Capital Improvement Plan 2016-17
Transcription
Capital Improvement Plan 2016-17
FINAL NorthbrookParkDistrict CapitalImprovementPlan 2016‐2017 1 Table of Contents Topic Page Introduction .......................................................................................................................................2‐3 Property and Facilities........................................................................................................................4‐7 Boundaries, Parks and Facilities Map.................................................................................................8‐9 Capital Improvement Plan Listing by Location ..............................................................................10‐14 Project Descriptions .......................................................................................................................15‐32 Projects under $10,000 (Manager’s Account) ...............................................................................33‐35 Appendix .............................................................................................................................................36 Appendix A—Park Fleet Replacement Schedule .......................................................................37‐40 Appendix B—Playground Replacement Schedule ..........................................................................41 Appendix C—Golf Fleet Replacement Schedule .......................................................................42‐45 Appendix D—Carryover Projects ....................................................................................................46 Introduction The Capital Improvement Plan (CIP) is the Northbrook Park District's forecast of park and facility improvements, along with repair and replacement of existing equipment and vehicles. The District is in the process of updating our Comprehensive Master Plan (CMP), a 10‐year road map defining priorities and projects that are developed with community involvement. The District believes it is wise to develop a five‐year CIP after the completion and adoption of the CMP, so that the two documents’ priorities align. Our CIP normally encompasses five years; however, the 2016‐17 plan will be for one year only. Several objectives drive the proposed 2016‐17 plan: After extensive planning and development of construction drawings for the Northbrook Sports Center Pool, the renovation of the pool shell and mechanical system and upgrading the changing areas and support amenities will begin in late summer of 2016, with the reopening scheduled for June 2017. Other Northbrook Sports Center upgrades include the final phase of the floor covering replacement project, scheduled replacement of various rooftop units (RTU), and improvements to restrooms throughout the facility. Parks and Properties will continue to focus on repair and replacement of aging infrastructure, such as lighting upgrades at Wood Oaks Green Park and ball field netting at Meadowhill Park. Additional projects consist of asphalt repair and seal coating of the parking lot and pathway at Stonegate Park. Crack repairs will take place, along with color coating, at Cedar Lane Tot Lot basketball court and Wood Oaks Green tennis courts. Golf Operations will invest in environmental stewardship projects for the natural areas, such as additional shoreline stabilization. Leisure Services will continue to focus on enhanced programming opportunities for customers, as well as facility aesthetics with the repair and improvement funds. These will include theatre lighting and lobby improvements and the renovation of the Oaklane Room for improved functionality. Other District‐wide projects include: Continuation of the technology plan, security efforts, and painting of structures and amenities at the Leisure Center, Meadowhill Aquatic Center, Village Green Park and Techny Prairie Park and Fields. Projects tentatively planned for 2016‐17 that were not deemed as inevitable or needed immediately were removed until the Comprehensive Master Plan is complete. 2 Funding for projects will come from general tax revenues, surplus from fee‐for‐service revenues, bond proceeds, development impact fees, state grants and donations. Worksheets contained in this Plan describe the projects and operational impacts, if any. The tentative schedules allow the District to make capital expenditures over time with appropriate coordination among the Divisions. The CIP also includes funding for improvements recommended by the Americans with Disabilities Act Transition Plan. The proposed CIP for 2016‐17 totals $7.1 million. The 2016‐17 CIP reflects an increase in spending from the 2015‐16 Plan, as the District has elected to draw down balances to address the Northbrook Sports Center pool renovation project and other deferred maintenance projects in order to maintain current amenities and facilities. All project costs are estimates that are based upon quotes provided by contractors and consultants for specific equipment or the scope of the project as defined at the time of this publication. The proposed CIP will be available at the Northbrook Public Library and the Joe Doud Administration Building. A summary of the FY 2016‐17 CIP will be in the Annual Budget, which will be on the District’s website after approval. 3 Property and Facilities Property and Facilities Owned by the District The Northbrook Park District serves a population of approximately 33,600 residents. The District operates and maintains 511 acres of property plus an additional 32 acres, due to intergovernmental agreements, for a total of 543 acres. Including the total acres owned or leased (511), the ratio of acres to residents is 15.21 per 1,000. Within this area of approximately 13 square miles, the District holds title to 28 parcels, representing more than 500 acres. LOCATION ACQUIRED ACREAGE BUILDING SIZE (SF) 545 Academy Drive Administration and Maintenance Facility 1/21/1993 2.75 52,486 Brees Park 1265 Countryside Lane 2.45 ACRES 10/17/1956 .72 0 Cedar Lane Lot A 1000 Block of Cedar Lane Donated 2/24/1955 .23 0 Coast Guard Park 2490 Dundee Road Granted 7/24/1978 4.39 0 Countryside Park Walnut and Oakwood Circle Donated 3/28/1955 1.73 0 7/10/1930 2.41 0 .35 0 11/24/2009 .77 0 Donated 4/9/1965 4.9 0 Crestwood Park 1824 Milton Avenue Englehardt Park Midway Road Floral Park 3105 Floral Drive Greenfield Park/Sky Harbor 2950 Harbor Lane 4 LOCATION ACQUIRED ACREAGE BUILDING SIZE (SF) Greenview Park 2407 Greenview Road 9/12/2005 1.88 0 Donated 11/28/1978 .72 0 6/1/1984 7.5 44,735 12/10/1958 32.81 19,265 Donated 1/30/1956 .62 0 Oaklane Park 636 Berglund Place 11/15/1984 2.46 0 Salceda North Park 1010 Fairview Lane Donated 6/1/1976 1.73 0 Salceda Park‐Four Winds 1010 Fairview Lane 8/5/1990 1.05 0 Sportsman’s Country Club, Clubhouse, Practice Range, Halfway House and Cart Storage 3535 Dundee Road 8/11/1978 151.82 21,585 Sportsman’s East Nine and Maintenance Facility 3401 Dundee Road 1/13/1988 63.04 14,780 Hampton Lane Basin Highland Road and Vicki Lane Indian Ridge Park, Leisure Center, Senior Center and Northbrook Theatre 3323 Walters Avenue Meadowhill Park, Meadowhill Aquatic Center, Chalet and Outdoor Education Center 1479 Maple Avenue Meadow Road Tot Lot 1100 Block of Meadow Road 5 LOCATION ACQUIRED ACREAGE BUILDING SIZE (SF) Stonegate Park 3425 Whirlaway Drive Donated 3/12/1997 6.15 0 Stonegate Park Lot 133 3425 Whirlaway Drive 12/12/2001 4.46 0 6/1/2000 60 2,240 Donated 1993‐1995 47.82 1,400 12/16/2011 6.0 0 Donated 8/3/1944 10 5,923 Wescott Park 1820 Western Avenue 5/6/1965 4.1 0 West Park and Northbrook Sports Center 1730 Pfingsten Road & 1710 Pfingsten Road 5/6/1965 24.05 89,096 Williamsburg Square Park 200 Lee Road 9/6/1974 8.56 0 Wood Oaks Green Park and Tennis Building 1160 Sanders Road 4/11/1975 55.9 1,750 508.92 ACRES 256,860 SQ. FT. Techny Prairie Park and Fields , Techny Prairie Center and Picnic Pavilions 1750 Techny Road Techny Prairie Park and Fields, Formerly Meadowhill South, Picnic/Warming Shelter and Restrooms 1750 Techny Road Techny Prairie Park and Fields 180 Anets Drive Village Green Park , Village Green Center and Pavilion 1810 Walters Avenue TOTAL 6 Property Leased by the District In addition to the property and facilities listed on the previous pages, the District leases two parcels: LOCATION ACQUIRED Cedar Lane Tot Lot 965 Cedar Lane Tower Rink 1225 Cedar Lane TOTAL Lease 8/1954 ACREAGE BUILDING SIZE (SF) .95 0 1.5 0 2.45 ACRES 7 Northbrook Park District Boundaries, Parks and Facilities h 2! r 2^ t No rt d roo w 3$ kA ve. e 2( hb i 2@ 2% 3^ 3* l 2& 3! s 2) 3) 1( g q f 3& 2$2*3@ 3% 2# 3# k N Vicki Ln. u j a y o 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Brees Park 1265 Country Lane Cedar Lane Tot Lot Between 933–1001 Cedar Lane Coast Guard Park 2490 Dundee Road Countryside Park Walnut Circle & Oakwood Road Crestwood Park 1824 Milton Avenue Engelhardt Park Northbrook Avenue & Midway Road Floral Park 3105 Floral Drive Greenfield Park 2950 Harbor Lane Greenview Park 2407 Greenview Road Hampton Lane Highland Drive and Vicki Lane Indian Ridge Park 3323 Walters Avenue Meadow Road Tot Lot 1100 Block of Meadow Road Meadowhill Park 1479 Maple Avenue Oaklane Park 636 Berglund Place Salceda Park Fairview Lane & Phyllis Road Stonegate Park 3425 Whirlaway Drive Techny Prairie Park and Fields 1750 Techny Road Village Green Park Shermer Road & Meadow Road Wescott Park 1820 Western Avenue West Park 1730 Pfingsten Road Williamsburg Square Park 200 Lee Road Wood Oaks Green Park 1150 Sanders Road Acres Out doo r Bas AEDs eba ll Bas /Softb all ket Dia bal mon lC Bat ds ting ourts Cag Cyc ling es T Dog rack/V elo Par dro k me Fiel ds ( Mu lti-p Fish urp ing ose ) Ice Ska ting Picn R ic A ink (O utd rea oor Pla s ) ygr oun d Poo ls (O Ska utdoor ) te P ark Sle dH ill Ten nis Cou Ten rts nis Pra ctic Trai eW ls & al Turf Pathw l ays Fiel ds Vol leyb all Cou rt (S and ) Key Park 0.72 0.92 • • 4.39 • 1.73 • • • 2.41 • • 4 • • .196 .75 4.90 2 1.88 • • • • • • • • • • .72 7.50 • 0.62 32.81 • • • 2 2.46 5 • • • • • • • • • 2.78 2 • 10.61 2 • 107.82 2 4 10.00 • • • 6.50 2 23.50 3 8.56 • 55.90 • • 6 • 2 Key Park District Facility • • • • • • • • • • • • • • 2 • • 3 • • 2 • • • • • 3 • 3 • 8 • 2 2 • Amenities 23 Anetsberger Golf Course, 1750 Techny Road 24 Ed Rudolph Velodrome, Meadowhill Park, 1479 Maple Avenue Official quarter-mile banked cycling track offering weekly races and training sessions 25 Greenbriar Gym, 1225 Greenbriar Lane Indoor gymnasium space available only during scheduled Park District hours 26 Joe Doud Administration Building, 545 Academy Drive Administrative and maintenance offices. 27 Leisure Center & Senior Center, 3323 Walters Avenue Classrooms for children and adults, Sunshine Preschool, special events, parties and rentals, gym, kitchen and art studio 28 Meadowhill Aquatic Center, Meadowhill Park, 1501 Maple Avenue Lap pool, zero-depth children’s pool, tube and body slides, diving boards and large sun deck 29 Northbrook Dog Park, Coast Guard Park, 2490 Dundee Road Enclosed 2-acre area for all dogs, enclosed .5-acre area for small dogs (under 26 pounds), shelter, dog wash, tables and benches, drinking fountain 30 Northbrook Sports Center and Northbrook Sports Center Pool, Two indoor NHL-sized ice rinks, community rooms and skate shop. Outdoor pool with lap lanes, zero-depth area, water slides and sun deck areas West Park, 1730 Pfingsten Road 31 Northbrook Theatre, 3323 Walters Avenue 32 Classroom space used for challenge programs and environmental activities 30-foot Outdoor Education Center and Northbrook Climbing Tower, high tower with four climbing routes, available for rental or for use with Teams Meadowhill Park, 1471 Maple Avenue Challenge Course 33 Skate Park, Techny Prairie Park and Fields 22,000-square-foot concrete bowl skateboard and in-line skate park 34 Sportsman’s Country Club, 3535 Dundee Road Championship 18-hole course, East Nine Course, pro shop, practice range, Mini-Golf, teaching academy, cross-country skiing 35 Teams Challenge Course, Meadowhill Park Series of outdoor activities and team-building exercises to promote personal and professional development 36 Tower Rink, Behind 1225 Cedar Lane Seasonal outdoor ice rink behind Village Hall, lighted at night 37 Trail Through Time, Techny Prairie Park and Fields Restored prairie, wetlands and historic land features in an award-winning 14-acre educational and recreational area 38 Village Green Center, 1810 Walters Avenue Athletics and Aquatics Offices, picnic permits and community room Nine-hole golf course and short game practice area 268-seat auditorium used by resident company of professional actors and children’s companies 9 Capital Improvement Plan Listing by Location 10 Northbrook Park District 2016-17 Capital Improvement Plan LOCATION / PROJECT ID Page Number 2016-17 180-01 16 60,000 180 ANETS DRIVE Anets Site - Well Removal and IEPA Permit SUBTOTAL 60,000 ADMINISTRATIVE OFFICES Security Plan Implementation Personal Computer Equipment Migration Main Computer Equipment and Network Replacement Computer Software Upgrade Admin. Office Furniture Replacement (2 / Year) HVAC Replace Rooftop Unit ADMIN-01 ADMIN-02 ADMIN-03 ADMIN-04 ADMIN-05 ADMIN-06 16 17 17 18 18 19 SUBTOTAL 40,000 25,000 65,000 70,000 14,500 110,000 324,500 CEDAR LANE TOT LOT See Parks Maintenance 04 - Tennis & Basketball Court Repairs SUBTOTAL 0 COAST GUARD PARK n/a SUBTOTAL 0 COUNTRYSIDE PARK Bollard Placement SUBTOTAL COU-01 19 24,000 24,000 CRESTWOOD PARK SUBTOTAL 145,000 ENGELHARDT PARK n/a SUBTOTAL 0 FLORAL DRIVE n/a SUBTOTAL 0 GREENFIELD PARK n/a SUBTOTAL 0 11 LOCATION / PROJECT ID Page Number 2016-17 GREENVIEW PARK n/a SUBTOTAL 0 INDIAN RIDGE PARK Bocce Ball Courts IR-01 20 SUBTOTAL 145,000 0 LEISURE CENTER Install Secured Doorways in Preschool & Ceramics Studio Hallways Preschool/Visual Art Room Relocation Main Hallway Bathroom Upgrades Theater Lobby Upgrades Theatre Border / Side / Downlight Replacement Leisure Center East Fence Replacement LC-01 LC-02 LC-03 LC-04 LC-05 LC-06 20 21 21 22 22 23 SUBTOTAL 50,000 25,000 39,000 24,000 75,000 24,000 237,000 MEADOW ROAD TOT LOT n/a SUBTOTAL 0 MEADOWHILL AQUATIC CENTER MAC-Pool Repairs Phase 2 of 2 MAC-01 23 SUBTOTAL 52,000 52,000 MEADOWHILL PARK n/a SUBTOTAL 0 OAKLANE PARK n/a SUBTOTAL 0 OUTDOOR EDUCATION CENTER n/a SUBTOTAL 0 PROGRAMS - GENERAL and RECREATION ADA Facility Requirements (47 Fund) SUBTOTAL PG&R-01 24 381,000 381,000 12 LOCATION / PROJECT ID Page Number 2016-17 PARKS-01 PARKS-02 PARKS-03 PARKS-04 PARKS-05 PARKS-06 24 25 25 26 26 32 435,000 53,500 18,500 210,000 17,500 14,250 PARKS MAINTENANCE - 545 Academy Asphalt Repairs (48 Fund) SC, SCC Cartpaths, & STG District Painting Projects Baseball Field Netting Replacement-MHP Tennis and Basketball Court Repair -Various Parks Skinned Infield Renovation Fuel Dispensing System Replacement SUBTOTAL 748,750 PARKS MAINTENANCE Vehicle and Equipment Replacement 2016 Bush Hog TD1500 (replacing 2001 Bush Hog 15' tri-plex - 4790) 2016 ABI Force-Infield Groomer (replacing 2009 Smithco G-Star - 4920) 2012 Ingersoll Rand P185WJD (replacing 1984 Sullair 185CFM Air Compressor - 5080) 4790 4920 5080 27 27 27 SUBTOTAL 11,000 16,500 15,000 42,500 SALCEDA NORTH PARK n/a SUBTOTAL 0 NORTHBROOK SPORTS CENTER Carpet Replacement HVAC Replacements Toilet Replacements SC-01 SC-02 SC-03 27 28 28 SUBTOTAL 34,000 40,000 33,000 107,000 NORTHBROOK SPORTS CENTER POOL Pool Renovation SCPOOL-01 29 SUBTOTAL 4,450,000 4,450,000 STONEGATE PARK n/a SUBTOTAL 0 GOLF OPERATIONS Sportsman's Country Club Shoreline Stabilization - Final Phase Naturalized Area Stewardship SUBTOTAL GOLF-01 GOLF-02 29 30 144,000 23,000 167,000 Clubhouse n/a SUBTOTAL 0 13 LOCATION / PROJECT ID Page Number 2016-17 7700 8150 8200 8210 30 30 30 30 22,000 60,000 42,000 22,000 GOLF OPERATIONS Vehicles and Equipment Replacement 2016 Toro Groundsmaster 3500D (replacing 2010 Toro 3100-D Reelmaster - 7700) 2016 Toro MP5800 Sprayer (replacing 2007 Toro Multipro 5700-D 300 Gallon Sprayer - 8150) 2016 Foley 653 Accu Master Reel Grinder (replacing 2005 Foley Accupro Grinder - 8200) 2016 Foley 672 Accu Pro Bednife Grinder (replacing 2003 Neary 277 Bed Knife Grinder - 8210) SUBTOTAL 146,000 Anetsberger Golf Course n/a SUBTOTAL 0 SUBTOTAL GOLF OPERATIONS 313,000 TECHNY PRAIRIE PARK AND FIELDS Greenroof Shade Structure TPPF-01 31 SUBTOTAL 50,000 50,000 TOWER RINK n/a SUBTOTAL 0 VILLAGE GREEN PARK AND CENTER Memorial Park Renovation VG-01 31 SUBTOTAL 75,000 75,000 WESCOTT PARK n/a SUBTOTAL 0 WEST PARK n/a SUBTOTAL 0 WILLIAMSBURG SQUARE PARK n/a SUBTOTAL 0 WOOD OAKS GREEN PARK Light Pole Replacement-Cracking Poles See Parks Maintenance 04 - Tennis & Basketball Court Repairs WOG-01 SUBTOTAL 32 104,000 104,000 TOTAL MANAGERS' PROJECTS (UNDER $10,000) TOTAL CAPITAL PROJECTS 19,900 7,113,750 GRAND TOTAL 7,133,650 14 Project Description Worksheets 15 Division: Location: Project Title: Administration 180 Anetsberger Drive Anets Site‐Well Removal and IEPA Permit Project ID: 180‐01 This project is intended to cover the remaining work needed to receive the No Further Remediation (NFR) letter from the Illinois Environmental Protection Agency (IEPA), which includes the removal and sealing of the remaining monitoring wells, two deep wells, and agency and consultant fees. Project Allocation 2016‐17 $60,000 Division: Location: Project Title: Administration District‐Wide Security Plan Implementation Project ID: ADMIN‐01 This project consists of the installation of a keyless entry at Village Green Center and Sportsman’s Maintenance Facility, in addition to the expansion of the camera system at several Point of Sale (POS) locations throughout the District. Project Allocation 2016‐17 $40,000 16 Division: Location: Project Title: Administration District‐Wide Personal Computer Equipment Migration Project ID: ADMIN‐02 The IT Department maintains more than 200 personal computers, laptops, phones and printers. To ensure that equipment meets current and future needs, along with the desire to normalize cost, the District has adopted an industry standard life cycle of 4‐5 years for PCs and printers and 3‐4 years for laptops. In 2016, the IT Department anticipates replacing 20 PCs, 2 printers and 10 laptops. Project Allocation 2016‐17 $25,000 Division: Location: Project Title: Administration District‐Wide Main Computer Equipment and Network Replacement Project ID: ADMIN‐03 In alignment with the District’s effort to leverage technology, a more progressive approach will continue to be used in 2016 to deploy customer‐facing technologies, as well as implement supporting network infrastructure for process improvement practices. This capital project addresses all hardware to support HR, Accounting, Technology and Marketing initiatives in 2016 as well as end‐of‐life infrastructure equipment and overall network security. In addition: Continue to expand digital storage capacity on the Storage Area Network Continued deployment of the District's Public WIFI accessibility Replacement of end‐of‐life wireless site‐to‐site connections Transition and elimination of 3 of the 25 servers and replacement of 2 of the 15 switches Work with Village to replace the core fiber switch that runs the backbone of the network Project Allocation 2016‐17 $65,000 17 Division: Location: Project Title: Administration District‐Wide Computer Software Upgrade Project ID: ADMIN‐04 Network software capital budget is the continuation of the District‐Wide Technology Plan, including the software requirements of the District. This includes: Additional licensing and implementation of the commercial‐grade WIFI software Standard upgrades to end‐user software, including Windows, Microsoft, Adobe and GIS products Standard network software upgrades, including Microsoft SharePoint, IP switch, VM ware, EMC and Microsoft SQL Server The IT Department will continue to address and update the District's network security by placing safeguards to protect from issues such as viruses, identity and credit card theft, EMV chip implementation and other high‐risk cyber crimes. As outlined in 2014 and 2015, the District will continue to comply with and address the changes in Microsoft regarding licensing and versions of its major product lines—specifically purchasing and migrating to the cloud‐based Office 16/365. The District will take on several major changes to its core software, including Recreation, Finance, Time & Attendance and HR software. Project Allocation 2016‐17 $70,000 Division: Location: Project Title: Administration Administration Admin. Office Furniture Replacement Project ID: ADMIN‐05 This project will replace the built‐in office furniture at the Administration building, focusing on two offices per year. The existing furniture is beginning to delaminate, and drawer hardware is failing. In 2016‐2017, the offices of the Business Manager and the Leisure Services Director will be completed. In 2017‐2018, the office of the Parks & Properties Director, Administrative Assistant to the Executive Director and Marketing and Communication Director will be completed. Project Allocation 2016‐17 $14,500 18 Division: Location: Project Title: Administration Administration HVAC‐Replace Rooftop Unit Project ID: ADMIN‐06 The District will replace the existing 40‐ton rooftop unit that was installed in 1994 with a higher‐efficiency model. The rooftop unit has exceeded its useful 20‐year life cycle. The use of geothermal technology will be investigated and, if feasible, will be included in this project. If geothermal technology is selected, the building automation system will be reprogrammed. Project Allocation 2016‐17 $110,000 Division: Location: Project Title: Parks and Properties Countryside Park Bollard Installation Project ID: COU‐01 This project places 120 bollards around the perimeter of the park to keep out unwanted vehicles. Bollards will be similar to those at Greenfield Park, with regard to spacing and type, and made of recycled plastic. Project Allocation 2016‐17 $24,000 19 Division: Location: Project Title: Parks & Properties Indian Ridge Park Bocce Ball Courts & Park Connections Project ID: IR‐01 Indian Ridge Park was selected for new bocce ball courts, based on several requests from neighbors and the proximity to the Leisure Center for Northbrook seniors. Partnerships with outside organizations or businesses will be pursued to help fund this project. This project will include the installation of 2 bocce ball courts, 2 shade shelters, 4 benches, court signage, 2 score boards, a small planting bed, site drainage, adjoining walkways, and 2 recycling and 2 garbage receptacles. Project Allocation 2016‐17 $145,000 Division: Location: Project Title: Leisure Services Leisure Center Install Secured Doorways (in Preschool Hallways) Project ID: LC‐01 This project will include the installation of a secured doorway system near the preschool classrooms. One set of double doors will be installed in the preschool (north) hallway, and a second set of double doors will be installed in the south hallway. In 2016, all preschool rooms will be located at the east end of the Leisure Center. This project will allow better controlled access and increase safety in this area. Project Allocation 2016‐17 $50,000 20 Division: Location: Project Title: Leisure Services Leisure Center Preschool/Visual Art Room Relocation Project ID: LC‐02 This project will include converting the Oaklane Room (preschool room) to a visual arts/multi‐use room. This project will require repainting, installing new cabinets/countertops and raising the sink. The new location of preschool will provide many benefits, including a larger room for children to play in, centrally located classrooms creating more of a school atmosphere, and improved security. Project Allocation 2016‐17 $25,000 Division: Location: Project Title: Leisure Services Leisure Center Main Hallway Bathroom Renovations Project ID: LC‐03 This project includes the removal and installation of sinks, soap dispensers, mirrors and light fixtures in the main hallway bathrooms. Current soap dispensers and faucets do not work properly and are showing their age. Light fixtures and mirrors will be installed to improve the customer experience. Project Allocation 2016‐17 $39,000 21 Division: Location: Project Title: Leisure Services Leisure Center/Theatre Theatre Lobby Upgrades Project ID: LC‐04 The furniture and lighting in the Theatre lobby is worn out and will be replaced. Window treatments and an outlet on the west wall will be added. Marketing materials, frames and prints will complete the area. Although this is an aesthetic project, the appearance of the facility is important to customers who spend time in the building waiting for their children or before and after shows. Project Allocation 2016‐17 $24,000 Division: Location: Project Title: Leisure Services Leisure Center/Theatre Theatre Border/Side/Down Light Replacement Project ID: LC‐05 This project will replace the aging border lights that use standard light bulbs with LED fixtures and replace stage fixtures, using halogen bulbs with LED fixtures, which are more energy efficient. The replacement also provides technicians with additional programming options. The current lights are 25 years old, and replacement parts are difficult to find‐if available at all. Project Allocation 2016‐17 $75,000 22 Division: Location: Project Title: Parks and Properties Leisure Center Privacy Fence East Fence Replacement Project ID: LC‐06 This project will remove and replace 375 linear feet of failing 6 foot stockade fence. Many fence posts have rotted, resulting in the need to install temporary metal poles for support. This fence is required to shield nearby homes from vehicle headlights exiting the Leisure Center. Project Allocation 2016‐17 $24,000 Division: Location: Project Title: Parks and Properties Meadowhill Aquatic Center MAC Pool Repairs Phase 2 of 2 Project ID: MAC‐01 The second phase of repairs at MAC consists of: a variable frequency drive (VFD) for the plunge pool filter motor; caulking the gutter line where it meets concrete on top of the deck around lap, dive and plunge pools; two new AquaSol chemical controllers; protective coating of the main filter to extend longevity; and replacing filter sand for main filter. Project Allocation 2016‐17 $52,000 23 Division: Location: Project Title: Parks and Properties Various Locations ADA Facility Requirements (47 Fund) Project ID: PG&R‐01 Funds are provided to implement the ADA Transition Plan to bring facilities to required accessibility standards. For fiscal year 2016‐2017, projects include the addition of two new bleacher pads, a connection to the existing pathways, and five detectable warning pads at Wood Oaks Green Park. In addition, there will be a considerable amount of ADA facility improvements in conjunction with the development of the new Northbrook Sports Center Pool. Project Allocation 2016‐17 $381,000 Bleacher Pads: Detectable Warning Pads: Sports Center Pool: Leisure Center Restroom: Sports Center Restroom: Division: Location: Project Title: $10,880 $13,090 $354,030 $2,000 $1,000 Parks and Properties Various Locations Asphalt Repairs Project ID: PARKS‐01 In conjunction with the new pool construction, this project will include: the removal, re‐grading and repaving of the Northbrook Sports Center parking lot, the removal and replacement of 5 portions of curbs to adjust sewers, and restriping and replacement of 54 wheel stops. At Stonegate Park, the project will include: patchwork, crack filling, seal coating and striping. Sportsman’s Country Club will see the removal and replacement of approximately 14,850 SF of cart paths that are in very poor condition. Project Allocation 2016‐17 $435,000 Northbrook Sports Center Parking Lot: $416,000 Stonegate Park Parking Lot: $3,000 Sportsman’s Country Club Cart Paths: $16,000 24 Division: Location: Project Title: Parks and Properties Various Locations District Painting Projects Project ID: PARKS‐02 Projects for 2016‐2017 include painting the exterior of Meadowhill Aquatic Center, the Outdoor Education Center and the Batting Cage Shelter at Techny Prairie Park and Fields; painting the Meadowhill Park Shelter; staining three shelters at Techny Prairie Park and Fields; and painting metal playground elements at Village Green Park. Project Allocation 2016‐17 $53,500 Division: Location: Project Title: Parks and Properties Meadowhill Park Baseball Field Netting Replacement Project ID: PARKS‐03 Torn and worn backstop nets installed in 2006 at Meadowhill Park on Fields #4 and #6 will be replaced. The life expectancy is 8‐10 years. The nets are in poor condition and need to be replaced to keep stray balls from leaving the playing area. Project Allocation 2016‐17 $18,500 25 Division: Location: Project Title: Parks and Properties Various Locations Tennis and Basketball Court Repair Project ID: PARKS‐04 The District’s hard courts will receive periodic maintenance, including patching, caulking, color coating and striping. This preventative maintenance ensures that quality courts are available to patrons. Projects for 2016‐2017 include repairs for the Cedar Lane basketball court and Wood Oaks North and South banks of courts. At Cedar Lane, the basketball court is experiencing large areas of cracking and peeling of the color coating and asphalt. This project would involve installing Titan Trax over the entire court, followed by color coating. Wood Oaks tennis courts include Armor Patch installation and color coating the North and South bank of courts. Project Allocation 2016‐17 $210,000 Cedar Lane: Wood Oaks Green: Division: Location: Project Title: $15,750 $194,250 Parks and Properties Various Locations Skinned Infield Renovation Project ID: PARKS‐05 Grade the subsurface to establish a uniform sub‐grade with a crown. Finish grade to the proper crown and compaction. The three fields scheduled for 2016‐2017 are West Park #14 and #16 and Meadowhill #5. Project Allocation 2016‐17 $17,500 26 Division: Location: Project Title: Parks and Properties District‐Wide Parks Vehicle and Equipment Replacement Project ID: V & E A 2009 infield groomer (#4920), 1984 air compressor (#5080) and 2001 towable mower (#4790) will be replaced due to their overall use and condition. Project Allocation 2016‐17 $42,500 Abi Force Infield Groomer: $16,500 Ingersoll Rand Air Compressor: $15,000 $11,000 Bush Hog Towable Mower: Ingersoll Rand Air Compressor Bush Hog Towable Mower Abi Force Infield Groomer Division: Location: Project Title: Leisure Services Northbrook Sports Center Carpet Replacement Project ID: SC‐01 The carpet will be replaced in the Main Office, staff offices, break room, Ron's Skate Shop and the NBHL locker room. Carpet in these areas was installed during the 1999 remodel and is worn, split in some areas, and well beyond its life cycle. Project Allocation 2016‐17 $34,000 27 Division: Location: Project Title: Parks and Properties Northbrook Sports Center HVAC Replacements Project ID: SC‐02 Rooftop unit (RTU) replacement continues with the replacement of rooftop unit #3 (Main Entrance/Lobby area). This RTU does not have a duct detector tied to the fire panel, as required by Village Code. This omission will be addressed in coordination with the RTU replacement. Project Allocation 2016‐17 $40,000 Division: Location: Project Title: Leisure Services Northbrook Sports Center Toilet Replacements Project ID: SC‐03 Replace 17 toilets in A and B lobby restrooms. The flush push buttons on the toilets need to be replaced by new water‐efficient handles. Current push buttons are hard to operate, and toilets are left unflushed. In order to install these efficient flushers, we must replace the toilets because current flushers are recessed, but new ones will be exposed. When replacing toilets, they will be raised to ADA‐required height; the current placement is too low, and patrons complain often about it. Project Allocation 2016‐17 $33,000 28 Division: Location: Project Title: Parks and Properties Northbrook Sports Center Pool Pool Renovation Project ID: SCPOOL‐01 The project includes the replacement and renovation of the aquatic facility as shown in the conceptual design below. Allocated funds are based on the current cost estimates with construction to begin in late summer with an estimated completion in June 2017. Project Allocation 2016‐17 $4,450,000 Division: Location: Project Title: Golf Sportsman’s Country Club Shoreline Stabilization Project ID: GOLF‐01 The project is the final phase of the re‐establishment and stabilization of pond shoreline with grading and planting work scheduled for ponds 5 and 9. Project Allocation 2016‐17 $144,000 29 Division: Location: Project Title: Golf Sportsman’s Country Club Naturalized Area Stewardship Project ID: GOLF‐02 This project includes stewardship of the naturalized area, recently restored shorelines, and the natural area along Landwehr Road, adding to the aesthetics and sustainability of the golf course. Project Allocation 2016‐17 $23,000 Division: Location: Project Title: Golf Sportsman’s Country Club Vehicle and Equipment Replacements Project ID: GOLF‐V&E This provides $146,000 for the replacement of a turf sprayer, a turf mower, a reel grinder and a bedknife grinder. The two grinders are used to accurately sharpen the mowers used on the greens and tees. Project Allocation 2016‐17 $146,000 Toro MP5800 Sprayer: Groundsmaster 3500D: Foley 653 Accu Master Reel Grinder: Foley 672 Accu Pro Bedknife Grinder: $60,000 $22,000 $42,000 $22,000 Toro MP5800 Sprayer Bedknife Grinder Reel Grinder Groundsmaster 3500D 30 Division: Location: Project Title: Parks and Properties TPPF‐Trail Through Time Green Roof Shade Structure Project ID: TPPF‐01 Install new 15’x20’ green roof shade structure in the northwest area of the Trail Through Time. The structure will provide seating and sun relief in the prairie, while offering an educational and picnicking opportunity. Project Allocation 2016‐17 $50,000 Division: Location: Project Title: Parks and Properties Village Green Park and Center Memorial Park Renovation Project ID: VG‐01 This project will redesign the north corner of Village Green Park in the memorial garden area to be dedicated in 2017, the District’s 90th anniversary. This will include a new sign, retaining walls, pavement, benches, plantings and lighting. Project Allocation 2016‐17 $75,000 31 Division: Location: Project Title: Parks and Properties Wood Oaks Green Park Light Pole Upgrades Project ID: WOG‐01 This project will replace parking lot and pathway concrete poles that are cracking/crumbling. The manufacturer is providing a 20% discount, due to product failure. Light fixtures will be replaced with energy‐efficient LED fixtures. Project Allocation 2016‐17 $104,000 Division: Location: Project Title: Parks and Properties Administration Building Fuel Dispensing System Replacement Project ID: PARKS‐06 The project will replace the fuel pump dispensing system for the diesel and unleaded fuel tanks located at the Parks maintenance facility. Project Allocation 2016‐17 $14,250 32 Manager’s Account Worksheets Projects under $10,000 33 Northbrook Park District 2016-17 Manager's Accounts PROJECTS UNDER $10,000 ID Page (Manager's Account) Budget (FY 16-17) LEISURE SERVICES Sports Center - Hand Dryer Replacement MALS-01 35 TOTAL LEISURE SERVICES $9,950 $9,950 PARKS & PROPERTIES MAPP-01 Indian Ridge Park Fence TOTAL PARKS AND PROPERTIES 35 $9,950 $9,950 GOLF OPERATIONS n/a TOTAL GOLF OPERATIONS $0 GRAND TOTAL $19,900 34 Division: Location: Project Title: Leisure Services Northbrook Sports Center Hand Dryer Replacement Project ID: MALS‐01 Six hand dryers in the lobby bathrooms will be replaced. The current dryers are not effective, have little power and leave hands wet. The high‐powered replacement dryers should dry hands completely. Project Allocation 2016‐17 $9,950 Division: Location: Project Title: Parks and Properties Indian Ridge Park Fence & Bollard Installation Project ID: MAPP‐01 Install 45 linear feet of 3’ chain‐link fence with an 8’ wide gate (two 4’ gates) along the north side, between the playground and parking lot. Install plastic bollards at a 6’ spacing with black rope looped between them around sections of the playground. Project Allocation 2016‐17 $9,950 35 Appendix 36 APPENDIX A Park Fleet Replacement Schedule No. Year Description 2016-17 Fleet Vehicles 1010 2020 2030 2040 3010 3020 3030 3040 3050 3060 3070 3080 3090 3100 3110 3120 3130 3140 3150 3180 3190 3200 3210 3220 3230 3240 3250 2012 2007 2010 2010 2010 2009 2008 2005 2005 2012 2013 2001 2010 2010 2006 2011 2007 2003 2009 2014 2010 2000 2008 2009 2001 2001 2008 Ford Edge Chevy 2WD 1500 Ford Transit Connect XLT Wagon Ford Transit Connect XLT Wagon Ford Transit Connect Cargo Van GMC 4WD 2500 (Plow Truck) GMC 4WD 2500 Utility Body (Plow Truck) GMC 2WD 2500 Lift Gate Chevy 2WD 2500 Ford F-250 Utility Body 4X4 (Plow Truck) Ford Transit Connect Cargo Van Ford F550 Bucket Truck Utility Body GMC 4WD 2500 Utility Body (Plow Truck) Ford Transit Connect Cargo Van GMC 6500 Large Dump Truck Ford F450 Dump (Plow Truck) Chevy Cube Van Chevy C4500 Mini Dump Chevy 2WD 2500 GMC 3500 HD 4x4 (Plow Truck) Toyota Prius GMC 2WD 1500 GMC 2WD 2500 Crewcab Chevy 2WD 2500 Liftgate GMC 2WD 1500 Chevy 2WD 1500 Chevy 2WD 2500 Crewcab 1987 1979 2010 2015 2007 2008 Century Concession Trailer Homemade Float Trailer Special Events Trailer Towmaster T10 Tilt Trailer 10k Bravo Enclosed Trailer Big Tex Utility Trailer Haulmark Enclosed Ball Field Trailer 2006 1996 2009 John Deere Aercore 1500 Bannerman D/M Dresser Aera-Vator First Products Trailers 5130 5140 5150 5160 5180 5230 5240 Aerifying 4230 4660 4700 Work Vehicles 4040 4045 5250 5251 1995 2012 2009 2015 Club Car Carryall Toro Workman MD Kubota RTV1100 4X4 Diesel Kubota RTV X100C Riding Trim Mower 4670 2002 Kubota 60" Zero -turn Diesel 37 APPENDIX A Park Fleet Replacement Schedule No. Year Description 2016-17 Walk-Behind Mowers 4510 4511 2000 2015 Bobcat 36" mower Toro 21" Trim Mower w/Bag 4680 2000 Bobcat 36" mower Wide Area Mowers 4031 4695 4790 2006 2015 2001 Toro Groundmaster 4500-D Befco Hurricane Flail Mower Bush Hog 15' tri-plex 1997 2002 2010 2008 2001 1996 Kubota M5400 Kubota M5700 Case 580 Super M Backhoe Kubota M7040HDC Bobcat 773 High Flow Skid Steer Kubota B2100 Diesel $11,000 Tractors 5010 5020 5030 5040 5050 5220 Ball Field Groomer 4890 4920 4922 2013 2009 2015 Gravely Base Runner Smithco Super Star ABI Force 1994 2000 Continental Sprayer-300 gallon Toro Multipro 5500 300-gallon $16,500 Sprayers 4300 4310 Blowers & Vacuums 4440 5301 5302 5303 5304 5305 5306 5307 5308 5309 5310 5311 5312 5325 5326 5327 5328 5329 1990 2009 2010 2010 2012 2014 2015 2015 2015 2008 2009 2009 2015 1998 2001 2001 1998 1993 Giant Vac Trailered Vacuum 1605 Echo PB-500 Backpack Blower Kawasaki KRB750A Backpack Blower Kawasaki KRB750A Backpack Blower Kawasaki KRB750A Backpack Blower Kawasaki KRB750B Backpack Blower Stihl Backpack Blower BR600 Stihl Backpack Blower BR600 Stihl Backpack Blower BR600 Stihl Backpack Blower BR550 Stihl Backpack Blower BR550 Stihl Backpack Blower BR550 Stihl Backpack Blower BR600 Little Wonder Walkbehind Blower Little Wonder Walkbehind Blower Giant Blo Walkbehind Blower Little Wonder Walkbehind Blower Giant Vac Walkbehind Blower 1999 2011 2007 2015 2011 2009 1999 1997 Stihl HD FS450K Brushcutter Stihl MS 441 Chainsaw Stihl TS 700 Cutquik Concrete saw Stihl MS 251 chainsaw Stihl 026 chainsaw Husky 14" Topper Chainsaw Stihl HT-131 pole saw Stihl MS250 Chainsaw Chainsaws 4160 4730 4740 4750 4760 4771 4780 4791 38 APPENDIX A Park Fleet Replacement Schedule No. Year Description 2016-17 Line Markers 4850 4860 4870 2014 2011 2014 Graco Field Laser S100 Jiffy 8000 Line Striper Graco Field Laser S100 2015 2008 2009 2008 Briggs & Stratton 5000 Watts 9HP Honda EU1000i Briggs & Stratton Honda EB 5000X Generators 4270 4271 4272 4273 Trash Pumps 4350 4360 4380 4480 4710 1987 2008 1982 1991 1996 Teel 3" Centrifugal Pump Honda Trash Pump WH20X (Plate Mounted) Teel 3" Centrifugal Pump Teel 2" Centrifugal Pump Wacker 3" Diaphragm Pump Snowblowers 4930 4931 4932 4933 2008 2008 2012 2004 Toro Powerclear Snowthrower Toro Powerclear Snowthrower Toro Powerclear Snowthrower Toro CCR2450 Snowthrower 4934 4935 4940 4950 4960 4970 4980 4985 4990 2008 2011 2008 2008 2015 2015 2015 2015 2015 Toro Powermax 828LXE Toro 1028 OXE Snowthrower Toro Powerclear Snowthrower Toro Powermax 1028LXE Toro Powerclear 721QZR Toro Powerclear 721QZR Toro Powerclear 721QZR Toro PowermaxHD 1028OHXE Toro PowermaxHD 1028OHXE Bed Edgers/Sod Cutters 4460 4461 4462 2014 2010 2014 2010 1984 2000 Little Wonder Bed Edger Bed Edger Little Wonder Bed Edger McLane Edger/Trimmer Ryan Sod Cutter Ryan Sod Cutter 2014 2010 2012 Kawasaki Hedge Trimmer Kawasaki KHT750S ECHO Shaft Hedge Trimmer 4463 4464 4465 Hedge Trimmers 4900 4901 4902 Sidewalk Edgers 4550 4551 2012 2008 Redmax SGCZ2401S Recipicator Redmax SGCZ2401S Recipicator String Trimmers 4365 4535 5400 5401 5402 5403 5404 5405 5406 2012 2012 2010 2010 2012 2009 2009 Handheld Echo Trash Pump Porta Pump Hand Pump Kawasaki KGT27C-4A Kawasaki KGT27C-4A Kawasaki KGT27C-A1 Kawasaki KGT27C-A1 Kawasaki KGT27C-4A Stihl FS 110 Stihl FS 110R 39 APPENDIX A Park Fleet Replacement Schedule No. Year Description 2016-17 Attachment/Equipment 2100 4170 4171 4150 4180 4220 4320 4450 4470 4560 4580 4581 4650 4655 4690 4705 4800 4880 5070 5080 5090 5051 5052 5053 5054 5055 5056 5057 5200 5210 5252 5253 5254 Total 2001 2011 2014 1993 1979 1972 1994 1991 1991 1976 1993 2012 1993 1989 2010 2009 2001 1988 2010 1984 2010 2010 2001 2013 2013 2009 2001 2011 1990 2010 2015 2015 2015 Belson Tow-Behind Propane Gas Grill Kifco T200 Water Cannon Kifco E110 Water Cannon Ground Hog 2-Man Auger Montgomery Ward Cement Mixer 3-Pt Howard Roto Tiller Corty Pressure Washer (545 Wash Bay) Troy-Bilt Work Horse Tiller Brutus Court Roller Layton 607-W 3Ton Vib. Roller Wacker Tamper/Compactor Wacker/Neuson Stake Pounder Aalindin Pressure Washer (545 Trailer Bay) Mi-T-M Pressure Washer CW 3004 Field Turf Groomall Seeder Attachment to Aero Vator (SB20) LandPride 48" Overseeder Up-Right Man Lift F-5118 Morbark M-15 Chipper Sullair 185 CFM Compressor K-Bar Tow-Behind Pressure Washer Bobcat SG60 Stump Grinder Attachment Bobcat Skid Steer Blower Attachment SnowSP-6000 1 CY Salt Spreader 925 Gallon Water Tank Bobcat Angle Broom Attachment Bobcat Skid Steer 60" Bucket Attachment Salty Dog Truck Mounted Salt Spreader Lely Fertilizer Spreader Toyota Forklift Kubota V-Plow Kubota 60" Brush Snow Ex Drop Spreader $15,000 $42,500 40 APPENDIX B Playground Replacement Schedule Original Cost Date for anticipated replacement 20 yr Replacement Budget 2004 $115,000 2024-25 $200,000 Countryside Park 2001 $80,000 2021-22 $205,000 Crestwood Park 2013 $170,000 2033-34 $245,000 Floral Drive 2010 $160,000 2030-31 $200,000 Greenfield Park 2003 $105,000 2023-24 $200,000 Greenview Park 2007 $118,000 2027-28 $212,000 Indian Ridge Park 2010 $285,000 2030-31 $325,000 Meadow Road Tot Lot 2009 $155,000 2029-30 $235,000 Meadowhill Park 1996 $47,000 2018-19 $195,000 Oaklane Park 1999 $65,000 2019-20 $185,500 Salceda North Park 2008 $170,000 2028-29 $245,000 Stonegate Park 1999 $155,000 2017-18 $295,000 Techny Prairie Park and Fields 2006 $124,000 2026-27 $212,000 Village Green Park 2003 $256,000 2023-24 $365,500 Wescott Park 2005 $210,000 2025-26 $365,500 West Park 2005 $153,000 2025-26 $196,000 Williamsburg Square Park 1999 $124,000 2019-20 $212,000 Woods Oaks Green Park Total 2008 $275,000 2028-29 $413,500 $4,507,000 Current installation Cedar Lane Tot Lot Site 41 APPENDIX C Golf Fleet Replacement Schedule No. Year Description 2000 2012 2008 Chevy Venture Ford F-250 4X4 Ext Cab (Plow truck) Chevy 2500 HD 4WD (Plow truck) 2008 2006 2006 2002 2006 2004 1993 2008 2006 2008 2009 2011 2011 2012 2012 Procore 648 Aerator Procore 880 Aerator Procore 648 Aerator Vertidrain Deep Tine Aerator John Deere Core Pulveriser Aerway Greens Express 60" Turfco III Topdresser Dakota 410 Turf Tender Topdresser Turfco CR-10 Topdresser Turfco Triwave Overseeder Groom-It Hydraulic Drag Broom Tru-Turf Roller/Spyker Tru-Turf Roller/Spyker Planetair Trifecta TB-200-(Fill and Sweep) 2003 2013 2001 2007 2002 2005 2006 2006 2011 2007 2013 2011 2011 2006 2006 2011 2011 2013 2013 2013 2006 2001 2000 2011 Yamaha Golf Car John Deere TX Turf Gator Cushman Truckster John Deere TX Turf Gator John Deere Pro Gator 2020 John Deere Gator TX John Deere TX Turf Gator John Deere TX Turf Gator John Deere E Gator John Deere TX Turf Gator John Deere TX Turf Gator 2011 Clubcar Villager Bus 2011 Clubcar Precedent-Electric Toro Workman 2110 Toro Workman 2110 John Deere E Gator Club Car CarryAll II Electric John Deere TX Turf Gator John Deere TX Turf Gator John Deere TX Turf Gator Toro Workman 3200 ADA Golf Car Turf I Carryall Clubcar Precedent 2016-17 Fleet Vehicles 6010 6020 6030 Aerifying 6090 6100 6110 6120 6130 6140 6160 6170 6180 6190 6200 6210 6220 6230 6240 Work Vehicles 6300 6310 6320 6330 6340 6350 6360 6370 6380 6390 6400 6410 6420 6430 6440 6450 6460 6470 6490 6500 6510 6520 6530 6540 42 APPENDIX C Golf Fleet Replacement Schedule No. Year Description 6550 6560 6570 6580 6590 6595 6600 6610 2011 2008 2009 2003 2003 1996 2010 2003 Clubcar Precedent John Deere TX Turf Gator John Deere TX Turf Gator Yamaha Golf Car Yamaha Golf Car Club Car Carryall - Beverage Car Club Car Range Picker Yamaha Golf Car 2016-17 Riding Tees/Greens Mower 7010 7020 7040 7050 7060 7070 7080 7090 2006 2006 2014 2014 2010 2003 2007 2011 John Deere 2500A Greensmower John Deere 2500A Greensmower Toro Groundsmaster 3300 Toro Groundsmaster 3300 John Deere 2500 E-Cut Tri-Plex Toro 3150 Triplex Greensmower John Deere 2500B Greensmower John Deere 2500E-Cut Tri-Plex Walk-Behind Greens Mowers 7200 7210 7220 7230 7240 7250 7260 7270 7280 7290 2005 2005 2005 2005 2008 2008 2008 2008 2010 2010 Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower Toro Flex 21" W/B Greensmower 2009 2009 2013 1999 1999 Toro Groundsmaster Toro 150" Groundsmaster 4700-D Toro Groundsmaster 4500 36" Bobcat W/B Rotary Mower 36" Bobcat W/B Rotary Mower 2008 2007 2012 2013 John Deere 7500 Fairway Mower John Deere 3225C Fairway Mower Toro Reelmaster 5210 Toro RM5210 2010 2010 2014 2007 Toro 3100-D Reelmaster Toro 3100-D Reelmaster Toro GM3500D Toro 3500-D Sidewinder Rough Mowers 7530 7540 7560 7600 7610 Fairway Mowers 7180 7190 7570 7590 Bank Mowers 7700 7710 7720 7730 $22,000 43 APPENDIX C Golf Fleet Replacement Schedule No. Year Description 2016-17 1999 2010 2004 John Deere 1070 Tractor John Deere 4520 Tractor Bobcat S-250 Skid Steer 2012 2003 2010 2011 Toro Sand Pro 2020 Toro 3020 Sand Pro Bunker Rake Toro 2020 Sand Pro Bunker Rake Toro 2020 Sand Pro Bunker Rake 2007 2009 2009 Toro Multipro 5700-D 300 gallon Sprayer Toro Multipro 5700-D 300 gallon Sprayer Lesco 50 Gallon Sprayer $60,000 2005 2003 Foley Accupro Neary 277 Bed Knife Grinder $42,000 $22,000 Tractor 7380 8010 8020 Bunker Rakes 8100 8110 8140 8180 Sprayers 8150 8160 9340 Grinders 8200 8210 Misc. Large Equipment 5610 8500 8520 8580 7000 8021 1992 1987 2011 2008 2009 2000 2007 Brouwer Turf Roller TR224 Ditch Witch Trencher NO Ramp U19 Trailer Provonost P-516/3S Dump Trailer Can-Am Outlander ATV Sand Silo Bobcat SB200-78" Snowblower Attachment Pond Aerators 2006 2007 2008 2011 2012 Billy Goat Force Blower Billy Goat Force Blower Toro Proforce Blower Toro Proforce Blower Buffalo Cyclone Squared Turbine Blower 2006 2007 2010 2010 2010 2010 2006 2007 2013 2014 Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B Kawasaki KRB750B RedMax Backpack Blower Blowers 9020 9030 9050 9070 9080 Backpack Blowers 9700 9710 9720 9730 9740 9750 9760 9770 9780 9790 44 APPENDIX C Golf Fleet Replacement Schedule No. Year Description 2008 2008 2008 2010 2013 2013 2013 2008 2013 2006 2009 2009 2009 2010 2009 2009 2009 2009 RedMax Recip. Brush Cutter MS290 RedMax Recip. Brush Cutter MS290 RedMax Recip. Brush Cutter MS290 Echo Edger BRD 280 Echo SRM 2501 Echo SRM 2501 Echo SRM 2501 Kawasaki Hedge Trimmer Red Max Hedge Trimmer Tanaka TCB-230 String Trimmer Kawasaki KGT35A-A1 (8.5" Sprinkler Head) Kawasaki KGT35A-A1 (7" Sprinkler Head) Kawasaki KGT27B-A1 String Trimmer Kawasaki KBL27B-A2 String Trimmer Kawasaki KGT27A-A1 String Trimmer Kawasaki KGT27B-A1 String Trimmer Kawasaki KGT27B-A1 String Trimmer Kawasaki KGT27A-A1 String Trimmer 2009 2009 2011 2011 2014 Stihl MS290 Stihl MS290 Stihl MS192 TC w/case Stihl Pole saw Stihl 441-CM 2008 2007 2009 2009 Ariens 21" Walker Ariens 21" Walker Toro 20" Self Propelled Toro 20" Self Propelled 2016-17 Trimmers 9400 9401 9402 9410 9411 9412 9413 9420 9421 9490 9500 9510 9520 9530 9560 9570 9580 9591 Chainsaws 9350 9351 9352 9353 9354 Hand Mowers 2110 2130 2190 2200 Golf Rental Carts (85) Golf Rental Cart Fleet Total $146,000 45 APPENDIX D Carry-Over Projects Carry-Over Projects Description Account number Budget Year Budget 63000-5815-A0029 2015-16 $35,000 Website 63000-5815-A0027 2015-16 $30,000 ADMINISTRATION Comprehensive Master Plan Computer Software Upgrade Total Administration $65,000 PARKS Meadhowhill Aquatic Center Meadowhill Aquatic Center Service Line Upgrade 63000-5820-MA013 2015-16 Total Parks $15,000 $15,000 LEISURE SERVICES n/a Total Leisure Services $0 GOLF OPERATIONS Sportsman's Country Club Total Golf Operations Grand Total Shoreline Stabilization 63400-5870-GD014 2015-16 $10,000 $10,000 $90,000 46