Presentasjon Nye redningshelikoptre - Karl

Transcription

Presentasjon Nye redningshelikoptre - Karl
AgustaWestland,AW101/612,
SAR,Helicopter,from,March,2017,
Same,,same,
But,different!,
NAWSARH
lördag 26 september 15
And,be;er,
Parliament*White*Paper*146*S*(201052011)*
Vedtak:*
Stor8nget*samtykker*i*at*Jus8s5*og*poli8departementet*kan:*
16*A/C*(+*6*opt),**
10520*Mtonnes*
Phase*in*2016*5*2020*
Infrastructure*at*6*bases*
+*hospital*helipads*
Training*solu8on*
Long*term*Maint.*&*Log.*
Support*
Total*cost*frame*2,807*BUSD**
1.  Innenfor*en)kostnadsramme)på)16)800)mill.)kroner:)
a. 
Inngå*kontrakt*om*anskaffelse*av*inn8l*16)redningshelikoptre)i)klassen)10–20)tonn)med*8lhørende*
reservedeler,*utstyrs5*og*treningspakker*8l*Fastlands5Norge*for*planlagt)innfasing)i)perioden)2016–2020.*
Kontrakten*skal*også*omfaLe*en*opsjon)på)y>erligere)inn?l)seks)redningshelikoptre)av)samme)type.*
b. 
Gjennomføre*infrastruktur?ltak,)herunder*bygningsmessige*8lpasninger*8l*valgt*helikoptertype*ved*flere*
baser,*samt*8lpasning*av*landingsmulighetene*ved*sykehus*som*benyLes*av*dagens*redningshelikoptre.*
2.  Inngå*kontrakt*om*langsik8g*vedlikeholds5*og*logis8kkavtale*8l*understøLelse*av*helikoptrenes*
driQ*innenfor*et*uendret*bevilgningsnivå*på*vedkommende*budsjeLpost*i*hele*avtaleperioden.**
3.  Innenfor*en*samlet*ramme*på*1*300*mill.*kroner*inngå*kontrakt*om*en*tjenesteleveranse)for)
Svalbard)av)to)store)redningshelikoptre)8lsvarende*dagens*Super*Puma*med*tjenestestart*1.*april*
2014*og*med*varighet*på*seks*år*og*opsjon*på*yLerligere*fire*år.*
Oslo,*i*jus8skomiteen,*den*29.*november*2011*
Approved*6.*December*2011**
Ny*proposisjon*vedtaL*før*sommeren!*
Proposisjon)101)S)(2014H2015),)jf.)(Innst.)267)S)(2014H2015):)«Stor8nget*samtykker*i*at*kostnadsrammen*for*anskaffelsen*av*nye*
redningshelikoptre*mv.*seLes*8l*14*045*mill.*kroner*inkl.*mva.»*
Kostnadsrammen*seLes*ned*med*ca.*4*mrd.*Kroner*målt*i*2015*kr.*
*
17.08.2015
lördag 26 september 15
NAWSARH
3
Hva berøres av anskaffelsen
Helikopter:$
”Basic$Helicopter”$
+$SAR$Dlpasninger$
=$SAR$Helicopter
LogisDkk$
(Integrated$
LogisDc$Support$
(ILS))
Mellomtungt$
vedlikehold$–$
”Base$
Maintenance”
(tyngre$
vedlikehold$kjøpes$
senere)
$Operasjonelt$og$
teknisk$Dlleggs$
utstyr
Kontraterror
Trening$og$
treningsmidler
Opsjoner
Egenregi'(government'furnished'assets):
• Operatørrollen/systemansvarlig$$$
• 1.$linje$vedlikehold$(Forsvaret)$
• Hangarer$(Forsvaret)/$baser$(Forsvaret)/$landingsplasser$sykehus$(RHF)$
• Medisinsk$Dlbud$(lege$og$medisinsk$utstyr)$(RHF)$
• Utstyr:$generelt$verktøy,$medisinsk$forbruksmateriell$(Forsvaret,$RHF)$
Forvaltningsrollene:$JD$har$budsjeU$og$tjenesteansvar$+$HRS.$FD$har$operasjon$og$regelverksansvar
7
lördag 26 september 15
Ut#$
fasing$
av$
Sea$King
Konkurransegrunnlaget – 1143 krav + kontrakt forhandlet og evaluert
Høringsmateriale
Simonsen
Nr.
Dokumentnavn
1
ITT- dokument
2
Check-list
3
Executive summary
4
Bridging Contract (Head of agreement)
5
Helicopter Contract
6
Support and training Contract
7
Annex 1 The Ministries Operational and Support Intent
8
- 
1A – Statement of Operational Intent
- 
1B – Statement of Support and training Intent
- 
1C – The providers description of means of fulfilling the Ministry's intent
Annex 6
SLA
Annex 2 NAWSARH Requirement Specification
Annex 2A Helicopter and its systems
Approx.
Approx.
Approx.
946 requirements
117 requirements
48 requirements
Annex 5
Program
Management
Annex
4
requirements
14
Delivery
Annex 2B ILS requirements
Schedule
Annex 3
Annex 2C Training solution requirements
Scope of
Annex 3 A/B/C Helicopter and its systems/ILS/training solution (scope of supply).
Annex 12
supply
Annex 2
Change
Annex 4 Delivery Schedule
Requirement
chatalogue
Annex 5 Supplier Program Management Requirements
Annex
11
specification
Annex
1
AbbreviaAnnex 6 Service Level Agreement
The
tions
Annex
10and
Annex 7 Prices and Payment
Ministries
S &Training
frequently
Guaranties
Operational
- 
Attachment 1 Price Request Form (FBEM)
Contract
used terms
and Support
Annex 9
- 
Attachment 2 Instructions to FBEM
Helicopter
Intent
Options
Contract
Annex 8 A/B GFE/GFA
15
Annex 9 Options
16
Annex 10 Guaranties (bank or parent company)
17
Annex 11 Definitions
18
Annex 12 Changes and Amendment Catalogue
9
10
11
12
PwC
Annex 8
GovernAnnexment
7
furnished
Prices
assets
&payment
13
8
lördag 26 september 15
ITT
Invitation
to tender
Bridging
Contract
Konkurransegrunnlaget tilgjengelig på www.nawsarh.dep.no
Att. 2
Instr. To
Att.price
1
request
Price
form
request
form
Rekkevidde og kapasitet
Krav: Unnsette to helt ut mot ytterkanten av
NRAO (uten konkret tidskrav). (Dvs. 350 400 Nm utenfor grunnlinjen)
Resultat (tur/retur): AW 315NM ved 2 nødstedte
uten behov for «refueling».
Krav: 150 Nm ut fra grunnlinjen, innen 2
timer kunne starte opphenting av 20
personer (blå linje).
Resultat: AW 266NM ved 20 nødstedte
Sea King rekkevidde ved opphenting av 20
personer: 53 Nm
15
lördag 26 september 15
Kapasitet til å assistere
nødstedte hvor som helst
langs kysten og over hele
landet og bringe dem i
sikkerhet. Skal være mulig å
starte opp redningen med
bedre effekt enn I dag..
AW101%NAWSARH%
Vekt:%
Sea%King:%%9700kg%
AW101:%15600kg%
lördag 26 september 15
Luftforsvaret
AW101-612 – KEY FEATURES
AW101-611 “CSAR”
as baseline for
certification
BERP III MRB
Full Ice Protection
(New eq./fairings)
Active Vibration
Attenuation (ACSR)
Crashworthy
Structure, Seats,
Fuel System
Ground Clearance
Ca. 500mm
Sliding door, Airstair
door & Ramp
3 Observation
Windows
183 cm Cabin height
lördag 26 september 15
30minute Dry
RunRun
Dry
capability
Transmission
XMSNs
10
Luftforsvaret
AW101-612 – KEY FEATURES
No folding MRB
Engine Configuration
(3x GE CT7-8E)
Fully articulated Tail
Rotor (NEW)
New Automatic Flight
Control System*
New AESA 3x Flat
Panel Radar
* Including Hover Trim Controller (HTC)
lördag 26 september 15
Low maintenance
workload program
11
Luftforsvaret
AW101-612 – KEY SA FEATURES
DETECTION
AESA Radar (Simultaneous Modes)
Independent Weather Radar
HD Electro Optics/IR Sensor
DF & Mobile Phone Detection
TERRAIN AWARENESS
HTAWS (Fully Integrated)
3 x Digital Map (Elevation Data)
Integrated Synthetic Vision
Low Height System (2 x Rad Alt)
Configurable S.A. Overlays
TRAFFIC AWARENESS
Integrated TCAS II (Overlay on Map)
ADS-B Tx Transmissions
AIS Tx/Rx Capability
IFF Transponder
SA ENHANCEMENT
Cockpit Display System (CDS)
Helmet mounted display (HMDS)
(Monocle day/night)
OBSTACLE DETECTION
Laser Obstacle Warning Syst. (LOAM)
Obstacle Proximity LiDAR Syst (OPLS)
Integrated Synthetic Vision
AREA NAVIGATION
3 x Integrated Digital Maps
High Integrity Navigation Suite
2 x Civil GPS, Integrated RadNav
Automatic nav. accuracy Monitoring
Jeppesen Database
VFR / IFR Navigation AFCS Modes
12
lördag 26 september 15
Introduc)on*to*Service*
******|*****2014*****|*****2015*****|*****2016*****|*****2017*****|*****2018*
1st*Produc)on*
lördag 26 september 15
Preparatory*work*in*this*
period*will*be*the*key*to*
success*
NAWSARH
More*test*
LLLLLLLLLLLLLLLLLLL*
7.08.2015
Product*Improvement*
Series*produc)on*
Test*
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL*
Development*
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL*
Design*
LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL* LLLLLLLLLLLLLLLLLLL*
Contract*signature*
19.12.13*
More*test*
Ini)al*deliveries*
Spring*2017*
O,T*&*E*
Training*
SAR*Service*
3
Några bilder
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
Two stretcher layout
(with catastrophic stretchers)
lördag 26 september 15
SAR 10 Passenger Layout
lördag 26 september 15
Long Range Layout
lördag 26 september 15
Fire Fighting (RITS) Layout
lördag 26 september 15
Incubator transport
lördag 26 september 15
Special intensive care transport layout
lördag 26 september 15
Norway 01
First flight 8 mars 2016
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
lördag 26 september 15
Norway 02
15 aug 2015
lördag 26 september 15
FACILITIES)(EBA))
FACILITIES)(EBA))
17.08.2015
17.08.2015
lördag 26 september 15
NAWSARH
NAWSARH
2
2
Facili&es)at)all)bases)will)be)upgraded/extended)or)replaced)
Base 0/1
Sola
Base 2
Ørland
Base 3
Banak
•  Completely new base with
three docks, located near
current building
•  Office space for squadron
leadership and AW reps
•  Current building to be used for
training/OT&E purposes until
FAC
Base 4
•  Completely new base with
three docks
Base 5
Rygge
•  Three docks, partly new build,
potentially partly reuse of
existing building
•  Existing facility to be
extended by extra
workshops/storage
space etc
•  Three docks, partly new
build, potentially partly
reuse of existing building
•  Two docks (i.e. one more
than today
•  Extra workshops/storage
etc?
Base 6
lördag 26 september 15
Bodø
Florø
Standard'base'
•  Standard base,
including technical
buildings:
5426 m2
•  Squadron leadership/
AW building at Sola:
527 m2
17.08.2015
lördag 26 september 15
NAWSARH
4
Standard'base'
17.08.2015
lördag 26 september 15
NAWSARH
5
Sola%
17.08.2015
lördag 26 september 15
NAWSARH
6
Timeline'
• 
• 
• 
• 
• 
Deadline'prequalifica1on'Ørland'
Deadline'tenders'Sola'
Contract'award'Sola'
ITT'Ørland'
Contract'award'Ørland'
•  Planning'of'Banak'and'Rygge'will'start'fall'2015'
•  Sola'ready'for'use'
•  Ørland'ready'for'use'
17.08.2015
lördag 26 september 15
NAWSARH
Aug'14,'2015'
Aug'21,'2015'
Sep'4,'2015'
Sep'7,'2015'
Nov'26,'2015'
'
'
'
Nov'2016'–'Feb'2017?'
Jan'–'Apr'2017?'
7
HELIPADS)AT)HOSPITALS)(LANDINGSPLASSER)SYKEHUS))
17.08.2015
lördag 26 september 15
NAWSARH
8
Upgrading current
Sea King helipads
(example Trondheim)
«Slik&skal&denne&bli&sterk&nok&
Landingspla*ormen/ved/St./Olavs/
Hospital/må/forsterkes/for/å/kunne/tåle/
forsvarets/nye/helikopter.»/
……./
(www.adressa.no)/
/
•  8/hospitals/
•  Sykehusbygg/administraCng/the/process/
•  A/steering/group/established,/with/senior/members/from/each/of/the/four/Regional/Health/
AuthoriCes/
•  A/first/review/of/all/8/projects/to/be/finalised/by/Sykehusbygg/by/Sept/1/
•  Downwash/and/noise/may/be/challenging/
•  At/Stavanger,/helipad/will/be/short/term/soluCon/only,/due/to/new/hospital/being/planned/
lördag 26 september 15
PROCUREMENT*OF*HELICOPTER*SERVICE*AT*FLORØ*(INNLEIE*
FLORØ)*
17.08.2015
lördag 26 september 15
NAWSARH
10
Helicopter*service*at*Florø*
•  Complete*turnkey*opera6on.*
•  From*September*1,*2017*and*through*FAC*(i.e.*3*years*and*3*months*if*implementa6on*of*
AW101*according*to*plan).*Op6ons*of*up*to*two*addi6onal*years.*
•  One*helicopter*permanently*sta6oned*at*Florø,*one*as*a*backup.*
•  Requirements*for*helicopter*and*equipment*based*on*Sea*King*standard*or*beMer.**
•  DeOice*equipment*as*important*shouldOrequirement.*
17.08.2015
lördag 26 september 15
NAWSARH
11
Timeline'
• 
• 
• 
• 
• 
• 
Deadline'prequalifica1on''
Deadline'tenders'
Clarifica1on'and'evalua1on'period'
Nego1a1on'period'
Contract'award'
Contract'signature'
•  Service'start'up'
17.08.2015
lördag 26 september 15
NAWSARH
Sep'1,'2015'
Oct'19,'2015'
Oct'20'–'Nov'9,'2015'
Nov'11,'2015'–'Jan'15,'2016'
Jan'29,'2016'
Feb'10,'2016'
'
Sep'1,'2017'
Full$Flight$Simulator$AW1012612$
lokalisert$på$Sola$(NAWSARH$spesific)$
Standalone'or'coupled'with'SOCS'
17.08.2015'
lördag 26 september 15
NAWSARH'
7
Utfordringer
lördag 26 september 15
Rotorwash
lördag 26 september 15
Høyde ifm heising?
lördag 26 september 15
Terreng- og snølandinger
lördag 26 september 15
SPØRSMÅL?)
lördag 26 september 15