We are a Canadian company with regional
offices in Canada, Venezuela and Panama.
We work under the concept of turn-key
projects, thus we establish operations in
every country where activities are started.
So far we have carried out projects in over
eight countries, in Latin America and Canada.
Instaelectri specializes in the construction
and infrastructure of next-generation data
centers, with optimal designs and highest
quality standards.
Canada: 1445 Lambert Closse, 2nd Floor.
Montreal, Quebec, Canada H3H1Z5 / Ph.
+1 450 327 6110 / [email protected]
Panama: Av. Centenario, PH Aseguradora
Ancón, Piso 19, Ofic.19T, Costa del Este,
Ciudad de Panama - Panama. / Tlf. +507
380 3311/ [email protected]
Venezuela: Zona Industrial La Trinidad,
Calle Luis de Camoens, Edif. Villanova,
P4, Caracas / Tlf. +58 212 941 3311
[email protected]
www.instaelectric.com
WUE
CONTENTS
About Us ................................................. 1 - 4
Nicaragua .............................................. 5 - 6
Puerto Rico .................................................. 8
Panama ................................................ 9 - 10
Costa Rica ................................................. 14
Mexico ........................................................ 15
Peru ............................................................. 15
Venezuela ........................................... 17 - 33
3
WUE
Brazil ..................................................... 11 - 12
Specialized technical assistance in
mission-critical
environment
We implement the integration of every technical discipline associated to a data
center, through the design and development of all systems under functional
processes, which distinguish us as suppliers of integrated projects.
These projects are directed from a PMO (Project Management Offiffice).
WUE
4
NICARAGUA
Data center construction I
BELLSOUTH, 1994-1995, NICARAGUA
Data centers design and construction, in turnkey regime.
It includes engineering, civil facilities, electrical systems, refrigeration systems,
A/A supply and installation, UPS, power plant, structured wiring and access
control.
• Continuous operation of the center
• Cutting-edge architecture after evaluation of scenarios for
equipment location
• Fast track
BellSouth Corporation is a telecommunications American company; the main
office is located in Atlanta (Georgia).
In 2004, BellSouth Nicaragua was acquired by Telefónica of Spain.
5
WUE
NICARAGUA
Construction of ten (10)
sites of 40 m and 60 m towers for
cellular phone network
TELEFONÍA CELULAR DE NICARAGUA S.A.
(MOVISTAR), 2005, NICARAGUA
Data center construction II
TELEFÓNICA, 2010, NICARAGUA
The construction of data center II was finalized, ensuring its continuity with
defined criteria for a TIER II topology, according to the Uptime Institute.
• Continuous operation of the center
• Cutting-edge architecture after evaluation of scenarios for
equipment location
By 2010, Telefónica was the fifth telecommunications company in the world,
regarding size and relevance.
6
PUERTO RICO
Construction of NOC for data center
CENTENNIAL, 2006, PUERTO RICO
Adaptation of the network data center for the improvement of the telecommunications
system, thus ensuring the continuous operation of the control center.
Assessment of electrical systems in
telecommunications stations
CENTENNIAL, 2006, PUERTO RICO
Inspection, diagnosis and evaluation of power generation, transformation and
distribution systems in telecommunications stations, to ensure the continuous
operation of the telecommunications system.
8
PANAMA
Basic and detailed engineering of
mission-critical systems in 35 cell
sites of the cellular system
HUAWEI PANAMÁ, 2008, PANAMA
Engineering designed for Claro Panama, company owned by América Móvil, a
business group recognized worldwide, with representatives in 19 countries and
over 267 million customers. In Panama, Claro has the country’s biggest 3.5G
network, and offers optimum quality voice and data transmission as well as
world-level cutting-edge products.
TIER III data center design
EVB DATA, 2013, PANAMA
Detailed engineering for the construction of a data center with TIER III reliability
level and cutting-edge architecture assess
• 8 data rooms with modular expansion
• 432 server racks with 12 kW/rack capacity
• Redundant capacity and concurrent maintenance components.
Engineering certified by the Uptime Institute as ¨Tier Certification of Design
Documents¨ for a TIER III topology
Infrastructure and Technological Services company, created to cover the need
for storage and processing of operational and strategic information, in companies
including mission-critical processes.
9
PANAMA
Assessment for energy
efficiency optimization
in Cable Onda’s data center
CABLE ONDA, 2014, PANAMA
Inspection, study and diagnosis of the current situation in the Telecarrier data
center, owned by Cable Onda, which has a white space of approximately 1400
m2 distributed in 3 rooms, from which mission-critical services are provided for
government, banking and commercial customers.
The premise of our recommendations was the continuous operation of the data
center and risks mitigation.
The recommendations issued by Instaelectric included a considerable improvement
in energy efficiency, with a quick return on investment.
10
BRAZIL
Main and back-up data center construction
NEXTEL, 1997-1998, BRAZIL
• Turn-key regime
• Continuous operation of the center
• Cutting-edge architecture
• Cooling systems
• Energy systems
• Reliable communications
• Safety control systems for the center
Subsidiary of the telecommunications company NII Holdings, Inc. specialized in
direct communication mobile services.
11
BRAZIL
Teleport Installation
IMPSAT, 1998, BRAZIL
Design and construction of ground communications for the retransmission of
different voice and data services. It included structured wiring and specialized
areas.
•
•
•
•
•
Turn-key regime
Cooling systems
Energy systems
Reliable communications
Safety control systems for the center
Impsat is specialized in the design of corporate networks and communications
systems through an exclusive network, able to transmit high-quality data, voice
or images. By 1998, Impsat Corp was billing 160 million dollars a year, and was
present in 17 countries. Currently, it is a part of Level 3.
12
COSTA RICA
Consulting service for the design
of back-up CORPOELEC data
center
INGENIUM, 2013, COSTA RICA
Revision of drawings in stages of schematic and construction design for every
area or discipline (Telecommunications, Automation, Safety, Electricity, Fire
system, Mechanics, Plumbing) involved in the data center, developed by
INGENIUM, in order to adjust the design parameters according to the regulations
and standards established in Venezuela.
Additionally, the design engineering for the civil structure of the building was
developed along with the architectural design, during the schematic and
construction stages.
14
MEXICO
Construction of main data
center
NEXTEL, 1999, MEXICO
•
•
•
•
•
•
•
Turn-key regime
Continuous operation of the center
Cutting-edge architecture
Cooling systems
Energy systems
Reliable communications
Safety control systems for the center
Subsidiary of the telecommunications company NII Holdings, Inc. specialized in
direct communication mobile services.
PERU
Transmantaro
HYDROQUEBEC, 2000, PERU
Fiber optic broadband communication project OPWG, from Lima to Arequipa.
700 km OPGW
• Conceptual engineering
• Schematic engineering|
15
VENEZUELA
Data center construction
CADAFE, 1991, VENEZUELA
Engineering, procurement and construction of four (4) data centers for the
executive vice-presidency of IT, interconnected through the public network and
located in the following cities:
•
•
•
•
Caracas 520 m2
Maracay 200 m2
Valera 300 m2
Cumaná 150 m2
CADAFE is a state-owned Venezuelan energy company in charge of the
generation, production and distribution of electricity, which by 2005 had over 2.5
million customers, becoming the electrical company with the highest number of
users in Venezuela.
Construction of EDS-operated
data center
GENERAL MOTORS VENEZUELA, 1994, VENEZUELA
Turn key project for the main data center of Venezuela’s pioneer assembly
company, located in Valencia, which by 1994 was importing to the Andean Trade
Pact member countries.
17
VENEZUELA
Data center construction and
wire rooms adaptation
INTESA, VENEZUELA
Turn key project for the construction of the main data center and 22 wire
rooms for Petróleos de Venezuela (PDVSA) La Salina and Bajo Grande
through INTESA, an information technology company in partnership with PDVSA
since 1996.
Preventive and corrective
maintenance management
of voice and data networks
CONSEJO DE LA JUDICATURA, 2000, VENEZUELA
Contract to ensure the sustainable operation of voice and data networks through
the proper management and planning of corrective and preventive maintenance
at a national level and in the main office, with a deferred maintenance objective
of 0%.
18
VENEZUELA
Data centers construction
ADRIÁTICA DE SEGUROS, 2001, VENEZUELA
Design, procurement, construction and commissioning of the data center in the
main office of the insurance company in Caracas, ensuring its continuity and safety
through the following aspects:
•
•
•
•
•
Cooling systems
Back-up energy systems
CCTV and access control system
Structured wiring
Grounding system
Project for the supply and
installation of equipment for
DIGITEL’s NOC
HEWLLETT-PACKARD DE VENEZUELA, 2001, VENEZUELA
Adaptation of the network operations center, designed to operate continuously
during 24 hours, 365 days a year. This room is essential since it supports
fundamental areas of the customers’ operations.
The NOC was built in Caracas, in the BANAVEN center and it included
telecommunications infrastructure solutions, specialized energy and cooling
systems, which respected the highest levels of quality required in order to
guarantee the continuous operation of Venezuela’s third telecommunications
company.
19
VENEZUELA
Remodeling and adaptation of
telecommunications room
SIDERÚRGICA DEL ORINOCO, 2004, VENEZUELA
This room consolidates SIDOR’s network connectivity, the building’s control
systems, and distributes them to predetermined areas of the company as a
convergence point.
SIDOR, a company for the production of steel with direct reduction technologies
and electric arc furnaces, is a part of the Corporación Venezolana de Guayana
(CVG), a technological partner of Instaelectric since 1989.
Adaptation of main office data
center for P&G Venezuela
PROCTER & GAMBLE, VENEZUELA
It includes structured wiring for the phone and computer network in the new
Sorokaima office.
P&G is a multinational company, manufacturer of personal care, cleaning,
detergent and medical products, among others.
20
VENEZUELA
Main office data center
construction
BANCO MERCANTIL, VENEZUELA
Project created for the design of the bank’s main office data center and the
supply and installation of the structured wiring network with fiber optic.
Venezuela’'s second most important bank.
By the end of 2007, it had 321 agencies, 313 of which were located in Venezuela.
Main office and data center
power plant installation
TOVENCA TOPFLIGHT DE VENEZUELA, 2010, VENEZUELA
Installation of a 750 kW back-up power plant, feeder lines to data center,
distribution panels, Diesel tank with 48 hours reserve.
TOVENCA has a trajectory of over 30 years in the manufacture of high quality
and technology labels and self-adhesive materials.
23
VENEZUELA
Main data center energy audit
BANESCO BANCO UNIVERSAL, 2010, VENEZUELA
Inspection, diagnosis and evaluation of the power generation, transformation and
distribution systems associated to the main data center of Ciudad Banesco located
in Caracas, encompassing the physical support infrastructure, power, mechanical
and telecommunications system of the 529 m2 Ciudad Banesco data center,
which includes the following:
Three 12.47kV/480V sub-stations, with nominal transformation capacities of 2000
kVA, 2000 kVA and 1250 kVA
Generation and co-generation system with a 4000 kVA installed capacity
•UPS systems with a 925 kVA installed capacity
Heat analysis of the data center, installed capacity survey of the precision cooling
system and heat load evaluation. BANESCO is Venezuela’s biggest banking group,
with 473 agencies in the country and a 14% share of the market.
24
VENEZUELA
Energy audit of Bancaribe’s main
office
BANCARIBE, 2010, VENEZUELA
Diagnosis of the current state of BANCARIBE’s electrical installations, specifically
at the power sub-station level, back-up energy system, UPS and power plant.
Survey and inspection of the current state of said systems and their measurement,
control and protection components, aimed at verifying their proper operation
and the compliance with the established regulations of the national electric code,
regarding energy quality, conditions and vulnerability of installations.
Additionally, the weak spots directly affecting the continuity of the bank’s
operations were analyzed, as to recommend the necessary corrections to be
made in order to safeguard BANCARIBE’s electrical system.
26
VENEZUELA
TIER II data center design for
CANTV
HUAWEI, 2011, VENEZUELA
Detailed engineering for the construction of the 170 m2-CANTV data center.
The work was based on designs, calculations, technical specifications, descriptive
memories, cost estimation, plant drawings, and details regarding the following:
• Electrical system for powering 48 high-density racks, (2) 500 kVA UPS
• Air conditioning system of (16) in row precision units, under the cold aisle
containment scheme
• Fire detection and extinction system using FM200
• Horizontal structured wiring system
• Grounding system design for the exclusive use of the data center
Back-up data center risk
analysis
BANCO NACIONAL DE CRÉDITO (BNC), 2012, VENEZUELA
A study of the risks associated to the BNC’s back-up data center location was
performed, and it was compared to the current location of the main data center.
The possibility that both centers might be affected by the same contingency was
evaluated, in order to have a thorough analysis that fulfills the request made by
the Venezuelan Superintendence of Banks (SUDEBAN).
27
VENEZUELA
Risk analysis of possible locations
for the main and back-up data
centers
BANCO FONDO COMÚN (BFC), 2012, VENEZUELA
Four possible locations for the back-up data center were evaluated; they were
compared with the main data center in order to define the location in the
interior regions of the country with the lowest level of risk in case of a natural or
man-made catastrophe. The Uptime Institute standards on data center operational
sustainability were respected, and the risk and impact levels were verified for each
section establishing a mitigation mechanism.
Risk analysis and inspection of
back-up data center
MULTINACIONAL DE SEGUROS, 2012, VENEZUELA
The analysis and insp ection were carried out in the city of Puerto Ordaz and included
the following:
Physical conditions (spaces, dimensions, pipe inlets, stair and elevator access, etc.)
• Mechanical conditions of the existing equipment to detect signs of inefficiency or
damage, capacities and assembly.
• Electrical connections of existing equipment
• Location of existing equipment
• Infrastructure construction characteristics
Multinacional de Seguros is one of the biggest insurance companies in Venezuela, with
54 branches in the country.
29
VENEZUELA
Construction of main data center
BANCO FONDO COMÚN (BFC), 2012-2013, VENEZUELA
Engineering, procurement, construction and commissioning of the main data
center with reliability and availability criteria for a TIER II level according to the
Uptime Institute. Project finalized under the PMI standards.
• 70 m2 servers’ area
• 100 kVA critical load
• Redundancy in uninterrupted power systems (UPS)
• Cooling system of 60 TR installed in n+1 configuration
• Reliable communications
• Fire system
• Safety control systems for the center
BFC is the tenth biggest Venezuelan bank, with approximately 165 agencies in
the country.
Structured wiring project
for back-up data center
CITIBANK, 2013, VENEZUELA
Supply, installation, certification and identification of UTP wiring 6A category,
according to EIA/TIA-606-A standard and Citibank internal regulations, for the
back-up data center located in Valencia, Carabobo state, Venezuela.
30
VENEZUELA
Schematic engineering developed
for the certification of a TIER III data
center by the Uptime Institute
Amagi iCloud, 2013, VENEZUELA
•
•
•
•
Unique White Space of 115 m2 in servers’ area.
40 server racks with a 4 kW/rack capacity (160 kW of critical load)
Modular scalable UPS system.
Concurrent maintenance in capacity equipments and distribution routes.
Amagi iCloud was created for the need to provide its customers with cloud
computing mission-critical services, contributing to optimize their services and
avoid risks in operational continuity.
AMAGI is a company that provides value to its customers through Information
Technology, consulting, outsourcing and cloud computing services, responding to
clients in all areas of the Venezuelan industry as well as other Spanish-speaking
countries.