Short Profile
Transcription
Short Profile
Group Presentation UNIT May 2016 UNIT GROUP UNIT AT A GLANCE Table of Content Page 1 UNIT 0 Company Overview 2 1.1 CHAIRMAN’S FOREWORD 1.2 HISTORY 1.3 BUSINESS DIVISIONS 1.3.1 Electricity Generation Portfolio 1.3.2 Electricity Trading 1.3.3 Power Plant Construction – EPC Works 1.3.4 Property Investments 1.3.5 Gas and Commodity Trade 1.3.6 Biotechnology 1.3.7 Tourism 2 Pipeline Projects Page 1 2 3 4 4 9 10 11 12 12 13 14 UNIT GROUP 1 1.1 UNIT AT A GLANCE Company Overview Chairman’s Foreword Starting from first steps of Unit, our goal was always to make business deals based on strong confidence relationships that will endure even through difficult times of any economic or political turbulence. When we started our initial transactions in early 80’s with Iran, we felt that the country was offering very strong opportunities for companies who are willing to be patient and persistent while offering a good value for the business. In this respect, we cooperated with our Iranian counterparts in order to respond to the needs of the country during the Iran-Iraq war time. We worked together and designed structured transactions of oil trade by way of bilateral agreements to supply the steel that Iran needed to reconstruct its cities. Three successful transactions were realized with 175 million, 250 million and 200 million USD tranches, which would be equal to several billion dollars today. Following the end of the war, our company gratefully started to look for other area of cooperation with Iran. As a growing economy, Iran was in need for new power plants to supply the amount of energy its strong industry needed. Unit in collaboration with world multinational companies succeeded to construct and finance four gas fired power plants namely Shariati 250 MW, Fars 740 MW, Shaid Rajaee 740 MW, Montazer Ghaem 700 MW in early 90’s for Iranian Government. Our knowledge and expertise would later be used for the services of the Iranian private sector for investing in the first privately owned BOO model gas fired power plant Rudeshur 750 MW CCGT which is operational since 2007 with very high reliability and performance standards. Today, we are proud to mention that even during the sanction period we never gave up our old friendship and ties in Iran. Me and my Iranian colleagues went through a difficult period during sanctions but we have always believed that Iran would find its well-deserved place in international business arena. We are confident that Iran will show a great growth story and recuperate the difficult time left behind. We are a company who has taken a pioneer role in Turkey in early 90’s to structure the first BOT type of power investment of the country. We established partnerships with world’s energy giants to guide them in Turkey for co-investing with us in a state of the art CCGT which is still in operation under a win-win base power purchase agreement with Turkish Government. The new scheme has paved the way for more than 25,000 MW of international energy investment in Turkey. All our knowledge and financing capabilities we accumulated till today are at Iranian Government’s disposal. We started development of CCGT projects amounting in total 5,200 MW in various strategical locations in Iran as well as 800 MW renewable projects requiring more than 6 billion USD of direct foreign investment in Iran. We are confident that, with the support of Iranian authorities the realization of our new projects through structuring international financing, will take place ahead of all the schedules and forecasts. As stated above, our philosophy of making business is to create strong relationships that will be supported by hard work, risk taking and long-term confidence. Ünal Aysal Chairman Page 2 UNIT GROUP 1.2 UNIT AT A GLANCE History Established in 1974, today UNIT is a reputable experienced group the power sector. The group is one of the most active players in the Turkish energy market with in-house expertise in EPC contracting, project development, financing, power plant operation, investment and electricity trading. This allows UNIT to develop projects with high efficiency and in a tight time frame and execute projects of quality, on time and within budget. Main activities of UNIT can be summarized as follows: Project development including land selection, authorizations/licensing, complex contract negotiation and financing Turnkey EPC power plant construction Electricity trading and; Investment in energy, real estate and tourism Below is a chart illustrating the division of different business lines of UNIT. Unit Investment NV is the investment vehicle of UNIT, whereas Unit International SA is the tool to realize trading and EPC transactions. UNIT’s generation assets turnover in 2015 was 400 million USD (as per the shareholding percentages) and trading arm’s turnover was be in the range of 250 million USD. Unit Investment NV minority share sale process to International Finance Cooperation (“IFC”) has been successfully completed on October 2015. With its 23.04% stake in Unit, IFC is targeting to enlarge their presence in the developing Turkish energy market. Company Chart Unit Investments SA SPF (LUXEMBOURG) 100% EUROPEAN POWER SYSTEMS SA 100% EUROPEAN ENERGY SYSTEMS SA 100% (LUXEMBOURG) (LUXEMBOURG) UNIT INTERNATIONAL SA (BELGIUM) 100% UNIT INVESTMENT NV (NETHERLANDS) 33% GüneyTurizm A.Ş. Unit HELLAS - Electricity Trade Company (Greece) 51% Duru Gayrimenkul Yeni Elektrik Üretim A.Ş. 865 MW CCGT Unit Energy Trade SRL (Romania) 80% ASL Havacılık A.Ş. 99,6% Unimar Enerji Yatırımları Aura Demir Çelik Ticaret A.Ş. 99,6% Unit Gayrimenkul Yatırımları 100% Unit Elektrik- Electricity 99,6% Akdenizli Elektrik Üretim A.Ş 49 MW Hydro PP . 59,7% 32% A.Ş 480 MW CCGT. 100% 70% Trade Company (Turkey) (Turkey) VGE - 1 OOD (BULGARIA) 9 MW Wind PP UNES İşletme ve Bakım A.Ş . O&M (Turkey) 50% Univiridas D.O.O. Boğaz Elektrik A.Ş. (Turkey) 94,7% (CROATIA 10 MW Biomass PP) Page 3 96% 99,6% Boyabat Elektrik Üretim A.Ş 513 MW Hydro PP. A.Ş. 100% A.Ş. Unit Biyoteknoloji Tarım ve 96% Hayvancılık A.Ş. Unit Turistlik Tesisler A.Ş. 97% UNIT GROUP 1.3 UNIT AT A GLANCE Business Divisions 1.3.1 Electricity Generation Portfolio 1.3.1.1 UNIMAR CCGT The 480 MW Uni-Mar Combined Cycle Gas Turbine (“Uni-Mar”) is known as the first B.O.T. scheme power plant project authorized by the Government of Turkey. Located in Marmara Ereğlisi (Tekirdağ), th the power plant completed its 15 operational year. The underlying authorization of Uni-Mar has been granted by the Ministry of Energy and Natural Resources pursuant to an Implementation Contract executed on June,18 1993. The authorization period is 50 years and the initial term of the energy sales agreement expires in 2019, being extendable subject to mutual agreement. UNI-MAR Location : Marmara Ereglisi, Turkey Contractor: ABB Project Type: CCGT Capacity: 480 MW Shareholder Structure: 33% UNIT, 33% Marubeni, 33% International Power Electricity Generation: 3.800.000 MWh/year Commercial Operation Date: June, 1999 Total Investment Cost: 620 million USD Financing: Citibank, BNP Paribas (Arrangers) 495 mln USD (fully repaid) 1.3.1.2 Boyabat HEPP The construction of 513 MW hydroelectric power plant (located in Sinop Province in the Black Sea region of Turkey) was completed on scheduled target in 2012 and became fully operational in December 2012. Boayabt is the largest hydroelectric power plant owned by private sector. The plant has an annual power generation capacity of around 1,350 GWh. With its massive dam storage and high installed capacity, the plant is recognized as one of the few real peak hour power plants in the Turkish electricity system with no royalty payable to General Directorate of State Hydraulic Works for water usage rights. UNIT is partner with equal shares with Doğuş and Doğan Groups in the special purpose company Boyabat Elektrik Üretim ve Ticaret A.Ş. The total project costs are about 1.2 billion USD. The 750 million USD of total project finance was awarded the European Hydro Power Deal of the Year 2010 award by Euromoney/Project Finance Magazine (later refinanced with 540 mln USD and 360 mln USD equivalent EUR loan tranches) with better terms and conditions). BOYABAT Location : Sinop Boyabat, Turkey Contractor: Dogus Insaat ve Tic A.S. Project Type: Dam Type HPP Capacity: 513 MW Shareholder Structure: 33% UNIT, 33% Dogan, 34% Dogus Electricity Generation: 1.350.000 MWh/year Commercial Operation Date: December, 2012 Total Invesment Cost: 1.2 Billion USD Financing: Garanti - Is Bankasi - Yapi Kredi – TSKB - Akbank 900 mln USD equivalent project finance loan Page 4 UNIT GROUP Night view from Boyabat HEPP Boyabat has a dam length of 60 km Page 5 UNIT AT A GLANCE UNIT GROUP UNIT AT A GLANCE 1.3.1.3 Yeni Elektrik CCGT Yeni Elektrik CCGT, situated at the core of the Turkey’s industrial hub and equipped with state of the art technology, is a competitive player in the Turkish Electricity Market which is operational since December 2013. Following a meticulous project financing process, in June 2010 four Turkish Banks (Garanti Bank, Yapı Kredi Bank, VakıfBank, İş Bank) committed 700 million USD term loan financing on a limited recourse basis. Being the first limited recourse merchant power project financed in Turkey, Yeni Elektrik Üretim received the following awards from leading industry trade journals: Turkish Deal of the Year 2011 by PFI, European Power Deal of the Year 2011 award by Euromoney / Project Finance, 2011 Deal of the Year - Power by Infrastructure Journal. The project benefits from strong partnership credentials, composed primarily of UNIT with a 60% stake and Ansaldo Energia 40%, Italy’s leading provider of thermoelectric power plants possessing a proven track record in the construction of CCGT’s. In addition, Ansaldo Energia acted as EPC contractor through a lump-sum, fixed price, date certain turnkey contract. The Project with its, strategical location at the heart of Turkey’s most intense industrial zone, plays a strategical balancing role for transmission grid stability. Yeni Elektrik Combined Cycle Power Plant Location: Kocaeli Dilovasi, Turkey Contractor: Ansaldo energia S.P.A. Project Type: CCGT Capacity: 865 MW Shareholder Structure: 60% UNIT, 40% Ansaldo Energia S.p.A. Electricity Generation: 5.000.000 MWh/year Commercial Operation Date: December, 2013 Total Invesment Cost: 1 Billion USD Financing: Garanti - Is Bankasi - Yapi Kredi - Vakif, 700 mln USD Night view from Yeni Elektrik Page 6 UNIT GROUP UNIT AT A GLANCE The cycling capabilities of Yeni Elektrik makes it one of the most competitive market players 1.3.1.4 Bağıştaş HEPP Bağıştaş II has achieved full capacity in April 2013 with the provisional acceptance of the third turbine. With a reservoir capacity of 250 hm³, it provides controlled water inflow to the project, which is essentially allocated to peak hours. Contrary to its peer projects (less than 50 MW) Bağıştaş II has additional regulatory rights to participate to balancing market. Following the completion of Bağıştaş I project located on the upper stream of the river, the project has gained more water management capacity. Bağıştaş II with its run of the river type design and installed capacity less than 50 MW is granted the right to receive its generation payments from the renewable tariff mechanism denominated in USD currency. The subscription to renewable tariff is a yearly option for the company. BAGISTAS II Location: Erzincan, Turkey Contractor: Taseli Sal – Dong Fang Siemens Project Type: Run of River Type HPP Capacity: 49.8 MW Shareholder Structure: %100 UNIT Electricity Generation: 177.930 MWh/year Commercial Operation Date: December, 2012 Total Investment Cost: 106 Million USD Financing: TSKB, 47 mln USD Page 7 UNIT GROUP UNIT AT A GLANCE Bağıştaş is located on of the main branches of Euphrates 1.3.1.5 Prolez WEPP Prolez Wind Energy Power Plant, with an installed capacity of 9 MW which was constructed and commissioned on turn-key basis by Vestas, is a renewable energy power plant that has been in operation since December 2010. It is located in Shabla, Bulgaria which is known for its wind potential being one of the most favourable around the Black Sea. BULGARIA WIND Location: Shabla, Bulgaria Contractor: Vestas Project Type: Wind Park Capacity: 9 MW Shareholder Structure: 100% UNIT Electricity Generation: 22.000 MWh/year Commercial Operation Date: December, 2010 Total Investment Cost: 11 million EUR Financing: Demir Halk Bank, 10 million EUR 1.3.1.6 Babina Greda Biomass Power Plant Having been started to be developed in early 2011, 9.7 MW Babina Greda Biomass Power Plant is the largest biomass project in Croatia. MW Power OY, of Finland, has been selected as the turnkey EPC Contractor for the project. The project has secured the wood chip fuel supply and will be operated by Valmet the O&M contractor. Page 8 UNIT GROUP UNIT AT A GLANCE 30 million EUR of project financing with 16 years of door-to-door maturity, which was backed by the ECA insurance of Finnish Export Agency, Finnvera, has been closed in September 2013 and the construction of the project has been initiated in late 2013. The project will become operational in August 2015. CROATIA Biomass Location: Babina Greda, Croatia Contractor: MV Power OY Project Type: Renewable / Biomass Capacity: 9,7 MW Shareholder Structure: 70% UNIT, 30%Others Electricity Generation: 77.660 MWh/year Commercial Operation Date: April, 2015 Total Investment Cost: 38 million EUR Financing: Finnvera, Credit Europe, Bank Pozitif, 30 mln EUR 1.3.1.1 Zakho SCGT Zakho project is designed as a natural gas simple cycle gas turbine power plant (SCGT) with a net capacity of 840 MW (Phase I) for the initial phase in Northern Iraq under a Build-Operate (BO) model backed by the Ministry of Electricity (“MoE”) through a 15 years take or pay off-take agreement for upto 80% of electricity capacity. The remainder capacity can be sold to export markets. The project company will source fuel from Ministry of Energy and Natural Resources (“MoNR”) for free of charge for the electricity sale to domestic market (KRG) and will have rights over the cash flows generated by the project during the term of the PPA (signed and secured by Kurdish Regional Government). IFC will likely become a shareholder both at the level of the SPC and holding company, in both cases as a minority shareholder, as well as being mandated lead arranger and debt provider. Under a fixed price turn-key EPC Contract, the EPC Contractor consortium Ansaldo/Gama will be responsible for the design, manufacturing, transportation, construction, installation and commissioning of the Zakho power plant, allowing the delivery of generated electricity to the MoE transmission grid. As part of the extension plan (Phase II), the project company has also secured the rights of combined cycle conversion of the Plant up to 1,260 MW capacity through the executed PPA, for a period of 15 years from entry into operation. Subsequent to the completion of phase I, the project company will procure financing for phase II on the basis of the current project contracts within a similar security structure. 1.3.2 Electricity Trading UNIT Group’s first electricity trading company, UNIT Elektrik, has been established and licensed by the Energy Market Regulatory Authority (EMRA) of Turkey in 2005 and is one of the oldest electricity trading companies in the country. Unit elektrik actively began participating in the wholesale market since 2009. In 2015 UNIT Elektrik reached a total contracted annual sales volume exceeding 5,500 GWh and 635 MW in peak hours making Unit Elektrik one of the market leaders. UNIT’s trade house consists of its licensed trading companies in Turkey, Bulgaria, Greece and Romania, which are all eligible to trade within its country of origin as well as across borders. With its solid infrastructure and professional approach, UNIT Elektrik and UNIT’s other trading companies in Page 9 UNIT GROUP UNIT AT A GLANCE Europe are important counterparties to Europe’s largest trading companies such as Statkraft Markets, Gen-i, Repower, Vitol and Public Power Corporation. 1.3.3 Power Plant Construction – EPC Works The Group’s involvement in the energy sector started in 1989 in Iran when it was awarded contracts for equipment supply and construction for power plants to be developed in Montazer Ghaem, Shaid, Fars and Shariati. The Group has completed the turnkey EPC works of 750 MW of Rudeshur Natural Gas Power Plant in Iran in 2008 bringing the overall successfully completed plants’ installed power generation capacity total to over 3,200 MW. RUDESHUR Tehran, Iran Location: Build Own-Operate scheme Power Plant, Tehran Iran Total capacity: Phase I : 800 MW / Phase II : 550 MW / Phase III : 800 MW Principal manufacturers of major equipment: Gas Turbine Siemens – V94.3A MONTAZER GHAEM Karadj, Iran Location: Build Own-Operate scheme Power Plant, Karadj Iran Total capacity: 700 MW Principal manufacturers of major equipment: Gas Turbine - General Electric Licensed - Frame 9E SHADID RAJAEE Qazuin, Iran Location: Build Own-Operate scheme Power Plant, Qazuin Iran Total capacity: 740 MW Principal manufacturers of major equipment: Gas Turbine - General Electric Licensed - Frame 9E FARS Shiraz, Iran Location: Build Own-Operate scheme Power Plant, Shiraz Iran Total capacity: 740 MW Principal manufacturers of major equipment: Gas Turbine - General Electric Licensed - Frame 9E SHARIATI Mashad, Iran Location: Build Own-Operate scheme Power Plant, Mashad Iran Total capacity: 250 MW Principal manufacturers of major equipment: Gas Turbine - General Electric Licensed - Frame 9E Page 10 UNIT GROUP 1.3.4 UNIT AT A GLANCE Property Investments Unit Properties is targeting to become one of the leading owner and developer of first-class real estate segment in Turkey. Located within the International Financial Center Istanbul, a GLA building with a land area of 6.741 m² and 50.000 m² will be the first office building investment of Unit’s real-estate arm. It is located in the newly developing finance center of Turkey in Atasehir district of Istanbul City - Istanbul International Finance Center (IFC). The 6.5 billion TL project, which will be completed by the end of 2018, will be built on a 300,000 m² area and is anticipated to employ approximately 50,000 people. The center will also include a 3,000 capacity congress and exhibition center, a library, hotel, school, mosque, nursery, medical center, fire station and police headquarters. A special incentive package is expected to be introduced by Ministery of Finance of Turkey for transforming Atasehir district to a unique and prestigious finance center in Middle East. UNIT Group’s main strategy is to allocate all real estate investments under an umbrella company and to pursue further growth in other strategical locations . Istanbul Finance Center is a candidate to be one of the world’s financial hubs Page 11 UNIT GROUP UNIT AT A GLANCE Unit is cooperating with best architectural designers for the project 1.3.5 Gas and Commodity Trade UNIT Group is a sizeable client in the Turkish gas sector, with approximately 2 bn cbm/year. The Group targets to build up its own client portfolio by combining UNIT’s internal consumption and demand from end users. Considering the end user portfolio of UNIT through UNIT Elektrik, the retail electricity sales company, UNIT expects to create a synergy for gas whole sale and retail business. In addition, the current investment and presence in north of Iraq is expected to facilitate the future gas exports from this region. 1.3.6 Biotechnology Unit Biotechnology Agriculture Stock Farming and Industry inc. was established in Igdır in 2007 as an agricultural production facility. The company is engaged in the production of fruit puree concentrate and tomato paste from produce grown on the microclimate region soils. Today Unit Biotechnology produces apricot-apple-peach puree concentrate and tomato paste. The company has strived to increase productivity through augmented technology usage and to support organic agriculture. High quality standards are maintained in the processes of cultivating, storage, processing and packaging. Page 12 UNIT GROUP 1.3.7 UNIT AT A GLANCE Tourism In addition to its activities in the energy sector UNIT Group is operating in the tourism sector with the following hotels: Hotel Les Ottomans is the refurbishment of an antique Sultan house which is transformed to one of the world’s most luxurious boutique hotels. Les Ottomans, with its unique location on the European side of the Bosphorus has become one of the symbols of Istanbul. Hotel Ma Biche is located in Antalya, Kemer a hot spot for Turkish international tourism. Hotel has a bed capacity of 710 and is welcoming his guests in 348 rooms. Ma Biche is also known for the thalassotherapy services which differentiates it from its peers. Hotel Les Ottomans together with Bosphorus Bridge Hotel Ma Biche with its private beach in Kemer Antalya Page 13 UNIT GROUP 2 UNIT AT A GLANCE Pipeline Projects Unit is currently developing CCGT and renewable project in various locations in Iran. Some of the under development projects are as follow: Sufian CCGT 1200 MW Zahedan CCGT 600 MW Save CCGT 1200 MW Ahvaz CCGT 1200 MW Mehran CCGT 450MW Quasr-ı Shirin CCGT 600 MW KHAF Wind Farm 150 MW HAMOON Wind Farm 50 MW QAEN Wind Farm 50 MW SHAHROUD Wind Farm 50 MW MIL NADER Wind Farm 50 MW ZABOL Wind Farm 50 MW SARAB Wind Farm 50 MW SOLTAN ABAD Wind Farm 50 MW Page 14