
Year 1992
Geognostica Umbra Company
Ponterio di Todi (PG)
VAT number: 00439930546
Contract STATE RAILWAY
EXECUTIVE PROJECT WALL PLATING ON THE ORTE - FALCONARA
LINE KM 209, ANCONA RAILWAY
Year 1992
Ediltevere Company S.p.A.
Pantalla di Todi (PG)
VAT number: 00279040547
Nas1:\20141111 Inglese Curriculum per settori
70
Contract A.N.A.S. Comp. Of UMBRIA
EXECUTIVE PROJECT UNDERGROUND BULKHEAD WALL ON THE S.S.
79 BIS ORVIETANA ROAD, KM 42+200
Year 1992
Gemignani Company S.r.l.
V.le Puccini n° 34
VAT number: 01309690467
Contract STATE RAILWAY Comp. of PISA
EXECUTIVE PROJECT OF CONTRASTING BULWARKS IN REINFORCED
CONCRETE PILES AT THE STATION OF LUCCA
Year 1992
Forti Oliviero Building Company
Via Amodio, 8 - SPOLETO (PG)
VAT number: 00226530541
Contract A.N.A.S. Comp. Of UMBRIA
EXECUTIVE PROJECT FOR CONSOLIDATION WORK ON LANDSLIDE
BETWEEN Km 21+535 AND 21+588 OF THE S.S. 503 - ANAS
FLORENCE ROAD
Year 1992
Settimi 80 Edilizia Company S.r.l.
Via Borgo San Giovanni - FOLIGNO (PG)
VAT number: 01111700546
EXECUTIVE PROJECT CONTRASTING BULKHEADS IN EXISTING
BUILDINGS
Year 1992
Massa Martana Town Council
Massa Martana (PG)
VAT number: 00429530546
EXECUTIVE PROJECT FOR CONSOLIDATION OF THE LANDSLIDE IN
THE MAIN TOWN – 2° phase
Year 1991
Dr. Ezio Mammoli & C. Company S.n.c.
Via Valle Inf. 27 - TODI (PG)
VAT number: 00292030541
Contract: Superintendence for BB.AA.AA.AA.SS. of Umbria
EXECUTIVE PROJECT FOR CONSOLIDATION OF TEMPLE OF SANTA
MARIA DELLA CONSOLAZIONE IN TODI
Nas1:\20141111 Inglese Curriculum per settori
71
Nas1:\20141111 Inglese Curriculum per settori
72
Year 1991
C.E.I. Costruzioni Company S.r.l.
Loc. Paciana - FOLIGNO (PG)
VAT number: 01211410541
PERUGIA Town Council contract
EXECUTIVE PROJECT AND TECHNICAL DIRECTION OF WORKS FOR
THE CONSOLIDATION OF ROOF OF THE ELEVATOR TUNNEL IN VIA
XIV SETTEMBRE A PERUGIA
Year 1991
Town Council of Lisciano Niccone
Lisciano Niccone (PG)
VAT number: 80010100545
EXECUTIVE PROJECT 3° PHASE OF CONSOLIDATION OF LANDSLIDE
IN CROCICCHIE
Year 1990
Todini Company S.p.a.
Via of Serafico, 200 - ROME
VAT number: 01959721000
Contract Regione of Umbria
EXECUTIVE PROJECT CONSOLIDATION WORK OF COLLE DI TODI
Year 1990
Ediltevere Company S.p.A.
Pantalla di Todi (PG)
VAT number: 00279040547
Contract A.N.A.S. Comp. of UMBRIA
EXECUTIVE PROJECT SUPPORTING WALL IN ABETO
Year 1990
Luzzi Company of Sansepolcro (AR), on behalf of SANSEPOLCRO TOWN
COUNCIL (AR)
BULKHEAD PROJECT EX AREA BUITONI - SANSEPOLCRO (AR)
Cost of work L. 100'000'000
€. 51.646
Years 1988/89
Town Council Massa Martana (PG)
CONSOLIDATION OF HYDRO-GEOLOGICAL DETERIORATION IN THE
MAIN TOWN
Cost of work L. 450'000'000
€. 232.406
Year 1988
Company Geognostica Umbra S.r.l., on behalf of the STATE RAILWAY
– FLORENCE area.
CONSOLIDATION OF THE FOUNDATIONS OF THE PRATO BRIDGE
OVER THE RIVER BISENZIO
Cost of work L. 500'000'000
€. 258.228
Year 1988
Umbria Region - Town Council of Montone
TECHNICAL CONSULTANCY FOR LAND MECHANICS IN THE
EXECUTIVE PROJECT FOR ZONE 2 OF THE TOWN LANDSLIDE
CONSOLIDATION WORK
Cost of work L. 500'000'000
€. 258.228
Year 1988
Umbria Region - Town Council of Montone
DIAPHRAGM PROJECT IN CONSOLIDATION AREA N° 4 FOR THE
CONSOLIDATION OF THE LANDSLIDE IN THE MAIN TOWN
Cost of work L. 500'000'000
Years 1987/90
Town Council of Peglio (PS)
FOUNDATION PROJECT FOR SPORTS CENTRE ON LANDSLIDE
Cost of work L. 600'000'000
€. 309.874
Nas1:\20141111 Inglese Curriculum per settori
73
Year 1987
Umbria Region
CONSOLIDATION WORK IN COLLE DI TODI
Special law n° 230/78 – Structural project for:
LOT B / 1° PHASE
LOT C / 2° PHASE - Wall of Cerquette and Zodiaco Wall.
Cost of work L. 750'000'000
€. 387.343
Year 1986
Town Council Montone (PG).
CONSOLIDATION OF MONTONE LANDSLIDE
Structural Project large diameter well.
Cost of work L. 5'000'000'000
€. 2.582.284
Year 1986
Regione of Umbria - Town Council of Gualdo Cattaneo
CONSOLIDATION OF GUALDO CATTANEO LANDSLIDE (PG)
Cost of work L. 400'000'000
€. 206.583
Year 1982
Town Council of Stroncone (RI).
CONSOLIDATION OF STRONCONE LANDSLIDE
Cost of work L. 120'000'000
€. 61.975
Year 1981
Todi Town Council (PG).
CONSOLIDATION AND RESTORATION OF THE MEDIEVAL TOWN
WALL – NORTH-EAST SIDE
Cost of work L. 600'000'000
Nas1:\20141111 Inglese Curriculum per settori
€. 309.874
74
c) L A R G E
STRUCTURES
Year 2004
Town Council Perugia – Socila Sevices Section
Political Operational Unit for Residential, Public and Scholastic Buildings
ELEMENTARY AND MIDDLE SCHOOL IN SOLFAGNANO - PARLESCA
Structural project for wooden panelling
Cost of work: €. 160.000,00
Year 2004
Town Council of Marsciano
Largo Garibaldi, 1 Marsciano - PERUGIA
PRELIMINARY PROJECT FOR THE VIABILITY OF P.R.G. CONNECTION
BETWEEN PIAZZALE EUROPA AND VIA TUDERTE IN MARSCIANO
Year 2000
C.U.S. Umbria Health Consortium
Via Pievaiola, 21 - PERUGIA
VAT number: 01892240548
Contract: Regione of Umbria
EXECUTIVE PROJECT FOR RESTRUCTURING WORK ON THE "LE GRAZIE"
HEALTH ASSISTANCE RESIDENCE FOR THE DISABLED, OF TERNI.
Year 2000
C.U.S. Umbria Health Consortium
Via Pievaiola, 21 - PERUGIA
VAT number: 01892240548
Contract: Region of Umbria
EXECUTIVE PROJECT FOR COMPLETION AND REPAIR TO RESIDENTIAL
CENTRE OF TREVI (PERUGIA).
Off. Lett. from C.U.S. Prot. 781/99 MM/rfbis of 16.09.1999
Cost of work: €. 2.032.512
Year 1999
Company Betti S.p.A.
Via Porta Sant’Angelo, 27 - TERNI
VAT number: 00166430546
Contract A.N.A.S. Comp. of UMBRIA
STRUCTURAL EXECUTIVE PROJECT FOR COMPLETION OF WORK ON THE
FORCA DI CERRO TUNNEL BETWEEN THE S.S. n° 3 FLAMINIA ROAD AND
THE S.S. n° 209 VALNERINA ROAD
Year 1997
Ediltevere S.p.A.
Pantalla of Todi (PG)
VAT number: 00279040547
Contract: Town Council GIANO OF UMBRIA
STRUCTURAL EXECUTIVE PROJECT FOR ACCUMULATION TANK IN GIANO
DELL’ UMBRIA, IN MONTECCHIO
Year 1996
Ubaldi Company S.n.c.
Via 3 ottobre, 33 (AP)
VAT number: 01231000446
Contract A.N.A.S. Comp. of PERUGIA
STRUCTURAL EXECUTIVE PROJECT AND URGENT WORK ON TYPE III ROAD
PLATFORM , LAW C.N.R. - S.S. n° 3 bis TIBERINA S.G.E. E/45
Year 1996
Roberto Rotoloni Company
Via Santa Petronilla, 5 - ROME
Contract Town Council PASSIGNANO (PG)
STRUCTURAL PROJECT FOR RECOVERING THE FAÇADE OF THE MUNICIPAL
Nas1: 20141111 Inglese Curriculum per settori
75
HEADQUARTERS AT PASSIGNANO SUL TRASIMENO
Cost of work: €. 180.000,00
Year 1994
Town Council of Collazzone
Collazzone (PG)
VAT number: 00449760545
EXECUTIVE PROJECT FOR COMPLETING TOWN ROAD N°18 “DELLE
CORONE” AND BRIDGE OVER THE PUGLIA RIVER
Year 1992
F.lli Scarpini Piero and Alvaro Company S.n.c.
Castiglione of Lago (PG)
VAT number: 01491940548
Contract STATE RAILWAY Comp. of TORINO
EXECUTIVE PROJECT FOR RAISING THE LEVEL OF THE BRIDGE OVER THE
RIVER TRESA - STATE RAILWAY
Year 1992
F.lli Scarpini Piero and Alvaro Company S.n.c.
Castiglione of Lago (PG)
VAT number: 01491940548
Contract STATE RAILWAY Comp. of FLORENCE
EXECUTIVE PROJECT FOR RAISING THE LEVEL OF THE FLYOVER AT Km
173+553 OF THE TRACK
Year 1991
Farnese Appalti Company S.r.l.
P.zza A. Mancini, 4 - ROME
VAT number: 01705301008
Contract STATE RAILWAY zone of FLORENCE
EXECUTIVE UNDERGROUND PROJECT AT Km 188+629 FF.SS. RAILWAY
LINE FROM CHIUSI - FIRENZE
Year 1987
Augusto Mecocci Company of Perugia, on behalf of the
STATE RAILWAY – HIGH SPEED
UNDERGROUND PRESSURE PROJECT FROM OLMO-AREZZO
Cost of work L. 600'000'000
€. 309.874
Year 1987
Town Council of Monte Castello of Vibio (PG)
PROJECT FOR TOWN AQUEDUCT
1°, 2° and 3° phase
Cost of work L. 1'200'000'000
€. 619.748
Year 1986
Augusto Mecocci Company of Perugia, on behalf of the STATE RAILWAY – zone
of ANCONA.
UNDERGROUND PRESSURE PROJECT – FALCONARA (AN)
Cost of work L. 500'000'000
€. 258.228
Year 1986
Ediltevere Company S.p.A., on behalf of the PROVINCE OF PERUGIA
PROJECTING OF THE BRIDGE ON THE PIOSINA ROAD SP. 101, CITTÀ DI
CASTELLO (PG)
Cost of work L. 300'000'000
€. 154.937
Nas1:\20141111 Inglese Curriculum per settori
76
SITE ENGINEERING AND
TECHNICAL DIRECTIONS
Year 2010
Bank of Mantignana
Cooperative Credit Umbro
Piazza Risorgimento, 7
06073 Corciano (PG)
SUPERVISION, COORDINATION AND ACCOUNTING OF WORK FOR THE
CONSTRUCTION OF THE BANK OF MANTIGNANA BRANCH IN PIAZZA IV
NOVEMBRE, 31 IN PERUGIA.
Contract of 18.08.2010
Authorizations issued by the Town Council of Perugia: Building Permit N.
1615/2010, Building Permit No 2720/2010 and Environmental Authorization
2722/2010
Total Cost of Work: € 1,160,609.17
Total Final Plot: € 55,049.02
Year 2009
Town Council of Viterbo
Public Sector Employment
Via Garbini - VITERBO
SUPERVISION OF WORK, COORDINATION OF SECURITY DURING THE
RECONSTRUCTION OF THE PAVEMENT IN THE HISTORIC CENTER- IN
“CORSO ITALIA” IN VITERBO (in team with Nicoletta Omicioli (Architect) and
Alessandro Sperenza (Engineer)
Appointment with authorization N° 53 of 12.02.2009
Final Gross Cost of work: € 308,296.80 of which €. 20,559.51 for security costs.
Year 2008
Town Council of Collazzone (PG)
Piazza Jacopone, 6
TOWN ROAD OF POGGIO: RECLAMATION OF THE GRAVITATIONAL
COLLAPSE OF THE ENBANKEMNT IN TOSCELLA
Cost of Work: € 139,380.14
Year 2007
Mr. Ottaviano Barboni
Via delle Fornacette, 1 – Fraz. Padule,
06024 Gubbio (PG)
DAMAGE REPAIR AND SEISMIC IMPROVEMENT OF BUILDING ACCORDING
TO LAW N ° 30/98 AND AID APPLICATION UNDER THE DGR 5180/98 AND
SUBSEQUENT AMENDMENTS AND ADDITIONS - Building No. 2293 located in
the Municipallity of Gubbio, Fraz. Padule (sheet 262 part 79)
Building permit No. 32/2008 issued by the Municipality of Gubbio - Sector Planning
and Construction - Housing Service on 04.03.2008.
Building Permit No. 88/2009 issued by the Municipality of Gubbio - Sector Planning
and Construction - Housing Service on 04.05.2009.
Cost of Work: € 561,812.85
Year 2006
Region of Umbria
C.U.S. Umbria Health Consortium
Via Pievaiola, 21 - Perugia
VAT: 01892240548
Nas1: 20141111 Inglese Curriculum per settori
77
President and Member of the Board of Directors and Technical Committee
SEISMIC VULNERABILITY ANALYSIS FOR THE HOSPITALS OF SPOLETO,
PERUGIA, TERNI, ORVIETO.
Cost of Work: € 135,000
Years
2005-2006
University of Perugia
Piazza Università, 1 (PG)
RESTRUCTURING OF PREMISES EX “OFFICINE GELSOMINI” TO CREATE A
UNIFIED LIBRARY FOR THE HUMANITIES FACULTY, LOCATED IN PIAZZA
MORLACCHI – PERUGIA.
Contract for professional services of 23.05.2005, Collection No. 4119
Approval Executive Project with Service Conference Minutes of 26.02.2005
Start of work: 07.11.2005
Completion of work: 10.10.2009
Cost of Work: € 4,607,719.86 of which € 484,505.58 for security charges
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi
Consolidation work at colle di Todi (D.M. 719/97 and L. 242/97, D.G.R.
2354/2005: Plan for use of residual funds)
CONSOLIDATION AND HYDRO-GEOLOGICAL REPAIR WORK ON THE ROAD
OF THE EX-ABATTOIR
Cost of work: €. 228.629,54
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi
Consolidation work at colle di Todi (D.M. 719/97 and L. 242/97, D.G.R.
2354/2005: Plan for use of residual funds)
REPAIR AND CONSOLIDATION OF HYDRO-GEOLOGICAL DETERIORATION
ALONG THE SLOPES OF THE LUCREZIA MOAT: VIADUCT SLOPE AND NIDO
DELL’ AQUILA SLOPE
Cost of work:
€. 681.058,35
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi (PG)
Consolidation work at colle di Todi (By Order of the Mayor of Todi n°39 of
14.03.2006, L. 242/97, D.G.R. 2354/2005: Plan for use of residual funds)
URGENT WORK TO CONSOLIDATE THE LANDSLIDE IN THE PARK OF LA
ROCCA, NEAR THE OBERDAN GARDENS ENTRANCE
Cost of work: €. 149.578,14
Years
2005-2006
Perugia University
Piazza Università, 1 (PG)
RESTRUCTURING OF EX GELSOMINI WORKSHOP BUILDING - FOR THE
CREATION OF A LIBRARY FOR THE HUMANITIES FACULTY, IN PIAZZA
MORLACCHI - PERUGIA
Cost of work: €. 4.400.000,00
Year 2005
Town Council of Castiglione del Lago (PG)
Piazza Gramsci, 1 Castiglione of Lago
COMPLETION OF RECOVERY OF MONUMENTAL COMPLEX OF THE LEONE
FORTRESS: TRIANGULAR DEFENCE TOWER (Of ib. G.R. 1559/04)
Cost of work: €. 200.000,00
Year 2004
Town Council of Castiglione del Lago (PG)
Nas1:\20141111 Inglese Curriculum per settori
78
Piazza Gramsci, 1 Castiglione of Lago
RECOVERY OF MONUMENTAL COMPLEX OF PALAZZO DELLA CORGNA,
TOWN WALLS, WALK AND GARDENS
Cost of work: €. 1.100.000,00
Year 2004
Dr. Cons. Giuseppe Severini
Viale Indipendenza, 33 - PERUGIA
STRUCTURAL CONSOLIDATION OF PRIVATE BUILDING
Year 2003
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
SPECIAL WORK FOR THE CONSERVATION AND IMPROVEMENT OF THE
ARCHAEOLOGICAL HERITAGE OF CORCIANO
Year 2003
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
CONSOLIDATION WORK OF THE UPPER CLOISTER- ARCHAEOLOGICAL
HALL OF THE NATIONAL ARCHAEOLOGICAL MUSEUM OF UMBRIA
DAMAGED BY THE EARTHQUAKE
Year 2003
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STRUCTURAL PROJECTING AND SAFETY COORDINATION FOR
RESTORATION WORK AND CONSOLIDATION OF THE TOWN WALLS OF THE
TOWN OF TODI
Year 2002
San Martino Association
Via G.B. Pontani, 15 - PERUGIA
VAT number: 00162940548
CONSOLIDATION WORK, REPAIR AND RESTORATION OF THE TEMPLE OF
SANT’ERCOLANO IN PERUGIA
Nas1:\20141111 Inglese Curriculum per settori
79
Convention of 19.07.2000 REP. 50
Cost of work: €. 1.138.000,00
Year 2002
Town Council of Giano dell’ Umbria
Giano dell’ Umbria (PG)
VAT number: 00470070541
EXECUTIVE PROJECT FOR CONSOLIDATION OF HYDRO-GEOLOGICAL
DETERIORATION IN BASTARDO
2° phase
Contract 120 of 27.07.2000
Year 2002
Town Council of Gualdo Cattaneo (PG)
Gualdo Cattaneo
VAT number: 82001410545
EXECUTIVE PROJECT FOR LANDSLIDE CONSOLIDATION NEAR LE CORONE
2° phase
D.G.R. 1686 19.12.2001.
Year 2002
Gerolamo Gaslini Foundation
C.so Italia, 26 - GENOVA
STRUCTURAL EXECUTIVE PROJECT FOR THE STATIC RECOVERY AND
DIRECTION OF WORKS AT THE ABBEY COMPLEX OF SANTA MARIA DI
VALDIPONTE
2° phase
Year 2001
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STRUCTURAL EXECUTIVE PROJECT FOR THE SAN DOMENICO COMPLEX PERUGIA
Nas1:\20141111 Inglese Curriculum per settori
80
Contract n° 2577 of 09.11.1999
Year 2001
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
CONSOLIDATION WORK ON THE CHURCH OF SANTA MARIA DELLA
CONSOLAZIONE IN TODI (PG).
Contract n° 2579 of 09.11.1999
Cost of work: €. 650.000,00
Year 2001
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
RESTORATION WORK AND IMPROVEMENT TO THE ARCHAEOLOGICAL
AREA OF THE ROMAN TOWN OF OCRICULUM (TR)
Let. contract. prot. n° 16112 of 30.12.2000
Year 2001
Town Council of Perugia
C.so Vannucci, 19 - PERUGIA
VAT number: 00163570542
INTERVENTIONS FOR THE IMPROVEMENT, REPAIR AND RESTORATION OF
THE COMPLEX OF SAN FRANCESCO AL PRATO IN PERUGIA
2° phase
Of . G.M. n° 148 of 23.02.2000 - Of . G.M. n° 519 of 27.07.2000
Cost of work: L. 1'930'000'000
€. 996.762
Year 2001
Town Council of Castiglione del Lago (PG)
Castiglione del Lago
VAT number: 00366960540
ARCHITECTURAL RESTORATION WORK, RESTORATION OF FACADE AND
SETTING UP OF INSTALLATIONS
Convention of 30.06.1998
Cost of work: L. 1'300'000'000
€. 671.394
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
CONSOLIDATION AND RESTORATION OF THE CHURCH OF SANTA MARIA
ASSUNTA IN SELLANO (PG)
Inc. n° 2490 Reg. 02.09.1999
Cost of work: L. 1'210'000'000
€. 624.913
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
PROVISIONAL WORK ON ROMAN BRIDGE IN VILLA SCIRCA - SIGILLO
(PG)
Year 2000
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
CONSOLIDATION OF THE CHURCH OF SANTA MARIA MAGGIORE IN ASSISI
Contract n° 96/99 of 25.09.1999
Year 2000
Region of Umbria - Operational Area for ordering of the Territory
P.zza Partigiani, 1 - PERUGIA
Nas1:\20141111 Inglese Curriculum per settori
81
VAT number: 01212820540
PLAN FOR INFRASTRUCTURAL EMERGENCY INTERVENTIONS AND INITIAL
HYDRO-GEOLOGICAL IMPROVEMENTS – CORRECTION OF SHEET
LANDSLIDE DAMAGE IN NEGRONE IN THE TERRITORY OF MONTONE
Order n° 279 of 22.121998
Cost of work: L. 1'300'000'000
€. 671.394
Year 2000
Gerolamo Gaslini Foundation
C.so Italia, 26 - GENOVA
VAT number: 00269520102
Contract: Region of Umbria
WORK COMMISSIONED FOR THE EASTERN WING OF THE VALDIPONTE
ABBEY COMPLEX IN THE MUNICIPALITY OF PERUGIA
1° phase
Prof.Cont. Of 30.03.2000 let. Prot. n° 198/200 LL/am
Cost of work: L. 1’250'000'000
€. 645.571
Year 2000
Town Council of Scilla (RC)
CONSOLIDATION WORK IN RESIDENTIAL AREA
Professional contract D.G.M. n° 107 of 03.09.1999 Conv. of 13.12.1999
Cost of work: L. 580'000'000
€. 299.545
Year 2000
Town Council of Perugia
C.so Vannucci, 19 - PERUGIA
VAT number: 00163570542
PROFESSIONAL CONSULTANCY ON LANDSLIDE IN PIAZZA SAN
FRANCESCO AL PRATO – BUILDING HOUSING THE ACADEMY OF FINE
ARTS IN PERUGIA
Professional contract n° Racc. 164/99 of 22.06.1999
Year 2000
Town Council of Monte Castello di Vibio (PG)
Monte Castello di Vibio
VAT number: 00470100546
CONSOLIDATION WORK AND IMPROVEMENT TO TOWN FOOTBALL PITCH
Year 2000
Town Council of Gualdo Cattaneo (PG)
Gualdo Cattaneo
VAT number: 82001410545
CONSOLIDATION OF LANDSLIDE NEAR THE SARAGANO ROAD JUNCTION
423 n° Civ. 26, IN THE MUNICIPALITY OF GUALDO CATTANEO
Ord. n° 18 of 07.08.1997
Year 2000
Town Council of Gualdo Cattaneo (PG)
Gualdo Cattaneo (PG)
VAT number: 82001410545
CONSOLIDATION OF LANDSLIDE NEAR "LE CORONE" – URGENT
INTERVENTION PLAN
Conv. Of 23.03.2000 Rep. N° 867
Year 2000
Town Council of Assisi (PG)
VAT number: 00313820540
FUNCTIONAL IMPROVEMENT TO INFRASTRUCTURE ASSISI TOWN CENTRE
1
Nas1:\20141111 Inglese Curriculum per settori
82
Convention n° 1433 of 13.07.1999
Cost of work: €. 2.592.547
Year 2000
C.U.S. Umbria Health Consortium
Via Pievaiola, 21 - PERUGIA
VAT number: 01892240548
Contract: Regione of Umbria
COMPLETION AND IMPROVEMENT TO REHABILITATION CENTRE IN TREVI
(PERUGIA).
Letter of contract: C.U.S. Prot. 781/99 MM/rfbis of 16.09.1999
Cost of work: €. 2.032.512
Year 2000
Gerolamo Gaslini Foundation
C.so Italia, 26 - GENOVA
VAT number: 00269520102
Contract: Regione of Umbria
WORK TO BE CARRIED OUT IN THE EASTERN WING OF THE ABBEY
COMPLEX OF SANTA MARIA DI VALDIPONTE IN THE MUNICIPALITY OF
PERUGIA
Inc. Prof. Of 30.03.2000 let. Prot. n° 198/200 LL/am
Cost of work: L. 1'250'000'000
€. 645.571
Year 2000
Via Serraloggia Apartment block
Via Serraloggia, 128 - FABRIANO
VAT number: 90010230424
Earthquake Contract UMBRIA/MARCHE
DEMOLITION OF BUILDING IN FABRIANO, VIA SERRALOGGIA 128
Cost of work: € 2.919.689
Year 2000
Perugia State Archives
PERUGIA
VAT number: 80002230540
CONSOLIDATION OF PORTION OF STUDY HALL BUILDING
prot. n° 6512/III.1 of 22.10.1999
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Nas1:\20141111 Inglese Curriculum per settori
83
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STATISTICAL SURVEY AND RESTORATION WORK OF THE NATIONAL
GALLERY OF UMBRIA – SOUTHERN WING
Reg.contract: 1494 of 31.12.1996
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STRUCTURAL CONSOLIDATION OF THE SAN DOMENICO BUILDING
COMPLEX IN PERUGIA
Inc. n° Reg. 2577 of 09.11.1999
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
CONSOLIDATION WORK ON DAMAGE CAUSED BY EARTHQUAKE OF
26.09.1997 AND LATER.
PALAZZO DEI PRIORI IN PERUGIA.
Conv. Of 22.10.1999 n° Reg. 2552
Cost of work: L. 3'500'000'000
€. 1.807.599
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
CONSOLIDATION OF THE CHURCH OF BUON GESÙ. MAGGIORE ISLANDTUORO SUL TRASIMENO
Conv. Of 10.02.1999 - Dcr. 494/96
Year 1999
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
CONSERVATION WORK AND IMPROVEMENTS TO FUNERARY MONUMENTIN CORTACCIONE - SPOLETO
Contract Prot n°. 4463/98
Year 1994
Perugia Province
P.zza Italia, 11 - PERUGIA
VAT number: 00443770540
CONSOLIDATION OF LANDSLIDE NEAR VALSORDA - GUALDO TADINO (PG)
Years
1990/1995
S.O.T. S.r.l. – Society, Todi Orvieto
Via of Colle - PERUGIA
VAT number: 01707470546
PAVING WORK, AND TODI TOWN CENTRE HYDRAULIC AND SEWAGE
SYSTEM
Cons. n° ref. 82/90 of 27.08.1990
Year 1990
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi
VAT number: 00316740547
WORK FOR REPAIR OF BUILDING COMPLEX BELONGING TO THE COUNCIL
IN VIA DI MEZZO MURO IN TODI
Year 1990
A.N.A.S. Perugia Department
Technical Director of the G.L.I.COS. S.r.l. Company - Perugia
Nas1:\20141111 Inglese Curriculum per settori
84
S.S. 452 - “LA CONTESSA” ROAD - AT KM 6+150
Year 1989
A.N.A.S. Perugia Department
Technical Director of the G.L.I.COS. S.r.l. Company - Perugia
S.S. 3 bis - Tiberina - S.G.C. E/45
REPAIR OF LARGE SCALE ROAD BANK LANDSLIDE DAMAGE AT 42+700 /
46+800
Cost of work L. 210'000'000 €. 108.456
Years
1987/89
Town Council Perugia
NEW SEWAGE BASIN PESCARA SETTEVALLI IN PERUGIA
Cost of work L. 500'000'000
€. 258.228
Years
1987/90
Town Council of Monte Castello di Vibio
CONSTRUCTION OF TOWN AQUEDUCT IN MONTE CASTELLO DI VIBIO
(PERUGIA)
1° e 2° phase.
Cost of work L. 1'300'000'000
€. 671.394
Years
1985/90
Town Council of Lisciano Niccone
CONSOLIDATION OF LANDSLIDE IN LISCIANO NICCONE (PG)
Cost of work L. 700'000'000
€. 361.520
Year 1987
Town Council of Collazzone (PG)
PROJECT FOR BRIDGE OVER THE PUIA RIVER
Cost of work L. 350'000'000
€. 180.760
Year 1987
Regione of Umbria
CONSOLIDATION WORK IN COLLE DI TODI
Special law n° 230/78.
Lot B - 1° phase.
Lot A - Consolidamento muro "Cerquette".
Lot A – Wide diameter well – Consolidation of the Zodiaco wall – Binding work,
micro-piles, special foundations, wide diameter draining wells, containing work,
trench draining.
Technical Director of the Franco Todini Company building site - ROME.
Cost of work L. 1'000'000'000
€. 516.457
Year 1986
Perugia Municipality
CONSOLIDATION OF EARTHQUAKE-DAMAGED BUILDING IN THE AREA OF
RESINA
Cost of work L. 120'000'000
€. 61.975
Years
1985/87
Region of Umbria
CONSOLIDATION WORK IN COLLE DI TODI
Special state law n° 230 of 1978.
Lot C - 2° phase – Draining work on the slopes, fixed and mobile containing work.
Technical Director of the Franco Todini Company building site. - ROME
Cost of work L. 1'300'000'000
€. 671.394
Year 1986
Superintendence of Archaeological Heritage
TECHNICAL-SCIENTIFIC CONSULTANCY FOR DIRECTION OF WORKS FOR
THE CONSOLIDATION AND RESTORATION OF SOME STRETCHES OF THE
ANCIENT TOWN WALL OF TODI (PG)
Cost of work L. 800'000'000
€. 413.166
Nas1:\20141111 Inglese Curriculum per settori
85
Year 1985
Self employed Consultant to the Franco Todini Company – Umbria Division
Year 1985
Region of Umbria
CONSOLIDATION WORKS FOR COLLE DI TODI - L.230/78.
CONSOLIDATION OF VIADUCT GIVING ACCESS TO THE TOWN OF TODI
AND CONSTRUCTION OF VERY DEEP DRAINING WELL OF VERY WIDE
DIAMETER
Cost of work L. 700'000'000
€. 361.520
Year 1985
Superintendence of Archaeological Heritage
Consultancy for the Direction of works FOR CONSOLIDATING A STRETCH OF
ANCIENT CITY WALL IN PIAZZA DEL MONTARONE IN TODI (PG)
Cost of work L. 200’000'000
€. 103.291
Year 1985
Superintendence of Archaeological Heritage
Consultancy for the Direction of works FOR CONSOLIDATING A STRETCH OF
ANCIENT CITY WALL IN PIAZZA DEL MONTARONE IN TODI (PG)
Law 230/78.
Cost of work L. 300'000'000
€. 154.937
Years 1985
- 1994
Superintendence of Archaeological Heritage
Consultancy for the Direction of works: PROJECTING CONSOLIDATION WORKS
FOR STRETCH OF ETRUSCAN WALL NEAR THE LUCREZIE MOAT IN TODI
(PG)
Law 230/78.
Cost of work L. 500'000'000
€. 258.228
Year 1983
Technical Director of the Ediltevere S.p.A Company on behalf of A.N.A.S Perugia
Division.
WIDENING OF ORTE – TERNI ROAD
Cost of work L. 200'000'000
€. 103.291
Year 1983
Ediltevere S.p.A., Company on behalf of Town Council TODI (PG)
NEW CEMETERY LANDSLIDE
Cost of work L. 200'000'000
€. 103.291
Year 1983
Technical Director of the G.L.I.Cos. S.r.l Company. - Perugia
ARTIFICIAL TUNNEL AND S.S. 320 OF CASCIA – Prevention of falling rocks
A.N.A.S. Perugia Division
Cost of work L. 355'000'000
€. 183.342
Year 1983
Ediltevere S.p.A., Company on behalf of Town Council TODI (PG)
CONSOLIDATION ROAD WORKS ON MAIN LOMBARDI ROAD
3° Lot
Cost of work L. 350'000'000
€. 180.760
Years
1982/92
Technical Director of the G.L.I.COS. S.r.l. Company – Perugia Contracts
- A.N.A.S. Perugia Division;
- Administration of the Province of Perugia;
- A.N.A.S. Bologna Division;
- A.N.A.S. Lazio Division;
- A.N.A.S. Firenze Division
Years
1982/84
Region of Umbria
Technical Director of the Franco Todini Company- Rome building site
Nas1:\20141111 Inglese Curriculum per settori
86
CONSOLIDATION WORK AT COLLE DI TODI
Law Sp. n° 230 of 1978.
Lot A - 3° phase, Lot C - 1° phase
Cost of work L. 800'000'000
€. 413.166
Years
1979/82
Regione of Umbria
Technical Director of the Franco Todini Company- Rome building site
CONSOLIDATION WORK AT COLLE DI TODI
L. 278/78
Lot A - 1° phase, Lot A - 2° phase
Cost of work L. 550'000'000
€. 284.051
Year 1978
Building site Engineer for the Giulio Mambrini Company (COGEMA).
VITERBO ROAD WORKS ON THE ORTE - TARQUINIA MOTORWAY
(VIADUCT)
Cost of work L. 4'500'000'000
€. 2.324.056
Year 1978
Engineer and Projector care of Studio Base
Via Ippolito Nievo, 63 - Rome.
Years
1974/75
Melpi Company General Construction, Via Ludovisi, 43 - Rome.
(Road works).
Year 1973
Ondaclear and Italtecnomontaggi Technical Company
Via Archimede, 112 – Rome (Sports Structure).
Years
1971/73
Ettore Cozzani Company
Road works of Villarosa (Enna).
PALERMO - CATANIA (A.N.A.S.) MOTORWAY, LOT N° 27. CONSTRUCTION
OF FIAMMINGO AND MALOPASSO VIADUCTS.
CONSTRUCTION OF THE FORTOLESE TWO-WAY TRAFFIC TUNNEL OF M
1600 – CONSOLIDATION DURING WORK WITH MIXTURE OF SODIUM
SILICATE ICE, PRESENCE OF GRISOU
Cost of work L. 4'000'000'000
€. 2.065.828
Years
1970/71
Ettore Cozzani Company
Road works of Marina of Carrara.
LIVORNO - SESTRI LEVANTE (S.A.L.T.) MOTORWAY LOT N°1
CONSTRUCTION OF CERRIONE VIADUCT AND LEVEL VIADUCT
With road survey and minor works
Cost of work L. 4'000'000'000
€. 2.065.828
Years
1969/70
Ettore Cozzani Company
Via Bradano, 2C (Rome).
BUILDING SITE FOR HOUSING IN SALARIO ALTO FOR THE CONSTRUCTION
OF 12 APARTMENT BUILDINGS AND 12 VILLAS IN ROME
Cost of work L. 1'500'000'000
€. 774.685
Year 1967
Eng. Belloni Office - Via Novi, 2 (Rome).
Nas1:\20141111 Inglese Curriculum per settori
87
SAFETY COORDINATION IN THE
PROJECTING AND EXECUTION
P H A S E S D.LGS. 528/99 E X D.LGS. 494/96
Years 20122013
Parish of St. Bartolomeo in Solomeo
Piazza Carlo Alberto Dalla Chiesa, 1 Solomeo - Corciano (PERUGIA)
RESTORATION OF THE CHURCH OF ST. BARTOLOMEO IN SOLOMEO
Cost of work: € 383.977,27
Year 2009
Town Council of Perugia
Social, Cultural and Sporting Services Sector
U.O. School buildings
Piazza Morlacchi, 23 - Perugia
P. VAT 00218180545
EXECUTIVE PROJECT, SUPERVISION WORKS AND COORDINATION OF
SECURITY DURING DESIGN AND IMPLEMENTAZIONE OF WORK FOR
ADAPTATION TO SAFETY STANDARDS OF PRIMARY SCHOOLS IN
SANTA LUCIA IN PERUGIA (in team with Nicoletta Omicioli (Architect) and
Stefano Berrettini (Engineer)
Contract specification task: Collection No. 1 of 12.01.2009
Validation of Executive Project of 23/03/2009.
Approved with D.G.C. No. 128. 09/04/2009.
Commencement of works: 09.07.2009
Duration of work: 168 (onehundredandeighty-six) days divided into 82 (eightytwo) for the first phase and 86 days (eighty-six) for the second phase
Minutes suspension of works: 11.09.2009
Minutes resumption of works: 16.06.2010
Certificate completion of works: 06.09.2010
Date advice requested: VV.F. of 03.03.2009
Approval Stamp VV.F. of 02.07.2009
Amount of project work: € 273,252.25
Amount final work: € 289,269.61 of which € 17,161.76 for security costs and
€ 16,326.47 security fees.
Year 2008
City of Perugia
C.so Vannucci, 19 - Perugia
VAT: 00163570542
PRELIMINARY AND EXECUTIVE PROJECT, SUPERVISION WORKS AND
COORDINATION OF SAFETY DURING DESIGN AND IMPLEMENTATION
PHASE FOR THE COMPLETION OF REPAIR, IMPROVEMENT AND
RESTORATION OF THE MONUMENTAL COMPLEX OF “ST FRANCESCO AL
PRATO” IN PERUGIA, DAMAGED DURING THE 1997 EARTHQUAKE
Phase 4 °
Det. Dir U.O. Cultural Heritage Policy No. 9 of 22/04/2008
Approval of the Project with Det. Dir N ° 4158 of 19.05.2009
Commencement of work: 04.05.2009
Expected date of work: 15.09.2010
Amount of works: € 714,000.00
Year 2007
City of Otricoli (TR)
Via Vittorio Emanuele III, 11
PRELIMINARY, FINAL and EXECUTIVE DESIGN, COORDINATION OF
SECURITY DURING THE DESIGN AND IMPLEMENTATION PHASE FOR
THE CONSERVATIVE RESTORATION, RECOVERY AND SECURING OF THE
THEATRE IN THE ARCHAEOLOGICAL SITE CALLED “OCRICULUM”
Nas1: 20141111 Inglese Curriculum per settori
88
Manager Assessment: No. 14 of 23.04.2007.
Works completed on 18.10.2008
Amount of works: € 164,784.00
Years 20062008
Town Council of Todi (PG)
COORDINATION OF SECURITY DURING DESIGN AND
IMPLEMENTATION OF THE ANNUAL PLAN FOR CULTURAL HERITAGE
DAMAGED BY SEISMIC EVENTS - SUPPLEMENTARY MEASURES TO
PLANS AND PROGRAMS ALREADY APPROVED – WORSENING –
INTERVENTION ON CITY WALLS OF TODI
Determination of Head of Heritage - Environment - Cemeteries Management
Service No. 223 OF 24.10.2005 Gen. Regulation 1216
Agreement of 01.03.2006 Racc. No.4866
Approval of the Project. R.u. Det. Exec. 368, 25.01.2006
Start of Work: 16.05.2006
Completion of Work: 26.10.2007
Cost of Work: € 190,139.75
Year 2006
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STRUCTURAL PROJECT AND SAFETY COORDINATION FOR
RESTORATION, CONSERVATION AND CONSOLIDATION WORK ON THE
CITY WALLS OF TODI
2° phase
Cost of work:
€. 178.824,03
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi
Consolidation work of Colle di Todi (D.M. 719/97 and L. 242/97, D.G.R.
2354/2005: (Use of residual funds)
REPAIR AND CONSOLIDATION WORK OF HYDRO-GEOLOGICAL
DETERIORATION ALONG THE SLOPE OF THE LUCREZIE MOAT: VIADUCT
SLOPE AND NIDO DI AQUILA SLOPE
Cost of work: €. 681.058,35
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi
Consolidation work of Colle di Todi (D.M. 719/97 e L. 242/97, D.G.R.
2354/2005: (Use of residual funds)
CONSOLIDATION AND HYDRO-GEOLOGICAL REPAIR WORK ON THE
ROAD OF THE EX ABATTOIR
Cost of work: €. 228.629,54
Year 2006
Town Council of Castiglione del Lago (PG)
Piazza Gramsci, 1
Castiglione del Lago (PG)
EXECUTIVE PROJECT, SUPERVISION WORKS, COORDINATION OF
SAFETY DURING DESIGN AND IMPLEMENTATION PHASE, ACCOUNTING
AND MEASUREMENT FOR THE RECOVERY OF MONUMENTAL COMPLEX
“ROCCA DEL LEONE”: TRIANGULAR MAST
(Resolution . GR 1559/04)
Architectural designers: Massimo Mariani (Engineer and Architect) - Antonio
Corradi (Architect)
Structural engineers: Massimo Mariani (Engineer and Architect) - Paul
ANDERLINI (Engineer)
Nas1:\20141111 Inglese Curriculum per settori
89
Director of Works: Massimo Mariani (Engineer and Architect)
Coordination of Safety: Massimo Mariani (Engineer and Architect)
Letter of Appointment Prot 6266 23.02.2005
Net amount of work € 112,233.47 net of fall auction (equal to 17.75%)
including fees for Security amounting to € 17,254.95
Total works: € 200.000,00
Approval of the First Examination of Variation: City Council Resolution No. 105
of 29.04.2008;
Final SAL, including the fall auction (equal to 17.75%) is equal to €
143,923.49;
Start of work: 19.02.2007
Completion of work: 25.08.2008
Gross Total works: € 200.000,00
Report on final bill and Certificate of full Performance: 30.10.2008
Year 2006
Town Council of Todi (PG)
Piazza of Popolo, 1 Todi (PG)
Consolidation work of Colle di Todi (Ordered by theMayor of Todi, n°39
of 14.03.2006, L. 242/97, D.G.R. 2354/2005 Use of residual funds)
EMERGENCY WORK OF CONSOLIDATION OF THE LANDSLIDE IN THE
PARK OF THE FORTRESS, NEAR THE ENTRANCE TO THE OBERDAN
GARDENS
Cost of work: €. 149.578,14
Year 2005
Town Council of Castiglione del Lago (PG)
Piazza Gramsci, 1 Castiglione of Lago (PG)
COMPLETION OF RECUPERATION OF MONUMENTAL COMPLEX OF LA
ROCCA DEL LEONE: TRIANGULAR DEFENCE TOWER (Of ib. G.R. 1559/04)
Cost of work: €. 200.000,00
Year 2005
Perugia University
Piazza Università, 1 (PG)
RESTRUCTURING OF THE GELSOMINI EX-WORKSHOP BUILDING, TO
CREATE A LIBRARY FOR THE HUMANITIES FACULTY, IN PIAZZA
MORLACCHI - PERUGIA
Cost of work: €. 4.400.000,00
Years 20042009
Town Council of Castiglione del Lago (PG)
Technical Department of Public Works and Heritage
Piazza Gramsci, 1 Castiglione del Lago (PG)
EXECUTIVE PROJECT, SUPERVISION WORKS, COORDINATION OF
SAFETY DURING DESIGN AND IMPLEMENTATION PHASE, ACCOUNTING
AND MEASUREMENT OF RECOVERY OF MONUMENTAL COMPLEX OF
“PALAZZO DELLA CORGNA”, CITY WALLS, COMMUNICATION TRENCH
AND GARDENS – PART OF COMMUNICATION TRENCH
Architectural designers: Massimo Mariani (Engineer and Architect) - Antonio
Corradi (Architect)
Structural engineers: Massimo Mariani (Engineer and Architect) - Paul Anderlini
(Engineer)
Director of Works: Massimo Mariani (Engineer and Architect)
Coordination of Safety: Massimo Mariani (Engineer and Architect)
Appointed with letter prot. 39698 of 16.12.2004
Net amount of work € 402,544.63 of the fall auction (equal to 16.132%)
including charges for Security amounting to € 23,770.09
Total work: € 780,000.00
Start of work: 12.03.07
Completion of work: 12.07.08
Prior Approval of Variant Expertise: Determination No. 816 of 31.12.2007;
Nas1:\20141111 Inglese Curriculum per settori
90
SAL Finals, including the fall auction (equal to 16.132%), amounting to €
432,054.98;
Gross Total of work: € 780,000.00
Final approval of the State of Works and Set Design with the Certificate of
Municipal Council Resolution No. 26 of 17.02.2009
Years 20052007
Town Council of Todi (PG)
Policies Unit for School and Public Housing
EXECUTIVE PROJECT PLANNING AND COORDINATION OF SECURITY
DURING THE DESIGN AND IMPLEMENTAQTION OF EMERGENCY WORK
AND CIVIL PROTECTION - CONSOLIDATION AND REORGANIZATION OF
THE NURSERY SCHOOL OF PIAN DI SAN MARTINO - COMPLETION
2nd phase
Det. Director of the Heritage Service - Environment - Cemeteries Regulation
No. 170 of 31.08.2005 Reg. Gen. 983.
Agreement Coll. No. 4779, 22.12.2005
Det. Director of the Heritage Service - Environment - Cemeteries, 23.11.2005
Reg No. 240 Reg. Gen N ° 1351.
Agreement Coll. No. 4865 of 01.03.2006
Approval of the project with Del. City Council No. 225 of 18.10.2005
Start of work: 23.01.2006
Completion of work of 03.11.2006
Report on final bill and Certificate of full performance of 10.04.2007
Amount of works: € 124,225.21
Year 2005
Ministry of Heritage and Culture Activities
Government Department responsible for the Archaeological Heritage of Umbria
Piazza Partigiani 11, PERUGIA
SAFETY PLAN DURING DESIGN FOR COMPLETION OF THE WORK OF
RECOVERY AND REHABILITATION AND PREPARATION OF THE
ANTIQUARIUM EX COUNTRY HOUSE ST. FULGENTIUS AND THE
CONSTRUCTION OF A WAREHOUSE FOR THE ARCHAEOLOGICAL FINDS
IN THE ARCHAEOLOGICAL AREA OF “OCRICULUM” LOCATED IN
MUNICIPALITY OF OTRICOLI (TERNI)
Government Department Note prot. No 3048 of 29.03.2005.
Cost of Work: € 137,668.71
Year 2004
Town Council of Castiglione del Lago (PG)
Piazza Gramsci, 1 Castiglione of Lago (PG)
RECOVERY OF MONUMENTAL COMPLEX OF PALAZZO DELLA CORGNA,
TOWN WALLS, WALK AND GARDENS
Cost of work: €. 1.100.000,00
Year 2004
Superintendence of Archaeological Heritage
P.zza Partigiani, 11 - PERUGIA
CONSOLIDATION WORK OF THE UPPER CISTERN IN CARSULAE (TR)
USED AS AN ANTIQUARIUM
Year 2003
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
CONSOLIDATION WORK IN THE UPPER CLOISTERS AND
ARCHAEOLOGICAL HALL OF THE NATIONAL ARCHAEOLOGICAL
MUSEUM OF UMBRIA, DAMAGED BY THE EARTHQUAKE.
Year 2003
Superintendence of Archaeological Heritage
Nas1:\20141111 Inglese Curriculum per settori
91
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
SPECIFIC WORK FOR THE CONSERVATION AND IMPROVEMENT OF THE
ARCHAEOLOGICAL HERITAGE OF THE TOWN COUNCIL OF CORCIANO
Years 20022006
Town Council of Castiglione del Lago (PG)
Piazza Gramsci, 1 Castiglione del Lago (PG)
EXECUTIVE PROJECT, SUPERVISION WORKS, COORDINATION OF
SAFETY DURING DESIGN AND DURING IMPLEMENTATION,
ACCOUNTING AND MEASUREMENT DURING CONSOLIDATION WORK
AND RECOVERY OF “ROCCA DEL LEONE”, AND MASTS AND TOWERS
Architectural designers: Massimo Mariani (Engineer and Architect) - Antonio
Corradi (Architect)
Structural Engineer: Massimo Mariani (Engineer and Architect)
Collaboration: Paul ANDERLINI (Engineer)
Supevision works: Massimo Mariani (Engineer and Architect)
Coordination of Safety: Massimo Mariani (Architect)
Executive Project Approval: City Council Resolution No. 171 of 01.07.2002
Amount of work subject to downward auction of € 540,214.42
Total work: € 665,497.53
Approval of Supplementary Examination of Alternative and Varied Distribution
of expenditure: Determination No. 180 of 21.12.2004;
Final SAL, net amount of work € 532,309.90;
Start of work: 30.06.2003
Completion of work: 14.06.2005
Report of Relations between the Region and the City Council: 21.03.2006
Years 20022006
City of Perugia
Cultural and Recreational Services Sector - Policy Unit of Cultural Heritage
C.so Vannucci, 19 - Perugia
VAT: 00163570542
EXECUTIVE PROJECT, SUPERVISION WORKS , COORDINATION OF
SECURITY, AND ACCOUNTING AND MEASUREMENT OF REPAIR,
IMPROVEMENT AND RESTORATION OF THE COMPLEX OF “ST
FRANCESCO AL PRATO” IN PERUGIA DAMAGED BY SEISMIC EVENTS
OF 1997
1° and 3° Phase
Regulations 2002.
Det. Dir of Cultural Policies Unit No. 64 of 23/04/03
Amount of works: € 1,697,901.85
Total work: € 2,220,764.42
Start of work 30.04.03
Completion of work : 06.03.06
Final amount of work: € 1,846,388.31
Gross Total of work: € 2,220,764.42
Report on the final bill: 20.07.06
Technical-administrative certificate of acceptance of work: 04.12.06
Years 20022006
City of Perugia
Cultural and Recreational Services Sector
Unit of Cultural Policies
EXECUTIVE PROJECT, SUPERVISION WORKS , COORDINATION OF
SECURITY, AND ACCOUNTING AND MEASUREMENT OF RESTORATION
OF THE HYDROGEOLOGICAL DAMAGE OF THE MONUMENTAL COMPLEX
OF “ST. FRANCESCO AL PRATO” IN PERUGIA
2° Phase
Regulations on 02.03.02
Amount of work: L. 1,930,726,800
Nas1:\20141111 Inglese Curriculum per settori
92
Total work: L. 2,500,000,000
Start of work: 27.06.02
Completion of work: 16.06.03
Final amount of work: € 1,060,324.03
Gross Total of work : € 1,291,142.25
Report on the bill: 22.10.03
Technical-administrative certificate of acceptance of work: 13.12.03
Year 2002
San Martino Association
Via G.B. Pontani, 15 - PERUGIA
VAT number: 00162940548
EXECUTIVE PROJECT, SUPERVISION OF WORKS, ACCOUNTING AND
SECURITY COORDINATION IN DESIGN PHASE OF REPAIR,
IMPROVEMENT AND RECONSTRUCTION OF THE TEMPLE OF
“SANT’ERCOLANO” IN PERUGIA DAMAGED DURING EARTHQUAKE OF
26.09.1997
Agreement of 19.07.2000 REP. 50
Approval of executive project with Resolution Board of Directors of the San
Martino Association n. 87 dated 16/04/2003
Authorization according to article 151 of the D.LGS 29/10/1999 Building
Licence from the Town Council of Perugia dated 26/08/2002 Prot. 1586
Authorization Government authority dated 22/08/2002
Costruction permit dated 7/09/2005 Prot. 1701
Certificato di collaudo dated 20/04/2006
Cost of work: €. 1.049,257.59
Year 2002
Town Council Giano dell’ Umbria (PG)
Giano dell’Umbria (PG)
VAT number: 00470070541
EXECUTIVE PROJECT FOR INTERVENTION TO HYDRO-GEOLOGICAL
DETERIORATION NEAR BASTARDO
2° phase
Nas1:\20141111 Inglese Curriculum per settori
93
Contract with council act n° 120 of 27.07.2000.
Year 2002
Town Council of Gualdo Cattaneo
Gualdo Cattaneo (PG)
VAT number: 82001410545
EXECUTIVE CONSOLIDATION OF LANDSLIDE NEAR LE CORONE
2° phase
D.G.R. 1686 19.12.2001.
Cost of work: €. 1.138.000,00
Year 2001
Superintendence of Archaeological Heritage
P.zza Giordano Bruno, 11 - PERUGIA
VAT number: 94031590543
EXECUTIVE PROJECT FOR STRUCTURAL RESTORATION WORK AND
IMPROVEMENT OF THE ARCHAEOLOGICAL AREA OF THE ROMAN TOWN
OF OCRICULUM (TR)
Off.lett.prot. n° 16112 of 30.12.2000
Year 2001
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL WORK ON THE CHURCH OF
SANTA MARIA DELLA CONSOLAZIONE IN TODI (PG)
Contract n° 2579 of 09.11.1999
Year 2001
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
VILLA DEL COLLE DEL CARDINALE IN COLLE UMBERTO - PERUGIA
Contract n° 2199 di Racc. of 03.12.1998
Year 2000
Perugia State Archives
PERUGIA
VAT number: 80002230540
EXECUTIVE CONSOLIDATION PROJECT FOR PART OF THE STUDY HALL
BUILDING
Prot. n° 6512/III.1 of 22.10.1999
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
CHURCH OF SANTA MARIA MAGGIORE IN ASSISI – SAFETY PLAN AND
COORDINATION DURING WORK FOLLOWING THE EARTHQUAKE OF
26.09.1997
Contract n° 22T/97bis – Contract let n° 6525 of 09.06.1999
Year 2000
Superintendence for i BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
PROJECT COORDINATION AND EXECUTION OF MODIFICATIONS TO
SCREENING WALL OF ETRUSCAN ARCH AND PART OF THE
SURROUNDING TOWN WALLS OF PERUGIA
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
Nas1:\20141111 Inglese Curriculum per settori
94
CHURCH OF SAN DOMENICO
Contract n° Reg. 2197 of 02.12.1998
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR CONSOLIDATION AND RESTORATION OF THE
CHURCH OF SANTA MARIA ASSUNTA IN SELLANO (PG)
Inc. n° 2490 reg, mail of 02.09.1999
Cost of work: €. 624.912,84
Year 2000
Region of Umbria - Operational area for organization of the Territory
P.zza Partigiani, 1 - PERUGIA
VAT number: 01212820540
EXECUTIVE PROJECT FOR INTERVENTION TO EMERGENCY
INFRASTRUCTURE AND HYDRO-GEOLOGICAL EMERGENCY REPAIR REPAIR OF SHEET LANDSLIDE MOVEMENT IN NEGRONE IN THE
MONTONE MUNICIPALITY
Order G.R. n° 279 of 22.121998
Cost of work: L. 1'300'000'000
€. 671.394
Year 2000
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR PROVISIONAL WORK ON ROMAN BRIDGE AT
VILLA SCIRCA - SIGILLO (PG)
Year 2000
Town Council of Scilla - Reggio Calabria
EXECUTIVE PROJECT FOR INTERVENTION ON RESIDENTIAL CENTRE
Professional Contract D.G.M. n° 107 of 03.09.1999 Conv. Of 13.12.1999
Cost of work: L. 580'000'000
€. 299.545
Year 2000
Gerolamo Gaslini Foundation
C.so Italia, 26 - GENOVA
VAT number: 00269520102
Regione of Umbria Contract
EXECUTIVE PROJECT FOR STATIC RECOVERY AND SITE MANAGEMENT
TO BE CARRIED OUT IN THE EAST WING OF THE BUILDING COMPLEX
Nas1:\20141111 Inglese Curriculum per settori
95
OF THE ABBEY OF SANTA MARIA DI VALDIPONTE IN PERUGIA TOWN
COUNCIL
Inc. Prof. Of 30.03.2000 lett. Prot. n° 198/200 LL/am
Cost of work: €. 645.571,12
Year 2000
C.U.S. Umbria Health Consortium
Via Pievaiola, 21 - PERUGIA
VAT number: 01892240548
Contract: Region of Umbria
EXECUTIVE PROJECT FOR COMPLETION AND REPAIR TO RESIDENTIAL
CENTRE OF TREVI (PERUGIA).
Off.lett from C.U.S. Prot. 781/99 MM/rfbis of 16.09.1999
Cost of work: €. 2.032.512
Year 2000
Town Council Gualdo Cattaneo
Gualdo Cattaneo (PG)
VAT number: 82001410545
EXECUTIVE PROJECT FOR INTERVENTION OF LANDSLIDE NEAR BIVIO
SARAGANO ROAD NUMBER 423 N° 26, IN THE MUNICIPALITY OF
GUALDO CATTANEO
Ord. Comm. n° 18 of 07.08.1997
Year 2000
Town Council of Monte Castello di Vibio (PG)
Monte Castello di Vibio
VAT number: 00470100546
CONSOLIDATION WORK AND IMPROVEMENT TO TOWN FOOTBALL
PITCH
Year 2000
Town Council of Assisi
VAT number: 00313820540
EXECUTIVE PROJECT FOR THE FUNCTIONAL RECOVERY OF THE
INFRASTRUCTURE OF THE CENTRE OF ASSISI 1
Convention n° 1433 of 13.07.1999
Year 2000
Town Council of Gualdo Cattaneo
Nas1:\20141111 Inglese Curriculum per settori
96
Gualdo Cattaneo (PG)
VAT number: 82001410545
EXECUTIVE PROJECT FOR CONSOLIDATION OF LANDSLIDE NEAR "LE
CORONE" – URGENT INTERVENTION PLAN
Conv. of 23.03.2000 Rep. N° 867
Year 2000
Via Serraloggia Apartment block
Via Serraloggia, 128 - FABRIANO
VAT number: 90010230424
Earthquake Contract UMBRIA/MARCHE
DEMOLITION OF BUILDING IN FABRIANO, VIA SERRALOGGIA 128
Cost of work: € 2.919.689
Year 1999
Superintendence for BB.AA.AA.AA.SS. of Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
EXECUTIVE PROJECT FOR STRUCTURAL CONSOLIDATION WORK ON
SAN DOMENICO BUILDING COMPLEX IN PERUGIA
Inc. n° Reg. 2577 of 09.11.1999
Year 1999
Town Council of Castiglione of Lago (PG)
Castiglione del Lago (PG)
VAT number: 00366960540
EXECUTIVE PROJECT FOR ARCHITECTURAL RECUPERATION,
RESTORATION OF THE FACADE, INSTALLATION OF SYSTEMS AND
SAFETY PLANNING IN PALAZZO DELLA CORGNA, WITH COORDINATION
DURING PROJECTING
Agreement of 30.06.1998
Cost of work: €. 671.000,00
Year 1999
Town Council of Castiglione of Lago (PG)
Castiglione of Lago (PG)
VAT number: 00366960540
EXECUTIVE PROJECT FOR ARCHITECTURAL RECUPERATION AND
REPAIR OF THE SEMI-UNDERGROUND FLOOR OF PALAZZO DELLA
CORGNA FOR OFFICE USE AND SAFETY PLANNING
Agreement of 16.06.1998 - REP. AP521
Cost of work: €. 300.000,00
Year 1998
Town Council of Perugia
PALAZZO DEI PRIORI
Seismic improvements and repair to damage caused by earthquakes of
26.09.1997 and later.
Cost of work L. 5'000'000'000
€. 2.582.284
Year 1998
Town Council of Castiglione del Lago (PG)
ARCHITECTURAL RECOVERY, REPAIR TO THE BASEMENT OF PALAZZO
OF “LA CORGNA” PALACE
Cost of work L. 500’000'000 €. 258.228
Year 1998
Town Council of Castiglione of Lago (PG)
ARCHITECTURAL RECOVERY, RESTORATION, MONITORING OF THE
NORTH-EASTERN WALL OF THE FORTRESS
and projecting of parapet surrounding the communication trench at the summit
Cost of work L. 150’000'000 €. 77.469
Nas1:\20141111 Inglese Curriculum per settori
97
Year 1998
Perugia State Archives
Projecting of NEW DISPLAY STRUCTURE to be built at the Perugia State
Archives
Cost of work L. 2’700’000'000
€. 1.394.434
Year 1998
Superintendence for BB.AA.AA.AA.SS. of Umbria
CONSOLIDATION AND RESTORATION OF THE SAN DOMENICO
COMPLEX
IN
PERUGIA,
SEAT
OF
THE
ARCHAEOLOGICAL
SUPERINTENDENCE AND OF THE STATE ARCHIVES
Cost of work L. 1'800'000'000
€. 929.622
Year 1997
Superintendence of Archaeological Heritage
EMERGENCY INTERVENTION AND CONSOLIDATION OF THE ETRUSCAN
CISTERN IN VIA C. CAPORALI IN PERUGIA DAMAGED BY THE
EARTHQUAKE OF 26.09.1997
Cost of work L. 50'000'000
€. 25.823
Year 1997
Superintendence of Archaeological Heritage
Emergency intervention and SUPPORTS IN SOME
SECTIONS OF THE NATIONAL ARCHAEOLOGICAL MUSEUM OF UMBRIA
in Perugia damaged by the earthquake of 26.09.1997 and those following.
Cost of work L. 78'000'000
€. 42.284
Year 1997
Superintendence for BB.AA.AA.AA.SS. of Umbria
Work to ADAPT 11 MILITARY WAREHOUSES IN SCANZANO – FOLIGNO
TO BE DESTINED FOR HOUSING WORKS OF ART
Cost of work L. 55'941'776
€. 28.892
Year 1997
Regione of Umbria
CONSOLIDATION OF LANDSLIDE MOVEMENT IN MONTE LADRONE IN
THE MUNICIPALITY OF TODI
Cost of work L. 561'000'000
€. 289.732
Year 1997
Regione of Umbria
CONSOLIDATION OF LANDSLIDE MOVEMENT NEAR THE SARAGANO
JUNCTION
S.P. n° 423 al n° civ. 26.
Cost of work L. 347'000'000
€. 179.210
Year 1997
Town Council of Castiglione of Lago (PG)
CONSOLIDATION AND RESTORATION OF TOWN WALLS
HISTORICAL TOWN CENTRE OF CASTIGLIONE DEL LAGO
Cost of work L. 229'000'000
€. 118.269
Year 1996
OF
THE
Superintendence for BB.AA.AA.AA.SS. of Umbria
CONSOLIDATION OF COVER OF THE CHURCH OF SAN DOMENICO PERUGIA
Cost of work: L. 300'000'000
€. 154.937
Nas1:\20141111 Inglese Curriculum per settori
98
ACCEPTANCE
OF
WORKS
Anno 2011
- 2013
Town Council of Perugia
P.zza Morlacchi, 23 - PERUGIA
VAT number: 00218180545
ACCEPTANCE OF WORKS OF INDUSTRIAL COMPLEX AND CONNECTION TO
PUBLIC SERVICES PROVIDED FOR THE IMPLEMENTATION PLAN APPROVED
BY RESOLUTION OF THE CITY COUNCIL N. 28/08.02.2010
Professional contract n. 52/2011 of 04.05.2011
Anno 2007
-2014
Town Council of Foligno (PG)
TECHNICAL ADMINISTRATIVE AND STATIC ACCEPTANCE OF WORKS OF
THE RENOVATION AND SEISMIC IMPROVEMENT OF THE EX
ANNUNCIATION CHURCH, FOLIGNO
Professional contract n. 1221 of 30.08.2007
Cost of work: € 2.597.190,07
Anno 2007
Town Council of Todi (PG)
TECHNICAL ADMINISTRATIVE AND STATIC ACCEPTANCE OF WORKS OF
THE NEW CEMETERY EXPANSION IN TODI
Professional contract: September 2007
Anni 2006
- 2014
Town Council of Gubbio (PG)
Via XX Settembre – Gubbio (PG)
TECHNICAL ADMINISTRATIVE AND STATIC ACCEPTANCE OF WORKS OF
THE CONSTRUCTION AND MANAGEMENT OF SAINT PETER PARKING IN
GUBBIO.
Professional contract: 05.05.2008.
Cost of work: € 11.857.557,48
Year 2007
Perugia University
P.zza Università,1 – PERUGIA
VAT number: 00448820548
TECHNICAL ADMINISTRATIVE AND STATIC ACCEPTANCE OF WORKS ON
THE SITE OF THE NEW MEDICINE FACULTY NEAR SANT’ANDREA DELLE
FRATTE IN PERUGIA
Professional contract of 27.06.2007
Cost of work: € 41.444.913,92
Year 2007
Convent of Santa Rita of the Augustinians in Cascia (PG)
Standing Abbess S.M. Natalina Rosa Todeschini
ACCEPTANCE OF WORKS OF REPAIR WORKS AND SEISMIC
IMPROVEMENTS TO THE “HOTEL DELLE ROSE” BUILDING IN CASCIA
Professional contract of 26.03.2007
Year 2005
H.C. Litorale S.p.a.
Via Aurelia 2849/G
Torrimpietra
00050 ROME
TECHNICAL AND STATIC ACCEPTANCE OF WORKS OF A SEMI-RESIDENTIAL
DAY CENTRE NEAR PALIDORO – VIA AURELIA – FIUMICINO (ROME)
Year 2004
Region of Umbria - Terni Town Council
TECHNICAL ADMINISTRATIVE AND STATIC ACCEPTANCE OF WORKS –
DURING WORK TO REPAIR LANDSLIDE MOVEMENT IN THE AREA OF THE
Nas1:\20141111 Inglese Curriculum per settori
99
MARMORE WATERFALLS, COMPLETION OF HIGH PANORAMA AND
CREATION OF NINTH WELL
Professional contract of 01.12.2004
Year 2004
Town Council Todi (PG)
TECHNICAL ADMINISTRATIVE AND STATIC ACCEPTANCE OF WORKS OF
THE SEAT OF THE “JACOPONE DA TODI” GRAMMAR SCHOOL – EX CONVENT
OF SAN FORTUNATO
Professional contract n° 283 del 10.12.2008
Cost of work: € 457.928,48
Year 2004
Town Council of Monte Castello di Vibio (PG)
STATIC ACCEPTANCE OF WORKS -ACCORDING TO ART. 7 OF LAW N. 1086 TO CONSTRUCT A SEWAGE COLLECTOR IN MADONNA DEL PIANO, Via
Tevere
Professional contract of 05.04.2004
Year 2003
Soc. Edinova S.r.l.
Via of Rame, 26 - PERUGIA
STATIC ACCEPTANCE OF WORKS - ACCORDING TO ART. 7 OF LAW N. 1086
- OF A RESIDENTIAL BUILDING NEAR COLLESTRADA – PERUGIA
Year 2002
Superintendence for Architecture, the Countryside, Art, History and
demographic, ethnic and anthropological heritage in Umbria
Via Ulisse Rocchi - PERUGIA
VAT number: 80003970540
STATIC ACCEPTANCE OF WORKS - ACCORDING TO ART. 7 OF LAW N. 1086
- OF EMERGENCY STAIRS AND ENTRANCE TO THE NATIONAL GALLERY OF
UMBRIA – PALAZZO DEI PRIORI IN PERUGIA
Year 2000
Lunghi S.r.l. construction Company
Zona ind.le Santa Maria degli Angeli (PG)
I.E.R.P. (Perugia)
STATIC ACCEPTANCE OF WORKS ACCORDING TO ART. 7 OF LAW N.
1086/71 OF A SEISMICALLY ISOLATED BUILDING IN CITTÀ DI CASTELLO
LOC. RIOSECCO
Special public building plan L. 61/98 Art. 7
New building intervention
II phase
Professional contract of 05.07.2000
Year 1999
University of Perugia
P.zza Università, 1 - PERUGIA
VAT number: 00448820548
STATIC LOT ACCEPTANCE OF WORKS OF THE EXTERNAL AREAS RELATING
TO THE ENGINEERING FACULTY IN PERUGIA: CONSTRUCTION OF STAIRS
AND SUPPORTING WALL IN REINFORCED CONCRETE AT THE
ENGINEERING FACULTY
Professional contract of 17.12.1999
Year 1993
Administrative government of the Province of Perugia
STATIC ACCEPTANCE OF WORKS OF THE BUILDING STRUCTURE IN
REINFORCED CONCRETE DESTINED AS NEW OFFICES FOR THE MOBILE
ROAD WORKS AND REPAIR CENTRE IN PONTE SAN GIOVANNI - PERUGIA
Professional contract of 26.02.1993
Nas1:\20141111 Inglese Curriculum per settori
100
Year 1993
Administrative government of the Province of Perugia
STATIC ACCEPTANCE OF WORKS DURING BUILDING CONSTRUCTION OF
THE BRIDGE OVER THE RIVER OSE – TOWN COUNCIL OF BETTONA AND
ASSISI – S.P. N°403 OF TOR D’ANDREA
Professional contract of 10.03.1993
Dr. Arch. Eng. Massimo Mariani
Nas1:\20141111 Inglese Curriculum per settori
101