Co., Ltd. Shanghai Jiangnan Changxing Shipbuilding Co.,Ltd

Transcription

Co., Ltd. Shanghai Jiangnan Changxing Shipbuilding Co.,Ltd
Development and Prospective
of Big LNG Transportation
Equipments in China
Sept. 2012
1
Contents
1.
Overview of China State Shipbuilding Corporation
(CSSC)
2.
LNG Carriers building in China
3.
New LNG productions development
2
1.
Overview of China State Shipbuilding Corporation
11 shipyards in two area.
Jiangnan Shipyard (Group) Co.,
Ltd.
Headquarter
Beijing
Shanghai
Guangzhou
Shanghai Jiangnan Changxing
Shipbuilding Co.,Ltd
Shanghai Jiangnan Changxing
Heavy Industry Co.,Ltd.
Hudong-Zhonghua Shipbuilding
(Group) Co., Ltd.
Shanghai Waigaoqiao Shipbuilding
Co., Ltd.
Shanghai Shipyard Co. Ltd.
Chengxi Shipyard Co. Ltd.
CSSC Guangzhou Longxue Shipbuilding
Co.,Ltd
Guangzhou Shipyard International Co. Ltd.
Guangzhou Wenchong Shipyard Co., Ltd.
Guangzhou Huangpu Shipyard Co.,Ltd.
3
1.
Overview of China State Shipbuilding Corporation

The 100% state-owned company;
The largest shipbuilding group in China and the second
one in the world by an annual production capacity up to
today at about 20 million tons;
Consisted by 60 sole enterprises/companies and
shareholding institutions including:
a. shipyards
b. ship repairing yards
c. marine design institutes
d. engine makers (MAN B&W and WARTSILA under licence)
e. 3 public-listed companies
f. other marine equipment manufacturers


4
1.
Overview of China State Shipbuilding Corporation
Shipbuilding Achievements in past 9 years
2003
2004
2005
2006
2007
2008
2009
2010
2011
Amount of new
orders
(million tons)
8.65
4.98
8.23
22.38
23.53
10.78
3.15
15.63
6.16
Value of new
orders
(billion USD)
3.32
3.27
4.86
12.1
14.83
10.23
4.56
7.6
6.7
Number of new
orders
117
85
99
219
265
183
59
166
133
Delivery volume
(million tons)
1.86
3.24
4.50
5.30
6.08
8.53
10.77
16.13
18.64
Delivery output
(billion USD)
0.91
1.24
1.77
2.35
3.1
7.21
7.49
9.068
13.3
Delivery number
32
43
63
74
84
150
170
167
219
2012-10-3
5
2.
LNG Carriers building in China
- World LNGC fleet :
371 Ships in use up to July,1, 2012,~56M cbm
Five ships have been built in China
World LNG carrier Fleet
Figure from Shipbuilding Economy Research Center of China
6
2.
LNG Carriers building in China
China State Shipbuilding Co.(CSSC) is only one has built
LNG carriers in China.
- Six ships have been delivered
- Four ships ordered
- Six ships have been declared win the tender
7
2.
LNG Carriers building in China
2001
1999
2003
1997 CSSC began R&D of LNG Carrier
1997
2005
2007
2009
2011
Sept. 29th, 2000 agreement with GTT on tech-support and license
April 2001 constructed LNG Mock-up model
May 10th,2001 signed Co-operation agreement with CDA France
Milestone of the first
LNGC “Dapeng Sun” built
in China
Feb, 2002 Won tender of Guangdong LNG project
Aug. 11, 2004 LNG1# Singing Contract (GD project)
Nov. 15, 2004 LNG1# Steel Cutting
Nov. 18, 2005 Signing Contract of Fujian Project
April 3, 2008 LNG1# Delivery
Jan. 28, 2010 Signed Contract (SH project)
Nov. 30, 2010 win the tender of EM/MOL Shipbuilding Contract
8
2.
LNG Carriers building in China
147,210 m3 LNG Carrier
Length Overall
abt. 290.00 m
Length between perpendiculars
274.10 m
Breadth (Moulded)
43.35 m
Depth (Moulded)
26.25 m
Designed Draught (Moulded)
11.43 m
Deadweight (at design draught)
Abt. 73,100 t
Cargo Capacity (100% filling)
abt.147,210 m3
Cargo Containment System
GTT No.96, 4 cargoes
Boil off Rate
<0.15%
Maximum propulsion shaft power
27,300 kW
Propulsion System
Steam turbine
Service Speed
19.5 knots
9
2.
LNG Carriers building in China
Cargo Containment System for Cargo Tank
10
2.
LNG Carriers building in China
147,210 m3 LNG Carrier
Dapeng Sun
(Delivered in Apr. 2008)
Min Rong
(Delivered in Feb. 2009)
Dapeng Moon
(Delivered in July 2008)
Min Lu
(Delivered in Aug. 2009)
Dapeng Star
(Delivered in Dec. 2009)
Shen Hai
(Delivered in Sept. 2012)
11
2.
LNG Carriers building in China
3 Shipyards are licensed by GTT in CSSC
-Hudong-Zhonghua Shipbuilding(HZ)
Only shipyard has six ships record
-Jiangnan Shipyard
-Shanghai Waigaoqiao Shipbuilding(SWS)
12
2.
LNG Carriers building in China
Insulation Box Line
First boxes line put into
construction on sep. of 2005.
Characteristic: We build
the boxes, invar tubes and
pump tower by ourselves.
13
2.
LNG Carriers building in China
INVAR prefabrication workshop
Including INVAR tube and INVAR trihedron and INVAR components.
Put into production on Nov. 23th of 2005.
14
2.
LNG Carriers building in China
The pump tower were
manufactured by ourselves.
15
2.
LNG Carriers building in China
Scaffolding in cargo hold
16
3. New LNG productions development
Different concept of LNGC be developed in CSSC
- Traditional steam turbine propulsion LNGC
17
3. New LNG productions development
- Slow speed engine + Reliquefaction plant, 172,000 m3
LNG Carrier order four by MOL
18
3. New LNG productions development
Reliquefaction Plant of 172,000 m3 LNG Carrier
19
3. New LNG productions development
- 174,000 m3 LNG Carrier with DFDE propulsion system
Length Overall
Length between perpendiculars
abt. 290.00 m
278.00 m
Breadth (Moulded)
45.60 m
Depth (Moulded)
26.50 m
Designed Draught (Moulded)
11.70 m
Deadweight (at design draught)
Cargo Capacity (100% filling)
Cargo Containment System
Number of cargo tanks
Boil off Rate
Propulsion System
Service Speed
abt. 84,000 t
abt.174,000m3
GTT No.96
4
<0.15%
Dual Fuel Diesel Engines
19.5 knots
20
3. New LNG productions development
- 174,000 m3 LNG Carrier with DFDE propulsion system
21
3. New LNG productions development
- DFDE, 220,000 m3 LNG Carrier
22
3. New LNG productions development
Since 2007 CSSC cooperated with ABS, LR, DNV,CCS etc. major
classification societies and MS, KONGSBERG, MAN, WARTSILA,
KHI companies developed different type of LNGCs.
23
3. New LNG productions development
Other LNG products developing by CSSC/HZ:
Feeder LNG carrier(10K-30KCBM, 30K-80K CBM)
LNG FSRU
LNG Storage Tanker
LNG Shuttle Tanker
LNG-FPSO
LNG Storage Tanker
30,k CBM LNG Carrier (Membrane type)
24
Many Thanks!
25