M`Zab valley: sanitation and flood protection

Transcription

M`Zab valley: sanitation and flood protection
M'ZAB VALLEY: SANITATION AND FLOOD
PROTECTION
September 1994 flood
CLIENT
The People's Democratic Republic of Algeria
Ministry of Infrastructures and Land Planning
PRESTATIONS
Sanitationand Wastewater
• Diagnosis of the sewage systems and existing
wastewater treatment plant
• Population and economic development study for
the M'Zab valley
• Feasibility and scenarios comparison, preliminary
and detailed designs, tender documents for the
main sewage line and for the wastewater
treatment system,
• Study for the re-use of the treated waters for
agricultural purposes or for the water table refill.
Flood protection
• Hydrology study and hydraulic analysis for the
M'Zab Wadi
• Drawing of flood risk maps (with GIS)
• Study of variants, preliminary and detailed design,
tender documents for the construction of flood
protection structures.
DURATION
Ongoing
WORKS AMOUNT
110 MCHF (~95 m€)
PROJECT DESCRIPTION
• Targetedpopulation : above 300 000 inhabitants in
2030
• Length of the considered river section : 30 km
BG Consulting Engineers
29.08.2013
www.bg-21.com