minutes - Shire of Laverton
Transcription
minutes - Shire of Laverton
UNCONFIRMED At the time of printing, these Minutes have yet to be confirmed as a true record of proceedings SHIRE OF LAVERTON MINUTES OF THE ORDINARY MEETING OF COUNCIL HELD ON 24 MARCH 2016 COMMENCING AT 5:05PM Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page i TABLE OF CONTENTS 1. DECLARATION OF OPENING ............................................................................. 1 2. ANNOUNCEMENT OF VISITORS ........................................................................ 1 3. RECORD OF ATTENDANCE ............................................................................... 1 4. APPLICATIONS FOR LEAVE OF ABSENCE ...................................................... 1 5. RESPONSE TO PREVIOUS PUBLIC QUESTIONS TAKEN ON NOTICE ............ 2 6. PUBLIC QUESTION TIME .................................................................................... 2 7. NOTICE OF ITEMS TO BE DISCUSSED BEHIND CLOSED DOORS .................. 2 8. CONFIRMATION OF MINUTES............................................................................ 2 8.1 Ordinary Meeting of Council, 18 February 2016 (File Ref: 793)......................... 2 OMC160301 ........................................................................................................... 2 Special Meeting of Council, 23 February 2016 (File Ref: 793) ........................... 3 OMC160302 ........................................................................................................... 3 9. PETITIONS / DEPUTATIONS / PRESENTATIONS ......................................................... 2 10. ANNOUNCEMENTS BY PRESIDING MEMBER WITHOUT DISCUSSION ..................... 3 10.1 President’s Report (File Ref: 198) ...................................................................................... OMC160303 ........................................................................................................... 10.2 Other Members’ Reports (File Ref: 55) ............................................................................. OMC160304 ........................................................................................................... 3 3 3 3 REPORTS OF COMMITTEES AND OFFICERS.............................................................. 4 11.1 HEALTH, BUILDING AND TOWN PLANNING BUSINESS .................................................. 11.1.1 Fencing Local Law - Outcome of Recent Inspection (File Ref: 1056) .................... OMC160305 ........................................................................................................... OMC160306 ........................................................................................................... 11.2 FINANCE AND ADMINISTRATION BUSINESS ................................................................... 11.2.1 Accounts Paid as at 29 February 2016 (File Ref: 39) ........................................... OMC160307 ........................................................................................................... 11.2.2 Outstanding Debtors Report as at 29 February 2016 (File Ref: 33) ..................... OMC160308 ........................................................................................................... 11.2.3 Reimbursement of Expenses as at 29 February 2016 (File Ref: 957) .................. OMC160309 ........................................................................................................... 11.2.4 Financial Activity Statements to 31 January 2016 (File Ref: 958) ......................... OMC160310 ........................................................................................................... 11.2.5 Bank Reconciliation Report as at 31 January 2016 (File Ref: 959) ...................... OMC160311 ........................................................................................................... 11.3 WORKS AND SERVICES BUSINESS .................................................................................. 11.3.1 Tender Purchase of Motor Grader (File Ref:1020) ................................................ OMC160312 ........................................................................................................... 11.4 COMMUNITY DEVELOPMENT BUSINESS ......................................................................... 11.5 MANAGEMENT AND POLICY BUSINESS .......................................................................... 11.5.1 GVROC Meeting Minutes 26 February 2016 (File Ref: 850) ................................ OMC160313 ........................................................................................................... 11.5.2 Councillors’ Information Bulletin February 2016 (File Ref: 779) ............................ OMC160314 ........................................................................................................... 4 4 5 5 6 6 10 10 11 12 13 13 15 15 17 17 17 19 19 19 19 21 21 23 8.2 11. OMC160324 Minutes - Unconfirmed Minutes Page ii Shire of Laverton Ordinary Meeting of Council – 24 March 2016 11.5.3 11.5.4 11.5.5 11.5.6 11.5.7 Audit Committee Meeting Minutes 24 March 2016 (File Ref: 568) ....................... OMC160315........................................................................................................... Delegation Review (File Ref: 58) .......................................................................... OMC160316........................................................................................................... Policy 02.18 Purchasing (File Ref: 95) ................................................................. OMC160317........................................................................................................... Disposal of Toyota Prado P233 (File Ref: 143) .................................................... OMC160318........................................................................................................... New Local Government Act Provisions - Disclosure of Contributions to Travel (File Ref: 57) ......................................................................................................... OMC160319........................................................................................................... 23 24 25 28 28 31 32 34 34 37 12. ELECTED MEMBERS’ MOTIONS OF WHICH PREVIOUS NOTICE HAS BEEN GIVEN 37 13. NEW BUSINESS OF AN URGENT NATURE INTRODUCED BY DECISION OF THE MEETING .................................................................................................................... 37 13.1 13.2 13.3 13.4 13.5 13.6 OMC160320........................................................................................................... RFQ – Provision of Design Services Great Central Road - 385 to 435 SLK (File Ref: 27) ......................................................................................................................... OMC160321........................................................................................................... Laverton Men’s Shed Inc. – Renewal of Use Arrangements for Old Courthouse (File Ref: 817) ....................................................................................................................... OMC160322........................................................................................................... Proposal to Use External Project Management Services for Main Street Project (File Ref: 566) ....................................................................................................................... OMC160323........................................................................................................... Design Laverton Western Heavy Haulage Bypass (File Ref: 556) ................................. OMC160324........................................................................................................... Consideration of Proposed RFQ Brief for the Design, Fabrication and Installation of Town Signage (File Ref: 566) ......................................................................................... OMC160325........................................................................................................... Playgroup/Childcare Building Upgrade and Renovation Update (File Ref: 883) .......... OMC160326........................................................................................................... 37 38 40 41 42 43 44 45 47 47 49 49 51 14. ITEMS FOR CONSIDERATION BEHIND CLOSED DOORS ...................................... 52 15. NEXT MEETING ......................................................................................................... 52 16. CLOSURE OF MEETING ............................................................................................ 52 ATTACHMENTS ATTACHMENT NO OMC1603-10.1.A OMC1603-10.2.A OMC1603-10.2.B OMC1603-11.2.4.A OMC1603-11.5.3.A OMC1603-11.5.4.A OMC1603-11.5.5.B OMC1603-13.5.A OMC1603-13.6.A DESCRIPTION PAGE NO President’s Report – Cr P Hill Elected Member’s Report – Cr D Ross Elected Member’s Report – Cr S Weldon Financial Report for Period to 31 January 2016 Audit Committee Meeting Minutes 24 March 2016 Delegation Register Draft Policy 02.18 Purchasing Draft RFQ Brief – Design, Fabrication and Installation of Town Signage Revised Scope of Works Appended Appended Appended Appended Appended Appended Appended Appended Appended OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 1 MINUTES OF THE ORDINARY MEETING OF COUNCIL, HELD IN THE LAVERTON COUNCIL CHAMBERS ON 24 MARCH 2016 COMMENCING AT 5:05PM 1. DECLARATION OF OPENING The President, Cr P Hill, declared the meeting open at 5:05pm and read aloud the disclaimer as printed in the Agenda. 2. ANNOUNCEMENT OF VISITORS Mr Bert Davis Ms Magz Day Ms Robyn Smith 3. Laverton Men's Shed Laverton Men's Shed Finance & Administration Manager, Shire of Laverton RECORD OF ATTENDANCE 3.1 PRESENT Cr P Hill Cr S Weldon Cr G Walder Cr R Ryles Cr D Ross Cr R Prentice President Deputy President (from 5:28pm) Councillor Councillor Councillor Councillor Mr S Deckert Mr G Stanley Mr R Williams Miss T Farlow Chief Executive Officer Executive Manager Corporate & Community Services Executive Manager Technical Services Executive Assistant to the CEO 3.2 APOLOGIES Cr D Cannons Councillor 3.3 LEAVE OF ABSENCE PREVIOUSLY APPROVED Nil 4. RESPONSE TO PREVIOUS PUBLIC QUESTIONS TAKEN ON NOTICE Nil. OMC160324 Minutes - Unconfirmed Minutes Page 2 5. Shire of Laverton Ordinary Meeting of Council – 24 March 2016 PUBLIC QUESTION TIME Mr Bert Davis outlined the plans of the Laverton Men's Shed Association Inc. to seek assistance and grant funding for the purchase of a new 20x20m shed and erection of this shed in the grounds of the Old Court House. This will provide additional room for members to work on projects and it is hoped this will attract new members who have projects of their own that they wish to work on. He advised that Ms Day has recently come on board as Secretary for the Men’s Shed and a couple of former members have returned but they are always looking for more new members. The Men’s Shed have a meeting with the EMTS and the EHO on 7 April 2016 to discuss plans for the new shed and requirements need for power, concrete and building permit applications etc. Mr Davis also advised that they would like to renew the appearance of the front façade of the Old Court House as although it has been washed down, the decorative ironwork is looking rather dilapidated and could do with a coat of paint. The President thanked Mr Davis and Ms Day for the good work the Men’s Shed is doing on the Old Court House Building. 05:19pm 6. Mr Davis and Ms Day left the meeting. APPLICATIONS FOR LEAVE OF ABSENCE There were no applications for Leave of Absence at this meeting. 7. NOTICE OF ITEMS TO BE DISCUSSED BEHIND CLOSED DOORS There were no items listed for discussion behind closed doors at this meeting. 8. CONFIRMATION OF MINUTES 8.1 ORDINARY COUNCIL MEETING – 18 FEBRUARY 2016 (FILE REF: 793) VOTING REQUIREMENTS Simple majority decision of Council required. OMC160301 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr G Walder: That the Minutes of the Ordinary Meeting of Council held on 18 February 2016, be confirmed as a true and accurate record. CARRIED 5/0 OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 8.2 Minutes Page 3 SPECIAL COUNCIL MEETING – 23 FEBRUARY 2016 (FILE REF: 793) VOTING REQUIREMENTS Simple majority decision of Council required. OMC160302 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr G Walder: That the Minutes of the Special Meeting of Council held on 23 February 2016, be confirmed as a true and accurate record. CARRIED 5/0 05:28pm 9. Cr S Weldon joined the meeting. PETITIONS/DEPUTATIONS/PRESENTATIONS There were no petitions, deputations or presentations listed for this meeting. 10. ANNOUNCEMENTS BY PRESIDING MEMBER WITHOUT DISCUSSION 10.1 PRESIDENT’S REPORT (FILE REF: 198) The President tabled and spoke to his report (Attachment OMC1603-10.1.A). VOTING REQUIREMENTS Simple majority decision of Council required. OMC160303 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr D Ross: That the President’s report (Attachment OMC1603-10.1.A) as tabled, be received. CARRIED 6/0 10.2 OTHER MEMBERS’ REPORTS (FILE REF: 55) Reports on activities prior to the Ordinary Meeting of Council have been submitted for information by Cr Deanne Ross and Cr Shaneane Weldon. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160304 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr G Walder; Seconded Cr S Weldon: That the Elected Members’ reports from Cr Deanne Ross (Attachment OMC160310.2.A) and Cr Shaneane Weldon (Attachment OMC1603-10.2.B) be received. CARRIED 6/0 OMC160324 Minutes - Unconfirmed Minutes Page 4 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 11. REPORTS OF COMMITTEES AND OFFICERS 11.1 HEALTH, BUILDING AND TOWN PLANNING BUSINESS 11.1.1 FENCING LOCAL (FILE REF 1056) LAW - OUTCOME OF RECENT INSPECTION SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Glenn Bone, Project Officer SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION To consider commencing a process that will result in the maintenance/replacement of dilapidated fencing in Laverton. ATTACHMENTS OMC1603-11.1.1.A OMC1603-11.1.1.B Draft letter re Fencing Inspections Confidential Attachment tabled at meeting – Property List APPLICANT’S SUBMISSION Not applicable. BACKGROUND A recent inspection of town fencing has identified the presence of a number of defective fencing structures. The particular fences are all in a damaged or dilapidated condition and are classified in the following way: Five properties with a shared boundary (ie, either a side or rear boundary). Two properties that adjoin vacant land. This therefore translates to the potential involvement of 12 different owners. STATUTORY ENVIRONMENT Fencing Local Law 2013 Clause 3.2 Maintenance of Fences (1) An owner and occupier of a lot on which a fence is erected shall maintain the fence in good condition so as to prevent it from becoming dangerous, dilapidated or unsightly. POLICY IMPLICATIONS Council has no policies in respect to this matter. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 5 FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Nil. COMMENT Basically Council’s position is that having made Fencing Local Laws, it now has an obligation to enforce the provisions in a satisfactory manner. A reasonable parallel can be drawn to the adoption several years ago of the Bush Fire Notice which was put in place to combat and reduce fire hazards around the town (flammable material). In that case it was initially a matter of owner education to effectively remove the fire hazards, however as time progressed, enforcement has become more regimented. A similar approach is now proposed in regard to the maintenance of fencing. However, as this is the first proposed action following the adoption of the Fencing Local Law 2013, it is not intended to be overbearing and will initially be advice to the property owners that their fences need repair or replacement and is therefore seeking feedback from them on their intended course of action. Depending on the owners’ response, or lack thereof, Council may then need to consider more affirmative action. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160305 STAFF RECOMMENDATION Moved Cr S Weldon; Seconded Cr G Walder: That Council: 1. Sanction the issue of correspondence to owners of properties with defective fencing as per the confidential list tabled at the meeting (Confidential Attachment OMC1603-11.1.1.B), requesting them to provide advice on their intended course of action to rectify the defects; and 2. Request that the owner’s response (or lack thereof) be referred back to Council in due course for consideration. MOTION LOST 2/4 OMC160306 COUNCIL DECISION Moved Cr R Ryles; Seconded Cr R Prentice: That Council reintroduce this item at the October 2016 Ordinary Meeting of Council. CARRIED 6/0 Reason for Amending the Staff Recommendation Council required more information before making a decision on this item and felt that this was not a priority at this time. OMC160324 Minutes - Unconfirmed Minutes Page 6 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 11.2 FINANCE AND ADMINISTRATION BUSINESS 11.2.1 ACCOUNTS PAID AS AT 29 FEBRUARY 2016 (FILE REF: 39) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Shire of Laverton AUTHOR: Tamara Hill, Administration Officer SENIOR OFFICER: Graham Stanley, Executive Manager Corporate and Community Services PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION The presentation of a list of accounts paid in the preceding month in accordance with Council Delegation 21. ATTACHMENTS Nil APPLICANT’S SUBMISSION Not applicable. BACKGROUND In accordance with Delegation 21, the Chief Executive Officer has approved the following accounts for payment: Creditors Aerodrome Compliance & Civic - EFT AirBP Andrew Sutcliffe - EFT ANL Lighting Australia Pty Ltd - EFT Atom Supply - EFT Austral Mercantile Collection - EFT Australia Post Australian Taxation Office - EFT B & S Printing Company - EFT Bailey's Fertiliser - EFT Bindi Bindi Publishing - EFT BOC Limited - EFT Bridgestone Earthmover Tyres Pty Ltd Bunnings Group Limited - EFT City of Kalgoorlie-Boulder - EFT Trans # 99554 99933 99839 99840 99555 99841 99556 99603 99879 99740 99842 99557 99558 99559 99604 99560 99843 99844 Type Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Date 12/02/16 15/02/16 25/02/16 25/02/16 12/02/16 25/02/16 12/02/16 12/02/16 25/02/16 19/02/16 25/02/16 12/02/16 12/02/16 12/02/16 12/02/16 12/02/16 25/02/16 25/02/16 Chq # Debit 12849 12859 12850 Amount -5,500.00 -9,993.87 -208.60 -1,564.15 -504.70 -1,125.55 -2,600.56 -427.54 -355.89 -24,922.00 -759.00 -13,807.04 -90.00 -80.76 -12,964.28 -5,584.01 -955.94 -17,600.00 OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Creditors Coca-Cola Amatil (Aust) Pty Ltd - EFT Coffee & Tea Supplies - EFT Complete Services Pty Ltd - EFT Courier Australia - EFT Covs Auto, Mining & Industrial - EFT CREDIT CARD PURCHASES CyberSecure Pty Ltd - EFT Dept of Transport Des Cannons - EFT Desert Sands Cartage - EFT Diggawest & Earthparts WA - EFT Eastgold Dairy Distributors - EFT Elders Midland Elite Gym Hire - EFT Elka Australia - EFT Evolution Mining (Mungari) Pty Ltd First National Real Estate - EFT Goldfields Pest Control - EFT Goldfields Truck Power - EFT Goldline Distributors - EFT Goldrush Tours - EFT Graham Stanley - EFT Gray & Lewis Land Use Planners - EFT GSM Mining Company Heather Hutchinson - EFT OMC160324 Minutes - Unconfirmed Minutes Page 7 Trans # 99561 99562 99563 99564 99565 99845 100047 99566 100014 100012 100010 99974 99972 99970 99954 99952 99950 99937 99932 99923 99915 99913 99911 99897 99895 100032 99567 99846 99847 99568 99848 99880 99569 99849 99570 99605 99571 99850 99572 99851 99573 99852 99574 99853 99854 99855 99606 99856 Type Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Date 12/02/16 12/02/16 12/02/16 12/02/16 12/02/16 25/02/16 03/02/16 12/02/16 02/02/16 03/02/16 04/02/16 05/02/16 08/02/16 09/02/16 10/02/16 11/02/16 12/02/16 15/02/16 16/02/16 19/02/16 22/02/16 23/02/16 24/02/16 25/02/16 26/02/16 29/02/16 12/02/16 25/02/16 25/02/16 12/02/16 25/02/16 25/02/16 12/02/16 25/02/16 12/02/16 12/02/16 12/02/16 25/02/16 12/02/16 25/02/16 12/02/16 25/02/16 12/02/16 25/02/16 25/02/16 25/02/16 12/02/16 25/02/16 Chq # Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit Debit 12860 12851 12852 Amount -426.63 -358.30 -2,024.00 -1,607.09 -771.23 -125.51 -12,558.61 -3,281.30 -2,988.40 -559.40 -641.25 -751.80 -672.75 -23.00 -541.90 -9.00 -556.80 -642.15 -1,322.40 -385.55 -221.55 -74.75 -661.30 -423.20 -41.80 -599.60 -827.27 -683.07 -1,727.00 -646.30 -193.90 -4,510.00 -660.00 -660.00 -239.03 -326.11 -4,180.00 -1,760.00 -1,356.34 -35.85 -1,190.33 -531.69 -1,694.90 -1,286.64 -360.00 -1,051.99 -781.26 -2,000.00 Minutes Page 8 Creditors Helga Watson - EFT Hippo Haulage Services - EFT Hitachi Construction Machinery - EFT Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Trans # 99575 99576 99577 99857 Horizon Power 99607 Horizon Power - EFT 99578 Information Services & Tech - EFT 99579 Investec Asset Finance & Leasing Pty Ltd 99935 Janelle Duncan - EFT 99580 Kalgoorlie Retravision - EFT 99581 Kalpumps Sales & Service - EFT 99858 Kott Gunning Lawyers - EFT 99275 99859 Landgate - EFT 99582 Laurinda Hill - EFT 99583 99860 Laverton Post Office - EFT 99584 Laverton Supplies - EFT 99585 99861 Leonora Investments (Laverton Motors)99586 EFT LGIS WA - EFT 99587 Marketforce - EFT 99862 Martin Seelander - EFT 99588 Mary-Jane Golding - EFT 99863 McMahon Burnett Transport - EFT 99864 Moore Stephens - EFT 99589 National Australia Bank Novimex Wholesale Giftware - EFT Parmelia Resources Limited Peerless Jal Pty Ltd - EFT Petty Cash Tin - Shire of Laverton PFD Food Services Pty Ltd - EFT Pivotel Satellite Pty Limited Pivotel Satellite Pty Ltd - EFT Powerchill - EFT PWT Electrical - EFT Quick Corporate - EFT Ray Martin - EFT Regis Resources Reliance Petroleum (BP) Robyn Smith - EFT Shire of Leonora - EFT Sports Power Kalgoorlie - EFT Type Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Date 12/02/16 12/02/16 12/02/16 25/02/16 12/02/16 12/02/16 12/02/16 15/02/16 12/02/16 12/02/16 25/02/16 01/02/16 25/02/16 12/02/16 12/02/16 25/02/16 12/02/16 12/02/16 25/02/16 12/02/16 Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque 99899 Bill Pmt -Cheque 100034 Bill Pmt -Cheque 99590 Bill Pmt -Cheque 99881 Bill Pmt -Cheque 99591 Bill Pmt -Cheque 99615 Bill Pmt -Cheque 99592 Bill Pmt -Cheque 99865 Bill Pmt -Cheque 99882 Bill Pmt -Cheque 99866 Bill Pmt -Cheque 99867 Bill Pmt -Cheque 99868 Bill Pmt -Cheque 99593 Bill Pmt -Cheque 99869 Bill Pmt -Cheque 99883 Bill Pmt -Cheque 99916 Bill Pmt -Cheque 99870 Bill Pmt -Cheque 99871 Bill Pmt -Cheque 99594 Bill Pmt -Cheque 12/02/16 25/02/16 12/02/16 25/02/16 25/02/16 12/02/16 3/02/16 17/02/16 25/02/16 29/02/16 12/02/16 25/02/16 12/02/16 15/02/16 12/02/16 25/02/16 25/02/16 25/02/16 25/02/16 25/02/16 12/02/16 25/02/16 25/02/16 22/02/16 25/02/16 25/02/16 12/02/16 Chq # 12853 Debit Debit Debit 12861 12858 12862 12863 Debit Amount -434.16 -440.00 -308.22 -7,823.68 -19,968.44 -750.00 -396.00 -3,059.04 -1,000.00 -446.00 -464.20 -192,532.73 -1,516.09 -131.50 -30.80 -34.00 -284.75 -785.31 -232.64 -35.04 -129.75 -6,003.52 -87.50 -133.79 -1,460.87 -10,085.48 -82,364.06 -95,494.37 -61.99 -42.90 -312.08 -236.88 -132.00 -464.95 -1,046.75 -157.05 -659.23 -21,692.98 -963.60 -1,435.50 -499.98 -126.29 -281.54 -155.72 -580.10 -2,521.04 -130.00 OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Creditors Sportsworld of WA - EFT StampStore (SJDK Group) Staples Australia Pty Limited - EFT Stockdale Building Company - EFT Telstra The Lister Specialists Pty Ltd - EFT The Wanneroo Agricultural Machinery EFT Titan Australia Pty Ltd - EFT Total Eden - EFT Tropicana Gold Limited Truckline - EFT WA Local Government Association - EFT WA Treasury Corporation - EFT Water Corporation Western Australia Planning Commission Westrac Pty Ltd - EFT WML Consultants Pty Ltd - EFT Wurth Australia Pty Ltd - EFT Minutes Page 9 Trans # 99595 99608 99596 99872 99609 99873 99597 Type Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Date 12/02/16 12/02/16 12/02/16 25/02/16 12/02/16 25/02/16 12/02/16 99874 99598 99610 99599 99875 99600 99876 100025 100030 99611 99884 99601 99877 99878 99602 Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque Bill Pmt -Cheque 25/02/16 12/02/16 12/02/16 12/02/16 25/02/16 12/02/16 25/02/16 10/02/16 29/02/16 12/02/16 25/02/16 12/02/16 25/02/16 25/02/16 12/02/16 Chq # 12854 12855 12856 Debit Debit 12857 12864 Total Amount -110.00 -81.00 -771.05 -8,250.00 -10,339.43 -27,738.76 -242.20 -4,092.00 -1,945.90 -1,135.79 -657.14 -657.81 -89.40 -292.30 -25,320.75 -16,687.10 -14,191.03 -572.00 -312.42 -510.23 -14,291.52 -509.37 -744,744.56 STATUTORY ENVIRONMENT Local Government (Financial Management) Regulations 1996 Reg. 34(2)(c) – Each statement of financial activity is to be accompanied by documents containing such other supporting information as is considered relevant by the local government. POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Not applicable. OMC160324 Minutes - Unconfirmed Minutes Page 10 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 COMMENT A listing of payments made providing more detail can be found in the February 2016 Information Bulletin. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160307 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr G Walder; Seconded Cr R Prentice: That Council acknowledges receipt of the list of payments made under Delegation 21 as per the submitted list totalling $744,744.56 and summarised as following: Cheque Numbers Direct Debit Payments Licensing Transfers Bank Fees VISA Payments EFT Payments Salary and Wages 12849 – 12864 01/02/16 – 29/02/16 01/02/16 – 29/02/16 01/02/16 – 29/02/16 29/12/15 to 28/01/16 01/02/16 – 29/02/16 01/02/16 – 29/02/16 Total Payments $67,295.37 $55,216.48 $11,116.60 $104.89 $12,558.61 $420,594.18 $177,858.43 $744,744.56 CARRIED 6/0 11.2.2 OUTSTANDING DEBTORS REPORT AS AT 29 FEBRUARY 2016 (FILE REF: 33) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Shire of Laverton AUTHOR: Tamara Hill, Administration Officer SENIOR OFFICER: Graham Stanley, Executive Manager Corporate and Community Services PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION The presentation of a report indicating the outstanding Debtor Balances as at the end of February 2016. ATTACHMENTS Nil APPLICANT’S SUBMISSION Not applicable. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 11 BACKGROUND Council has requested a report of the Outstanding Debtors of the Shire of Laverton as at the preceding month end. STATUTORY ENVIRONMENT Local Government (Financial Management) Regulations 1996 Reg. 5(1) (a) – The Chief Executive Officer is to establish efficient systems and procedures for the proper collection of all money owing to the local government. POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Not applicable. COMMENT The balance of Outstanding Debtors at 29 February 2016 is $1,911,772.95. A detailed list of Debtor Balances is provided in the February 2016 Information Bulletin. The total debtor balance includes: General Debtors Doubtful Debt Rates TOTAL Current 1,233,516.90 0.00 0.00 1,233,516.90 1 - 30 177,511.29 0.00 9,867.02 187,378.31 31 - 60 10,634.51 0.00 -7,938.16 2,696.35 61 - 90 48,011.45 0.00 0.00 48,011.45 > 90 27,114.30 -138,000.00 551,055.64 440,169.94 TOTAL 1,496,788.45 -138,000.00 552,984.50 1,911,772.95 VOTING REQUIREMENTS Simple majority decision of Council required. OMC160308 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr S Welson: That the report of Outstanding Debtors as at 29 February 2016 be received. CARRIED 6/0 OMC160324 Minutes - Unconfirmed Minutes Page 12 11.2.3 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 REIMBURSEMENT OF EXPENSES AS AT 29 FEBRUARY 2016 (FILE REF: 957) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Shire of Laverton AUTHOR: Tamara Hill, Administration Officer SENIOR OFFICER: Graham Stanley, Executive Manager Corporate and Community Services PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION Presentation of an information report to Council on expenses that have been reimbursed to Staff who have incurred expenditure during the course of business on behalf of Council. ATTACHMENTS Nil APPLICANT’S SUBMISSION Not applicable. BACKGROUND Pursuant to Policy No. 3.11, expenses have been incurred on behalf of Council: Andrew Sutcliffe Workshop Manager Graham Stanley EMCCS Laurinda Hill Great Beyond Co-Ordinator Laurinda Hill Great Beyond Co-Ordinator Martin Seelander Community Liaison Officer Mary-Jane Golding Library/CRC Officer Raymond Martin Swimming Pool Manager Robyn Smith Finance & Administration Manager Reimbursement For BPT Side Window & MRI Inspection $218.60 Reimbursement For 50% Of Mobile Phone Expenses – May 2015 to January 2016 $360.00 Reimbursement For Valentines Day Gifts $34.00 Reimbursement For Ice For Australia Day & Milk For Great Beyond $30.80 Reimbursement For Fuel Costs $87.50 Reimbursement For Meals & Travel Cost Incurred Whilst Attending DOT Traning $133.79 Reimbursement For Printer Cartridges & Other Stationery $126.29 Reimbursement For Expenses For Final Interview & Relocation to Laverton Shire $580.10 TOTAL $1,571.08 OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 13 STATUTORY ENVIRONMENT As per adopted Council Policy 3.11 – Reimbursement of Expenses. POLICY IMPLICATIONS Policy 3.11 - Reimbursement of Expenses. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Not applicable. COMMENT Copies of attachments to support the purchases and the amount reimbursed can be found in the February 2016 Information Bulletin. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160309 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Ryles; Seconded Cr G Walder: That Council acknowledge the reimbursement of expenses already paid in accordance with Policy No. 3.11 amounting to $1,571.08. CARRIED 6/0 11.2.4 FINANCIAL ACTIVITY STATEMENTS FOR THE PERIOD TO 31 JANUARY 2016 (FILE REF: 958) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Graham Stanley, Executive Manager Corporate and Community Services SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION To accept the Financial Activity Statements for the period to 31 January 2016. OMC160324 Minutes - Unconfirmed Minutes Page 14 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 ATTACHMENTS OMC1603-11.2.4.A Financial Report for Period to 31 January 2016 (Appended) APPLICANT’S SUBMISSION Not applicable. BACKGROUND Regulation 34 of the Local Government (Financial Management) Regulations 1996 requires the preparation of a statement of financial activity each month, reporting on revenue and expenditure. Material variances (as determined by the Council annually) between actual and budgeted figures must be commented on. Variances between budgeted and actual expenditure, including the required Material Variances of plus or minus 10% and $10,000, which is the limit set as per Council Resolution, should be reported on. STATUTORY ENVIRONMENT Local Government (Financial Management) Regulations 1996 Reg 34(2) – Provides a local government may require such other supporting information as is considered relevant by the local government. POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Not applicable. COMMENT The Financial Reports are presented monthly, generated by our off-site Accountants, Moore Stephens and printed in our office. Once the reports are received from Moore Stephens, comments are added to various sections of the report to provide additional information or explanations. Explanations for any material variance identified in the reports are provided in Note 13 Major Variances. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 OMC160310 Minutes Page 15 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr G Walder; Seconded Cr R Ryles: That the Financial Activity Statements for the month ending 31 January 2016, as presented (Attachment OMC1603-11.2.4.A), be accepted. CARRIED 6/0 11.2.5 BANK RECONCILIATION REPORT AS AT 31 JANUARY 2016 (FILE REF: 959) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Graham Stanley, Executive Manager Corporate and Community Services SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION The report presented reflects the reconciliation of the Council’s bank accounts, including invested funds, as at 31 January 2016. ATTACHMENTS Nil APPLICANT’S SUBMISSION Not applicable. BACKGROUND Each month Council’s financial accounting system and the various bank accounts operated by Council are reconciled as a means of determining the completeness and integrity of transaction processing. STATUTORY ENVIRONMENT Local Government (Financial Management) Regulations 1996 Reg 34(2) – Provides a local government may require such other supporting information as is considered relevant by the local government. POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. OMC160324 Minutes - Unconfirmed Minutes Page 16 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Not applicable. COMMENT The balance of the bank statement does not identify any outstanding receipts or payments that have not been received by the bank. This will generally mean that the balance on the bank statement will differ from the balance in the financial statements. The Bank Reconciliation Report shown below provides information of any outstanding receipts or payments so that a true picture is provided in relation to the balance of the various bank accounts. SHIRE OF LAVERTON BANK RECONCILIATION AS AT 31 JANUARY 2016 MUNICIPAL FUND OBH DEV. FUND (HELD IN TRUST ACCOUNT) INVESTMENT - RESERVES RESTRICTED CASH FUND (TRUST) Balance as per General Ledger : A01101 Municipal Fund A1102 Unrestricted Short Term Investment 623,348.40 2,000,000.00 3,985,332.44 A01110 Term Deposit Reserves/Muni 38,741.28 A1000 Restricted Cash Fund A1001 Outback Highway Tourism Fund 164,616.21 A1002 Outback Hwy Development Fund Balance as per Bank Statement 2,623,348.40 164,616.21 3,985,332.44 38,741.28 2,685,007.28 164,616.21 3,985,332.44 38,741.28 164,616.21 3,985,332.44 38,741.28 2,623,348.40 164,616.21 3,985,332.44 38,741.28 0.00 0.00 0.00 0.00 Adjustments Un-receipted Income Outstanding Deposits 2,175.30 2,687,182.58 Less Outstanding Cheques/Withdrawal Reconciled Balance Variance 63,834.18 OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 17 VOTING REQUIREMENTS Simple majority decision of Council required. OMC160311 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr S Weldon: That Council accept the Bank Reconciliation Report as at 31 January 2016, as outlined above. CARRIED 6/0 11.3 WORKS AND SERVICES BUSINESS 11.3.1 TENDER PURCHASE OF MOTOR GRADER (FILE REF: 1020) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The applicant has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Russell Williams; Executive Manager Technical Services SENIOR OFFICER: Steven Deckert; Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION To consider options for the changeover of a grader as provided for in the budget, due to changing market conditions. ATTACHMENTS Nil APPLICANT’S SUBMISSION Not applicable. BACKGROUND Plant management through a plant replacement program assists staff to identify a continuous turnover of major plant items, as and when required. The plant replacement program supports practices incorporated in the annual budget to maintain a steady level of funding on a yearly basis to avoid spikes and troughs when determining a budget. In considering the replacement of the oldest John Deere Grader, it has become evident that the market has changed since the budget estimates were prepared. This has probably come about due to the downturn in the mining industry with an increase in second-hand machines for sale. OMC160324 Minutes - Unconfirmed Minutes Page 18 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Council is therefore requested to give due consideration whether to call tenders for the replacement of the grader or to consider other options. STATUTORY ENVIRONMENT Local Government Act 1995 Section 3.57 – A local government is required to invite tenders before it enters into a contract of a prescribed kind under which another person is to supply goods or services. Local Government (Functions and General) Regulations 1996 Reg. 11 – 24 sets out all the parameters for the calling of Tenders. POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS A budgeted allocation (net changeover cost of $180,000, being $360,000 less trade-in of $180,000) was included in the 2015/16 financial year budget. Consideration has to be given to the recent mining downturn and the possiblity that the Shire may not achieve the anticipated trade-in value that was estimated to be in the vicinity of $180,000. Indications reveal that the trade value could be less than $100,000. Coupled with indicative increases in new machine prices, there could be a shortfall of around $120,000 if tenders were to be called. STRATEGIC IMPLICATIONS Not applicable. CONSULTATION Fintan Kearns, Westrac Equipment Ken MacDonald: Hitachi Construction Equipment Steve Maffesioni; Komatsu Australia COMMENT It is ideal for Council to endeavour to maintain a modern, well maintained fleet of earthmoving equipment. This is highlighted in the Shire’s Plant Replacement Program. In the current budget, the oldest of three graders, P282, was due for changeover in acccordance with the Plant Replacement Program. As indicated in the ‘Financial Implications’ section above, Council has available $180,000 of net funds for the purchase of a new grader. Current indications are: Purchase Price Trade-In Net cost to Council $400,000 $100,000 $300,000 Therefore there is a potential shortfall of $120,000 Council would need to fund. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 19 The two options available to Council are: 1. Call tenders on the understanding that Council will need to identify savings in other areas of the budget. 2. Defer this plant replacement and re-budget in 2016/17 The recommendation of this report is to request the EMTS to investigate these options further and report on his findings at the next Council Meeting. It should be noted that Council still has the option to make a decision in respect to calling tenders or deferring, however there is insufficient information at this time to make an informed decision. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160312 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Ryles; Seconded Cr R Prentice: That Council requests the EMTS to investigate further the options of inviting tenders for the purchase of a new grader (including trade-in of P282) or to defer the changeover to 2016/17, and to report his findings and recommendation to the next Ordinary Meeting of Council. CARRIED 6/0 11.4 COMMUNITY DEVELOPMENT BUSINESS There was no Community Development Business listed for this Agenda. 11.5 MANAGEMENT AND POLICY BUSINESS 11.5.1 GVROC MEETING MINUTES 26 FEBRUARY 2016 (FILE REF: 850) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Tiffany Farlow, Executive Assistant to the CEO SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION The Council is requested to receive the minutes of the meeting of the Goldfields Voluntary Regional Organisation of Councils (GVROC) held by teleconference on 26 February 2016. OMC160324 Minutes - Unconfirmed Minutes Page 20 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 ATTACHMENTS OMC1603-11.5.1.A Minutes of the GVROC Meeting held by teleconference on 26 February 2016 APPLICANT’S SUBMISSION Not applicable. BACKGROUND The GVROC is a voluntary regional organisation established to enhance service delivery and infrastructure for the collective and individual communities and to achieve a sustainable, cost effective model for sharing of resources. The GVROC comprises the following local governments: Shire of Coolgardie Shire of Dundas City of Kalgoorlie-Boulder Shire of Laverton Shire of Leonora Shire of Menzies Shire of Ngaanyatjarraku Shire of Wiluna Shire of Esperance Shire of Ravensthorpe The objectives of the GVROC are to form a strategic alliance for the retention of infrastructure and community services, acquiring funding from government grants, economic development initiatives and private sector funding and establish and maintain effective communication and consultative mechanisms between the participating local governments on policy and processes using a management strategy. STATUTORY ENVIRONMENT Local Government Act 1995 Section 2.7(2) – Provides that Council is to oversee the allocation of local government finances and resources and to determine the local government policies; Section 3.1 – Provides that the general function of the local government is to provide for the good government of persons in its district; POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. STRATEGIC IMPLICATIONS Council’s participation in and support of the GVROC is important in ensuring that Laverton has a regional voice and will be important as our preferred regional grouping of local governments in the structural reform process. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 21 CONSULTATION Not applicable. COMMENT The minutes of the Meeting of the GVROC held by teleconference on 26 February 2016 are appended for Council’s information. The minutes are presented as an agenda item in case Council is required to consider any matter within the minutes and make a decision. While Council’s delegates to the GVROC meeting can make decisions at the GVROC meeting, the GVROC cannot make decisions binding on the individual member Councils. In respect to this meeting, there are no specific items requiring Council’s consideration from the GVROC Minutes and they are presented for information and noting. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160313 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr S Weldon; Seconded Cr D Ross: That Council: 1. Receives the Minutes of the teleconference Meeting of the GVROC held on 26 February 2016, and notes the decisions of the GVROC Council contained within the Minutes; and 2. Endorses the decisions made at the meetings and as recorded in the Minutes of the Meeting held 26 February 2016. CARRIED 6/0 11.5.2 COUNCILLORS’ (FILE REF: 779) INFORMATION BULLETIN FEBRUARY 2016 SUBMISSION TO: Ordinary Meeting of Council, 18 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Tiffany Farlow, Executive Assistant to the CEO SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION Receiving of the Councillors’ Information Bulletin for the period ending 29 February 2016 by Council. OMC160324 Minutes - Unconfirmed Minutes Page 22 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 CONFIDENTIAL ATTACHMENTS Shire of Laverton Councillors’ Information Bulletin February 2016 circulated under separate cover and is deemed to be a ‘Confidential’ document for Councillors’ information only. APPLICANT’S SUBMISSION Not applicable. BACKGROUND Councillors’ Information Bulletin February 2016 for the period ending 29 February 2016 was completed and circulated to Councillors. STATUTORY ENVIRONMENT Local Government Act 1995 Section 2.7(2) – Provides that Council is to oversee the allocation of local government finances and resources and to determine the local government policies; Section 3.1 – Provides that the general function of the local government is to provide for the good government of persons in its district; POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. STRATEGIC IMPLICATIONS Keeping Councillors updated and informed in respect to matters impacting on their role as Councillor. CONSULTATION Nil. COMMENT The Councillors’ Information Bulletin is produced to provide Councillors with information that is relevant to their role as a Councillor for the Shire of Laverton, but not requiring a decision of Council. The Councillors’ Information Bulletin was never intended to be a public document. Now with the inclusion of confidential information, it is important that the Information Bulletin be circulated to Councillors and Senior Staff only and not released to the general public. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 OMC160314 Minutes Page 23 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr G Walder: That Council receive the Councillors’ Information Bulletin February 2016 for the period ended 29 February 2016, as previously circulated to Councillors. CARRIED 6/0 11.5.3 MINUTES OF AUDIT COMMITTEE MEETING – 24 MARCH 2016 (FILE REF: 568) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Shire of Laverton AUTHOR: Glenn Bone, Project Officer SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION Minutes of the Audit Committee meeting which is being held on 24 March 2016. ATTACHMENTS OMC1603-11.5.3.A Minutes of the Audit Committee Meeting held 24 March 2016 APPLICANT’S SUBMISSION Minutes of the Audit Committee meeting which is being held on 24 March 2016. BACKGROUND A mandatory duty of the Audit Committee is to review the annual compliance audit return. As a consequence, Council therefore needs to receive the Minutes of the Audit Committee meeting held on 24 March 2016 and consider the Committee’s recommendations to Council. The Minutes of the Audit Committee meeting held on 24 March 2016 are now presented (Attachment OMC1603-11.5.3.A) to Council for consideration. STATUTORY ENVIRONMENT Local Government (Audit) Regulations 1996 Regulation 14(3) – After the audit committee has reported to the council under sub regulation (3A), the compliance audit return is to be – (a) presented to a meeting of the council; (b) adopted by the council; and (c) recorded in the minutes of the meeting at which it is adopted. OMC160324 Minutes - Unconfirmed Minutes Page 24 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Regulation 15 – A certified copy of the return together with a copy of the relevant section of the minutes at which it was adopted, is to be submitted to the Executive director by 31 March next following for the period to which the return relates. POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS There are no financial implications in respect to this report. STRATEGIC IMPLICATIONS There are no strategic implications in respect to this report. CONSULTATION This return has been completed by Project Officer, Glenn Bone, following liaison with relevant staff members. COMMENT It is anticipated the Audit Committee will note the outcome as to the result of the Compliance Audit Return 2015. Based on this outcome it is then proposed that the Compliance Audit Return 2015 be presented to Council for adoption (along with any comments and/or amendments). VOTING REQUIREMENTS Simple majority decision of Council required. OMC160315 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr S Weldon; Seconded Cr G Walder: That Council: 1. Receives the Minutes of the Audit Committee Meeting held on 24 March 2016 (Attachment OMC1603-11.5.3.A) and notes the resolution of the Committee contained therein. 2. Acknowledges the five issues of non-compliance and notes the explanation and mitigation steps provided by the CEO. 3. Is satisfied that the Audit Committee has fulfilled its responsibilities in review of the 2015 Compliance Audit Return, including the issues of non-compliance. 4. Adopts Recommendation 3 of the Audit Committee Meeting as a resolution of Council, namely: That the Audit Committee recommends that Council now adopt the attached Compliance Audit Return as the official return of Council for the period of 1 January – 31 December 2015 and the return be certified by the President and the Chief Executive Officer. CARRIED 6/0 OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 11.5.4 Minutes Page 25 DELEGATIONS REVIEW - ANNUAL REVIEW DUE 2016 (FILE REF: 113) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Shire of Laverton AUTHOR: Glenn Bone, Project Officer SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION The review of delegations to the Chief Executive Officer (CEO) made under the Local Government Act 1995 and other Acts, plus delegations made to other officers by Council pursuant to various Acts. ATTACHMENTS OMC1603-11.5.4.A Delegation Register APPLICANT’S SUBMISSION Council last carried out a review of delegations in March 2015. It is again necessary to review the total of 42 delegations currently in existence in accordance with Local Government Act requirements. BACKGROUND There are currently 42 delegations in place (please refer to the current Delegation Register – Attachment OMC1603-11.5.4.A), with the breakup being: Thirty-eight delegations direct to the CEO, who in turn delegates a number to other Officers; and Four delegations direct to other Officers. Delegations 007-008, 010, 012-013, 015, 017-018, 020-023, 025-030, 038-040, 042-044, 047, 050 and 053-054 are made under the Local Government Act 1995. The remainder (being 002-006, 034, 037, 045-046, 048, 052 and 055-057) are made under various other Acts or legislation as indicated in “Statutory Environment”. However, whilst Delegations 034, 037, 045, 046-048, 052 and 055-057 do not have to be reviewed each year, they are included for the sake of consistency. Of the 38 delegations to the CEO, 24 have in the past been delegated to various employees, either completely or in part. Part of the review process for delegations also includes a requirement for the CEO to review delegations made by him. Within the “comment” section appears a listing of delegations currently authorised to the CEO and other officer/persons. It should be noted a number of delegations have either not been used through lack of need or on occasions the subject itself has been referred to Council for determination because of sensitivity. Usage of the delegations varies considerably according to the nature of the delegation itself. OMC160324 Minutes - Unconfirmed Minutes Page 26 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Delegation 021 (Payment from Shire of Laverton Bank Accounts) is by far the most active followed by the likes of Delegation 028 (Rate Book) and Delegation 002 (Grant of Building Permits). STATUTORY ENVIRONMENT Local Government Act 1995 Section 5.18 – provides that a local government is to keep a register of delegations and review the delegations once every financial year (to committees). Section 5.46(2) – provides that at least once in every financial year delegations are to be reviewed by the delegator (Council). Building Act 2011 Sections 20-22, 32, 58, 110 and 117 – provides for the CEO to be delegated various powers whilst section 117 enables the CEO to delegate such powers to the Environmental Health Officer/Building Surveyor (EHO). Bush Fires Act 1954 Section 17(10) – provides that a local government may delegate to the President and its Chief Bush Fire Control Officer, jointly its powers and duties under 17 (7-8) – variation of prohibited burning times. Section 18 (5C) – provides that a local government may delegate to the President and its Chief Bush Fire Control Officer, jointly the power to vary the restricted burning times. Sections 59/59A enables the CEO to institute proceedings for offences under the Act. Cat Act 2011 Section 44(1) – provides that the CEO may be delegated the exercise of any power or duty of the local government under the Act. Dog Act 1976 Section 10AA(1) – provides that the CEO may be delegated the exercise of any power or duty of the local government under the Act. Section 44 – enables the CEO to initiate proceedings for offences under the Act. Food Act 2008 Section 122 – enables the EHO to institute, exercise and discharge powers and functions of the local government under the Act. Health Act 1911 Section 26 – enables the EHO to be appointed as the Shire of Laverton’s deputy. Town Planning Scheme No. 2 (2003) Clause 11.3 – enables Council to delegate powers and duties to the CEO. POLICY IMPLICATIONS There are no direct implications on any current policies however a number of delegations are linked to Council policies. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 27 FINANCIAL IMPLICATIONS The delegations allow for staff to authorise expenditure, raise income, write-off monies, provide staff benefits and also hasten processing times across various areas of operations. STRATEGIC IMPLICATIONS From a local government perspective, the concept of “delegation” is: To entrust or commit (authority etc.) to another as an agent or deputy. Consequently, the decision making power of the delegator (Council) to the delegate (CEO, other officer or committee), is bestowed by a formal Council resolution. The effect of delegating is to streamline the decision making process as the subject matter does not have to wait for a Council meeting for a decision. The outcome is that the Shire of Laverton is perceived more favourably by customers for making timely decisions. CONSULTATION No public consultation is required on this matter. Appropriate staff have been consulted as to the relevance and/or updating of the existing delegations. COMMENT Delegations to the CEO 002 003 004 005 006 007 008 010 012 013 015 017 018 020 021 022 023 025 026 027 Grant of Building Permits Demolition Permits Grant of Occupancy Permit Grant of Building Approval Certificate Building Orders Bush Fire – Use of Council Plant Staff – Housing Bonds Staff – Private Use of Council Vehicles Land Valuations Tenders for Equipment Purchase Plant – Use by Employees Early Morning Swimming Private Works Road Train Permits Payment from Shire of Laverton Bank Accounts Hire Charges – Council Property & Equipment Mobile Food Vans Staff – Housing Rental Subsidies Liquor – Sale of from Council Property Contract Variations OMC160324 Minutes - Unconfirmed 028 029 030 037 038 039 040 042 043 044 046 047 048 050 053 054 055 056 Rate Book Thoroughfares – Temporary Closure to Vehicles Disposal of Surplus Equipment, Materials, Tools etc Native Title Telephones (Private) – Use by Employees for Council Business Impounding Goods – Authorised Employee Sale of Impounded, Seized or Confiscated Vehicles, Animals or Goods Insurance – Public Liability Claims Staff Housing Contractors – Use on Works Offences – Bush Fires Act Mining Tenements Proceedings under Dog Act Write off of Debts Less than $500 Local Government Property Local Law Laverton Race Club Activities Dog Act Powers and Duties Cat Act Powers and Duties Minutes Page 28 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Delegations to other Officers (by Council for other Acts) 034 045 Septic Tank Approvals Burning, Prohibited and Restricted Times (Variation) Health Act - (Deputy) Food Act 2008 052 055 As part of the review, all delegations have been thoroughly examined to ensure they are still relevant and the wording of each is appropriate. In considering the review each delegation has been viewed in the context of whether it is a power or a duty of the local government, hence a delegation can occur, or it is an administration function that is part of the CEO or other officer’s responsibility and therefore a delegation is not required. In undertaking this review it is particularly acknowledged there was a substantial revamp of delegations in the 2010 review but only minor changes in the following years. Two additional delegations were introduced on 19 June 2014 (Delegations 056 and 057). VOTING REQUIREMENTS Absolute majority decision of Council required. OMC160316 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr G Walder; Seconded Cr D Ross: That Council: 1. Reaffirms Delegation numbers 002-008, 010, 012-013, 015, 017-018, 020-023, 025-030, 037-040, 042-044, 046-048, 050, 053-054 and 056-057 (as per Attachment OMC1603-11.5.4.A) to the Chief Executive Officer; and 2. Reaffirms Delegation numbers 034, 045, 052 and 055 (as per Attachment OMC1603-11.5.4.A) to other Officers/Persons. CARRIED 6/0 11.5.5 REVIEW OF POLICY 02.18 – PURCHASING (FILE REF: 95) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter. OWNER/APPLICANT: Shire of Laverton AUTHOR: Glenn Bone, Project Officer SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: OMC151220 of 17/12/2015 MATTER FOR CONSIDERATION For Council to consider the revised Policy 02.18 – Purchasing. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 29 ATTACHMENTS OMC1603-11.5.5.A OMC1603-11.5.5.B Current Purchasing Policy Draft Purchasing Policy APPLICANT’S SUBMISSION Not applicable. BACKGROUND A Purchasing Policy was first adopted in1997 with major reviews resulting in new policies in both 2011 and again in 2014 when WALGA produced a comprehensive model for use by local government in general. The intent of the Model Policy was to ensure full compliance and best practice in local government purchasing. The 2014 version of the Model Policy incorporated far more of the regulatory provisions than were included in the past. Whilst this is arguably not essential, the material benefit is to place all relevant purchasing information in the one document and this has been very useful for all staff members with purchasing responsibilities. The Shire adopted a modified version of the Model Policy in 2014 which had been tailored to the particular needs of the Shire of Laverton. Please refer to Attachment OMC1603-11.5.5.A to view the current policy. WALGA have recently produced a revised 2015 version of the Model Policy which incorporates recent changes to the Local Government (Functions and General) Regulations 1996. In the main these relate to the new provisions for Panels of Pre-qualified Suppliers, however there are some other minor changes due to other regulatory amendments. STATUTORY ENVIRONMENT Local Government Act 1995 Section 2.7(2) (b) – It is the role of Council to determine the local government’s policies. Local Government (Functions and General) Regulations 1996 Reg. 11A(1) – A local government is to prepare or adopt a purchasing policy for goods and services worth $150,000 or less. Local Government (Financial Management) Regulations 1996 Reg. 5(1)(e) – Efficient systems and procedures are to be established by the CEO of a local government to ensure proper authorisation for the incurring of liabilities and the making of payments. POLICY IMPLICATIONS Policy 02.17 – Policy Manual, sets down guidelines for the making and changing of Shire policies. FINANCIAL IMPLICATIONS The recommendations of this report have no financial implications for Council. OMC160324 Minutes - Unconfirmed Minutes Page 30 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 STRATEGIC IMPLICATIONS The recommendations of this report have no strategic implications for Council CONSULTATION Mr Steven Deckert Mr Graham Stanley Mr Russell Williams Ms Robyn Smith Ms Joanna Seczkowski Chief Executive Officer; Executive Manager Corporate and Community Services; Executive Manager Technical Services; Finance and Administration Manager; and Community Development Manager for Strategic and Special Projects. COMMENT There are substantially similarities in the new WALGA Model Policy to that contained in the earlier 2014 version. Much of the previous policy (amended in December 2015), has been retained with only minor changes due to regulatory amendment through clauses 1 - 4. A copy of the proposed draft Policy is appended (Attachment OMC1603-11.5.5.B) for Council’s information. A summary of the changes (where applicable), is set out below: Clause 1 Policy– In the current policy the first paragraph is titled “Introduction” and is un-numbered, however the context is the same. Clause 2 Objectives – The current policy has the same title and is also un-numbered. The Model Policy has been reworded but embraces the same meaning as previously. Clause 3 Ethics & Integrity – Referred to as clause 1 in the current policy but the Model Policy retains the same wording. Clause 4 Value for Money – Referred to as clause 2 in the current policy. Re-worded in the Model Policy with the same intent. Clause 5 Purchasing Requirements – Clauses 5.1, 5.2 are the same as in the current policy 3.1 and the first two paragraphs of clause 3.2. Sub-clause 5.4 Purchasing from Existing Contracts – This is a new provision. Sub-clause 5.5 Purchasing Thresholds – Previously sub-clause 3.3 and last amended on 22 October 2015. Sub-clause 5.5 has been expanded to include more explicit definitions of the “Purchasing Method Required” and there is also been some minor modification to those persons identified in “Authorised Purchaser”. Sub-clause 5.6 Tender Exemptions – Previously attached to the second part of sub-clause 3.2. Sub-clause 5.6 has been amended in the Model Policy to include the new regulatory changes to this area. Sub-clause 5.7 Inviting Tenders Under the Tender Threshold - Whilst this is now a new sub-clause, the provisions therein were previously contained in part of sub-clause 3.3. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 31 Sub-clause 5.8 Sole Source of Supply - A new provision. Sub-clause 5.9 Anti-Avoidance – A new provision. Sub-clause 5.10 Emergency Purchases – A new provision. Sub-clause 5.11 Purchasing Procedures – All of the purchasing processes identified in the current policy have been retained. Clause 6 Records Management – Previously sub-clauses 4.1 and 4.2, the Model Policy has been consolidated. Clause 7 Sustainable Procurement and Corporate Social Responsibility Previously Clause 5 the Model Policy has been extensively reworded. Clause 8 Buy Local Policy – A new provision. Clause 9 Purchasing From Disability Enterprises – Previously clause 6 the Model Policy has been extended to include Australian enterprises rather than just West Australian ones.as part of the new regulatory changes. Clause 10 Purchasing From Aboriginal Businesses – A new provision resultimg from regulatory changes in September 2015. Clause 11 Panels of Pre-qualified Suppliers - Last December Council adopted clause 7 which was added to the current policy in response to the regulatory changes made in September 2015. The new Model Policy which was not available in December, will now be used to set out the Shire’s future position in this area. Form 02.18.A – Record of Verbal Quotations – This form is retained. Form 02.18.B – Evaluation of written Quotations - This form is retained. Form 02.18.C – Allocating Work to Pre-qualified Contractors/Suppliers of Plant Hire – This form, which was adopted in December 2015, is also being retained. In conjunction with each use of Form 02.18C, the Shire will also need to prepare a Spreadsheet Ranking Template. A sample format of this document is attached to Form 02.18.C for information purposes. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160317 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr G Walder: That Council: 1. Revokes Policy 02.18; and 2. Adopts new Policy 02.18 – Purchasing (as per Attachment OMC1603-11.5.5.B). CARRIED 6/0 OMC160324 Minutes - Unconfirmed Minutes Page 32 11.5.6 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 DISPOSAL OF TOYOTA PRADO P233 (FILE REF: 143) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Russell Williams; Executive Manager Technical Services SENIOR OFFICER: Steven Deckert; Chief Executive Officer PREVIOUS MEETING REFERENCE: Not Applicable MATTER FOR CONSIDERATION Consider the offers received for the purchase of the Shire’s 2006 Toyota Prado. ATTACHMENTS OMC1603-11.5.6.A OMC1603-11.5.6.B Offer - Mr Jute Taylor Offer - Mr Rod Kison APPLICANT’S SUBMISSION Not applicable BACKGROUND The 2006 Toyota Prado is now surplus to requirements and was advertised for sale on 27 February 2016. A new vehicle has been purchased for the Executive Manager Corporate and Community Services and his current vehicle will now become the Administration Pool vehicle. STATUTORY ENVIRONMENT Local Government Act 1995 Section 3.58(3) A local government can dispose of property other than under subsection (2) if, before agreeing to dispose of the property(a) it gives local public notice of the proposed disposition Local Government (Functions and General) Regulations 1996 Section 30(3) A disposition of property other than land is an exempt disposition if (a) its market value is less than $20,000. POLICY IMPLICATIONS Council has no policies in respect to this matter. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 33 FINANCIAL IMPLICATIONS The adopted budget includes the following in respect to the purchase of the new Prado and sale of the 2006 Prado: Purchase of new vehicle Sale of 2006 Prado Net changeover cost $75,000 $10,000 $65,000 (excluding GST) The actual cost for the new Prado is $57,847.40 (excluding GST). Accepting either of the offers still results in a better than budget outcome for the Shire. STRATEGIC IMPLICATIONS The recommendations of this report have no strategic implications for Council. CONSULTATION Goldfields Toyota - to gain a estimated trade/sale value. COMMENT Purchased in 2006, the Toyota Prado has provided 10 years of service to the Shire. With the purchase of new executive vehicles, this vehicle has become redundant and excess to the Shire’s requirements. An advertisement was placed in the Kalgoorlie Miner on 27 February 2016 requesting offers to purchase. The closing date was 9 March 2016. Two offers were received, the highest being $8,500.00 and the second being for $8,000.00. Red Book value for a 2007 GX 3 Litre Diesel. The Red Book does not provide prices prior to 2007 – as the Shire vehicle is a 2006 model, an estimated value has been provided for comparison. $16,650.00 2006 Model Toyota Prado GX Manual Diesel (Average Condition) $14,000.00 Consideration of the vehicle as it stands - discount -$3,500.00 Estimated Fair Value $10,500.00 Whilst the two offers received are less than the estimated fair value (and budget provision), it is debatable whether a better price could be obtained using other sale methods, such as re-advertising or placing the vehicle with a car auction house. In this case the vehicle has been offered for sale by an open sale process which has resulted in offers that reflect the current market, therefore it is recommended to sell the vehicle to the highest offer. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160324 Minutes - Unconfirmed Minutes Page 34 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 OMC160318 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Ryles; Seconded Cr R Prentice: That Council accept the highest offer received of $8,500 for the 2006 Toyota Prado, and should the sale not proceed to then offer the vehicle to the second highest bidder for $8,000. CARRIED 6/0 06:40pm 11.5.7 Miss T Farlow left the meeting. NEW LOCAL GOVERNMENT ACT PROVISIONS - DISCLOSURE OF CONTRIBUTIONS TO TRAVEL (FILE REF: 57) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Glenn Bone, Project Officers SENIOR OFFICER: Steven Deckert; Chief Executive Officer PREVIOUS MEETING REFERENCE: Not Applicable MATTER FOR CONSIDERATION Awareness of the recent changes to gift and travel disclosure provisions in the Local Government Act 1995 and subsidiary legislation. ATTACHMENTS OMC1603-11.5.7.A Special Governance Bulletin APPLICANT’S SUBMISSION Not applicable BACKGROUND In the latter part of last year a furore erupted with the release by the Corruption and Crime Commission (CCC) – Report on an Investigation into Acceptance and Disclosure of Gifts and Travel contributions by the Lord Mayor of the City of Perth (5 October 2015). The government moved swiftly to address the fallout from these disclosures and proposed amendments to the Local Government Act 1995 and subsidiary legislation to alleviate identified shortcomings. This resulted with a number of amendments contained within the City of Perth Bill 2015 which passed into law on 3 March 2016. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 35 A period of 28 days from the Royal Assent date (3 March 2016), will be allowed for Councillors and designated employees to disclose gifts and travel contributions during the transition period. Specifically, the transition period is from 1 July 2015 to 3 March 2016, meaning that the disclosure of gifts and travel contributions needs to be completed by 31 March 2016. STATUTORY ENVIRONMENT Local Government Act 1995 Section 5.78 - Information to be disclosed in returns This section has been amended to remove the need to disclose gifts and contributions to travel under sections 5.82 and 5.83 in the annual return. Section 5.82 - Gifts From 4 March 2016 the amendments to sections 5.82 and 5.83 require relevant persons to declare gifts and contributions to travel, in writing, to the CEO within 10 days of receipt, rather than on an annual basis. This includes multiple gifts made within a year made by the same person, the aggregate value of which reach the prescribed amount of $200. Section 5.83 - Contributions to travel See s.5.82 above. Section 5.89A - Register of gifts and contributions to travel A new section that requires the CEO to keep a register of gifts and contributions to travel in the form prescribed (Form 4). Local Government (Rules of Conduct) Regulations 2007 Regs 14-15 - Transitional provisions for council members These two regulations require council members to disclose gifts and contributions to travel received between 1 July 2015 and 3 March 2016 within 28 days (that is, by 31 March 2016). This disclosure is necessary as these will no longer form part of the annual return. The disclosure needs to be in writing and to the CEO. Local Government (Administration) Regulations 1996 Regs 34F-34G - Transitional provisions for designated employees These two regulations require designated employees to disclose gifts and contributions to travel received between 1 July 2015 and 3 March 2016 within 28 days (that is, by 31 March 2016). This disclosure is necessary as these will no longer form part of the annual return. The disclosure needs to be in writing and to the CEO. Shire of Laverton Code of Coduct This Code was adopted by Council on 23 April 2009 (from a WALGA model) and is unaffected by by the recent changes to legislation. POLICY IMPLICATIONS Council has no policies in respect to this matter. OMC160324 Minutes - Unconfirmed Minutes Page 36 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Nil. COMMENT The Department of Local Government and Communities has just released a Special Governance Bulletin to provide information regarding recent changes to gift and travel disclosure provisions in the Local Government Act 1995 and subsidiary legislation as part of the City of Perth Act 2015. This edition provides an in-depth look at the new legislative requirements and guidance on how they apply to elected members and staff across all local governments in Western Australia. A copy of the Bulletin is attached (Attachment OMC160311.5.7.A) for Councillors' information. It is of vital importance for Councillors (and designated staff) to study this document without delay as there may well be a need for some individuals to make a declaration in accordance with the transitional requirements – that is, by 31 March 2016. Also of vital importance is the ongoing need as from 4 March 2016, for relevant persons who accept a gift worth more than $200 to disclose this gift, in writing, to the CEO within 10 days of receipt. A final note of importance is that there is nothing in the new provisions that affects a council member or any employee’s obligations in the new provisions in relation to notifiable or prohibited gifts. The Shire’s Code of Conduct (adopted 23 April 2009), is unaffected by the recent legislative changes. It contains the following provisions: “token gift” “notifiable gift” “prohibited gift” means a gift that is worth less than $50 (does not need to be recorded in the Gifts Register) means a gift worth more than $50 (record in Gifts Register) means a gift worth more than $300 (cannot be accepted) The Bulletin also contains eleven (11) Case Studies to provide valuable insight regarding interpretation and understanding of the new requirements. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 37 STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr R Ryles: That Councillors (and designated staff) assess their need or otherwise of making a written disclosure to the CEO (by 31 March 2016), pursuant to the transitional requirements of the Regulations regarding gifts and contributions to travel. OMC160319 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr R Ryles: 1. That Councillors (and designated staff) assess their need or otherwise of making a written disclosure to the CEO (by 31 March 2016), pursuant to the transitional requirements of the Regulations regarding gifts and contributions to travel. 2. That Council is aggrieved with the imposition of these requirements and requests that this matter be referred to GVROC for discussion on a regional basis. CARRIED 6/0 Reason for Amending the Staff Recommendation Council is of the view that the reporting requirements in respect to gifts and travel being placed on Councillors is becoming unreasonable, prohibitive, restrictive and a burden and should be referred to GVROC so that a region-wide position is agreed upon. 07:04pm The meeting was adjourned. 07:44pm The meeting resumed. 12. ELECTED MEMBERS' MOTIONS OF WHICH PREVIOUS NOTICE HAS BEEN GIVEN At the time of preparing this Agenda there were no motions from Elected Members of which previous notice has been given. 13. NEW BUSINESS OF AN URGENT NATURE INTRODUCED BY DECISION OF THE MEETING OMC160320 PROCEDURAL MOTION Moved Cr S Weldon; Seconded Cr G Walder: That Council consider the following items of new business of an urgent nature introduced by decision of the meeting: 13.1 RFQ – Provision of Design Services Great Central Road - 385 to 435 SLK (File Ref: 27) 13.2 Laverton Men’s Shed Inc. – Renewal of Use Arrangements for Old Courthouse (File Ref: 817) OMC160324 Minutes - Unconfirmed Minutes Page 38 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 13.3 Proposal to Use External Project Management Services for Main Street Project (File Ref: 566) 13.4 Design Laverton Western Heavy Haulage Bypass (File Ref: 556) 13.5 Consideration of Proposed RFQ Brief for the Design, Fabrication and Installation of Town Signage (File Ref: 566) 13.6 Playgroup/Childcare Building Upgrade and Renovation Update (File Ref: 883) CARRIED 6/0 13.1 RFQ - PROVISION OF DESIGN SERVICES GREAT CENTRAL ROAD - 385 TO 435 SLK (FILE REF: 27) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Russell Williams, Executive Manager Technical Services SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: OMC150511 Great Central Road Redevelopment 21/05/2016 MATTER FOR CONSIDERATION To consider the ‘Quotation Assesment’ carried out by the Executive Manager Technical Services in respect to the responses received for RFQ for the Provision of Design Services, Great Central Road - 385 to 435 Straight Line Kilometre (SLK). ATTACHMENTS OMC1603-13.1.A Confidential Attachment: Evaluation Matrix - RFQ - Provision of Design Services Great Central Road - 385 to 435 SLK. APPLICANT’S SUBMISSION Not applicable BACKGROUND In 2014 the Federal Government announced an allocation of thirty three million dollars funding for improvements to the Outback Way/Great Central Road to a sealed standard. The funding was divided equally between Queensland, Northern Territory and Western Australia. The funding was provided on the agreed understanding that the individual States and Territory provided matching funding on a dollar for dollar basis to see the project go ahead. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 39 The Federal contribution to Western Australia is eleven million dollars which will be matched on a dollar for dollar basis by the Western Australian State Government to be distributed equally between the Shire of Ngaanyatjarraku and the Shire of Laverton, with each Shire receiving eleven million dollars each, extended over a three year period at $3.667 million dollars per year. The money allocated for this project will be used for the design, construction and sealing of a predetermined section of the Great Central Road (385 to 435 SLK). To begin the process, a feature survey had to be completed to provide the road designer with a digital “foot print” of the conditions, vertical and horizontal alignments and other prominent elements of the existing road. The feature survey was completed in September 2015. This digital survey will be provided to the respondent who is awarded the design works. STATUTORY ENVIRONMENT Local Government Act 1995 Section 3.57 – A local government is required to invite tenders before it enters into a contract of a prescribed kind under which another person is to supply goods or services Local Government (Functions and General) Regulations 1996 Reg. 11 – 24 Sets out all the parameters for the calling of Tenders. POLICY IMPLICATIONS Council has no policies in respect to this matter FINANCIAL IMPLICATIONS The cost associated with this Request for Quotation are accounted for under Item CR 16417 which is included in the 15/16 budget (Great Central Road Major Project). The ongoing development of the Great Central Road in consultation with the Outback Way Development Council has subtaintial positive implications for the Shire. The sealing of the Great Central Road will contribute to the practical sustainability of Laverton with the advent of more tourism, commercial enterprises and mining ventures using the road as a conduit to central Australia and beyond. STRATEGIC IMPLICATIONS The ongoing development of the Great Central Road has a focus on safety and serviceability of the Shire's road network. CONSULTATION Contribution Agreement; Great Central Road, Main Roads WA OMC160324 Minutes - Unconfirmed Minutes Page 40 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 COMMENT In January 30 2016 an advertisement was placed in the West Australian and Kalgoorlie Miner for a Request for Quotation - Provision of Design Services Great Central Road 385 to 435 SLK. Twenty eight briefs were forwarded to suppliers of services. The closing date for responses was 15 February 2016 at 1400 hours (2.00pm). On Monday 15 February 2016 at 3.00pm the tender box was opened with nineteen responses being received in total. All respondents delivered their responses via electronic email to the Shire’s encrypted email address. Each response has been evaluated using the qualitative criteria as described in the brief. All nineteen responses were deemed compliant and considered in the evaluation. All responses were evaluated and results recorded on the attached spread sheet. The preferred supplier Shawmac Pty Ltd were slightly ahead on the points scoring ratio with the final decision being made on the turnaround time to have the design delivered back to the principal. Referees of the preferred quote provider were contacted for comment and these comments are provided in the assessment matrix spread sheet provided as an attachment in this item. Council's attention is drawn to costs as reflected in the confidential spreadsheet (Confidential Attachment OMC1603-13.1.A), there is a substantial variation in design quotes. Local Government has to be diligent in selecting the supplier that offers the best value for money while offering depth of ability and capacity. A selective evaluation was made to reduce the number of responses that would be considered in the final four. Broadly speaking, all responses were accepted as being compliant. All responses were graded on their ability compliance with the qualitative criteria. Of the nineteen responses received, nine of these were priced over the $150,000 dollar threshold. If these responses were to be accepted, the Local Government (Functions and General) Regulations 1996 would dictate that a tender would have to be called. In reviewing the remaining ten responses, it was revealed that all were comparable and all acceptable for further assessment. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160321 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr R Ryles: That Council approve that the RFQ Provision of Design Services Great Central Raod - 385 to 435 SLK be awarded to Shawmac Pty. Ltd for the cost of $39,149.00 (excluding GST). CARRIED 6/0 OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 13.2 Minutes Page 41 LAVERTON MEN’S SHED INC. – RENEWAL OF USE ARRANGEMENTS FOR OLD COURTHOUSE (FILE REF: 817) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Tiffany Farlow, Executive Assistant to the CEO SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: OMC150327 from OMC 19/03/2015 MATTER FOR CONSIDERATION To consider a request by the Laverton Men’s Shed Inc. to renew their use arrangements of the Old Courthouse. ATTACHMENTS Copy of Laverton Men’s Shed current insurances. OMC1603-13.2.A APPLICANT’S SUBMISSION Not applicable BACKGROUND Conditional approval for the Laverton Men’s Shed Inc. to use the Old Courthouse was originally granted by Council on 22 August 2013. The initial approval period was for six months expiring on 21 February 2014. Since then Council has approved two further twelve months usage renewals with the most recent one being approved on 19 March 2015. The Laverton Men’s Shed Inc. have provided copies of their current insurance policies in compliance with one of the provisos of their continuing agreement with the Shire. STATUTORY ENVIRONMENT Local Government Act 1995 Section 2.7(2) – Provides that Council is to oversee the allocation of local government finances and resources and to determine the local government policies; Section 3.1 – Provides that the general function of the local government is to provide for the good government of persons in its district; and Section 3.58 – Provides for the methods a local government can dispose of property. POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. OMC160324 Minutes - Unconfirmed Minutes Page 42 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 STRATEGIC IMPLICATIONS Strategic Community Plan; the following goals are relevant: Goal 1.2 – Foster a greater sense of community pride Goal 1.3 – Encourage a more active and engaged community Goal 1.4 – Support our senior residents in their community CONSULTATION Not applicable. COMMENT The arrangements that Council put in place at the August 2013 Council Meeting have been working well, with the Men’s Shed having completed clean up and maintenance works and progressed with extending a roofed area at the back of the Old Courthouse, repainting the interior of the building and other refurbishment works. These works are ongoing, so the request for an extension of time is to allow them to complete these improvements. It is recommended that the ‘conditional’ hire arrangements as previously approved be extended for a further twelve months. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160322 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Ryles; Seconded Cr S Weldon: That Council: 1. Grants approval to the Laverton Men’s Shed Inc. for the hire of the courtroom, kitchen/servery and an area of the back patio at the Old Courthouse, for the purposes of conducting their activities; 2. The approval granted in point 1 above is subject to: a. The hire charge will be waived on the condition the Laverton Men’s Shed Inc. undertakes minor repairs and maintenance of the Old Courthouse building; b. This arrangement being reviewed in twelve months’ time; c. The Laverton Men’s Shed Inc. continue to maintain appropriate insurance cover; d. That should the facilities be required for another purpose, the Laverton Men’s Shed Inc will temporarily remove their belongings and/or allow access when requested; e. The Laverton Men’s Shed Inc. ensuring other users of the facilities, such as Gym members, are not inconvenienced by their activities; and f. Any proposed works to be carried out on the Old Courthouse must be approved by the CEO and Building Permit applications lodged and approved if required, before any work commences. CARRIED 6/0 OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 13.3 Minutes Page 43 PROPOSAL TO USE EXTERNAL PROJECT MANAGEMENT SERVICES FOR MAIN STREET PROJECT (FILE REF: 566) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Steven Deckert, Chief Executive Officer SENIOR OFFICER: Not applicable PREVIOUS MEETING REFERENCE: Minute OMC160225, Ordinary Meeting 18 February 2016 MATTER FOR CONSIDERATION To receive an update following the close of RFQ submissions and to determine whether to appoint a consultant project manager. ATTACHMENTS OMC1603-13.3.A CONFIDENTIAL ATTACHMENT - Summary of CEO’s assessment of RFQ’s received against the ‘Assessment and Selection Criteria’. APPLICANT’S SUBMISSION Not applicable. BACKGROUND At the Ordinary Meeting of Council on 18 February 2016, Council resolved to undertake a Request for Quotation process with the intention of appointing a Project Manager to provide superintendence and supervision services for the next stage of the Main Street Project. An advertisement was placed in the West Australian and Kalgoorlie Miner on Saturday 5 March 2016 and closing 21 March 2016 inviting submissions in response to the RFQ Brief endorsed at the last meeting by Council. At the close of submissions, 9 responses had been received. The CEO has carried out an assessment of the RFQ’s against the ‘Assessment and Selection Criteria’ endorsed by Council. This report presents the CEO’s assessment and seeks the Council’s decision on whether to accept the recommendation of the CEO. STATUTORY ENVIRONMENT Local Government Act 1995 Section 2.7(2) – Provides that Council is to oversee the allocation of local government finances and resources and to determine the local government policies Section 3.1 – Provides that the general function of the local government is to provide for the good government of persons in its district OMC160324 Minutes - Unconfirmed Minutes Page 44 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 POLICY IMPLICATIONS Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council. The provision in the 2015/16 Adopted Budget for the Main Street Project includes allowance for the engagement of a Project Manager. STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Nil. COMMENT The CEO has carried out an assessment of the 9 submissions received and this is summarised in Attachment OMC1603-13.3.A. All respondents had the ability and capacity to fulfil the requirements of the Brief. Some had more relevant experience in this region while others had experience in this type of project, and as consequence, excluding the pricing, the scoring was close. However, the price, which had a weighting of 25% saw a variation in prices ranging from $109,785 to $246,000 (excl. GST), which impacted on the final assessment outcome. The CEO will provide further information at the meeting on the final assessment outcome, however the three highest rated RFQ’s, in order of preference are: 1. WML Consultants 2. NS Projects 3. Cardno 78 points 73 points 72 points $109,785 $127,035 $161,604 Council now needs to consider the foregoing and determine whether to appoint the highest ranked consultancy which represents the most advantageous outcome for the Shire or to determine any other outcome. VOTING REQUIREMENTS Simple Majority decision of Council required. OMC160323 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Ryles; Seconded Cr G Walder: That Council: 1. Receives and notes the outcome of the assessment of the RFQ’s undertaken by the CEO; 2. Appoints WML Consultants as Project Manager for the next stage of the Main Street Project in accordance with the RFQ Brief adopted at the Ordinary Meeting on 18 February 2016, at the quoted price of $109,785 (excl. GST), subject to point 3 following. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 3. Minutes Page 45 Is of the understanding that the final cost for the Project Management Service may vary from the quoted price depending on the actual length of the project and whether the Shire needs additional services over and above the level outlined in the RFQ Brief. CARRIED 6/0 13.4 DESIGN LAVERTON WESTERN HEAVY HAULAGE BYPASS (FILE REF: 566) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Russell Williams, Executive Manager Technical Services SENIOR OFFICER: Steven Deckert, Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION For Council to: 1. Consider a revision of the intersecting roads on the enterance to the town of Laverton, including the following roads; Laverton – Leonora Road, Mt Margaret Road and the Mt Weld Road (known as the Laverton Bypass). For all intent and for the purpose of this design, it will be known as the ‘Laverton Western Heavy Haulage Bypass’ until such time Council considers a suitable project name. 2. Establish a working group of elected Councillors to work with the Technical Sevices staff and attend meetings as representatives of Council. ATTACHMENTS OMC1603-13.4.A OMC1603-13.4.B Email from Ammar Mohammed, Main Roads WA 12/02/2016 Sketch of a practical design – open for discussion APPLICANT’S SUBMISSION Not applicable BACKGROUND Main Roads WA representative, Mr Ammar Mohammed, has advised that his department has been asked to consult with the Shire’s Technical Services Staff and discuss the possibility of improving the flow of traffic through the intersection of the Leonora – Laverton, Mt Margaret and Mt Weld Roads and other intersections, dependent on priority. The intersection has been discussed at a Council level without a recommendation being presented to Main Roads WA. OMC160324 Minutes - Unconfirmed Minutes Page 46 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Some design work has been completed by Cardno’s, although this design is still in a design stage. STATUTORY ENVIRONMENT Local Government Act 1995 Section 2.7(2) – Provides that Council is to oversee the allocation of local government finances and resources and to determine the local government policies. Section 3.1 – Provides that the general function of the local government is to provide for the good government of persons in its district. POLICY IMPLICATIONS Council has no policies in respect to this matter FINANCIAL IMPLICATIONS This concept is in the planning stages and there has been no estimate of cost calculated. Design cost will be met by Main Roads WA. There are no financial Implications to Council at this point in time. STRATEGIC IMPLICATIONS The implementation of a more practical design will aid the coefficient flow of traffic through what is now a ‘bottle-neck’, and provide a safe, practical flow of traffic into the town of Laverton while attending to the needs of transport agents navigating their way to the minesites to the south of Laverton. CONSULTATION Main Roads WA - Mr Ammar Mohammed Main Roads WA - Mr Shane Power COMMENT Main Roads representatives approached the EMTS requesting information and a concept design of what Council would like to have established in this area. Ammar Mohammed will be visiting Laverton on Tuesday 5 April 2016 at 11.00 am to meet with Council executives and representatives of Council to discuss a variety of suggested options as detailed in the attached email. The comment from Mr Shane Power was that the Main Roads WA would like to consider all proposals that are placed on the table by the Shire. Main Roads WA have not budgetted any funding for projects in the Laverton area for some time and would like to receive some indication from the Shire of projects that have priority for consideration. This is an oportunity for this Shire to nominate projects that would be of benefit to the Shire and its constituent. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 47 STAFF RECOMMENDATION That Council: 1. Agree in principle to presenting the ‘Practical Design’ with amendments to Main Roads WA and; 2. Appoint elected councillors to make up a Technical Services Working Group. OMC160324 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr S Weldon; Seconded Cr D Ross: That Council: 1. Agree in principle to presenting the ‘Practical Design’ with amendments to Main Roads WA and; 2. Appoint all elected councillors to make up a Technical Services Working Group. CARRIED 6/0 Reason for Amending the Staff Recommendation Council believes it is important for any Councillor interested in this to be on the Working Group. 13.5 CONSIDERATION OF PROPOSED RFQ BRIEF FOR THE DESIGN, FABRICATION AND INSTALLATION OF TOWN SIGNAGE (FILE REF: 566) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Steven Deckert, Chief Executive Officer SENIOR OFFICER: Not applicable PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION To consider the draft RFQ Brief for the design, fabrication and installation of town entry statements and other signage and, if appropriate, to approve commencement of the advertising seeking submissions. ATTACHMENTS OMC1603-13.5.A Draft RFQ Brief – Design, Fabrication and Installation of Town Signage APPLICANT’S SUBMISSION Not applicable OMC160324 Minutes - Unconfirmed Minutes Page 48 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 BACKGROUND The Shire has included within its budget for the past couple of years, a provision of $100,000 for Town Entry statements as part of the Main Street Project. These entry statements have effectively been placed on hold, pending the outcome of the review of the Shire’s logo and branding. Now that this review is completed, we can commence the process for the entry statements. A draft RFQ Brief has been developed for Council’s consideration. Attachment OMC1603-13.5.A. Please refer to STATUTORY ENVIRONMENT Local Government Act 1995 Section 2.7(2) – Provides that Council is to oversee the allocation of local government finances and resources and to determine the local government policies. Section 3.1 – Provides that the general function of the local government is to provide for the good government of persons in its district. POLICY IMPLICATIONS Council has no policies in respect to this matter FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council as a provision of $100,000 has been made in the 2015/16 Adopted Budget. It is anticipated that the quotes will be in the vicinity of this amount and should the quotes exceed the budget, then adjustments can be made to suit. STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Nil. COMMENT With the adoption of a new logo, we can now commence consideration of new town entry statements. Also incorporated into the draft RFQ Brief are other signs to compliment the entry statements such as smaller entry statements for minor roads, Shire boundary signage and airport signage. Council’s endorsement of the RFQ Brief including the selection criteria and weightings, with or without amendment is sought so we can commence the process. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 OMC160325 Minutes Page 49 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Prentice; Seconded Cr D Ross: That Council: 1. Receives the RFQ Brief for “REQUEST FOR QUOTATION DESIGN, FABRICATION AND INSTALLATION OF TOWN SIGNAGE” as appended (Attachment OMC1603-13.5.A). 2. Endorses the RFQ Brief for the purposes of advertising; 3. Endorses the Assessment and Selection Criteria as listed in Section 4, namely: Selection Criteria 4. Submissions to meet the requirements of this request for quotation – 15% Assessment of the preliminary entry statement concept designs and signage incorporating the Shire of Laverton’s style guide – 35% Relevant experience (of tenderer and proposed sub-contractors) in designing, fabrication and installation of entry statements and signage – 25% Lump sum fee to undertake scope – 25% Authorises the CEO to receive and assess the RFQ’s received and to then make a recommendation to Council for Council’s consideration on the appointment of the preferred respondent. CARRIED 6/0 13.6 PLAYGROUP/CHILDCARE BUILDING UPGRADE AND RENOVATION UPDATE (FILE REF: 883) SUBMISSION TO: Ordinary Meeting of Council, 24 March 2016 DISCLOSURE OF INTEREST: The author has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Steven Deckert, Chief Executive Officer SENIOR OFFICER: Not applicable PREVIOUS MEETING REFERENCE: Minute OMC160223 – Ordinary Meeting 18 February 2016 MATTER FOR CONSIDERATION To consider a revised scope of works and if appropriate to seek quotes for the proposed works. ATTACHMENTS OMC1603-13.6.A OMC160324 Minutes - Unconfirmed Revised scope of works Minutes Page 50 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 APPLICANT’S SUBMISSION Not applicable BACKGROUND At the February 2016 Ordinary Meeting, Council resolved: That Council: 1. Acknowledges the receipt of the Scope of Works, plans and costings as prepared by Stockdale Building for the upgrade and maintenance of the current Playgroup Building, as tabled at this meeting; 2. Acknowledges that some works are required on the existing building if it is to be used for the next 2 to 3 years; 3. Refers this information to the Playgroup/Childcare Project Working Group and consults with the Working Group on their views of: a. reducing the scope of works further to within a budget of $100,000 (accounting for the $50,000 grant received to be matched on a $ for $ basis), or b. Holding off any further decisions or actions until such time as the outcomes of the various funding applications for the Laverton Community Hub Project are known and a more informed decision can be made. As directed, this matter was referred to the Playgroup/Childcare Project Working Group for their consideration. The Working Group has met informally on 3 occasions and has formed the opinion that even if the Laverton Community Hub Project proceeds, there will be a period of at least 3 years where the existing building is still to be used. Therefore, the working group recommends that some works be undertaken to extend the usable life of the existing facility and has reviewed the initial scope of work accordingly. Please refer to Attachment OMC1603-13.6.A which shows the original scope (on the left) and the Working Group’s recommended scope (on the right). Council is now requested to consider the revised scope and determine whether to approve seeking of quotes. STATUTORY ENVIRONMENT Local Government Act 1995 Section 2.7(2) – Provides that Council is to oversee the allocation of local government finances and resources and to determine the local government policies. Section 3.1 – Provides that the general function of the local government is to provide for the good government of persons in its district. POLICY IMPLICATIONS Council has no policies in respect to this matter FINANCIAL IMPLICATIONS The recommendation of this report has no financial implications for Council as the 2015/16 Budget has sufficient grant and Shire funds available to carry out the works of the revised scope. OMC160324 Minutes - Unconfirmed Shire of Laverton Ordinary Meeting of Council – 24 March 2016 Minutes Page 51 STRATEGIC IMPLICATIONS The recommendation of this report has no strategic implications for Council. CONSULTATION Playgroup/Childcare Project Working Group comprising: Councillors: Staff: Community Representatives: (reference group) Deanne Ross, Geoff Walder & Rex Ryles CEO, EMCCS Jasmine Walder, Tracey Murphett, Megan James, Rebecca Wells and Kathy James COMMENT While Council has resolved to form the Playgroup/Childcare Project Working Group and appointed Shire representatives, the appointment of community representatives has not been finalised due to more nominations being received than positions available. The Working Group discussed this aspect and believes that all nominees for the community positions be included as an informal ‘reference group’ rather than formal committee members. This may need to be reviewed in due course, however seems to be working for the time being. As the Working Group is more informal than formal, their meetings have not been minuted as any ideas or suggestions from the Working Group have no formal status. As requested by Council, the Playgroup/Childcare Project Working Group has met to discuss the proposed scope of works for the Playgroup Building. They have met on three separate occasions and have reviewed the scope of works to include only those items that are necessary to enable the Playgroup and future childcare service to operate safely and comfortably for the next few years. The estimated cost of these works, as indicated on the attached scope of works (Attachment OMC1603-13.6.A), is $108,500 compared to the original estimate of $274,300. The Working Group understands that quotes will need to be called and that the actual cost will not be known until the quotes have been received. Therefore the amount of $108,500 could be considered indicative and Council may wish to set a ‘ceiling’ of say $100,000 based on the grant of $50,000 matched $ for $ by the Shire. If Council agrees with this course of action, it is requested that Council endorse the revised scope of works for the purpose of advertising seeking quotes from registered builders. VOTING REQUIREMENTS Simple majority decision of Council required. OMC160326 COUNCIL DECISION/STAFF RECOMMENDATION Moved Cr R Ryles; Seconded Cr S Weldon: That Council: 1. Endorse the revised scope of works for the upgrade and renovation of the Playgroup building as proposed by the Playgroup/Childcare Project Working Group as appended (Attachment OMC1603-13.6.A). OMC160324 Minutes - Unconfirmed Minutes Page 52 Shire of Laverton Ordinary Meeting of Council – 24 March 2016 2. Approves that advertising commence as soon as practicable calling for quotes from registered builders to undertake the works in accordance with the scope. 3. Agrees to not set a limit on the maximum expenditure for the works at this stage and that this be further considered once the quotes have been received and referred to Council. CARRIED 6/0 14. ITEMS FOR CONSIDERATION BEHIND CLOSED DOORS There were no items listed for consideration behind closed doors. 15. NEXT MEETING The next Ordinary Meeting of Council will be held on Thursday, 22 April 2016 at the Shire of Laverton Council Chambers, commencing at 5.00pm. 16. CLOSURE OF MEETING There being no further business, the President declared the meeting closed at 8:37pm. 17. CERTIFICATION BY CHAIRMAN I, Patrick Hill, hereby certify that the Minutes of the Ordinary Meeting of Council held on 24 March 2016 are confirmed as a true and correct record, as per the Council resolution of the Ordinary Meeting of Council held on 21 April 2016. SIGNED: DATED: 2016 OMC160324 Minutes - Unconfirmed ATTACHMENT OMC1603-10.2.B Page 1 of 1 Report to Ordinary Meeting of Council 24 March 2016 I was on Study Leave for several weeks earlier in the year however I have attended the following meetings in recent weeks: DATE DETAIL Tue 22 Dec 2016 Attended Leonora meeting to hear proposal from Minister Alan Tudge, Wendy Duncan MP and Rick Wilson MP regarding Cashless Welfare Card (with President Hill, Cr Cannons and Marty Seelander) Wed 27 Jan 2016 Completed WALGA Training – Serving on Council. Thu 28 Jan 2016 Completed WALGA Training – Meeting Procedures and Debating. Fri 29 Jan 2016 Attended the GVROC Council meeting in Esperance with the President and the CEO: Salaries & Allowances Tribunal Presentation from GEDC Electoral Distribution Commission submission National Broadband Network Fri 29 Jan 2016 Attended a Regional Biosecurity Workshop in Esperance with President Hill and the CEO. Thu 04 Feb 2016 Attended the Annual Electors Meeting. Tue 23 Feb 2016 Attended Special Meeting of Council Wed 09 Mar 2016 Attended Laverton Working Group meeting, chaired by Wendy Duncan MP and President Hill Community Safety Plan Shaneane Weldon Deputy President ATTACHMENT OMC1603-10.2.A Page 1 of 1 ATTACHMENT OMC1603-10.1.A Page 1 of 1 ATTACHMENT OMC1603-11.2.4.A Page 1 of 56 SHIRE OF LAVERTON MONTHLY FINANCIAL REPORT For the Period Ended 31 January 2016 LOCAL GOVERNMENT ACT 1995 LOCAL GOVERNMENT (FINANCIAL MANAGEMENT) REGULATIONS 1996 TABLE OF CONTENTS Statement of Financial Activity by Program Summary Graphs ‐ Financial Activity Note 1 Note 2 Note 3 Note 4 Note 5 Note 6 Note 7 Note 8 Note 9 Note 10 Note 11 Note 12 Note 13 Significant Accounting Policies Net Current Funding Position Capital ‐ Acquisitions, Funding and Disposal Cash and Investments Receivables Payables Cash Backed Reserves Rating Information Information on Borrowings Grants and Contributions Budget Amendments Trust Material Variances 2 3 4‐6 7 8‐11 12 13 14 15 16 17‐18 19‐20 21 22 23 ATTACHMENT OMC1603-11.2.4.A Page 2 of 56 ATTACHMENT OMC1603-11.2.4.A Page 3 of 56 SHIRE OF LAVERTON STATEMENT OF FINANCIAL ACTIVITY Statutory Reporting Program For the Period Ended 31 January 2016 Adopted Annual Budget $ 500 3,539,855 1,362,058 57,260 100,100 175,805 39,124 108,790 114,359 4,504,503 702,724 143,560 10,848,638 Note Operating Revenues Governance General Purpose Funding ‐ Rates General Purpose Funding ‐ Other Law, Order, Public Safety Health Education and Welfare Housing Community amenities Recreation and Culture Transport Economic Services Other Property and Services Total Operating Revenue Operating Expense Governance (859,572) General Purpose Funding (261,604) Law, Order, Public Safety (454,710) Health (308,340) Education and Welfare (217,225) Housing (118,256) Community Amenities (483,482) Recreation and Culture (918,271) Transport (7,360,995) Economic Services (2,138,641) Other Property and Services (47,901) Total Operating Expenditure (13,168,997) Funding Balance Adjustments Add back Depreciation 1,992,900 Adjust (Profit)/Loss on Disposal 88,516 Adjust Provisions and Accruals 0 Net Cash from Operations (238,943) Capital Revenues Grants, Subsidies and Contributions 6,880,151 Proceeds from Disposal of Assets 3 336,000 Total Capital Revenues 7,216,151 Capital Expenses Land 3 (185,000) Land and Buildings 3 (1,537,500) Infrastructure ‐ Roads 3 (5,882,167) Infrastructure ‐ Other 3 (4,427,842) Plant and Equipment 3 (1,149,000) Furniture and Equipment 3 (128,460) Total Capital Expenditure (13,309,969) Net Cash from Capital Activities (6,093,818) Financing Transfer from Reserves 7 2,404,420 Proceeds from Borrowings 9 400,000 Repayment of Debentures 9 (122,189) Transfer to Reserves 7 (110,374) Net Cash from Financing Activities 2,571,857 Net Operations, Capital Financing Opening Funding Surplus(Deficit) 2 Closing Funding Surplus(Deficit) 2 YTD Budget (a) $ 292 3,539,855 794,534 33,402 58,392 102,553 22,822 63,461 66,709 2,627,627 409,922 83,743 7,803,312 YTD Actual (b) $ 203 3,553,830 693,096 11,071 84,029 1,812 21,701 106,850 9,852 51,271 369,496 92,532 4,995,743 Var. $ (b)‐(a) Var. % (b)‐(a)/(a) Var. $ % (89) (30%) 13,975 0% (101,438) (13%) (22,331) (67%) 25,637 44% (100,741) (98%) (1,121) (5%) 43,389 68% (56,857) (85%) (98%) (2,576,356) (40,426) (10%) 8,789 10% (2,807,569) (501,417) (152,602) (265,248) (179,865) (126,715) (68,983) (282,031) (535,658) (4,293,914) (1,247,541) (27,942) (7,681,915) (459,904) (121,400) (88,572) (201,123) (133,549) (44,485) (227,735) (594,858) (1,612,745) (1,007,050) (154,346) (4,645,767) 1,162,525 51,634 0 1,335,556 1,373,036 (5,000) (70,581) 1,647,431 4,013,421 196,000 4,209,421 162,285 20,000 182,285 (3,851,136) (96%) (176,000) (90%) (120,000) (398,000) (1,727,826) (449,842) (180,000) (33,240) (2,908,908) 1,300,513 (200,292) (90,441) (1,934,222) (135,193) (127,277) (23,894) (2,511,319) (2,329,034) (80,292) 0 0 (60,400) (64,385) (124,785) 0 0 (60,400) (59,889) (120,289) 2,511,285 3,760,904 6,272,189 (801,892) 3,798,037 2,996,145 (3,760,904) 3,760,904 0 41,513 31,202 8% 20% 176,676 67% (21,258) (12%) (6,834) (5%) 24,498 36% 54,296 19% (59,200) (11%) 2,681,169 62% 240,491 19% (126,404) (452%) 3,036,148 210,511 18% (56,634) (110%) (70,581) (100%) 311,875 (4,027,136) (67%) 307,559 77% (206,396) (12%) 314,649 70% 52,723 29% 9,346 28% 397,589 (3,629,547) 0 0 0 0% 4,496 4,496 (7%) (3,313,178) (37,133) Indicates a variance between Year to Date (YTD) Budget and YTD Actual data as per the adopted materiality threshold. Refer to the attached Explanation of Material Variances Statement for an explanation of the reasons for the variance. This statement is to be read in conjunction with the accompanying financial statements and notes. 2 Please refer to Compilation Report ATTACHMENT OMC1603-11.2.4.A Page 4 of 56 Amount $(000's) 12,000 10,000 8,000 6,000 4,000 2,000 0 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 Jul Jul Oct Nov Dec Jan Nov Dec Jan Feb Mar Apr May Jun Capital Expenses Oct 12,000 10,000 8,000 6,000 4,000 2,000 0 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 Jul Jul Aug Aug Amount $(000's) 3 Nov Dec Jan Feb Mar Operating Revenue Oct Operating Revenue Budget 2015‐16 Operating Revenue Actual 2015‐16 Capital Revenue Apr May Jun Please refer to Compilation Report Sep Oct Nov Dec Jan Feb Mar Apr May Jun Capital Revenue Budget 2015‐16 Capital Revenue Actual 2015‐16 Sep SHIRE OF LAVERTON SUMMARY GRAPHS ‐ FINANCIAL ACTIVITY For the Period Ended 31 January 2016 Feb Mar Apr May Operating Expenses Sep Operating Expenditure Budget 2015‐16 Operating Expenditure Actual 2015‐16 Aug Sep Aug Capital Expenditure Budget 2015‐16 Capital Expenditure Actual 2015‐16 Amount $(000's) This information is to be read in conjunction with the accompanying financial statements and notes. Amount $(000's) ATTACHMENT OMC1603-11.2.4.A Page 5 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 1. SIGNIFICANT ACCOUNTING POLICIES (a) Basis of Accounting This statement comprises a special purpose financial report which has been prepared in accordance with Australian Accounting Standards (as they apply to local governments and not‐for‐profit entities), Australian Accounting Interpretations, other authoritative pronouncements of the Australian Accounting Standards Board, the Local Government Act 1995 and accompanying regulations. Material accounting policies which have been adopted in the preparation of this statement are presented below and have been consistently applied unless stated otherwise. Except for cash flow and rate setting information, the report has also been prepared on the accrual basis and is based on historical costs, modified, where applicable, by the measurement at fair value of selected non‐current assets, financial assets and liabilities. Critical Accounting Estimates The preparation of a financial report in conformity with Australian Accounting Standards requires management to make judgements, estimates and assumptions that effect the application of policies and reported amounts of assets and liabilities, income and expenses. The estimates and associated assumptions are based on historical experience and various other factors that are believed to be reasonable under the circumstances; the results of which form the basis of making the judgements about carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates. (b) The Local Government Reporting Entity All Funds through which the Council controls resources to carry on its functions have been included in this statement. In the process of reporting on the local government as a single unit, all transactions and balances between those funds (for example, loans and transfers between Funds) have been eliminated. All monies held in the Trust Fund are excluded from the statement, but a separate statement of those monies appears at Note 11. (c) Rounding Off Figures All figures shown in this statement are rounded to the nearest dollar. (d) Rates, Grants, Donations and Other Contributions Rates, grants, donations and other contributions are recognised as revenues when the local government obtains control over the assets comprising the contributions. Control over assets acquired from rates is obtained at the commencement of the rating period or, where earlier, upon receipt of the rates. (e) Goods and Services Tax Revenues, expenses and assets are recognised net of the amount of GST, except where the amount of GST incurred is not recoverable from the Australian Taxation Office (ATO). Receivables and payables are stated inclusive of GST receivable or payable. The net amount of GST recoverable from, or payable to, the ATO is included with receivables or payables in the statement of financial position. Cash flows are presented on a gross basis. The GST components of cash flows arising from investing or financing activities which are recoverable from, or payable to, the ATO are presented as operating cash flows. (f) Cash and Cash Equivalents Cash and cash equivalents include cash on hand, cash at bank, deposits available on demand with banks and other short term highly liquid investments that are readily convertible to known amounts of cash and which are subject to an insignificant risk of changes in value and bank overdrafts. Bank overdrafts are reported as short term borrowings in current liabilities in the statement of financial position. (g) Trade and Other Receivables Trade and other receivables include amounts due from ratepayers for unpaid rates and service charges and other amounts due from third parties for goods sold and services performed in the ordinary course of business. Receivables expected to be collected within 12 months of the end of the reporting period are classified as current assets. All other receivables are classified as non‐current assets. Collectability of trade and other receivables is reviewed on an ongoing basis. Debts that are known to be uncollectible are written off when identified. An allowance for doubtful debts is raised when there is objective evidence that they will not be collectible. (h) Inventories General Inventories are measured at the lower of cost and net realisable value. Net realisable value is the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimated costs necessary to make the sale. Land Held for Resale Land held for development and sale is valued at the lower of cost and net realisable value. Cost includes the cost of acquisition, development, borrowing costs and holding costs until completion of development. Finance costs and holding charges incurred after development is completed are expensed. Gains and losses are recognised in profit or loss at the time of signing an unconditional contract of sale if significant risks and rewards, and effective control over the land, are passed on to the buyer at this point. Land held for sale is classified as current except where it is held as non‐ current based on Council’s intentions to release for sale. (i) Fixed Assets All assets are initially recognised at cost. Cost is determined as the fair value of the assets given as consideration plus costs incidental to the acquisition. For assets acquired at no cost or for nominal consideration, cost is determined as fair value at the date of acquisition. The cost of non‐current assets constructed by the local government includes the cost of all materials used in the construction, direct labour on the project and an appropriate proportion of variable and fixed overhead. Certain asset classes may be revalued on a regular basis such that the carrying values are not materially different from fair value. Assets carried at fair value are to be revalued with sufficient regularity to ensure the carrying amount does not differ materially from that determined using fair value at reporting date. (j) Depreciation of Non‐Current Assets All non‐current assets having a limited useful life are systematically depreciated over their useful lives in a manner which reflects the consumption of the future economic benefits embodied in those assets 4 Please refer to Compilation Report ATTACHMENT OMC1603-11.2.4.A Page 6 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 Note 1 (j) (Continued) Borrowings are classified as current liabilities unless the Council has an unconditional right to defer settlement of the liability for at least 12 months after the balance sheet date. Borrowing Costs Borrowing costs are recognised as an expense when incurred except where they are directly attributable to the acquisition, construction or production of a qualifying asset. Where this is the case, they are capitalised as part of the cost of the particular asset. (n) Provisions Provisions are recognised when: The council has a present legal or constructive obligation as a result of past events; it is more likely than not that an outflow of resources will be required to settle the obligation; and the amount has been reliably estimated. Provisions are not recognised for future operating losses. Where there are a number of similar obligations, the likelihood that an outflow will be required in settlement is determined by considering the class of obligations as a whole. A provision is recognised even if the likelihood of an outflow with respect to any one of item included in the same class of obligations may be small. (o) Current and Non‐Current Classification In the determination of whether an asset or liability is current or non‐current, consideration is given to the time when each asset or liability is expected to be settled. The asset or liability is classified as current if it is expected to be settled within the next 12 months, being the Council's operational cycle. In the case of liabilities where Council does not have the unconditional right to defer settlement beyond 12 months, such as vested long service leave, the liability is classified as current even if not expected to be settled within the next 12 months. Inventories held for trading are classified as current even if not expected to be realised in the next 12 months except for land held for resale where it is held as non current based on Council's intentions to release for sale. (p) Nature or Type Classifications Rates All rates levied under the Local Government Act 1995. Includes general, differential, specific area rates, minimum rates, interim rates, back rates, ex‐gratia rates, less discounts offered. Exclude administration fees, interest on instalments, interest on arrears and service charges. Operating Grants, Subsidies and Contributions Refer to all amounts received as grants, subsidies and contributions that are not non‐operating grants. Non‐Operating Grants, Subsidies and Contributions Amounts received specifically for the acquisition, construction of new or the upgrading of noncurrent assets paid to a local government, irrespective of whether these amounts are received as capital grants, subsidies, contributions or donations. Profit on Asset Disposal Profit on the disposal of assets including gains on the disposal of long term investments. Losses are disclosed under the expenditure classifications. Depreciation is recognised on a straight‐line basis, using rates which are reviewed each reporting period. Major depreciation rates and periods are: Asset Buildings Furniture and Equipment Plant and Equipment Roads and Streets Footpaths ‐ slab Airport Parks and gardens equipment Information Bay Town Centre Facilities Tools Depreciation Rate 40 years 10 years 3 ‐ 10 years 35 years 20 years 20 years 35 years 35 years 35 years 10 years (k) Trade and Other Payables Trade and other payables represent liabilities for goods and services provided to the Council prior to the end of the financial year that are unpaid and arise when the Council becomes obliged to make future payments in respect of the purchase of these goods and services. The amounts are unsecured, are recognised as a current liability and are normally paid within 30 days of recognition. (l) Employee Benefits The provisions for employee benefits relates to amounts expected to be paid for long service leave, annual leave, wages and salaries and are calculated as follows: (i) Wages, Salaries, Annual Leave and Long Service Leave (Short‐term Benefits) The provision for employees’ benefits to wages, salaries, annual leave and long service leave expected to be settled within 12 months represents the amount the Shire has a present obligation to pay resulting from employees services provided to balance date. The provision has been calculated at nominal amounts based on remuneration rates the Shire expects to pay and includes related on‐costs. (ii) Annual Leave and Long Service Leave (Long‐term Benefits) The liability for long service leave is recognised in the provision for employee benefits and measured as the present value of expected future payments to be made in respect of services provided by employees up to the reporting date using the project unit credit method. Consideration is given to expected future wage and salary levels, experience of employee departures and periods of service. Expected future payments are discounted using market yields at the reporting date on national government bonds with terms to maturity and currency that match as closely as possible, the estimated future cash outflows. Where the Shire does not have the unconditional right to defer settlement beyond 12 months, the liability is recognised as a current liability. (m) Interest‐bearing Loans and Borrowings All loans and borrowings are initially recognised at the fair value of the consideration received less directly attributable transaction costs. After initial recognition, interest‐bearing loans and borrowings are subsequently measured at amortised cost using the effective interest method. Fees paid on the establishment of loan facilities that are yield related are included as part of the carrying amount of the loans and borrowings. 5 Please refer to Compilation Report ATTACHMENT OMC1603-11.2.4.A Page 7 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 Note 1 (p) (Continued) Fees and Charges Revenues (other than service charges) from the use of facilities and charges made for local government services, sewerage rates, rentals, hire charges, fee for service, photocopying charges, licences, sale of goods or information, fines, penalties and administration fees. Local governments may wish to disclose more detail such as rubbish collection fees, rental of property, fines and penalties, other fees and charges. Service Charges Service charges imposed under Division 6 of Part 6 of the Local Government Act 1995. Regulation 54 of the Local Government (Financial Management) Regulations 1996 identifies the These are television and radio broadcasting, underground electricity and neighbourhood surveillance services. Exclude rubbish removal charges. Interest and other items of a similar nature received from bank and investment accounts, interest on rate instalments, interest on rate arrears and interest on debtors. Interest Earnings Interest and other items of a similar nature received from bank and investment accounts, interest on rate instalments, interest on rate arrears and interest on debtors. Other Revenue / Income Other revenue, which can not be classified under the above headings, includes dividends, discounts, rebates etc. Employee Costs All costs associate with the employment of person such as salaries, wages, allowances, benefits such as vehicle and housing, superannuation, employment expenses, removal expenses, relocation expenses, worker's compensation insurance, training costs, conferences, safety expenses, medical examinations, fringe benefit tax, etc. Materials and Contracts All expenditures on materials, supplies and contracts not classified under other headings. These include supply of goods and materials, legal expenses, consultancy, maintenance agreements, communication expenses, advertising expenses, membership, periodicals, publications, hire expenses, rental, leases, postage and freight etc. Local governments may wish to disclose more detail such as contract services, consultancy, information technology, rental or lease expenditures. Utilities (Gas, Electricity, Water, etc.) Expenditures made to the respective agencies for the provision of power, gas or water. Exclude expenditures incurred for the reinstatement of roadwork on behalf of these agencies. Insurance All insurance other than worker's compensation and health benefit insurance included as a cost of employment. Loss on asset disposal Loss on the disposal of fixed assets. Depreciation on non‐current assets Depreciation expense raised on all classes of assets. Interest expenses Interest and other costs of finance paid, including costs of finance for loan debentures, overdraft accommodation and refinancing expenses. Other expenditure Statutory fees, taxes, provision for bad debts, member's fees or levies including WA Fire Brigade Levy and State taxes. Donations and subsidies made to community groups. (r) Program Classifications (Function/Activity) Governance Includes the activities of members of council and the administrative support available to the council for the provision of governance of the district. Other costs relate to the task of assisting elected members and ratepayers on matters which do not concern specific council services. General Purpose Funding Rates, general purpose government grants and interest revenue. Law, Order, Public Safety Supervision and enforcement of various local laws relating to fire prevention, animal control and other aspects of public safety including emergency services. Health Inspection of food outlets and their control, provision of meat inspection services, noise control and waste disposal compliance. Education and Welfare Maintenance of child minding centre, playgroup centre, senior citizen centre and aged care centre. Provision and maintenance of home and community care programs and youth services. Housing Provision and maintenance of elderly residents housing. Community Amenities Rubbish collection services, operation of rubbish disposal sites, litter control, construction and maintenance of urban storm water drains, protection of the environment and administration of town planning schemes, cemetery and public conveniences. Recreation and Culture Maintenance of public halls, civic centres, aquatic centre, beaches, recreation centres and various sporting facilities. Provision and maintenance of parks, gardens and playgrounds. Operation of library, museum and other cultural facilities. Transport Construction and maintenance of roads, streets, footpaths, depots, cycle ways, parking facilities and traffic control. Cleaning of streets and maintenance of street trees, street lighting etc. Economic Services Tourism and area promotion including the maintenance and operation of a caravan park. Provision of rural services including weed control, vermin control and standpipes. Building Control. Other Property and Services Private works operation, plant repair and operation costs and engineering operation costs. 6 Please refer to Compilation Report ATTACHMENT OMC1603-11.2.4.A Page 8 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 NOTE 2. NET CURRENT ASSETS Note Net Current Assets Current Assets Cash Municipal Cash Reserves Receivables ‐ Rates Receivables ‐Other Provision for Doubtful Debts Inventories Less: Current Liabilities Payables Provisions Less: Cash Reserves Add: Cash Backed Leave Provisions 30 June 2015 $ YTD 31 Jan 2015 $ YTD 31 Jan 2016 $ 4 4 5 5 2,998,646 3,925,443 286,855 1,219,684 (138,000) 177,979 8,470,607 2,578,413 3,855,676 472,886 432,301 (138,000) 153,959 7,355,235 2,640,938 3,985,332 691,200 259,721 (138,000) 123,733 7,562,924 6 (747,127) (508,961) (3,925,443) 508,961 (608,516) (385,350) (3,855,676) 385,350 (581,447) (438,380) (3,985,332) 438,380 3,798,037 2,891,043 2,996,145 7 Net Current Funding Position Positive=Surplus (Negative=Deficit) Liquidity Over the Year 6,000 Amount $ ( '000s) 5,000 4,000 3,000 2,000 1,000 0 Jul Aug Sep Oct Nov Dec 2014‐15 7 Jan Feb Mar Apr May Jun 2015‐16 Please refer to Compilation Report ATTACHMENT OMC1603-11.2.4.A Page 9 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 NOTE 3. CAPITAL ‐ ACQUISITIONS AND FUNDING YTD YTD Actual Actual (Renewal New Note /Upgrade Expenditure) Capital Acquisitions (a) (b) $ $ Land 200,292 0 Buildings and Improvements 87,896 2,545 Roads 0 1,934,222 Other Infrastructure 4,894 130,299 Plant & Equipment 33,077 94,200 Furniture & Equipment 12,420 11,474 Capital Expenditure Totals 338,579 2,172,740 $ 185,000 1,537,500 5,882,167 4,427,842 1,149,000 128,460 13,309,969 Capital Acquisitions Funded By Capital Grants and Contributions Borrowings Other (Disposals & C/Fwd) Total Council Contribution‐ Cash Backed Reserves Council Contribution ‐ Operations Capital Funding Total 6,880,151 400,000 336,000 0 5,693,818 13,309,969 Annual Budget YTD Actual YTD Budget Total Variance (d) (c) = (a)+(b) (d) ‐ (c) $ $ $ 120,000 200,292 (80,292) 398,000 90,441 307,559 1,727,826 1,934,222 (206,396) 449,842 135,193 314,649 180,000 127,277 52,723 33,240 23,894 9,346 2,908,908 2,511,319 397,589 4,013,421 0 0 0 (1,104,513) 2,908,908 162,285 0 0 0 2,349,034 2,511,319 Capital Expenditure Program YTD YTD Actual Total YTD Budget Furniture & Equipment Plant & Equipment Other Infrastructure Roads Buildings and Improvements 0 100 200 300 400 500 600 700 800 9001,0001,1001,2001,3001,4001,5001,6001,7001,8001,9002,0002,100 Amount $(000's) 8 Please refer to Compilation Report ATTACHMENT OMC1603-11.2.4.A Page 10 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 NOTE 3. CAPITAL ACQUISITIONS Annual Budget Capital Acquisitions Building and Improvements New House for Doctor Early Childhood Precinct 8 Leahy Close Completion 1 Mikado Way Burt St Group Housing Staff Housing Upgrading First Aid Room For Swimming Pool Electrical Upgrade Depot Coach House Restoration 3 Laver Place TOTAL ‐ Building and Improvements Land Surplus ALT land Old Post Office Site UCL Hawke Place 3 Laver Place TOTAL ‐ Land Plant & Equipment Dog Pound Upgrade Youth Officer Vehicle Depot Fuel Facility Four Wheel Car Trailer 4.5 Tonne Boom Spray for JD Tractor Drum Mower for Town Oval Dethatcher for Town Oval Maintenance Accom Trailer Grader Retro Fit Loading Ramps P240 Metro Count Traffic Counters 37 KVA Generator Executive Vehicle EMCCS Executive Vehicle EMTS Executive Vehicle CEO TOTAL ‐ Plant & Equipment Furniture & Equipment Honour Board Council Chambers Youth Officer Computer Pool Blanket Winder Dry Chlorine Dosing System Pocket Ramm, Metro Count/Roman Tablet Thuraya Satellite Phones Hall of Fame Screens & Audio GB Security Screens GB Artefact Display Cabinets GB Shelving for Sea Container CRC Computer Replacement CRC Large Fridge & Freezer Replace Desktop Computers Wi‐Fi Computer Connections YTD Budget YTD Actual $ $ Variance (Under)/ Over $ (500,000) (275,000) (1,455) (2,500) (232,104) (66,000) (40,000) (20,000) (145,000) (165,000) $ 500,000 275,000 4,000 2,500 320,000 66,000 40,000 20,000 145,000 165,000 1,537,500 0 0 0 0 200,000 13,000 0 20,000 0 165,000 398,000 0 0 2,545 0 87,896 0 0 0 0 0 90,441 New New New New 30,000 50,000 50,000 55,000 185,000 5,000 50,000 10,000 55,000 120,000 2,768 4,523 5,775 187,226 200,292 (27,232) (45,477) (44,225) 132,226 Upgrade Renewal Upgrade New New Renewal Renewal Renewal Renewal New Renewal Renewal Renewal Renewal Renewal 5,000 41,000 38,000 25,000 15,000 57,000 18,000 250,000 360,000 45,000 20,000 25,000 75,000 80,000 95,000 0 0 0 25,000 15,000 57,000 18,000 0 0 45,000 20,000 0 0 0 0 0 0 0 0 7,955 57,000 18,000 0 0 25,122 19,200 0 0 0 0 (5,000) (41,000) (38,000) (25,000) (7,045) 0 0 (250,000) (360,000) (19,878) (800) (25,000) (75,000) (80,000) (95,000) 0 1,149,000 180,000 127,277 Upgrade Renewal Renewal Renewal New 4,000 3,000 9,655 0 3,000 4,000 3,000 9,655 0 0 1,300 0 9,045 2,429 3,035 (2,700) (3,000) (610) 2,429 35 Renewal New New New New Renewal New Renewal New 20,000 20,000 4,000 8,085 2,420 15,000 3,800 3,500 32,000 0 0 0 8,085 0 5,000 0 3,500 0 0 0 0 8,085 0 0 0 0 0 (20,000) (20,000) (4,000) 0 (2,420) (15,000) (3,800) (3,500) (32,000) 128,460 33,240 23,894 New Upgrade Renewal Renewal New Upgrade New Upgrade Renewal New TOTAL ‐ Furniture & Equipment 9 Please refer to Compilation Report ATTACHMENT OMC1603-11.2.4.A Page 11 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 NOTE 3. CAPITAL ACQUISITIONS Capital Acquisitions Building and Improvements Roads Erliston Road (I) CO 21109289 Old Laverton Rd (I) RRG 21109952 Old Laverton Rd (I) RRG 21109951 Gt Central Rd (I) Major Project 21100777 Gt Central Rd (I) Major Project Fed & Direct Grant Works to be determined Bandya Rd (I) RRG 21111449 Bandya Rd (I) RRG 21111446 Old Laverton Rd (I) RRG 21111448 Old Laverton Rd (I) RRG 21111447 Lav ‐ Mt M Rd (I) RRG 21111445 Gt Cent Rd Major Gt 21100777 Roads to Recovery (RAAR) GCH Roads to Recovery Mt Weld Road Roads 2 Recovery Reseal Town Sts RAAR Gt Central Rd TBD TOTAL ‐ Roads Other Infrastructure War Memorial Lighting Bore Water Supply to Oval Tank Racecourse Bore Water Supply to Tank Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Renewal Annual Budget YTD Budget YTD Actual $ $ $ 79,941 80,792 93,870 477,004 2,666,666 154,200 113,322 62,367 113,322 188,870 19,949 1,000,000 320,000 48,000 343,864 120,000 0 80,792 93,870 477,004 0 154,200 33,322 62,367 113,322 0 19,949 645,000 0 48,000 0 0 88,917 309,998 60,325 0 0 0 56,353 60,897 140,372 0 14,433 1,161,885 0 41,042 0 0 5,882,167 1,727,826 1,934,222 Variance (Under)/ Over $ 8,976 229,206 (33,545) (477,004) (2,666,666) (154,200) (56,969) (1,470) 27,050 (188,870) (5,516) 161,885 (320,000) (6,958) (343,864) (120,000) New New New 15,000 60,000 150,000 0 0 0 0 0 0 (15,000) (60,000) (150,000) Racecourse Power Supply Laver Place Revitalisation & Retic Leahy Park Upgrade ‐ with MEEDAC Tourist Bays Infrastructure Airport Runway Lighting Replacement New Upgrade Upgrade Upgrade Renewal 50,000 100,000 92,000 15,000 260,000 0 0 92,000 0 0 0 0 0 0 0 (50,000) (100,000) (92,000) (15,000) (260,000) Airport Runway Enrichment Seal Airport Runway Pavement Rating Airport Runway Linemarking Main Street Project Augusta Stg IB Civil Main Street Project Civil Works 1B Part B Renewal Renewal Renewal 268,000 35,000 35,000 0 325,000 0 0 0 0 235,000 0 32,985 0 4,894 92,554 (268,000) (2,015) (35,000) 4,894 (232,446) 1,922,842 122,842 4,760 (1,918,082) 100,000 1,000,000 0 0 0 0 (100,000) (1,000,000) Renewal Main Street Project Landscaping 1B Part Renewal A Renewal Town entry Statements Underground Power SUPP Program New TOTAL ‐ Other Infrastructure 4,427,842 449,842 13,309,969 2,908,908 10 135,193 (4,292,649) 2,511,319 Please refer to Compilation Report Plant and Equipment Youth Officer X‐Trail Trailer 1TAX661 #404 and Trailer #261 Grader John Deere 770 P282 LA3262 1 Erlistoun St Lot 339 #199 Pool Vehicle 160LA (EMCCS) Toyota Prado GX 2006 (EMTS) Landcruiser GXL 0LA (CEO) Description Disposed Asset Assets Disposed NOTE 3. CAPITAL DISPOSALS 0 1,503 48,087 0 4,508 7,514 11,872 0 73,484 0 498,000 Accum Depr $ 11,000 8,000 320,000 15,000 15,000 50,000 79,000 Cost $ 11 0 336,000 11,000 10,000 180,000 45,000 10,000 35,000 45,000 Proceeds $ 0 (88,516) 0 3,503 (91,913) 30,000 (492) (7,486) (22,128) Adopted Budget Profit/(Loss) $ SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 0 5,000 0 0 0 5,000 0 0 0 Actual Profit/(Loss) $ Comments Please refer to Compilation Report 0 93,516 0 (3,503) 91,913 (25,000) 492 7,486 22,128 Variance $ ATTACHMENT OMC1603-11.2.4.A Page 12 of 56 (a) Cash Deposits Municipal Account Short Term Investments Trust Account Outback Highway Development Fund Outback Highway Investment Cash on Hand (b) Term Deposits N/A (c) Other Investments Reserves ‐ Term Deposit 77‐216‐3432 Total Bank Accounts NOTE 4. CASH AND INVESTMENTS 2,640,938 17,590 623,348 2,000,000 Municipal $ 3,985,332 3,985,332 Reserves $ 12 203,357 38,741 4,616 160,000 Trust $ Investments $ 0 3,985,332 6,829,627 0 623,348 2,000,000 38,741 4,616 160,000 17,590 Total Amount $ SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 NAB NAB NAB NAB NAB NAB N/A Institution 31/03/2016 Cheque Acc 29/02/2016 Cheque Acc Cheque Acc 31/03/2016 On Hand Maturity Date Please refer to Compilation Report 3.03% Variable 2.88% Variable Variable 2.88% Interest Rate ATTACHMENT OMC1603-11.2.4.A Page 13 of 56 0 500 1,000 1,500 2,000 2,500 3,000 Jul Aug Sep Dec 2014‐15 Nov Jan 2015‐16 Feb Mar Apr May Jun YTD 31 Jan 2016 30 June 2015 $ $ 286,855 250,553 3,553,830 3,702,053 (3,149,485) (3,665,751) 691,200 286,855 691,200 286,855 82.00% 92.74% Rates Receivable Oct Opening Arrears Previous Years Levied this year Less Collections to date Equals Current Outstanding Net Rates Collectable % Collected Receivables ‐ Rates and Other Rates Receivable NOTE 5. RECEIVABLES Credit $ (429) Current $ 13 60 Days 83% Current 0% 90+Days 60 Days 30 Days Current Credit Please refer to Compilation Report Credit 0% Accounts Receivable (non‐rates) 90+Days 11% 30 Days 6% 259,721 30 Days 60 Days 90+Days Total $ $ $ $ 0 16,271 216,497 27,382 259,721 Total Receivables General Outstanding Amounts shown above include GST (where applicable) Receivables ‐ General Receivables ‐ General SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 ATTACHMENT OMC1603-11.2.4.A Page 14 of 56 ATTACHMENT OMC1603-11.2.4.A Page 15 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 NOTE 6. PAYABLES Payables Credit $ (1,005) Payables ‐ General Current $ 305,268 30 Days $ 11,605 60 Days $ 1,708 90+Days $ 52,533 Total $ 370,109 Balances per Trial Balance Sundry Payables 370,109 Payroll Payables ATO Liability Other Payables Accrued Expenses Total Payables General Outstanding Amounts shown above include GST (where applicable) 202,695 (23,983) 32,626 0 211,338 581,447 Total Payables Aged Payables 90+Days 14% Credit Credit 0% Current 30 Days 60 Days 60 Days 1% 90+Days 30 Days 3% Current 82% Payables Accrued Expenses Other Payables ATO Liability Payroll Payables Sundry Payables (50,000) 0 50,000 100,000 150,000 200,000 14 250,000 300,000 350,000 400,000 Please refer to Compilation Report Aerodrome Reserve Leave Reserve Road Reserve Plant Reserve Swimming Pool Reserve Council Builing Reserve Great Beyond Reserve Community Bus Reserve Town Site Revitalisation Reserve $0 Community Loan and Grant… Economic Development Reserve Coach House Renovation… GCF / Skull Ck Floodway Reserve Aerodrome Reserve Leave Reserve Road Reserve Plant Reserve Swimming Pool Reserve Council Builing Reserve Great Beyond Reserve Community Bus Reserve Town Site Revitalisation Reserve Community Loan and Grant Reserve Economic Development Reserve Coach House Renovation Reserve GCF / Skull Ck Floodway Reserve Reserves NOTE 7. CASH BACKED RESERVE $100,000 $200,000 Opening Balance $ 274,070 221,822 607,121 273,708 209,991 922,493 110,187 14,016 276,323 19,038 549,704 222,149 224,821 3,925,443 $400,000 15 $500,000 $600,000 $700,000 Please refer to Compilation Report $900,000 Budget Closing Balance $1,000,000 Actual YTD Budget Closing Closing Balance Balance $ $ 16,237 278,251 226,813 225,206 220,781 616,384 101,920 277,884 174,716 213,195 139,249 936,567 86,246 111,868 34,331 14,230 12,540 280,539 9,466 19,328 237,072 558,091 142,147 225,538 229,879 228,251 1,631,397 3,985,332 Actual YTD Closing Balance $800,000 Actual Budget Actual Budget Actual Transfers In Transfers In Transfers Out Transfers Out Transfer out Interest (‐) Reference (‐) (+) (+) Earned $ $ $ $ $ 4,181 (264,000) 3,384 0 9,263 (400,000) 4,176 (180,000) 3,204 (40,000) 14,074 (804,000) 1,681 (26,420) 214 20,000 0 4,216 (270,000) 290 (10,000) 8,387 (325,000) 3,389 (85,000) 3,430 0 59,889 20,000 0 (2,404,420) 0 0 $300,000 Budget Interest Earned $ 6,167 4,991 13,660 8,212 4,725 20,756 2,479 315 6,217 428 12,368 4,998 5,058 90,374 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 ATTACHMENT OMC1603-11.2.4.A Page 16 of 56 . Discounts Concessions Amount from General Rates Rates Written Off Total 1,359 59 1 0 410 13 483 Minimum $ 280 280 280 280 140 Minimum Payment GRV Townsite GRV Mining UV Pastoral UV Mining UV Shared Tenements Sub‐Totals 160 12 17 687 876 Rate in $ 0.1072 0.0803 0.0880 0.1486 Number of Properties Sub‐Totals RATE Differential General Rate GRV Townsite GRV Mining UV Pastoral UV Mining NOTE 8. RATING INFORMATION 30,927,839 17,618 20 0 408,817 4,199 430,654 30,497,185 Rateable Value $ 2,451,074 13,002,176 592,775 14,451,160 136,180 16,520 280 0 113,960 5,420 136,180 0 262,755 1,044,074 52,164 2,144,097 Rate Revenue 16 0 0 0 0 313 0 0 0 0 YTD Actual Interim Back Rates Rates 0 0 0 0 0 0 0 0 0 0 0 0 (85,753) 0 3,553,830 0 3,553,830 3,639,583 16,520 280 0 114,273 5,420 136,493 3,503,090 262,755 1,044,074 52,164 2,144,097 Total Revenue SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 280 16,520 280 0 114,800 1,820 280 3,506,435 262,755 1,044,074 52,164 2,147,442 Rate Revenue 0 0 0 0 0 0 0 0 0 0 0 0 (95,000) (5,000) 3,539,855 (15,000) 3,524,855 3,639,855 16,520 280 0 114,800 1,820 133,420 3,506,435 262,755 1,044,074 52,164 2,147,442 Total Revenue Please refer to Compilation Report 0 0 0 0 0 0 0 0 0 0 0 0 Budget Interim Back Rate Rate ATTACHMENT OMC1603-11.2.4.A Page 17 of 56 400,000 598,825 0 1,132,100 Economic Services Loan 80 Main St Project Funding New ‐ Main St Underground Power All debenture repayments will be financed by general purpose revenue. 200,000 165,411 367,864 0 200,000 New Loans Housing Loan 79B Two Executive Houses Loan 81 Burt St Group Housing New ‐ Doctor's House Particulars Principal 1‐Jul‐15 17 60,400 32,152 0 11,609 16,639 0 122,189 64,944 0 23,574 33,671 0 Principal Repayments 2015/16 2015/16 Actual Budget $ $ (a) Debenture Repayments Movement in debentures and interest between the beginning and the end of the current financial year. NOTE 9. INFORMATION ON BORROWINGS SHIRE OF LAVERTON MONTHLY FINANCIAL REPORT For the Period Ended 31 January 2016 1,071,700 566,673 0 153,802 351,225 0 1,532,100 598,825 200,000 165,411 367,864 200,000 Principal Outstanding 2015/16 2015/16 Actual Budget $ $ 49,965 23,194 0 9,800 16,971 0 Please refer to Compilation Report 25,677 11,917 0 5,078 8,682 0 Interest Repayments 2015/16 2015/16 Actual Budget $ $ ATTACHMENT OMC1603-11.2.4.A Page 18 of 56 400,000 200,000 200,000 Amount Borrowed Budget WATC WATC Institution Debentures Debentures Loan Type 10 10 Term (Years) 18 The Shire does not have an overdraft facility. It is not anticipated a facility will be required during 2015/16. (d) Overdraft The Shire had no unspent debenture funds as at 30th June 2015, nor is it expected to have unspent debenture funds as at 30th June 2016. (c) Unspent Debentures Doctor's House Main St Underground Power Particulars/Purpose (b) New Debentures ‐ 2015/16 NOTE 9. INFORMATION ON BORROWINGS (Continued) SHIRE OF LAVERTON MONTHLY FINANCIAL REPORT For the Period Ended 31 January 2016 108,670 54,335 54,335 Total Interest & Charges 4.72 4.72 Interest Rate % Balance Unspent $ 0 0 0 Please refer to Compilation Report 400,000 200,000 200,000 Amount Used Used Budget ATTACHMENT OMC1603-11.2.4.A Page 19 of 56 1,390,981 320,000 I121020 Government Grant ‐ Project Based Grants MRWA I121025 Remote Aboriginal Access Roads C/O MRWA Subtotal Regis Resources WANDRRA Federal Govt State/Federal 5,845,313 299,000 11,510,479 19 100,000 4,151,000 0 0 0 0 0 0 100,000 4,151,000 391,864 2,666,666 40,000 220,800 MRWA MEWA 154,200 MRWA I121025 Remote Aboriginal Access Roads 15‐16 Other Streets/Roads Funding I121035 Contribution to Roadworks Maintenance I121048 Funding for Flood Damage I121045 Roads to Recovery I121066 OHDC Grant Funding Aerodrome Funding I126030 RADS Grants 32,000 47,087 9,000 0 0 32,000 47,087 9,000 9,655 72,000 DSR Dept Ed Various 0 171,605 0 0 171,605 0 100,000 50,000 50,000 100,000 2,960 1,000 2,960 1,000 764,298 416,363 DPC Minara Y DFES 764,298 416,363 Budget $ 0 0 0 0 0 0 299,000 5,665,166 0 0 391,864 2,666,666 40,000 1,390,981 320,000 220,800 154,200 0 0 0 9,655 72,000 0 0 100,000 2015‐16 Budget Operating Capital $ $ 100,000 Y Y WALGCC WALGCC Grant Provider Approval (Y/N) 2015‐16 Various General Purpose Funding I032010 Grants Commission I032020 Local Road Grants Law, Order, Public Safety I051125 Contributions and Donations I053005 Grant Income I054015 Contribution towards Flood Management Plan Health I074010 Mining Company Subsidy Education & Welfare I085005 Youth Worker Grant I087020 Grant Income I088010 Grant Early Childhood Precinct Recreation and Culture I112006 CPRC Swimming Pool Grant I113015 Govt Grants ‐ Education Dept Oval I119010 Reimbursements I112006 CPRP Swimming Pool Grant I113020 Grant for War Memorial Lighting Transport MRWA Funding I122200 MRWA Direct I121020 Government Grant ‐ Project Based Grants Carry‐over Grants NOTE 10. GRANTS AND CONTRIBUTIONS SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 0 1,521 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,521 0 0 0 0 0 0 0 831,170 0 0 0 0 0 0 0 0 154,200 0 0 0 0 0 0 1,521 0 83,829 0 1,290 0 382,149 208,181 $ 299,000 10,680,830 100,000 4,151,000 391,864 2,666,666 40,000 1,390,981 320,000 220,800 0 32,000 47,087 9,000 9,655 72,000 171,605 0 100,000 16,171 50,000 1,670 1,000 382,149 208,182 $ Recoup Status Received Not Received Please refer to Compilation Report 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Variations Additions / (Deletions) Operating Capital $ ATTACHMENT OMC1603-11.2.4.A Page 20 of 56 Economic Services Community Development I131011 Grants & Donations Community Resource Centre I134045 CRC Support Unit Funding I134065 CRC Operating Grants Economic Development I131036 Purchase of Land Public Utility Services I131051 Main Street Project I131052 Underground Power Heritage Development I131060 Influential Families I131042 Coach House Remediation Works Great Beyond Visitor Centre I133061 Great Beyond VC Grant Funding I134081 GRANT FUNDING TOTALS Grants NOTE 10. GRANTS AND CONTRIBUTIONS GVROC et al Grant Provider Approval (Y/N) Subtotal 126,813 4,500 0 0 0 20,415 0 0 0 6,339,058 126,813 4,500 45,000 600,000 500,000 20,415 60,000 8,085 1,900 13,219,209 20 342,017 8,085 1,900 6,880,151 0 60,000 600,000 500,000 45,000 0 0 0 0 0 1,521 0 0 0 0 0 0 0 0 8,085 0 934,365 0 0 0 0 0 95,110 0 0 $ 831,170 0 1,900 12,286,365 20,415 60,000 600,000 500,000 45,000 31,703 4,500 342,017 $ 10,680,830 Recoup Status Received Not Received Please refer to Compilation Report 0 0 0 0 0 0 0 0 0 0 0 Variations 2015‐16 Budget Additions / (Deletions) Operating Capital Operating Capital $ $ $ 5,845,313 5,665,166 1,521 0 342,017 Budget $ 11,510,479 2015‐16 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 ATTACHMENT OMC1603-11.2.4.A Page 21 of 56 Description Council Resolution Amended Budget Cash Position as per Council Resolution Opening Carried Forward Surplus (Deficit) COA Budget Amendments Amendments to original budget since budget adoption. Surplus/(Deficit) NOTE 11. BUDGET AMENDMENTS 21 Classification SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 0 No Change ‐ (Non Cash Items) Adjust. $ 0 0 0 Please refer to Compilation Report 0 0 0 0 0 0 Amended Increase in Decrease in Available Budget Running Available Balance Cash Cash $ $ $ ATTACHMENT OMC1603-11.2.4.A Page 22 of 56 ATTACHMENT OMC1603-11.2.4.A Page 23 of 56 SHIRE OF LAVERTON NOTES TO THE STATEMENT OF FINANCIAL ACTIVITY For the Period Ended 31 January 2016 NOTE 12. TRUST FUND Funds held at balance date over which the Shire has no control and which are not included in this statement are as follows: Description Housing Bonds Building Levies Youth Advisory Council Laverton Clubs and Discos Donations Received North East G/fields LCDC holding Sport & Recreation Grant Funds Outback Hwy Development Fund Unclaimed Monies Opening Balance 1 Jul 15 $ 3,950 2,384 1,029 1,530 9,044 14,333 6,000 181,377 261 219,908 22 Amount Received $ 610 Amount Paid $ (400) 1,045 (17,806) 1,655 (18,206) Closing Balance 31 Jan 16 $ 4,160 2,384 1,029 1,530 9,044 14,333 6,000 164,616 261 203,357 Please refer to Compilation Report ATTACHMENT OMC1603-11.2.4.A Page 24 of 56 NOTE 13. EXPLANATION OF MATERIAL VARIANCES Details and explanations of the material variances reflected on the Statement of Financial Activity are provided below as required by Local Government (Financial Management) Regulation 34(1) (d). pq Indicates a variance between Year to Date (YTD) Budget and YTD Actual data as per the adopted materiality threshold of 10%. Reporting Program Operating Revenues Governance General Purpose Funding - Rates General Purpose Funding - Other Law, Order, Public Safety Health Education and Welfare Housing Community amenities Recreation and Culture Transport Economic Services Other Property and Services Total Operating Revenue Variance $ Variance Var. Timing/ Permanent Explanation of Variance (89) 13,975 % (30.40%) 0.39% (101,438) (12.77%) q Timing (22,331) (66.85%) q Timing 25,637 43.91% p Timing (100,741) (1,121) (98.23%) (4.91%) q Timing 43,389 68.37% p Timing (56,857) (85.23%) q Timing (2,576,356) (40,426) 8,789 (2,807,569) (98.05%) (9.86%) 10.49% 0.00% q Timing No significant variance No significant variance Revenue appears lower due to timing of Grants Commission payment and receipt of interest on Revenue is lower due to the timing of the Flood Management Plan funding. Variance due to timing of Mining company contributions towards Medical Service Revenue is down due to timing of Youth Service Grant & Pre School Lease fees No significant variance Revenue appears up due to he timing of the rubbish collection charges Revenue is down due to the timing of the swimming pool & oval grants Revenue is down due to the timing of the flood damage funding and lower airport fees & fuel sales. No significant variance No significant variance ATTACHMENT OMC1603-11.2.4.A Page 25 of 56 Operating Expense Governance $ 41,513 % 8.28% No significant variance General Purpose Funding 31,202 20.45% q Timing Law, Order, Public Safety 176,676 66.61% q Timing Expenditure is down due to the timing of Valuation expenses, lower Admin costs and rates write offs. Expenditure is down due to the timing of the Flood Management plan expenditure, lower animal control expenses and lower Fire Control Expenses (21,258) (6,834) (11.82%) (5.39%) p Housing 24,498 35.51% q Community Amenities 54,296 19.25% q (59,200) (11.05%) p 2,681,169 62.44% q 240,491 19.28% q Expenditure is up due to the timing of payments for the Doctors subsidy Timing & Nurses incentives No significant variance Expenditure is down due to the timing of Loan Interest and Loan Timing Guarantee Fee payments Expenditure is down due to lower Cemetery Maintenance costs, loweer public convenience and town Timing planning costs Expenditure is up mainly due to increased depreciation resulting from the revaluation of buildings last Permanent year. Expenditure is down. Most of this is due to the timing of flood damage Timing works. Expenditure is down due to the timing of Dr Laver celebrations, Influential Families project, Advances to Community Groups, The GVROC Energy Efficiency Program expenditure, the Coach House Redevelopment Plan, Gt Beyond Stage 2 Planningand Cactus control contributions as well as lower Timing Building control expenses and Admin (126,404) (452.37%) 3,036,148 0.00% 0 0.00% 210,511 18.11% p Expenditure is up due to the timing of Insurance payments, Licences and holiday pay and increased expenditure on Tyres, termination payments and higher depreciation. (56,634) (109.68%) (70,581) (100.00%) 0 311,875 0.00% q Health Education and Welfare Recreation and Culture Transport Economic Services Other Property and Services Total Operating Expenditure Funding Balance Adjustments Add back Depreciation Adjust (Profit)/Loss on Disposal Adjust Provisions and Accruals Adjust Deferred Rates Net Cash from Operations p Timing Permanent Depreciation was under budgeted. A number of vehicle changeovers are Timing yet to take place. ATTACHMENT OMC1603-11.2.4.A Page 26 of 56 Capital Revenues $ % Grants, Subsidies and Contributions (3,851,136) (95.96%) q Timing Proceeds from Disposal of Assets Total Capital Revenues Capital Expenses Land (176,000) (4,027,136) (89.80%) 0.00% q Timing (80,292) (66.91%) p Permanent 307,559 77.28% q Timing Infrastructure - Roads (206,396) (11.95%) p Timing Infrastructure - Other 314,649 69.95% q Timing 52,723 9,346 397,589 (3,629,547) 29.29% 28.12% 0.00% 0.00% q Timing Land and Buildings Plant and Equipment Furniture and Equipment Total Capital Expenditure Net Cash from Capital Activities Additional Comments Note 2 - Net Current Assets Note 3 - Capital Note 4 - Cash Note 5 - Receivables Note 6 - Payables Note 7 - Reserves Note 8 - Rates Note 9 - Borrowings Note 10 Grants Note 11 - Budget Amendments Note 12 - Trust Timing isssues on a number of infrastructure grants. A number of asset purchases are yet to take place. Timing of staff housing and Community Hub Roadworks have been focussed on completing grant jobs. Timing of Main Street Project & Airport works A number of vehicle changeovers are scheduled to occur between March No significant variance Nil ATTACHMENT OMC1603-11.2.4.A Page 27 of 56 Shire of Laverton STATEMENT OF FINANCIAL ACTIVITY (Statutory Reporting Program) For the Period Ended 31 January 2016 SUPPLEMENTARY REPORTS 10:21 AM 16/02/16 Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 28 of 56 Shire of Laverton Balance Sheet As of January 31, 2016 Jan 31, 16 Jun 30, 15 $ Change ASSETS Current Assets Chequing/Savings A01100 · Cash at Bank 623,348.40 2,997,046.39 2,000,000.00 0.00 2,623,348.40 2,997,046.39 A1111 · Aerodrome Reserve Account 278,251.52 274,070.12 4,181.40 A1112 · Leave Reserve Account 225,206.27 221,822.01 3,384.26 A1113 · Road Reserve Account 616,383.90 607,121.27 9,262.63 A1114 · Plant Reserve Account 277,884.10 273,708.23 4,175.87 A1115 · Swimming Pool Reserve Account 213,195.12 209,991.35 3,203.77 A1116 · Council Building Reserve 936,567.52 922,493.36 14,074.16 A1117 · Great Beyond Reserve 111,867.92 110,186.84 1,681.08 14,229.80 14,015.97 213.83 280,538.14 276,322.38 4,215.76 19,328.40 19,037.94 290.46 A1121 · Economic Development Reserve 558,090.91 549,704.26 8,386.65 A1123 · Coach House Renovation Reserve 225,537.69 222,148.44 3,389.25 A1124 · GCR/Skull Ck Floodway Reserve 228,251.15 224,821.13 3,430.02 3,985,332.44 3,925,443.30 59,889.14 6,608,680.84 6,922,489.69 (313,808.85) A01101 · Unrestricted Municipal Bank A01102 · Unrestricted Short Term Investm Total A01100 · Cash at Bank (2,373,697.99) 2,000,000.00 (373,697.99) A01110 · Reserved Cash A1118 · Bus Reserve A1119 · Townsite Revitalisation Reserve A1120 · Community Loan & Grant Reserve Total A01110 · Reserved Cash Total Chequing/Savings Accounts Receivable A01120 · ACCOUNTS RECEIVABLE A01122 · Prov Doubtful Debts A01120 · ACCOUNTS RECEIVABLE - Other Total A01120 · ACCOUNTS RECEIVABLE Total Accounts Receivable (138,000.00) (138,000.00) 0.00 950,920.65 1,008,487.14 (57,566.49) 812,920.65 870,487.14 (57,566.49) 812,920.65 870,487.14 (57,566.49) 15,990.00 0.00 Other Current Assets 1499 · Undeposited Funds 15,990.00 1,600.00 1,600.00 A01131 · Prepayments - Other 0.00 57,391.25 (57,391.25) A01133 · Accrued Jet Fuel Revenue 0.00 338,895.25 (338,895.25) A01134 · Other Accrued Income 0.00 101,765.32 (101,765.32) 123,732.51 177,978.65 (54,246.14) 141,322.51 677,630.47 (536,307.96) 7,562,924.00 8,470,607.30 (907,683.30) A01105 · Petty Cash and Cash on Hand A01190 · STOCK ON HAND Total Other Current Assets Total Current Assets 0.00 Page 1 of 29 OMC1603-11.2.4.A 10:21ATTACHMENT AM Page 29 of 56 16/02/16 Accrual Basis Shire of Laverton Balance Sheet As of January 31, 2016 Jan 31, 16 Jun 30, 15 $ Change Fixed Assets A0151 · Land 903,000.00 918,000.00 62,572.06 62,572.06 0.00 62,572.06 62,572.06 0.00 CL16211 · Land For Redevelopment 2,768.13 0.00 2,768.13 CL16212 · Swap Costs for i Erlistoun OPO 4,523.15 0.00 4,523.15 A015100 · Land at Valuation (15,000.00) A01512 · At Cost A015121 · Additions 14/15 C130210 · Land for Redevelopment Total A015121 · Additions 14/15 CL16 · Land Additions 15-16 5,775.00 0.00 5,775.00 187,225.56 0.00 187,225.56 200,291.84 0.00 200,291.84 262,863.90 62,572.06 200,291.84 1,165,863.90 980,572.06 185,291.84 A015200 · Buildings at valuation 5,090,000.00 5,090,000.00 0.00 A015202 · Improvements at Valuation 3,217,000.00 3,217,000.00 0.00 CL16213 · Aqcuisition of UCL Hawks Place CL16214 · Acquisition of 3 Laver Place Total CL16 · Land Additions 15-16 Total A01512 · At Cost Total A0151 · Land A0152 · Buildings and Improvements A01521 · Accum.Depn - Buildings (835,367.80) (611,301.63) (224,066.17) 31,999.09 31,999.09 0.00 31,999.09 31,999.09 0.00 87,895.69 0.00 87,895.69 2,545.45 0.00 2,545.45 90,441.14 0.00 90,441.14 122,440.23 31,999.09 90,441.14 7,594,072.43 7,727,697.46 A01522 · At Cost CB15 · Buildings Additions 14-15 CB15208 · Electrical Upgrade Transport De Total CB15 · Buildings Additions 14-15 CB16 · Buildings Additions 15-16 CB16204 · Burt St Group Dwelling C/O CB16207 · 8 Leahy Close Completion Total CB16 · Buildings Additions 15-16 Total A01522 · At Cost Total A0152 · Buildings and Improvements (133,625.03) Page 2 of 29 10:21 AM 16/02/16 Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 30 of 56 Shire of Laverton Balance Sheet As of January 31, 2016 Jan 31, 16 Jun 30, 15 $ Change A0153 · Infrastructure - Roads A01531 · Accumulated Depn - Infra (32,962,924.71) (32,313,879.46) (649,045.25) A01533 · At Cost A01548 · Additions 2013-14 C120432 · Bandya Rd C/O (I) E104 66,380.29 66,380.29 0.00 C120433 · Erlistoun Rd C/O (I) E105 39,836.68 39,836.68 0.00 C120434 · Great Central Rd (E100) I 403,490.40 403,490.40 0.00 12,445.82 12,445.82 0.00 C120436 · GCR - Sealing 316,318.94 316,318.94 0.00 C120437 · Old Laverton Rd (P) 217,225.67 217,225.67 0.00 1,418.40 1,418.40 0.00 C120435 · Mt Weld Rd C/O from 2012-13 C120438 · Laverton-Mt Margaret Rd (P) 98,613.90 98,613.90 0.00 C120440 · Bandya Rd (I) 122,535.33 122,535.33 0.00 C120442 · Great Central Rd C/O 2012-13 389,761.23 389,761.23 0.00 C120443 · Great Central Rd - R2R 484,489.16 484,489.16 0.00 C120444 · Great Central Rd - RAAR 125,898.14 125,898.14 0.00 2,278,413.96 2,278,413.96 0.00 76,058.78 76,058.78 0.00 284,368.92 284,368.92 0.00 40,867.00 40,867.00 0.00 C120439 · Old Laverton Rd (I) Total A01548 · Additions 2013-14 CR15 · IR Additions 2014-15 CR15400 · Erlistoun Road (I) CR15401 · Mt Weld C/O PIN 21105520 CR15402 · Old Laverton Road C/O 21109285 84,035.00 84,035.00 0.00 CR15404 · Bandya Rd (I) CO 21109288 120,001.44 120,001.44 0.00 CR15405 · Erliston Rd(I)CO 21104166 19,200.00 19,200.00 0.00 CR15403 · Old Laverton Road (I)CO21109287 9,834.00 9,834.00 0.00 CR15410 · Old Laverton (i) RRG 21109952 189,208.21 189,208.21 0.00 CR15411 · Old Laverton (i) RRG 21109951 80,130.64 80,130.64 0.00 CR15412 · Bandya Rd (I) RRG 21109953 497,081.26 497,081.26 0.00 CR15413 · Great Central (I) RAAR 21100784 133,677.20 133,677.20 0.00 CR15406 · Mt Weld Rd Seal R2R 31,618.00 31,618.00 0.00 CR15415 · Bandya Rd (I)RAAR 21100782 100,792.84 100,792.84 0.00 CR15416 · Great Central Road (1) 21100777 529,171.46 529,171.46 0.00 CR15436 · Great Central Road – Sealing (C 382,593.56 382,593.56 0.00 CR15438 · Laverton-Mt Margaret Rd (P) (C/ 50,200.42 50,200.42 0.00 CR15442 · Great Central Road – C/O 2012-1 185,695.83 185,695.83 0.00 2,814,534.56 2,814,534.56 0.00 CR16401 · Mt Weld Road Sealing (R2R) 41,041.88 0.00 41,041.88 CR16402 · Erliston Road (I) CO 21109289 88,916.73 0.00 88,916.73 CR16403 · Old Laverton Rd(I) RRG 21109951 60,325.35 0.00 60,325.35 CR16405 · Bandya Rd (I) RRG 21111449 56,352.75 0.00 56,352.75 CR16406 · Bandya Rd (I) RRG 21111446 60,897.08 0.00 60,897.08 CR15414 · Old Laverton Rd (I)RAAR21100783 Total CR15 · IR Additions 2014-15 CR16 · IR Additions 2015-16 140,371.69 0.00 140,371.69 CR16409 · Lav - Mt M Rd (I) RRG 21111445 14,432.86 0.00 14,432.86 CR16410 · Old Laverton (i) RRG 21109952 309,998.47 0.00 309,998.47 1,161,885.04 0.00 1,161,885.04 1,934,221.85 0.00 1,934,221.85 CR16407 · Old Laverton Rd (I RRG 21111448 CR16416 · Great Central Road (1) 21100777 Total CR16 · IR Additions 2015-16 Page 3 of 29 OMC1603-11.2.4.A 10:21ATTACHMENT AM Page 31 of 56 16/02/16 Accrual Basis Shire of Laverton Balance Sheet As of January 31, 2016 Jan 31, 16 Jun 30, 15 $ Change 61,423,586.33 61,423,586.33 0.00 68,450,756.70 66,516,534.85 1,934,221.85 35,487,831.99 34,202,655.39 1,285,176.60 53,693.91 53,693.91 0.00 (31,747.39) (14,872.60) 5,137.75 5,137.75 0.00 Total C120337 · Council Chambers Upgrade 5,137.75 5,137.75 0.00 C120346 · Transportable Office Partitions 4,179.72 4,179.72 0.00 C120347 · CEO's Office Furniture C/O 4,331.72 4,331.72 0.00 32,131.09 32,131.09 0.00 6,454.64 6,454.64 0.00 52,234.92 52,234.92 0.00 CF15302 · Dry Chlorine Dosing system 32,966.18 32,966.18 0.00 CF15303 · Surv System - Depot 34,084.00 34,084.00 0.00 CF15304 · Surv System - Airport 17,077.00 17,077.00 0.00 CF15306 · Ssecurity Surveillance - GB A01533 · At Cost - Other Total A01533 · At Cost Total A0153 · Infrastructure - Roads A0154 · Furniture & Equipment A015400 · F & E Management Valuation A01541 · Accumulated Depn - F&E (16,874.79) A01542 · At Cost A01588 · Additions 13-14 C120337 · Council Chambers Upgrade 120337A · Cabinet C120349 · IT Admin Office Renewal C120350 · Medical Equipment Total A01588 · Additions 13-14 CF15 · Furniture Additions 14-15 16,628.00 16,628.00 0.00 CF15308 · GB Laptop Computer 1,424.00 1,424.00 0.00 CF15309 · Computer for P.O.S - GB 2,093.00 2,093.00 0.00 CF15310 · Security Surveillance - CRC 17,452.00 17,452.00 0.00 CF15315 · Security Surv Syst Admin Office 17,752.00 17,752.00 0.00 CF15316 · SBS Radio Services - install 19,672.00 19,672.00 0.00 20,330.29 20,330.29 0.00 179,478.47 179,478.47 0.00 CF16301 · Council Chamber Honour Board 1,300.00 0.00 1,300.00 CF16302 · Dry Chlorine Dosing System 2,428.94 0.00 2,428.94 CF16304 · Pocket Ramm Metro Count 3,034.96 0.00 3,034.96 CF16308 · GB Artefact Display Cabinets 8,085.00 0.00 8,085.00 CF16317 · Pool Blankets Roller Winder 9,044.60 0.00 9,044.60 23,893.50 0.00 23,893.50 255,606.89 231,713.39 23,893.50 277,553.41 270,534.70 7,018.71 CF15317 · Pool Blankets and Rollers Total CF15 · Furniture Additions 14-15 CF16 · Furniture Additions 15-16 Total CF16 · Furniture Additions 15-16 Total A01542 · At Cost Total A0154 · Furniture & Equipment Page 4 of 29 10:21 AM 16/02/16 Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 32 of 56 Shire of Laverton Balance Sheet As of January 31, 2016 Jan 31, 16 Jun 30, 15 $ Change (1,194,195.80) (1,074,635.18) (119,560.62) A0155 · Infrastructure - Other A01551 · Accumulated Depn. - Inf Other A01552 · At Cost A01568 · Additions 13-14 C120131 · FCWP Oval Upgrade 145,734.25 145,734.25 0.00 C120133 · MSP Constr'n, Designs & Plan'ng 1,040.37 1,040.37 0.00 C120134 · MSP Augusta Stg 1B Civil Works 878,883.80 878,883.80 0.00 C120135 · MSP Project Management 105,528.15 105,528.15 0.00 C120138 · FCWP Main St Underground Power C120140 · Landscaping - Trans Office Total A01568 · Additions 13-14 450.00 450.00 0.00 2,131.57 2,131.57 0.00 1,133,768.14 1,133,768.14 0.00 1,441,986.03 1,441,986.03 0.00 CIO15 · IO Additions 2014-15 CI15109 · Main St Proj Stage 1B Part B 4,366.28 4,366.28 0.00 1,446,352.31 1,446,352.31 0.00 4,894.00 0.00 4,894.00 CI16109 · Main St Proj Stage 1B Part B 92,553.88 0.00 92,553.88 CI16111 · Airport Runway Pavement Rating 32,985.27 0.00 32,985.27 4,760.00 0.00 4,760.00 135,193.15 0.00 135,193.15 1,671,709.96 1,671,709.96 0.00 4,387,023.56 4,251,830.41 135,193.15 3,192,827.76 3,177,195.23 15,632.53 2,934,214.76 2,934,214.76 0.00 CI15114 · Racecourse Power Total CIO15 · IO Additions 2014-15 CIO16 · IO Additions 2015-16 CI16100 · MSP Augusta Stg 1B Civil Works CI16113 · Main St Stage 1B Part A Total CIO16 · IO Additions 2015-16 A01552 · At Cost - Other Total A01552 · At Cost Total A0155 · Infrastructure - Other A0156 · Plant & Equipment A015600 · P & E Management Valuation A01561 · Accumulated Depn - P&E (936,293.00) (696,344.82) (239,948.18) A01562 · At Cost A01577 · Additions 13-14 C120539 · Vehicle - CCBO 35,643.00 35,643.00 0.00 C120541 · Generator 30KVA 20,103.08 20,103.08 0.00 C120543 · Transfer Pump 27,222.53 27,222.53 0.00 C120544 · Tyre Changer 24,153.64 24,153.64 0.00 C120545 · Depot Manager's Vehicle 55,403.11 55,403.11 0.00 C120547 · Crew Cab Truck 85,310.00 85,310.00 0.00 5,460.50 5,460.50 0.00 C120550 · Bitumen Spray Emulsion Unit 21,350.00 21,350.00 0.00 C120553 · Works Manager's Vehicle C120549 · Hydraulic Repair Station 50,217.73 50,217.73 0.00 C120554 · Tractor Attachments 6,430.00 6,430.00 0.00 C120555 · Traffic Counters 8,220.00 8,220.00 0.00 Total A01577 · Additions 13-14 339,513.59 339,513.59 0.00 Page 5 of 29 OMC1603-11.2.4.A 10:21ATTACHMENT AM Page 33 of 56 16/02/16 Accrual Basis Shire of Laverton Balance Sheet As of January 31, 2016 Jan 31, 16 Jun 30, 15 $ Change CP15 · Plant Additions 14-15 CP15501 · Doctor's Vehicle CP15505 · Generator 8KVA CP15506 · Tipper Truck (HR) 13-14 CP15507 · Laser Level Constr Works 39,216.23 39,216.23 0.00 44,586.79 44,586.79 0.00 120,170.00 120,170.00 0.00 4,180.00 4,180.00 0.00 22,000.00 22,000.00 0.00 123,720.00 123,720.00 0.00 CP15513 · Town Crew Service Veh (1) 21,360.36 21,360.36 0.00 CP15514 · Town Crew Service Veh (2) 26,219.36 26,219.36 0.00 CP15515 · SP14-23 Bore Pump 21,763.28 21,763.28 0.00 Total CP15 · Plant Additions 14-15 423,216.02 423,216.02 0.00 CP16505 · Drum Mower for Town Maintenance 57,000.00 0.00 57,000.00 CP16506 · Dethatcher for Town Oval Mtce 18,000.00 0.00 18,000.00 CP16509 · Retro Fit Loading Ramps P240 25,122.00 0.00 25,122.00 CP15508 · Kevrek Crane for Crew Cab CP15511 · Second Hand Trailer CP16 · Plant Additions 15-16 CP16510 · Boom Spray CP16511 · Metro Count Traffic Counters 4 Total CP16 · Plant Additions 15-16 Total A01562 · At Cost Total A0156 · Plant & Equipment 7,954.60 0.00 7,954.60 19,200.00 0.00 19,200.00 127,276.60 0.00 127,276.60 890,006.21 762,729.61 127,276.60 2,887,927.97 3,000,599.55 (112,671.58) A0157 · Tools A01571 · Accumulated Depn - Tools A015722 · Management Valuation Total A0157 · Tools (1,591.27) (1,230.00) 4,050.00 4,050.00 (361.27) 2,458.73 2,820.00 (361.27) (121,047.87) 0.00 (121,047.87) (121,047.87) 0.00 (121,047.87) 0.00 A0158 · Improvements A01581 · Acc Depn - Improvements Total A0158 · Improvements A0159 · Golf Course 52,000.00 52,000.00 0.00 52,000.00 52,000.00 0.00 28,000.00 28,000.00 0.00 28,000.00 28,000.00 0.00 A01610 · At Valuation 39,000.00 39,000.00 0.00 A01611 · Acc Depn - Payground Equipment (5,761.47) (3,630.00) (2,131.47) 33,238.53 35,370.00 (2,131.47) 50,600,726.85 49,477,444.39 A01590 · At Valuation Total A0159 · Golf Course A0160 · Race Course A01600 · At Valuation Total A0160 · Race Course A0161 · Playground Equipment Total A0161 · Playground Equipment Total Fixed Assets 1,123,282.46 Page 6 of 29 10:21 AM 16/02/16 Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 34 of 56 Shire of Laverton Balance Sheet As of January 31, 2016 Jan 31, 16 Jun 30, 15 $ Change 1,086,828.68 1,086,828.68 0.00 1,086,828.68 1,086,828.68 0.00 59,250,479.53 59,034,880.37 215,599.16 370,108.60 609,802.61 (239,694.01) 370,108.60 609,802.61 (239,694.01) L01210 · Mr Steven John Deckert 3,767.12 3,040.89 726.23 L01211 · Mr Graham Phillip Stanley 3,945.81 2,836.12 1,109.69 Other Assets A0180 · Buildings WIP Total Other Assets TOTAL ASSETS LIABILITIES Current Liabilities Accounts Payable L01215 · SUNDRY CREDITORS Total Accounts Payable Credit Cards 2,301.83 1,375.93 925.90 10,014.76 7,252.94 2,761.82 320.00 0.00 320.00 144,485.43 879.47 143,605.96 1,640.00 0.00 1,640.00 56,249.60 53,528.96 2,720.64 Total 2100 · Payroll Liabilities 202,695.03 54,408.43 148,286.60 2200 · Tax Payable (23,982.82) 34,546.13 (58,528.95) 6,175.31 (6,175.31) L01212 · Mr Russell Joseph Williams Total Credit Cards Other Current Liabilities 2100 · Payroll Liabilities L01261 · Transfer to Trust Account L01262 · Superannuation L01263 · Social Club L01266 · PAYG Tax L01216 · Accrued Expenses 0.00 L0122 · Employee Entitlements L01225 · Annual Leave 276,416.67 276,416.67 L01226 · LSL Liability Current 161,962.93 180,640.86 (18,677.93) L01235 · Accrued Wages Liability 0.00 51,904.21 (51,904.21) Total L0122 · Employee Entitlements 438,379.60 508,961.74 (70,582.14) 61,789.03 122,189.17 (60,400.14) L01221 · Borrowings - Current L01222 · Accrued Interest L01233 · Transport (DPI) L01234 · Fringe Benefit Tax L01244 · Deposits paid (Key & General) L01258 · ESL Levied Total Other Current Liabilities Total Current Liabilities 0.00 0.00 13,319.16 (13,319.16) 4,540.40 1,903.35 2,637.05 0.00 7,802.00 (7,802.00) 4,806.80 4,441.80 365.00 13,263.98 7,474.51 5,789.47 701,492.02 761,221.60 (59,729.58) 1,081,615.38 1,378,277.15 (296,661.77) Page 7 of 29 OMC1603-11.2.4.A 10:21ATTACHMENT AM Page 35 of 56 16/02/16 Accrual Basis Shire of Laverton Balance Sheet As of January 31, 2016 Jan 31, 16 Jun 30, 15 $ Change Long Term Liabilities 52,015.57 52,015.57 0.00 1,009,911.18 1,009,911.18 0.00 1,061,926.75 1,061,926.75 0.00 2,143,542.13 2,440,203.90 (296,661.77) 57,106,937.40 56,594,676.47 512,260.93 3000 · Opening Bal Equity 19,060,513.57 19,120,402.71 3900 · *Retained Earnings 29,439,403.72 24,459,982.41 L01230 · Provision - Employee LSL L01710 · Loan Liability Total Long Term Liabilities TOTAL LIABILITIES NET ASSETS EQUITY (59,889.14) 4,979,421.31 L01900 · Reserved Equity 4,109,426.74 4,109,426.74 0.00 L01904 · Aerodrome Reserve 278,251.52 274,070.12 4,181.40 L01905 · Leave Reserve 225,206.27 221,822.01 3,384.26 L01907 · Plant Reserve 277,884.10 273,708.23 4,175.87 L01909 · Road Reserve 616,383.90 607,121.27 9,262.63 L01911 · Swimming Pool Reserve 213,195.12 209,991.35 3,203.77 L01916 · Council Buildings Reserve 936,567.52 922,493.36 14,074.16 L01917 · Great Beyond Reserve Equity 111,867.92 110,186.84 1,681.08 L01901 · Revaluation Reserve L01918 · Bus Reserve Equity L01919 · Townsite Revitalisation Reserve 14,229.80 14,015.97 213.83 280,538.14 276,322.38 4,215.76 19,328.40 19,037.94 290.46 L01921 · Economic Development Reserve 558,090.91 549,704.26 8,386.65 L01923 · Coach house Renovation Reserve 225,537.69 222,148.44 3,389.25 L01924 · GCR/Skull Creek Floodway 228,251.15 224,821.13 3,430.02 8,094,759.18 8,034,870.04 59,889.14 512,260.93 4,979,421.31 57,106,937.40 56,594,676.47 L01920 · Community Loan & Grant Reserve Total L01900 · Reserved Equity Net Income TOTAL EQUITY (4,467,160.38) 512,260.93 Page 8 of 29 10:31 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 36 of 56 Shire of Laverton Income Statement by Program July 1, 2015 to 31 January, 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget Income I03 · GENERAL PURPOSE FUNDING I04 · GOVERNANCE 4,246,926.38 4,473,477.00 (226,550.62) 4,901,913.00 203.32 500.00 (296.68) 500.00 I05 · LAW ORDER & PUBLIC SAFETY 11,071.09 57,260.00 (46,188.91) 57,260.00 I07 · HEALTH 84,028.81 100,100.00 (16,071.19) 100,100.00 1,811.66 275,805.00 (273,993.34) 275,805.00 I08 · EDUCATION & WELFARE 21,700.58 39,124.00 (17,423.42) 39,124.00 106,850.00 108,790.00 (1,940.00) 108,790.00 9,852.26 196,014.00 (186,161.74) 196,014.00 I12 · TRANSPORT 205,470.85 9,988,014.00 (9,782,543.15) 9,988,014.00 I13 · ECONOMIC SERVICES 377,581.44 1,917,709.00 (1,540,127.56) 1,917,709.00 92,531.76 143,560.00 (51,028.24) 143,560.00 5,158,028.15 17,300,353.00 (12,142,324.85) 17,728,789.00 5,158,028.15 17,300,353.00 (12,142,324.85) 17,728,789.00 E03 · GENERAL PURPOSE FUNDING. 121,400.29 261,604.00 (140,203.71) 261,604.00 E04 · GOVERNANCE. 459,904.26 859,572.00 (399,667.74) 859,572.00 88,571.85 454,710.00 (366,138.15) 454,710.00 E07 · HEALTH. 201,123.27 308,340.00 (107,216.73) 308,340.00 E08 · EDUCATION & WELFARE. 133,548.65 217,225.00 (83,676.35) 217,225.00 44,484.91 118,256.00 (73,771.09) 118,256.00 E10 · COMMUNITY AMENITIES. 227,734.84 483,482.00 (255,747.16) 483,482.00 E11 · RECREATION & CULTURE. 594,857.39 918,271.00 (323,413.61) 918,271.00 E12 · TRANSPORT. 1,612,745.32 7,360,995.00 (5,748,249.68) 7,360,995.00 E13 · ECONOMIC SERVICES. 1,007,050.10 2,138,640.00 (1,131,589.90) 2,138,640.00 154,346.34 47,902.00 4,645,767.22 13,168,997.00 (8,523,229.78) 13,168,997.00 512,260.93 4,131,356.00 (3,619,095.07) 4,559,792.00 I09 · HOUSING I10 · COMMUNITY AMENITIES I11 · RECREATION & CULTURE I14 · OTHER PROPERTY & SERVICES Total Income Gross Profit Expense E05 · LAW ORDER & PUBLIC SAFETY. E09 · HOUSING. E14 · OTHER PROPERTY & SERVICES. Total Expense Net Income 106,444.34 47,902.00 Page 9 of 29 ATTACHMENT OMC1603-11.2.4.A 2:30 PM Page 37 of 56 Accrual Basis Shire of Laverton Income Statement by Nature and Type July 1, 2015 to January 31, 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget 13,974.87 3,539,855.00 Revenue 3,553,829.87 3,539,855.00 Operating Grants,subs & Contrib 772,079.79 5,945,504.00 (5,173,424.21) 6,339,058.00 Non-op Grants, subs & contrib 162,285.00 6,880,151.00 (6,717,866.00) 6,880,151.00 Fees and Charges 325,612.34 628,661.00 (303,048.66) 628,661.00 Interest earnings 83,252.03 139,015.00 (55,762.97) 173,897.00 Rates 5,000.00 33,503.00 (28,503.00) 33,503.00 255,969.12 133,664.00 122,305.12 133,664.00 5,158,028.15 17,300,353.00 (12,142,324.85) 17,728,789.00 Employee Costs (1,953,814.89) (3,766,696.00) 1,812,881.11 (3,766,696.00) Materials and Contracts (1,752,725.81) (6,193,638.00) 4,440,912.19 (6,193,638.00) Depreciation non-current asset (1,373,035.62) (1,992,900.00) 619,864.38 (1,992,900.00) Insurance expenses (209,949.99) (212,876.00) 2,926.01 (212,876.00) Utility Charges (174,308.59) (252,600.00) 78,291.41 (252,600.00) (15,613.08) (49,965.00) 34,351.92 (49,965.00) (122,019.00) 122,019.00 (122,019.00) (578,303.00) 312,313.39 (578,303.00) (13,168,997.00) 8,523,229.78 (13,168,997.00) Profit on Asset Disposal Other Revenue Total Revenue Exp Interest Expense Loss on Asset Disposal Other expenditure 0.00 (265,989.61) Alloc Admin Allocated 228,971.66 POC 563,246.11 PWOH 307,452.60 Total Alloc 1,099,670.37 Total Exp Unclassified TOTAL 0.00 Wages (4,645,767.22) 0.00 0.00 512,260.93 4,131,356.00 0.00 (3,619,095.07) 0.00 4,559,792.00 Page 10 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 38 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget Income I03 · GENERAL PURPOSE FUNDING I031 · Rates I031005 · GRV 5.1 · GRV Townsite 5.2 · GRV Minesite Total I031005 · GRV 262,754.99 262,755.00 1,044,074.73 1,044,074.00 (0.01) 0.73 1,044,074.00 262,755.00 1,306,829.72 1,306,829.00 0.72 1,306,829.00 I031010 · UV 52,164.21 52,164.00 10.2 · UV Mining 2,144,096.59 2,147,442.00 (3,345.41) 2,147,442.00 Total I031010 · UV 2,196,260.80 2,199,606.00 (3,345.20) 2,199,606.00 16,520.00 16,520.00 0.00 16,520.00 280.00 280.00 0.00 280.00 16,800.00 16,800.00 0.00 16,800.00 113,960.00 114,800.00 5,419.55 1,820.00 3,599.55 1,820.00 Total I031020 · UV - Minimum 119,379.55 116,620.00 2,759.55 116,620.00 I031025 · Instalment Interest 10,658.96 5,000.00 5,658.96 5,000.00 4,989.90 17,500.00 (12,510.10) 30,000.00 0.00 2,000.00 (2,000.00) 2,000.00 10.1 · UV Pastoral 0.21 52,164.00 I031015 · GRV - Minimum 15.1 · GRV Town Mins 15.2 · GRV Mining Mins Total I031015 · GRV - Minimum I031020 · UV - Minimum 20.2 · UV Mining Mins 20.3 · UV Mining Shared I031030 · Non Payment Penalty I031035 · Rates Administration Fee I031040 · Account Enquiries I031045 · Discount Allowed 761.00 (85,753.50) 500.00 (840.00) 261.00 114,800.00 500.00 (95,000.00) 9,246.50 (95,000.00) I031046 · Interim Rates 46.2 · UV Interims 46.2.2 · UV Mining Interims 310.59 Total 46.2 · UV Interims 310.59 Total I031046 · Interim Rates 310.59 I031052 · Bad Debts Recovered 140.33 I031055 · Rate Concession I031060 · Legal Expenses Recovered Total I031 · Rates (5,000.00) 5,000.00 (5,000.00) 6,275.01 0.00 5,000.00 1,275.01 5,000.00 3,576,652.36 3,569,855.00 6,797.36 3,582,355.00 Page 11 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 39 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget I032 · Other GPF I032010 · Grants Commisson 382,149.00 509,532.00 (127,383.00) 764,298.00 I032020 · Local Road Grants 208,181.50 277,575.00 (69,393.50) 416,363.00 I032030 · Interest on Investments - Muni 20,054.38 28,307.00 (8,252.62) 48,522.00 I032045 · Interest - Aerodrome Reserve 4,181.40 4,001.00 I032050 · Interest - Leave Reserve 3,384.26 4,991.00 (1,606.74) 4,991.00 I032055 · Interest - Plant Reserve 4,175.87 8,212.00 (4,036.13) 8,212.00 I032060 · Interest - Road Reserve 9,262.63 13,660.00 (4,397.37) 13,660.00 I032065 · Interest - Swim Pool Reserve 3,203.77 4,725.00 (1,521.23) 4,725.00 180.40 6,168.00 14,074.16 20,756.00 (6,681.84) 20,756.00 I032074 · Interest - Great Beyond Reserve 1,681.08 2,479.00 (797.92) 2,479.00 I032075 · Interest - Coach House Ren Res 3,389.25 4,998.00 (1,608.75) 4,998.00 I032076 · Interest - Eco Develop Reserve 8,386.65 12,368.00 (3,981.35) 12,368.00 0.00 0.00 I032078 · Interest - Comm. Bus Reserve 213.83 315.00 (101.17) 315.00 I032079 · Interest - Community Loan Res 290.46 428.00 (137.54) 428.00 I032081 · Interest - Townsite Rev Reserve 4,215.76 6,217.00 (2,001.24) 6,217.00 I032082 · Interest GCR/Skull Cr F Reserve 3,430.02 5,058.00 (1,627.98) 5,058.00 670,274.02 903,622.00 (233,347.98) 1,319,558.00 4,246,926.38 4,473,477.00 (226,550.62) 4,901,913.00 203.32 500.00 (296.68) 500.00 203.32 500.00 (296.68) 500.00 203.32 500.00 (296.68) 500.00 1,290.00 2,960.00 (1,670.00) 2,960.00 9,183.59 1,000.00 8,183.59 1,000.00 10,473.59 3,960.00 6,513.59 3,960.00 I032070 · Interest - Council Build Reserv I032077 · Interest - Short Stay Acc Res Total I032 · Other GPF Total I03 · GENERAL PURPOSE FUNDING 0.00 0.00 I04 · GOVERNANCE I041 · Governance - Membership I041010 · Reimbursements - Members Total I041 · Governance - Membership Total I04 · GOVERNANCE I05 · LAW ORDER & PUBLIC SAFETY I051 · Fire Prevention I051125 · Contributions & Donations I051130 · Fire Control Charges Total I051 · Fire Prevention I052 · Animal Control I052110 · Fines & Penalties 0.00 300.00 (300.00) 300.00 I052120 · Impounding Fees 0.00 1,000.00 (1,000.00) 1,000.00 597.50 1,000.00 (402.50) 1,000.00 597.50 2,300.00 (1,702.50) 2,300.00 0.00 1,000.00 (1,000.00) 1,000.00 0.00 1,000.00 (1,000.00) 1,000.00 I054015 · Cont. - Flood Management Plan 0.00 50,000.00 (50,000.00) 50,000.00 I054020 · Emergency Management Support 0.00 0.00 0.00 50,000.00 (50,000.00) 50,000.00 11,071.09 57,260.00 (46,188.91) 57,260.00 I052130 · Dog Registrations Total I052 · Animal Control I053 · Other Law Order & Public Safety I053005 · Grant - Crime Prevention Total I053 · Other Law Order & Public Safety I054 · Emergency Managemnt & Recovery Total I054 · Emergency Managemnt & Recovery Total I05 · LAW ORDER & PUBLIC SAFETY 0.00 0.00 Page 12 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 40 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget 100.00 100.00 I07 · HEALTH I074 · Admin. & Inspections 200.00 100.00 I074010 · Mining Company Subsidy 83,828.81 100,000.00 I074011 · Medical Practice Receipts 0.00 0.00 0.00 0.00 I074025 · Grant Funding 0.00 0.00 0.00 0.00 84,028.81 100,100.00 (16,071.19) 100,100.00 84,028.81 100,100.00 (16,071.19) 100,100.00 0.00 171,605.00 (171,605.00) 171,605.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 290.91 171,605.00 (171,314.09) 171,605.00 0.00 4,200.00 (4,200.00) 4,200.00 0.00 4,200.00 (4,200.00) 4,200.00 0.00 100,000.00 (100,000.00) 100,000.00 0.00 100,000.00 (100,000.00) 100,000.00 1,811.66 275,805.00 (273,993.34) 275,805.00 3,750.58 5,000.00 (1,249.42) 5,000.00 13,450.00 26,520.00 (13,070.00) 26,520.00 17,200.58 31,520.00 (14,319.42) 31,520.00 4,500.00 7,604.00 (3,104.00) 7,604.00 4,500.00 7,604.00 (3,104.00) 7,604.00 21,700.58 39,124.00 (17,423.42) 39,124.00 I074005 · Charges - Food Vendors Total I074 · Admin. & Inspections Total I07 · HEALTH (16,171.19) 100,000.00 I08 · EDUCATION & WELFARE I085 · Youth Worker I085005 · Youth Worker Grant I085010 · Youth Services Reimbursement I085100 · Youth & Recreation Services I085110 · Profit on sale of vehicle Total I085 · Youth Worker 290.91 I086 · Pre-School I086010 · Leases/Charges Total I086 · Pre-School I087 · Other Education I087020 · Grant Income Total I087 · Other Education 1,520.75 1,520.75 I088 · Care of Families & Children I088010 · Grant Funds - Early Childhood Total I088 · Care of Families & Children Total I08 · EDUCATION & WELFARE I09 · HOUSING I091 · Staff Housing I091005 · Reimbursements I091010 · Staff Housing Rental Total I091 · Staff Housing I092 · Other Housing I092005 · Housing Rental - Other Total I092 · Other Housing Total I09 · HOUSING Page 13 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 41 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget 0.00 103,790.00 I10 · COMMUNITY AMENITIES I101 · Sanitation - Townsite Refuse Co I101016 · Rubbish Collection Charges 103,790.00 103,790.00 360.00 600.00 (240.00) 600.00 I101025 · Septic Tank Fees 0.00 100.00 (100.00) 100.00 I101030 · Liquid Waste Disposal Fees 0.00 1,500.00 (1,500.00) 1,500.00 104,150.00 105,990.00 (1,840.00) 105,990.00 0.00 0.00 0.00 0.00 I102105 · Charges Cemetery By-Laws 2,700.00 1,800.00 900.00 1,800.00 Total I102 · Other Community Amenities 2,700.00 1,800.00 900.00 1,800.00 0.00 1,000.00 (1,000.00) 1,000.00 0.00 1,000.00 (1,000.00) 1,000.00 106,850.00 108,790.00 (1,940.00) 108,790.00 481.36 500.00 (18.64) 500.00 481.36 500.00 (18.64) 500.00 0.00 41,655.00 (41,655.00) 41,655.00 I101020 · Sale of Bins Total I101 · Sanitation - Townsite Refuse Co I102 · Other Community Amenities I102010 · Reimbursements I106 · T.P & Regional Develop I106010 · Town Planning Fees Total I106 · T.P & Regional Develop Total I10 · COMMUNITY AMENITIES I11 · RECREATION & CULTURE I111 · Public Halls and Civic Centres I111005 · Charges - Hall Hire Total I111 · Public Halls and Civic Centres I112 · Swimming Areas & Beaches I112006 · CPRC Swimming Pool Grant I112010 · Charges - Pool Admissions 2,297.91 3,500.00 (1,202.09) 3,500.00 Total I112 · Swimming Areas & Beaches 2,297.91 45,155.00 (42,857.09) 45,155.00 47,087.00 (47,087.02) 47,087.00 I113 · Other Recreation I113015 · Grant - Education Dept Oval (0.02) 778.20 2,500.00 (1,721.80) 2,500.00 778.18 49,587.00 (48,808.82) 49,587.00 I115005 · Lost Books 0.00 100.00 (100.00) 100.00 I115060 · Grant Funds & Donations/Gifts 0.00 0.00 0.00 100.00 (100.00) 100.00 I113050 · Community Gym Subscriptions Total I113 · Other Recreation I115 · Library Total I115 · Library 0.00 0.00 I119 · TV & Radio Rebroadcasting 6,294.81 28,672.00 (22,377.19) 28,672.00 I119020 · Cont. Digital TV Conversion 0.00 72,000.00 (72,000.00) 72,000.00 Total I119 · TV & Radio Rebroadcasting 6,294.81 100,672.00 (94,377.19) 100,672.00 9,852.26 196,014.00 (186,161.74) 196,014.00 I119010 · Reimbursements Total I11 · RECREATION & CULTURE Page 14 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 42 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget I12 · TRANSPORT I121 · Roads & Streets I121020 · Govt Grant - Project Based Gran 0.00 1,611,781.00 (1,611,781.00) 1,611,781.00 (360,000.00) 360,000.00 0.00 360,000.00 154,200.00 154,200.00 I121035 · Contributions to Roadworks Main 0.00 100,000.00 I121045 · Roads to Recovery 0.00 391,864.00 (391,864.00) 391,864.00 I121048 · Funding for Flood Damage 0.00 4,151,000.00 (4,151,000.00) 4,151,000.00 I121025 · Aboriginal Access Roads Grant I121030 · Government Grant - Direct Grant I121066 · OHDC Grant Fund. for Gt Cent.Rd Total I121 · Roads & Streets 0.00 (100,000.00) 154,200.00 100,000.00 0.00 2,666,666.00 (2,666,666.00) 2,666,666.00 154,200.00 9,435,511.00 (9,281,311.00) 9,435,511.00 0.00 3,503.00 (3,503.00) 3,503.00 0.00 3,503.00 (3,503.00) 3,503.00 (70,357.31) 120,000.00 I123 · Plant Costs I123005 · Gain on Disposal of Assets Total I123 · Plant Costs I126 · Aerodrome 49,642.69 120,000.00 I126010 · Telephone 0.00 0.00 I126012 · Fuel Sales 1,628.16 130,000.00 (128,371.84) 130,000.00 0.00 299,000.00 (299,000.00) 299,000.00 51,270.85 549,000.00 (497,729.15) 549,000.00 205,470.85 9,988,014.00 (9,782,543.15) 9,988,014.00 I131042 · Coach House Remedial Works 0.00 60,000.00 (60,000.00) 60,000.00 I131060 · Influential Families I126005 · Landing Fees I126030 · RADS Grants Total I126 · Aerodrome Total I12 · TRANSPORT 0.00 0.00 I13 · ECONOMIC SERVICES I131 · Economic Development I1310 · Heritage Development 0.00 20,415.00 (20,415.00) 20,415.00 Total I1310 · Heritage Development 0.00 80,415.00 (80,415.00) 80,415.00 I131010 · Reimbursements 0.00 100.00 (100.00) 100.00 153,000.00 342,017.00 (189,017.00) 342,017.00 I131036 · Purchase of Land 0.00 45,000.00 (45,000.00) 45,000.00 I131040 · R4R - Comm Local Govern Fund 0.00 0.00 I131011 · Grants & Donations I131044 · Proceeds from Sale of Assets 0.00 0.00 5,000.00 I131051 · Grant Funds Main Street Project 0.00 600,000.00 (600,000.00) 600,000.00 I131052 · Grant Funds Underground Pwr 0.00 500,000.00 (500,000.00) 500,000.00 158,000.00 1,567,532.00 (1,409,532.00) 1,567,532.00 I132010 · Police House Admission 0.00 100.00 (100.00) 100.00 I132025 · Laverton Calendar Sales Anglogo 0.00 0.00 I132050 · Reimbursements 0.00 5,564.00 (5,564.00) 5,564.00 0.00 5,664.00 (5,664.00) 5,664.00 Total I131 · Economic Development I132 · Tourism/Area Promotion Total I132 · Tourism/Area Promotion 0.00 0.00 Page 15 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 43 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget I133 · Great Beyond Explorers Centre 40,794.50 75,000.00 (34,205.50) 75,000.00 5,330.00 8,500.00 (3,170.00) 8,500.00 44,828.21 50,900.00 (6,071.79) 50,900.00 145.27 275.00 (129.73) 275.00 I133025 · Sale of Mt Morgans Books 0.00 0.00 I133026 · Sale of Outback Way Atlas 1,221.27 2,500.00 (1,278.73) 2,500.00 116.37 700.00 (583.63) 700.00 I133005 · Cafe Sales I133010 · Entrance Fees I133015 · Merchandise Sales I133020 · Sale of GQDT Books I133030 · Sale of Laverton Calendars 0.00 0.00 0.00 100.00 (100.00) 100.00 I133050 · Goldrush Tours 7,155.18 10,000.00 (2,844.82) 10,000.00 I133061 · Display Cabinet 8,085.00 8,085.00 107,675.80 156,060.00 849.99 100.00 I134020 · Sturt Pea Advertising 1,977.22 4,000.00 (2,022.78) 4,000.00 I134025 · Secretarial/Internet Access 1,962.24 5,000.00 (3,037.76) 5,000.00 0.00 200.00 (200.00) 200.00 I133035 · Sale of Outback Angles Video Total I133 · Great Beyond Explorers Centre 0.00 (48,384.20) 8,085.00 156,060.00 I134 · Community Resource Centre I134010 · CRC Memberships I134030 · Equipment & Conference Area Hir 749.99 100.00 I134035 · Sale of Stock 581.81 600.00 (18.19) 600.00 I134040 · General Income 921.12 1,500.00 (578.88) 1,500.00 95,109.75 126,813.00 (31,703.25) 126,813.00 I134050 · Licensing Agent - Commissions 5,927.08 11,000.00 (5,072.92) 11,000.00 I134065 · CRC Operating Grants 3,500.00 4,500.00 (1,000.00) 4,500.00 457.00 50.00 98.07 100.00 I134045 · CRC Support Unit Funding I134066 · Express Yourself Printing I134067 · DPS Photo Lab 407.00 (1.93) I134080 · Coach House Ren/CRC Co-loc'n 0.00 0.00 I134081 · Community Garden Project 0.00 1,900.00 (1,900.00) 0.00 50.00 100.00 0.00 1,900.00 0.00 30,000.00 (30,000.00) 30,000.00 111,384.28 185,763.00 (74,378.72) 185,763.00 I135005 · Building Permits 86.36 1,000.00 (913.64) 1,000.00 Total I135 · Building Control 86.36 1,000.00 (913.64) 1,000.00 435.00 1,690.00 (1,255.00) 1,690.00 435.00 1,690.00 (1,255.00) 1,690.00 377,581.44 1,917,709.00 (1,540,127.56) 1,917,709.00 4,129.92 10,000.00 (5,870.08) 10,000.00 0.00 10,000.00 (10,000.00) 10,000.00 4,129.92 20,000.00 (15,870.08) 20,000.00 I134600 · Gain on sale of assets Total I134 · Community Resource Centre I135 · Building Control I136 · Other I136005 · Caravan Park Registration Fees Total I136 · Other Total I13 · ECONOMIC SERVICES I14 · OTHER PROPERTY & SERVICES I141 · Private Works I141005 · Charges - Private Works I141010 · Community Bus Hire Total I141 · Private Works Page 16 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 44 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget I143 · Public Works Overheads I143010 · Reimbursements Total I143 · Public Works Overheads 5,000.00 5,500.00 (500.00) 5,500.00 5,000.00 5,500.00 (500.00) 5,500.00 0.00 6,000.00 (6,000.00) 6,000.00 I144 · Plant Operation Costs I144010 · Charges - Sale of Scrap I144020 · Reimbursements I144030 · Fuel Tax Credits Income Total I144 · Plant Operation Costs 0.00 7,000.00 (7,000.00) 7,000.00 59,763.00 90,000.00 (30,237.00) 90,000.00 59,763.00 103,000.00 (43,237.00) 103,000.00 I145 · Administration I145010 · Reimbursements I145020 · Commissions I145022 · BCITF & Bldg Comm Commissions I145030 · Photocopies & Facsimiles Total I145 · Administration 2,179.25 1,000.00 1,179.25 1,000.00 20,492.56 14,000.00 6,492.56 14,000.00 0.00 0.00 0.00 0.00 56.63 60.00 (3.37) 60.00 22,728.44 15,060.00 7,668.44 15,060.00 92,531.76 143,560.00 (51,028.24) 143,560.00 5,158,028.15 17,300,353.00 (12,142,324.85) 17,728,789.00 5,158,028.15 17,300,353.00 (12,142,324.85) 17,728,789.00 I148 · Unclassified I148020 · Suspense - Income Total I148 · Unclassified Total I14 · OTHER PROPERTY & SERVICES Total Income Gross Profit 910.40 910.40 Expense E03 · GENERAL PURPOSE FUNDING. E031 · Rates 214.60 2,000.00 (1,785.40) 2,000.00 E031010 · Legal Expenses 7,385.44 10,000.00 (2,614.56) 10,000.00 E031020 · Valuation Expenses 2,414.85 17,500.00 (15,085.15) 17,500.00 E031005 · Rate Advertising E031025 · Rate Printing, Postage & Statio 0.00 2,500.00 (2,500.00) 2,500.00 E031040 · Rates Written Off 0.00 15,000.00 (15,000.00) 15,000.00 E031200 · Admin Allocation - Rates Total E031 · Rates 91,202.89 175,949.00 (84,746.11) 175,949.00 101,217.78 222,949.00 (121,731.22) 222,949.00 1,520.93 2,500.00 (979.07) 2,500.00 E032 · Other E032005 · Bank Charges E032010 · Title Searches E032200 · Admin Allocation - Other GPF Total E032 · Other Total E03 · GENERAL PURPOSE FUNDING. 24.60 200.00 (175.40) 200.00 18,636.98 35,955.00 (17,318.02) 35,955.00 20,182.51 38,655.00 (18,472.49) 38,655.00 121,400.29 261,604.00 (140,203.71) 261,604.00 Page 17 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 45 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E04 · GOVERNANCE. E041 · Membership 24,129.34 40,000.00 (15,870.66) 40,000.00 E041010 · Election Expenses 4,399.81 10,000.00 (5,600.19) 10,000.00 E041015 · Subscriptions 9,756.07 10,313.00 (556.93) 10,313.00 E041020 · Donations 5,100.00 5,500.00 (400.00) 5,500.00 E041005 · Members Conference Expenses 3,319.78 3,320.00 (0.22) 3,320.00 25,000.00 27,500.00 (2,500.00) 27,500.00 E041035 · Other Expenses 945.05 10,000.00 (9,054.95) 10,000.00 E041040 · Public Relations 2,963.56 10,000.00 (7,036.44) 10,000.00 E041045 · President's Allowance 9,381.82 17,200.00 (7,818.18) 17,200.00 E041050 · Members Travel Expenses 1,557.19 5,000.00 (3,442.81) 5,000.00 E041055 · Deputy President's Allowance 2,345.47 4,300.00 (1,954.53) 4,300.00 E041065 · Attendance Fees 30,136.36 67,000.00 (36,863.64) 67,000.00 E041070 · Refreshments & Receptions 11,227.56 14,500.00 (3,272.44) 14,500.00 2,820.89 6,286.00 (3,465.11) 6,286.00 792.14 5,000.00 (4,207.86) 5,000.00 25,800.00 30,000.00 (4,200.00) 30,000.00 0.00 16,000.00 (16,000.00) 16,000.00 3,664.25 5,000.00 (1,335.75) 5,000.00 296,315.24 571,653.00 (275,337.76) 571,653.00 249.73 1,000.00 (750.27) 1,000.00 Total E041 · Membership 459,904.26 859,572.00 (399,667.74) 859,572.00 Total E04 · GOVERNANCE. 459,904.26 859,572.00 (399,667.74) 859,572.00 E051005 · Insurance - Fire Control 3,000.00 3,000.00 E051010 · Fire Control Expenses 5,668.43 26,455.00 (20,786.57) 26,455.00 0.00 19,229.00 (19,229.00) 19,229.00 1,522.30 2,937.00 (1,414.70) 2,937.00 E041025 · Insurance - Members E041030 · Outback Highway Development Exp E041075 · Council Chamber Maintenance E041080 · Members Training E041085 · Consultancies E041090 · Regional Local Government E041091 · GVROC Records Facility E041200 · Admin Allocation - Members E041298 · Depn - Membership E05 · LAW ORDER & PUBLIC SAFETY. E051 · Fire Prevention E051020 · Fire Control - Shire Properties E051200 · Admin Allocation - Fire Control E051298 · Depn - Fire Control Total E051 · Fire Prevention 0.00 3,000.00 176.23 2,400.00 (2,223.77) 2,400.00 10,366.96 54,021.00 (43,654.04) 54,021.00 56.73 10,610.00 (10,553.27) 10,610.00 E052 · Animal Control E052010 · Dog Pound Maintenance 0.00 3,500.00 (3,500.00) 3,500.00 E052020 · Dog Control Expenses 4,706.52 77,662.00 (72,955.48) 77,662.00 E052200 · Admin Allocation - Animal Contr 3,157.65 6,092.00 (2,934.35) 6,092.00 0.00 1,000.00 (1,000.00) 1,000.00 7,920.90 98,864.00 (90,943.10) 98,864.00 E052015 · Control Expenses - Other E052298 · Depn - Animal Control Total E052 · Animal Control Page 18 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 46 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E053 · Crime Prevention 33,632.62 80,668.00 (47,035.38) 80,668.00 923.40 7,517.00 (6,593.60) 7,517.00 3,483.95 5,260.00 (1,776.05) 5,260.00 981.81 6,245.00 (5,263.19) 6,245.00 86.00 300.00 (214.00) 300.00 E053016 · CCBO - Housing 7,033.90 18,491.00 (11,457.10) 18,491.00 E053017 · CCBO - FBT 2,771.67 1,000.00 1,771.67 1,000.00 E053018 · Short Term Camp Fac. - Op. Exp 7,784.71 10,363.00 (2,578.29) 10,363.00 E053019 · Community Engagement 2,384.67 8,495.00 (6,110.33) 8,495.00 E053200 · Admin Allocation - Crime Preven 4,521.72 8,723.00 (4,201.28) 8,723.00 E053298 · Crime Prevention - Deprecn 4,411.20 7,000.00 (2,588.80) 7,000.00 68,015.65 154,062.00 (86,046.35) 154,062.00 40,913.00 (40,913.00) 40,913.00 E053010 · Crime Prevention Strategies E053011 · CCBO - Superannuation E053012 · Crime Prevention - M/V Expenses E053013 · Crime Prevention - CCBO Other E053014 · CCBO - Subsidies Total E053 · Crime Prevention E054 · Emergency Management & Recovery E054010 · Local Emerg Man. & Recov. Plan 2,268.34 E054011 · Emergency Management - Wages 0.00 E054012 · Emergency Management - Super 0.00 3,850.00 (3,850.00) 3,850.00 E054020 · Skull Creek Flood Mngement Plan 0.00 103,000.00 (103,000.00) 103,000.00 2,268.34 147,763.00 (145,494.66) 147,763.00 88,571.85 454,710.00 (366,138.15) 454,710.00 0.00 3,000.00 (3,000.00) 3,000.00 454.26 1,286.00 (831.74) 1,286.00 E074015 · Doctor's House - 6 Duketon Stre 9,013.84 21,854.00 (12,840.16) 21,854.00 E074020 · Health Expenses Inspection 4,462.09 15,227.00 (10,764.91) 15,227.00 E074025 · Medical Practice Subsidy 77,188.77 104,500.00 (27,311.23) 104,500.00 E074030 · Doctor's Subsidy - Mining Compa 77,014.61 100,000.00 (22,985.39) 100,000.00 Total E054 · Emergency Management & Recovery Total E05 · LAW ORDER & PUBLIC SAFETY. E07 · HEALTH. E074 · Admin. & Inspections E074005 · Health - Other Expenses E074010 · Doctor's Vehicle Expenses 22.18 22.00 E074200 · Admin Allocation - Other Health 5,772.72 11,137.00 E074298 · Depn. - Health Admin. & Inspect 8,057.85 8,000.00 E074031 · Medical Practice Expenses E074300 · Emergency Services Support Total E074 · Admin. & Inspections 0.18 (5,364.28) 57.85 22.00 11,137.00 8,000.00 1,099.83 5,405.00 (4,305.17) 5,405.00 183,086.15 270,431.00 (87,344.85) 270,431.00 E075 · Preventative Services E075005 · Analytical Expenses E075010 · Mosquito Control Industrial Are E075015 · Pest Control Total E075 · Preventative Services 450.00 450.00 0.00 1,000.00 (1,000.00) 0.00 1,000.00 450.00 0.00 2,000.00 (2,000.00) 2,000.00 450.00 3,450.00 (3,000.00) 3,450.00 E077 · Other E077005 · Flying Doctor Services E077010 · Gratuity Payments - Registered 0.00 2,500.00 (2,500.00) 2,500.00 17,250.00 27,500.00 (10,250.00) 27,500.00 337.12 4,459.00 (4,121.88) 4,459.00 Total E077 · Other 17,587.12 34,459.00 (16,871.88) 34,459.00 Total E07 · HEALTH. 201,123.27 308,340.00 (107,216.73) 308,340.00 E077020 · GP Network Building Expenses Page 19 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 47 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E08 · EDUCATION & WELFARE. E085 · Youth & Recreation Services E085060 · Youth & Recreation Services 55,249.93 93,274.00 (38,024.07) 93,274.00 E085062 · Youth & Rec Superannuation 7,033.10 8,728.00 (1,694.90) 8,728.00 E085063 · Youth & Rec - Utilities & Ins. 9,572.34 8,436.00 1,136.34 8,436.00 E085061 · Youth & Rec Officer Salary E085064 · Youth & Rec - Subsidies E085065 · Youth & Rec - Training & Conf 0.00 1,000.00 (1,000.00) 1,000.00 881.84 2,500.00 (1,618.16) 2,500.00 1,520.69 1,521.00 (0.31) 1,521.00 E085067 · Youth & Rec. - M/V Expenses 734.78 4,099.00 (3,364.22) 4,099.00 E085068 · Youth & Rec. - FBT 183.96 1,000.00 (816.04) 1,000.00 E085069 · Youth & Rec. - Other Expenses 484.18 2,500.00 (2,015.82) 2,500.00 E085070 · Youth & Rec. - Housing Alloc 4,180.35 4,998.00 (817.65) 4,998.00 E085071 · Youth Centre Operations 9,867.54 12,286.00 (2,418.46) 12,286.00 E085072 · Youth Ctr Activities & Programs 3,386.07 10,000.00 (6,613.93) 10,000.00 E085200 · Admin Allocation - Youth Co-Ord 18,840.47 36,347.00 (17,506.53) 36,347.00 4,229.51 1,200.00 3,029.51 1,200.00 E085066 · Youth & Rec. - Advertising E085298 · Youth Centre - Depreciation E085060 · Youth & Recreation Services - Other 538.17 116,702.93 187,889.00 (71,186.07) 187,889.00 116,702.93 187,889.00 (71,186.07) 187,889.00 E086005 · Pre-School Maintenance 3,949.66 3,511.00 E086200 · Admin Allocation - Pre School 1,092.75 2,109.00 (1,016.25) E086298 · Depn - Pre School 2,614.07 4,500.00 (1,885.93) 4,500.00 7,656.48 10,120.00 (2,463.52) 10,120.00 935.62 2,762.00 (1,826.38) 2,762.00 7,500.00 15,000.00 (7,500.00) 15,000.00 753.62 1,454.00 (700.38) 1,454.00 9,189.24 19,216.00 (10,026.76) 19,216.00 217,225.00 (83,676.35) 217,225.00 Total E085060 · Youth & Recreation Services Total E085 · Youth & Recreation Services E086 · Pre-School Total E086 · Pre-School 438.66 3,511.00 2,109.00 E087 · Other Education E087005 · Playgroup E087010 · Playgrp/Day Care Ctr Planning E087200 · Admin Allocation - Other Educat Total E087 · Other Education E089 · Welfare Services E089200 · Admin Allocation - Welfare Serv Total E089 · Welfare Services Total E08 · EDUCATION & WELFARE. 0.00 0.00 133,548.65 Page 20 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 48 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E09 · HOUSING. E091 · Staff Housing E091005 · 10 Lancefield St (1 Burt St) 4,165.21 15,772.00 (11,606.79) 15,772.00 E091010 · 2 Shirley Avenue 7,818.94 25,959.00 (18,140.06) 25,959.00 E091021 · 1 Erlistoun Street 2,651.00 2,873.00 (222.00) 2,873.00 15,219.16 22,796.00 (7,576.84) 22,796.00 E091030 · 11 Boomerang Street 2,255.13 36,533.00 (34,277.87) 36,533.00 E091035 · 8 Cable Street 6,284.33 10,883.00 (4,598.67) 10,883.00 E091040 · 15 Cable Street 5,880.07 23,619.00 (17,738.93) 23,619.00 E091045 · 6 Craiggie Street 4,641.37 16,672.00 (12,030.63) 16,672.00 E091050 · 8A Craggie Street 2,363.55 11,373.00 (9,009.45) 11,373.00 E091055 · Interest Loan 79 & 81 3,696.46 26,771.00 (23,074.54) 26,771.00 125.79 3,732.00 (3,606.21) 3,732.00 E091060 · 8B Craiggie Street 2,610.57 11,204.00 (8,593.43) 11,204.00 E091065 · 2 Boomerang Street 7,601.03 13,078.00 (5,476.97) 13,078.00 E091025 · 3 Mikado Way E091056 · Loan Fees - Loan 79 Exec Houses 3,396.71 17,378.00 (13,981.29) 17,378.00 E091075 · 11 Mikado Way 11,722.74 7,796.00 3,926.74 7,796.00 E091080 · 1 Mikado Way 4,412.77 7,785.00 (3,372.23) 7,785.00 E091085 · 8 Leahy Close 6,458.77 7,993.00 (1,534.23) 7,993.00 12,837.42 22,257.00 (9,419.58) 22,257.00 E091070 · 14 Boomerang Street E091086 · Burt St - Group Dwelling E091090 · Staff Housing Asset Mngmnt Plan E091100 · Less Housing Allocated to Other E091200 · Admin Allocated - Staff Housing E091298 · Depn - Housing - Council Staff E091 · Staff Housing - Other Total E091 · Staff Housing 0.00 (147,184.79) 3,000.00 (293,971.00) (3,000.00) 146,786.21 3,000.00 (293,971.00) 8,937.90 17,243.00 (8,305.10) 17,243.00 58,864.81 40,000.00 18,864.81 40,000.00 0.00 0.00 0.00 0.00 24,758.94 50,746.00 (25,987.06) 50,746.00 8,650.93 29,267.00 (20,616.07) 29,267.00 E092 · Other Housing E092001 · 14 Erlistoun Street E092004 · 14 Augusta St 272.57 500.00 (227.43) 500.00 E092006 · 12 Weld Drive 1,864.57 20,500.00 (18,635.43) 20,500.00 0.00 0.00 8,937.90 17,243.00 0.00 0.00 19,725.97 67,510.00 (47,784.03) 67,510.00 44,484.91 118,256.00 (73,771.09) 118,256.00 E092035 · Loss on Disposal on Asset E092200 · Admin Allocation -Other Housing E092298 · Depn - Other Housing Total E092 · Other Housing Total E09 · HOUSING. 0.00 (8,305.10) 0.00 0.00 17,243.00 0.00 Page 21 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 49 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E10 · COMMUNITY AMENITIES. E101 · Sanitation Townsite E101005 · Litter Control 71,919.40 107,763.00 (35,843.60) 107,763.00 E101010 · Commercial/Industrial Collectio 11,737.84 39,717.00 (27,979.16) 39,717.00 E101015 · Domestic Collection 24,800.49 41,194.00 (16,393.51) 41,194.00 2,356.27 3,400.00 (1,043.73) 3,400.00 E101020 · Purchase of Bins 43,234.31 73,523.00 (30,288.69) 73,523.00 E101030 · Household Verge Collection 0.00 10,524.00 (10,524.00) 10,524.00 E101100 · Domestic Coll. - Mt Margaret 9,143.12 26,638.00 (17,494.88) 26,638.00 E101200 · Admin Allocation - Refuse 7,912.99 15,266.00 (7,353.01) 15,266.00 171,104.42 318,025.00 (146,920.58) 318,025.00 E106005 · Consultants Fees, Advertising e 5,383.85 22,500.00 (17,116.15) 22,500.00 E106200 · Admin Allocation - Town Plannin 1,311.30 2,530.00 (1,218.70) 2,530.00 6,695.15 25,030.00 (18,334.85) 25,030.00 5,786.16 61,565.00 (55,778.84) 61,565.00 0.00 10,374.00 (10,374.00) 10,374.00 E101025 · Refuse Site Maintenance Total E101 · Sanitation Townsite E106 · T.P. & Regional Devel Total E106 · T.P. & Regional Devel E107 · Other E107005 · Cemetery Operations E107010 · Other Cemetery Expenses 5,841.87 6,099.00 (257.13) 6,099.00 E107015 · Public Conveniences 18,129.75 40,562.00 (22,432.25) 40,562.00 E107020 · Church Maintenance 1,268.62 5,269.00 (4,000.38) 5,269.00 E107200 · Admin Allocation - Other Commun 5,991.25 11,558.00 (5,566.75) 11,558.00 E107298 · Depn - Other Community Services 12,917.62 5,000.00 7,917.62 5,000.00 49,935.27 140,427.00 (90,491.73) 140,427.00 227,734.84 483,482.00 (255,747.16) 483,482.00 13,604.10 43,963.00 (30,358.90) 43,963.00 E107011 · Grave Digging Total E107 · Other Total E10 · COMMUNITY AMENITIES. E11 · RECREATION & CULTURE. E111 · Public Halls & Civic Centres E111005 · Town Hall Operations E111010 · Refund Hall Hire E111200 · Admin Allocation - Public Halls E111298 · Depn - Public Halls Total E111 · Public Halls & Civic Centres 0.00 500.00 (500.00) 500.00 7,626.62 14,713.00 (7,086.38) 14,713.00 47,893.31 22,000.00 25,893.31 22,000.00 69,124.03 81,176.00 (12,051.97) 81,176.00 Page 22 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 50 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget 100.00 0.00 E112 · Swimming Areas E112005 · Swimming Pool FBT E112010 · Swimming Pool Salaries E112015 · Swimming Pool Superannuation E112020 · Swimming Pool Maintenance 100.00 0.00 42,980.51 81,203.00 (38,222.49) 4,083.16 7,556.00 (3,472.84) 7,556.00 45,698.91 49,437.00 (3,738.09) 49,437.00 227.89 81,203.00 E112025 · Swimming Pool Telephone 1,227.89 1,000.00 E112030 · Swimming Pool Electricity 4,817.59 20,000.00 (15,182.41) 20,000.00 E112035 · Swimming Pool Water 3,948.73 30,000.00 (26,051.27) 30,000.00 E112040 · Swimming Pool Chemicals 15.36 12,000.00 (11,984.64) 12,000.00 E112045 · Swimming Pool Insurance 7,880.41 7,880.00 0.41 1,000.00 7,880.00 0.00 300.00 (300.00) 300.00 E112055 · Swimming Pool Training & Confer 1,972.71 2,000.00 (27.29) 2,000.00 E112200 · Admin Allocation - Swimming 6,428.37 12,402.00 (5,973.63) 12,402.00 (844.58) 4,998.00 E112050 · Swimming Pool Subsidies E112201 · Staff Housing Allocation E112298 · Depn - Swimming Pool & Beaches Total E112 · Swimming Areas 4,153.42 4,998.00 10,052.75 5,000.00 133,359.81 233,776.00 5,052.75 (100,416.19) 5,000.00 233,776.00 E113 · Other Recreation E113005 · Racecourse and Stable Maintenan 25,259.09 32,826.00 (7,566.91) 32,826.00 E113010 · Parks, Gardens & Reserves 69,046.44 183,925.00 (114,878.56) 183,925.00 E113015 · Shire/Education Oval 42,285.24 94,174.00 (51,888.76) 94,174.00 13,852.00 E113025 · Youth Centre Repairs & Maint 98.04 E113040 · Community Gym Operations 8,149.68 13,852.00 (5,702.32) E113050 · Oval Changeroom-Old Court House 1,683.30 8,353.00 (6,669.70) 8,353.00 E113060 · Recreation & Sport Planning 72,100.00 80,000.00 (7,900.00) 80,000.00 E113200 · Admin Allocation - Other Recrea 18,395.82 35,489.00 (17,093.18) 35,489.00 E113298 · Depn - Other Recreation 93,865.71 45,000.00 48,865.71 45,000.00 330,883.32 493,619.00 (162,735.68) 493,619.00 6,625.66 19,361.00 (12,735.34) 19,361.00 753.62 1,454.00 (700.38) 1,454.00 4,781.01 8,000.00 (3,218.99) 8,000.00 12,160.29 28,815.00 (16,654.71) 28,815.00 17,210.89 20,066.00 (2,855.11) 20,066.00 2,482.27 1,857.00 10,892.75 10,879.00 104.94 600.00 (495.06) 600.00 6,650.00 12,000.00 (5,350.00) 12,000.00 E115035 · Library Training/Conference Exp 0.00 4,000.00 (4,000.00) 4,000.00 E115040 · Lost Books 0.00 500.00 (500.00) 500.00 Total E113 · Other Recreation E114 · TV & Radio Broadcasting E114005 · TV Operating Expenses E114200 · Admin Allocated - TV E114298 · Depn - TV Total E114 · TV & Radio Broadcasting E115 · Library E115005 · Library Costs - Salaries E115010 · Library Costs - Superannuation E115020 · Library Utilities & Insurance E115025 · Library Subsidies E115030 · Library Floor Rental E115045 · Library Repairs & Maintenance E115050 · Library - Other Expenses E115060 · Expenditure from Grant funds E115200 · Library Admin Allocation E115298 · Library Depreciation Total E115 · Library Total E11 · RECREATION & CULTURE. 625.27 1,857.00 13.75 10,879.00 0.00 4,000.00 (4,000.00) 4,000.00 2,803.26 8,518.00 (5,714.74) 8,518.00 0.00 0.00 9,156.46 17,665.00 (8,508.54) 29.37 800.00 (770.63) 800.00 49,329.94 80,885.00 (31,555.06) 80,885.00 594,857.39 918,271.00 (323,413.61) 918,271.00 0.00 0.00 17,665.00 Page 23 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 51 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E12 · TRANSPORT. E122 · Road Maintenance E122005 · Shire Number Plates 0.00 300.00 (300.00) 300.00 337,284.16 847,322.00 (510,037.84) 847,322.00 E122012 · Roads to Recovery 0.00 1,200.00 (1,200.00) 1,200.00 E122015 · Depot Maintenance 23,694.88 45,746.00 (22,051.12) 45,746.00 E122010 · Maintenance Rural Roads E122016 · Gravel Pits E122017 · Flood Damage E122020 · Footpath Maintenance E122025 · Street Lights - Townsite E122030 · Information Bays E122035 · Tourism/Picnic Tables E122040 · Drainage Works 0.00 15,000.00 (15,000.00) 15,000.00 3,215.44 4,151,000.00 (4,147,784.56) 4,151,000.00 2,881.06 33,101.00 (30,219.94) 33,101.00 12,199.51 43,000.00 (30,800.49) 43,000.00 4,997.16 7,914.00 (2,916.84) 7,914.00 0.00 7,423.00 (7,423.00) 7,423.00 1,139.57 70,000.00 (68,860.43) 70,000.00 6,542.30 51,218.00 (44,675.70) 51,218.00 E122050 · Traffic & Street Signs, inc Gui 64,589.45 75,994.00 (11,404.55) 75,994.00 E122055 · Maintenance - Town Streets E122045 · Street Trees and Tree Watering 85,119.93 148,820.00 (63,700.07) 148,820.00 E122060 · Depot Nursery Operations 236.15 8,047.00 (7,810.85) 8,047.00 E122075 · Mt.Weld Rd Maint.0-12kms 0.00 0.00 E122100 · Loss on sale of assets 0.00 91,913.00 (91,913.00) 91,913.00 20,920.43 40,360.00 (19,439.57) 40,360.00 E122200 · Admin Allocation - Roads E122298 · Depreciation - Transport Other Total E122 · Road Maintenance 0.00 0.00 676,202.92 1,240,000.00 (563,797.08) 1,240,000.00 1,239,022.96 6,878,358.00 (5,639,335.04) 6,878,358.00 7,897.54 40,070.00 (32,172.46) 40,070.00 124,543.06 106,684.00 17,859.06 106,684.00 3,017.37 6,500.00 (3,482.63) 6,500.00 99,881.75 136,763.00 (36,881.25) 136,763.00 6,541.41 12,620.00 (6,078.59) 12,620.00 E126 · Aerodrome E126005 · Airport Terminal Maintenance E126010 · Aerodrome Operations E126015 · Collection costs - Landing Fees E126020 · Refuelling Facility E126200 · Admin Allocation - Aerodromes 131,841.23 180,000.00 (48,158.77) 180,000.00 Total E126 · Aerodrome 373,722.36 482,637.00 (108,914.64) 482,637.00 Total E12 · TRANSPORT. 1,612,745.32 7,360,995.00 (5,748,249.68) 7,360,995.00 E126298 · Depn - Aerodromes Page 24 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 52 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E13 · ECONOMIC SERVICES. E131 · Community Development 39,949.01 82,198.00 (42,248.99) 82,198.00 E131010 · CDM Superannuation 6,529.10 13,069.00 (6,539.90) 13,069.00 E131015 · Utilities & Insurance 3,380.86 4,245.00 (864.14) 4,245.00 0.00 5,000.00 (5,000.00) 5,000.00 0.00 2,000.00 (2,000.00) 2,000.00 1,920.00 2,000.00 (80.00) 2,000.00 E131005 · CDM Salary E131020 · Laverton Shire Web Site E131025 · Economic Development E131030 · Curtin Volunteers - Accomm, etc 0.00 0.00 66.00 600.00 (534.00) 600.00 1,150.37 3,000.00 (1,849.63) 3,000.00 584.82 3,106.00 (2,521.18) 3,106.00 E131045 · Comm Develop Advertising 0.00 500.00 (500.00) 500.00 E131031 · Cont. to Comm. Groups Secretary E131035 · Comm Develop Subsidies E131037 · CDO Fringe Benefits Tax E131040 · Comm Develop Vehicle Expenses 0.00 0.00 E131050 · CDO Training & Conference Exp 0.00 4,000.00 (4,000.00) 4,000.00 E131055 · Comm Develop - Other Expenses 0.00 2,500.00 (2,500.00) 2,500.00 E131060 · Influential Families 0.00 15,190.00 (15,190.00) 15,190.00 E131062 · Laverton Celebrations 0.00 100,000.00 (100,000.00) 100,000.00 0.00 10,000.00 (10,000.00) 10,000.00 E131066 · Loan Interest 8,660.71 23,194.00 (14,533.29) 23,194.00 E131067 · Loan Fees 3,763.44 4,191.00 (427.56) 4,191.00 353,320.00 645,337.00 (292,017.00) 645,337.00 23,754.04 45,826.00 (22,071.96) 45,826.00 E131065 · Advances to Community Groups E131069 · Grant Expenditure E131200 · Comm Develop Admin Allocation E131201 · Staff Housing Allocation E131298 · Comm Develop Depreciation Total E131 · Community Development 9,994.88 14,896.00 (4,901.12) 14,896.00 26,851.50 15,000.00 11,851.50 15,000.00 479,924.73 995,852.00 (515,927.27) 995,852.00 2,675.24 5,500.00 (2,824.76) 5,500.00 0.00 500.00 (500.00) 500.00 E132 · Tourism/Area Promotion E132009 · Printing of Maps and Brouchures E132010 · Expenses and Consumables E132011 · Tourism Training Conference 2,020.35 2,000.00 E132012 · Tourism Signage Project 3,972.36 15,016.00 E132013 · Tourism and Area Promotion 7,218.43 7,000.00 E132014 · Tourism & Area Advertising 7,426.97 9,088.00 (1,661.03) 9,088.00 E132015 · Visitor Centre Memberships 1,695.82 1,800.00 (104.18) 1,800.00 E132016 · Famils E132200 · Admin Allocation - Tourism Total E132 · Tourism/Area Promotion 20.35 (11,043.64) 218.43 2,000.00 15,016.00 7,000.00 0.00 500.00 (500.00) 500.00 656.43 1,454.00 (797.57) 1,454.00 25,665.60 42,858.00 (17,192.40) 42,858.00 1,637.82 18,263.00 (16,625.18) 18,263.00 E133 · Heritage Dev. & Maintenance E133005 · Heritage Development E133006 · Coach House Operations E133004 · Couch House Redevelopment Plann E133008 · Depreciation on Coach House E133006 · Coach House Operations - Other Total E133006 · Coach House Operations 0.00 50,000.00 (50,000.00) 50,000.00 22,276.05 10,000.00 12,276.05 10,000.00 5,210.42 11,925.00 (6,714.58) 11,925.00 27,486.47 71,925.00 (44,438.53) 71,925.00 Page 25 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 53 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 E133009 · Display of Historic Equipment Budget $ Over Budget Annual Budget 0.00 2,000.00 (2,000.00) 2,000.00 141.48 14,604.00 (14,462.52) 14,604.00 E133011 · Mt Morgans's Muni Chambers 1,303.68 2,736.00 (1,432.32) 2,736.00 E133015 · Golden Quest Discovery Trail 36,600.00 40,000.00 (3,400.00) 40,000.00 E133017 · Laverton History & Research 0.00 10,000.00 (10,000.00) 10,000.00 E133018 · History Walk 0.00 1,000.00 (1,000.00) 1,000.00 E133019 · Heritage Collections 1,457.97 26,037.00 (24,579.03) 26,037.00 E133200 · Admin Allocation - Heritage Dev 3,865.27 7,269.00 (3,403.73) 7,269.00 72,492.69 193,834.00 (121,341.31) 193,834.00 0.00 75,000.00 (75,000.00) 75,000.00 114,437.57 208,069.00 (93,631.43) 208,069.00 E133010 · Windarra Heritage Trail Total E133 · Heritage Dev. & Maintenance E1330 · Great Beyond Visitor Centre E133021 · Planning - GB Stage 2 and Cafe E133030 · GB - Hall/Fame Salarys E133035 · GB - Advertising 5,542.66 7,978.00 (2,435.34) 7,978.00 E133050 · GB - Superannuation 9,435.90 20,550.00 (11,114.10) 20,550.00 E133054 · Bank Charges (EFTPOS Fees) E133055 · GB - Utilities E133056 · GB - Professional Development 653.49 1,100.00 (446.51) 1,100.00 25,124.06 37,265.00 (12,140.94) 37,265.00 360.00 5,000.00 (4,640.00) 5,000.00 0.00 1,000.00 (1,000.00) 1,000.00 56.73 500.00 (443.27) 500.00 E133060 · GB - Repairs & Maint 8,656.79 19,083.00 (10,426.21) 19,083.00 E133065 · GB - Souvenirs 2,970.49 5,000.00 (2,029.51) 5,000.00 E133066 · GB - G/rush Tours less comm 9,344.11 9,000.00 E133067 · GB - Merchandise 7,353.04 15,000.00 (7,646.96) 15,000.00 259.08 1,000.00 (740.92) 1,000.00 E133070 · GB - Operating Expenses 4,959.75 11,500.00 (6,540.25) 11,500.00 E133075 · GB - Books, Cd's and Videos 5,397.33 8,000.00 (2,602.67) 8,000.00 26,120.47 37,500.00 (11,379.53) 37,500.00 1,361.05 2,000.00 (638.95) 2,000.00 E133057 · GB - Uniforms E133058 · Medicals, Recruitment Costs E133068 · Events, Functions & Promotions E133080 · GB - Cafe Costs E133085 · GB - T-shirts and Clothing 344.11 9,000.00 234.88 1,000.00 (765.12) 1,000.00 E133095 · GB - Maps and Map Books 3,698.28 3,000.00 698.28 3,000.00 E133096 · GB - Cleaning 6,603.47 11,358.00 (4,754.53) 11,358.00 9,156.46 17,665.00 (8,508.54) 17,665.00 17,481.79 20,000.00 (2,518.21) 20,000.00 E133090 · GB - Signage E133097 · Admin Allocation - G/Beyond E133098 · GB - Depreciation E133099 · GB Staff Housing Total E1330 · Great Beyond Visitor Centre 4,647.66 38,351.00 (33,703.34) 38,351.00 263,855.06 555,919.00 (292,063.94) 555,919.00 Page 26 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 54 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E134 · Community Resource Centre 69,074.74 110,654.00 (41,579.26) 110,654.00 E134010 · CRC Superannuation 7,825.61 12,980.00 (5,154.39) 12,980.00 E134015 · Repairs & Maintenance 4,959.99 12,368.00 (7,408.01) 12,368.00 E134020 · Utilities & Insurance 6,848.94 9,694.00 (2,845.06) 9,694.00 313.44 600.00 (286.56) 600.00 E134025 · Functions, Events & Promotions 10,721.52 15,600.00 (4,878.48) 15,600.00 E134030 · Training & Conference Expenses 0.00 1,000.00 (1,000.00) 1,000.00 E134045 · Production of the 'Sturt Pea' 7,569.53 21,000.00 (13,430.47) 21,000.00 E134050 · Stock Purchases for Re-Sale 158.03 1,000.00 (841.97) 1,000.00 2,502.90 6,450.00 (3,947.10) 6,450.00 0.00 1,500.00 (1,500.00) 1,500.00 E134068 · Professional Development 6,296.62 7,000.00 (703.38) 7,000.00 E134069 · ICT Support & Development 5,285.27 13,000.00 (7,714.73) 13,000.00 E134070 · Floor Rental 6,650.00 12,000.00 (5,350.00) 12,000.00 E134005 · CRC Salaries E134021 · Bank Charges (EFTPOS Fees) E134066 · Equip, Fixtures & Fittings E134067 · Marketing & Promotions 600.17 1,500.00 (899.83) 1,500.00 2,095.54 5,700.00 (3,604.46) 5,700.00 E134085 · Housing 10,211.48 27,777.00 (17,565.52) 27,777.00 E134200 · Admin Allocation - CRC 15,690.33 30,270.00 (14,579.67) 30,270.00 156,804.11 290,093.00 (133,288.89) 290,093.00 E135005 · Building Control Expenses 4,462.09 15,227.00 (10,764.91) 15,227.00 E135200 · Admin Allocation - Building 3,813.32 7,357.00 (3,543.68) 7,357.00 Total E135 · Building Control Expenses 8,275.41 22,584.00 (14,308.59) 22,584.00 E136010 · Weed Control 32.50 37,500.00 (37,467.50) 37,500.00 Total E136 · Rural Services 32.50 37,500.00 (37,467.50) 37,500.00 1,007,050.10 2,138,640.00 (1,131,589.90) 2,138,640.00 E141005 · Private Works 4,102.61 3,896.00 E141100 · Community Bus Expenses 1,471.55 3,230.00 (1,758.45) 3,230.00 E141101 · Community Bus Depn 1,174.86 5,000.00 (3,825.14) 5,000.00 E141200 · Admin Allocation - Private Work 2,939.12 5,670.00 (2,730.88) 5,670.00 9,688.14 17,796.00 (8,107.86) 17,796.00 E134075 · Subsidies E134080 · CRC Other Expenses Total E134 · Community Resource Centre E135 · Building Control Expenses E136 · Rural Services Total E13 · ECONOMIC SERVICES. E14 · OTHER PROPERTY & SERVICES. E141 · Private Works Total E141 · Private Works 206.61 3,896.00 Page 27 of 29 10:27ATTACHMENT AM OMC1603-11.2.4.A Page 55 of 56 Accrual Basis Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E143 · Works Overheads E143005 · Exec Mgr Tech Serv Salary 0.00 E143006 · Works Management Salary 120,151.29 E143010 · Exec Mgr Tech Serv Super (2,284.62) E143011 · Works Management Super 25,178.70 E143015 · Works Supervisors Salary 72,390.27 134,006.00 (134,006.00) 134,006.00 21,900.00 (24,184.62) 21,900.00 106,166.00 (33,775.73) 106,166.00 E143020 · Works Supervisors Superannuatio 0.00 9,992.00 (9,992.00) 9,992.00 E143021 · Works Technical Officer Salary 0.00 68,720.00 (68,720.00) 68,720.00 E143022 · Works Technical Officer Super 0.00 6,832.00 (6,832.00) 6,832.00 E143023 · Depot - Admin Support Salary 0.00 74,529.00 (74,529.00) 74,529.00 0.00 12,055.00 (12,055.00) 12,055.00 E143025 · Depot Operational Expenses 39,763.03 34,780.00 4,983.03 34,780.00 E143030 · Superannuation of Workmen 90,751.23 136,650.00 (45,898.77) 136,650.00 E143035 · Holiday Pay 53,806.61 81,477.00 (27,670.39) 81,477.00 E143037 · Termination Payments 38,315.57 E143040 · Insurance on Works E143024 · Depot - Admin Support Super 47,862.73 47,863.00 (0.27) 47,863.00 E143045 · Tech Services/Works FBT 8,872.70 10,000.00 (1,127.30) 10,000.00 E143050 · Protective Clothing 8,237.51 9,900.00 (1,662.49) 9,900.00 E143055 · Induction, Medicals 1,388.36 2,000.00 (611.64) 2,000.00 E143060 · Public Holidays 19,737.87 39,109.00 (19,371.13) 39,109.00 E143065 · Sick Leave 10,252.73 16,295.00 (6,042.27) 16,295.00 E143070 · Advertising 1,643.28 4,000.00 (2,356.72) 4,000.00 0.00 6,000.00 (6,000.00) 6,000.00 2,356.85 11,000.00 (8,643.15) 11,000.00 23,303.93 55,280.00 (31,976.07) 55,280.00 7,612.25 12,000.00 (4,387.75) 12,000.00 E143095 · EMTS & Works Manager Vehicles 10,234.22 30,717.00 (20,482.78) 30,717.00 E143100 · Training/Meetings Town Crew 15,068.09 34,801.00 (19,732.91) 34,801.00 E143199 · Staff Housing Allocation 66,352.13 121,048.00 (54,695.87) 121,048.00 284,569.00 (137,063.18) E143075 · Relocation Expenses E143080 · Training & Conference Expenses E143085 · Subsidies E143090 · Computer Services E143200 · Admin Allocation E143290 · LESS PWOH ALLOCATED-PROJECTS E143298 · Depreciation Total E143 · Works Overheads 147,505.82 (718,667.66) (1,383,689.00) 8,551.73 12,000.00 98,384.62 0.00 234,791.61 425,000.00 665,021.34 (3,448.27) 98,384.62 284,569.00 (1,383,689.00) 12,000.00 0.00 E144 · Plant Cost Overheads E144005 · Fuel & Oil (190,208.39) 425,000.00 76,217.98 55,000.00 21,217.98 55,000.00 E144015 · Parts and Repairs 150,202.65 250,000.00 (99,797.35) 250,000.00 E144020 · Repair Wages 188,973.48 384,434.00 (195,460.52) 384,434.00 19,473.49 18,000.00 1,473.49 18,000.00 7,997.63 15,000.00 (7,002.37) 15,000.00 E144010 · Tyres & Tubes E144025 · Workshop Operations E144030 · Sundry Tools E144035 · Insurance and Licences E144290 · LESS POC ALLOCATED-PROJECTS E144298 · Plant Depreciation Total E144 · Plant Cost Overheads 27,416.42 (856,006.62) 34,678.00 (1,507,112.00) 196,990.39 325,000.00 46,057.03 0.00 (7,261.58) 651,105.38 (128,009.61) 46,057.03 34,678.00 (1,507,112.00) 325,000.00 0.00 Page 28 of 29 10:27 AM Accrual Basis ATTACHMENT OMC1603-11.2.4.A Page 56 of 56 Shire of Laverton Income Statement by Program (Detailed) July 1, 2015 to 31 January 2016 Jul 15 - Jan 16 Budget $ Over Budget Annual Budget E145 · Administration Overheads E145005 · Employee Costs - Salaries E145010 · Employee Costs - Superannuation 329,726.75 670,918.00 (341,191.25) 670,918.00 51,890.83 96,299.00 (44,408.17) 96,299.00 362.60 3,500.00 (3,137.40) 3,500.00 E145025 · Employee Costs - FBT 7,306.10 31,000.00 (23,693.90) 31,000.00 E145030 · Employee Costs - Training 2,453.62 24,000.00 (21,546.38) 24,000.00 E145035 · Staff Recruitment 4,448.86 2,500.00 1,948.86 2,500.00 E145036 · Subscriptions 7,969.76 8,500.00 E145020 · Uniforms E145040 · Employee Costs - Subsidies E145045 · Maintenance - Building/Office (530.24) 8,500.00 4,610.04 9,500.00 (4,889.96) 9,500.00 27,443.52 35,281.00 (7,837.48) 35,281.00 2,051.20 4,500.00 (2,448.80) 4,500.00 13,307.19 22,051.00 (8,743.81) 22,051.00 E145056 · Loss on Disposal of Asset 0.00 30,106.00 (30,106.00) 30,106.00 E145060 · Conference and Travelling 9,767.39 9,000.00 E145065 · Printing and Stationery 2,913.96 8,000.00 (5,086.04) 0.00 2,500.00 (2,500.00) 2,500.00 6,993.09 13,000.00 (6,006.91) 13,000.00 E145050 · Office Expenses Other E145055 · Vehicle Expenses E145066 · Records Management Products E145070 · Telephone Expense 767.39 8,000.00 2,489.47 2,000.00 15,732.23 22,000.00 (6,267.77) 22,000.00 4,297.08 40,000.00 (35,702.92) 40,000.00 70,700.00 104,220.00 (33,520.00) 104,220.00 657.96 1,500.00 (842.04) 1,500.00 E145095 · Consultancy Fees 24,444.28 113,500.00 (89,055.72) 113,500.00 E145100 · Insurance - Administration 51,821.51 56,704.00 (4,882.49) 56,704.00 E145105 · Audit Fees 26,025.13 65,000.00 (38,974.87) 65,000.00 2,046.00 10,000.00 (7,954.00) 10,000.00 40,637.90 63,412.00 (22,774.10) 63,412.00 E145075 · Advertising E145080 · Maintenance - Office Equipment E145085 · Computer Services E145087 · Financial Management Services E145090 · Postage and Freight E145110 · Legal Expenses E145200 · Staff Housing Allocation E145298 · Depn - Administration General E145300 · LESS ADMIN ALLOCATED-PROGRAMS Total E145 · Administration Overheads 43,521.98 (753,618.45) 0.00 35,000.00 (1,453,885.00) 489.47 9,000.00 8,521.98 700,266.55 2,000.00 35,000.00 (1,453,885.00) 30,106.00 (30,106.00) 30,106.00 1,706,920.08 3,191,679.00 (1,484,758.92) 3,191,679.00 (1,706,919.83) (3,191,679.00) 1,484,759.17 (3,191,679.00) E146 · Salaries Control E146010 · Gross Total Salaries and Wages E146200 · LESS SALS/WAGES ALLOCATED Total E146 · Salaries Control 0.25 0.00 0.25 0.00 154,346.34 47,902.00 106,444.34 47,902.00 4,645,767.22 13,168,997.00 (8,523,229.78) 13,168,997.00 512,260.93 4,131,356.00 (3,619,095.07) 4,559,792.00 E147 · Unclasified Items E147900 · Suspense Total E147 · Unclasified Items Total E14 · OTHER PROPERTY & SERVICES. Total Expense Net Income 216.30 216.30 Page 29 of 29 ATTACHMENT OMC1603-11.5.3.A Page 1 of 15 SHIRE OF LAVERTON AUDIT COMMITTEE MEETING MINUTES of the meeting held on Thursday 24 March 2016 commencing at 4.30 pm ATTACHMENT OMC1603-11.5.3.A Page 2 of 15 Minutes Page 2 Shire of Laverton Audit Committee Meeting 24 March 2016 MINUTES OF THE AUDIT COMMITTEE, HELD IN THE LAVERTON COUNCIL CHAMBERS ON 24 MARCH 2016 COMMENCING AT 4:30PM 1. DECLARATION OF OPENING The Chairman, Cr Patrick Hill, Declared the meeting open at 4.30pm and welcomed everyone to the meeting. 2. RECORD OF ATTENDANCE 2.1 PRESENT Cr P Hill Cr G Walder Cr R Ryles Cr R Prentice Cr D Ross Mr S Deckert Mr G Stanley Miss T Farlow Chairman Councillor Councillor Councillor Councillor Chief Executive Officer EMCCS (from 4:45pm) Executive Assistant 2.2 APOLOGIES Cr S Weldon Cr D Cannons Councillor Councillor 2.3 LEAVE OF ABSENCE Nil 2.4 VISITORS Nil 160324 Audit Committee Meeting Minutes ATTACHMENT OMC1603-11.5.3.A Page 3 of 15 Minutes Shire of Laverton Audit Committee Meeting – 24 March 2016 Page 3 3. CONFIRMATION OF MINUTES OF PREVIOUS MEETING: 3.1 MINUTES OF AUDIT COMMITTEE MEETING HELD 17 DECEMBER 2015 (File Ref: 793) AC160301 COMMITTEE DECISION/OFFICER RECOMMENDATION Moved Cr G Walder; Seconded Cr D Ross: That the Minutes of the Audit Committee Meeting held on 17 December 2015 (Attachment AC1603-3.1.A) be confirmed as a true and accurate record. CARRIED 5/0 4. REPORTS OF COMMITTEE AND OFFICERS 4.1 COMPLIANCE AUDIT RETURN 2015 (File Ref: 568) SUBMISSION TO: Audit Committee Meeting, 24 March 2016 DISCLOSURE OF INTEREST: The applicant has no financial interest in this matter OWNER/APPLICANT: Not applicable AUTHOR: Glenn Bone, Project Officer SENIOR OFFICER: Steven Deckert; Chief Executive Officer PREVIOUS MEETING REFERENCE: Not applicable MATTER FOR CONSIDERATION: For the Audit Committee to consider the Compliance Audit Return for 2015. ATTACHMENTS: AC1603-4.1.A Completed Compliance Audit Return for 2015 APPLICANT’S SUBMISSION: Not applicable. BACKGROUND: The Local Government Compliance Audit return for the period 1 January – 31 December 2015 must be completed and returned to the Executive Director, Department of Local Government and Communities by 31 March 2016. The Compliance Audit Return is to be: a) b) c) Reviewed by the Audit Committee; Presented to Council at a meeting of the Council; Adopted by Council (along with comments and amendments); and 160324 Audit Committee Meeting Minutes ATTACHMENT OMC1603-11.5.3.A Page 4 of 15 Minutes Page 4 Shire of Laverton Audit Committee Meeting 24 March 2016 The adoption is to be recorded in the minutes of the meeting at which it is adopted. STATUTORY ENVIRONMENT: Local Government (Audit) Regulations 1996 Regulation 14(1) – Requires a local government to carry out a compliance audit for the period 1 January to 31 December in each year. Regulation 14(3A) – The local government’s audit committee is to review the compliance audit return and is to report to council the results of that review. Regulation 14(3) – After the audit committee has reported to council under subregulation (3A), the compliance audit is to be – a) presented to a meeting of the council; b) adopted by the council; and c) recorded in the minutes of the meeting at which it is adopted. Regulation 15 – A certified copy of the return together with a copy of the relevant section of the minutes at which it was adopted, is to be submitted to the Executive Director by 31 March next following for the period to which the return relates. POLICY IMPLICATIONS: Council has no policies in respect to this matter. FINANCIAL IMPLICATIONS: There are no financial implications in respect to this report. STRATEGIC IMPLICATIONS: There are no strategic implications in respect to this report. CONSULTATION: This return has been completed by Project Officer, Glenn Bone, following liaison with relevant staff members. COMMENT: This year’s Compliance Audit Return poses a total of 87 questions including 10 new questions in the section dealing with Tenders for Providing Goods and Services. A number of issues of non-compliance are noted in the Compliance Audit Return 2015. Specifically these relate to the sections dealing with “Disclosure of Interest” and “Finance”. Explanations for these instances are set out below: Disclosure of Interest Question 4: Was a primary return lodged by all newly elected members within three months of their start day? 160324 Audit Committee Meeting Minutes Shire of Laverton Audit Committee Meeting – 24 March 2016 ATTACHMENT OMC1603-11.5.3.A Page 5 of 15 Minutes Page 5 COMMENT: Two members submitted their return after the due date. Question 6: Was an annual return lodged by all continuing elected members by 31 August 2015? COMMENT: All five continuing members as at 31 August 2015 failed to lodge an annual return by the due date. Subsequently received. Question 7: Was an annual return lodged by all designated employees by 31 August 2015? COMMENT: Three designated employees failed to lodge an annual return by the due date. Subsequently received. CEO’S COMMENT: While it is every individual person’s (Councillors and designated staff) responsibility to ensure that they fulfil their legislative obligations in respect to the completion of Financial Intertest Returns, it can be very easily overlooked as they are only required on an annual basis. This year due to an administrative oversight, a ‘reminder’ was not issued to Councillors and staff at the appropriate time. PROPOSED ACTION: It is proposed that to overcome this in future, the CEO’s Executive Assistant (and the CEO) will place a reminder of this requirement so they can then arrange the issue of the necessary returns for Councillors/staff to complete by the due date. Finance Question 5: Was the Auditor’s report for the financial year ended 30 June 2015 received by the local government within 30 days of completion of the audit? COMMENT: As at 8 March 2016 the audit has not yet been undertaken. Pursuant to s.6.4(3) of the LGA, the Minister has allowed until 23 December 2015 for the completion of the annual financial reports. NOTE: The audit will be progressed as soon as possible. Question 6: Was the Auditor’s report for 2014/15 received by the local government by 31 December 2015? COMMENT: See Question 5 above. CEO’S COMMENT: Due to the delayed completion of the 2013/14 Annual Report, this has, as a consequence, delayed the completion of the 2014/15 financials for presentation to the Auditor. A further compounding factor is the requirement for the Shire’s infrastructure assets to be re-valued as part of the completion of the 2014/15 Financial Reports. This is currently being done and it is expected that the final reports will be presented to the Auditor no later than 15 April 2016. 160324 Audit Committee Meeting Minutes ATTACHMENT OMC1603-11.5.3.A Page 6 of 15 Minutes Page 6 Shire of Laverton Audit Committee Meeting 24 March 2016 PROPOSED ACTION: The excessive workload placed on the Executive Manager Corporate and Community Services (EMCCS) has been acknowledged for some time. In February this year, in accordance with the Organisational Structure Review, a Finance and Administration Manager (FAM) commenced employment. This will enable the EMCCS to divest a number of time consuming day to day tasks and responsibilities to the FAM so that he can concentrate on the Shire meeting its financial management compliance requirements, particularly in respect to completion of the Annual Financial Statements. 04:45pm Mr Graham Stanley joined the meeting. VOTING REQUIREMENTS: Simple majority decision of Council required. AC160302 COMMITTEE DECISION/OFFICER RECOMMENDATION Moved Cr G Walder; Seconded Cr D Ross: That the Audit Committee: 1. Advise Council that it has conducted a review of the Compliance Audit Return 2015 and notes the five (5) issues of non compliance raised; 2. Notes the explanations and mitigation steps identified by the CEO to avoid any reoccurrence of these shortcomings in 2016; and 3. Recommends that Council now adopt the Compliance Audit Return 2015 (Attachment AC1603-4.1.A) as the official return of Council for the period of 1 January – 31 December 2015 and the return be certified by the President and the Chief Executive Officer. CARRIED 5/0 5. CLOSURE OF MEETING There being no further business, the Presiding Member declared the meeting closed at 04:42 pm. 6. CERTIFICATION I, Patrick Hill, hereby certify that the Minutes of the Audit Committee Meeting held on 24 March 2016 are confirmed as a true and correct record, as per the Council resolution of the Ordinary Meeting of the Audit Committee held on __________. SIGNED: DATED: 2016 160324 Audit Committee Meeting Minutes ATTACHMENT OMC1603-11.5.3.A Page 7 of 15 ATTACHMENT OMC1603-11.5.3.A AC1603-4.1.A Page 8 2 of 15 9 ATTACHMENT OMC1603-11.5.3.A Page 9 of 15 ATTACHMENT OMC1603-11.5.3.A AC1603-4.1.A Page 10 4 ofof915 ATTACHMENT OMC1603-11.5.3.A Page 11 of 15 ATTACHMENT OMC1603-11.5.3.A AC1603-4.1.A Page 12 6 ofof915 ATTACHMENT OMC1603-11.5.3.A Page 13 of 15 ATTACHMENT OMC1603-11.5.3.A AC1603-4.1.A Page 14 8 ofof915 ATTACHMENT OMC1603-11.5.3.A Page 15 of 15 ATTACHMENT OMC1603-11.5.4.A Page 1 of 51 SHIRE OF LAVERTON DELEGATION REGISTER 2015-03-20 Delegation Register - Reprinted January 2016 – Reprinted January 2016 ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 2 of 51 PREFACE The Meaning of Delegation Macquarie defines the word ‘delegate’ as to meaning, ‘to commit powers or functions to others.’ Before a person can commit a power or duty to another, the person proposing the delegation: Must possess that power or duty; and Must possess the power to delegate that specific power or duty. However, a Council cannot delegate any of the powers or duties under the Local Government Act 1995 to: An individual Council member; Any officer other than the Chief Executive Officer; Committees mentioned under Section 5.17(2); or Any other person. Notwithstanding the above, this Register also contains a number of other delegations that derive from other Acts or the Shire’s Town Planning Scheme. Purpose of Delegating Authority The aim of delegated authority is to assist with improving the time taken to make decisions within the constraints allowed by the relevant legislation. This is consistent with the Shire’s commitment to a strong customer focus. Preparation of the Register This Register has been prepared following an extensive review of delegations made in previous years and also includes some new additions. Indexing has been approached on three (3) fronts: a Table of Contents a Subject Section Index an Alphabetical Index Amendments to Delegations The Register will be subject to ongoing review with amendments and additions to keep in vogue with current requirements. This includes the review of delegations by the delegator at least once every financial year (Section 5.46(2)). When these changes occur, Councillors and staff will be provided with amended copies of relevant delegations and requested to keep their register updated. Steven J Deckert CHIEF EXECUTIVE OFFICER W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 3 of 51 Shire of Laverton – Delegation Register LEGISLATIVE PROVISIONS LOCAL GOVERNMENT ACT Legislation The Local Government Act 1995 made significant changes to the way local government conducts its business. Its general aim is to enable local governments to provide good, open and accountable government to the community. One of the changes was the degree of delegated authority available to be passed onto the Chief Executive Officer or a Committee in order to manage the day to day operations of the Shire. The Act allows for a local government to delegate to the Chief Executive Officer the exercise of most of its powers or the discharge of most of its duties. All delegations must be by an absolute majority decision. Limits on Delegations The following are decision areas that cannot be delegated by Council to the Chief Executive Officer under the Local Government Act 1995. Any power or duty that requires a decision of an absolute majority of the local government: accepting a tender which exceeds an amount determined by the local government; appointing an auditor; acquiring or disposing of any property valued at an amount determined by the local government; any of the local government’s powers under Sections 5.98, 5.98A, 5.99, 5.99A and 5.100 of the Act; borrowing money on behalf of the local government; hearing or determining an objection of a kind referred to in Section 9.5; the power under section 9.49A(4) to authorise a person to sign documents on behalf of the local government any power or duty that requires the approval of the Minister or Governor; or such other duties or powers that may be prescribed by the Act. Delegation to Committees A local government may delegate to a committee any of its powers and duties: 5.16 (1) (2) (3) (4) (5) Absolute majority required to delegate. Cannot delegate power of delegation. To be in writing and may be general or conditional. Can be for a period of time or indefinite. Doesn’t prevent Council acting through another. Limits of delegations to committees. 5.17 Register of Delegations to committees is to be kept and reviewed annually. 5.18 Register of Delegations to committees is to be kept and reviewed annually. W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 4 of 51 Delegation to Chief Executive Officer 5.42 (1) (2) 5.43 Limits on delegation to Chief Executive Officer. 5.44 Chief Executive Officer may delegate to others, but not the power of delegation. 5.45 (1) (2) 5.46 (1) (2) (3) Absolute majority required to delegate. To be in writing and may be general or conditional. (a) Can be for a period of time or indefinite. (b) Absolute majority required to amend or revoke. Doesn’t prevent Council or Chief Executive Officer acting through another. Register of the delegations made to the CEO and employees to be kept. Delegations to be reviewed at least once every financial year. A person to whom a power of duty is delegated under this Act is to keep records in accordance with regulations in relation to the exercise of the power or the discharge of the duty. Records to be kept by Delegates Admin Reg. 19 “Where a power of duty has been delegated under the Act to the Chief Executive Officer or to any other local government employee, the person to whom the power or duty has been delegated is to keep a written record of: (a) (b) (c) how the person exercised the power or discharged the duty: when the person exercised the power or discharge the duty: the persons or classes of persons, other than Council or Committee members or employees of the local government, directly affected by the exercise of the power or the discharge of the duty.” ASSOCIATED LEGISLATION Delegations or authorisations may occur in the following legislation, and where applicable, regulations: Planning and Development Act 2005 Dog Act 1976; Cat Act 2011; Bush Fires Act 1954; Health Act 1911; Freedom of Information Act 1992; Land Administration Act 1997; Litter Act 1979; Local Government (Miscellaneous Provisions) Act 1960; Caravan Parks and Camping Grounds Act 1995; and Control of Vehicles (Off Road Areas) Act 1978. (Note: This is not an exhaustive list) W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 5 of 51 Shire of Laverton – Delegation Register Contents DELEGATION NUMBER DELEGATION SUBJECT CURRENT DATE 001 Animals - Unlawful Release from Pound 002 Grant of Building Permits 19/03/2015 003 Demolition Permits 19/03/2015 004 Grant of Occupancy Permit 19/03/2015 005 Grant of Building Approval Certificate 19/03/2015 006 Buildings Orders 19/03/2015 007 Bush Fire - Use of Council Plant 19/03/2015 008 Staff - Housing Bonds 19/03/2015 009 Recovery of Debts 010 Staff - Private Use of Council Vehicles 011 Legal Advice 012 Land Valuations 19/03/2015 013 Tenders for Equipment Purchases 19/03/2015 014 Staff - Attendances at Conferences and Training Courses 015 Plant - Use by Employees 016 Roads and Footpaths - Damage to 017 Early Morning Swimming 19/03/2015 018 Private Works 19/03/2015 019 Signs - Roads and Streets 020 Road train Permits 19/03/2015 021 Payments from Shire of Laverton Bank Accounts 19/03/2015 022 Hire Charges - Council Property & Equipment 19/03/2015 023 Mobile Food Vans 19/03/2015 024 Air BP - Laverton Airport Lease REVOKED 025 Staff Housing Rental Subsidies 19/03/2015 026 Liquor - Sale of from Council Property 19/03/2015 027 Contract Variations 19/03/2015 028 Rate Book 19/03/2015 029 Thoroughfares – Temporary Closure to Vehicles 19/03/2015 030 Disposal of Surplus Equipment, Materials, Tools etc 19/03/2015 031 Buildings - Dangerous REVOKED 032 Buildings - Certificates of Classification REVOKED 033 Media Authorisation REVOKED 034 Septic Tank Approvals 035 Finance - Preparation of Annual Financial Report REVOKED 036 Award/Industrial Matters REVOKED 037 Native Title 19/03/2015 038 Telephones (Private) – Use by Employees for Council Business 19/03/2015 039 Impounding Goods – Authorised Employee 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx REVOKED REVOKED 19/03/2015 REVOKED REVOKED 19/03/2015 Revoked REVOKED 19/03/2015 ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 6 of 51 DELEGATION NUMBER DELEGATION SUBJECT CURRENT DATE 040 Sale of Impounded/Seized/Confiscated Vehicles, Animals or Goods 041 Insurance – Contracts of 042 Insurance – Public Liability Claims 19/03/2015 043 Staff Housing 19/03/2015 044 Contractors – Use on Works 19/03/2015 045 Burning, Prohibited and Restricted Times (Variation) 19/03/2015 046 Offences – Bush Fires Act 19/03/2015 047 Mining Tenements 19/03/2015 048 Proceedings under Dog Act 19/03/2015 049 Plant and Equipment – Use by Private Persons 050 Write off of Debts Less than $500 051 Powers and Duties of the Laverton Housing Project Development Committee 052 Health Act – (Deputy) 19/03/2015 053 Local Government Property Local Law 19/03/2015 054 Laverton Race Club Activities 19/03/2015 055 Food Act 2008 19/03/2015 056 Dog Act – Powers and Duties 19/03/2015 057 Cat Act – Powers and Duties 19/03/2015 (Please see last page for Alphabetic Index) W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx 19/03/2015 REVOKED REVOKED 19/03/2015 REVOKED ATTACHMENT OMC1603-11.5.4.A Page 7 of 51 Shire of Laverton – Delegation Register Delegation 002: Grant of Building Permits Legislative Power: Building Act 2011 Sections 20, 22, 32 and 127 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority under sections 20, 22 and 32 of the Building Act 2011 to: 1. Approve or refuse to approve plans and specifications; and 2. Approve or refuse an extension of time where a building has not been completed within the specified time. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 127 of the Building Act 2011, has delegated this power/duty to the Environmental Health Officer/Building Surveyor (EHO). SJ Deckert, Chief Executive Officer, 20 March 2015. Method of Recording Use of Delegation: Building License Register and individual files within Building Licence Cabinet. For refusals – refer also to agenda report to Council. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Revoked 17/04/2014 Reissued 17/04/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 8 of 51 Delegation 003: Demolition Permits Legislative Power: Building Act 2011 Sections 21, 22 and 127 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to approve the issue of a demolition permit under Sections 21 and 22 of the Building Act 2011 to take down a building or a part of a building and such permit may be subject to such conditions as the Chief Executive Officer considers necessary for the safe and proper execution of the work. It is a condition of this delegation that the Chief Executive Officer ensures that the work is in accordance with all legislative requirements and in accordance with the appropriate Australian Standards. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 127 of the Building Act 2011, has delegated this power/duty to the Environmental Health Officer/Building Surveyor (EHO). SJ Deckert, Chief Executive Officer, 20 March 2015. Method of Recording Use of Delegation: Demolition Permit Register and relevant property file within Building Licence Cabinet. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Revoked 17/04/2014 Reissued 17/04/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 9 of 51 Shire of Laverton – Delegation Register Delegation 004: Grant of Occupancy Permit Legislative Power: Building Act 2011 Sections 58 and 127 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority under section 58 of the Building Act 2011 to approve, modify or refuse Grant of Occupancy Permit applications. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 127 of the Building Act 2011, has delegated this power/duty to the Environmental Health Officer/Building Surveyor (EHO). SJ Deckert, Chief Executive Officer, 20 March 2015. Method of Recording Use of Delegation: Relevant property file within Building Licence Cabinet. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Revoked 17/04/2014 Reissued 17/04/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 10 of 51 Delegation 005: Grant of Building Approval Certificate Legislative Power: Building Act 2011 Sections 58 and 127 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority under section 58 of the Building Act 2011 to approve, modify or refuse Grant of Building Approval Certificate Applications. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 127 of the Building Act 2011, has delegated this power/duty to the Environmental Health Officer/Building Surveyor (EHO). SJ Deckert, Chief Executive Officer, 20 March 2015. Method of Recording Use of Delegation: Relevant property file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Revoked 17/04/2014 Reissued 17/04/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 11 of 51 Shire of Laverton – Delegation Register Delegation 006: Building Orders Legislative Power: Building Act 2011 Sections 110, 117 and 127 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority under the following sections of the Building Act 2011 to: 1. 2. Section 110 – To make building orders in relation to – (a) Building work (b) Demolition work (c) An existing building or incidental structure Section 117 – To revoke building orders. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 127 of the Building Act 2011, has delegated this power/duty to the Environmental Health Officer/Building Surveyor (EHO). SJ Deckert, Chief Executive Officer, 20 March 2015. Method of Recording Use of Delegation: Relevant property file within the Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Revoked 17/04/2014 Reissued 17/04/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 12 of 51 Delegation 007: Bush Fire – Use of Council Plant Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to place Shire plant and operators at the disposal of a Bush Fire Control Officer in the event of an emergency for bush fire prevention and/or control measures. In situations where Shire plant or equipment is required, the persons requesting such assistance must first guarantee payment for all costs incurred. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject File within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 13 of 51 Shire of Laverton – Delegation Register Delegation 008: Staff – Housing Bonds Legislative Power: Residential Tenancies Act 1987 Local Government Act 1995 Section 5.42 Local Government (Functions and General) Regulations 1996 Regulation 30(2)(d) Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to levy the appropriate maintenance and cleaning bonds on the prospective tenants of Council houses and to manage the bonds in accordance with the Residential Tenancies Act 1987. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager Corporate and Community Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: On relevant personnel file. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 14 of 51 Delegation 010: Staff – Private Use of Council Vehicles Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated the authority to make all appropriate private use arrangements with all staff entitled to the use of a Council vehicle. CEO Delegation: Not applicable. Method of Recording Use of Delegation: On relevant personnel file. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 15 of 51 Shire of Laverton – Delegation Register Delegation 012: Land Valuations Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: Subject to provision being made in the budget for land valuation expenses, the Chief Executive Officer is delegated authority to obtain from the Valuer General or a qualified private Valuer, the value of any land or property that is the subject of a report or submission to the Council involving negotiations for the purchase or sale of the property. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 16 of 51 Delegation 013: Tenders for Equipment Purchase Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: Where provision has been made in the budget, the Chief Executive Officer is delegated authority to call tenders for items of plant, equipment or machinery subject to compliance with Functions and General Regulation 14. On the receipt of the tenders, the Chief Executive Officer shall report on tenders received to the next meeting of Council. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant Tender file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 17 of 51 Shire of Laverton – Delegation Register Delegation 015: Plant – Use by Employees Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to allow after hours usage of plant to employees subject to the following: 1. Usage will be permitted within the townsite area, to those employees who are conversant with the operating capabilities of the plant that they propose to use and subject to their agreement to accept full responsibility for any loss or damage caused by negligence to that plant. 2. Where the use, or intended use, of plant is likely to conflict with usage of Council, of that plant, then permission will not be given. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: On relevant personnel file. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 19/06/2003 Reaffirmed 17/09/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 18 of 51 Delegation 017: Early Morning Swimming Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to consider and approve or reject applications from swimmers wishing to participate in early morning swimming. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 19 of 51 Shire of Laverton – Delegation Register Delegation 018: Private Works Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is authorised, without reference to Council to approve carrying out of private works where the value of the works does not exceed $20,000. This delegation is subject to the following: Private works will only be undertaken when time permits to ensure there is no disruption to Council’s work programme. Requests for private works for time other than that suited to Council shall be completed outside Council’s normal working hours and charged at the appropriate penalty rates. All private works undertaken by Council staff is to be listed in the Works Manager’s report for presentation at the next following monthly Council meeting. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Private Works Register and Executive Manager Technical Services Report in next available Councillors’ Information Bulletin. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 20 of 51 Delegation 020: Road Train Permits Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to approve or reject applications to use road trains on roads under the Shire’s control. Details of any approvals or rejections issued under this delegation are to be reported via the Information Bulletin. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Councillors’ Information Bulletin and relevant subject file in Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 21 of 51 Shire of Laverton – Delegation Register Delegation 021: Payments from Shire of Laverton Bank Accounts Legislative Power: Local Government Act 1995 Section 5.42 Local Government (Financial Management) Regulations 1996 Reg 11 & 12 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to authorise the approval of payments by cheque, electronic funds transfer or by other means from bank accounts held in the name of the Shire of Laverton subject to: 1. The authority extends only to payments for items previously authorised by the Council by either inclusion in the budget or Council resolution and approved by the Chief Executive Officer. 2. The Chief Executive Officer is to ensure the relevant debt was incurred by a person who was properly authorised to do so, was in accordance with purchasing policies and that the goods or services to which each account relates were provided in a satisfactory condition or to a satisfactory standard as the case requires. (See Policy 3.20 - Authorisation for Payment of Accounts) 3. Notwithstanding the above, authority also extends to the payments to Creditors who provided goods or services by Tender, Contract or Quote previously authorised by Council. The authority is limited to amounts set out in the Tender, Contract or Quote. Furthermore, the works, services or goods must be supplied to the satisfaction of the Chief Executive Officer. 4. A list of the accounts so paid is to be presented to the next meeting of the Council and included in the minutes of that meeting, and (See also Policy 3.20) 5. The vouchers, supporting invoices and other relevant documents be made available for inspection by Councillors at any time following the date of the payment and at the next ordinary meeting of the Council. (See also Policy 3.20) CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Corporate and Community Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Accounts Paid Listing as presented to Council – Summary in Agenda, Detailed Listings in Councillors’ Information Bulletin. BIBLIOGRAPHY Adopted 15/05/1997 Amended 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/09/2008 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 22 of 51 BIBLIOGRAPHY Adopted 15/05/1997 Amended 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/09/2008 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 23 of 51 Shire of Laverton – Delegation Register Delegation 022: Hire Charges – Council Property and Equipment Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: That the Chief Executive Officer be delegated authority to consider applications for the free use of Council property and equipment or the use of Council property and equipment at a reduced charge and to approve or reject such applications. The Chief Executive Officer in exercising this delegation shall have due regard to all Council policies. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager Corporate and Community Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Amended 23/09/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 24 of 51 Delegation 023: Mobile Food Vans Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: Pursuant to the provisions of clause 11.3 of Town Planning Scheme No. 2, the Chief Executive Officer is delegated authority to consider and approve or reject applications by mobile food van operators to operate from locations within the Shire other than within the caravan park. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Amended 23/09/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 25 of 51 Shire of Laverton – Delegation Register Delegation 025: Staff Housing Rental Subsidies Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to determine applications for a housing subsidy in accordance to the guidelines set down in Policy 5.14 – Employee Housing Subsidy. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant employee’s personnel file. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Amended 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 26 of 51 Delegation 026: Liquor – Sale of From Council Property Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to approve applications for the sale of liquor from property under the care, control and management of the Council and to approve applications to consume liquor on property under the care, control and management of Council. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager Corporate and Community Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 27 of 51 Shire of Laverton – Delegation Register Delegation 027: Contract Variations Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to approve minor variations to contracts entered into by Council, subject to the funds required to meet the cost of the variations being contained within the amount set aside in the budget adopted by the Council. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 28 of 51 Delegation 028: Rate Book Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: 1. Entering into an agreement in accordance with 6.49 of the Local Government Act 1995. 2. The recovery of rates by complaint or action pursuant to the provisions of 6.56(1) of the Local Government Act 1995. 3. Requiring a lessee to pay rent to the Council in satisfaction of rates or service charges due and payable in accordance with 6.60(2) of the Local Government Act 1995. 4. The exercise of discretion in regard to granting of any extension of time for service of objections to the Rate Book 6.76(4) of the Local Government Act 1995. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager Corporate and Community Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 29 of 51 Shire of Laverton – Delegation Register Delegation 029: Thoroughfares – Temporary Closure to Vehicles Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: Pursuant to the provisions of section 3.50(1) of the Local Government Act 1995, the Chief Executive Officer is delegated authority to temporarily close a thoroughfare or a portion of a thoroughfare in the following circumstances: 1. Rain Damage For a period not exceeding 28 days if he is of the opinion that by reason of heavy rain a thoroughfare is likely to be damaged by the passage of traffic generally or traffic of any particular class. 2. Unsafe Conditions For a period not exceeding 7 days due to roadworks or safety issues where a thoroughfare may be unsafe to the user. 3. Blasting Conditions For a period not exceeding 30 minutes to enable a mining operator to carry out blasting in the near vicinity of a thoroughfare. 4. Community Events For a period not exceeding 7 days for community or fundraising events, which must also have the approval of the Commissioner of Police or to safety issues, where use of the street may be unsafe to the user. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 30 of 51 Delegation 030: Disposal of Surplus Equipment, Materials, Tools etc Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: Pursuant to the provisions of section 3.58 of the Local Government Act 1995 and regulation 30(3) of the Local Government (Functions & General) Regulations 1996, the Chief Executive Officer is delegated authority to: 1. Sell by calling for expressions of interest, holding of a surplus goods sale at the Shire Depot, or any other fair means, items of surplus equipment, materials, tools, etc which are no longer required, or are outmoded, or are no longer serviceable. 2. This delegation applies only to items with an estimated value of less than $2,000. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 31 of 51 Shire of Laverton – Delegation Register Delegation 034: Septic Tank Approvals Legislative Power: Health Act 1911 Local Government Act 1995 Section 5.42 Delegate: Environmental Health Officer/Building Surveyor Delegation: Pursuant to the provisions of section 107 of the Health Act 1911, the Environmental Health Officer/Building Surveyor is delegated authority pursuant to the Health Amendment Act 1996 to approve septic tank systems to serve single dwellings on existing vacant lots (or non residential lots having a single residential equivalent) where such systems are designed to serve up to 10 persons. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 32 of 51 Delegation 037: Native Title Legislative Power: Local Government Act 1995 Section 5.42 Native Title Act 1993 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to register an interest in any Native Title Claim affecting Council in order for Council to have sufficient interest to become a party to the Native Title Application. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 15/05/1997 Reaffirmed 22/05/1998 Reaffirmed 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/06/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 21/07/2005 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 33 of 51 Shire of Laverton – Delegation Register Delegation 038: Telephones (Private) – Use by Employees for Council Business Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to make appropriate financial and other arrangements with all employees to have a telephone installed in his/her principal place of residence within the Shire for some use on Council business. The Chief Executive Officer is further delegated authority to make appropriate arrangements to reimburse any employee with any telephone expenses incurred on Council business. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant employee’s personnel file. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Amended 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 34 of 51 Delegation 039: Impounding Goods – Authorised Employee Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: Pursuant to the provisions of section 3.39(i) of the Local Government Act 1995, the Chief Executive Officer is delegated authority to authorise any employee to remove and impound any goods that are involved in a contravention that can lead to impounding. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 35 of 51 Shire of Laverton – Delegation Register Delegation 040: Sale of Impounded/Seized/Confiscated Vehicles, Animals or Goods Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: Pursuant to the provisions of sections 3.47 and 3.58 of the Local Government Act 1995, the Chief Executive Officer is delegated authority to: 1. Dispose of any vehicles, animals or goods that have been impounded/seized or confiscated. 2. Dispose of the above only after calling tenders in accordance with Part 4 of the Local Government (Functions and General) Regulations. 3. Pursuant to section 5.43 (b) of the Local Government Act 1995, to accept any tender up to the value of $1000 and subject to the proviso that tenders for amounts exceeding $1000 shall be referred to the Council for consideration. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 36 of 51 Delegation 042: Insurance – Public Liability Claims Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to consider claims against Council for property damage that do not exceed the insurance policy excess levels, and to accept or deny liability on behalf of Council. In cases where liability is accepted, payment may only be made up to value of Council’s relevant insurance excess amount and then only upon receipt of an appropriate release form prepared by Council’s Solicitors. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 37 of 51 Shire of Laverton – Delegation Register Delegation 043: Staff Housing Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to make all arrangements in regard to occupancy and maintenance of all staff accommodation provided by Council. In exercising this delegation the Chief Executive Officer shall have regard to any Council policy in place from time to time. In the event that any Council provided accommodation is, at any time, not required for Council employees, the Chief Executive Officer is delegated authority to rent the accommodation to persons other than Council employees, provided the tenancy arrangement is only on a monthly basis. The Chief Executive Officer is further delegated authority to determine the level of bond to be applied to each occupancy arrangement. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 38 of 51 Delegation 044: Contracts – Use on Works Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to engage private contractors to assist and compliment Council’s work staff in carrying out any works and services. In exercising this delegated authority, the Chief Executive Officer shall have due regard to the following: a) It must be demonstrated that by engaging the private contractors, it will be in the best interests of Council. b) Appropriate funds are provided within the budget. c) The engagement of private contractors shall only take place with due compliance with the Local Government (Functions and General) Regulations relating to tenders. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System and Tender Register if appropriate. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 39 of 51 Shire of Laverton – Delegation Register Delegation 045: Burning – Prohibited and Restricted Times (Variation) Legislative Power: Bush Fires Act 1954 Delegate: President and Chief Bush Fire Control Officer Delegation: Pursuant to Sections 17(10) and 18(5C) of the Bush Fires Act 1954, the President and the Chief Bush Fire Control Officer are jointly delegated the Council’s powers and duties under Section 17(7) and (8) and Section 18(5) of the Bush Fires Act 1954 in respect to varying the prohibited and restricted burning times, provided that the Officer in Charge of the Department of Parks and Wildlife (DPAW) is consulted before the authority under this delegation is exercised. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 40 of 51 Delegation 046: Offences – Bush Fires Act Legislative Power: Bush Fires Act 1954 Section 59(3) Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated general authority to consider allegations of offences alleged to have been committed against the Bush Fires Act 1954 within the district, and if considered appropriate, to institute and carry out proceedings in the name of the Shire against any person alleged to have committed any of those offences. This delegation also extends to the issue of infringement notices in accordance with the provisions of Section 59A of the Act. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 41 of 51 Shire of Laverton – Delegation Register Delegation 047: Mining Tenements Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority to lodge objections to the granting of mining tenements that may affect Council property. The Chief Executive Officer is further delegated authority to negotiate/impose appropriate conditions to be applied to the granting of any mining tenement in order to protect Council’s interest in that property. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Reaffirmed 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 42 of 51 Delegation 048: Proceedings under Dog Act Legislative Power: Dog Act 1976 Delegate: Chief Executive Officer Delegation: Pursuant to Section 44 of the Dog Act, the Chief Executive Officer is authorised to institute and carry on proceedings in the name of the Shire in respect to offences alleged to have been committed within the district against the Dog Act 1976. This delegation also enables the Chief Executive Officer to issue infringement notices pursuant to the provisions of Section 29 of the Act. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Technical Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 20/05/1999 Reaffirmed 18/05/2000 Reaffirmed 21/09/2000 Reaffirmed 21/09/2001 Reaffirmed 20/06/2002 Reaffirmed 19/06/2003 Reaffirmed 17/06/2004 Reaffirmed 24/04/2006 Amended 18/02/2010 Reaffirmed 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 43 of 51 Shire of Laverton – Delegation Register Delegation 050: Write-off of Debts Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: Pursuant to section 6.12(1)(c) of the Local Government Act 1995, the Chief Executive Officer is delegated authority to write off amounts of money owed, subject to the following conditions: 1. The authorisation shall apply to an individual amount up to a value of $500 (excluding GST); 2. Council is are to be advised of such decisions via the Information Bulletin on a monthly basis, or as the need arises; and 3. Factors to be considered when deciding to write-off a debt include: i. The amount of the debt outstanding; ii. The likelihood of the monies being collected; iii. The costs and administrative time in pursuing payment; iv. The impact of the writing off of the debt will have on the Shire’s finances and the debtor; and v. Any other relevant legislation, delegation or Council Policy. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated this power/duty to the Executive Manager, Corporate and Community Services. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file within Records System and next available Councillors’ Information Bulletin. BIBLIOGRAPHY Adopted 18/09/2009 Reaffirmed 18/02/2010 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 Reaffirmed W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed 21/03/2013 ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 44 of 51 Delegation 052: Health Act – (Deputy) Legislative Power: Health Act 1911 Section 26 Delegate: Environmental Health Officer/Building Surveyor (EHO) Delegation: Pursuant to section 26 of the Health Act 1911, the EHO is appointed and authorised to be the Shire of Laverton’s deputy and to exercise and discharge all or any of the powers and functions of the local government for such time and subject to such conditions and limitations (if any) as the local government shall see fit from time to time. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 18/02/2010 Reaffirmed 19/03/2015 Reaffirmed 22/02/2011 Reaffirmed W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx 22/03/2012 Reaffirmed 21/03/2013 Reaffirmed 20/03/2014 ATTACHMENT OMC1603-11.5.4.A Page 45 of 51 Shire of Laverton – Delegation Register Delegation 053: Local Government Property Local Law Legislative Power: Local Government Act 1995 Section 5.42 Section 9.10 Delegate: Chief Executive Officer Delegation: The administration of the Local Government Property Local Law, including the appointment of authorised persons (under section 9.10 of the Act) to perform any of the functions of the authorised person under this local law, be delegated to the Chief Executive Officer, subject to the following: a) The Chief Executive Officer may refer any matter, at his discretion, for decision to the Council; b) The Council is to be provided details of any prosecution under the local law; c) Only the Council is to: i. Make a determination under Part 2; ii. Adopt or vary a policy containing conditions subject to which an application for a permit may be approved under clauses 3.3(1)(a); iii. Enter into an agreement with a permit holder in respect of ownership of a materials in a building (clause 3.7); iv. Issue a permit under clause 3.13(1)(I) (erect a building) or 3.13 (1)(n) (erect or install any utility service structure); v. Cancel a permit under clause 3.12; vi. Hear an objection under Part 7; and vii. Appoint authorised persons who are not employees under section 9.10 of the Act. CEO Delegation: The Chief Executive Officer, in exercising authority under Section 5.44 of the Local Government Act 1995, has delegated his power/duty in respect to the control and operation of the Laverton Swimming Pool to the Swimming Pool Manager, with the exception of the power to appoint authorised persons under section 9.10 of the Act. SJ Deckert, Chief Executive Officer, 20 March 2015 Method of Recording Use of Delegation: Relevant subject file written Records System. BIBLIOGRAPHY Adopted 22/02/2011 Reaffirmed 22/03/2012 Reaffirmed W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx 21/03/2013 Reaffirmed 20/03/2014 Reaffirmed 19/03/2015 ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 46 of 51 Delegation 054: Laverton Race Club Activities Legislative Power: Local Government Act 1995 Section 5.42 Delegate: Chief Executive Officer Delegation: The Chief Executive Officer is delegated authority, subject to not exceeding the annual Budget provision, to authorise: 1. Applications from the Laverton Race Club to conduct Race Days at the Laverton Race Course (Reserve 33841). 2. The grading and preparation of the trace for the annual Race Day, together with the provision of associated services, such as rubbish removal. 3. The printing of the Race Book and Certificates. 4. Waiving the requirement for the bond and hire charges relevant to the use of the Community Bus on Race Day, but subject to the conditions that the Bus is returned in a clean condition and that the Laverton Race Club accepts responsibility for any damage that may occur while in the Club’s possession. 5. A contribution to the race prize pool of up to $1,000 to be drawn from Account E113005 – Race Course and Stable Maintenance. CEO Delegation: Not applicable. Method of Recording Use of Delegation: In the next issue of the ‘Information Bulletin’. BIBLIOGRAPHY Adopted 18/09/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 47 of 51 Shire of Laverton – Delegation Register Delegation 055: Food Act 2008 Legislative Power: Food Act 2008 Section 122 Delegate: Environmental Health Officer/Building Surveyor (EHO) Delegation: Pursuant to section 122 of the Food Act 2008, the Environmental Health Officer is appointed and authorised to exercise and discharge powers and functions of the local government for such time and subject to such limitations (if any) as the local government shall see fit from time to time. CEO Delegation: Not applicable. Method of Recording Use of Delegation: Relevant subject file within Records System. BIBLIOGRAPHY Adopted 18/09/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 48 of 51 Delegation 056 Dog Act Powers and Duties Legislative Power: Dog Act 1976 Section 10AA Delegate: Chief Executive Officer Delegation: Pursuant to section 10AA(1) of the Dog Act 1976, the Chief Executive Officer is delegated the exercise of any power or duty of the local government under another provision of this Act. CEO Delegation: Method of Recording Use of Delegation: BIBLIOGRAPHY Adopted 18/09/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Page 49 of 51 Shire of Laverton – Delegation Register Delegation 057 Cat Act Powers and Duties Legislative Power: Cat Act 2011 Section 44(1) Delegate: Chief Executive Officer Delegation: Pursuant to section 44(1) of the Cat Act 2011, the Chief Executive Officer is delegated the exercise of any power or duty of the local government under another provision of this Act. CEO Delegation: Method of Recording Use of Delegation: BIBLIOGRAPHY Adopted 18/09/2014 Reaffirmed 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx ATTACHMENT OMC1603-11.5.4.A Shire of Laverton – Delegation Register Page 50 of 51 Index DELEGATION NUMBER DELEGATION SUBJECT CURRENT DATE 024 Air BP - Laverton Airport Lease REVOKED 001 Animals - Unlawful Release from Pound REVOKED 036 Award/Industrial Matters REVOKED 032 Buildings - Certificates of Classification REVOKED 031 Buildings - Dangerous REVOKED 006 Buildings Orders 19/03/2015 045 Burning, Prohibited and Restricted Times (Variation) 19/03/2015 007 Bush Fire - Use of Council Plant 19/03/2015 057 Cat Act – Powers and Duties 19/03/2015 027 Contract Variations 19/03/2015 044 Contractors – Use on Works 19/03/2015 003 Demolition Permits 19/03/2015 030 Disposal of Surplus Equipment, Materials, Tools etc 19/03/2015 056 Dog Act – Powers and Duties 19/03/2015 017 Early Morning Swimming 19/03/2015 035 Finance - Preparation of Annual Financial Report 055 Food Act 2008 19/03/2015 005 Grant of Building Approval Certificate 19/03/2015 002 Grant of Building Permits 19/03/2015 004 Grant of Occupancy Permit 19/03/2015 052 Health Act – (Deputy) 19/03/2015 022 Hire Charges - Council Property & Equipment 19/03/2015 039 Impounding Goods – Authorised Employee 19/03/2015 041 Insurance – Contracts of 042 Insurance – Public Liability Claims 19/03/2015 012 Land Valuations 19/03/2015 054 Laverton Race Club Activities 19/03/2015 011 Legal Advice 026 Liquor - Sale of from Council Property 19/03/2015 053 Local Government Property Local Law 19/03/2015 033 Media Authorisation 047 Mining Tenements 19/03/2015 023 Mobile Food Vans 19/03/2015 037 Native Title 19/03/2015 046 Offences – Bush Fires Act 19/03/2015 021 Payments from Shire of Laverton Bank Accounts 19/03/2015 015 Plant - Use by Employees 19/03/2015 049 Plant and Equipment – Use by Private Persons W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx REVOKED REVOKED REVOKED REVOKED REVOKED ATTACHMENT OMC1603-11.5.4.A Page 51 of 51 Shire of Laverton – Delegation Register DELEGATION NUMBER DELEGATION SUBJECT CURRENT DATE 051 Powers and Duties of the Laverton Housing Project Development Committee 018 Private Works 19/03/2015 048 Proceedings under Dog Act 19/03/2015 028 Rate Book 19/03/2015 009 Recovery of Debts REVOKED 020 Road train Permits 19/03/2015 016 Roads and Footpaths - Damage to 040 Sale of Impounded/Seized/Confiscated Vehicles, Animals or Goods 19/03/2015 034 Septic Tank Approvals 19/03/2015 019 Signs - Roads and Streets REVOKED 014 Staff - Attendances at Conferences and Training Courses REVOKED 008 Staff - Housing Bonds 19/03/2015 010 Staff - Private Use of Council Vehicles 19/03/2015 043 Staff Housing 19/03/2015 025 Staff Housing Rental Subsidies 19/03/2015 038 Telephones (Private) – Use by Employees for Council Business 19/03/2015 013 Tenders for Equipment Purchases 19/03/2015 029 Thoroughfares – Temporary Closure to Vehicles 19/03/2015 050 Write off of Debts Less than $500 19/03/2015 W:\04 Delegations\2015-03-20 Delegation Register - Reprinted January 2016.docx REVOKED Revoked ATTACHMENT OMC1603-11.5.5.B Page 1 of 24 Page 02.18-1 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing 1. Introduction The Shire of Laverton (the “Shire”) is committed to delivering best practice in the purchasing of goods, services and works that align with the principles of transparency, probity and good governance and complies with the Local Government Act 1995 (the “Act”) and Part 4 of the Local Government (Functions and General) Regulations 1996, (the “Regulations”). Procurement processes and practices to be complied with are defined within this Policy and the Shire’s prescribed procurement procedures. 2. Objectives The objectives of this Policy are to ensure that all purchasing activities: demonstrate that best value for money is attained for the Shire; are compliant with relevant legislations, including the Act and Regulations; are recorded in compliance with the State Records Act 2000 and associated records management practices and procedures of the Shire; mitigate probity risk, by establishing consistent and demonstrated processes that promotes openness, transparency, fairness and equity to all potential suppliers; ensure that the sustainable benefits, such as environmental, social and local economic factors are considered in the overall value for money assessment; and are conducted in a consistent and efficient manner across the Shire and that ethical decision making is demonstrated. 3. Ethics and Integrity 3.1 Code of Conduct All officers and employees of the Shire undertaking purchasing activities must have regard for the Code of Conduct requirements and shall observe the highest standards of ethics and integrity. All officers and employees of the Shire must act in an honest and professional manner at all times which supports the standing of the Shire. 3.2 Purchasing Principles The following principles, standards and behaviours must be observed and enforced through all stages of the purchasing process to ensure the fair and equitable treatment of all parties: BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 2 of 24 Page 02.18-2 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d full accountability shall be taken for all purchasing decisions and the efficient, effective and proper expenditure of public monies based on achieving value for money; all purchasing practices shall comply with relevant legislation, regulations, and requirements consistent with the Shire’s policies and Code of Conduct; purchasing is to be undertaken on a competitive basis where all potential suppliers are treated impartially, honestly and consistently; all processes, evaluations and decisions shall be transparent, free from bias and fully documented in accordance with applicable policies, audit requirements and relevant legislation; any actual or perceived conflicts of interest are to be identified, disclosed and appropriately managed; and any information provided to the Shire by a supplier shall be treated as commercial-in-confidence and should not be released unless authorised by the supplier or relevant legislation. 4. Value for Money 4.1 Policy Value for money is determined when the consideration of price, risk and qualitative factors that are assessed to determine the most advantageous outcome to be achieved for the Shire. As such, purchasing decisions must be made with greater consideration than obtaining lowest price, but also to incorporate qualitative and risk factors into the decision. 4.2 Application An assessment of the best value for money outcome for any purchasing process should consider: all relevant Total Costs of Ownership (TCO) and benefits including transaction costs associated with acquisition, delivery, distribution, as well as other costs such as but not limited to holding costs, consumables, deployment, maintenance and disposal; BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 3 of 24 Page 02.18-3 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d the technical merits of the goods or services being offered in terms of compliance with specifications, contractual terms and conditions and any relevant methods of assuring quality, including but not limited to an assessment of levels and currency of compliances, value adds offered, warranties, guarantees, repair and replacement policies, ease of inspection, ease of after sales service, ease of communications etc. financial viability and capacity to supply without risk of default (competency of the prospective suppliers in terms of managerial and technical capabilities and compliance history); a strong element of competition in the allocation of orders or the awarding of contracts. This is achieved by obtaining a sufficient number of competitive quotations wherever practicable; the safety requirements associated with both the product design and specification offered by suppliers and the evaluation of risk when considering purchasing goods and services from suppliers; purchasing of goods and services from suppliers that demonstrate sustainable benefits and good corporate social responsibility; and providing opportunities for businesses within the Shire’s boundaries to be given the opportunity to quote for providing goods and services wherever possible. 5. Purchasing Requirements 5.1 Legislative/Regulatory Requirements The requirements that must be complied with by the Shire, including purchasing thresholds and processes, are prescribed within the Regulations, this Policy and associated purchasing procedures in effect at the Shire. 5.2 Policy Purchasing that is $150,000 or below in total value (excluding GST) must be in accordance with the purchasing requirements under the relevant threshold as defined under Section 5.5 of this Policy. Purchasing that exceeds $150,000 in total value (excluding GST) must be put to public Tender when it is determined that a regulatory Tender exemption, as stated under Section 5.6 of this Policy is not deemed to be suitable. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 4 of 24 Page 02.18-4 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d 5.3 Purch asing Value Definition Determining purchasing value is to be based on the following considerations: Exclusive of Goods and Services Tax (GST); The actual or expected value of a contract over the full contract period, including all options to extend; or the extent to which it could be reasonably expected that the Shire will continue to purchase a particular category of goods, services or works and what total value is or could be reasonably expected to be purchased. A best practice suggestion is that if a purchasing threshold is reached within five years for a particular category of goods, services or works, then the purchasing requirement under the relevant threshold (including the tender threshold) must apply. Must incorporate any variation to the scope of the purchase and be limited to a 10% tolerance of the original purchasing value. 5.4 Purchasing from Existing Contracts Where the Shire has an existing contract in place, it must ensure that goods and services required are purchased under these contracts to the extent that the scope of the contract allows. When planning the purchase, the Shire must consult its Tender Register in the first instance before seeking to obtain quotes and tenders on its own accord. 5.5 Purchasing Thresholds The table below prescribes the purchasing process that the Shire must follow, based on the purchase value: Monetary Threshold (excluding GST) Up to $499 Purchasing Method Required Quotation not required for operational expenditure Authorised Purchaser * Great Beyond Coordinator Works Supervisor Depot & Town Services Coordinator Workshop Manager Pool Manager ETO (Building Maintenance Items only) CRC Coordinator BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 5 of 24 Page 02.18-5 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d Monetary Threshold (excluding GST) Purchasing Method Required Authorised Purchaser * Up to $999 (Form 02.18.A) Two (2) verbal quotations that are documented CEO by the officer. EMTS EMCCS $1,000 - $9,999 (Form 02.18.A or Form 02.18.B) Three (3) verbal quotations or two (2) written quotations that are documented by the officer and being either from: • an existing panel of pre-qualified suppliers administered by the Shire; or • a pre-qualified supplier on the WALGA Preferred Supply Program or State Government CUA; or • from the open market. $10,000 - $49,999 (Form 02.18.B) Three written quotations that are documented CEO by the officer and being either from: EMTS • an existing panel of pre-qualified suppliers EMCCS administered by the Shire; or • a pre-qualified supplier on the WALGA Preferred Supply Program or State Government CUA; or • from the open market. $50,000 - $149,999 (Form 02.18.B) Three (3) written quotations based upon a CEO written specification or brief having been EMTS provided. EMCCS • an existing panel of pre-qualified suppliers administered by the Shire; or • a pre-qualified supplier on the WALGA Preferred Supply Program or State Government CUA; or • from the open market $150,000 and above Public tender process (subject to section 5.6 – Council Tendering Exemptions, as set out below). CEO EMTS EMCCS FAM ($2,000 limit) * The listing of “Authorised Purchasers” is a management (CEO) responsibility that has been included in this document for the sake of identity and clarity. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 6 of 24 Page 02.18-6 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d 5.6 Tendering Exemptions An exemption to publicly invite tenders may apply in the following instances: the purchase is obtained from a pre-qualified supplier under the WALGA Preferred Supply Program or State Government Common Use Arrangement. the purchase is from a Regional Local Government or another Local Government; the purchase is acquired from a person registered on the WA Aboriginal Business Directory, as published by the Small Business Development Corporation, where the consideration under contract is worth $250,000 or less and represents value for money; the purchase is acquired from an Australian Disability Enterprise and represents value for money; the purchase is from a pre-qualified supplier under a Panel established by the Shire; or any of the other exclusions under Regulation 11 of the Regulations apply. 5.7 Inviting Tenders Under the Tender Threshold Where considered appropriate and beneficial, the Shire may consider publicly advertising Tenders in lieu of undertaking a Request for Quotation for purchases under the tender threshold. This decision should be made after considering the benefits of this approach in comparison with the costs, risks, timeliness and compliance requirements and also whether the purchasing requirement can be met through the WALGA Preferred Supply Program or State Government CUA. If a decision is made to undertake a public Tender for contracts expected to be $150,000 or less in value, the Shire’s tendering procedures must be followed in full. 5.8 Sole Source of Supply Where the purchasing requirement is over the value of $5,000 and of a unique nature that can only be supplied from one supplier, the purchase is permitted without undertaking a tender or quotation process. This is only permitted in circumstances where the Shire is satisfied and can evidence that there is only one source of supply for those goods, services or works. The Shire must use its best endeavours to determine if the sole source of supply is genuine by exploring if there are any alternative sources of supply. Once determined, the justification must be endorsed by the relevant Manager, prior to a contract being entered into. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 7 of 24 Page 02.18-7 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d From time to time, the Shire may publicly invite an expression of interest to effectively determine that one sole source of supply still genuinely exists. 5.9 Anti-Avoidance The Shire shall not enter into two or more contracts or create multiple purchase order transactions of a similar nature for the purpose of "splitting" the value of the purchase or contract to take the value of the consideration of the purchase below a particular purchasing threshold, particularly in relation to Tenders and to avoid the need to call a public Tender. 5.10 Emergency Purchases An emergency purchase is defined as an unanticipated and unbudgeted purchase which is required in response to an emergency situation as provided for in section 6.8(1)(c) the Local Government Act 1995. In such instances, quotes and tenders are not required to be obtained prior to the purchase being undertaken. An emergency purchase does not relate to purchases not planned for due to time constraints. Every effort must be made to anticipate purchases required by the Shire in advance and to allow sufficient time to obtain quotes and tenders, whichever may apply. 5.11 Purchasing Procedures 5.11.1 Tender or Request for Quotation through Tender Exempt Panels ($150,000 or over in value) For the procurement of goods, services or works where the value exceeds $150,000, the Shire must either undertake: a public Tender process; or a Request for Quotation process from a Tender exempt panel of prequalified suppliers including WALGA Preferred Supply Contracts (which are specifically designed around local government requirements) or State Government Common Use Arrangements (where local government access is permitted). 5.11.1.1 Using a Tender Exempt Panel of Pre-Qualified Suppliers When accessing a Tender exempt panel of pre-qualified suppliers, such as a WALGA Preferred Supply Contract, the Shire must utilise a Request for Quotation process through eQuotes or in writing direct with the Preferred Suppliers. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 8 of 24 Page 02.18-8 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d In undertaking a Request for Quotation, the Shire does not need to request that pre-qualified suppliers provide the type of information that is normally provided in a public Tender. The fact that WALGA has already undertaken a public procurement process and has pre-qualified each Preferred Supplier means that this information has already been obtained and validated. Additionally, the Shire does not need to use its own contractual terms and conditions given that WALGA has already developed best practice contractual terms and conditions which have been accepted by every Preferred Supplier. These contractual terms and conditions ensure that the interests of the Shire are fully protected. Keeping the scope of the Request for Quotation focused on the Specification and the selection criteria that will be utilised by the Shire to assess different quotations will ensure that only the required information is sought from Preferred Suppliers and the response process is streamlined. Responses from Preferred Suppliers should be in writing and contain the price and a sufficient amount of information that addresses the Specification and selection criteria provided by the Shire. 5.11.1.2 eQuotes eQuotes is a secure, web-based procurement tool that streamlines and simplifies the Request for Quotation process with WALGA Preferred Suppliers at the same time as facilitating purchasing compliance, probity and control over all aspects of purchasing. All WALGA Preferred Supply Contracts are available on eQuotes and all necessary contract information is preloaded to enable informed procurement choices, including contract details, insurances, pricing (where applicable) etc. The Shire can also upgrade eQuotes to include their local suppliers. 5.11.1.3 Request for Quotation Process In the event that the Shire elects to call a Request for Quotation, the following process should be followed: The Request for Quotation documentation must include: written Specification that communicates the requirement(s) in a clear, concise and logical fashion; selection criteria to be applied; price schedule; conditions of responding; and validity period of offer. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 9 of 24 Page 02.18-9 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d Invitations to quote must be issued simultaneously to ensure that all parties receive an equal opportunity to respond. This can be done through eQuotes or directly to suppliers. New information that is likely to change the requirements must be offered to all prospective suppliers at the same time. Written responses must be assessed for compliance, then against the selection criteria, and then value for money. All evaluations must be documented. Respondents must be advised in writing as soon as possible after the final determination is made and approved. For this procurement range, selection must be based on value for money (in accordance with the definition stated within this Policy) and which quotation would be most advantageous to the Shire. The evaluation process should include an assessment of qualitative factors such as quality, stock availability, accreditation, time for completion or delivery, warranty conditions, technology, maintenance requirements, organisation’s capability, previous relevant experience, environmental and social impacts, corporate social responsibility and any other relevant factors as part of the assessment of the supplier’s response. The Shire can utilise the flexible nature of WALGA Preferred Supply Contracts to leverage optimal value for money through the competitive nature of the quotation process and based on their purchasing intent (e.g. volume or value of items to be purchased, period of contract etc). Additionally, when using a WALGA Preferred Supply Contract the Shire may negotiate with the highest rated Preferred Supplier from the evaluation process. This does not rule out the other Preferred Suppliers until successful conclusion of negotiations via award of contract. The responsible officer is expected to demonstrate due diligence when conducting a Request for Quotation process and must comply with any record keeping and audit requirements. Record keeping requirements must be maintained in accordance with record keeping policies. 5.11.1.4 Public Tender In the event that the Shire elects to call a Public Tender, the following process should be followed: Before Tenders are publicly invited, the Shire must record the decision to invite Tenders (which is to be recorded in the Tender Register) and must determine in writing the criteria for deciding which tender should be accepted. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 10 of 24 Page 02.18-10 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d The Evaluation Panel must be established prior to the advertising of the Tender and include a mix of skills and experience relevant to the nature of the purchase. For Tenders with a total estimated value (ex GST) of between $50,000 and $149,999, the Evaluation Panel must contain a minimum of two (2) members. For Tenders with a total estimated value (ex GST) of $150,000 and above, the Evaluation Panel must contain a minimum of three (3) members. A Tender Notice must be advertised in a State wide publication e.g. “The West Australian” newspaper (Local Government Tenders section), preferably on a Wednesday or Saturday. The Tender must remain open for at least 14 days after the date the Tender is advertised. Care must be taken to ensure that 14 full days are provided as a minimum. The Tender Notice must include: a brief description of the goods or services required; information as to where and how Tenders may be submitted; the date and time after which Tenders cannot be submitted; and a contact person to supply more detailed information if required. Detailed information must include: such information as the local government decides should be disclosed to those interested in submitting a Tender response; detailed specifications of the goods or services required; the criteria for deciding which Tender response should be accepted; and whether or not the local government has decided to submit a Tender response. Tenders must not be made available (counter, mail, internet, referral, or other means) without a robust process to ensure the recording of details of all parties who acquire the documentation. If clarifications, addendums or further communication are required prior to the close of Tenders, all potential Tenderers must have equal access to this information in order for the local government not to compromise its duty to be fair. (NOTE: Delegation 013 – Tenders for Equipment Purchase: Where provision has been made in the budget the CEO is delegated authority to call tenders for items of plant, equipment or machinery subject to compliance with Local Government (Function’s and General) Regulation 14.) BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 11 of 24 Page 02.18-11 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d If, after the Tender has been publicly advertised, any changes, variations or adjustments to the Tender document and/or the Conditions of Tender are required, the Shire may vary the initial information by taking reasonable steps to give each person who has sought copies of the Tender documents notice of the variation. A Tender response that is not received in full in the required format by the advertised Tender Deadline must be rejected. No tenders are to be removed from the Tender Box or opened (read or evaluated) prior to the Tender Deadline. Tenders are to be opened in the presence of at least two employees of the Shire or one employee of the Shire and at least one other person authorised by the Chief Executive Officer to open tenders. The details of all Tender responses received and opened must be recorded in the Tenders Register. Tender responses are to be opened in accordance with the advertised time and place. There is no obligation to disclose or record tendered prices at the Tender opening, and price information should be regarded as commercial-in-confidence to the local government. Members of the public are entitled to be present. The Tenderer’s offer form, price schedule and other appropriate pages from each Tender shall be date stamped and initialled by at least two (2) Shire officers present at the opening of Tenders. Where the local government has invited Tenders and no compliant submissions have been received; direct purchases can be arranged on the basis of the following: a sufficient number of quotations are obtained; the process follows the guidelines for seeking quotations (see 5.11.1.3 Request for Quotation process on page 02.18-8); the specification for goods and/or services remains unchanged; and purchasing is arranged within six (6) months of the closing date of the lapsed Tender. Tender responses that have not been rejected must be assessed by the Shire by means of a written evaluation against the pre-determined criteria. The Evaluation Panel must assess each Tender response that has not been rejected to determine which response is most advantageous. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 12 of 24 Page 02.18-12 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d If after the Tender has been publicly advertised and a successful Tenderer has been chosen, and before the Shire and Tenderer have entered into a contract, a minor variation may be made by the Shire. A minor variation may not alter the nature of the goods and/or services procured, nor may it materially alter the specification or structure provided for by the initial Tender. Each Tenderer shall be notified of the outcome of the Tender following Council’s resolution or appropriate delegated authority. Notification must include: the name of the successful Tenderer; and the total value of consideration of the winning offer. The details and total value of consideration for the winning offer must be entered into the Tenders Register at the conclusion of the Tender process. For this procurement range, selection of Tenderer must be based on value for money (in accordance with the definition stated within this Policy) and which Tender response would be most advantageous to the local government. To comply with the requirements of Regulation 18(4) of the Local Government (Functions and General) Regulations 1996, the Tender evaluation process must provide a written assessment of the extent that each Tender response satisfies the criteria which was set prior to advertising the Tender. This should include an assessment of qualitative factors such as quality, stock availability, accreditation, time for completion or delivery, warranty conditions, technology, maintenance requirements, organisation’s capability, previous relevant experience, environmental and social impacts, corporate social responsibility and any other relevant factors as part of the assessment of the Tender response. The responsible officer is expected to demonstrate due diligence when conducting a public Tender and must comply with any record keeping and audit requirements. 5.11.2 Request for Quotation ($50,000 or over to $149,999 in value) For the procurement of goods or services where the value exceeds $50,000 but is less than $149,999, it is a general requirement that at least three (3) written quotations be obtained from the market or from a pre-qualified panel of suppliers including WALGA Preferred Supply Contracts. Where circumstances dictate or there is a genuine lack of competitive quotations available, then these reasons must be recorded on Form 02.18.B. In the event that a Shire elects to call a Request for Quotation, the following process should be followed: BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 13 of 24 Page 02.18-13 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d Provide a Request for Quotation that includes as a minimum: written Specification that communicates the requirement(s) in a clear, concise and logical fashion; selection criteria to be applied; price schedule; conditions of responding; and validity period of offer. Invitations to quote must be issued simultaneously to ensure that all parties receive an equal opportunity to respond. This can be done through eQuotes or directly to suppliers. New information that is likely to change the requirements must be offered to all prospective suppliers at the same time. Written responses must be assessed for compliance, then against the selection criteria, and then value for money. All evaluations must be documented. Respondents must be advised in writing as soon as possible after the final determination is made and approved. Requests for Quotation to a panel of pre-qualified suppliers, such as a WALGA Preferred Supply Contract, should be undertaken through eQuotes or in writing directly with the Preferred Suppliers. Responses from Preferred Suppliers should be in writing and contain the price and a sufficient amount of information that addresses the Specification and selection criteria provided by the local government. For this procurement range, selection of supplier should be based on value for money (in accordance with the definition stated within this Policy) and the response which would be most advantageous to the local government. The evaluation of quotations should consider qualitative factors such as quality, stock availability, accreditation, time for completion or delivery, warranty conditions, technology, maintenance requirements, organisation’s capability, previous relevant experience, environmental and social impacts, corporate social responsibility and any other relevant factors as part of the assessment of the quote). The Shire can utilise the flexible nature of WALGA Preferred Supply Contracts to leverage optimal value for money through the competitive nature of the quotation process and based on their purchasing intent (eg volume or value of items to be purchased, period of contract etc). Additionally, when using a WALGA Preferred Supply Contract the Shire may negotiate with the highest rated supplier from the evaluation process. This does not rule out the other suppliers until successful conclusion of negotiations via award of contract. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 14 of 24 Page 02.18-14 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d The responsible officer is expected to demonstrate due diligence seeking quotes and to comply with any record keeping and audit requirements. Record keeping requirements must be maintained in accordance with record keeping policies. 5.11.3 Written Requests for Quotation - Under $50,000 in value For the procurement of goods or services where the value is under $50,000, it is a general requirement that at least three (3) written quotations be obtained from the market or from a pre-qualified panel of suppliers including WALGA Preferred Supply Contracts. Where circumstances dictate or there is a genuine lack of competitive quotations available, then these reasons must be recorded on Form 02.18.B. In the event that the Shire elects to call a Request for Quotation, the following process should be followed: Provide a simple Request for Quotation document that outlines the key elements of the process and requires written quotations. Provide an appropriately detailed written Specification that communicates the requirement(s) in a clear, concise and logical fashion. Invitations to quote must be issued simultaneously to ensure that all parties receive an equal opportunity to respond. This can be done through eQuotes or directly to suppliers. New information that is likely to change the requirements must be offered to all prospective suppliers at the same time. Written responses must be assessed for compliance, then against the selection criteria, and then value for money. All evaluations must be documented. Respondents must be advised in writing as soon as possible after the final determination is made and approved. 5.11.4 Request for Quotation - $1,000 or over to $9,999 in value For the procurement of goods or services where the value is between $1,000 and $9,999 the local government may undertake a verbal or written Request for Quotation process. At least three (3) verbal quotations or two (2) written quotations must be obtained from the market or the local government may purchase from a Tender exempt panel of prequalified suppliers including WALGA Preferred Supply Contracts. The requirements relating to verbal quotations are: Ensure that the requirement/specification is clearly understood by the local government employee seeking the verbal quotations. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 15 of 24 Page 02.18-15 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d Ensure that the requirement is clearly, accurately and consistently communicated to each of the suppliers being invited to quote. Ensure that all quotations from suppliers are in writing and/or refer to a pricing list in an email, website or catalogue. The responsible officer is expected to demonstrate due diligence seeking quotes and to comply with any record keeping and audit requirements. The quotations must be recorded on Form 02.18.A (verbal quotations) or Form 02.18.B (written quotations). 5.11.5 Verbal Requests for Quotations - $500 or over to $9,999 in value For the procurement of goods or services where the value is under $1,000 the local government may undertake a verbal Request for Quotation process. At least two (2) verbal quotations must be obtained from the market or the local government may purchase from a Tender exempt panel of pre-qualified suppliers including WALGA Preferred Supply Contracts. For the procurement of goods or services where the value is in the range of $1,000 to $9,999, the local government may also undertake a verbal Request for Quotation process. At least three (3) verbal quotations must be obtained from the market or the local government may purchase from a Tender exempt panel of pre-qualified suppliers including WALGA Preferred Supply Contracts. The requirements relating to verbal quotations are: Ensure that the requirement/specification is clearly understood by the local government employee seeking the verbal quotations. Ensure that the requirement is clearly, accurately and consistently communicated to each of the suppliers being invited to quote. Ensure that all quotations from suppliers are in writing and/or refer to a pricing list in an email, website or catalogue. The responsible officer is expected to demonstrate due diligence seeking quotes and to comply with any record keeping and audit requirements. The quotations must be recorded on Form 02.18.A. 6. Records Management Records of all purchasing activity must be retained in compliance with the State Records Act 2000 (WA), the Shire’s Records Management Policy and associated procurement procedures. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 16 of 24 Page 02.18-16 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d For each procurement activity, such documents may include: The Procurement initiation document such as a procurement business case which justifies the need for a contract to be created (where applicable); Procurement Planning and approval documentation which describes how the procurement is to be undertaken to create and manage the contract; Request for Quotation/Tender documentation; Copy of public advertisement inviting tenders, or the notice of private invitation (whichever is applicable); Copies of quotes/tenders received; Evaluation documentation, including individual evaluators note and clarifications sought; Negotiation documents such as negotiation plans and negotiation logs; Approval of award documentation; All correspondence to respondents notifying of the outcome to award a contract; Contract Management Plans which describes how the contract will be managed; and Copies of contract(s) with supplier(s) formed from the procurement process. 7. Sustainable Procurement and Corporate Social Responsibility The Shire is committed to providing a preference to suppliers that demonstrate sustainable business practices and high levels of corporate social responsibility (CSR). Where appropriate, the Shire shall endeavour to provide an advantage to suppliers demonstrating that they minimise environmental and negative social impacts and embrace CSR. Sustainable and CSR considerations must be balanced against value for money outcomes in accordance with the Shire’s sustainability objectives. 8. Buy Local Policy As much as practicable, the Shire must: where appropriate, consider buying practices, procedures and specifications that do not unfairly disadvantage local businesses; consider indirect benefits that have flow on benefits for local suppliers (i.e. servicing and support); BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 17 of 24 Page 02.18-17 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d ensure that procurement plans address local business capability and local content; explore the capability of local businesses to meet requirements and ensure that Requests for Quotation and Tenders are designed to accommodate the capabilities of local businesses; avoid bias in the design and specifications for Requests for Quotation and Tenders – all Requests must be structured to encourage local businesses to bid; and provide adequate and consistent information to potential suppliers. To this extent, a qualitative weighting may be afforded in the evaluation of quotes and tenders where suppliers are located within the boundaries of the Shire, or substantially demonstrate a benefit or contribution to the local economy. 9. Purchasing From Disability Enterprises Pursuant to Part 4 of the Local Government (Functions and General) Regulations 1996, the Shire is not required to publicly invite tenders if the goods or services are to be supplied from an Australian Disability Enterprise, as registered on www.ade.org.au. This is contingent on the demonstration of value for money. Where possible, Australian Disability Enterprises are to be invited to quote for supplying goods and services under the tender threshold. A qualitative weighting may be afforded in the evaluation of quotes and tenders to provide advantages to Australian Disability Enterprises. 10. Purchasing From Aboriginal Businesses Pursuant to Part 4 of the Local Government (Functions and General) Regulations 1996, the Shire is not required to publicly invite tenders if the goods or services are to be supplied from a person registered on the Aboriginal Business Directory published by the Small Business Development Corporation on www.abdwa.com.au, where the expected consideration under contract is worth $250,000 or less. This is contingent on the demonstration of value for money. Where possible, Aboriginal businesses are to be invited to quote for supplying goods and services under the tender threshold. A qualitative weighting may be afforded in the evaluation of quotes and tenders to provide advantages to Aboriginal owned businesses, or businesses that demonstrate a high level of aboriginal employment. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 18 of 24 Page 02.18-18 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d 11. Panels of Pre-qualified Suppliers 11.1 Policy Objectives In accordance with Regulation 24AC of the Local Government (Functions and General) Regulations 1996, a Panel of Pre-qualified Suppliers (“Panel”) may be created where most of the following factors apply: the Shire determines that a range of similar goods and services are required to be purchased on a continuing and regular basis; in a remote town with only a few suppliers of goods and services , a panel tender provides transparency, fairness and integrity; the purchasing activity under the intended Panel is assessed as being of a low to medium risk; the Panel will streamline and will improve procurement processes; and the Shire has the capability to establish, manage the risks and achieve the benefits expected of the proposed Panel. The Shire will endeavour to ensure that Panels will not be created unless most of the above factors are firmly and quantifiably established. 11.2 Establishing a Panel Should the Shire determine that a Panel is beneficial to be created, it must do so in accordance with Part 4, Division 3 the Local Government (Functions and General) Regulations 1996. Panels may be established for one supply requirement, or a number of similar supply requirements under defined categories within the Panel. Panels may be established for a minimum of eighteen (18) months and for a maximum length of time deemed appropriate by the Shire. Evaluation criteria must be determined and communicated in the application process by which applications will be assessed and accepted. Where a Panel is to be established, the Shire will need to appoint at least three (3) suppliers to each category, on the basis that best value for money is demonstrated. Where less than three (3) suppliers are available to each category within the Panel, the category is not to be established. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 19 of 24 Page 02.18-19 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d In each invitation to apply to become a pre-qualified supplier (through a procurement process advertised through a state-wide notice), the Shire must state the expected number of suppliers it intends to put on the panel. 11.3 Distributing Work Amongst Panel Members To satisfy Regulation 24AD(5) of the Regulations, when establishing a Panel of prequalified suppliers, the detailed information associated with each invitation to apply to join the Panel must either prescribe whether the Shire intends to: Obtain quotations from each pre-qualified supplier on the Panel with respect to all purchases, in accordance with Clause 11.4; OR Purchase goods and services exclusively from any pre-qualified supplier appointed to that Panel, and under what circumstances; OR Develop a ranking system for selection to the Panel, with work awarded in accordance with Clause 11.3.(b). In considering the distribution of work among Panel members, the detailed information must also prescribe whether: (a) each Panel member will have the opportunity to bid for each item of work under the Panel, with pre-determined evaluation criteria forming part of the invitation to quote to assess the suitability of the supplier for particular items of work. Contracts under the pre-qualified panel will be awarded on the basis of value for money in every instance; OR (b) work will be awarded on a ranked basis, which is to be stipulated in the detailed information set out under Regulation 24AD(5)(f) when establishing the Panel. The Shire is to invite the highest ranked Panel member, who is to give written notice as to whether to accept the offer for the work to be undertaken. Should the offer be declined, an invitation to the next ranked Panel member is to be made and so forth until a Panel member accepts a Contract. Should the list of Panel members invited be exhausted with no Panel member accepting the offer to provide goods/services under the Panel, the Shire may then invite suppliers that are not pre-qualified under the Panel, in accordance with the Purchasing Thresholds stated in section 5.5 of this Policy. When a ranking system is established, the Panel must not operate for a period exceeding 12 months. Form 02.18.C – Allocating Work to Prequalified Contractors/Suppliers of Plant Hire, is to be completed for each bidding opportunity created. In conjunction with each use of Form 02.18.C, the Shire will also need to prepare a Spreadsheet Ranking Template. A sample format is attached to Form 02.18.C for information purposes. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 20 of 24 Page 02.18-20 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d In every instance, a contract must not be formed with a pre-qualified supplier for an item of work beyond 12 months, which includes options to extend the contract. 11.4 Purchasing from the Panel The invitation to apply to be considered to join a panel of pre-qualified suppliers must state whether quotations are either to be invited to every member (within each category, if applicable) of the Panel for each purchasing requirement, whether a ranking system is to be established, or otherwise. 11.5 Recordkeeping Records of all communications with Panel members, with respect to the quotation process and all subsequent purchases made through the Panel, must be kept. The Record of Decisions Made must be recorded on Form 02.18.C. For the creation of a Panel, this includes: The Procurement initiation document such as a procurement business case which justifies the need for a Panel to be created; Procurement Planning and approval documentation which describes how the procurement is to be undertaken to create and manage the Panel; Request for Applications documentation; Copy of public advertisement inviting applications; Copies of applications received; Evaluation documentation, including clarifications sought; Negotiation documents such as negotiation plans and negotiation logs; Approval of award documentation; All correspondence to applicants notifying of the establishment and composition of the Panel such as award letters; and Copies of framework agreements entered into with pre-qualified suppliers. BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 21 of 24 Page 02.18-21 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 22 of 24 Page 02.18-22 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 23 of 24 Page 02.18-23 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-11.5.5.B Page 24 of 24 Page 02.18-24 Shire of Laverton – Policy Manual 02. ADMINISTRATION 02.18 Purchasing cont’d BIBLIOGRAPHY Adopted 15/05/1997 Substituted 17/04/2014 Reaffirmed 24/05/2007 Reaffirmed 17/09/2015 Reaffirmed 18/06/2009 Amended 22/10/2015 Substituted 22/02/2011 Revoked: 24/03/2016 Amended 22/03/2012 Reissued 24/03/2016 OMC1603-11.5.5.B ATTACHMENT OMC1603-13.5.A Page 1 of 7 ATTACHMENT OMC1603-13.5.A Page 2 of 7 ATTACHMENT OMC1603-13.5.A Page 3 of 7 ATTACHMENT OMC1603-13.5.A Page 4 of 7 ATTACHMENT OMC1603-13.5.A Page 5 of 7 ATTACHMENT OMC1603-13.5.A Page 6 of 7 ATTACHMENT OMC1603-13.5.A Page 7 of 7 Remove existing wall mounted airconditioners and surrounds, provide trimming and resheet as required. Allow 4 panels. Replace damaged exterior BUILDING FABRIC Remove and replace existing ramp to main door and rear door to extent drawn. Hardwood construction c/w handrails. Allow 2 coat tinted deck seal Remove west verandah. Remove northern timber pergola. Remove existing shade cloth covered play space, realign post locations. Agree. Nil cost Agree. Nil cost Leave play space in current location. Realign post locations. Allow $2,500? Agree Provision of $1,500 2,500 1,500 Agree with this. Provision of $5,000 5,000 Remove existing wall mounted airconditioners and surrounds, provide trimming and resheet as required. Allow 4 panels. Replace damaged exterior BUILDING FABRIC Remove and replace existing ramp to main door and rear door to extent drawn. Hardwood construction c/w handrails. Allow 2 coat tinted deck seal Remove west verandah. Remove northern timber pergola. Realign posts as required within existing location Repave and extend paving where required to make safe and improve amenity. 15,000 Create nominal 5m x 5m hardwood deck off south side in front of new sliding door set. Include for steps and 2 coat tinted deck seal. Allow to relocate exiting shade sail structure c/w new footings as directed by Shire of Laverton Make provision to repair and make good existing fence to make safe and compliant. Need to replace front fence. Allow $5,000? Delete this component at this time. Providing other existing external doors and access are upgraded. Also existing surface is upgraded where required. Allow $10,000? Replace front fence (MacPherson Place) and repair and make good remaining existing fence to make safe and compliant. EXTERIOR SITE COMMENTS FROM WORKING GROUP 3/3/16 & 16/3/16 30,000 COST ex GST $ 1,500 2,500 5,000 10,000 5,000 COST ex GST $ Working Group’s revised scope and cost estimate Replace site fencing with nominally 90 m of 2.1 high powder coated steel fencing, with gates. Include for demolition and removal of existing. Allow for staged removal and replacement to maintain security on site. EXTERIOR Original scope of works and cost estimate SITE PRIORITY WORKS ATTACHMENT OMC1603-13.6.A Page 1 of 6 Can this be reviewed with the view of refurbishing existing? Allow $10,000 35,000 3,000 1,500 Agree Provision of $3,000 Agree Provision of $1,500 Not sure this is required. 1,500 3,500 Remake in existing location (or relocated if no extra cost) Allow $2,000? Agree to extent of refurbishing existing. Have a 5m x 5m shade sail in store. Allow $3,000? Agree Provision of $3,500 3,000 Make good roof sheeting and flashings. Longitudinal/ joiner flashing to be resealed adequately. Nominally 18m. repair 2 damaged end sheets, replace 150mm x 150mm barge flashing, zincalume, nominally 10m. replace apron flashings as required, nominally 15m. clean all guttering and downpipes. Make good falls to existing paving away from building. Extend paving to cover removed north sand pit. Source pavers to match existing. New patio roof off existing building to north, west and south sides of existing building. Minimum width 2.4 m. Note this may be superseded if Shire accepts price for full parasol roof over, see Discretionary Items schedule. Make good base of wall corrosion all round existing structure. Remove rusted material, treat with rust kill as specified, cover with enlarged Delete this component at this time 7,500 3,000 Agree Provision of $1,000 1,000 Reinstate existing shade cloth structure for enlarged shaded area. Supply and install new shade cloth 90 % shade factor. Confirm colour selection with Shire representative wall sheet and corner flashings with similar low profile metal sheet panel. Relocate existing water supply and external GPO south side. Disconnect and remove existing external vent south wall. Supply and install nominal 3 m sliding door, fully trimmed and new frame. All aluminium clear anodised finish. Include sliding security door and deadlatch keyed alike to sliding door. Door wire security stainless steel mesh. Remake southern play space to accommodate sail shade plus 1.2 m fall space all round, fill with fine shredded pine mulch. Soft fall edge. Make good base of wall corrosion all round existing structure. Remove rusted material, treat with rust Refurbish existing patio roof and extend if feasible. Make good roof sheeting and flashings. Longitudinal/ joiner flashing to be resealed adequately. Nominally 18m. repair 2 damaged end sheets, replace 150mm x 150mm barge flashing, zincalume, nominally 10m. replace apron flashings as required, nominally 15m. clean all guttering and downpipes. Make good falls to existing paving away from building. Potential site for small shed. Remake southern play space in current location to accommodate sail shade plus 1.2 m fall space all round, fill with fine shredded pine mulch. Soft fall edge. Reinstate existing shade cloth structure for shaded area. Install new 5m x 5m shade sail (supplied). wall sheet and corner flashings with similar low profile metal sheet panel. Relocate existing water supply and external GPO south side. Disconnect and remove existing external vent south wall. 3,000 10,000 1,500 3,500 3,000 2,000 1,000 ATTACHMENT OMC1603-13.6.A Page 2 of 6 Remove and replace wall between toilet and store. Water proof and protect base of panelling to prevent cleaning water damage. Laundry/pantry to be in room next to sleeping room, office to be in room next to kitchen. Note new vinyl resilient flooring to these areas will be by the Shire Repaint interior complete with scrubbable low sheen acrylic. Allow deep base colours for pricing. INTERIOR BUILDING FABRIC Remove and replace damaged ply panels around in-wall airconditioners. Allow to repaint. 4 panels 1200x2400 Remove and replace damaged ceiling panels throughout. 3 sheets(~2800x1200) with damage Supply and install 50mm coved cornice to all ceilings and to cover services on roof complexing beam. Supply and install block out curtains to children’s sleeping area. 3 lots ~1200x900 each Replace three half doors and toilet partitions to children’s toilets. Reuse existing door hardware. Cut from white two face laminated, WP sheet. Trim all edges with white powder coated aluminium trim. 75mm flashing sealed against remaining wall sheet. Remove and replace front and rear doors, including new frames, with 920 solid core doors, external grade, weather stripped 4 sides, three coat gloss paint finish. Allow to remove and replace door hardware with keyed alike lever sets. Keying to match sliding door lock. 5,000 2,500 3,500 500 Are there any costs other than the Shire installing the flooring? Remove this from scope. The Shire will undertake Agree Provision of $500 Can existing doors be reused? Would like to have one adult (unisex) toilet cubicle and two children’s cubicles. Plumbing needs to be checked. Allow $3,500? Agree Provision of $2,500 Agree Provision of $1,500 Agree Provision of $1,500 1,500 1,500 Agree Provision of $1,500 Agree Provision of $500 500 1,500 Agree Provision of $2,500 2,500 INTERIOR BUILDING FABRIC Remove and replace damaged ply panels around in-wall airconditioners. Allow to repaint. 4 panels 1200x2400 Remove and replace damaged ceiling panels throughout. 7 sheets(~2800x1200) with damage Supply and install 50mm coved cornice to all ceilings and to cover services on roof complexing beam. Supply and install block out curtains to children’s sleeping area. 3 lots ~1200x900 each Renovate existing toilet block to provide one adult (unisex) toilet cubicle and two children’s cubicles. Reuse existing doors and hardware where possible. Cut from white two face laminated, WP sheet if needed. Trim all edges with white powder coated aluminium trim. Inspect plumbing to toilet building and repair as required. Remove and replace wall between toilet and store. Water proof and protect base of panelling to prevent cleaning water damage. Laundry/pantry to be in room next to sleeping room, office to be in room next to kitchen. Note new vinyl resilient flooring to these areas will be by the Shire Cost of painting to Shire – will be removed from final scope. Allow- to repaint interior and exterior kill as specified, cover with enlarged 75mm flashing sealed against remaining wall sheet. Remove and replace front and rear doors, including new frames, with 920 solid core doors, external grade, weather stripped 4 sides, three coat gloss paint finish. Allow to remove and replace door hardware with keyed alike lever sets. Keying to match sliding door lock. 1,000 (vinyl flooring) 2,500 2,500 3,500 500 1,500 1,500 1,500 500 2,500 ATTACHMENT OMC1603-13.6.A Page 3 of 6 MECHANICAL Remove existing wall mount airconditioners. Remove existing cool room refrigeration plant externally and internally. ELECTRICAL Terminate and blank off four existing wall GPO to playgroup area. Supply and install 3 of hard wired smoke alarms to children’s sleeping area (1) and playgroup room (2) Allow new circuit to supply children’s sleeping area airconditioning unit with WP isolator. Replace 11 internal fluorescent light fittings with 1200mm twin tube 30 W warm white fittings c/w diffusers. Supply new single bowl sink with overflow to laundry/ change area, c/w hot and cold over-sink outlet and washing machine cocks. SERVICES HYDRAULIC Supply and install 30 litre, single phase, mains pressure storage hot water unit, connected to kitchen and laundry area c/w tempering valve. Relocate cold water supply to south side clear of proposed double sliding doors. As above 1,000 4,500 1,500 1,000 800 1,500 500 1,500 Agree Agree. Investigate if this space can be incorporated into the new Agree Provision of $800 Agree Provision of $1,000 Agree Provision of $1,500 Agree with the need to replace, however could this be done later by local sparky as might be cheaper? Allow $3,000? Agree. Even though sliding door excluded, relocate water supply if sliding door installed at later date. Provision of $500 Agree Provision of $1,500 Agree Provision of $1,500 this task. Consider repainting external surfaces as well. MECHANICAL Remove existing wall mount airconditioners. Remove existing cool room refrigeration plant externally and internally. Incorporate into new ofice space. ELECTRICAL Terminate and blank off four existing wall GPO to playgroup area. Supply and install 3 of hard wired smoke alarms to children’s sleeping area (1) and playgroup room (2) Allow new circuit to supply children’s sleeping area airconditioning unit with WP isolator. Replace 11 internal fluorescent light fittings with 1200mm twin tube 30 W warm white fittings c/w diffusers. This item to be carried out by local contractor. Supply new single bowl sink with overflow to laundry/ change area, c/w hot and cold over-sink outlet and washing machine cocks. SERVICES HYDRAULIC Supply and install 30 litre, single phase, mains pressure storage hot water unit, connected to kitchen and laundry area c/w tempering valve. Relocate cold water supply to south side clear of proposed double sliding doors. As above 1,500 3,000 1,500 1,000 800 1,500 500 1,500 ATTACHMENT OMC1603-13.6.A Page 4 of 6 INTERIOR BUILDING FABRIC Replace existing kitchen door with fully trimmed half door c/w barrel bolt to kitchen side. Supply and install practising structural engineer certified full parasol/ tropical roof over building and to extent of verandahs north, west and south as shown. Nominal area 185sq/m - not covering back half of main building BUILDING FABRIC Supply and fit 900 deep awning shades to 2 x children’s sleeping area windows. 1,000 90,000 Refurbish existing door. Need some shade to these windows? Preferably roller shutters. Not required Site to be determined onsite. Storage needed so include. Material costs only as Shire can erect. 3,000 3,000 Refurb existing. Costs included above. 5,000 INTERIOR BUILDING FABRIC Refurbish existing door to make usable. BUILDING FABRIC Supply and fit 900 deep roller shutters to 2 x children’s sleeping area windows. Supply and install nominal 3m x 2m lockable garden shed, on raised precast 600 x 600 slab base, to north side paved area clear of existing hydraulic services and kitchen window, or other site as determined. Material costs only, Shire to instal. SITE Allow to provide nature play area to southern playground to future detail. Allow provisional sum of $5,000 for preparation and installation using Shire supplied material. Supply and install nominal 3m x 2m lockable garden shed, on raised precast 600 x 600 slab base, to north side paved area clear of existing hydraulic services and kitchen window. EXTERIOR Supply and install split, reverse cycle airconditioning unit to children’s sleeping area, nominal capacity 1.5 hp SUBTOTAL SITE $149,300 5,000 EXTERIOR DISCRETIONARY WORKS Supply and install split, reverse cycle airconditioning unit to children’s sleeping area, nominal capacity 1.5 hp SUBTOTAL office space, maybe as storage. Provision of $1,500 Agree Provision of $5,000 200 0 3,000 1,000 0 $83,300 5,000 ATTACHMENT OMC1603-13.6.A Page 5 of 6 TOTAL Site mobilisation Site demobilisation Transport allowance for material to be included in each scope element cost Preliminaries – Included Profit and Overhead to be included in each scope element cost noted above. Sub-Total CONTRACTOR COSTS MECHANICAL nil Sub-Total $274,300 Up to $20,000 ~ 7-10,000 Nil 7-10,000 7-10,000 nil $105,000 Allow MECHANICAL nil Sub-Total ELECTRICAL Supply and install of 2 off movement sensor external security lights. Only 2 required ELECTRICAL Supply and install of 6 off movement sensor external security lights. 3,000 SERVICES HYDRAULIC nil SERVICES HYDRAULIC nil $108,500 20,000 $5,200 1,000 ATTACHMENT OMC1603-13.6.A Page 6 of 6