Status of the SPIRAL2 facility
Transcription
Status of the SPIRAL2 facility
laboratoire commun CEA/DSM CNRS/IN2P3 Status of the SPIRAL2 facility M. Lewitowicz GANIL, CEA/DSM-CNRS/IN2P3, Caen, France on behalf of GANIL, SPIRAL2 Project Group & Physics Collaborations M. Lewitowicz NuPECC Meeting, 15-16/03/2013, Jülich www.ganil-spiral2.eu GANIL/SPIRAL2 laboratoire commun CEA/DSM M. Lewitowicz laboratoire commun CEA/DSM CNRS/IN2P3 NuPECC Meeting, 15-16/03/2013, Jülich CNRS/IN2P3 Existing GANIL facility & SPIRAL2 under construction Caen, France Phase 1: High intensity stable beams + Experimental rooms (S3 + NFS) Phase 2: High-intensity low-energy (DESIR) & post-accelerated Radioactive Ion Beam facility NFS S3 Phase 1 AL 2 SPIR CIME cyclotron RIB at 1-20 AMeV (up to 9 AMeV for FF) IR DES C LINA LINAC: 33 MeV p, 40 MeV d (5mA) 14.5 A.MeV HI (1mA) e Curr RIB p h ction u d o r i facil 1 L A SPIR / L I AN nt G all Phase 2 RIB Production Cave Up to 1014 fiss./sec. DESIR Low-energy RIB facility Cost of SPIRAL2: 210 M€ + 40 M€ spectrometers & detectors M. Lewitowicz NuPECC Meeting, 15-16/03/2013, Jülich ty SPIRAL2 phase 1 civil construction Underground laboratoire commun CEA/DSM Injector Hall October 2012 NFS facility LINAC Underground LINAC Hall S3 facility ü Installation of equipment Q3 2012 è Q4 2013 ü Commissioning M. Lewitowicz NuPECC Meeting, 15-16/03/2013, Jülich : 2014 è CNRS/IN2P3 SPIRAL2 phase 1 civil construction Underground laboratoire commun CEA/DSM Injector Hall February, 2013 Accelerator facilities building (ground floor) Main Entrance (ground floor) M. Lewitowicz NuPECC Meeting, 15-16/03/2013, Jülich CNRS/IN2P3 SPIRAL2 phase 1 Installation of LINAC Underground laboratoire commun CEA/DSM Injector Hall February, 2013 Installation of heavy-ion injector Installation of light-ion injector M. Lewitowicz CNRS/IN2P3 NuPECC Meeting, 15-16/03/2013, Jülich Phase 1 HI injector Cold Box d & p injector Cryomodule A Cryomodule B RFQ M. Lewitowicz laboratoire commun CEA/DSM NuPECC Meeting, 15-16/03/2013, Jülich CNRS/IN2P3 Phase 1 HI injector on i t a l al t s n I te r a t s d s a Inst ns o i t lla End ed tart Cold Box d & p injector ng i n n gi e b n o i t a ll 14 a 0 t 2 s In of of d n e n o i lat l RFQ a t Ins NuPECC Meeting, 15-16/03/2013, Jülich t s e t of 01 2 n i 3 Cryomodule A Cryomodule B s End 3 201 M. Lewitowicz CNRS/IN2P3 laboratoire commun CEA/DSM est t f o 01 2 n i 3 GANIL/SPIRAL 2 facility: Exp. halls NFS Funded MoU laboratoire commun CEA/DSM CNRS/IN2P3 DESIR Coll. Agreement – DECA Funds granted S3 Funds granted ACTAR-TPC Coll. Agreement Demonstrator funded PARIS MoU Demonstrator funded SPIRAL2 Phase 1 Commissioning/ experiments in 2014/2015 GASPARD SPIRAL2 Phase 2 (ISOL RIB) Civil construction from 2015 M. Lewitowicz NEDA MoU EXOGAM 2 Funded MoU NuPECC Meeting, 15-16/03/2013, Jülich FAZIA MoU Demonstrator funded Dispersive zone 3 × dipoles Low Energy Branch laboratoire commun CEA/DSM CNRS/IN2P3 ANR Grant request 2013 Fingers : tested for Open triplet : CfT 31st of January 5kW/cm2 Delivery: March 2013 Detection system Target system 7 × SC multipoles ANR Grant request 2013 E dipole CFT March 2013 FISIC International ANR Grant request 2013 Design: Feb 2012 Prototype: Jan 2014 Last Delivery: Oct 2015 è Critical Path CFT Cryo sytem June 2013 CFT June 2013 Dispersive zone 3 × dipoles Low Energy Branch laboratoire commun CEA/DSM CNRS/IN2P3 ANR Grant request 2013 Fingers : tested for Open triplet : CfT 31st of January 5kW/cm2 Delivery: March 2013 wer o p ts, e l p i Target system 013 open tr …) 2 n 16 rs i enics, em 0 t e s 2 d y ten Cryog t in ms r n u e o c f c rim le, cs, va all e o C p p i x i d è st e tric han r c c i e e l F (E ,m s e i l supp 7 × SC multipoles Detection system ANR Grant request 2013 E dipole CFT March 2013 FISIC International ANR Grant request 2013 Design: Feb 2012 Prototype: Jan 2014 Last Delivery: Oct 2015 è Critical Path CFT Cryo sytem June 2013 CFT June 2013 Status of Neutrons for Science facility laboratoire commun CEA/DSM CNRS/IN2P3 ● Beam at 0° ● Collimator ↔ beam quality ● Size (Lⅹl) ≃ (28m ⅹ 6m) - TOF measurements - free flight path Use of radioactive samples A< 1 GBq for thin layers A< 10 GBq for thick samples I < 50 µA P < 2 kW ● Beam line extension ● Converter ● Magnet and beam dump ● Irradiation station (n, p, d) Status of Neutrons for Science facility laboratoire commun CEA/DSM To be ready for experiments by end of 2014 Use of radioactive samples A< 1 GBq for thin layers A< 10 GBq for thick samples TOF area Converter room CNRS/IN2P3 The DESIR facility at SPIRAL2 h"p://www.cenbg.in2p3.fr/desir 120 physicists, 35 ins0tu0ons, 15 countries Bertram Blank – CENBG France (Project leader) Jean Charles Thomas – GANIL France (EQUIPEX) High quality 1+ RIB of 10 to 60 kV from: • SPIRAL1 (light n-‐deficient nuclei from beam/target fragmentaGon) • SPIRAL2 (n-‐rich fission fragments, transfer and fusion-‐evaporaGon products) • S3 (fusion-‐evaporaGon products, refractory elements) DESIR experimental hall & associated detectors laboratoire commun CEA/DSM DECA Agreement MLLTrap N -TOF detector PIPERADE+TAGS ed n g i s R I ES D X LPCTrap E P QUI E n o i h nt c r e a v TETRA M BEDO Con g n l i t a i e c e n s m a e i t n t i BELEN c r a a Silicon r p t è F a l n l Cube co X by E IP ay U s r Q O E LUMIERE f N f P o I TONNERRE ick- 013 at K è 2 , h t 29 Identification station Parties: 14 owners of DESIR experimental equipment Commitment: ~5 M€ & 520 men.months NuPECC Meeting, 15-16/03/2013, Jülich M. Lewitowicz CNRS/IN2P3 Timeline GANIL & SPIRAL2 4,5 m. 5 m. 3 m.? 3 m.? 2 m.? 3 m.? SPIRL2 Phase 2 5 m.? AGATA @ GANIL Construction Phase 1 LINAC, NFS, S3 47 LoIs LINAC Beams Co m. NFS experiments Com. M. Lewitowicz Upgrade SPIRAL1 France Hadron Commissioning Phase 1 SPIRL2 Phase 1 GANIL 2012 I 2013 I 2014 I 2015 I 2016 S3 experiments Financial Decision SPIRAL2 Phase 2 Design, R&D, prototypes Phase 2 RIB, DESIR Design, Safety File Phase 2 RIB, DESIR NuPECC Meeting, 15-16/03/2013, Jülich Civil Construction Phase 2 RIB, DESIR 16 laboratoire commun CEA/DSM CNRS/IN2P3 GANIL/SPIRAL2 2013-2014 Challenges • Installation and timely commissioning of SPIRAL2 LINAC & NFS with a 4-5 months/year of operation of the current GANIL facility (mainly for AGATA campaigns) • Additional budget and manpower requested by GANIL • Ensure the most favourable funding profile for the construction of SPIRAL2 Phase 2 • Signature of an International MoU on construction of SPIRAL2 (based on 20 already signed bilateral agreements) M. Lewitowicz NuPECC Meeting, 15-16/03/2013, Jülich laboratoire commun CEA/DSM Thank your for your attention M. Lewitowicz NuPECC Meeting, 15-16/03/2013, Jülich CNRS/IN2P3