Presentation 3Q2013
Transcription
Presentation 3Q2013
170609-1Q09 251113 – 3Q2013 www.bakrieland.com BAKRIELAND’S PROFILE 2 Vision & Mission Our vision To become a leading integrated property company in Indonesia Our mission Delivering integrated quality living products for the nation tHat leverage our competencies and development partners in a way tHat upholds financial and environmental sustainability 3 ABOUT BAKRIELAND PT Bakrieland Development Tbk is a public listed company (code: ELTY) engaged in property and mixed use development. The company is the first developer of the largest superblock (53,5 Ha) in the Jakarta CBD area (City Property), a developer of Landed Residential, as well as Hotels & Resorts and theme park projects tHat are all located in Indonesia’s prime areas. 4 MANAGEMENT TEAM - BAKRIELAND BOARD OF COMMISSIONERS Bambang Irawan Hendradi President Commissioner Armansyah Yamin Commissioner Supartono Commissioner Lukman Purnomosidi Independent Commissioner Kanaka Puradiredja Independent Commissioner BOARD OF DIRECTORS & SENIOR EXECUTIVES Ambono Janurianto President Director Agus J.Alwie Director Marc Dressler Director Buce Yeef Chief Financial Officer Kurniawati Budiman Corporate Secretary Yudy Rizard Hakim Chief Corporate Affairs Officer 5 CORPORATE STRUCTURE PT BAKRIELAND DEVELOPMENT TBK INTEGRATED PROPERTY COMPANY CITY PROPERTY LANDED RESIDENTIAL HOTELS & RESORTS PT Bakrie Swasakti Utama INVESTMENT PT GraHa Andrasentra P. PT Samudra Asia Nasional INVESTMENT INVESTMENT Jungle Water Park Pullman Bali Legian Nirwana * Wisma Bakrie 1 Wisma Bakrie 2 Bakrie Tower * Epiwalk & Mediawalk Aston Rasuna Jakarta * Plaza Festival Jungle Mall Aston Bogor Hotel & Resort * Jungle Festival ** PT Krakatau Lampung T. D. INVESTMENT PROJECT Grand Elty Krakatoa Bogor Nirwana Residence Elite Club Epicentrum • Jungle Sky Apartment PROJECT • The Fusion – Indigo Cluster PT Bakrie GraHa Investama Rasuna Epicentrum: • The Fusion – Olive Cluster INVESTMENT Grove Condominium • Cendana Cluster Grand Elty Singgasana Grove Suites • Harmony Boulevard 2 Wave Condominum Ocea Condotel PT Bakrie Pangripta Loka PROJECT PT Bukit Jonggol Asri INVESTMENT Jungleland Adventure Theme Park*** Sentra Timur Residence PROJECT PT GraHa Multi Insani Sentul Nirwana*** PROJECT Awana Yogyakarta Hadiningrat Terrace * Partly retained ** to be completed in Dec 2013 *** Partly owned 6 MAJOR SHaREHOLDERS (>5%) CGMI 10.41% FIDELITY INVESTMENT 5.08% PUBLIC 84.51% CGMI FIDELITY INVESTMENT PUBLIC : Custodian Code of Avenue Luxembourg SARL (Avenue Capital) : THE NORTHERN TST CO SA FIDELITY INVESTMENT : Each ownership < 5% Source : SHare Registrar, as of 31 October 2013 7 CITY PROPERTY PROJECTS 8 Rasuna Epicentrum Superblock in Jakarta CBD CITY PROPERTY DEVELOPMENT 18 thirty-storey condominium towers (4,250 units), fully developed Jakarta H K E Current Land Bank 5,000 m2 G. Media Walk B. Lifestyle Center H. The Wave C. Pasar Festival I. D. Elite Club Epicentrum F B A J I G A. Bakrie Tower E. Taman Rasuna Apartment The Grove Condominium J. The Grove Suites K. Ocea Condotel F. Aston Rasuna A D B C Australian MMC Embassy Hospital Malaysian Embassy 1 3 2 Completed Completed Sport complex and retail area, fully developed and retained as recurring-income asset I J H K Scheduled completion in 1Q 2014 Scheduled completion in 4Q 2013 Scheduled completion in 4Q 2013 Scheduled completion in 4Q2014 Jakarta CBD (Golden Triangle) JAKARTA SUPERBLOCKS 1. Rasuna Epicentrum (53.5 Ha) 2. SCBD (47.7 Ha) 3. Mega Kuningan (44.5 Ha) The first and the largest superblock 2010 Indonesia Property & Bank Award 9 City Property Product Pyramid US$ 150,000 - US$ 250,000 US$100,000 – US$ 140,000 US$ 27,000 – US$ 90,000 10 THE GROVE CONDOMINIUM THE GROVE SUITES CITY PROPERTY DEVELOPMENT CITY PROPERTY DEVELOPMENT Project • 2 mid-up segment condominium towers with 440 units • Total Units Sold : 79.3% •A five star strata hotel with 151 units • Total Units Sold : 79.5% • Construction progress 99% • Construction progress77% • Target completion in 1Q2014 • Average price : US$ 255,000 / unit • Target completion in 4Q2013 • Average price : US$ 155,000 / unit • Average price : US$ 2,400 / sqm • Average price : US$ 2,700 / sqm 02/09/2013 02/09/2013 11 THE WAVE CONDOMINIUM OCEA CONDOTEL CITY PROPERTY DEVELOPMENT CITY PROPERTY DEVELOPMENT Project • 2 mid-up segment condominium towers with 848 units • A four star strata hotel with 324 units • Total Units Sold : 67% • Total Units Sold : 36% • Construction progress98% • Target completion in 4Q2014 • Target completion in 4Q2013 • Average price : US$ 140,000 / unit • Average price : US$ 100,000 / unit • Average price : US$ 3,400 / sqm • Construction progress 51% • Average price : US$ 2,000 / sqm 02/09/2013 02/09/2013 12 BAKRIE TOWER Investment • Jakarta’s highest strata office tower • 47-storey of grade-A office building with 62,035 sqm useable area • In operation since May 2010 • 96% total take up rate EPICENTRUM XX1 LIFESTYLE CENTER CITY PROPERTY DEVELOPMENT • A cinema with a unique red carpet concept in an independent building • Capacity 300 seats and 500 seats (the largest capacity in Jakarta in terms of seating) • Equipped with a lounge for gatherings, events etc. • Entertainment center and office tower • 29,208 sqm useable area • Tenants Farmers Market, Starbucks, Flagship Store, Cafe & Restaurants, Banks (BNI, BCA) etc • 92% total take up rate 13 Sentra Timur Superblock in East Jakarta CBD CITY PROPERTY DEVELOPMENT Total 11 apartment towers: • PHase 1 (3 towers) completed inJuly 2010 • PHase 2 (3 towers) scheduled completion July 2014. 2 Total 26 shop houses: 3 • PHase 1 (11 units) completed in July 2012 • PHase 2 (15 units) scheduled completion December 2013 Total 17 shop houses: Under construction 4 1 • Total development area : 16.9 Ha (Land bank : 13.2 Ha) • Development plan : 40 Ha 1 2 3 11. 22. Sentra Timur Residence 33. 44. CBD 2 CBD 1 Mutiara Platinum 4 14 Sentra Timur Residence & Superblock (1/2) SENTRA TIMUR RESIDENCE COMMERCIAL PARK (CP 1& 2) T. Abu-abu T. Ruby T. Orange • Total land area : 32.343 M2 • Launched: PHase 1A : April 2008 PHase 1B : April 2012 Total units : • PHase 1 A : 1.327 units (Unit Sold 82%) • PHase 1 B : 885 units (Unit Sold 47%) •Construction Progress : CP 1 : 1.995 M2 / 11 units CP 2 : 2.966 M2 / 15 units • Launched : CP 1 : July 2011 CP 2 : April 2012 • Total Units Sold : 80% • Construction Progress : PHase 1A 100% CP 1 : 100% PHase 1B 39.4% CP 2 : 54.8% • Average Price : US$ 27,000 – US$ 33,000 / unit 15 •Total land area & Total Unit : • Average Price : US$ 210,000 / unit 15 Sentra Timur Residence & Superblock (2/2) MUTIARA PLATINUM GRAND MUTIARA PLATINUM COMMERCIAL PARK 7 • Total units : 11 • Total units: 14 • Total units : 17 • Total land area : 2.055 M2 • Total land area : 2.220 M2 • Total land area : 3.958 M2 • Launched : 20th October 2012 • Launched : November 2013 • Launched : December 2013 • Total Units Sold (average) : 0% • Total Units Sold : 29% • Total Units Sold (average) : 60% • Construction Progress : 78.5% • Average Price : US$ 190,000 16 • Construction Progress : Infrastructure 77% • Average Price : US$ 200,000 • Construction Progress : Preparation stages 100% • Average Price: US$ 310,000 16 Awana Project in Yogyakarta AWANA CONDOTEL AWANA TOWNHOUSE • Total units : 296 • Total units : 38 • Room Type : • Type : Standard (20-22 sqm) : 224 units LT/LB : 90/120 Superior (28 sqm) : 64 units • Launched : Feb 2012 Suite (57 sqm) : 8 units • Construction Progress : 100% • Launched : 24th Feb 2012 • Average Price : US$ 1,000/sqm • Construction Progress : 22% • Average Price : US$ 1,600 - US$ 2,300/sqm 17 17 Future Project Rasuna Epicentrum: Tower 5 Condotel & Apartment Location 15 Tower 5 Development : Condotel & Apartment Land Area : 4.840 sqm Average Price : • Condotel : US$ 3.600/sqm • Apartment : US$ 3.200/sqm Schedule Construction : Q2 2014 – Q2 2016 18 Future Project Awana Premium Town House & Hadiningrat Terrace Hotel & Apartment, Yogyakarta Awana Premium (Town House) Project Hadiningrat Terrace Hotel & Apartment Development : • 12 unit art deco & etnic modern premium Townhouse • LT/LB 183/400 Land Area : • 3.378 sqm (premium Townhouse) Average Price : • Townhouse : ± US$ 450,000 – US$ 640,000 /unit Location Schedule Construction: • Townhouse : 2014 Launched : 19 29th November 2013 : Jl. Dr. Sardjito, Yogyakarta (± 1.5 Km dari UGM & Jl. Malioboro) Development : Hotel & Apartment Land Area : ± 3.177 sqm (total) Average Price : Apartment: ± US$ 1,600 /sqm Schedule Construction : • Hotel : Q2 2014 – Q1 2016 • Apartment: Q2 2014 – Q4 2015 Launched : 8th November 2013 19 Future Project Sentra Timur, Jakarta (2014-2018) Central Business District I (± 3.7 Ha) Condotel Sentiwalk Commercial Park I Hyper- Commercial market Park II Apartment Condotel Land Area : 1.502 sqm Floor Area : 7.324 sqm Total Floor : 10 floors Total units : 155 units Unit Types : • Standard (137 units @22,75 sqm) Condotel • Deluxe (8 units @ 26 sqm) • Suite (10 units @ 34,77 sqm) Apartment Facilities : Coffee shop, meeting room, swimming pool, fitness center, function Hall Owned by Perumnas (3.7 Ha) Joint Operation Area (3 Ha) Commercial Park Hypermarket Commercial Park I Land Area : 3.008 sqm Floor Area : 3.240 sqm Total units : 16 units Total Floor : 3 floors Sentra Timur Walk Sentra Timur Walk Land Area : 5.231 sqm Floor Area : 8.771 sqm Total Floor : 2 floors + 1 basement Total Tenants : 22 units kiosk + 10 units kiosk extension Hypermarket 9 units island Land Area : 8,040 sqm Floor Area : 10.316 sqm Total Floor : 2 floors + 1 semi basement 20 Tenant Area : Kiosk 2.445 sqm + 224 sqm extension Island 221,86 sqm 20 Future Project Kahuripan Nirwana MADURA ISLAND GRESIK SURAMADU BRIDGE Destination Distance Estimation (km) Time Estimation (minutes) Surabaya 35 30-40 Bandara Juanda 30 30-40 Rungkut 20 20-30 Stasiun Kereta Api Sidoarjo 5,4 15-20 Alun-alun Sidoarjo 4,8 10-15 Gelanggang Olahraga Sidoarjo 2,9 5-10 RSUD Sidoarjo 6,2 15-20 MADURA STRAIT TJ. PERAK SEAPORT SURABAYA JUANDA INTERNATIONAL AIRPORT To MOJOKERTO Kahuripan Nirwana range distance with strategic location PHase 1 Kahuripan Nirwana ±220 Ha SIDOARJO ± 280 Ha PHase 2 Kahuripan Nirwana Toll road To MALANG Ring road Rail road 21 Future Project Kahuripan Nirwana 1: Development plan 2014 – 2023 commercial and residential (mixed use) To Surabaya Housings & Commercial Water Park Theme Park Hotels To Malang 22 LANDED RESIDENTIAL PROJECTS 23 Bogor Nirwana Residences is an integrated township in Bogor, targeting middle-up customers segment • Bogor Nirwana Residence (BNR) is a township development project in Bogor city, with total development area of ~1.220 Ha • Current product features : • Middle-upper cluster segment landed residential (selling price: 0.2 – 6 Bio Rp) • Commercial (The Jungle Mall with leasable area ~11,315 sqm ; OrcHard walk with saleable area ~15,735 sqm) • 4-star hotel (Aston Hotel & Resort 223 rooms) • Jungle Water Park (with 1 million visitors in 2012) A B Rancamaya Jagorawi Proposed Bogor Toll Road Inner Ring Road Proposed Bogor Proposed Ciawi Outer Ring Road Sukabumi Toll Road A Bogor train station (4 km to BNR) B Batu Tulis train station (1 km to BNR) 24 24 Landed Residential Product Pyramid US$ 230,000 - US$ 450,000 US$ 120,000 - US$ 160,000 US$ 91,000 - US$ 110,000 US$ 27,000 – US$ 90,000 25 Landed Residential Project Jungle Sky Apartment The Cliff Cluster The Fusion – Indigo Cluster Land Area : 1.5 Ha Land Area : 6.2 Ha Land Area : 3.7 Ha Total tower : 3 towers (6 wings) Total units : 72 units Total units : 118 units Total units : ± 1.200 units Units Sold : 94% Units Sold : 89% Average Price : US$ 27,000 – US$ Average Price : US$ Average Price : US$ 91,000 - 90,000 280,000 - US$ 450,000 US$ 110,000 Launched : Wing Azure : April 2013 Units Sold : 76% Wing Balfour : June 2013 Units Sold : 45% 26 Landed Residential Project The Fusion – Olive Cluster Cendana Cluster Land Area : 6.2 Ha Land Area Total units : 84 units Total units : 153 units Total units : 54 units Units Sold : 86% Units Sold Units Sold : 97% Average Price : US$ Average Price : US$ 120,000 - Average Price US$ 155,000 130,000 - US$ 160,000 230,000 - US$ 360,000 : 6.7 Ha Harmony Boulevard 2 : 98% Land Area : 2.4 Ha : US$ 27 Supporting Facilities The Jungle Water Park Jungle Mall Land Area : 2,4 Ha Land Area : 4,3Ha Building Area : 2,2 Ha Opened : December 2007 Leasable Area : 1,1 Ha Visitors : 1 million /year Tenants Themed Entertainment Association as : • Timezone 16th in the world and 10th in Asia Pacific • OrcHard Futsal Ticket price • OrcHard Karaoke Rp 50.000 (weekday) • Bowling Center Rp 70.000 (weekend) • Lawson / Indomaret Rp 85.000 (for special day) : 28 Supporting Facilities Jungle Fest Land Area : 5.5 Ha Schedule Opening : Q4 2013 Aston Bogor Hotel Land Area : 3 Ha Operation : December 2010 Target Visitors : 1.5 million/year Features Target market : Groups, family, kids & 223 Unit Rooms, 2 Grand Ballrooms, 10 meeting rooms, 3 outdoor swimming pool, teenager Features : : terrace cafe, boutique store, coffe shop, pub Theme Park, Jungle Bazaar (Center of and music room, pool side restaurant, Arts, Handiecraft and Local & Int’l Culinary mezzanine café. kids club, spa, fitness cuisine) , Family Rides, Education Zone, center Petting Zoo, Garden Festival, Carnival Average occupancy rate : 82% as of October Show, Light Show, Branded Restaurants 2013 29 Future Project Bogor Nirwana Residence 2014 - 2015 Landed Residential & Apartment *Image browsing *Image browsing Crimson The Fusion Land Area : 3,17 Ha Schedule : Mei 2014 Unit Type : 200-550 Average Price 270,000 - US$ 550,000 : US$ Jungle Fest Apartment Land Area : 0,9 Ha Schedule : Q3 2015 Total Tower : 3 towers Total Unit : 650 units Average Price : US$ 27,000 - US$ 100,000 Golden The Fusion Land Area : 1,9 Ha Schedule : Aug 2014 Unit Type : 150/420 Average Price 270,000 - US$ 360,000 : US$ Excellent 1 Land Area : 9 Ha Schedule : Q3 2015 Unit Type : LB/LT 250-350/375700 Average Price : US$ 320,000 – US$ 640,000 Grand Cendana Land Area : 7,3 Ha Schedule : Sept 2014 Unit Type : 120-170/200-320 Average Price US$ 110,000 - US$ 180,000 30 HOTELS & RESORTS PROJECTS 31 HOTEL LIFETIME INVESTMENT Project PULLMAN BALI LEGIAN NIRWANA HOTEL & RESORT DEVELOPMENT Seminyak • The first 5-star strata hotel in Kuta-Bali • Managed by Accor International • 356 five-star hotel units on 2.4 Ha • Commenced Operations in February 2011 • 85% average occupancy rate as of October 2013 PULLMAN BALI LEGIAN NIRWANA KUTA BEACH Jimbaran Bali island HaRD ROCK HOTEL - BALI 32 Grand Elty Krakatoa Trans Sumatera main road ~35 km to Bakauheni Port • Grand Elty Krakatoa (GEK) is a regional city hotel within Krakatoa Nirwana Resort in Kalianda, South Lampung, covering a ~62 km to Radin Inten II Airport total area of 350 Ha land • Operated by Elty Hotel & Resort (BNS’s flagship branded hotel cHain) • 40 hotel room units & 36 villas units • Features excellent beach restaurant, beach lounge, beach activities, swimming room, meeting rooms 33 Grand Elty Singgasana • Grand Elty Singgasana (GES) is a regional city hotel in Tenggarong, East Kalimantan (2nd largest city after Samarinda and known for it’s coal mining industry), targeted for business travel and company gathering activities • Operated by Elty Hotel & Resort • GES is managed through Build, Operate, Transfer (BOT) agreement with Tenggarong local government • 74 rooms & suites • Features : • ballroom & meeting room, sports area, near location to tourism destination (Pulau Kumala, Mulawarman Museum) and business district, 34 Future Project Grand ELTY Samarinda, East Kalimantan Facade - Existing Ballroom - Refurbishment • Location : Samarinda, East Kalimantan • Facade - Refurbishment Room Interior - Refurbishment • Total room : 212 Superior: 10 Deluxe: 53 Business: 142 Junior Suite: 4 Executive Suite: 2 Royal ELTY Suite: 1 Features : restaurant, ballroom, meeting room, karaoke, bar lounge, executive lounge, spa, business center, retail (Commercial area) Activity Schedule Refurbishment (2 pHases) Q4 2013-Q2 2015 Soft Opening Q4 2014 Grand Opening Q4 2015 35 FINANCIAL HIGHLIGHTS 36 COMPREHENSIVE INCOME 3,500 2,950 Net Revenues (Rp billion) 3,000 2,691 5-year CAGR (2008-2012) : 2,500 1,928* 29% 2,000 1,500 1,054 1,059 2008 2009 1,368 1,000 500 0 2010 2011 2012 3Q2013 * Restated due to the divestment of toll road (IDR billion) Net Revenues Gross Profit Operating Profit EBITDA Net Income** 3Q2013 2,690.7 1,618.2 1,095.0 1,184.2 757.6 3Q2012 1,257.5 628.2 148.0 215.1 (133.0) % Change 114.0 157.6 639.9 450.5 669.6 ** Income attributable to owners of the parent entity 9M13 1H13 IQ13 4Q12 3Q12 2Q12 1Q12 4Q11 3Q11 2Q11 1Q11 4Q10 3Q10 2Q10 1Q10 4Q09 Quarterly Revenue 3Q09 2Q09 IDR bn 1Q09 3,000 2,500 2,000 1,500 1,000 500 0 37 FINANCIAL POSITION IDR billion 2010 audit ed Cash & cash equivalents 2011 audit ed 2012 audit ed 3Q2013 unaudit ed 860.6 597.1 268.4 207.2 5,580.3 5,958.8 4,448.0 1,547.7 349.3 298.8 1,240.6 4,524.1 Inventories and land banks 6,312.5 6,662.7 6,788.6 3,962.7 Other assets 3,961.5 4,190.5 2,490.0 3,913.9 17,064.2 17,707.9 15,235.6 14,155.6 Interest bearing liabilities 1 4,389.2 4,841.8 3,561.2 3,556.0 Other liabilities 2,193.0 1,964.0 2,510.2 2,293.0 Non-controlling Interest 2,460.0 2,555.2 1,858.0 72.5 Equity 2 8,022.0 8,346.9 7,306.2 8,234.1 17,064.2 17,707.9 15,235.6 14,155.6 Fixed assets Investment in share of stock Total assets Total liabilities & Equity 3 1 Including equity-linked bonds 2 Equity attributable to parent entity 3 Including non-controlling interest in equity 38 LAND BANK 30 September 2013 Location City Property Rasuna Epicentrum CBD Jakarta 0.5 Sentra Timur East Jakarta 13.2 Kahuripan Nirwana Sidoarjo Hadiningrat Terrace Yogyakarta Landed Residential Bogor Nirwana Residence Sentul* Hotel & Resort Grand Elty Krakatoa Total Bogor Land Bank (Ha) 500.0 0.3 755.0 Jonggol 1,000.0 Lampung 99.8 2,368.8 * In finalization progress 39 PT BAKRIELAND DEVELOPMENT TBK THank You For further information please contact : Marc Dressler (Director & Chief Services Officer) Gilang Rakasiwi (Investor Relations) Wisma Bakrie 1, 6th Floor Jl. HR Rasuna Said Kav. B-1 Jakarta 12920 Tel +62 21 525 7835 Fax +62 21 522 5063 [email protected] http://www.bakrieland .com Disclaimer: Any statements & presentations in this booklet are for information purposes only and may contain forward-looking statements tHat involve risks and uncertainties. Many of which are difficult to predict and are generally beyond the control of the company. Such risks and uncertainties could cause actual results and developments to differ materially from those expressed in or implied in these statements. Considerable care Has been taken in preparing information which is contained in this presentation. However, PT Bakrieland Development Tbk is unable to provide any warranty concerning the accuracy or completeness of any information contained herein.