January 2014 - Bachman Homes

Transcription

January 2014 - Bachman Homes
Having trouble viewing the message below? View as Web page.
January 2014
s Project Spotlight s
Bachman Homes recently remodeled one
of our legacy homes.
Our customer needed
a larger entry area with garage
access as well as additional
finished space on the second
floor for a family room. In addition,
s ome
family members
have allergies, so
all carpet on the
second floor was
replaced
with
maple flooring to
match the stairs
and first floor. Thank you Quality Hardwoods.
s Home Construction 101 s
Over the course of the next year we’re going to identify key milestones when building a
custom home. Every month a new step is identified, complete with photographs so you
can visually follow the progress.
Step 5: Framing
Framing includes not only
the floor structure (joists)
but the deck (floors) and
stud walls. The roof is typically built with engineered
trusses. Once this process
is complete the windows are
set.
Fireblocking is also
complete prior to a required
inspection.
Next month: Roof material
s Maintenance Corner s
Carpet Cleaning—a Green approach
I recently had the carpet in my home cleaned by a company promoting a Green approach. Green Guys Carpet
Care uses a patented air cell extraction method that
dries quickly, is safe for people and pets, and contains
biodegradable detergents. Think globally—buy locally!
888.777.2218 or [email protected]
3
"Always forgive your
enemies; nothing
annoys them so
much."
- Oscar Wilde
A special greeting to my friend, Ray,
who is enjoying retirement in Florida
and catching a lot of fish. Thank you
for serving our country.
My best,
Ken
Unsubscribe | Newsletter Archives | Questions or Comments?
Bachman Homes on Facebook
© 2007-2013 All rights reserved
PA 018345
www.bachmanhomes.com
Bachman Homes PO Box 78 Boalsburg PA 16827-0078 Voice 814.466.7001 Fax 814.466.7056 [email protected]