FORMER RadiciSpandex Plant

Transcription

FORMER RadiciSpandex Plant
FORMER
RadiciSpandex Plant
Production euipment and building available in Tuscaloosa, AL
DRY SPIN PLANT
TUSCALOOSA, ALABAMA
n  Established in 1994
n  265,000 sq. Ft across three floor levels
n  Approximately 20 acres of property in an Industrial park setting
2
DRY SPIN PLANT AND PROCESS
PLANT
n 
168 spinning cells
n 
Six spinning sub systems
n 
Twenty-eight spinning cells per sub system
n 
Sixteen / twenty-four positions per cell
n 
Annual capacity is 12-14 million lbs in denier range of 10 - 1680
3
DRY SPIN PLANT AND PROCESS
DRY SPINNING PROCESS
Major Process systems
n 
Raw Material Delivery and Storage – All stainless steel storage
n 
Pre-polymer (6- reactors, flow controls and pumps – all stainless)
n 
Polymerization (6 – reactors, flow controls and agitated storage vessels, attritors,
specialized mixing equipment)
n 
Spinning Systems – 168 - 16 & 24 end solution dry spin cells, gode’ assemblies,
winders, lubrication application.
n 
DCS – Foxboro I/A – upgraded 2009, hardware and software
n 
Solvent Recovery – three distillation skids for DMAc recovery
n 
Infrastructure – four boilers, six chillers, two low temperature chillers, five air
compressors w/ dryers, five cooling towers
n 
Large quantity of MCC equipment all Allen Bradely, large volume of VFD with HP
range of 10 – 100.
n 
Large quantity of HVAC euipment, exhaust fans and swamp coolers
4
DRY SPIN PLANT AND PROCESS
DRY SPINNING PROCESS
Two Bay truck unloading – covered and diked, load and unload walkways
and ramps for top tanker access, dock leveler
5
DRY SPIN PLANT AND PROCESS
Pre Polymer Capping Reactor – six total
6
DRY SPIN PLANT AND PROCESS
POLYMER REACTOR – six total units
7
DRY SPIN PLANT AND PROCESS
DRY SPINNING PROCESS
DSC – Foxboro I/A – two control rooms
8
DRY SPIN PLANT AND PROCESS
SPINNING SYSTEM – 168 cells
9
DRY SPIN PLANT AND PROCESS
DRY SPINNING PROCESS
Solvent Process
Condensors
10
DRY SPIN PLANT AND PROCESS
WINDER AREA
11
DRY SPIN PLANT AND PROCESS
DRY SPINNING PROCESS
Quality Assurance Lab – titrators, Brookfield
viscometers, moisture analysis, GC, fiber
testing equipment
12
DRY SPIN PLANT AND PROCESS
SOLVENT RECOVERY - DMAc
Three skid mounted units
13
14
15
16
17
18
19
20
Three - 3500 KVA Transformer / Switching Gear
21
Contact
Alan Davis
Director Operations
205.752.0677 / 205.657.0795
[email protected]
pateholdings.net

Similar documents