MASTER PLAN DIAGRAMS ORANGEVIEW JUNIOR HIGH
Transcription
MASTER PLAN DIAGRAMS ORANGEVIEW JUNIOR HIGH
SECTION 7 MASTER PLAN DIAGRAMS MASTER PLAN DIAGRAMS 7.6 FACILITIES MASTER PLAN ORANGEVIEW JUNIOR HIGH | OVERVIEW ORANGEVIEW JHS | EXISTING (OVERVIEW) Classrooms, Classrooms, CR CR Science Science Labs,Labs, SCI SCI Special Education Special Education Electives BT - Business Technology Electives Computer Lab Computer Lab Admin / Faculty FW - Faculty Work, FL - Faculty Lounge Admin / Faculty FW - Faculty Work, FL - Faculty Lounge Library / MPR Library / MPR Food Service Food Physical Service Education / Athletics Playfields P.E. Physical Education, LR - Locker Room Physical Education Support Spaces/ Athletics P.E. Physical Education, LR - ULocker S - Storage, T - Toilets, - Utility, Room C - Custodial Support Spaces S - Storage, T - Toilets, U - Utility, C - Custodial Hardcourts Play Fields Hardcourts Main Entrance Play Fields Hardcourts Drop-off Main Entrance Drop-off S KNOTT AVE. Tennis Courts Main Quad W ORANGE AVE. July 2014 Page 297 240ft ft 240 1”==60’ 240’ 1” ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan Page 1 Anaheim Unified High School District began a long range Facilities Master Plan in October 2013. Over the last 7 months, the District has engaged school site staff, teachers, principals, community members and leadership in the discussion about what the vision of AUHSD’s schools should become. This existing site map represents the uses identified in the needs assessment study, completed in February 2014. Additional input was incorporated into the plan based on LPA’s site walks and Site Committee meetings in November - December 2014, where there was a review of each schools site committee questionnaire responses and planning opportunities were identified. Anaheim Unified High School District began a long range Facilities Master Plan in October 2013. Over the last 7 months, theinitial District has engaged school site staff, teachers, principals, community members and leadership in the discussion about what the vision of AUHSD’s schools should become. Facility Master Planning is, by its nature, a broad endeavor. The Facilities Master Plan (FMP) developed is a “living” document and also a strategic This existing site map represents the uses identified in the needs assessment study, completed inplanning December 2013. input was incorporated into tool thatAdditional will identify short-term and long-term facility goals for the District. the plan based on LPA’s site walks and Site Committee meetings in November - December 2014, where there was a review of each schools site committee questionnaire responses and initial planning opportunities were identified. Facility Master Planning is, by its nature, a broad endeavor. The Facilities Master Plan (FMP) developed is a “living” document and also a strategic planning tool that will identify short-term and long-term facility goals for the District. Classrooms, Classrooms, CR CR Science Labs, SCI Science Labs, SCI GYM / P.E. Playfields Special Education Special Education Electives BT - Business Technology Electives Computer Lab SECTION 7 MASTER PLAN DIAGRAMS MASTER PLAN DIAGRAMS 7.6 FACILITIES MASTER PLAN ORANGEVIEW JUNIOR HIGH | EXISTING ORANGEVIEW JHS | EXISTING Computer Lab Admin / Faculty Hardcourts FW - Faculty Work, FL - Faculty Lounge GIRLS LR BOYS LR Admin / Faculty Library / MPR FW - Faculty Work, FL - Faculty Lounge Library / MPR Food Service FOOD SERVICE Food Physical Service Education / Athletics P.E. Physical Education, LR - Locker Room Support Spaces/ Athletics Physical Education BAND P.E. Physical Education, LR - ULocker S - Storage, T - Toilets, - Utility, Room C - Custodial Support Spaces OCS FL MATH HIST T COMP LAB T BUSINESS TECH. CAFETERIA S - Storage, T - Toilets, U - Utility, C - Custodial CHOIR Hardcourts Play Fields Hardcourts ELD HIST HIST Vacant SCI T Main Entrance Main Quad SCI T Play Fields Drop-off Main Entrance Drop-off NURSE MATH MATH MATH MATH SCI RSP ART Parent Center LIBRARY ADMIN OFFICE Current Enrollment : WOOD SHOP ENG / DRAMA T T SCI SCI HIST ENG ENG HIST Classrooms Teaching Stations Sub Total: 17 5 7 29 Resource Specialist, RSP Classrooms Special Science LabsEducation Physical Education, P.E. Elective Sub Total: 17 3 5 5 7 1 29 Science Labs Current Enrollment : Elective ENG Exploratory Tech ENG Conference RSP RSP T T ENG SPEC. ED. SDC Anaheim Achieves 1,174 Teaching Stations COMP LAB SDC 1,174 Resource Specialist, RSP Special Education Physical Education, P.E. Grand Total: 3 5 1 38 W ORANGE AVE. Grand Total: 120ft ft 120 120’ 1”1”==30’ ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan 38 Page 3 July 2014 Page 298 Main Entry Point / Circulation Drop-Off Fire Lane Main Entry Point / Circulation Fencing / Landscape Buffer Drop-Off SECTION 7 MASTER PLAN DIAGRAMS MASTER PLAN DIAGRAMS 7.6 FACILITIES MASTER PLAN ORANGEVIEW JUNIOR HIGH | PROPOSED OVERALL + CIRCU. ORANGEVIEW JHS | PROPOSED SITE + CIRCULATION Fire Lane Existing Building Fencing New Construction Playfields Learning Courts Existing Building Construction Main New Quad Learning Courts Hardcourts Main Quad Play Fields Hardcourts Main Entrance Play Fields Main Entrance Hardcourts Learning Courts S KNOTT AVE. Learning Courts Main Quad New Tennis Courts Learning Courts Learning Courts Learning Courts W ORANGE AVE. July 2014 Page 299 240ft ft 240 1”==60’ 240’ 1” ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan Page 2 Modernization Modernization The improvements shown on this proposed plan represents the optimal vision based on the Educational Specifications developed with the input of the principals, teachers, community members and leadership over the course of the Facilities Master Plan (FMP) project. Implementation of these projects depends upon funding. The projects will most likely be phased in over time. NewNew Construction Construction The master plan is designed to serve as a starting point to plan for future improvements. One of the main goals of this process to ensure equitable improvements at all sites. A master plan is the first step in moving forward to improve our facilities district-wide. As funding becomes available, the District will go back to all of the school sites to work through the next phase of construction design details and to develop projects consistent with your teachers, students, parents, and administrators’ needs and wants. Reconfigure Reconfigure The FMP will be presented to the Board of Education in May. Classrooms, Classrooms, CRCR The improvements shown on this proposed plan represents the optimal vision based on the Educational Specifications developed with the input of the principals, teachers, community members and leadership over the course of the Facilities Master Plan (FMP) project. Implementation of these projects depends upon funding. The projects will most likely be phased in over time. Science Labs, SCI Science Labs, SCI The master plan is designed to serve as a starting point to plan for future improvements. One of the main goals of this process to ensure equitable improvements at all sites. A master plan is the first step in moving forward to improve our facilities district-wide. As funding becomes available, the District will go back to all of the school sites to work through the next phase of construction design details and to develop projects consistent with your teachers, students, parents, and administrators’ needs and wants. Playfields Gym Special Education Special Education Electives Lab spaces will be determined by Electives program need. They could include PBL, STEM, ordetermined other elective. Lab spaces will be by program need. TheyLab could include Computer PBL, STEM, or other elective. Boys LR SECTION 7 MASTER PLAN DIAGRAMS MASTER PLAN DIAGRAMS 7.6 FACILITIES MASTER PLAN ORANGEVIEW JUNIOR HIGH | PROPOSED ORANGEVIEW JHS | PROPOSED Computer Lab Girls LR Admin / Faculty FW - Faculty Work, FL - Faculty Lounge Admin / Faculty Library / MPR FW - Faculty Work, FL - Faculty Lounge Hardcourts Library / MPR Food Service FoodPhysical ServiceEd / Athletics Food Learning Court Service P.E. Physical Education, LR - Locker Room Band Support Physical Ed Spaces / Athletics S - Storage, T - Toilets, Office P.E. Physical Education, LRO- -Locker RoomU - Utilities & Building Support, CR Fitness & Storage P.E. CR T T Food Service Elective Lab ART C - Custodial Choral Parking Expansion Expansion U - Utilities & Building Support, C - Custodial Dress / Green Room Lunch Shelter Learning Court Stage (Drama) CR CR CR CR SCI SCI T T Support Spaces Learning Courts T - Toilets, O - Office S - Storage, T MPR Lobby Hardcourts Main Quad (Site Improvements) T U Main Quad Main Quad Learning Courts (Site Improvements) Play Fields Hardcourts Main Entrance Play Fields Fire Access Fire Lane Learning Court Main Entrance CR CR CR CR SCI CR SCI CR CR Fencing / Landscape Buffer Special Ed Library Media / Student Union (2-SH) Learning Court Elective Lab (Wood Shop) Elective Lab Elective Lab T T Fire Lane Drop - Off Fencing / Landscape Buffer 99 Recommended Parking : Planning Capacity: 1,200 Innov. Lab SCI SCI RSP / MM RSP / MM CR CR Recommended Parking:: Proposed Drop - OffEnrollment Teaching Stations CR : Recommended Parking Planning Capacity: Classrooms Recommended Parking:: Science Labs Proposed Enrollment Learning Center Elective Elective Lab Elective Lab Admin CR CR CR CR T T CR CR CR 99 23 1,200 99 1,200 Teaching Stations Sub Total: Learning Court Elective Lab 99 1,200 CR Fencing with Covered Waiting Drop - Off Expansion 6 10 39 Resource Specialist Program / Classrooms Mild - Moderate, RSP/MM Science Labs Special Education Elective Physical Education, SubP.E. Total: 23 2 6 10 2 39 2 Resource Specialist Program / Mild - Moderate, RSP/MM Special Education Physical Education, Grand P.E. Total: 2 2 245 W ORANGE AVE. Grand Total: 120ft ft 120 120’ 1”1”==30’ ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan 45 Page 4 July 2014 Page 300 Modernization Modernization The improvements shown on this proposed plan represents the optimal vision based on the Educational Specifications developed with the input of the principals, teachers, community members and leadership over the course of the Facilities Master Plan (FMP) project. Implementation of these projects depends upon funding. The projects will most likely be phased in over time. NewNew Construction Construction The master plan is designed to serve as a starting point to plan for future improvements. One of the main goals of this process to ensure equitable improvements at all sites. A master plan is the first step in moving forward to improve our facilities district-wide. As funding becomes available, the District will go back to all of the school sites to work through the next phase of construction design details and to develop projects consistent with your teachers, students, parents, and administrators’ needs and wants. Reconfigure Reconfigure The FMP will be presented to the Board of Education in May. Classrooms, Classrooms, CRCR Science Labs, SCI Science Labs, SCI Playfields 4 Gym Special Education Special Education Electives Lab spaces will be determined by Electives program need. They could include PBL, STEM, ordetermined other elective. Lab spaces will be by program need. TheyLab could include Computer PBL, STEM, or other elective. Boys LR SECTION 7 MASTER PLAN DIAGRAMS MASTER PLAN DIAGRAMS 7.6 FACILITIES MASTER PLAN ORANGEVIEW JUNIOR HIGH | PROPOSED-PHASE 1 ORANGEVIEW JHS | PROPOSED Computer Lab Girls LR Admin / Faculty FW - Faculty Work, FL - Faculty Lounge Admin / Faculty Library / MPR FW - Faculty Work, FL - Faculty Lounge Hardcourts Library / MPR Food Service FoodPhysical ServiceEd / Athletics Food Learning Court Service P.E. Physical Education, LR - Locker Room Band Support Physical Ed Spaces / Athletics S - Storage, T - Toilets, Office P.E. Physical Education, LRO- -Locker RoomU - Utilities & Building Support, CR Fitness & Storage P.E. CR T T Food Service Elective Lab ART C - Custodial Choral Learning Court Stage (Drama) Fire Access 1,7* CR CR CR SCI SCI T T Learning Courts T - Toilets, O - Office S - Storage, U - Utilities & Building Support, C - Custodial Dress / Green Room Lunch Shelter CR Support Spaces Parking Expansion Expansion MPR Main Quad (Site Improvements) Play Fields T Hardcourts Main Entrance 1 Learning Court Hardcourts Lobby U Main Quad Main Quad Learning Courts (Site Improvements) T Play Fields 3 Fire Lane Main Entrance CR CR CR CR SCI CR SCI CR CR Fencing / Landscape Buffer Special Ed Library Media / Student Union (2-SH) Learning Court Elective Lab (Wood Shop) Elective Lab Elective Lab T T Fire Lane Drop - Off Fencing / Landscape Buffer 99 Recommended Parking : Planning Capacity: 1,200 Innov. Lab SCI SCI RSP / MM RSP / MM CR CR Recommended Parking:: Proposed Drop - OffEnrollment Teaching Stations CR Classrooms 23 Science Labs OF WORK 6 PROPOSED SCOPE Elective 10 1. Reconfiguration of existing Library. Sub Total: 39 Learning Center Learning Court Elective Lab Elective Lab Elective Lab Admin CR CR CR CR T T CR CR CR CR 2. 3. Fencing with Covered Waiting Drop - Off Expansion 4. 5. 6. 5 7. W ORANGE AVE. 120ft ft 120 120’ 1”1”==30’ 99 1,200 8. Modernization / Reconfiguration at some Classrooms, Elective/ Labs and Resource Specialist Program 2 Mild - Moderate, RSP/MM Restrooms. Special Education 2 Upgrades to site utilities* Physical Education, P/.E. 2 New Library-Media Student Union. (Location of building to be confirmed) Reconfigure / Modernization of Locker Rooms Expansion of drop-off and fencing Safety and security enhancements 45 Grand Total: including fencing, cameras and locks Some Quad/ Learning Court improvements Flexible furniture, equipment and technology infrastructure (*Scope of work and areas of work to be determined) ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan Page 4 July 2014 Page 301 MASTER PLAN DIAGRAMS ORANGEVIEW JUNIOR HIGH | PROGRAM Orangeview Junior High School Anaheim Union High School District Depart: 1200 Student Program New Construction Statistical Summary Regular Classrooms Regular Labs Student Capacity State Loading Grade 7 Grade 8 Sciences Applied Arts/Technology Visual Arts Multi-Purpose/Performing Arts PE/gym Info Commons Total: Academic RSP Special Ed (Edit per School) Total: All Spaces Type: Area: Number: Total Area: SC Department by Type NS/ANC SP Ancillary Support Non-Scheduled Scheduled Spaces: Class/Lab Capacity Space: Scheduled 1200 Student Master Plan Capacity (State Loading @ 31.5 Students/Teaching Station = 38 TS) 600 Students/Grade (Grades 7-8) 100 Students/Period = (3.25) Teaching Stations (7 Period Day, 31.5 Students/TS) Academic Department Orangeview Junior High School Anaheim Union High School District Square Footage AUHSD 27/31.5 27/31.5 27/31.5 27/31.5 27/31.5 27/31.5 27/0 27/0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 0 54 27 27 108 0 0 0 0 0 63 0 0 63 0 0 0 0 0 12,230 0 1,200 13,430 13/28 13/15 0 0 - 0 0 0 0 0 0 0 2 108 63 13,430 Support Spaces: Administration: Health: Media Center: Student Services: Food Service: Custodial Support Services: Total Support: 4,575 415 4,000 1,330 3,600 550 14,470 Subtotal: 27,900 Circulation @ 25%: 9,207 Total Proposed: 37,107 Multi-Purpose/Performing Arts 17 Lobby 18 Multi-Purpose Room 19 Student Store 20 Table/Chair/Equipment Storage 21 Music Platform/Drama 22 Dressing Room/Green Room 23 Toilet 24 Instrumental Room 25 Storage 26 Practice Room 27 Choral Room 28 Wardrobe 29 Performing Arts Office 30 Restrooms ANC NS ANC ANC NS ANC ANC SC ANC ANC SC ANC ANC ANC 500 5,000 200 200 1,200 150 65 1,800 200 225 1,200 150 100 200 1 1 1 3 1 2 2 1 1 2 1 1 1 2 500 5,000 200 600 1,200 300 130 1,800 200 450 1,200 150 100 400 3,000 12,230 Student Services Administration 57 Lobby 58 Reception 59 Principal 60 Assistant Principal 61 Flex Office 62 Counselor 63 PBIS Office 64 Attendance Clerk 64 Registrar 65 Clerical 66 Large Conference 67 Parent Center 68 Resource Room 69 Community Liaison Office 70 Workroom/Copy/Supply 71 Staff Lounge 72 Kitchen 73 Staff Toilets 74 Records Storage SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP 400 75 200 150 150 150 150 150 75 75 350 300 100 150 600 450 100 200 100 1 1 1 2 1 2 1 1 1 3 1 1 1 1 1 1 1 2 1 SECTION 7 MASTER PLAN DIAGRAMS 7.6 9,230 0 400 75 200 300 150 300 150 150 75 225 VP , Admin and Counselor 350 300 100 150 600 450 100 400 100 4,575 Health 75 Exam/Treatment 76 Toilet SP SP 350 65 1 1 350 65 415 0 July 2014 Page 302 ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan JHS1200_Orangeview.xlsx5/19/2014 MASTER PLAN DIAGRAMS ORANGEVIEW JUNIOR HIGH | PROGRAM Learning Center 77 RSP Workstations 78 Break Out Area 79 IEP 80 Records Storage 81 Speech Office 82 Psychologist Office SP SP SP SP SP SP 80 200 150 100 200 200 6 1 1 1 1 1 SECTION 7 MASTER PLAN DIAGRAMS 7.6 480 200 150 100 200 200 1,330 0 Media Center (2SF/Student minimum per CDE) 83 Circulation Desk 84 Innovation lab 85 Library/Media/Student Union 86 Collection Display/Stacks 87 Study Rooms 88 Workroom 89 Textbook/Tech Storage 90 Tech Office 91 Office/Equipment Storage 91 Toilet SP NS SP SP SP SP SP SP SP SP 100 1,200 1,600 600 250 200 300 200 100 50 1 1 1 1 3 1 1 1 2 1 100 1,200 1,600 600 750 200 300 200 200 50 1,200 4,000 1,200 Nutrition Services 92 Serving Kitchen/Food Prep 93 Dry Storage 94 Ref. Freezer 95 Serving Line 96 Office 97 Changing Room 98 Toilet 99 Lunch Shelter SP SP SP SP SP SP SP SP 800 150 75 1,200 75 50 75 3,600 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 3,600 3,600 0 Custodial Support Services 100 Head Custodian 101 Supply Storage 102 Grounds Storage 103 Custodial Closets SP SP SP SP 100 200 200 50 1 1 1 1 100 200 200 50 550 0 Total: Total Assignable Square Footage: 3,000 10,430 13,430 14,470 27,900 NOTE: SC AC SP NS Scheduled Teaching Station, Classroom or Lab. Ancillary Space, Square Footage totaled as part of Department Areas. Support Spaces Non-Scheduled Teaching Station July 2014 Page 303 ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan MASTER PLAN DIAGRAMS ORANGEVIEW JUNIOR HIGH | PROJECT COST SUMMARY Anaheim Union High School District SCOPE OF WORK CATEGORIES Orangeview JHS PROPOSED PHASE 1 TOTAL 1 Modernize & Reconfig Existing Classrm & Lab Bldgs. 1. Modernize & Reconfigure Existing Classroom & Lab Buildings $4,643,000 22% $1,000,000 2. Existing Building 2Systems Toilets Systems & Toilets Existing&Building $5,686,000 48% $2,750,000 3. Site Utilities $3,252,000 46% $1,500,000 $0 0% $4,330,000 50% $2,500,000 $940,000 0% $0 7. Multipurpose / Food Service Improvements Service Improvements 7 Multipurpose/Food $7,786,000 10% $750,000 8. Physical Education8Improvements Physical Education Improvements $3,562,000 45% $1,600,000 9. Administration & Staff Support & Staff Support 9 Administration $3,115,000 0% $0 10. Student Collaboration & Student Support Services Collaboration & Student Support Services 10 Student $3,870,000 100% $3,870,000 11. Safety & Security 11 Safety & Security $2,826,000 53% $1,500,000 12. Outdoor Learning12 Quads Outdoor Learning Quads $1,809,000 0% $0 13. Exterior Play Fields Hardcourts Play Fields & Hardcourts 13&Exterior $2,931,000 0% $0 14. 21st Century Learning Classroom FlexibilityClassroom Flexibility Century Learning 14 21st $1,100,000 50% $550,000 $766,000 50% $383,000 3 Site Utilities 4. New Construction Classrooms 4 New Construction Classrooms 5. Design Lab, Science, and Career Tech Education Lab, Science, and Career Tech Education 5 Design 6. Performing Arts Improvements 6 Performing Arts Improvements 15. Technology Infrastructure 15 Technology Infrastructure SECTION 7 MASTER PLAN DIAGRAMS 7.6 July 2014 Page 304 Total Construction / Project Cost (2014$) Total Construction / Project Cost (2014$) $46,616,000 $16,403,000 ANAHEIM UNION HIGH SCHOOL DISTRICT Facilities Master Plan