Untitled - Türkerler Holding A.Ş.

Transcription

Untitled - Türkerler Holding A.Ş.
With our professional experience and
financial power, together with the technical
and executive staff capable of competing
with the entire world, we add value to our
business and we are proud to be a symbol
of Turkey’s transcending power.
Türkerler Construction
Türkerler Energy
Infrastructure
Energy Generation
Emaar Libadiye
Hydroelectric Power Plant (14 Licenses 428 MW)
Kayabeyi Dam and Akıncı Hydroelectric Power Plant
Wind Energy Power Plant Renewable Energy Systems
Erenköy Regulator and Hydroelectric Power Plant
Yayla Regulator and Hydroelectric Power Plant
Geothermal Energy (4 Licenses 150 MW)
Angutlu I-II Regulator and Hydroelectric Power Plant
Thermal Power Plant (609 MW)
Demirci Regulator and Hydroelectric Power Plant
Kanat Regulator and Hydroelectric Power Plant
Electricity Trading
Başköy Dam
Ambar Dam
Mucur Compressor Station
Natural Gas
Natural Gas Pipelines
İzmirgaz (Distribution – 6,5 bcm/year capacity)
Taşoluk Potable Water Treatment Plant
İnci Natural Gas Imports and Exports
Ulus – Keçiören Subway
İnci Natural Gas Transmission
Bağcılar – Güneşli Highway Junction
Angoragaz Natural Gas Wholesale Imports and Exports
İzmir Natural Gas Distribution Project
Turga Natural Gas Exports and Imports
Ankara Natural Gas Distribution City Gate Station Project
Superstructure
Ankara Etlik Integrated Healthcare Campus
Çiftçi Towers
Park Yaşam Mavişehir
Ankara Westgate Project
Ankara Arena Multipurpose Sports Complex
Ankara Metropolitan Municipality Building
Kuzey Ankara 2nd, 11th and 16th Stages
Çarşamba 672 Residence
Samsun Training and Research Hospital
Adıyaman Public Hospital
Fatih Sultan Mehmet Han Hospital
Police Morale and Education Center
(35 Licenses 1,527.5 MW)
Türker Group Electricity
Public Private Partnership
Hospital Projects
Water Treatment and Distribution
Other Group Companies
Ankara Etlik Integrated Healthcare Campus
Türkerler Water Distribution
Textile
(Astaldi – Türkerler Partnership)
(Türkerler – Veolia Water Treatment
Selen Giyim (Garments)
Joint Venture)
Saten Hazır Giyim (Ready wear)
Selnes Textile Consultancy
Petroleum
Petsel Petroleum
Informatics
TG Technology
MTG Soft
Kazım TÜRKER / Chairman
Türkerler İnşaat A.Ş. (Türkerler Construction Inc.) was established in
1993 with the purpose of undertaking infrastructural and super-structural
contracts and real estate investments. The company managed to
become a leading brand in the construction business in no time thanks
to its high quality notion of service in the projects it has realized. In
terms of sectoral diversity, we have affiliates in the fields of renewable
energy generation, energy trading, natural gas distribution, real
estate development, public private partnership, petroleum, textile and
informatics. The group has considerable know-how and work experience
in terms of public and private contracts, privatizations, partnerships,
natural gas, energy and undertaking projects.
Proceeding with momentum and determination in becoming one of the
leading firms of the electricity industry in Turkey, our company plays a
major role as project developer, investor, producer and operating firm
together with international finance institutions and partners in the energy
sector. To this effect, our operations and investments in the fields of
wind, hydroelectric, geothermal and thermal energy are carried on with
full speed. Our interest in new sources of energy such as solar, biomass,
etc. is also rapidly increasing.
We rely on our expert staff, professional experience and financial
capabilities in performing our activities. I have full confidence in our
technical and executive staff which is capable of competing in the
global environment we are working in. I strongly believe that with the
entrepreneurial spirit of the Turkish people, any project can be completed
with success and any obstacle can be overcome. The whole world
is currently undergoing a process of serious change. All balances are
changing and a brand new world order is being created. Our company
is also renewing and developing itself in this process to confidently take
its position in the new order. We have realized very important projects
through hard work that took long years, which were regarded as dreams
only yesterday and we are continue to work as hard in order to finalize
the ones which are currently on our agenda. We are taking utmost care
to increase our competitive power by becoming even stronger through
continuous improvement and by prioritizing long term investments.
As Türkerler, we will carry on creating value for our country and our
employees with our construction and energy projects in the global
environment.
I hereby thank all our staff and partners who are working with devotion.
Regards.
On earth, we have carved our dreams which we
believe were the best through the many projects we
have completed in the field of construction since
1993. We continue to perform the best.
Construction
and Investment
Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
was established in 1993 with the purpose of undertaking infrastructural and super-structural projects
and real estate investments.
The company managed to become a leading brand
in the construction business in no time thanks to its
high quality notion of service in the projects it has
realized.
Particularly due to the magnitude of its investments
involving real estate development and flat for land
and revenue sharing type investments, Türkerler is
cited among the major construction firms that contribute to Turkey’s development.
Our Fields of Activity
•
•
•
•
•
Hospital, Hotel and School Projects
Residential Buildings and Intelligent Buildings
Touristic Facilities
Privatization and Public Private Partnership Projects
Real Estate Development Projects
• Highways, Bridges and Junctions
• Light Rail System, Subway and Tramway Systems
• Offshore Structures
•
•
•
Dams, Hydroelectric Power Plants and
Irrigation Projects
Natural Gas Pipelines
Natural Gas Municipal Distribution Projects
• Water Treatment Facilities
• Water Distribution Projects
• Mains (natural gas, water, electricity)
çiftçi
towers
Employer
: Çiftçiler Real Estate, Investment, Consultancy, Construction, Trade Inc.
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: İstanbul, Turkey
Start
: June 2011
Completion
: June 2014
Project Details:
The “Çiftçi Towers Project which we are a partner of, consists of two towers, each with
10 floors underground and 45 above ground, built on a base of 25,000 m², located
in Zincirlikuyu, the most valuable site in İstanbul, over a total construction site of
292,000 m². Our project incorporates a parking space of approximately 2,500 vehicles,
residential area of 84,000 m², office area of 10,000 m², shopping center area of 68,000
m², as well as depot and technical floors. The design of the project is performed by
John McAslan, a British architect. The facades will be covered with aluminum and
terracotta panel systems. Heating and cooling will be provided with central systems of
fan coils.
09
park yaşam
mavişehir
Employer
: Emlak Real Estate Investment Company
Contractor
:Türkerler – Durmaz – İzka Partnership
Location
:İzmir, Turkey
Start
:26 December 2008
Completion
: 30 May 2013
Project Details:
Located on an area of 32,104 m² at a 2-minute distance from the shore and the
light rail system, Park Yaşam Mavişehir consists of 521 residences, 184 offices
and a shopping hall over a total construction site of 150,000 m². The project
incorporates 27 different types of flats in 7 blocks, an outdoor and an indoor
swimming pool, 2 tennis courts, 1 basketball court and playgrounds.
11
emaar
libadiye
Employer
: Emaar Turkey
Contractor
: Makyol – Türkerler Ordinary Partnership
Location
: İstanbul, Turkey
Date of Contract
: 07 September 2011
Date of Completion Foreseen : 12 February 2013
Contract Value
: USD 63,919,928
Project Details:
Within the scope of this project which is planned to be become
operational under the name “Yeni İstanbul” (“New İstanbul”),
deep foundation excavations of 52 m and shoring work has
been conducted. Excavations over an area of 2,777,997 m²,
embedment work of 243,057 m and bored piling of 53,028 m
have also been completed.
13
ankara
westgate
project
Employer
: TOKİ (Housing Development Administration of Turkey)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Ankara, Turkey
Start
: 30 October 2011
Completion
: 12 April 2015
Project Details:
The project which has a construction site of 275,000 m² over a landed property
of 40,000 m² is located on Eskişehir Highway, which is the most valuable and
rapidly developing axis of Ankara. With a 2-minute distance to the subway, Ankara
Westgate will comprise residential area of 62,000 m² (495 residences), office area
of 54,000 m², a business hotel of 180 rooms (15,000 m²) and commercial area of
16,000 m².
15
ankara etlik
integrated healthcare
campus
Employer
: Ministry of Health – Public Private
Partnership Department
Investor and Contractor
: Astaldi – Türkerler Partnership
Location
: Ankara, Turkey
Date of Contract
: 05 March 2012
Investment / Operation Period
: 42 Months / 25 Years
Investment Value
: TL 2,414,000,000
Project Details:
The largest integrated hospital campus of the world, Ankara Etlik Integrated Healthcare
Campus will be constructed over a landed property of 1,400,000 m². Consisting of
several hospitals with a total covered area of 1,071,000 m² and (several hospitals with)
a total bed capacity of 3,566, it is the largest implementation of the Public Private
Partnership in Turkey. Within the scope of the project, there will be a main hospital,
a rehabilitation hospital, a high-security psychiatric hospital, Provincial Directorate
of Health building, hotels, shopping halls and commercial areas. The main hospital
will incorporate general branches, orthopedics, neurology, cardiovascular, child,
gynecology and oncology clinics and over 100 surgery rooms. The final objective of
the project is to offer our country and the neighbor countries non-stop, world-class
quality healthcare services employing state-of-the-art technologies.
17
400-bed capacity
samsun training and
research hospital
Employer
: TOKİ (Housing Development Administration of Turkey)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Samsun, Turkey
Start
: 20 December 2006
Completion
: 11 January 2010
Contract Value
: TL 59,493,000
Project Details:
Built over a total construction site of 77,600 m², the hospital with 400-bed capacity
provides emergency airlift service and incorporates an intensive care unit, 16
surgery rooms and 3 conference halls. The project has been cited as a model
implementation by TOKİ and received Best Work Prize.
19
kayabeyi dam and
akıncı hydroelectric
power plant project
Employer
: Pelin Enerji A.Ş. (Pelin Energy Inc.)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Ardahan, Turkey
Start
: 17 January 2010
Completion
: 14 June 2013
Investment Value
: USD 132,000,000
Project Details:
The roller-compacted concrete (RCC) hydroelectric power plant (900,000 m²), which
is a Türkerler Holding construction and investment project, will be 145 m in height.
The project will be realized with a total installed capacity of 77.5 MW and 344 GWh/
year energy generation.
yayla regulator and
hydroelectric power
plant project
Employer
: Egeli Enerji A.Ş. (Egeli Energy Inc.)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Artvin, Turkey
Start
: 30 December 2009
Completion
:31 December 2012
Investment Value
:USD 15,000,000
21
Project Details:
The river-type hydroelectric power plant project which is a Türkerler Holding
construction and investment project will be realized with a total installed capacity of
5.1 MW and 22.26 GWh/year energy generation.
başköy
dam
Employer
: State Hydraulic Works
Contractor
: ASKA – Türkerler Partnership
Location
: Erzurum, Turkey
Start
: 01 April 2010
Completion
: 01 October 2015
Contract Value
: TL 97,447,331
Project Details:
Within the scope of the irrigation project to be built over the Başköy
Stream of Erzurum by Türkerler Construction Inc., a 3,000,000 m³ clay
core rock fill dam with a height of 101 m is under construction.
ambar
dam
Employer
: State Hydraulic Works
Contractor
: Yöntaş – Türkerler Partnership
Location
: Diyarbakır, Turkey
Start
: 21 October 2011
Completion
: 29 September 2015
Contract Value
: TL 31, 912,282
23
Project Details:
Within the scope of the irrigation project undertaken by Türkerler
Construction Inc, a 45 m high dam with 1,006,000 m³ clay core
and 2,900,000 m³ hard core is being constructed.
ankara arena
multi-purpose
sports complex
Employer
: Ankara Metropolitan Municipality
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Ankara, Turkey
Start
: 15 June 2009
Completion
: 01 May 2010
Contract Value
: TL 47,100,000
Project Details:
This FIBA-approved, multi-purpose sports complex, which has hosted the World
Basketball Championship, has been built over a construction site of 40,000 m²
and has an audience capacity of 10,600, 1,425 of which are protocol seats.
The project was nominated for the Mies van der Rohe prize within the scope of
“Cityscape Global 2011” and received the second prize at the “Highly Commended”
status in the “Community Built” category.
ankara metropolitan
municipality service
building
Employer
: EGO (Electricity, Gas, Transportation)
Directorate General
Contractor
: Türkerler İnşaat A.Ş.
(Türkerler Construction Inc.)
Location
: Ankara, Turkey
Start
: 10 September 2002
Completion
: 01 March 2007
Contract Value
: TL 86,497,337
25
Project Details:
The project incorporating intelligent building technologies at an elevated level
consist of the service building of 26 floors and additional buildings erected
over a construction site of 92,854 m².
erenköy regulator
and hydroelectric
power plant project
Employer
:Nehir HES A.Ş.
(Nehir Hydroelectric Power Plant Inc.)
Contractor
:Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
:Artvin, Turkey
Start
:14 December 2006
Completion
:01 October 2010
Investment Value
:USD 48,000,000
Project Details:
The river-type hydroelectric power plant project which is a
Türkerler Holding construction and investment realizes 87 GWh/
year energy generation with a total installed capacity of 22.5 MW.
angutlu I-II regulator
and hydroelectric
power plant
Employer
: T.G. Elektrik A.Ş. (T.G. Electricity Inc.)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Giresun, Turkey
Start
: 06 July 2010
Completion
: 06 March 2013
Investment Value
: USD 58,500,000
27
Project Details:
The Angutlu Hydroelectric Power Plant project we have undertaken the
construction and investment of which is being built at two stages over the
Aksu Stream located in the Dereli County of Giresun. Angutlu I will consist of
a regulator, a 3,931 m tunnel, 3-stage Francis-type turbine and an operator
building. Angutlu II, on the other hand, consists of a regulator, a 3,441 m tunnel,
a Francis-type turbine with 3 units and an operator building.
demirci regulator
and hydroelectric
power plant
Employer
: Demirci Enerji A.Ş. (Demirci Energy Inc.)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Kastamonu, Turkey
Start
: 30 September 2010
Completion
: 30 September 2012
Investment Value
: USD 28,000,000
Project Details:
The Demirci Regulator and Hydroelectric Power Plant constructed over Gökırmak in
Kastamonu which we have undertaken the construction and investment of is a rock
fill regulator at a height of 5 m from the river bed (thalweg) and 8 m from foundation.
It consists of a supply duct of 21,900 m, a fore bay, a pressure pipeline of 220 m, a
Francis-type horizontal axis turbine with 3 units and an operator building.
kanat regulator
and hydroelectric
power plant
Employer
: Türkerler Enerji Yatırım Üretim İnşaat ve Ticaret A.Ş.
(Türkerler Energy, Investment, Production, Construction and Trade Inc.)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Giresun, Turkey
Start
: 01 April 2012
Completion
: 30 September 2013
Investment Value
: USD 32,000,000
Project Details:
The Kanat Regulator and Hydroelectric Power Plant being constructed on
Aksu Stream and Dereli Stream, which is a branch of Aksu, located in the
Dereli County of Giresun will consist of a regulator, a power tunnel of 3,050 m,
a transmission tunnel of 1,403 m and an operator building. The license for the
project was obtained in 2010 and it is planned to generate 49.2 GWh/year with
an installed capacity of 13.3 MW. Construction work of the project is ongoing.
29
adıyaman state
hospital with
400-bed capacity
Employer
: TOKİ (Housing Development Administration of Turkey)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Adıyaman, Turkey
Start
: 10 November 2009
Completion
: 21 February 2013
Contract Value
: TL 68,430,000
Project Details:
The hospital with capacity of 400 beds, built over a construction site of 83,900
m², comprises 4 intensive care units, 20 surgery rooms and 1 conference hall.
mucur
compressor
station
Employer
: BOTAŞ
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Mucur, Kırşehir, Turkey
Start
: 21 July 2011
Completion
: 21 December 2012
Contract Value
: USD 19,889,925
31
Project Details:
The project involves the demounting of the current Gebze Compressor
Station, its transfer to the transmission line coming from East Anatolia, and
thereby, construction of a new compressor station.
taşoluk potable
water treatment
facility
Employer
: İstanbul Water and Sewerage
Administration General Directorate
Contractor
: Türkerler – Güriş Partnership
Location
: İstanbul, Turkey
Start
: 27 March 2003
Completion
: 02 January 2006
Completion Value
: TL 19,945,398.42
Project Details:
The capacity of the project, which is built over a total
construction site of 94,000 m², is 150,000 m²/day.
north ankara
11 stage
th
Employer
: TOKİ (Housing Development
Administration of Turkey)
Contractor
: Türkerler İnşaat A.Ş.
(Türkerler Construction Inc)
Location
: Ankara, Turkey
Start
: 03 January 2010
Completion
: 30 June 2012
Contract Value
: TL 38,187,079
33
Project Details:
The project built on a construction site of 114,000 m² consists of 610 residences
and social infrastructural units and includes 13 blocks, a commercial center,
parking lot, sports facilities, a mosque and green space.
north ankara
16 stage
th
Employer
: TOKİ (Housing Development Administration of Turkey)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc)
Location
: Ankara, Turkey
Start
: 03 December 2009
Completion
: 01 June 2012
Contract Value
: TL 38,253,000
Project Details:
The project built on a construction site of 92,177 m² consists of 512 residences
and social infrastructural units and includes 13 blocks, parking lot, a primary school,
sports facilities, a mosque and green space.
bağcılar-güneşli
highway junction
Employer
: İstanbul Metropolitan Municipality
Contractor
: Limak – Türkerler Partnership
Location
: İstanbul, Turkey
Start
: 09 January 2003
Completion
: 25 July 2007
Contract Value
: TL 16,692,540.93
Project Details:
The project involved stream remediation and construction of 3 bridges, 1 overpass and
2 underpasses, as well as rehabilitation of the existing two bridges and displacement of
the facilities on the road.
ulus-keçiören
subway
Employer
: Ankara Metropolitan Municipality
Contractor
: Türkerler – Limak Partnership
Location
: Ankara, Turkey
Start
: 19 August 2003
Completion
: 31 March 2011
Contract Value
: USD 86,312,000
Project Details:
The project involved boring of a tunnel with a length of 2,916 m,
excavations of 6 stations, cut and cover of 490 m, tbm of 2,650 m
and conventional system of 3,100 m.
35
çarşamba
672 residences
Employer
: TOKİ (Housing Development Administration of Turkey)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Samsun, Turkey
Start
: 27 August 2007
Completion
: 16 July 2009
Contract Value
: TL 53,690,000
Project Details:
The project built over a total construction area of 132,671 m², construction of 672
residences and social infrastructure facilities has been undertaken.
north ankara
nd
2 stage
Employer
: TOKİ (Housing Development Administration of Turkey)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Ankara, Turkey
Start
: 25 May 2007
Completion
: 29 April 2010
Contract Value
: TL 47,247,613
Project Details:
The project that involved construction of 755 residences and social infrastructure
units over a total construction site of 114,401 m² consisted of 6 blocks of 13
floors, 7 blocks of 6 floors and a kindergarten.
37
fatih sultan mehmet
han hospital
Employer
: Keçiören Municipality
Location
: Ankara, Turkey
Start
: 27 June 1997
Completion
: 28 September 1998
Project Details:
The project equipped with all required service systems consisted
of an intensive care unit, 3 surgery rooms, delivery rooms and 5
patient and guest lifts.
police morale and
education center
Employer
: İstanbul Security Directorate
Location
: İstanbul, Turkey
Start
: 27 March 1998
Completion
: 30 December 1998
Project Details:
The 200-bedded facility constructed at a 5-star hotel standard consists of 3
sports centers, 3 restaurants and 2 conference halls.
izmir natural gas
distribution project
Employer
: İzmirgaz A.Ş. (İzmir Natural Gas Inc.)
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: İzmir, Turkey
Project Details:
The “Natural Gas Distribution License for İzmir” has been
granted to İzmirgaz Intracity Natural Gas Distribution Inc.,
of which Türkerler is also a partner, on 07 July 2005 for a
period of 30 years, to cover the area including İzmir Central,
Konak, Karşıyaka, Bornova, Buca, Balçova, Çiğli, Gaziemir,
Narlıdere, Güzelbahçe, Aliağa, Kemal Paşa, Menemen, Torbalı,
Menderes and Tire. Within the framework of this project with an
investment budget of USD 300 million, engineering and design
service, infrastructural construction work and construction of
regulator facilities is being undertaken by Türkerler Construction
Inc. Within this scope, construction of steel pipeline fittings of
240 km, polyethylene distribution pipeline of 2,360 km, 76,000
service lines and 90 regional regulators has been completed.
39
ankara natural gas
distribution city gate
station project
Employer
: EGO (Electricity, Gas, Transportation) Directorate General
Contractor
: Türkerler İnşaat A.Ş. (Türkerler Construction Inc.)
Location
: Ankara, Turkey
Start
: 11 January 2002
Completion
: 15 April 2005
Contract Value
: USD 32,045,807.51
Project Details:
Within the scope of this project which involved a natural gas pipeline of 90
km, decompression stations of 1,000,000 m³/s and 250,000 m³/s were
constructed for city gate station of Ankara.
anadolu (95) ümraniye natural
gas transmission pipeline
Employer
: İGDAŞ (İstanbul Gas Distribution Inc.)
Location
: İstanbul, Turkey
Start
: 26 July 2001
Completion
: 25 April 2002
Project Details:
Within the scope of the project that involved the urban distribution network and
residential connections, natural gas pipeline connections of 90 km and natural
gas infrastructural constructions were performed.
anadolu (106) beykoz natural
gas steel pipeline
Employer
: İGDAŞ (İstanbul Gas Distribution Inc.)
Location
: İstanbul, Turkey
Start
: 23 July 2002
Completion
: 26 February 2003
Project Details:
The project involved construction of the natural gas
infrastructure consisting of a steel pipeline of 20 km.
41
water treatment
and distribution
In line with the joint venture decision we have taken with Veolia, one of the world’s
largest water treatment firms, we are undertaking water treatment and water
distribution projects in Turkey in cooperation with this company.
Within the framework of the standards set for treated water compatible with the
chemical and bacteriological limits stated in the European Union Pharmacopy,
we choose the water resources adequately in line with our environmental
perspectives so as to prevent any irrecoverable outcomes and we offer high
technology and high quality with local price advantages.
43
We trace renewable,
sustainable,
economical,
environment-friendly,
local energy sources
and mobilize our
efforts in the field of
energy with our R&D
activities.
energy
The increase in the demand for energy as a result
of our growing economy and the priority given to
local and renewable sources in terms of energy
generation provoke our enthusiasm to proceed with
speed and determination in becoming one of the
leading firms of the industry. We are undertaking an
active role in cooperation with international finance
institutions and partners thereof through renewable
energy projects we realize.
Our fields of activity:
We are accelerating our efforts so as to establish
as energy trading network with strong international
connections.
• Natural Gas
Transmission
Imports
Exports
•
Energy Generation
Wind Energy
Hydroelectric Energy
Geothermal Energy
Thermal Energy
• Energy Trading
We are keeping with the adventure that started with moving a
sailboat, dating back 5,500 years, and we are dominating the
wind to convert it into energy at the most adequate locations,
employing the state-of-the-art technological trends.
wind
power
With the purpose of contributing to healthy formation and
As the licensing and investment process continues, the
rapid development of wind power industry in our country,
wind energy projects of 1,527.5 MW in our portfolio, which
just like other countries in the world and especially in the
are subject to investment and partnership negotiations,
European Union, 67 projects which have been prepared
constitute approximately 18% of the Turkish wind power
through comprehensive efforts were submitted to the
market.
Energy Market Regulatory Board (EPDK) on 1 November
2007, located in various areas and adding up to a capacity
In order to meet Turkey’s electricity energy requirements
of approximately 9,000 MW. As a result of decisions
in a reliable and environmentally friendly manner, we are
involving technical and administrative amendments of
targeting to become a leading energy firm in the industry
EDPK and other institutions, detailed development efforts
with our wind power investments, which is among
continued for 59 projects for a total of 3,432.5 MW.
renewable energy sources. (*In accordance with WEPP
Of these projects, those that were licensed as single
(wind power plant) license and compatibility data published
applications and those that were qualified as a result of
on the web page of EMRA as of 24 February 2012.)
competitions approached 2,000 MW within the portfolio.
Wind Power Projects
Licensed Projects
Uluborlu WEPP Isparta
60 MW
Yuvacık WEPP
Kocaeli 120 MW
Gölmarmara WEPP Manisa
45 MW
Pamukova WEPP Sakarya 20 MW
Zonguldak WEPP Zonguldak
120 MW
M. Şevket Paşa-2 WEPP İstanbul 100 MW
Gölyaka WEPP Düzce
15 MW
Tire WEPP
İzmir 50 MW
Meryem WEPP Bilecik
30 MW
Kalfaköy WEPP Balıkesir
10 MW
Türkeli WEPP Sinop
30 MW
Şapdağı WEPP
Balıkesir
55 MW
İncesu WEPP Afyon 10 MW
M. Şevket Paşa-1 WEPP İstanbul 8 MW
Afyon – 2 WEPP Afyon 88 MW
Korudağı WEPP 3 MW
Sandıklı WEPP Afyon
12 MW
FROM COMPETITION 790 MW
Kandıra WEPP Kocaeli 49 MW
Çakıl WEPP İstanbul 52,5 MW
Tekirdağ Compatibility Approved Projects
SINGLE APPLICATIONS
Kirazlı WEPP İzmir 50 MW
Şile WEPP İstanbul 50 MW
Söke WEPP
Aydın
104 MW
Adapazarı WEPP Sakarya 80 MW
Gökdağ WEPP Kocaeli 10 MW
Çandır WEPP Edirne
10 MW
Bozüyük WEPP Bilecik 90 MW
Pazarköy WEPP
Balıkesir
44 MW
Geyve WEPP Sakarya 50 MW
Gelibolu WEPP Çanakkale 30 MW
Ömerli WEPP İstanbul 100 MW
Barbaros WEPP Tekirdağ Yenihisar WEPP Aydın 20 MW
COMPATIBILITY DECISION 226 MW
12 MW
ACQUIRED FROM TURKISH ELECTRICITY TRANSMISSION CORPORATION COMPETITIONS
: 1.016 MW
TOTAL
: 1.527,5 MW
47
We are tracing
water running
across rivers and
we convert it into
energy.
hydroelectric
power
As the host of hydroelectric power plant projects with a capacity of
428 MW, currently in operation, being constructed or at the licensing
stage within the process of making use of Turkey’s renewable energy
resources, we are proceeding with speed and determination in
becoming one of the leading firms of the electricity industry in Turkey.
We are undertaking an active role as project developer, investor,
constructor and operator in the energy industry in cooperation with
international finance institutions and our partners.
The Erenköy Regulator and Hydroelectric Power Plant in Artvin have
become operational in October 2010 with an installed capacity of 22.5
MW. We are targeting to start operating our new hydroelectric facilities
of approximately 150 MW, together with the projects currently being
constructed, in the near future.
49
erenköy regulator and
hydroelectric power plant
The Erenköy Regulator and Hydroelectric Power Plant which is our first power generation
facility were put into operation in 2010. Contributing to Turkey’s supply of electricity, the project
is remarkable in terms of the innovative methods employed for its construction. The project
of Erenköy Regulator and Hydroelectric Power Plant constructed with a power of 22.5 MW
in less than two years’ time on the Murgul Stream in Borçka County of Artvin is planned to
generate 87 GWh of electricity on average every year. During the construction of the project,
Türkerler has reflected its construction experience on the field successfully. Within the scope of
this project, a tunnel of 6,500 m, a regulator, a fore bay pool, a pressure pipeline, an operator
building and an energy transmission line of 9 km were constructed.
kayabeyi dam and akıncı
hydroelectric power plant
The project is located on the Kura River in Çıldır County of Ardahan. The plant, which is a roller
compacted concrete dam with a fill volume of 900,000 m³ and a height of 145 m from the
river bed (thalweg), consists of a derivation tunnel with a diameter of 6 m and a length of 360
m, an energy tunnel with a diameter of 4 m and a length of 2,620 m, a surge chamber and an
operator building. With an installed capacity of 77.5 MW, the plant is projected to generate
343.7 GWh of electricity every year. The project which is currently being constructed is targeted
to be completed within 2013.
yayla regulator and
hydroelectric power plant
The project is located in Murgul County of Artvin. The plant consists of a
regulator to be built on the Murgul Stream, an energy tunnel with a length of
1,354 m, a surge chamber and an operator building. With an installed capacity
of 5.1 MW, yearly generation of 22.26 GWh of electricity is foreseen. The project
licensed in 2008 is currently being constructed and planned to be completed
within 2012.
angutlu ı-ıı regulator and
hydroelectric power plant
Constructed in two stages, the Angutlu Hydroelectric Power Plant Project is
located on Aksu Stream in the Dereli County of Giresun. Angutlu I Hydroelectric
Power Plant will consist of a regulator, a 3,931 m tunnel, 3-stage Francis-type
turbine and an operator building. With an installed capacity of 15 MW, it is
foreseen to generate 54.47 GWh of electricity annually. Angutlu II Hydroelectric
Power Plant, on the other hand, consists of a regulator, a 3,441 m tunnel, a
Francis-type turbine with 3 units and an operator building. With an installed
capacity of 9.25 MW, it is foreseen to generate 34.07 GWh of electricity annually.
The project licensed in 2008 has started to be constructed.
51
çayırlı regulator and
hydroelectric power plant
The project of Çayırlı Regulator and Hydroelectric Power Plant which is planned to be
constructed over the Kura River in central Ardahan will consist of a supply duct with a length
of 1,579 m, a regulator and an operator building. With an installed capacity of 5.5 MW, it is
planned to generate 13.6 GWh of electricity annually.
taşköprü regulator and
hydroelectric power plant
Licensed in 2008, the Taşköprü Regulator and Hydroelectric Power Plant which will be
constructed over the Aralık Stream in Borçka County of Artvin will consist of a tunnel with a
length of 2,800 m, a supply duct with a length of 748 m and an operator building. With an
installed capacity of 16.4 MW, the plant is planned to generate 56.8 GWh of electricity annually.
demirci regulator and
hydroelectric power plant
The Demirci Regulator and Hydroelectric Power Plant being constructed over Gökırmak
Stream in Kastamonu is a fill dam at a height of 5 m from the river bed (thalweg) and 8 m from
foundation. It will consist of a supply duct of 21,900 m, a fore bay pool, a pressure pipeline
of 220 m, Francis-type horizontal axis turbine with 3 units and an operator building. With an
installed capacity of 12.06 MW, it is projected to generate 59.1 GWh of electricity annually. The
project licensed in 2009 is currently being constructed.
kanat regulator and
hydroelectric power plant
The Kanat Regulator and Hydroelectric Power Plant being constructed over Aksu Stream and its
branch Dereli Stream located in the Dereli County of Giresun will consist of a regulator, an energy
tunnel with a length of 3,050 m, a supply duct with a length of 1,403 m and an operator building.
Licensed in 2010, this project is foreseen to generate 49.2 GWh of electricity annually with an
installed capacity of 13.3 MW. Construction work of the project is ongoing.
53
dilektaşı ı-ıı dam and
hydroelectric power plant
The project is planned to be constructed in two stages in Zap Suyu Basin and Nehil Stream of
Hakkari. Dilektaşı I Dam and Hydroelectric Power Plant will be a concrete faced rock fill dam
with a fill volume of 1,629,231 m3 and a height from the river bed (thalweg) 73 m. It will have
a derivation tunnel with a diameter of 7 m and a length of 304 m and an energy tunnel with a
diameter of 3.5 m and a length of 6,200 m. With an installed capacity of 30 MW, it is planned
to generate 85.6 GWh of electricity annually. Dilektaşı II Dam and Hydroelectric Power Plant, on
the other hand, will incorporate a regulator with a height of 21 m from the river bed (thalweg)
and a transmission tunnel with a diameter of 3.60 m and length of 5,055 m. With a 100 MW
installed capacity, the project is foreseen to generate 255.4 GWh of electricity.
mut dam and hydroelectric
power plant
The project planned to be constructed over Göksu River in Mut County of Mersin will be a
clay core rock fill dam and consist of an impoundment plant and a main central building to be
built to supply sap to the river mouth. With an installed capacity of 92 MW, it is foreseen to
generate 229.4 GWh of electricity annually.
hidronehir ı regulator and
hydroelectric power plant
The Hidronehir I Regulator and Hydroelectric Power Plant project is located in
the east of Tosya County of Kastamonu. Planned to be constructed over Devrez
Stream, the project will consist of two supply ducts of 1,964 m and 5,278 m, two
transmission tunnels of 352 m and 300 m, a regulator and an operator building.
With an installed capacity of 10.1 MW, the plant is foreseen to generate 29.4
GWh of electricity annually.
55
hidronehir ıı regulator and
hydroelectric power plant
The Hidronehir II Regulator and Hydroelectric Power Plant project is located in
Kargı County of Çorum. Planned to be constructed over Devrez Stream, the
project will consist of two supply ducts of 6,730 m and 2,812 m, a transmission
tunnel of 66 m, a regulator and an operator building. With an installed capacity of
15 MW, the plant is foreseen to generate 44.7 GWh of electricity annually.
We are extracting
underground heat to
convert it into energy
employing the safest
methods, following the
latest technological
developments.
geothermal
energy
Turkey is fortunate in terms of geothermal energy, as it is a clean,
environment-friendly and renewable source of energy. With its approximately
2,000 MW potential capacity, our country ranks 7th in the world and 1st in
Europe in terms of highest potential for geothermal energy.
With its four different geothermal exploration licenses, Türkerler has started
its geothermal drilling operations in February 2011 near Alaşehir, Manisa.
Following the successful results obtained in the first wells, efforts continue for
energy generation investments in binary plants. The objectives for these areas
are reaching installed capacity of 150 MW, generating 1.26 million kWh of
energy and completing the initial stage of the project within a period of 1 year.
thermal
energy
With its decision dated 04 April 2012, the Energy Market Regulatory Board
(EPDK) has approved licensing for period of 49 years for the ES-ES Elektrik
Üretim A.Ş. (ES-ES Electricity Generation Inc.).
The natural gas combined cycle plant to be constructed in Muttalip Village
of the central district of Eskişehir will be of an installed capacity of 609 MW
and have approximately 4.8 billion kWh of electrical energy generation
capacity.
With the Environmental Impact Assessment Certification relevant to
the project having obtained, the engineering and machinery-equipment
procurement activities are being pursued simultaneously. The plant is
foreseen to be commercially operated in 2016.
electricity
trading
With its license obtained in 2011, Türkerler Elektrik Toptan Satış Şirketi
(Türkerler Wholesale Electric Supply Company) targets to become one of
the leading firms of the electricity market.
The company pursues its efforts in an innovative and reliable manner with
the purpose of meeting the needs of independent consumers besides its
output supplied to Market Financial Settlement Center.
Within this framework, Türkerler is becoming increasingly preferred
by consumers who are carbon emission sensitive thanks to its ample
capabilities in renewable energy generation.
59
With our natural gas
distribution and procurement
projects, we bring warmth
and happiness to homes
and accelerate industrial
production.
natural gas
Rich natural gas reserves of Turkey’s neighbor countries,
environmental factors and primary energy resources diversification
policies are the factors that contributed to conveying of natural
gas to Europe and bringing our country to an important position in
natural gas trading. Türkerler continues its efforts in the imports,
storage, exports, sales and distribution of natural gas, in parallel
with deregulation of the natural gas sector.
izmirgaz
The “Natural Gas Distribution License for İzmir” has been granted to İzmirgaz Intracity Natural
Gas Distribution Inc., of which Türkerler is also a partner, on 07 July 2005 for a period of 30
years, to cover the area including İzmir Central, Konak, Karşıyaka, Bornova, Buca, Balçova,
Çiğli, Gaziemir, Narlıdere, Güzelbahçe, Aliağa, Kemal Paşa, Menemen, Torbalı, Menderes
and Tire. Within the framework of this project with an investment budget of USD 300 million,
Türkerler is offering services involving operation, subscription, sales and service for the natural
gas network including the engineering and design services, infrastructural construction work
and construction of regulator facilities. Upon completion of the investment period, the company
aims at reaching 6.5 billion m³/year of gas consumption and over 1 million customers
inci doğalgaz
inci natural gas
With the purpose of meeting our country’s natural gas requirement, Türkerler İnşaat
A.Ş. (Türkerler Construction Inc.) and Crescent Petroleum have established the
companies İnci Doğalgaz İthalat İhracat San. ve Tic. A.Ş. (İnci Natural Gas Imports
Exports Industry and Trade Inc.) and İnci Doğalgaz İletim Sanayi ve Ticaret A.Ş.
(İnci Natural Gas Transmission Inc.). İnci companies have applied to EPDK (Energy
Market Regulatory Authority) for “Imports License” and “Transmission License” for a
period of 30 years, to be able to operate in the natural gas market. At the end of the
licensing process, provision of gas to Turkey, Nabucco, ITGI and Tap projects and
neighbor countries will be possible.
turga doğalgaz
turga natural gas
TURGA Doğalgaz İthalat Sanayi Ticaret A.Ş. (TURGA Natural Gas Imports
Industry and Trade Inc.) has been established in our country which is to
eventually become a power bridge, to export natural gas and LNG from Turkey
initially through the Turkish-Greek pipeline, Nabucco and other export pipelines.
63
We are adding onto
our strength with
our companies
functioning in the
fields of textile,
petroleum and
informatics, which
were established
during the startup
and development
stages of our
company.
group companies
textile
The Türker Family has started its commercial activities in the field of textiles, which
it currently continues with 3 different firms. Selen Giyim which was established in
1989 in Ankara pursues its operations with its production capacity of 15,000 units
a month and its manufacturing park consisting of computerized sewing machines.
Selen Giyim products are sold in select stores in 50 provinces of Turkey and in
Russia and United Arab Emirates abroad. Saten Giyim which has been established
in Ankara in 2004 serves in the field of women’s outerwear and has a monthly
production capacity of 8,000 units. Selnes which started to operate in 2009 in
cooperation with Advansa imports special fabrication textiles from abroad and
provides garment sewing and designing services to corporations in Turkey.
petroleum
informatics
Petsel Petroleum Construction Tourism Food Mining Imports Exports Industry
TG Technological Systems Inc. established in Ankara in 2002 provides
and Trade Ltd. which was established in 2003 in Ankara serves the energy
contemporary consultancy and outsourcing services, with first and foremost
market mainly with petroleum and petroleum products.
system selection and integration that suit the firms’ purposes.
67
With the awareness of social responsibility, we
provide uninterrupted support to education.
social
responsibility
Within the scope of uninterrupted support to education, we provide
education opportunity to new generations with the primary school
buildings we have constructed with 1000 and 800 student capacity,
in line with our motto “full support for a bright future”.
We have had 500,000 books printed from among the 100
elementary literary works determined by the Ministry of Education
and distributed these books to students enrolled in the schools all
over Turkey.
We continue our efforts of social responsibility in the field of
“education”, which we believe is the most important factor in the
development of our country. Within this scope, the construction of
Azizli Bağlar Village Primary School has been initiated, in addition to
the Türker and Türkerler Primary Schools previously constructed.
71
Türkerler Construction Inc.
Türkerler Energy
Türkerler İstanbul Office
Turan Güneş Bulvarı Galip Erdem Caddesi
Turan Güneş Bulvarı Galip Erdem Caddesi
Çamlık Caddesi Zambaklı Sokak No:1
(Eski 15. Cadde) No:11
(Eski 15. Cadde) No:9
3. Levent 34340 İSTANBUL / TURKEY
Çankaya 06650 ANKARA / TURKEY
Çankaya 06650 ANKARA / TURKEY
Tel : +90 212 278 3266
Tel : +90 312 492 0306
Tel : +90 312 492 0306
Faks: +90 212 278 3099
Faks: +90 312 490 9451
Faks: +90 312 490 9451
www.turkerler.com / [email protected]
Design: Cosmic Creative / Print: Acar Basım ve Cilt San. Tic. A.Ş.