977 SOUTH ROUTE 83 • ELMHURST, ILLINOIS 60126 • T 630.834

Transcription

977 SOUTH ROUTE 83 • ELMHURST, ILLINOIS 60126 • T 630.834
9 7 7 S O U TH R O U TE 8 3 • EL M H UR S T , I L L I N O I S 6 0 1 2 6 • T 6 3 0 .8 3 4 .8 0 4 3 • F 6 3 0 .8 3 4 .8 0 4 6 • W W W .ICIINC.COM
Table of Contents
INTERNATIONAL CONTRACTORS INC.
1. Firm Introduction
2.
Relevant Experience
WWW.ICIINC.COM
1
SECTION ONE
Firm Introduction
CORPORATE OFFICE
THE COMPANY
977 SOUTH IL ROUTE 83
Currently in our 33rd year in business, ICI is a family-owned company in its second
ELMHURST, ILLINOIS 60126
generation of leadership. Since 1982, we have completed award-winning projects
T 630.834.8043
through general contracting, construction management and design/build project
F 630.834.8046
delivery.
WWW.ICIINC.COM
Our clients represent a variety of industries: education, retail, restaurant and
healthcare, to name a few; yet their construction needs are essentially the same
FLORIDA OFFICE
– the delivery of high-quality spaces on time and within their budget. ICI not only
4168 SOUTHPOINT PKWY.
meets our clients’ expectations, we exceed them. The proof: more than 80% of
SUITE 101
our projects are generated by repeat clients and referrals. Clients continually turn
JACKSONVILLE, FLORIDA 32216
to ICI for their construction needs because of our performance history and strong
T 904.245.1782
project delivery.
OUR PEOPLE
Each member of our staff fulfills an essential role within the company. As such,
our team of more than 40 has been carefully assembled throughout the years
and the formula has proven successful; many team members have exceeded their
10 year mark as an ICI employee.
In addition to bachelor and master’s degrees in construction management,
architecture and civil engineering, members of our skilled team hold many
respected industry-specific accreditations and professional certifications. ICI
employs 2 of only 26 Certified Professional Estimators (CPE) in the state of Illinois,
9 LEED Accredited Professionals, 1 Certified Professional Constructor (CPC), 16
SWPPP (Storm Water Pollution Prevention Plan) Certified Staff members and 1
Certified Preparer of SWPPP (CPSWPPP).
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Firm Introduction
More than 80%
of our projects
are generated
HISTORY
International Contractors, Inc. was founded in 1982 by Richard Bronge and
his eldest son, Randall. Two years later Richard’s middle son Bruce joined the
business, followed by his youngest son Jeff in 1988.
by repeat clients
and referrals.
For the first several years, the firm focused on hard bid general contracting. As
time passed and the firm grew, there was a gradual shift towards the relationshipbased business the firm remains today. Because of this approach to construction,
several of ICI’s first clients from the early 1980s remain clients today.
Richard has since retired and the firm is now in its second generation of leadership.
Bruce is ICI’s President, Randall is the Executive Vice President and Jeff has been
with the estimating department since the late 1980s.
PROFILE
Our proven ability to build strong partnerships has led to over 80% of our projects
being generated by repeat clients and referrals in several markets including more
than $150 million in retail projects, $70 million in restaurant construction and
over $250 million in education projects in the past 5 years.
Acting as a construction manager, a general contractor or as part of a design/
build team, ICI has delivered projects ranging in scope and scale from $200,000
renovations and expansions to the construction of $40 million new buildings on
50+ acre sites.
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Firm Introduction | Markets
ICI employs
2 of only 26
Certified Professional
Estimators in Illinois.
Automotive
From showroom renovations to façade improvements to the construction of new dealerships,
ICI is a trusted construction partner to dealership owners and general managers.
Commercial
ICI is accustomed to fast-track projects and handling the details and finishes that go into
opening new commercial facilities and renovating existing ones.
Healthcare
From ambulatory surgical centers to medical office buildings, our healthcare leadership team
has the experience and knowledge necessary to uphold our client’s vision throughout all
phases of a project.
Higher Education
Our growing portfolio of includes a new state-of-the-art athletic facility, a student welcome
center and many learning environments that incorporate the latest technology and student
amenities.
K-12 Education
ICI possesses extensive experience with new facilities, additions, life safety renovations, utility
updates and new technology integration.
Municipal
Municipalities and public entities throughout the Chicago area turn to ICI for the instruction
of their village halls, fire stations and libraries, to name a few.
Recreation
Clients have sought us out to build television studios, museum exhibits, entertainment venues
and spas. ICI excels at projects that require great attention to detail.
Restaurant
Our reputation in the restaurant industry is unparalleled. ICI has extensive experience
building projects ranging from local family cafes to nationally franchised restaurants.
Retail
ICI has an excellent history of constructin strip centers, stand-alone facilities, ground floor
retail space, store front build-outs and space renovations.
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
2
SECTION TWO
INTERNATIONAL CONTRACTORS, INC.
Automotive Experience
From showroom renovations to façade
improvements to the construction of
new dealerships, ICI is a trusted construction partner to dealership owners
and general managers. ICI established a
strong presence in the automotive construction market in our earliest years in
business. Since that time, our portfolio
has grown significantly and we have traveled across the country for our dealership
clients providing general contracting,
design/build and construction management services.
Whether you are planning to renovate an
existing dealership or moving into a new
building, ICI’s team of project managers,
cost estimators and superintendents will
Clients
Chrysler Realty Corporation
Larry Roesch Family Auto Group
Fields Auto Group
Loeber Motors
and staff; outline an aggressive project
Glenview Autobody
Orlando Infiniti
schedule; and ultimately, deliver a deal-
Grossinger Auto Group
work with you to develop a customized
construction plan that will minimize disturbance to your operations, customers
ership that projects an image and brand
worthy of your business.
INTERNATIONAL CONTRACTORS INC.
Harold Ziegler Auto Group
Roland Gartner Cars
The Exchange Auto Group
WWW.ICIINC.COM
The Exchange Auto
Group
In May 2015, ICI broke ground on
with high-end suspended ceiling systems,
a new 45,000 square foot two-story
8’ tall wood doors in aluminum door
PORSCHE DEALERSHIP
Porsche Dealership in Highland Park for
frames a multitude of interior window
The Exchange Auto Group. The project
systems.
LOCATION
is targeted to be complete and open for
Highland Park, Illinois
business by July 2016.
The building is heated and cooled with
7 packaged rooftop units, make-up air
PROJECT DELIVERY
Within the Porsche Exchange Dealership
units, infrared heating in Service areas,
General Contractor
ICI will construct a new showroom,
various exhaust systems and an elaborate
customer lounge, sales area, vehicle
control system.
ARCHITECT
delivery, service reception space, service
JRB Group Architects
department for 15 vehicles, a two-level
The
parts department and employee areas
structurally-glazed
including a break room and locker room.
aluminum composite wall panels. The
building
exterior
Fin
includes
system
a
and
site employs an underground storm
The building has porcelain tile, Clinker
water detention system and elaborate site
tile, carpeting and vinyl floor finishes,
lighting and parking for 268 cars.
decorative metal panel ceilings along
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
BMW Dealership
In continuation of a nearly twenty-year
new canopies project up to 13 feet off
FIELDS AUTO GROUP
partnership with the Fields Auto Group,
the building.
ICI was contracted in late summer 2015
LOCATION
Northfield, Illinois
PROJECT DELIVERY
General Contracting
ARCHITECT
Charles Vincent George Architects
to renovate and expand the auto group’s
In addition to the new curtainwall, the
BMW Dealership in Northfield, Illinois.
exterior is comprised of Drvit EIFS
finish with a glossy glass look with a
The primary objective of the renovation
hydrophobic coating.
/ expansion project is to align the
dealership with the current BMW design
The dealership has remained operational
standards. To keep the dealership on
throughout construction. To achieve
brand, ICI replaced the glass curtainwall
minimal disruption to both staff and
system on the west, south and eastern
customers, the ICI Team coordinated
façades. The existing showroom was
portions of work to take place during
also renovated and expanded and new
off-hours.
finishes are being installed throughout.
The project is scheduled to be completed
ICI installed large structural steel
in two phases. Phase I was completed in
members over the existing roof structure
February 2016 and Phase II is currently
to carry the new cantilevered canopies
underway.
projecting out from the building. The
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Ford Dealership
In late summer 2016, ICI is breaking
of the project and worked alongside
PACKEY WEBB BROTHERS
ground on site improvements and the
ownership to prepare the cost estimates
construction of a new Ford Dealership in
needed to secure TIF funding.
Downers Grove, Illinois. The significant
The new dealership will feature a state-
project marks ICI’s first with the Packey
of-the-art showroom made highly visible
Webb automotive group.
on the well-traveled intersection due to
LOCATION
Downers Grove
PROJECT DELIVERY
Construction Management
ARCHITECT
Charles Vincent George Architects
the exterior glass curtainwall system.
The new 63,000 square foot dealership is
Other portions of the building will be
being constructed on a 10 acre site at the
clad with a slate gray ribbed metal panel,
intersection of Lacey Road and Ogden
giving the building a distinct, forward-
Avenue.
thinking appearance.
The parcel is currently vacant but will
The project is targeted for completion in
require site contamination management
early fall 2017.
as
well
as
extensive
underground
detention. ICI was heavily involved
throughout the preconstruction phase
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Chrysler Jeep Dodge
Dealership
ICI completed all preconstruction and
ICI prepared a soils import/export
site work for the Chrysler Jeep Dodge
cost analysis report and recommended
FIELDS AUTO GROUP
Dealership in “The Glen” in Glenview
a change in the planned elevation to
Illinois in 2004. The project was then
provide a cost savings of $450,000.00.
LOCATION
put on hold for several years. After the
Site work included the installation of
Glenview, Illinois
hiatus, Fields Auto Group once again
137 caissons at a bearing elevation of
turned to ICI for the completion of the
-20 ft. Additionally, ICI has installed the
project. Construction of the building
facility’s stormwater detention system,
took place beginning in early summer
comprised of 2,400 lineal feet of 8 foot
2013 and was turned over to the client
diameter detention pipe.
PROJECT DELIVERY
Construction Management
ARCHITECT
JRB Group Architects
in March 2014.
The building is a stucco outer finish and
INTERNATIONAL CONTRACTORS INC.
The facility was constructed on what
features a massive glass curtain wall.
was originally intended to be a 6.125
The interior is constructed of high-end
acre detention area for the adjacent retail
millwork and finishes under 20+ foot
complex. Therefore, ICI went to extreme
vaulted ceilings. The large showroom,
measures to construct a building pad
waiting area, cafe, executive offices,
suitable for construction of the facility.
service area and parts department are
WWW.ICIINC.COM
Chrysler Jeep Dodge
Dealership
all included in this 42,000 SF auto
To date, we have built auto dealerships
dealership. ICI has been working with
for them throughout the Chicago area as
FIELDS AUTO GROUP
the Fields Auto Group since the 1990s.
well as in Florida and California.
[CONT’D.]
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Land Rover Dealership
In late 2014, ICI completed the Fields
ceiling. New interior ceilings, soffits and
FIELDS AUTO GROUP
Auto Group’s Land Rover Dealership
floor and wall finishes will be replaced
in Northfield, Illinois. The project
throughout the store. New first floor
LOCATION
scope consisted of the conversion of an
offices are also part of the project scope.
Northfield, Illinois
existing dealership and work included a
PROJECT DELIVERY
new façade as well as demolition of the
Site work for the project included the
existing showroom and offices.
installation of a new Land Rover test
Construction Management
track as well as new lighting throughout
The existing façade was completely
ARCHITECT
removed and the new consists of metal
JRB Group Architects
panels and cultured stone.
the site.
Within the store, ICI installed elements
consistent with Land Rover branding:
decorative timber trusses and a wood
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Ford Dealership
The Roesch Family’s Ford Dealership
The project consists of demolition of the
ROESCH FAMILY AUTO GROUP
in Bensenville was in need of updates
existing showroom and the installation
and an image overhaul. Because of
of a new reinforced curtainwall system
International Contractors’ long-standing
for the new showroom. The expansion
partnership with the dealership owner,
features a new 30’ tall by 165’ wide Ford
the Roesch Family looked to ICI to
Brand Wall clad with composite metal
provide a solution.
panels and a 24’ tall Ford Brand Wall
LOCATION
Bensenville, Illinois
PROJECT DELIVERY
Design / Build
ARCHITECT
The DePalma Group
Entry Tower also clad with composite
The Owner outlined their budget and
metal panels. The new showroom
project timeline upfront. To meet these
incorporates porcelain tile throughout
aggressive goals, ICI advised the client to
the entire floor.
opt for a Design / Build project delivery
INTERNATIONAL CONTRACTORS INC.
method. ICI issued a Request for
Additionally, the office spaces were
Proposal from various auto dealership
renovated and the mechanical systems
architects and worked with the owner to
were replaced. The project was completed
select The DePalma Group.
in May 2013.
WWW.ICIINC.COM
Mini Dealership
ICI finished the complete renovation of
a new steel building structure with slab-
FIELDS AUTO GROUP
an existing, 14,000 SF, service and parts
on-grade concrete and a TPO membrane
building and the construction of a new,
roofing system.
location
Chicago, Illinois
project delivery
7,000 SF, showroom/office building for
this new BMW MINI Dealership within
a very tight 5-month schedule.
The north side of the addition is
comprised of full-height (20+ feet) glass
curtainwall and exterior aluminum
Renovation of the existing space included
composite panel cladding. The finished
the installation of new underground
space features plastic laminate cabinets
architect
plumbing
with solid surface countertops, interior
JRB Group
concrete,
Construction Management
systems,
slab-on-grade
non-load-bearing
masonry
aluminum and glass storefront partitions,
walls, new mechanical and electrical
acoustical ceiling tile systems, stained
systems, roof deck insulation, overhead
concrete flooring, ceramic tile, and
doors and vitrified (clinker) ceramic tile.
carpet flooring.
After
existing
As Construction Manager for Fields Auto
showroom, construction of the new
Group, ICI has completed more than 20
addition began with installation of
auto dealership projects since 1994.
demolition
of
the
concrete foundations and the erection of
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Volvo Dealership
In February 2011, ICI completed
Management Program and was able to
FIELDS AUTO GROUP
construction of a new 27,500 SF, Volvo
achieve our goal of diverting 95% of
Dealership in Northfield, Illinois. This
all construction debris from the waste
dealership, ICI’s 20th project with Fields
stream.
location
Northfield, Illinois
Auto Group, is recognized by the United
project delivery
States Green Building Council as a
General Contracting
LEED Silver Certified facility.
Our administrative staff kept detailed
records on all materials used on this
project. At project completion, the
The first of its kind in the U.S., this
volume of recycled content used in
dealership incorporates many unique
building materials was over 26% and the
features which increase the sustainability
volume of regional materials (extracted
CERTIFICATION
of the building, including wind turbines,
and manufactured within 500 miles) was
LEED SILVER
a rain water harvesting system, solar
above 40%. Factoring in construction
panels and an “eco-garden,” to name a
waste, the project earned six points for
few.
these credits alone, which includes two
architect
JRG Group Architects
AWARD
ENR Midwest Merit Award
2011 Green Building Project
During construction, ICI implemented
points for Exemplary Performance.
a comprehensive Construction Waste
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Volvo Dealership
During both design and construction,
Compounds and Allergens were not
FIELDS AUTO GROUP
the project employed a number of
introduced into the building. Finally, the
[CONT’D.]
innovative methods to ensure the Indoor
HVAC System was commissioned and
Environmental Quality met LEED
the building was thoroughly flushed of
Standards. For example, the project
any contaminates prior to occupancy.
incorporates day lighting and allows the
occupants the ability to control lighting
levels. During construction, special care
was taken to ensure dirt, Volatile Organic
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
BMW Dealership
Fields Auto Group purchased an existing
The separate new building is an auto-
fields auto group
building and a vacant parcel of land ad-
matic car wash and a new 4-bay prep
jacent the property. The dealership own-
center. Lastly, within the existing build-
ers turned to ICI to renovate the existing
ing, ICI remodeled the general offices
building, expand onto the western edge
and expanded the service manager’s of-
of the building and also construct a stand
fice area.
location
Lakeland, Florida
project delivery
Construction Management
architect
JRB Group Architects
alone building on the edge of the property. Additionally, ICI added 140 new
parking space and placed associated site
utilities - landscape, paving and curbs.
Within the addition, ICI constructed an
service center with eight bays and added
and new tool room, parts room elevator,
training center and an expansion of a
2-level parts storage area.
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Fiat Dealership
Chrysler Corporation brought FIAT
the façade storefront, interior finishes
fields auto group
back into the United States for the first
and existing signage, immediately after
time in 25 years and Fields Motorcars
the Client’s transition from the space.
location
Highland Park, Illinois
opened the first dealership in Illinois.
In
coordination
with
Complete renovation of the showroom
construction
and other sales / customer areas took
project delivery
completed on a new Fields Volvo
place within a non-stop, eight (8)
Construction Management
Dealership in Northfield, IL, the new
week, schedule. To ensure a quick
FIAT dealership moved into an existing
transformation, ICI coordinated with
architect
location in Highland Park, previously
Fields Motorcars and JRB Group
JRB Group Architects
occupied by Volvo. ICI’s ability to
architects during preconstruction to
develop and effectively coordinate the
identify, coordinate, and place orders for
schedules of these two projects was crucial
FIAT approved materials.
in allowing for a smooth transition.
The scope of work for the fast-track FIAT
project included complete demolition of
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Infiniti Dealership
This 36,910 SF building includes a full-
completed prior to the winter months.
FIELDS AUTO GROUP
service cafe, theatre room, fitness center
Additionally, sizing and coordination
and patio deck. Based merely on three
of electrical utilities and placement of
early design drawings and a soils report,
primary service to a new transformer
ICI was able to accurately forecast the
were allowed without complete electrical
budget for this project. In fact, the final
drawings.
location
Glencoe, Illinois
project delivery
Construction Management
architect
JRB Group
construction cost, at $6.5 Million was
within 4% of the design budget. This
Five thousand cubic yards of unsuitable
budgeting allowed the owner to obtain
soil was removed and an underground
financing and ICI to tighten the schedule,
detention system was installed to
bid the project to trade subcontractors
accommodate an additional parking lot.
and begin construction as the design was
being completed.
The fast-track schedule allowed trade
contractors
Because
of
schedule
to
work
through
constraints,
winter, saving months on the schedule
ICI established a fast-track phased
and thousands of dollars in General
construction sequence and worked
Condition costs.
with the Village of Glencoe closely to
coordinate interim permitting. This
allowed for site grading and paving to be
INTERNATIONAL CONTRACTORS INC.
the
WWW.ICIINC.COM
Land Rover Dealership
For more than fifteen years, the Fields
The dealership features a contemporary
FIELDS AUTO GROUP
Auto Group, JRB Group Architects
interior and exterior design with the
and ICI have collaborated on numerous
added amenities of a customer lounge,
car dealership design and construction
patio and Land Rover off-road test track
projects.
with water feature.
During that time, projects have entailed
The service area is particularly unique
the construction fo new, ground up
featuring 17 service bays, one alignment
facilities as well as the renovation,
rack and three detail bays. Energy
conversion or expansion of existing
efficient, high speed motion sensors
facilities.
activate the bay doors when a vehicle
LOCATION
Eatonville, Florida
PROJECT DELIVERY
Construction Management
ARCHITECT
JRB Group Architects
approaches. The maintenance free floors
The 33,240 SF Land Rover Dealership in
are poured, dyed with a concrete finish,
Eatonville, Florida is an excellent example
and then sealed with a buffering polish.
of the schedule and cost efficiencies
INTERNATIONAL CONTRACTORS INC.
possible when this well-acquainted team
During
collaborates. The new dealership was
ICI provided over $110,000 in value
completed for $5.5 million within a 10
engineering options. Also during design,
month project schedule.
ICI and JRB Group worked closely in
the
preconstruction
WWW.ICIINC.COM
phase,
Land Rover Dealership
the redesign of the shop light fixture
Furthermore, an environmentally safe,
FIELDS AUTO GROUP
package. T8 fluorescent light fixtures
filtered, underground runoff system was
[CONT’D.]
were installed, reducing energy usage
developed conserving usage of public
throughout the store.
wastewater treatment facilities.
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Land Rover and Jaguar
Dealership
The Land Rover and Jaguar Dealership in
further complicate the project, site work
Waukesha, Wisconsin project consisted
needed to be completed while the Volvo
fields auto group
of an expansion onto an existing Volvo
remained operational. Additionally, the
Dealership to accommodate space for
construction of the infrastructure went
location
the two new dealers. Additionally, ICI
through 0 degree weather by enclosing
Waukesha, Wisconsin
renovated the existing Volvo showroom
the structure area by area. Despite these
and service area and constructed a new
conditions, the project was delivered in
project delivery
outlot building for car wash and prep
the spring as promised.
General Contracting
bays.
architect
The
JRB Group Architects
several challenges. Among them, design
schedule
presented
ICI
with
documents were not available until the
fall, yet site work needed to be complete
prior to the winter ground freeze. To
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Smart Car Dealership
ICI was contracted by Loeber Motors to
to protect it from any dust or potential
LOEBER MOTORS
remodel its existing showroom space to
damage.
make way for a new Smart Car line.
LOCATION
Lincolnwood, Illinois
Loeber Motors wanted the Smart Car
and ceramic tile to complete the desired
showroom to be available within 8
Smart Car look.
PROJECT DELIVERY
weeks, so ICI set an aggressive schedule
General Contracting
and completed the 2,400 SF build-out
on-time and budget.
ARCHITECT
Valerio Dewalt Train
ICI installed an armature wall display
Night work included demolition of the
The dealership remained open during the
duration of the project, requiring ICI to
work around the Loeber employees and
customers in order to avoid disruption.
existing showroom floor in preparation
for the build-out. The area’s original felt
ceiling was covered in durable plastic
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM
Chrysler, Dodge, Jeep
Dealership
Initially, the Roesch Chrysler dealership
Decorative and durable porcelain tile
and Service Center were in two separate
was installed throughout.
but adjacent buildings. ICI was assigned
of ornamental wire mesh enhance the
the task of demolishing the Chrysler
newly installed staircase to the service
location
showroom while keeping the service area
area as well as the showroom entry area.
Elmhurst, Illinois
intact and functioning. This required
Executive offices are located on the
disconnecting utility services to the
mezzanine overlooking the showroom.
roesch family auto group
project delivery
showroom while retaining them in the
Design / Build
service building.
Handrails
ICI served as Design-Builder for this
$4.5 Million Diamler Chrysler “Alpha”
architect
The new, 2-level showroom encompasses
project. Hiring VDT to work under
Valerio Dewalt Train
24,250 SF and is constructed of masonry,
contract with ICI provided the Client
steel and glass.
with a single-source of responsibility
throughout the project.
Alucobond panels were installed over
the masonry to provide a decorative
and contemporary look to the building’s
exterior. These, along with a 28-foot glass
curtain wall, added to the appeal of the
final product.
INTERNATIONAL CONTRACTORS INC.
WWW.ICIINC.COM