TRANSMITTAL
Adena Corporation
No. 00082
1310 West Fourth Street
Mansfield, OH 44906
Phone: 419-529-4456
Fax: 419-529-4288
PROJECT: Shelby High School
TO:
Barton Malow
8720 Orion Place
Suite 110
Columbus, OH 43240
ATTN:
Erich Hiedemann, AIA
WE ARE SENDING:

DATE: 4/5/2012
REF:
SUBMITTED FOR:

Shop Drawings
ACTION TAKEN:
Approval
Approved as Submitted
Letter
Your Use
Approved as Noted
Prints
As Requested
Returned After Loan
Change Order
Review and Comment
Resubmit

Plans
SENT VIA:
Samples
Other: Made from Distributions
ITEM NO. COPIES DATE
Returned for Corrections
Separate Cover Via:
ITEM
NUMBER
Due Date:
email
REV. NO. DESCRIPTION
4/5/2012
SUB
102226-002
001
Title: 1.5B LEED
NEW
1
4/5/2012
SUB
102226-003
001
Title: 1.5C Shop drawings
NEW
1
4/5/2012
SUB
102226-004
001
Title: 1.5F qualification data
NEW
1
4/5/2012
SUB
102226-005
001
Title: 1.5H Product test reports
NEW
1
4/5/2012
SUB
102226-006
001
Title: 1.5J sample warranty
NEW
1
4/5/2012
SUB
102226-001
001
Title: 1.5A product data
NEW
SUBMITTAL REVIEW
REVIEWED
FURNISH AS CORRECTED
REVISE AND RESUBMIT
REJECTED
SUBMIT SPECIFIED ITEM
x
This review is only for general conformance with (1) the design concept and (2) the information
given in the construction documents. Corrections or comments made on a shop drawing during
this review do not relieve the contractor from compliance with the requirements of the plans and
specifications. Approval of a specific item does not include approval of an assembly of which
the item is a component. The contractor remains responsible for: dimensions to be confirmed and
correlated at the job site; information that pertains solely to the fabrication process or to the
means, methods, techniques, sequences and procedures of construction; coordination of the
Work with that of all other trades; and performing all Work in a safe and satisfactory manner.
Date:
CC: file
STATUS
1
Remarks:
By:
Submit
Returned
 Attached
Specifications

operable partition
Shelby HS
Shelby ohio
NO EXCEPTIONS TAKEN
MAKE CORRECTIONS NOTED
AMEND & RESUBMIT
REJECTED - SEE REMARKS
REVIEWED FOR COORDINATION
APPROVAL IS SUBJECT TO ALL CONTRACT DOCUMENTS AND DOES NOT AUTHORIZE ANY CHANGE
IN COST UNLESS STATED IN SEPARATE LETTER
OR CHANGE ORDER.
ADENA CORPORATION
ENGINEERS & CONSTRUCTION
4/5/12
DATE ______________
31203
JOB NO. _______________
BY:
4/6/2012
Signed:
J.J. Trumpower
Expedition ®
MR(4.1-4.2): Recycled
Content
Content
LEED data 700 series
Product Component
Material
Astragal
Aluminium
3.00%
Panel Frame
Steel
Panel Skin Backing
MR(5.1-5.2): Local/Regional Materials
EQ(4.1-4.4): Low-Emitting
Materials
VOC limits
Ureaformaldehyde
resins
23
NO
NO
11
NO
NO
Boucherville, QC
Montreal, QC
(Moderco)
(Carrière Lefebvre)
18
NO
NO
2.50%
Boucherville, QC Lachine, QC (Acier
(Moderco)
Blais)
20
NO
NO
0.00%
0.00%
Boucherville, QC
(Moderco)
Drummondville,
QC (Extrusion de
l'Est)
57
YES (0.4%)
NO
0.85%
80.00%
20.00%
Boucherville, QC
(Moderco)
Ste-Julie, QC
(Acier picard)
11
NO
NO
0.85%
1.25%
80.00%
20.00%
Boucherville, QC
(Moderco)
Ste-Julie, QC
(Acier picard)
11
NO
NO
Aluminium
3.30%
5.00%
0.00%
0.00%
Boucherville, QC
(Moderco)
Montreal, QC
(Indalex)
23
NO
NO
Trolley and Support
Steel
0.70%
3.00%
80.00%
20.00%
Boucherville, QC
(Moderco)
Montreal, QC
(Acier picard)
11
NO
NO
End Cap
Plastic
0.05%
1.15%
0.00%
100%
Boucherville, QC
(Moderco)
Thetford Mines,
QC (Inivex)
144
NO
NO
Adhesive (Panel skin)
Adhesive
0.13%
2.00%
0.00%
0%
Boucherville, QC
(Moderco)
Grand Rapids, MI
(H.B. Fuller)
701
NO
NO
Adhesive (Panel finish)
Adhesive
0.13%
2.00%
0.00%
0%
Boucherville, QC
(Moderco)
Grand Rapids, MI
(H.B. Fuller)
701
NO
NO
98.00%
75.00%
26.46%
42.08%
% post
consumer
% pre
consumer
(post
industrial)
7.00%
0.00%
0.00%
Boucherville, QC
(Moderco)
Montreal, QC
(Indalex)
7.50%
10.00%
80.00%
20.00%
Boucherville, QC
(Moderco)
Montreal, QC
(Acier picard)
Gypsum
42.00%
6.50%
5.50%
93.50%
Panel Skin
Steel
35.00%
27.00%
47.50%
Trim and Seals
Plastic
5.00%
9.25%
Drop Seals Mechanism
Steel
0.35%
Drop Seals
Steel
Track
Total without finish
% Material % Material
Weight
Cost
Place of
Place where raw
Mealage (MI)
(numbers
manufacture
materials are
underlined
(final assembly
extracted,
of components) harvested(compo represent 80% of
the material weight)
nents)
Finish **
Carpet
2.00%
25.00%
5-50%
50-95%
Boucherville, QC
(Moderco)
Randolph, MA
(Hytex)
332
NO
NO
Finish **
Vinyl
2.00%
25.00%
0%
0.00%
Boucherville, QC
(Moderco)
Columbus, MS
(Omnova)
1430
NO
NO
Finish **
Cork
2.00%
25.00%
0%
1.00%
Boucherville, QC
(Moderco)
Spain
≈4500
NO
NO
Finish **
Laminate
2.00%
25.00%
0%
0.00%
Boucherville, QC
(Moderco)
Temple, TX
≈3000
NO
YES (Trace)
Finish **
White board
0%
95%
Boucvherville, QC
(Moderco)
0
20
NO
?
Finish **
Woven fabric
0%
100%
Boucherville, QC
Valdese, NC, USA
(Moderco)
991
NO
NO
2.00%
25.00%
** Finish depends on the specification of the customer.
Tableau LEED
For each product or material included in this sheet, please:
Complete ALL information fields (if an item does not apply, enter "N/A") AND
Attach backup Source Information.
This form is required for all materials used in spec sections 3-10, 31, 32 and all VOCs
regardless of spec section.
LEED MATERIAL BUY-OUT FORM
Subcontractor Information
Company Name:
Address:
Phone Number
y V£) _ 2. 3 ,£""— C/
Fax Number
(c
—
Project Contact:
Cost2
Spec.
Section
t<92J2.24
Product or Material
<9/2e^U
Source Information1
(Attached)
fafi'fra,ll_
V^
Construction
Cost (includes
labor,
equipment,
materials)
Materials Cost
(excludes labor,
equipment)
ys'&B^Qs&t
Regional Materials3
Wood
component
cost
I Recycled Content4
Distance
Distance
% of Material
% Post
between
between
meeting 500- j Consumer
project &
project &
mile standard for
manufacture extraction (in
manufacture
(in miles)
miles)
AND extraction
%
%Pre
Consumer
(aka PostIndustrial)
>SZ>O >S~Oo T-Z^T^.V^fv^.O^
T—~ -
FSC Certified Wood5
% Certified
Wood
P/A
|
Forest Stewardship
Council Chain-ofCustody Certificate
Number
"/A
VOC6
VOC
Content
(9'U
Material
Quantity (in
gallons or
liters)
i (2 , ^±
\
i
-
- T
|
"
r "
i
I
" Ir
—
I
--
_
—
j
"J
!
1
•
r
I
1 Attach Source Information for the materials / products listed verifying each category claiming credit. Acceptable sources include product literature, a letter from the manufacturer or product cut sheets. Letters from the installer or vendor are not acceptable unless they are also the
manufacturer.
2 Construction cost is the total contract cost of materials, labor and equipment for the installation of a given product or material. Materials cost is the construction cost minus the labor and equipment cost. Cost information is not required for adhesives sealants or paints reporting only VOC
content (unless that product also claims credit for another category.
3 Manufacture location is defined as the final assembly location of the product or material. Extraction location is where the source material was mined, harvested or collected. For recycled materials, the extraction point is the place where the recycling occurred. If only a fraction of a
product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value (referred to as "percent compliance" per LEED). Any material with a manufacture or extraction point further than 500 miles, please
indicate >500 in the corresponding box.
4 Recycled content is calculated by cost and percentages are determined by weight, separated into pre-consumer and post-consumer content. Pre-Consumer (aka post-industrial) recycled content is output from a process that has not been used as part of a consumer product, that is sold,
traded, or exchanged under commercial terms as feedstock for another industrial process, and that would otherwise be landfilled, incinerated or somehow disposed of as waste, as defined by the Federal Trade Commission. Post-Consumer recycled content is consumer waste that has
become raw material (feedstock) for another product. It originates from projects that have served a useful purpose in the consumer market.
5 Forest Stewardship Council (FSC) is a third-party certification system adopted by timber management companies. A LEED point is earned if at least 50% of wood based products (by cost) used on the project carry this certification standard. The calculation includes the total cost of FSCcertified wood products divided by the total cost of wood-based products used on the project.
6 VOC content and total product quantity information must be provided for all adhesives, sealants, paints and coatings used within the building moisture barrier.