Status of the SPIRAL2 facility

Transcription

Status of the SPIRAL2 facility
laboratoire commun CEA/DSM
CNRS/IN2P3
Status of the SPIRAL2 facility
M. Lewitowicz
GANIL, CEA/DSM-CNRS/IN2P3, Caen, France
on behalf of GANIL, SPIRAL2 Project Group
&
Physics Collaborations
M. Lewitowicz
NuPECC Meeting, 15-16/03/2013, Jülich
www.ganil-spiral2.eu
GANIL/SPIRAL2
laboratoire commun CEA/DSM
M. Lewitowicz
laboratoire commun CEA/DSM
CNRS/IN2P3
NuPECC Meeting, 15-16/03/2013, Jülich
CNRS/IN2P3
Existing GANIL facility &
SPIRAL2 under construction
Caen, France
Phase 1: High intensity stable beams + Experimental rooms (S3 + NFS)
Phase 2: High-intensity low-energy (DESIR) & post-accelerated Radioactive Ion Beam facility
NFS
S3
Phase 1
AL 2
SPIR
CIME cyclotron RIB
at 1-20 AMeV (up to
9 AMeV for FF)
IR
DES
C
LINA
LINAC:
33 MeV p,
40 MeV d (5mA)
14.5 A.MeV HI (1mA)
e
Curr
RIB
p
h
ction
u
d
o
r
i
facil
1
L
A
SPIR
/
L
I
AN
nt G
all
Phase 2
RIB Production Cave
Up to 1014 fiss./sec.
DESIR Low-energy RIB facility
Cost of SPIRAL2: 210 M€ + 40 M€ spectrometers & detectors
M. Lewitowicz
NuPECC Meeting, 15-16/03/2013, Jülich
ty
SPIRAL2 phase 1 civil construction
Underground
laboratoire commun CEA/DSM
Injector Hall
October 2012
NFS facility
LINAC
Underground LINAC
Hall
S3 facility
ü Installation of equipment Q3 2012 è Q4 2013
ü Commissioning
M. Lewitowicz
NuPECC Meeting, 15-16/03/2013, Jülich
: 2014 è
CNRS/IN2P3
SPIRAL2 phase 1 civil construction
Underground
laboratoire commun CEA/DSM
Injector Hall
February, 2013
Accelerator facilities
building (ground floor)
Main Entrance
(ground floor)
M. Lewitowicz
NuPECC Meeting, 15-16/03/2013, Jülich
CNRS/IN2P3
SPIRAL2 phase 1 Installation of LINAC
Underground
laboratoire commun CEA/DSM
Injector Hall
February, 2013
Installation of
heavy-ion injector
Installation of
light-ion injector
M. Lewitowicz
CNRS/IN2P3
NuPECC Meeting, 15-16/03/2013, Jülich
Phase 1
HI injector
Cold Box
d & p injector
Cryomodule A
Cryomodule B
RFQ
M. Lewitowicz
laboratoire commun CEA/DSM
NuPECC Meeting, 15-16/03/2013, Jülich
CNRS/IN2P3
Phase 1
HI injector
on
i
t
a
l
al
t
s
n
I
te
r
a
t
s
d
s
a
Inst
ns
o
i
t
lla
End
ed
tart
Cold Box
d & p injector
ng
i
n
n
gi
e
b
n
o
i
t
a
ll
14
a
0
t
2
s
In
of
of
d
n
e
n
o
i
lat
l
RFQ
a
t
Ins
NuPECC Meeting, 15-16/03/2013, Jülich
t
s
e
t
of
01
2
n
i
3
Cryomodule A
Cryomodule B
s
End
3
201
M. Lewitowicz
CNRS/IN2P3
laboratoire commun CEA/DSM
est
t
f
o
01
2
n
i
3
GANIL/SPIRAL 2 facility: Exp. halls
NFS
Funded
MoU
laboratoire commun CEA/DSM
CNRS/IN2P3
DESIR Coll. Agreement – DECA
Funds granted
S3
Funds granted
ACTAR-TPC
Coll. Agreement
Demonstrator
funded
PARIS
MoU
Demonstrator
funded
SPIRAL2 Phase 1
Commissioning/
experiments
in 2014/2015
GASPARD
SPIRAL2 Phase 2
(ISOL RIB)
Civil construction
from 2015
M. Lewitowicz
NEDA
MoU
EXOGAM 2
Funded
MoU
NuPECC Meeting, 15-16/03/2013, Jülich
FAZIA
MoU
Demonstrator
funded
Dispersive zone
3 × dipoles
Low
Energy
Branch
laboratoire commun CEA/DSM
CNRS/IN2P3
ANR Grant request 2013
Fingers : tested for
Open triplet :
CfT 31st of January
5kW/cm2
Delivery: March 2013
Detection system
Target system
7 × SC multipoles
ANR Grant request 2013
E dipole
CFT March
2013
FISIC
International ANR Grant
request 2013
Design: Feb 2012
Prototype: Jan 2014
Last Delivery:
Oct 2015
è Critical Path
CFT Cryo sytem
June 2013
CFT
June 2013
Dispersive zone
3 × dipoles
Low
Energy
Branch
laboratoire commun CEA/DSM
CNRS/IN2P3
ANR Grant request 2013
Fingers : tested for
Open triplet :
CfT 31st of January
5kW/cm2
Delivery: March 2013
wer
o
p
ts,
e
l
p
i
Target system
013 open tr …)
2
n
16
rs i enics,
em
0
t
e
s
2
d
y
ten Cryog
t in
ms
r
n
u
e
o
c
f
c
rim
le, cs, va
all
e
o
C
 
p
p
i
x
i
d
è
st e
tric
han
r
c
c
i
e
e
l
F
(E
,m
s
e
i
l
supp
7 × SC multipoles
Detection system
ANR Grant request 2013
E dipole
CFT March
2013
FISIC
International ANR Grant
request 2013
Design: Feb 2012
Prototype: Jan 2014
Last Delivery:
Oct 2015
è Critical Path
CFT Cryo sytem
June 2013
CFT
June 2013
Status of Neutrons for Science facility
laboratoire commun CEA/DSM
CNRS/IN2P3
● Beam at 0°
● Collimator ↔ beam quality
● Size (Lⅹl) ≃ (28m ⅹ 6m)
- TOF measurements
- free flight path
Use of radioactive samples
A< 1 GBq for thin layers
A< 10 GBq for thick samples
I < 50 µA
P < 2 kW
● Beam line extension
● Converter
● Magnet and beam dump
● Irradiation station (n, p, d)
Status of Neutrons for Science facility
laboratoire commun CEA/DSM
To be ready for experiments by end of 2014
Use of radioactive samples
A< 1 GBq for thin layers
A< 10 GBq for thick samples
TOF area
Converter room
CNRS/IN2P3
The DESIR facility at SPIRAL2
h"p://www.cenbg.in2p3.fr/desir 120 physicists, 35 ins0tu0ons, 15 countries Bertram Blank – CENBG France (Project leader) Jean Charles Thomas – GANIL France (EQUIPEX) High quality 1+ RIB of 10 to 60 kV from: •  SPIRAL1 (light n-­‐deficient nuclei from beam/target fragmentaGon) •  SPIRAL2 (n-­‐rich fission fragments, transfer and fusion-­‐evaporaGon products) •  S3 (fusion-­‐evaporaGon products, refractory elements) DESIR experimental hall & associated detectors
laboratoire commun CEA/DSM
DECA Agreement
MLLTrap
N -TOF
detector
PIPERADE+TAGS
ed
n
g
i
s
R
I
ES
D
X
LPCTrap
E
P
QUI
E
n
o
i
h
nt
c
r
e
a
v
TETRA M
BEDO Con
g
n
l
i
t
a
i
e
c
e
n
s
m
a
e
i
t
n
t
i BELEN
c
r
a
a
Silicon
r
p
t
è F a
l
n
l
Cube
co
X
by
E
IP
ay
U
s
r
Q
O
E
LUMIERE
f
N
f
P
o
I
TONNERRE
ick- 013 at
K
 
è
2
,
h
t
29
Identification
station
Parties: 14 owners of DESIR experimental equipment
Commitment: ~5 M€ & 520
men.months
NuPECC
Meeting, 15-16/03/2013, Jülich
M. Lewitowicz
CNRS/IN2P3
Timeline GANIL & SPIRAL2
4,5
m.
5 m.
3
m.?
3
m.?
2
m.?
3
m.?
SPIRL2 Phase 2
5 m.?
AGATA @ GANIL
Construction
Phase 1
LINAC, NFS, S3
47 LoIs LINAC Beams
Co
m.
NFS experiments
Com.
M. Lewitowicz
Upgrade
SPIRAL1
France Hadron
Commissioning
Phase 1
SPIRL2 Phase 1
GANIL
2012 I 2013 I 2014 I 2015 I 2016 S3 experiments
Financial Decision
SPIRAL2 Phase 2
Design, R&D,
prototypes
Phase 2
RIB, DESIR
Design, Safety File
Phase 2
RIB, DESIR
NuPECC Meeting, 15-16/03/2013, Jülich
Civil Construction
Phase 2
RIB, DESIR
16
laboratoire commun CEA/DSM
CNRS/IN2P3
GANIL/SPIRAL2 2013-2014 Challenges
•  Installation and timely commissioning of SPIRAL2
LINAC & NFS with a 4-5 months/year of operation of the
current GANIL facility (mainly for AGATA campaigns)
•  Additional budget and manpower requested by GANIL
•  Ensure the most favourable funding profile for the
construction of SPIRAL2 Phase 2
•  Signature of an International MoU on construction of
SPIRAL2 (based on 20 already signed bilateral
agreements)
M. Lewitowicz
NuPECC Meeting, 15-16/03/2013, Jülich
laboratoire commun CEA/DSM
Thank your for your attention
M. Lewitowicz
NuPECC Meeting, 15-16/03/2013, Jülich
CNRS/IN2P3