3. issue - Company magazine Snow World

Transcription

3. issue - Company magazine Snow World
wwww.demaclenko.com
EN // ISSUE N˚ 3
snow world
The magazine for the snow specialists
Let´s have snowmaking begin… opening ceremonies around the world // Sellaronda Skimarathon //
We ­
proudly present - our new homepage is online // A new era in snowmaking: EOS // The world’s
most powerful fan gun // New production sites // Demaclenko Service Team // Get in touch with…
the Swiss Service Team // Projects 2014 // Demaclenko worldwide
www.demaclenko.com
INDEX
_ 4 Let´s have snowmaking begin… opening
ceremonies around the world
_ 6 Sellaronda Skimarathon
Interview Silverio Pezzei
_7 We proudly present - our new homepage
is online
_ 8 A new era in snowmaking: EOS
_ 10The world’s most powerful fan gun
Titan 2.0
_ 12New production sites
Production Austria - Location Demaclenko France
_13 Demaclenko Service Team
_ 14Get in touch with…
the Swiss Service Team
_ 15Projects 2014
AT – Silvretta Montafon, Ischgl, Murtal/Kreischberg,
Kitzbühel, Krings, Alpendorf, Arlberg Bergahnen,
Fieberbrunn, Wintersportarena Liebenau.
DE – Brauneck. CH – St. Moritz.
I – Sexten Dolomites, Passo Sella.
GE - Gudauri, Didveli. ASIA – Sky Valley, Saibei,
Ibukinosato. SE – Malå Kommun. US – Bear Creek
_ 26Demaclenko worldwide
Facilities & Dealers
NOTES
3rd Edition - April 2015
Editor
DEMACLENKO IT Srl
Griesbruck 14/B - Neidegg
I-39043 Klausen
Tel. +39 0472 061601
Fax +39 0472 061649
[email protected]
www.demaclenko.com
Editorial Office
Marketing, DEMACLENKO
Print
13.000 copies
Grafic and Layout Design
hannomayr.communication
EDITORIAL
Dear Readers,
Due to this winter’s weather, with lacking natural snow, everybody realised how important it is to have a quality, tried- and tested snowmaking
system. Such a system ensures that the winter season runs without
complications or delays, and guarantees a long life cycle within the
entire value-added chain and throughout work activities related to the
functioning of a ski area.
In fact, ski areas equipped with an excellent snowmaking system were
able to commence the season well, despite unfavourable weather conditions. During this period, we stood alongside our customers, placing
at their disposal our expertise and skill, our products and our services,
and therefore contributed to their successful season.
In recent years, the Demaclenko brand has grown, secured an excellent
position, and our blue champions are now rooted on the most famous
pistes worldwide - in America, Europe and Asia. Dolomiti Superski, Ischgl, Kitzbühel, St. Moritz and Zermatt are just a few of the distinguished names that have chosen us, marking our ability to build new and
important partnerships year after year.
Business and marketing strategies combine with our dedication to develop sustainable and efficient products. The new Eos lance is an example of our ability to enhance snow production while improving power
efficiency (see page 8-9). Another objective we have is to reduce noise
from our machinery. This has been achieved with our Titan 2.0, thanks
to a new fan and an aerodynamically improved turbine see page 10-11).
Thanks to the many technical changes we have made, we have been
able to make our snowmaking systems even more modern and functional, without losing sight of cost-efficiency, performance and environmental friendliness.
In view of the success of the past season with the sale of over 1000
snow guns, we look forward to the next season with confidence, convinced that we can improve this result even further.
Demaclenko, your snowmakers.
Andreas Dorfmann - CEO
Editorial3
Photos: Daniel Hug . www.terragraphy.de
Special Edition for
Silvretta Montafon
LET´S HAVE SNOWMAKING BEGIN…
OPENING CEREMONIES AROUND
THE WORLD
Opening ceremony of the new snowmaking system in
ket as a one-stop supplier for ski area managers. The Sesto team
Sextner Dolomiten
commented on their satisfaction regarding the functioning of the
A new system was also officially opened in Alta Pusteria. The new
cableway, the snow grooming machines and the snow guns pro-
Elmo-Croda Rossa connection is an example of innovative tech-
vided by the LEITNER HTI group. „We want to grow and exploit
nology at the service of the sector. In this context, the LEITNER
group emerges as a unique entity, capable of entering the mar-
these synergies,“ said Mark Winkler, CEO of Sextner Dolomiten,
„LEITNER/ HTI really is our ideal partner.“
From left to right: Rudolf Egarter - Technical Director Sextner Dolomiten AG, Fritz Egarter - Major of Sexten,
Ing. Mark Winkler - Managing Director Sextner Dolomiten AG, Franz Senfter - President of Sextner Dolomiten AG,
Dr. Waltraud Deeg - State Government official, Dr. Luis Durnwalder - Former Governor,
Dr. Erwin Lanzinger - President of Tourism Office Alta Pusteria
4
Snowmaking system
Official ceremony in Silvretta Montafon
Silvretta Montafon, 29th January 2015: Under heavy snowfall,
the Demaclenko snowmaking system was officially opened.
This super-sporty ski area will have a future of successful
seasons, due in part to the impeccable performance of this
new system.
From left to right:
Peter Marko – Board Member of Silvretta Montafon Bergbahnen AG,
Harald Sonderegger – Cultural Authority of Vorarlberg,
Michael Moosbrugger - Sales Manager for Demaclenko,
Martin Oberhammer - Engineer at Silvretta Montafon Bergbahnen AG
GEORGIA
From left to right: Giorgi Kvirikashvili, Deputy Prime Minister
and Minister for the Economy and Sustainable Development
Andreas Dorfmann, Managing Director and CEO of Demaclenko
Opening ceremony of the new snowmaking system in
Georgia
After 4 months of construction, the new Demaclenko snowmaking system was finally unveiled on Sunday 21st December
2014 in Georgia. In the presence of the Deputy Prime Minister
and Minister for the Economy and Sustainable Development, Giorgi Kvirikashvili, the Director of the ‘Gudauri Development Agency’ and the Managing Director and CEO of Demaclenko, Andreas
Dorfmann, officially ’cut the ribbon‘ on this new project. Andreas Dorfmann used the occasion to present the unique miniature
Swiss pine model of the Titan Silent snow gun.
Snowmaking system
5
A NIGHT
RACE ON
THE SNOW
SELL ARONDA
SKIMARATHON
The famous and unique Sellaronda night race has now
Snowmaking systems are also used for the Sellaronda com-
been running for twenty years. Support and enthu-
petition. How much snow is usually needed? What types of
siasm for this event has greatly increased among
snow guns are generally used?
passionate devotees of cross-country skiing and ski
Snowmaking systems are used for the Sella Ronda, because the
mountaineering.
course largely follows ski runs, as at Canazei. On the race day, we
have to cover some of the roads in the town to make the race
It was essential for Demaclenko to be part of the event as a spon-
more accessible, spectacular and exciting for the public. A thou-
sor and to ensure that the tracks were perfectly prepared for the
sand cubic metres of artificial snow are needed for this operation
competition. To learn more about the next Skimarathon we met
alone, produced by fan guns located in the town, and DemacLen-
Silverio Pezzei, Race and Track Director of Val di Fassa/Canazei.
ko equipment is a godsend for this!
At Demaclenko we are very familiar with the race… but
winter season on the SITC pistes?
more as spectators. How much work goes into the event?
The Titan 2.0 was fully satisfactory, thanks to its impressive snow-
When do you start working on it and how many of you are
making capacity and to the quality of the snow. The range has also
What were the results of the Titan 2.0 tests performed this
involved?
been improved, which is particularly important for us in that it helps
A few days before the race, work progresses at a sustained pace,
us in our daily piste preparation activity. It is a highly functional
in order to prepare and ensure track safety; work increases dispro-
machine, also in terms of maintenance and handling convenience,
portionately on the day of the race, and at the end of the twentieth
and a technologically sophisticated product.
race a number of us will already be thinking about the organisation
Titan 2.0 is Demaclenko’s solution ensuring the best possible
of the next one. In all, there are 500 of us volunteers divided over
results in terms of both snow quantity and quality, regardless of
the four Ladin valleys.
weather conditions.
As a person in charge, you have spent a lifetime working on
snow and for snow. Today, the topic of snowmaking crops up
increasingly on the agendas of site managers. What do think...
are companies in the sector moving in the right direction?
Snowmaking is a topic that has to be increasingly discussed by
site managers since there is no way of escaping weather conditions. In a ski resort, a high-powered snowmaking system is much
more important these days than a cableway installation, because
the opening of a resort is dependent on snow conditions. After a
year like this, many resorts will reflect on future strategies. However,
a good number of them are already moving in the right direction.
6
Sellaronda Skimarathon
OUR NEW WEBSITE IS ONLINE!
Didn’t you know? Then hurry and visit our new websi-
In short, a 360° view and a dynamic experience of the world of
te. Here you can learn more about the corporate iden-
snowmaking. Visitors of the website can send in their photos and
tity of this energetic young company. Lots of news,
we will gladly publish them to reveal views and fresh perspectives
new pages and sections to discover and read. It’s
of our blue champions on the snow - we never tire of admiring the
not just a question of getting to know each other,
spectacular throwing range of our snowguns.
but also of sustaining that healthy passion for snow
and snowmaking.
Last but not least... the pages dedicated to our products and
services. An initial introduction to our unique and comprehensive
range, using descriptions backed up by drawings, images and
First, there’s the new snow magazine where you can find out the
technical texts, all detailed and easy to understand.
latest news, what we are designing, our projects and events… as
well as chatting about snow, involving others, who like us, live on
Coming soon... our online shop will open, offering the complete
the snow and for snow.
range of merchandise, clothing included.
Demaclenko highlights and the most important topics will be published in the main ‘showcase’ page on our homepage.
Follow us on demaclenko.com – a unique snow and snow
A space is also dedicated to those who work every day to cover
making website!
the pistes. We will be talking about their lives and experiences, to
understand what makes them dedicated to this job.
A new era in
snowmaking:
EOS
Eos was the Greek goddess of the dawn. Demaclenko’s
new ambitious project borrows her name as a symbol of
a new era in the snowmaking sector.
Thanks to the excellent combination of advanced
snowmaking performance, power efficiency, and
reliable technology this new lance has all it takes to
win the trust of clients.
The new Eos lance is the result of our team’s continuous
efforts in terms of Research & Development. The visibly innovative design of the head, the new nucleators
and nozzles have all been conceived to significantly improve snowmaking quantity and quality.
Eos is pure passion: it is the expression of our constant
effort towards innovation, technological development,
improved performance, sustainability and a modern,
clean design. It’s a revolutionary product, ready to make
its appearance in 2016.
8
New Lance
New Lance
9
THE WORLD’S
MOST POWERFUL
FAN GUN:
TITAN
2.0
The Titan in version 2.0, launched this year, is the most powerful
The improved fan also means lower sound emissions. This com-
fan gun on the market, combining sophisticated design with the
ponent was developed in collaboration with the famous Fraun-
best materials available.
hofer research institute, our priority being to obtain environmen-
Let’s see - in detail - what the product’s highlight are. It all stems
tally sustainable products, respectful of the surrounding flora and
from a complete redefinition of the fan-turbine concept. The
fauna.
combination of the new fan and longer turbine blades significantly
increased the cannon’s range. The nozzles have also been im-
These features - developed thanks to the efforts and know-how
proved, enabling better nucleation in low pressure conditions.
of our R&D department – have already been implemented in the
This means that the machine is capable of producing great
Titan currently under production.
amounts of snow when the pressure is low, thus ensuring the
best possible piste conditions.
R&D Team: from left to right
Emanuele Bazzechi, Viktor Prinoth, Achim Frontull
10
Titan 2.0
Innovative
R&D concept
Maximum
snowmaking
performance
105 m3/h
Hohe
Excellent
ratio
Schneileistung
of snow quantity and
105 m3/h
energy consumption
Titan 2.0
11
NEW PRODUCTION
SITE IN AUSTRIA
Starting this year, a significant portion of our
single production facility at Telfs, in Tyrol, in order to provide better
products will be manufactured in Austria – the Ventus
support for our customers. Indeed, manufacturing at Telfs means
and Titan fan guns in particular will be produced
that it will be much easier for many of our customers to reach us
at the Telfs plant – but without compromising tradi-
and at the same time, the facility will become a spare parts centre.
tional production at our site in Val Gardena.
We aim to acquire a fundamental role, including manufacturing, in
this market sector in Austria, and this new site will enable us to im-
Austria, one of our key markets, is actually more than that. Through-
prove our manufacturing processes and have more than just local
out the Alpine region, Demaclenko has proved capable of building
significance.
mutually beneficial long-term business ties. Precisely for this reason, and after long reflection, an important decision was made to
In march, the first snow guns entirely produced in Telfs were de-
bring a significant part of production closer to our Austrian cus-
livered to Bergbahnen Kitzbühel, and we are delighted and proud
tomers. We will be manufacturing with our sister companies in a
that one of the finest ski areas in the world has chosen us.
DEMACLENKO, THE SNOWMAKING BRAND
NOW ALSO IN ACTION IN FRANCE.
Under the guidance of Franck Tiffreau, we will start operating this
solutions for ski area development. We are confident and totally
spring in the French market together with LEITNER France. An
optimistic in the face of this new challenge, and look forward to
important step – together with our sister companies, we can fi-
demonstrating our expertise and services to our French custo-
nally present ourselves to this market as a sole supplier of turnkey
mers.
New office in France
12Demaclenko
Demaclenko France: Franck Tiffreau, Commercial and
technical Director & Philippe Jobard, Sales and Project Manager
DEMACLENKO SERVICE
TEAM – THE IMPORTANCE
OF BEING A PARTNER
From left to right:
Michael Kompatscher,
Nicel Bioc,
Stephan Hafner,
Mattia Bastianutto,
Meinhard Rassler
Since we have several new service team members providing assistance, we would like to introduce our new staff
and explain their respective roles.We have some interesting news for our customers concerning the Service
Department. In line with a new strategy that emphasises our partnership role with clients, we have recently
enhanced the department with new personnel and new responsibilities. Let’s see in more detail.
We have two new managers: Stephan Hafner and Michael
In North America, Adam Askwith has joined us to head our service.
Pramsohler – Stephan is responsible for snow gun equipment and
He comes to us with several years of experience in the industry, he
electrical and electronic products, Michael for hydraulic systems
will provide our customer with excellent service. He will be based
and pumping stations.
at our Gilmanton, NH location.
They both have extensive experience in the field; Michael has
been working for us for some years, while Stephan joined the
The remaining service team staff are located at our Austrian site in
team in 2014.
Telfs, and include Florian Pedevilla, Paul Wibmer and Manuel He-
Other colleagues include: Michael Kompatscher, Nicel Bioc and
to deliver services in Scandinavia.
bein, while in Sweden, Jens Nillson and Elon Eriksson will continue
Mattia Bastianutto, who provide snowmaking service, being onsite
when required. They also coordinate and direct installation. They
In Switzerland, Christian Neff and Harry Breitenmoser (see inter-
will provide assistance to customers in the early stages of use as
view on p.14) provide assistance for systems installed there.
well as managing the pumping station.
In addition, Meinhard Rassler, who is dedicated to in-house services at our Chiusa site (spare parts and quality control), has
worked in the snowmaking sector for some time, and with Demac­
lenko since 2014.
Service13
GET IN TOUCH WITH …
THE SWISS SERVICE TEAM
INTERVIEW
good. And when it’s mild and not so cold, I also enjoy walking in
INTERVIEW
You’ve already been working with us for a while, when
the mountains. In winter... well, my eyes are on the pistes at work,
and if there’s time, I’m on my board or skis.
Harry: I’m in the Sirnach and the Guggenmusik Mosnang bands.
Otherwise I meet up with friends to play squash, or ride around on my
did you actually start?
Monkey Bike. Then there’s my old Mercedes minivan that needs a bit
Christian: I started with Demac in spring 2010.
of care and attention so that it’s ready for the summer holidays.
Harry: I’ve been working as a service technician at Demaclenko since
September 2013. I used to work in the vehicle assembly sector.
You must have many experiences with customers to talk
about. Is there any particular one that had a lasting impres-
Do you like your job? What made you decide to work in the
sion on you?
service team? In particular you deal with the maintenance
Christian: There are so many stories to tell... but one in particular
of snow guns:
comes to mind: three of us were with a customer to change the
Christian: I love our work team, we work well together and we
EPROMs on about 15 snow guns and build a bridge on the com-
help and support each other. Our work is never monotonous, every
munication cable. We got back from the customer during the night
day there is something different. I also like the idea of working in
and there was about a metre of snow. At one point, the weather
places where other people are on holiday, and this is what made
got worse and it started to snow more and more... but that’s not
me choose this job.
the half of it… a snowcat driver arrives with his bright red groomer
Harry: Yes, because it’s never monotonous, it’s dynamic, and ev-
to lead us to the piste to repair the machines. The trouble is that
ery day is a challenge. We are truly a dream team, in my opinion,
this driver was a fresh-faced boy who had started working barely
almost a second family. I also like the fact that in this sector you
a week before. We had just finished with the second gun when the
get to see new places and meet new people. For me this new job
driver, looking rather frightened, asked us if we knew where we
is like a breath of fresh air compared to my previous position, and
were as he had lost all sense of direction. But we used our radio to
it came just at the right time in my life.
help the driver find his bearings and head towards the right piste.
Everything seemed fine, but as soon as he attempted to move the
What is a typical day like for our service staff during the high
vehicle, it got stuck in the snow and we were left caught in the
season?
middle of the blizzard. It seemed as if things would never end. After
Christian: A typical day?? It doesn’t exist… I would say that some
a while, another two snowcats arrived and pulled us out, and we
nights and days are never ending. Just imagine, the battery on my
were able to continue our work on these two guns.
mobile is already dead around midday.
Harry: I really only remember the moments when I could finally
Harry: A typical day usually starts in the evening. My phone starts
catch my breath, sit down and have a coffee with a customer once
ringing, and the first thing we do is to try and solve equipment prob-
everything had gone well and the job was finished. In those mo-
lems by giving the customer precise instructions over the phone. If
ments, you get to know a person, not only on a professional, but
we see that the problem can’t be resolved, we head off full speed - a
also on a private level. And then there are the breathtaking views of
good night’s sleep during this period is an impossible luxury.
our mountains which remain in my heart.
What do you do in your spare time?
Christian: There’s really very little spare time. It depends a bit on
the period. I certainly spend all the time I can with my dog. I also like
travelling, discovering new cultures and new countries. In summer,
I get my motorbike out and hit the road, especially if the weather’s
14Interview
PROJECTS 2014
Austria: Silvretta Montafon, Ischgl, Murtal/Kreischberg, Kitzbühel, Krings, Alpendorf,
Arlberg Bergbahnen, Fieberbrunn, Liebenau. Germany: Brauneck. Switzerland: St. Moritz.
Italy: Sexten Dolomites, Passo Sella. Georgia: Gudauri, Didveli. Asia: Sky Valley,
Saibei, Ibukinosato. Sweden: Malå Kommun. USA: Bear Creek.
A
Projects in Austria
Kitzbühel
This year Demaclenko also made it to the renowned Kitzbühel pistes, working for the first time with the Bergbahnen Kitzbühel company.
Trust and quality are essential for establishing long-term business relationships. The relationship created this year between the Tyrolean ski
area and Demaclenko is precisely of this nature. Several projects are planned for the coming years, such as the upgrading of the system
at Brunn Pengelstein, and improvement work on the snowmaking machines on the famous Streif piste.
W W W bergbahn-kitzbuehel.at
Ulli Aufschneiter, Snowmaking Manager at Berg-
70 pits
bahnen Kitzbühel: ”This year, the snow covering
the piste was impeccable, and the scheduled
works have only just begun. Over the coming
years there are plans to install a new system, as
well as about a hundred pits, a new pipeline construction and new
snow guns. For this project we chose the expertise and skill of
Demaclenko.”
Fan guns
5 Titan AMK
1 Titan ATK
3 Titan S ASK
1 Titan ASK
2 Ventus AMK
Projects 2014
15
Silvretta Montafon
A site of enormous proportions and one of the most renowned ski
areas in Austria. The partnership has worked perfectly. Demaclenko supplied a new snowmaking system to the Silvretta Montafon
ski resort to guarantee a constant and abundant snow level on the
vast pistes in the area. We earned the trust of the Vorarlberg site
managers by proposing our range of solutions and snow guns to
cater for any needs.
Martin Oberhammer, Dipl. Ing. Silvretta Montafon
Bergbahnen AG: ”We chose DemacLenko because
they gained our confidence. This company already
looked very promising a few years ago and we followed it with a certain interest. They have performed
excellently and we have not regretted this choice.“
Main pump station Seebliga
1800 kW Total capacity
300 l/s Total pump capacity
120 l/s Total capacity cooling system
264 kW Total capacity compressor station
ca. 100.000 m³ Capacity water storage/reservoir
Pits
118 Concrete pits
snowVisual Software
Fan guns
5 TITAN AMK
12 TITAN AS 3.20
3 TITAN ASK 3.20
24 TITAN AT 1.80
14 TITAN ATK 1.80
8 TITAN Silent AMK
14 VENTUS ATK 1.80
Lances
20 VIS C4-H
11 VIS A4-H
6 VIS UP A4-H
16 VIS UP C4-H
4 VIS A4K-H
W W W silvretta-montafon.at
Murtal/Kreischberg
This year at Kreischberg, significant funding has been made available in preparation for the forthcoming Freestyle
Ski and Snowboard Championships. Demaclenko convinced the managers of the area with a complete solution
from the LEITNER/ HTI Group backed up by the Demaclenko expertise and skill acquired over the years. The new
snowmaking system is able to provide an efficient use of resources, ensuring well-covered pistes for the future
but with an eye on savings.
W W W kreischberg.at
Reinhard Kargl, CEO of Murtal Seilbahnen BePump station
1.770 kW Total capacity
600 l/s Total pump capacity
300 l/s Total capacity cooling system
60 kW Total capacity compressor station
triebs GmbH: “Here at Kreischberg we have a
genuine top-quality solution, thanks to DemacLenko and Snowvisual control software. We
wanted a system that could manage resources
more efficiently and reduce management costs.
Pits
10 Concrete pits
The Demaclenko upgrade was just what we wanted. Snowvisual
snowVisual Wireless modem
able to control older snow guns still used on the pistes.”
Fan gun
25 Titan AMK
16
Projects 2014
has a wide range of easy-to-use functions, and the software was
ModelNeue
TITAN,
Murtal/Kreischberg
Neue
Projekte
Projekte 17 17
Alpendorf
Demaclenko also carried out a project at the Alpendorf resort this
summer - the construction of two new pump houses that proved
their efficiency this winter by serving the entire system.
W W W alpendorf.com
2 Main pump houses
920 kW Total capacity
500 l/s Total pump capacity Gsteng
180 l/s Total pump capacity Kreisten
Ischgl
W W W ischgl.com
Ischgl is a dynamic ski area, constantly seeking new opportunities for improvement in order to take full advantage of the winter season. Construction of the new ski lift facility was completed
only recently, and this year the pistes will be equipped with new
snowmaking systems. The Demaclenko brand was chosen for this
investment.
Fan guns & Lances
9 Titan S ASK
2 Titan S AMK
1 Vis Up A4K
1 Vis Up A4
Johannes Siegele, Site Manager for Silvretta Seilbahnen Ischgl: „Last summer we purchased 11
Demaclenko Silent machines, nine with an inclined
tower and two mobile. The project ran smoothly,
and during the installation process we received
prompt and effective service, and assistance in resolving any problems. In the Prennerhang ski area, near the valley and villages, the
decision to install Titan Silent machines was a particularly good
choice. The guns are really silent and no complaints have been received, despite constant use; even the mobile machines, which are
often used right in the middle of the village, have caused no disturbance with their ability to produce snow quietly.“
18
snowVisual Wireless modem
Projects 2014
Krings
The Krings brothers, pioneers in the sector, were among the first to order a snowmaking system back in 1985 at Obertauern. Thirty years
later, it was time for a radical renewal using the latest generation products. The choice fell on the LEITNER Group, and specifically Demaclenko, to take care of the pump house and other equipment.
W W W bergbahnen-obertauern.com
Robert Lasshofer, Site Director of Krings Bergbahnen GmbH: “Collaboration between the
Krings brothers and the LEITNER Group began
in the eighties. We had Prinoth snow grooming
machines on the pistes, we then built the new ski
lifts, and lastly, the Demaclenko snow specialists arrived. We were
pleased with their work and enjoyed working with them, but above
all, having LEITNER as a one-stop supplier gives us more confidence, as well as saving time. The LEITNER/ HTI Group is certainly
Pumpstation
300 l/s Total pump capacity
Pipes
19 Concrete pits
2.000 m Total pipe lenght
5.500 m Total cable lenght
snowVisual by LEITNER
Fan guns & Lances
5 Titan AMK
3 Titan ASK 4.2 M
5 VIS C2
a guarantee for us.”
W W W abbag.com
Arlberg Bergbahnen
We are growing rapidly in Austria, thanks to an increasing number
snowVisual Software
of ski resorts in neighbouring areas that choose us and appre-
Fan guns
7 Titan
7 Ventus
ciate our work, and with whom we establish strong professional
relations that last for years. We were also invited to tender some
of our great products for the famous Tyrolean ski area of Arlberg
Bergbahnen.
Projects 2014
19
Fieberbrunn
W W W bergbahnen-fieberbrunn.at
Demaclenko’s snow of the future also arrived in Fieberbrunn, a
well-known ski area near Kitzbühel. This season several snow
guns, renowned for their outstanding performance, will provide
well-prepared, whitened pistes with great rapidity.
Infrastructure
6 Concrete pits
6 Fibreglass pits
9 Overground hydrants
1.350 m Total pipe length
Fan guns & Lances
3 Evo AT
1 Ventus AT
2 Ventus AMK
4 Ventus AS
2 Titan AMK
4 Vis A2
W W W wintersportarena-liebenau.com
Main pump house Liebenau
110 kW Total capacity
25 l/s Total pump capacity
50 l/s Total capacity Cooling System
4.000 m³ Capacity water storage/reservoir
Infrastructure
7 Overground hydrants
2000 m Total cable length
1000 m Total pipe length
snowVisual Software
Fan guns
2 Whisper
1 Ventus
20
Projects 2014
Wintersportarena Liebenau
At Liebenau, an artificial reservoir and a new pump house were
built to enable snowmaking operations to be performed smoothly
and more efficiently during the winter. Wise choices for building a
future of successful seasons.
DE Projects in Germany
Brauneck
To counteract the winter months when snowfall is low, Brauneck
Pits
87 concrete pits
and Wallbergbahnen, two German ski areas, turned to DemacLenko this season and purchased around twenty lances and a similar
snowVisual Software
number of guns and pits. Our equipment will ensure that the twenty-one hectares of pistes are covered to perfection.
Fan guns & Lances
8 FA540
27 VIS A4
52 VIS C4
W W W brauneck-bergbahn.de
CH Projects in Switzerland
W W W engadin.stmoritz.ch
ca. 400.000 m³ capacity water storage/reservoir
Infrastructure
32 GFRP pits
3.400 m Total cable length
10.750 m Total pipe length
Fan guns
20 Titan AT
1 Titan X AMK
1 Titan Silent
Rieto Bieri, technical manager of Engandin St.Moritz Mountains AG:
St. Moritz
“Our business relationship with Demaclenko is a long standing one,
and we are perfectly happy with our choice of supplier. Peter Wid-
A noteworthy and enduring partnership between Engadin St. Moritz
mer and Rinaldo Kreuzer are reliable partners, to be counted upon
Mountains AG and DemacLenko. A vast project which, in the initial
right from the start of the project. 2014 saw the installation of 20
stage, involves the construction of the artificial ‘Lej Alv’ reservoir,
out of the 60 new snow guns we ordered for the 2017 Alpine World
the largest in Switzerland.
Ski Championships. In particular, the Titan is an excellent machine
and its performance when it comes to snowmaking at marginal
temperatures has been significantly improved. It’s a real pleasure to
work with this team.”
pantone 012 u
cmyk
0/4/100/0
pantone 299 u
cmyk
86/8/0/0
pantone 432 u
cmyk
67/45/27/70
ev.
korr
cmyk
50/40/27/40
WICHTIG: die farben müssen in den Profilen angepasst weden!
Projects 2014
21
I
Projects in Italy
DOLOMITEN
Alta Pusteria
SEXTNER
DOLOMITEN
Sexten Dolomites
W W W s-dolomiten.com
The recently built connection at Versciaco between the two sides
of the Sesto valley has significantly boosted tourism in Sesto, in
Alta Val Pusteria. Since 2010, our team has been involved in very
important works in this South Tyrolean ski area. Our snow guns are
covering the pistes of this renowned ski resort in sixty hours this
winter, whereas previously it took two weeks.
Rudolf Egarter, Technical Director of Sextner Dolomiten AG: “The work went smoothly with Demaclenko. We are pleased with the installed machines,
as well as with the technicians and the service offered by this company – they are reliable and fast.”
Pump house
1 Booster Pump
75 kW Total capacity
2x25 l/s Total pump capacity
90 kW Total capacity compressor station
Infrastructure
24 GFRP pits
12.300 m Total cable length
4.900 m Total pipe length
snowVisual Software
Fan guns & Lances
8 Evo AS
2 Vis A4
Passo Sella
The Demaclenko team is engaged in a second project in South
Paolo Cappadozzi, owner of the system: “Colla­
Tyrol, at the Passo Sella. The work has involved the renewal of a
boration between Demaclenko and me has con-
system that dates back to the nineties, originally built by the then
tinued for a long time - this company has never
Demac company of Val Gardena.
disappointed me. We have plans for some important work next year.”
W W W pizsella.com
300 l/s Pump house capacity
Infrastructure
18 Concrete pits
10.000 m Total cable length
5.600 m Total pipe length
snowVisual Software
Fan guns
3 Titan AMK
1 Ventus AMK
1 Evo AMK
1 Evo AT
1 Evo ATK
22
Projects 2014
GE Projects in Georgia
Gudauri
Our company won an important order from Georgia. The entire project was completed successfully this year. It consisted of building a
complete automatic snowmaking system with a pump house and our cooling system.
W W W gudauri.info
Main pump house
132 kW Total capacity
28l/s Total pump capacity
28l/s Total capacity cooling system
75 kW Total capacity compressor station
Infrastructure
2 Concrete pits
29 GFRP pits
2.600 m Total cable length
1.300 m Total pipe length
snowVisual Software
Lances
29 Vis Up C4
Didveli
The Divdeli project went through intense and exciting work phases. The new system was eagerly awaited in Georgia, where the economic
growth of recent years has led to an increase in the popularity of winter sports. Once the work was completed, we felt that we had achieved an
important goal and we are really thrilled about continuing our collaboration with our Georgian friends.
Main pump house
200 kW Total capacity
26l/s Total pump capacity
26l/s Total capacity Cooling system
75 kW Total capacity compressor station
Infrastructure
36 GFRP pits
4.000 m Total cable length
2.000 m Total pipe length
snowVisual Software
Fan guns & Lances
2 540 whisper on tower
34 VIS UP C4
Aleksandre Onoprishvili, Head of Mountain Resort Development Company: “Over the years
I have visited several ski areas in the Alps, and
have always dreamt that one day I would build
equally beautiful ones in my own country, Georgia. I am convinced that with the construction of the snowmaking
systems in Gudauri and Divdeli, we have taken an important step
towards achieving this goal. Demaclenko built and organised everything efficiently and to tight deadlines, bringing a breath of fresh
air to these areas. Indeed, this project has brought a wave of optimism to the Divdeli and Gudauri teams and serves as an incentive
to make the area an ever-increasing tourist attraction. I’m really
happy to have been involved in this project, and to have brought
the best snowmaking technology to Georgia.”
Projects 2014
23
ASIA Projects in China
Saibei
Thanks to its intensive marketing strategy, Demaclenko was highly
successful in China. This summer, several Titan fan guns headed
towards the Saibei Duolemeide Mountain Resort to guarantee excellent piste conditions. Snowvisual software adds the finishing touch,
allowing perfect management of the available resources.
snowVisual Software
Fan guns
8 Titan AMK
ASIA Projects in Japan
Ibukinosato
W W W ibukinosato.co.jp
130 l/s Total capacity compressor station
Infrastructure
20 Overground Hydrants
Lances
30 Vis M4
Sky Valley
Main pump house
41 kW Total capacity
15 l/s Total pump capacity
15 l/s Total capacity cooling system
Infrastructure
3 Overground Hydrants
700 m Total cable length
350 m Total pipe length
Lances
3 Titan MMK
24
Projects 2014
W W W skyvalley.jp
SE Projects in Sweden
Malå Kommun
Main pump house and pump house with inverter
37 kW Total capacity pump with inverter
200 kW Total capacity Main pump
45 l/s Total pump capacity pump with inverter
45 l/s Total pump capacity Main pump
In Sweden we have carried out several projects, some of which
started years before, while others are completely new. One of the
most important is at Malå Kommun, where we have rebuilt the
pumping station and upgraded the snowmaking system.
Infrastructure
4 Overground Hydrants
snowVisual Software
Fan guns
2 Ventus AMK
US Projects in USA
Bear Creek Mountain Resort, PA
DemacLenko is not only active in the European Alpine area, but also in North America with a growing market presence. At Bear Creek in
Pennsylvania, thirteen automatic snow guns were installed and are managed by Snowvisual.
W W W bcmountainresort.com
snowVisual Software
Fan guns
3 EVO ATK
2 Ventus AMK
7 Titan AMK
1 Titan ASK
Projects 2014
25
DEMACLENKO WORLDWIDE
FACILITIES
DEMACLENKO IT Srl/GmbH
HEADQUARTER
Griesbruck 14/B
IT-39043 Chiusa
Tel. +39 0472 061601
Fax:+39 0472 061649
VAT-Number: IT02712150214
[email protected]
Head of Sales (World):
Michele Hillebrand
[email protected]
Sales Manager (Italy):
Jürgen Ortler
[email protected]
Export Manager:
Mirco Demetz
[email protected]
DEMACLENKO DEALERS
America
CL Muñoz y Timmermann Limitada AR LEITNER-POMA / PRINOTH Chile
Lautaro 2165
Concepcion
Tel. +56 912 85 344
[email protected]
Asia
CN Beijing Carving Ski Equipment Co.,Ltd
Room 804, Building A,
Raycom Creative Centre,
No. 65, Bajiao East Street,
Shijingshan District,
Beijing, China
Tel.: +86 10 68809488
Mobil: +86 13911164111
[email protected]
26
Demaclenko worldwide
DEMACLENKO GmbH
Michael-Seeber-Straße 1
A-6410 Telfs
Tel. +43 5262 621210
Fax: +43 5262 62121 3400
VAT-Number:ATU32410209
[email protected]
DEMACLENKO
SWITZERLAND GmbH
Birkenweg 7
CH-8362 Balterswil
Tel. +41 71 9714866
Fax: +41 71 9712870
[email protected]
General Manager:
Roland Auer
[email protected]
Tel.: +43 5262 62121 3407
General Manager:
Peter Widmer
[email protected]
Tel: +41 (79) 646 7180
Sales Manager:
Michael Moosbrugger
[email protected]
Tel. +43 664 150 5337
KR K1 Corporation
Choong-Hyun Villa No. 103
669-7 SEOUL
Tel. +82 (02) 569 0307
Fax: +82 (02) 569 0309
[email protected]
JP JFE Mechanical Co. Ltd.
422-1 Jimba, Furuma
389-1313 Nagano
Tel. +81 338 643 915
Fax:+81 338 643 869
[email protected] or
[email protected]
Europe
NO TaubaneTeknikk AS
Postboks 203
5700 Voss
Tel.:+47 56 53 00 70
Fax :+47 56 51 79 40
[email protected]
[email protected]
SE TaubaneTeknikk AB
Box 3084
Inspektorsvägen 16,
83103 Östersund
Tel +46 63 589 99 00
[email protected]
[email protected]
[email protected]
EE Artic Freetec Oy
FI Sipolantie 5
96100 Rovaniemi
Tel.:+35 801 631 0121
[email protected]
HR Furlani d.o.o
SI Damber 37
RS 5000 Nova Gorica
Tel. +38 653 332 717
Fax:+38 653 332 717
[email protected]
CZ Snowtech s.r.o.
Palackeho 339
53281 Slatinany
Tel. +420 777 726 941
[email protected]
DEMACLENKO AMERICA
264 NH Route 106
US-Gilmanton, NH 03237
Tel. +1 603 267 7840
VAT-Number: 02-0796004
[email protected]
Sales Manager:
Dennis Kinsella
[email protected]
Tel. + 1 603 8429001
DEMACLENKO AMERICA
2746 Seeber Drive
US-Grand Junction, CO 81506
Tel. +1 970 241 4442
[email protected]
DEMACLENKO FRANCE
Voie Galilée – Zone d’Activité
d’Alpespace – CS50001
F- 73802 MONTMELIAN Cedex
Commercial & technical Director:
Franck Tiffreau
[email protected]
Sales & Project Manager:
Philippe Jobard
[email protected]
Tel. +33 (6) 76107482
CZ Sport Stupava SRO
Stupapa 111
68601 Uherské Hradiště
Tel. +420 604 223 026
[email protected]
UA TSOV Vita Construction
Viyskovych Veteraniv Str. 6
76019 St. Ivano-Frankivsk
Tel. +39 335 7902162
[email protected]
RO Quasar Group
22 Decembrie Boulevard
330166 Deva
Tel. +40 254 222 999
Fax:+40 254 206 291
[email protected]
UA TSOV Vita Construction
Viyskovych Veteraniv Str. 6
76019 St. Ivano-Frankivsk
Tel. +39 335 7902162
[email protected]
RU ISS 000
Krylatskaya 1,
121551 Moscow
Tel. +7 495 221 0439
Fax: +7 499 140 1648
[email protected]
Oceania
TR Karbeyaz Spor
16070 Bursa
Tel. +90 224 233 0374
Fax: +90 224 233 5675
[email protected]
UA KievSportService LLC
23a Protasiv Yar Str.
03038 Kiev
Tel. +38 050 442 7744
Fax: +38 044 525 4311
[email protected]
NZ Lyttelton Engineering LTD
PO Box 176
8841 Lyttelton
Tel. +64 03 328 8105
Fax:+64 03 328 7289
Mobile: +64 27 229 6793
[email protected]
[email protected]
PL P.P.H.U. - Jerzy Nieboras
Graniczna 3
43-445 Dziegielow
Tel. +48 338529249
Fax: +48 338529522
[email protected]
RU Dolina Co. Ltd.
Blagodatnaya 63
196105 St. Petersburg
Tel. +7 (812) 387 1255
Fax: +7 (812) 388 23 07
[email protected]
AU Hans Oversnow
Lot 10 Lee Avenue
2067 Jindabyne
Tel. +61 02 6457 5334
[email protected]
Demaclenko worldwide
27
WE WISH TO SAY THANK YOU
Location: Silvretta-Montafon . Foto: Daniel Hug . www.terragraphy.de
to our customers for allowing us to successfully complete their new snowmaking system
and whish their customers lots of fun on pistes covered with Demaclenko snow!