GMMOS High-End Steel Fabrication

Transcription

GMMOS High-End Steel Fabrication
PREQUALIFICATION
Gulf Marine Maintenance & Offshore Service Company – Dubai – L.L.C.
Page 1
Edited: July 17, 2012
PREQUALIFICATION DOCUMENT
Gentlemen,
I would like to take this opportunity of presenting GULF MARINE MAINTENANCE
& OFFSHORE SERVICE COMPANY (GMMOS) through our Pre-Qualification
Document.
This document outlines GMMOS' capabilities as a General Offshore Contracting Company
in the fields of fabrication, offshore hook-up and maintenance. The base of our operations
is located in Dubai and work is carried out on Projects throughout the U.A.E.
GMMOS' Fabrication Yard is one of the most active in the region, catering to oil companies
in the Red Sea, Persian Gulf and India. Moreover, GMMOS' fabrication department is
holding the Certificate of Authorization from ASME to design and manufacture pressure
vessels.
GMMOS Engineering & Estimation department provides engineering services that begin at
the initial discussion stage through to the final design. During the bidding stage, the
Engineers perform the estimating, design calculations, prepare the design drawings and
material take-offs while also using the latest Auto Cad design packages to produce the
optimum design which can ultimately save you, the customer, valuable time and money.
GMMOS Engineers and Draftsmen have a diversified experience in Marine, Structural and
Mechanical projects which form the backbone of the Fabrication & Ship Repair Division
and together become actively involved to give the best service possible to the client.
The GMMOS group has a workforce of over 500 skilled personnel plus a full complement
of equipment and machinery that makes it possible for GMMOS to meet the stringent
needs and demands of our clients.
We trust you will find the above information of interest and look forward to working with
your company in the future. Please contact us if you require additional information, or if
you have any specific queries regarding this presentation.
Yours sincerely,
Gulf Marine Maintenance & Offshore Service Company-Dubai-L.L.C.
Mag. Dr. Michael R. Rannacher
Executive Vice President
Page 2
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
INDEX
Section 1
Introduction
Section 2
GMMOS Profile
Section 3
Organization Key Managers
Section 4
Engineering Design & QA/QC Capability
Section 5
Resources
Section 6
Equipment Lists
Section 7
Partial Client Lists
Section 8
GMMOS Fabrication, Maintenance & Refurbishment
Experiences
-
Structural Fabrication
Piping Fabrication
SPM Refurbishment Experience
Fabrication of Pressure Vessels & Skid Packages
Section 9
Certificates of Authorization
Section 10
GMMOS Photo Gallery
Page 3
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
CONTENTS
Section 1
Introduction – GMMOS Dubai LLC
Page
4
Introduction – GMMOS Kazakhstan
Section 2
GMMOS Dubai LLC Profile
5
Section 3
Organization & Management
10
GMMOS Organization Chart
11
Section 4
Mechanical Design & AutoCAD Drafting Capability
12
Quality Assurance & Quality Control Capability
13
Section 5
Resources
14
Section 6
Partial Equipment List
16
Section 7
Partial Client Lists
Section 8
GMMOS Fabrication Experiences
x Structural Fabrication
x Piping Fabrication
x SBM Refurbishment & SPM Projects
x Flare Stacks & Heaters
x Fabrication of Pressure Vessels
Section 9
Certificates of Authorization
Section 10
Page 4
Revised: July 17, 2012
18
19 - 21
22
23 - 25
26 - 28
29
PREQUALIFICATION DOCUMENT
GMMOS Photos Gallery
Page 5
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 1:
1.
Introduction
Background Information
1.1
Gulf Marine Maintenance & Offshore Service Company Dubai LLC
(GMMOS) has been established since 1981 in Dubai, United Arab Emirates
under our main Commercial License No. 200154 with license activities to Oil
& Natural Gas Well Equipment Repairing & Maintenance; Ship & Boats
Maintenance Services; Steel & Basic Steel Products Trading; Paint & Varnish
Trading; Ship & Boats Spare Parts & Components Trading; Marine
Equipment & Engine Repairing & Maintenance, Ship Charter. GMMOS
Industrial License activities include Tank Manufacturing; Oil & Gas Fields
Equipment Manufacturing & Structural Steel Manufacturing.
1.2
The subsidiaries companies of GMMOS are:
Name
Place of Formation
Gulf Marine Maintenance & Offshore Service Company – Dubai -L.L.C.
Dubai
GMMOS Kazakhstan L. L. C.
Aktau
Gulf Marine Maintenance & Offshore Service Company – WLL
1.3
Abu Dhabi
Affiliated Sister Company – GMMOS Kazakhstan
Principal Activities of GMMOS – Kazakhstan L. L. C.
Provides the following services to the Oil and Gas Industry:
x
Engineering, Procurement & Fabrication and Refurbishment of Pressure
Vessels, Process Skids and Process Piping
Page 6
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 2:
1.0
GMMOS Dubai L. L. C.
Manufacturing & Fabrication:
Gulf Marine Maintenance & Offshore Service Company Dubai (GMMOS) has
been manufacturing pressure vessels up to 115mm Thickness since 2003. The recent
acquisition of a Hugh Smith 3000 Ton Roll Bending Machine allows for the
fabrication of vessels up to 150mm Thickness.
Our new premises at Parcel Lot No. 599-733, Jebel Ali Industrial Area 1, Dubai, are
fully functional with amenities for both the administration and manufacturing
services. The new location is operating under the same management and procedures
as at the previous location. The yard and equipment have been significantly
augmented with new cranes and production equipment.
GMMOS fabrication department holds the Certificate of Authorization from ASME
to design and manufacture pressure vessels (U & U2 Stamp), fabrication and
assembly of pressure piping (PP Stamp), fabrication and assembly of power boilers
(S - Stamp) and National Board “R” Stamp for repair and/or alterations. We have
“NB” Mark Authorization to register Boilers, Pressure Vessels, or other Pressure
retaining items with the National Board.
GMMOS holds a Certificate of API 2B Monogram for fabrication of Structural Steel
Pipe.
Our Quality System is ISO 9001-2008 compliant.
Page 7
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
A)
Specialized Services:
1) Yard Facilities
The GMMOS yard is extremely well designed, equipped, built after detailed
planning to meet wide range of high end fabrication requirement specially for Oil
& Gas applications.
Fabrication and manufacture pressure vessels, pipe spooling and general
fabrication for offshore and onshore oil & gas equipments, skid packages,
jackets, risers, conductors and various jacket components.
™
™
™
™
™
™
™
™
™
Scrubbers
™ KO Drums
Filters
™ Fabrication of Spools
Air Drying Unit
™ Anchor Piles
Dearators
™ Cladding – Various Pressure Vessels
Surge Tanks
™ Chemical Injection Package
Pig Launchers and Receivers
™ Metering Skid Packages
Manifold Skids
™ Burner Booms
Fired Heaters
™ Flare Stacks
Skid Mounted Packages (Glycol Dehydration Package, TEG Package, MEG Package,
Separators Package, Desalters, Vapor Recovery,
™ Spud Cans
™ Jack Up Legs
Materials used for manufacturing pressure vessels are:
Materials
Carbon Steel
Stainless Steel
Clad Materials
Thickness Range
Min 5 mm – Max 150 mm
Min 5 mm – Max 100 mm
15 + 3 mm to 90 + 3 mm
Materials used for manufacturing of Structural (i.e. Pipe Racks & Skid
Manifolds etc.) & Spools are:
Materials
Carbon Steel, Stainless Steel, Alloy Steel, Copper Nickel, Duplex/Super Duplex
Inconel, Hastelloy, Monel, 904L, 254 SMO
Page 8
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
2)
Engineering Design & Drafting
GMMOS has in-house engineering, design and drafting division based in
Mumbai and Dubai which is well established.
The GMMOS division provides wide range of facilities customized to
specific client requirements and equipped with latest software’s and trained
manpower.
GMMOS provides pressure vessel design and drafting facilities from initial
concept to final design. The company is equipped with the latest CAD
Software enabling it to tailor client designs on line.
3) Onshore & Offshore Manpower Services
GMMOS supplies manpower and equipment services for onshore and
offshore to Dubai Petroleum Company for nearly three (3) decades. This
includes sandblasters, painters, welders, fabricators, pipe fitters, riggers,
carpenters, electricians, clerks, and warehouse and yard personnel for short
or long-term service contracts.
Page 9
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 2:
GMMOS Dubai Jebel Ali Yard
Plant
Manufacturing Facilities – GMMOS Jebel Ali
U AnnualProductionCapacity
YardAreas
U TotalYardArea
Length
(Meter)
9,000Tons
Width
(Meter)
Area
(M²)
Area
(SqFt.)
223.0
150.0
33450
360,052.80
U FabricationBay#1(OpenBothEnds)
90
23.4
2106
22,668.80
U FabricationBay#2(OpenOneEnd)
40
23.4
936
10,075.02
U FabricationBay#3(OpenOneEnd)
50
23.4
1170
12,593.78
U FabricationBay#4(2Doors3MWidex5MHigh)
42
10.0
420
4,520.00
U StoresBay#5(1Door3MWidex5MHigh)
30
10.0
300
3,229.00
U GantryCraneBay(Uncovered)
90
12.5
1125
12,109.00
U BlastingShop(6Mx6MDoorsBothEnds)
30
14
420
4,520.00
U PaintingShop(6Mx6MDoorsBothEnds)
34
14
476
5,123.00
U PaintingHardStandingArea(Uncovered)
40
14
560
6,027.79
U PWHTFurnaceArea(LengthAdjustabletoSuit)
5.5MWidex5.0MHighx34MLong
U RadiographyBunker(Uncovered)
23
30
690
7,427.98
U PressureTestArea(Uncovered)
25
25
625
67,27.44
U Pipe&PlateStorageArea(Uncovered)
25
30
750
8,072.93
23,872
256,956.10
U OpenFabricationArea(Uncovered)
U PressureTestingEquipment
15000PSIG
U PowerSupply
3000KVA
U Parking
56Spaces
1x10Meters,1x20Meters
1650M²
17,760.45
U AccessGates
U Offices/Building
Page 10
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Page 11
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 2:
1)
Financial
Mashreq Bank PSC
P.O. Box 2469, Dubai, U.A.E.
USD Account No. 0448477512
Account of Gulf Marine & Offshore Service Company Dubai LLC
Swift Code: BOMLAEAD
2)
Lloyds TSB Bank PLC, Dubai
USD Account No. 60600756222301
Ultimate Beneficiary: Gulf Marine & Offshore Service Company Dubai LLC
Swift Code: LOYD AEAD
Page 12
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 3:
Organization & Management
GMMOS GROUP CORPORATE OFFICE
Vikram Naik
Praman Naik
Michael Rannacher
Sameer P. Sharma
:
:
:
:
President & CEO
Managing Director
Executive Vice President
Chief Financial Officer
Gulf Marine Maintenance & Offshore Service Company Dubai LLC –
Operating Company Management
Johann Stangl
Natrajan Ponuswamy
Bashir
Akilesh Tiwari
T.K.SreeRanganath
Syed Aqeel
Muthalugu Alagapan
Henson D’Souza
Marian Sirbu
Albino
Henson D’Souza
Gabawan
Sudhir &
Jeniel Maligmat
Logistics & Stores Supervisor
Vinod Kumar
Page 13
Revised: July 17, 2012
:
:
:
:
:
:
:
:
:
:
:
:
Operations Manager
QA/QC Manager
HR & Admin Manager
Purchasing Dept. Head
Estimation Dept. Head
Project Manager
Design Engineering Dept. Head
Drafting - Supervisor
Yard Superintendent
HSE Manager
Drafting - Supervisor
Yard General Foreman
:
NACE II Painting Inspectors
:
:
Helmi Fares
IT Manager
Section 3:
Page 14
Edited: July 17, 2012
Organizational Chart
PREQUALIFICATION DOCUMENT
Section 4:
Mechanical Design and
AutoCAD Drafting Capability
Detailed Engineering involving design calculations and shop fabrication drawings of static
mechanical equipments viz pressure vessels, process columns and reactors, skid mounted
packages etc. is our area of specialization.
A team of qualified and experienced engineers and draughtsman can produce quality design
documents that meet the requirements of international codes, specifications, standards and
design practices.
International design codes frequently used by us are ASME Section VIII Division 1,
Division 2 ASME Section I, PD 5500, ASME B 31.3, 31.4, 31.8, etc. Accreditation to
the following ASME stamps is available U, U2, R, S and PP.
Indian Design codes commonly used by us are IBR, ISO-R-831, SMPV, IS-875 (Pt3),
IS-1893, etc.
The specifications, standards and design practices frequently used by us are those of
ARAMCO,
SHELL,
BECHTEL,
TECHNIP,
FLUOR
DANIEL,
SNAMPROGETTI, BROWN, FOSTER WHEELER, CHIYODA, ETC.
The materials used are conforming to ASME Section II Parts A, B, C, D, ASTM, DIN,
JIS, AISI, IS, API, etc.
The following software’s is utilized for design:
a.
P. V. Elite
b.
Finglow,
c.
Advanced Pressure Vessels
d.
Stad III,
e.
Caesar II
f.
Cadworx Pipe
All the drawings we produce are in AutoCAD Release 2005.
E-mail and Internet facilities available in house enable electronic transmission of documents.
Page 15
Edited: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 4:
Quality Assurance & Quality Control
Capability
1.0
GMMOS QA System is documented and implemented against QA Standards ISO
9001-2000, accredited by internationally recognized body ABS Quality Evaluations
Inc.
2.0
Our company is authorized to apply ASME Code Stamp(s) U, U2, S, PP & R Stamp
and API Monogram Spec 2 B.
3.0
Our Quality Plans and Work Instruction is being used as controlling documents on
the shop floor and routinely used for the compliance with specification and quality
plan requirements.
4.0
GMMOS is a member of the following manufacturers associations:
i)
ii)
iii)
American Society of Mechanical Engineers (ASME)
The National Board of Boiler & Pressure Vessel Inspections
American Petroleum Institute
5.0
We permit our clients to carry out QA Audit during order execution.
6.0
Sub suppliers and sub contractors are assessed for approval and selection by
performance and product evaluation.
7.0
Procurement of materials is in accordance with client’s specification and
requirements.
8.0
We have specialized in-house facilities for ring groove, pipe bore cladding, cladding,
SAW and Electroslag for welding and fabrication along with other welding process
like SMAW, FCAW, GMAW, GTAW.
9.0
Weld Procedures and Welder Qualifications generally performed under the
surveillance of a recognized independent inspectorate.
10.0
Standard Procedures and Welders are qualified through ASME IX, AWS D1.1, EN
287 Code.
Page 16
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 5:
Resources
NumbersofManpowerResourcesforthefollowingcategoriesemployedbyGMMOS:
AdministrationStaff(i.e.CEO,GM,Accounts,HumanResources,Secretaries,Drivers,
Clerks,SecurityGuards,DataEntryClerks
AssistantGeneralManager
Estimators
ProjectEngineers
DesignEngineers
Draftsman
BillofMaterialsEngineers
QA/QCEngineers
QA/QCInspectors
NDTTechnicians
QA/QCDocumentControllers
MaterialTraceability
SafetyManager
SafetyOfficer
Yard&ShopSuperintendent
GeneralForeman
Foreman&LeadmanWelding
Foreman&LeadmanStructuralFabrication
Foreman&LeadmanPressureVesselFabrication
Foreman&LeadmanPiping
Foreman&LeadmanBlast&Paint
PaintInspector&Supervisor
QualifiedWelders
Fabricators
PipeFitters
Painters&Blasters
Blaster&PaintersDPESupply
Riggers
PurchasingOfficers&Buyers
Port,Custom,TransportationLogisticsOfficer
MaterialCoordinator,Warehousemen&Clerks
Electricians
Mechanics
ForkliftOperators
CraneOperators
40
1
4
6
2
8
2
3
4
4
4
5
1
2
1
1
8
8
8
4
2
2
146
110+
40+
30+
60
30+
3
2
6
4
5
3
3
N. B.
Arrangements can be made for either skilled or unskilled labour to be engaged to meet the
requirement of the clients.
Page 17
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
List of Information Systems
We have a client/server setup using Windows Server 2003, with over
4 Dell Servers for Data, Exchange, Proxy, Web and Anti Virus
100 Workstations
15 Network Printers
30 Local Printers
Servers are less than 2 years old with Intel Dual Xeon Processors (2.66 Ghz+)
List Of Engineering Application Software Used:
Software
Available
Software Developer
Name/Description
Version
PV-elite
Coade
Till 2010
Code Calc
Coade
Till 2010
Nozzle Pro
Paulin Research
Groups
2009
Finglow
Finglow
2008
STADD Pro
Bently Systems
V8i
CAD Worx
AutoDesk
2009
Auto CAD
AutoDesk
2007
Usage
Design Of Pressure Vessels, Columns And
Heat Exchangers
Individual Pressure/Non-Pressure Load
Bearing Components Design.
Finite Element Analysis For Nozzles,
External Attachments And Saddles Of
Various Configurations
Design Of Pressure Vessels, Columns And
Heat Exchangers
Structural Analysis And Design
3D Modeling Of Pressure Vessels, Heat
Exchangers And Skid Mounted Packages
Including Piping, Structural’s And Isometric
Drawing Generations.
Preparation Of 2D Drawings For Various
Systems, Equipments And Components
PROFESSIONAL BASIC USER SUPPORT
WINDOWS XP PROFESSIONAL, OFFICE 2003, ACROBAT
FILE SERVER, WEB SERVER, EXCHANGER SERVER, PROXY, MAIN SCANNER,
NETWORK SHARE, NETWORK PRINTER ETC. – HARDWARE USED
PENTIUM 4 (3.60 GHZ TO QUAD CORE 2.66 GHZ) RAM 2 GB MS – 2GB HDD40 -160 GB
– SYSTEM USED END USER MACHINES
WINDOWS SERVER 2003, EXCHANGE 2003, GFI MAIL SECURITY, SYMANTEC ANTI
VIRUS WITH ANTI SPYWARE – BACKEND SERVER SUPPORT
2.8 GHZ DUAL XEON PROCESSOR SERVERS WITH 200 GB INTERNAL & 20DGB EXT
STORAGE & EXTERNAL FIREWALL (NET SCREEN) – HARDWARE USED
JUNIPER NETSCREENS + FIREWALL & MCAFEE ENTERPRISE ANTI VIRUS
Page 18
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 6:
Partial Yard Equipment Lists:
Yard Cranes
Fabrication Bay #1
2 x 10 Tons (7M To Hook)
2 x 1.5 Tons JIB
Fabrication Bay #2
1 x 10 Tons (7M To Hook)
Fabrication Bay #3
1 x 10 Tons (7M To Hook)
Fabrication Bay #4
1 x 7.5 Tons (5M To Hook)
Stores Bay #5
1 x 3Ton High reach Fork Lift
Gantry Crane Bay #6
1 x 5 Ton Gantry Crane 4M to Hook
Blasting Shop
100 Ton Bogey on Rail Track
Painting Shop
100 Ton Bogey on Rail Track
Paint Hard Standing Area
100 Ton Bogey on Rail Track
PWHT Furnace Area
Open Fabrication Area Lifting Equipment
Radiographic Bunker
Open Fabrication Area Lifting Equipment
Pressure Test Area
Open Fabrication Area Lifting Equipment
Pipe & Plate Storage Area
Open Fabrication Area Lifting Equipment
Open Fabrication Area
1 x 250 Ton FMC Crawler
1 x 80 Ton Kobelco Crawler
2 x 25 Ton Mobile
2 x 7.5 Ton Fork Lift
1 x 3.0 Ton Forklift
Additional Equipment List: (Attached)
Page 19
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
HUGH SMITH 3000 TONNE VERTICAL BENDER CAPACITY LIST
Thickness which can be bent to all diameters to the following minima using
the Main Roller.
The 3000 Tonne Machine can accommodate plates up to 200 mm thick
4.0M Machine
Yield Stress
Kg/mm²
Min. Inside Dia.
960 mm Main Roller Diameter
25
50
Small Dia. Range
1150
Plate Width
35
1170
25
35
50
Medium Diameter
1340
2300
25
35
50
Large Dia. Range
5500 and above
Plate Thickness
4000
77
68
60
97
85
74
125
107
90
3500
81
72
63
102
90
79
133
114
96
3000
86
77
67
108
96
83
142
123
104
2500
93
82
72
117
103
89
153
134
113
2000
102
89
78
128
112
97
168
146
126
1500
113
100
88
145
126
110
188
165
143
Contact Centers
For above
Thickness
Page 20
Revised: July 17, 2012
500
650
800
PREQUALIFICATION DOCUMENT
Section 7:
Partial Client & Structural Fabrication List
Major Clients
Major clients include:
PLENTY FILTERS – UK
DUBAI PETROLEUM COMPANY
ETA PROCESS PLANT – UK
LARSEN & TOUBRO – INDIA
SAUDI ARAMCO – KSA
GLOBAL PROCESS SYSTEMS - UAE
QATAR PETROLEUM
SNAMPROGETTI – ITALY
SCHLUMBERGER
INDIA
–
MIDDLE
EAST
&
TECHNIP – KTI
ALDERLEY FZE - UAE
PETROLEUM DEVELOPMENT OMAN
J. RAY MCDERMOTT – UAE
EXPRO GROUP
LAMPRELL ENERGY LTD.
TOTAL – ABK - UAE
PETROFAC SHARJAH
CAIRN ENERGY
Page 21
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
Section 8:
GMMOS FABRICATION EXPERIENCE
STRUCTURAL FABRICATION
Year
2011
2011
2008
JobNo.
5103
5042
4690
Client
CairnEnergy
IndiaPty
Ltd.
Lamprell
Energy
Emirates
Alumuniun
(EMAL)SNC
Lavalin
EndUser
CairnEnergy
FredOlsen
Emirates
Alumuniun
(EMAL)
Project
MBAPhaseII
Development
BhagyamField
Project
WindCarrier
OffshoreInstallation
Vessels1
SmelterComplex
PowerPlant
Taweelah
ScopeofService
ManifoldSkidsTypeI&II
(SkidFrame,Piping,
Insulation,Assemblyof
SkidFrame&Piping,
Installation,HookUpand
Precommissioning,
Instrumentation&Supply
ofMaterials
17Nos.
FabricationofSpudCans
8,500Widthx13,500
Lengthx4,000Longx200
Tons
2Nos.
FabricationofTubularLegs
4,600ODx25,000mmLong
x230Tons
4Nos.
P91HPSteamLinesand
Drains
256Meter
P11HPSteamLinesand
Drains
22Meter
A53HPSteamLinesand
Drains
13Meter
P91HPSHeaderand
BypassLines
440Meter
A53HPSHeaderand
BypassLines
8Meter
A53LPSteamLineand
Drains
576Meter
A53CLSSupply&Return
Lines
469Meter
A53HRSGInstrumentAir
Lines
322Meter
A106HRSGFeedwaterand
Condensate
74Meter
A53HRSGFeedwaterand
Condensate
GalvanizedSteelPipeRack
ModulesSteelAssembly
Page 22
Revised: July 17, 2012
Quantity
357Meter
16Modules
PREQUALIFICATION DOCUMENT
Year
JobNo.
Client
EndUser
Project
ScopeofService
Quantity
2sets
2sets
2008
4685
Expro
Americas
LLC
HerculesRig
262
PE0771R3
UShaped90FtBoomswith
PipingWaterSpraySystem
&GasFlare,VerticalKing
Post,SeaEmeraldBurner,
DiverterManifold&Diesel
Tank,PropaneManifold
2008
4675
DPIRLimited
60FtBurnerBooms&2
EachMiniKingPost
2008
4627
Bluewater
Energy
Service
MaerskOil
QatarBlk5
Development
AlShaheenTerminal
2008
2007
2007
2007
27OffSPMAnchorPiles&
27Nos.
12OffBackOffMooring
Piles
12Nos.
4606
Expro
Americas
LLC
RowanRig
600
PE0726
UShaped90FtBoomswith
PipingWaterSpraySystem
&SeaEmeraldBurner,Rig
DiverterManifold&17
NozzleDelugeSystem,Gas
FlareTip
4560
Leighton
Contractors
IndiaPvt.
Ltd.
M/sReliance
Portsand
Terminals
Limited
SBM/Bechtel
RelianceJamnagar
ExportRefinery
Project
EarthquakeRestraintPiles
2Nos.
1Set
1No.
4518
TotalABK
TotalABK
EC2309AKEast
SouthSideSlot
Extension
FabricationofSupply
materials,fabricatedeck
framingmembers,bracing,
stiffeners,hatchcovers,
mezzaninedeckwith
ladder/handrailand
grating,gritblast&paint
structures
4471
Leighton
Contractors
IndiaPvt.
Ltd.
M/sReliance
Portsand
Terminals
Limited
SBM/Bechtel
RelianceJamnagar
ExportRefinery
Project
AP41AnchorPilefor
Bechtel
2007
4408
TotalABK
TotalABK
EC2308AKFWSouth
SlotExtension
2007
4378
TotalABK
TotalABK
EC2308AKFWSouth
SlotExtension
2007
4365
TotalABK
TotalABK
SO4900003584EC
23071/2
Page 23
Revised: July 17, 2012
Fabricationof3Conductor
GuideFramesandmisc
looseitemsbyusingPipe
14",12",10",8"&6"Fitted
withone38"IDConical
Guides
FabricationofSupply
materials,fabricatedeck
framingmembers,bracing,
stiffeners,hatchcovers,
mezzaninedeckwith
ladder/handrailand
grating,gritblast&paint
structures
FabricationConductor
Guides
2sets
3Sets
1Set
1Set
PREQUALIFICATION DOCUMENT
Year
JobNo.
2006
4298
2006
4233
2006
4224
2006
4209
Client
Bluewater
Energy
Service
Toyo
Engineering
Corporation
Bluewater
Energy
Service
SBMImodco
Inc.
EndUser
Project
RelianceJamnagar
ExportRefinery
Project
FoundationPiles610mm
DiaxWallThickness19mm
x16750mmLength,Weight
inAir5mTonseach
4Nos.
NIOC
StackSectionSouth
ParsPhase6,7&8
ExhaustStacks4500Meter
3Nos.
ADOCJapan
FabricationofAnchorPile
54"Lengthx16Meters
1No.
RelianceJamnagar
ExportRefinery
Project
Fabricationof12Nos.
MooringPiles&8Nos.Pin
PilesforExportBuoys
SBM5AnchorPiles2250
Diax8230Long
SBM5PlemPiles1070Dia
x10150Long
SBM4AnchorPiles2490
Diax10250Long
SBM4PlemPiles1070Dia
10150Long
SBM3PlemPiles1070Dia
x15650Long
M/sReliance
Portsand
Terminals
Limited
3874
Bluewater
Energy
Service
ADOCJapan
2005
3607
Technip
Oceania
Woodside
Subsea7EnfieldJV
2003
2963
TotalABK
TotalABK
2002
2435
SingleBuoy
Mooring
Shell
2027
SingleBuoy
Mooring
2001
2018
SingleBuoy
Mooring
2001
1951
SingleBuoy
Mooring
2001
1950
SingleBuoy
Mooring
2001
1933
SingleBuoy
Mooring
Page 24
Revised: July 17, 2012
Quantity
M/sReliance
Portsand
Terminals
Limited
2005
2001
ScopeofService
Halliburton/
Shell
Development
Company
Nigeria
Halliburton/
Shell
Development
Company
Nigeria
Nigerian
National
Petroleum
Corporation
Nigerian
National
Petroleum
Corporation
Nigerian
National
Petroleum
JobEC2100North
SideSlotExtension
ShellBonga,Lagos
Nigeria
54"x16MeterAnchor
Piles
PullinWinch,Ballast&
LandingP/F+AddItems&
RiserColumnFender
FabricationofConductor
Guides&Decks
SPMITubesRiserClamp
Support
12Nos.
6Nos.
4Nos.
6Nos.
4Nos.
4Nos.
6Nos.
1Sets
1Sets
1No.
ShellEAField
Development
SoftYokeMooring
PlatformSBMRefSO
12750FabricationofYoke
1No.
ShellEAFPSO
SO–12750Jacket&Yoke
1No.
AtlasCoveProjectfor
NNPC
SO12770Fabricationof
20"Plem
AtlasCoveProjectfor
NNPC
SO12770Fabricationof
52"Plem
AtlasCoveProjectfor
NNPC
SO12770Fabricationof6
MagAnchors
6Nos.
PREQUALIFICATION DOCUMENT
Year
2010
2011
2009
JobNo.
5046
4690&
4879
2007
4520
2010
5023
EPCFORRUWAIS4TH
NGLTRAINPROJECT
CARBONSTEEL
PIPING
PREFABRICATION&
PAINTINGWORKS
PETROFACGS
JV
EMALSMELTER
COMPLEX
SIMPLECYCLE
LARGEBOREPIPING
FORNATURALGAS,
HYDROGEN,LUBE
OIL,SEAWATER
SERVIVE&PIPE
SPOOLSFORPIPE
RACKSHPSTEAM
&HPFEEDWATER
SERVICE
SNCLAVALIN
WORLY
PARSONSJV/
EMAL
67344
2"~36"
PETROFAC
24000
0.5"~18"
MATERIALFIMBY
CLIENT
DPIR
5832
2"~4"
AISI4130& SA106
GRB
SELASFLUID
PROCESSING
CORP(SUBSIDIA
RYLINDE
GROUP)
14400
2"~3"
SA106GRBPIPING
D.P.C
19112
2"~18"
APIX52&SA333
GR6
NENOOTER/
ERICKSEN
12150
0.5"~20"
SA106GRBPIPING
NENOOTER/
ERICKSEN
11390
3"~14"
SA106GRBPIPING,
&S&PPSTAMP
CONDENSATE
PIPING
ALDERLY/
PETROFAC
2500
2"~40"
FISCALMETERING
SYSTEM
PIPING
ALDERLY/
CHIYODA
TECHNIPJV
4000
2"~24"
FISCALMETERING
SYSTEM
PIPING
ALDERLY/
CHIYODA
TECHNIPJV
3000
2"~36"
PIPESPOOL
FABRICATIONFOR
RIGS
MIS
3000
2"~6"
PIPESPOOL
FABRICATION
DPC
9069
2"~20"
DPIRKIRINSKAYA
BOROUGEIII
ETHYLENE
CRACKINGFURNACE
RUWAIS
COMPLEX
D.P.C
2008
4586
2004
3122
2006
3882
FEWA/NAKHEELHRSG
#4
2006
4096
KKURSANIYAH/SAUDI
ARAMCO
2009
4890
2007
4517
2006
4036
2009
4910
2005
2276
KUWAITOILCO
QGIICL4FISCAL
METERING
SYSTEM
QATARGASII
DEVELOPMENT
PROJECT
RIG013&RIG014
D.P.C
DUPLEXPIPE
SPOOLS(SA790
DUPLEX
UNS31803)FOR
TRAINSGT3&
SGT4
HPPRESSUREPIPE
SPOOLS
FLUEGASPIPING
FORETHYLENE
CRACKING
FURNACE
PIGLAUNCHERS&
RECEIVERS
PIPINGFORHRSG
#4BOILERPLANT
FEWA
PIPINGFORHRSG
KHURSANIAH
PROJECT
Page 25
Revised: July 17, 2012
Pipesizes
handled
Natureofwork
PETROLEUMSALAM
GAS
TREATMENTUNIT
Client'sname
Total
inch
dia
33774
396376
Projectdescription
166
CSPIPE
LTCS
GLASSFLA
KELINE
SPOOL
Remarks
APPROXIMATELY
190,000WELDDIA
INCHOFNDT,
PWHTAND
PAINTING
SA335P91 5468DI
(PPSTAMP)&
SA106GRC7981DI
FORPIPERACK
MODULES(VALUE
INCLUDESSUPPLY
OFVALVESAND
ASSEMBLYOFPIPE
RACKS)
SIMPLECYCLEPIPE
SPOOLS
SA106GRB46531
DI&
SA312TP304L&
31254PIPES
7365DI
SA106GRBPIPING
&FIMBY
CLIENT
SA106GRBPIPING
&FIMBY
CLIENT
SA106GRBPIPING
&
SA312TP304LFIM
BYCLIENT
SA106GRBPIPING
FIMBY
CLIENT
SA106GRBPIPING
FIMBY
CLIENT
PREQUALIFICATION DOCUMENT
Section 8:
GMMOS FABRICATION EXPERIENCE
SPM REFURBISHMENT
Over the past 8 years, GMMOS has ventured into this specialized type of work and has
successfully completed dry docking and overhauling of fourteen (14) units, owned by some
of the prominent petroleum companies in the Persian Gulf. GMMOS has the capability of
disconnecting the buoy, utilizing diving services and towing the unit into GMMOS yard for
dry-docking and refurbishing. After completion, the unit can be towed back on location and
reconnected to sub-marine hoses and back in operation.
Below is a typical and brief scope of work carried out on the SPM units refurbished by
GMMOS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
Disconnection and inspection of the submarine hoses, anchor chains and
mooring chains.
Wet tow the SPM to GMMOS Jetty.
Dry dock SPM in Dubai Ship Docking Yard.
H.P. wash, clean, gas free and disassembly of piping and valves.
Disconnect turntable/arms and MPDU for overhauling.
Weld repair, re-bushing, and line boring of connecting pad eyes of arms and
MPDU.
Disassemble MPDU, clean, inspect and weld repair as necessary.
Reassemble with new bearing and seals.
Pressure test and rotation test as per manufacturer's specification.
Fabricate new product piping and pipe supports and install on pipe arm.
Install 3/4" thick bogie wheel track plate and modify bogie wheel assembly
to suit the new arrangement.
Overhaul watertight arrangement and valves.
Renew damaged skirt fender and deck fender.
Lining inside of hawser pipe.
Removal of existing rubber fender and install 8" diameter steel fender on
hull.
Grit blast and paint as per clients' specification.
Reassemble turntable/arms and MPDU.
Install bogie wheel, rope guard and navigational lights.
Pressure test as per manufacturers' specification.
Undock and carry out floatation test and rotation test as per clients'
specification.
Tow back to the field and install the buoy in position.
Connect submarine hoses, pressure test and handover to client.
Page 26
Revised: July 17, 2012
PREQUALIFICATION DOCUMENT
SPM Projects include the following:
Date of completion
October 2005 to June 2006
Client/Owner: Petroleum
Development Oman
November 2002
Client/Owner: Al Khafji Joint
Operation
Page 27
Revised: July 17, 2012
Specifications
Make: SBM
1) SO-1107
2) SO-1246
3) SO-1157
Weight:
Diameter
Depth:
Make: SBM
Weight: 156 M Tons
Diameter:
Depth:
Scope of Work
Scope of Work:
This contract involves change out of 3 SBM Buoys
and complete overhaul including replacement of
bearing.
Change Out & Overhaul:
Dry-docking of Buoy, Scrapping & HP Washing,
Degassing & Hot work Permit, Inspection & UT
Test, and Removal of misc. items, piping, valves, &
water connection.
Disconnect & remove turntable, removal of CP
bearing, C. Well Piping.
Renew Skirt Fender, outer shell plate, outboard
ladder.
Repair mooring platform, manhole covers, & winch
support foundation Remove & overhaul mooring
platform, Chain Hawsers, & piping.
Replace protection cage & weld chain hose and reweld bottom cutout.
Overhaul mooring equipment.
Leak Test
Compartments & Hawser Box.
Install wooden platform, new lights supports
Reinstall swivel, main bearing & grout, turntable,
piping, valves, anode lights, bridles etc.
Hydrotest turntable, Trim test, Blast & Paint,
Undock & Preparation of Towing.
SCOPE OF WORK:
Overhaul repair, disassembly of SPM Buoy.
Remove turn table sealing, all manholes, valves,
expansion joints, central pipe arm, main veering,
mooring bridle, turntable and misc. items. Marine
growth removal etc. Surface preparation and
painting final assembly, testing.
PREQUALIFICATION DOCUMENT
Date of completion
June 2002
Client/Owner: Zakum Development
Company (ZADCO)
Specifications
Make: IMODCO
Scope of Work
SCOPE OF WORK:
INT’L. INC.
Dry docking, clean, water wash, renewal of skirt
fender and plates, repair and modification of
hydraulic skid unit, disconnection of arms and
MPDU unit, overhauling of winch, air motor,
MPDU, valves and pulleys, grit blast and paint,
hydro test, rotation test, load test, undock and
trim test.
SCOPE OF WORK:
Dry docking, clean, water wash, renewal of skirt
fender and plates, repair and modification of
hydraulic skid unit, disconnection of arms and
MPDU unit, overhauling of winch, air motor,
MPDU, valves and pulleys, grit blast and paint,
hydro test, rotation test, load test, undock and
trim test.
Weight:
Diameter:
Depth:
2001
Make: SBM
Weight: N/A
Diameter: N/A
Depth: N/A
Client/Owner: National Iranian
Oil Company
(NIOC)
August 1999
Client/Owner: Dubai
Petroleum Company (DPC)
Section 8:
Make: SBM
Weight: 252 (approx.)
Diameter: 12.5 m
Depth: 5.3 m
SCOPE OF WORK:
Towing to dry dock, disassemble turntable and
piping, renew main and swivel bearing, built up
and machine contact surface of seal running face
of swivel, renew skirt fenders, deck fenders and
damaged hull plate, grit blast and paint,
reassemble, test, undock.
GMMOS FABRICATION EXPERIENCE
FLARE STACKS & HEATERS
Year
Job
No.
Client
End User
Project
2009
4980
John
Zink/Petrofac
ADCO
EPC For Asab
FFD Project
Page 28
Revised: July 17, 2012
Scope of Service
Quantity
Flare Risers (Guy Wired Flares)
Tag
Height
(m)
Dia Inch x
Thk mm
PREQUALIFICATION DOCUMENT
70
36" x
12/16/18mm
48" x 12/16mm
1
14-39-FL-1935
70
48" x 12/16mm
1
14-39-FL-1939
70
48" x 12/16mm
1
14-39-FL-1936
40
36" x 12mm
1
14-39-FL-1938
40
36" x 12mm
1
14-39-FL-1937
30
20" x 12mm
1
14-39-FL-1951
23
18" x 12/16mm
1
14-39-FL-1952
25
18" x 12/16mm
1
14-39-FL-1953
25
18" x 12/16mm
1
14-39-FL-1933
55
14-39-FL-1934
1
Flare Risers (Self Supported Flares)
2008
4722
Born Canada
Petrofac
Ebla Gas
Project, Syria
14-39-FL-1946
16
18" x 10/12mm
1
14-39-FL-1947
16
18" x 10/12mm
1
14-39-FL-1948
16
18" x 10/12mm
1
14-39-FL-1949
16
18" x 10/12mm
1
14-39-FL-1950
16
18" x 10/12mm
1
8046-06 Hot Oil Fired Heater Package Structural
Fabrication of Convection Section, Radiant
Section, Stacks, Transition, Ladders & Platforms,
Stack Frames, Internal Baffles, Dampers
Supports, Saddles, Lining Anchors & External
Painting
Steel Stack Size:
* Dia 4400 x 6 Thk x 14000 Long &
* Dia 1500 x 8 Thk x 20000
Total Weight: Approximately 65 Tons
Coil Fabrication of Radiant Section, Convection
Section including installations of tube sheets,
header box dampers, sidewall etc.
Page 29
Revised: July 17, 2012
1 Lot
PREQUALIFICATION DOCUMENT
Year
2008
Job
No.
4771
Client
Born Canada
End User
Petrofac/Hayan
Petroleum, Syria
Project
Jihar Stage 3
Project
Scope of Service
8049-05 Hot Oil Fired Heater Package Structural Fabrication of Convection
Section, Radiant Section, Stacks,
Transition, Ladders & Platforms, Stack
Frames, Internal Baffles, Dampers
Supports, Saddles, Lining Anchors &
External Painting
Steel Stack Size:
* Dia 5500 x 6 Thk x 17000
Quantity
1 Set
* Dia 1500 x 8 Thk x 15500
Total Weight: Approximately 75 Tons
Coil Fabrication of Radiant Section,
Convection Section including installations
of tube sheets, header box dampers,
sidewall etc.
2008
2007
4662
4551
Verga
Engineering
Born Canada
W. J. Towell
Company
LLC/Petroleum
Development
Oman
NPCC
C671C010/C110
REV. 00 Gas
Sweetening
Unit Upgrade
- Lekhwair
Maersk Oil Al
Shaheen
Development
Supply and relevant fabrication of
steelwork and coil fabrication for New
Fired for Hot Oil Heaters Item F27700/F-27701 (Radiant Floor, Radiant
Vertical Walls, Radiant Arch, Transition,
Convection Materials, Convection End
Tube Sheets, Convection Header Boxes,
Breeching, Stack Frame and Add
Structures, Stack, Ladders & Platforms,
Gratings, Stack Dampers, Instrument
Conn, Lining Anchors Weld, Stiffening for
transport, Trial Assembly, Inlet Duct,
Ducts to Burners, Stack Accessories)
Steel Stack Size:
* Dia 4500 x 6 Thk x 10000 = 1 No.
* Dia 1500 x 16/8 Thk x 37000 = 1 No.
Total Weight: Approximately 110 Tons
Heater, Convection Boxes 8042-06A
Radiant Section - 114,600 lbs
Convection Box - 28,660 lbs
Stack - 24,250 lbs
Transition - 4,409 lbs.
Ladders & Platforms & Structure
55,120.00
2 Lots
1 Lot
Fan Ducting, Welding of Fiber Studs,
Welding of SS Anchor, Welding of Mesh,
Painting of Structure, Fabrication of SS
Items.
2007
4351
Born Canada
Page 30
Revised: July 17, 2012
Khalda
Petroleum
Company
Salam Gas
Train 3 & 4
Project
8040-05 Hot Oil Fired Heater Radiant Coil
& Convection Coil 388 + 612 Joints
Radiant Section - 124,620 lbs
Convection Box - 29,846.53 lbs
Stack - 21,506.11 lbs
Transition - 70045.50 lbs
Ladders & Platforms - 35,903.30 Lbs
Fan Ducting, Fasteners, Shipping Saddles,
Welding of Mesh, Fiber Studs
1 Lot
PREQUALIFICATION DOCUMENT
Year
2005
2004
Job
No.
3886
3201
Client
Born Canada
Mactronic/
Enerflex,
Reed Alberta
Canada
Page 31
Revised: July 17, 2012
End User
CCC & Oman
Refinery
Company LLC
ADCO
Project
Scope of Service
Preflash
Tower Fired
Reboiler
Stack Top Section L12600 x W1600 x
H1600
Stack Middle Section L1200 x W1600 x
H1600
Stack Bottom Section w/Damper L12000 x
W2200 x H2000
Transition Section L3400 x W1900 x H1750
Convection Section, with coil, header boxes,
etc
Radiant Section, complete with Arc Roof,
Internal Coil and coil supports
Buhasa - Cable
& Block
Diagram
Project
Quantity
1 Set
1 Set
1 Set
1 Set
1 Set
1 Set
HP Flare System & LP/HP Flare System
Package (FL-1945, 1947) Design “A” 48”
Dia.*.375” Inlet 48”
2 Nos.
LP Flare System & Tank Flare System
Package (FL-1946) Design “A” 42” Dia.
*.375” Inlet 42”
1 No.
Tank Flare System Package (FL-1941)
Design “C” 36”/24”/20” Dia. *.375” inlet
42”
1 No.
Tank Flare System Package (FL-1942,
1943,1944) Design “C” 42”/24”/20” Dia.
*.375” Inlet 42”
RDS-1,2,3 Flare System Package (FL1952,1953, 1954) Design “A” 24” Dia.
*.375” Inlet 12”
HP Flare System Package (FL-1951) Design
“A” 30” Dia.*.375” Inlet 20”
30” Guy Ring/Lug Assembly
3 Nos.
3 Nos.
1 No.
11 Nos.
PREQUALIFICATION DOCUMENT
Section 9:
Certificates of Authorization
Issued By
1
The National Board of Boiler
and Pressure Vessel Inspectors
2
The American Society of
Mechanical Engineers
3
The American Society of
Mechanical Engineers
4
The American Society of
Mechanical Engineers
5
The American Society of
Mechanical Engineers
6
The National Board of Boiler
and Pressure Vessel Inspectors
7
ABS Quality Evaluations Inc.
8
API Monogram
Description of Certificate
Certificate of Authorizations:
NB
ASME Stamp: U, S, PP U2:
GMMOS is authorized to apply
the “NB” mark and register
boilers, pressure vessels, or
other pressure retaining items
with the National Board in
accordance with its provisions.
Certificate of Authorization: U2
Scope: Manufacture of Pressure
Vessels in Registered Location
& Field Sites
Certificate of Authorization: U
Scope: Manufacture of Pressure
Vessels in Registered Location
& Field Sites
Certificate of Authorization: PP
Scope: Fabrication & Assembly
of Pressure Piping.
Certificate of Authorization: S
Scope: Manufacture of Power
Boilers
Certificate of Authorization: R
Metallic
Repairs
&/or
Alterations at the above location
& extended for Field Repairs
&/or Alteration Controlled by
this location.
ISO 9001:2008 Certificate of
Compliance
American Petroleum Institute
entitled API Spec 2B Certificate
#2B-0084
Copies of each Certificate are attached.
Page 32
Revised: July 17, 2012
Issue Date
Expiration Date
March 2, 2012
February 8, 2015
January 30, 2012
February 8, 2015
January 30, 2012
February 8, 2015
January 30, 2012
February 8, 2015
January 30, 2012
February 8, 2015
March 2, 2012
February 8, 2015
23 October
2002
10 October 2014
January 4, 2008
January 14, 2014
Activity:
Validity of this certificate is based on the periodic audits of the management system defined by the above scope and is contingent upon prompt, written
notification to ABS Quality Evaluations, Inc. of significant changes to the management system or components thereof.
ABS Quality Evaluations, Inc. 16855 Northchase Drive, Houston, TX 77060, U.S.A.
Validity of this certificate may be confirmed at www.abs-qe.com/cert_validation.
Copyright 2003 ABS Quality Evaluations, Inc.. All rights reserved.
Additional Facility:
has been assessed by ABS Quality Evaluations, Inc. and found to be in conformance with the requirements set forth by:
Certificate Of Conformance
ABS Quality Evaluations
Effective Date: JANUARY 4, 2011
Expiration Date: JANUARY 4, 2014
QMS Exclusions: Section 7.3, Design and Development
The scope of this license includes the following product: Steel Pipe
2B-0084
API Spec 2B
GULF MARINE MAINTENANCE & OFFSHORE SERVICE COMPANY DUBAI LLC
Parcel ID 599-733
Jebel Ali Industrial Area 1
Jebel Ali, Dubai
United Arab Emirates
2B-0084
Job No. 2850 - GPS/Addax
Test Separator
Job No. 2838 GPS/Petroiran
GLP Gas Dehydration Package
Job No. Sadra – Samsung/Frames
Glycol Regeneration
Job No. 2944 – Schlumberger
Three Phase Separator
Job No. 2896 GPS/Petroiran
KPP Gas Dehydration Package
Job No. 2235 – GPS/GNPOC
Electrostatic Treater Package
Gulf Marine Maintenance &
Offshore Service Company Dubai L. L. C.
Job No. 2149 – Schlumberger
KO Drum
Job No. 2607 GPS/Daewoo
Fuel Gas Package
Job No. 2797 – Halliburton
Calibration Tanks
Job No. 2163 – GPS/China Petroleum
Fire Water KO Drum
Job No. 2147 – GPS
Power Generation Module
Job No. 1976 - ADDAX
Three Separation Package
Job No. 2103 – Frames
Shell EA Gas Dehydration Package
Job No. 3014 - GPS
Low Pressure Fuel Gas System
Job No. 2346 – Hardy Oil
FPU Water Injection
Tel: 009714-8803637 Fax: 009714-8803647
Parcel ID 599-733, Jebel Ali Industrial Area I
P. O. Box 4613 Dubai, United Arab Emirates
Job No. 2899 - Petreco Sarl
HP Vent KO Drum
Job No. 2888 – GPS Canadian Nexen
Water Pump Strainers
Job No. 2531-5 GPS/SBM
HP Fuel Gas Scrubber
Job No. 2363 – Kuwait Oil Company
Test Separator
Job No. 2570 – ETA Process Plant
Vacuum Dearator
Job No. 2791 - Plenty Filters
Seawater Strainers
Job No. 2697 – GPS/ADDAX
Pig Launcher & Receiver
Job No. 2563 – Plenty Filters
Sour Gas Filter Separator
Gulf Marine Maintenance &
Offshore Service Company Dubai L. L. C.
Job No. 2889 – Canadian Nexen 400
Bbl Pop Tank
Job No. 2083 – Lamprell
KO Drum
Job No. 2790 – Plenty Filters
Liquid/Gas Filters
Job No. 2500 Alderley/Aramco
Horizontal Liquid Gas Separator
Job No. 2304 – Bluewater
Buoyancy Tank
Job No. 2403 – SBM/GPS
Fuel Gas Scrubber
Job No. 2837 – Plenty Filters
Botas – Filter Vessels
Job No. 2798 – GPS/Canadian Nexen
Inlet Separator
Tel: 009714-8803637 Fax: 009714-8803647,
Parcel ID 599-733, Jebel Ali Industrial Area I
P. O. Box 4613 Dubai, United Arab Emirates
Job No. 4245 Lamprell
Degasser Installed on Module
Job No. 4315 Lamprell/SBM/Chevron
30 mm SS Clad Scrubber
Job No. 4344 Lamprell/Aker
Fuel Gas Scrubber
Job No. 4245 Lamprell
2nd Stage Separator
Job No. 4315 Lamprell/SBM/Chevron
30 mm SS Clad Scrubber
Job No. 4315 Lamprell/SBM/Chevron
MBD-1070 Test Separator
Gulf Marine Maintenance & Offshore Service Company
Dubai L. L. C.
Job No. 4315 Lamprell/SBM/Chevron
Amine Flash Drum
Job No. 4315 Lamprell/SBM/Chevron
20mm x 27.5 M Vertical SS Steel Column
Job No. 4344 Lamprell/Aker
70 mm 1st Stage Clad Vessel
Job No. 4315 Lamprell/SBM/ Chevron
MBD-1050 2nd Stage Test Separator
Job No. 4315 Lamprell/SBM/Chevron
24 Meter x 85 mm SS Strip Clad
Vertical Contactor
Job No. 4315 Lamprell
30mm 2nd Stage
Tel: 00971-4-8803637 Fax: 00971-4-8803647,
Parcel ID 599-733 Jebel Ali Industrial Area 1,
P. O. Box 4613 Dubai, U. A. E
Job # 4487 Margham Dubai
Suction Scrubbers 65mm + 4mm
Job # 4173 Plenty Filters/Technip
Filters/Technip
Stainless Steel (50 mmThk)
mmThk)
Job # 4157 Foster Wheeler/ENOC
LPG Wash Water Drum (25mm)
75 mm Compressor K. O. Drum
Job # 3973 Plenty/Snamprogetti
Plenty/Snamprogetti
Job # 4118 Fasam/Iranian
Fasam/Iranian Central
Oilfields
2nd Stage Suction Scrubber
Job # 4173 Plenty
Filters/Technip/Yemgas
Filters/Technip/Yemgas
90 mm Common Gas Filter
Job # 4195 Snamprogetti
(Product Chamber)
Job # 4257 Snamprogetti
High Pressure Flare KO Drum
Job # 3957 Technip KTI
Thermal Oxidizer under production
Job # 3920 ETA/Weir Westgarth/
Westgarth/
Saipem
Golfinho – Dearator Vessel
High Pressure Flare KO Drum under
production
Job # 3895 Snamprogetti
Tel: 00971-4-8803637 Fax: 00971-4-8803647, Parcel ID 599-733
Jebel Ali Industrial Area 1, P. O. Box 4613 Dubai, U. A. E
Job # 4157 Foster/ENOC
HC Flare KO Drum
Gulf Marine Maintenance & Offshore Service Company
Dubai L. L. C.
GMMOS
EMAL PIPE RACK MODULES FOR
TAWEELAH SMELTER PLANT
(Fabricated & Assembled at GMMOS RAK Yard)
Description
Client
Project
OD
Length
Weight
Year Built
Owner
: Jack up Leg Section Vessel 1 & 3 - Part 1 to 4
: Lamprell Energy
: The Construction of Self Elevating Wind
Turbines Installation Vessels
:
:
:
:
:
4,600 mm
25,000mm
230 Tons
2011 – 2012
Fred Olsen Windcarrier
Job No.: 5042
Description : Spud Cans Vessel 1 – 2 Nos.
Client
: Lamprell Energy
Project
: The Construction of Self Elevating Wind Turbines
Installation Vessels
Size
Width
Height
Length
Weight
Year Built
Owner
:
:
:
:
:
:
8,200 mm
13,500 mm
4,000 mm
200 Tons Each
2011 - 2012
Fred Olsen Windcarrier
Job No.: 5042
Description
Client
Project
End User
:
:
:
:
Skid Manifold – 17 Sets
Cairn Energy India
Bhagyam Field Development
ONGC India
Year
: 2011 - 2012
Fabrication of Skid Frames, Piping, Insulation, Assembly of
Skid Frame & Piping, Installation, Hook Up and Precommissioning, Instrumentation & Supply of Materials
Job No.: 5103
Description
Client
Project
Year
End User
:
:
:
:
:
Carbon Steel Piping Prefabrication Works & Painting
Petrofac GS Joint Venture
GASCO Ruwais 4th NGL Train Project
2011 - 2012
GASCO Abu Dhabi
Prefabrication of approximately 190,000 Weld Dia Inch of CS Piping,
relevant NDE, PWHT and Painting
Job No.: 5046
Description
Client
Project
Year Built
: Fabrication, Assembly & Delivery of Pipe Rack
Modules 17 Nos.
: SNC Lavalin/Emirates Aluminium
: EMAL Smelter Complex Power Plant Taweelah
: 2008-2009
Scope of Works:
Purchased Materials, Received and Stored EMAL Supplied P91 Piping & Pipe Rack Steel, Pipe Fabrication,
Assembly Pipe Rack Modules, Structural Steel, Freight and Off Load for Pipe Rack Modules, and Fabrication of
Simple Cycle Bore Pipe
Approximate Weights: Structural, Piping & Valves
Module 1
: 56.01 Tons
Module 6
: 167.42 Tons Module 11: 53.97 Tons
Module 2
: 74 .11 Tons
Module 7
: 152.27 Tons Module 12: 53.97 Tons
Module 3
: 107.44 Tons Module 8
: 56.41 Tons
Module 13: 53.97 Tons
Module 4
: 57.61 Tons
Module 9
: 79.11 Tons
Module 14: 53.97 Tons
Module 5
: 111.16 Tons Module 10: 79.24 Tons
Materials: Pipe S335 P91, SA 53A/106GRB , SS304
Job No.: 4690 & 4879
EMAL PIPE RACK MODULES FOR
TAWEELAH SMELTER PLANT
(Fabricated, Assembled GMMOS RAK Yard & Loaded to Rak
Port Jetty)
Scope of Works:
Purchased Materials, Received and Stored EMAL Supplied P91 Piping & Pipe Rack Steel, Pipe Fabrication,
Assembly Pipe Rack Modules Structural Steel, Freight and Off Load for Pipe Rack Modules, and Fabrication of
Simple Cycle Bore Pipe
Approximate Weights: Structural, Piping & Valves
Module 1
: 56.01 Tons
Module 6
Module 2
: 74 .11 Tons
Module 7
Module 3
: 107.44 Tons Module 8
Module 4
: 57.61 Tons
Module 9
Module 5
: 111.16 Tons Module 10:
:
:
:
:
:
167.42 Tons
152.27 Tons
56.41 Tons
79.11 Tons
79.24 Tons
Module 11:
Module 12:
Module 13:
Module 14:
53.97 Tons
53.97 Tons
53.97 Tons
53.97 Tons
Materials: Pipe S335 P91, SA 53A/106GRB , SS304
Job No.: 4690 & 4879
Description : Changeout and Overhaul of SPM Buoys
Client
: Petroleum Development Oman
Area
: Mina Al Fahal
SO1107/SO1157/SO1246
SBM BODY
Outside Diameter
Inside Diameter
Skirt Diameter
Body Height
Buoy Weight
Compartment
:
:
:
:
:
:
12.00m
3.73m
16.00m
5.30m
230T (approx.)
6 unequal spaced
NOMINAL PLATE THICKNESS
Outside Shell Plating
: 9mm & 12mm
Inside Shell Plating
: 9mm & 16mm
Bottom Plating
: 12mm & 14mm
Deck Plating
: 9mm & 16mm
Watertight bulkheads
: 9mm & 12mm
Description : 2 Nos. KPP Gas Dehydration System Package
Client
: Global Process Systems/PEDCO/NIOC
Project
: Salman Oil & Gas Field
Job No. 2896
Description
Client
Project
Year Built
:
:
:
:
2 Nos. KPP Gas Dehydration System Package
Global Process Systems/PEDCO/NIOC
Salman Oil & Gas Field
2004
Scope of Work includes fabrication of skid frames, piping,
platforms, ladders, assemblies and instrumentations
Job No. 2896
Description
Client
Year Built
Length
Diameter
Thickness
Weight
Includes
: 200 Psig Test Separator
: ADOC Japan Abu Dhabi
: 2010
:
:
:
:
:
8230mm T/T
1981 mm (Incoloy 825 Roll Bonded)
16mm
12200 Kg
Fabrication of Skid, Piping, Ladders, Platforms
including Assembly and Instrumentations & Valves
Job No.: 4873
Description
Client
Location
: 3 Phase 2000 Psig WP Test Separator Skid Pkg.
: Expro Group Ltd.
: Algeria
Length
: 4572mm T/T
Diameter
: 1067mm ID
Thickness
: 70mm
Weight
: 13799 Kg
Includes
: Fabrication of Skid, Piping, Ladders, Platforms
including Assembly and Electrical & Instrumentations & Valves,
Belzona Lining
Job No.: 5101
Description
Client
E. P. N.
Installation
End User
:
:
:
:
:
Jacket Leg Structure Fabrication – Under Construction
Single Buoy Moorings Inc.
Halliburton
Hook-Up FPSO to SYMP using SBM’s Dynamic Installer
Shell Petroleum Development Co. Nigeria –
Shell EA FPSO – SO 12750
Year Built
: 2000
Bottom section of a shallow water jacket unders construction at
Al Jadaf Yard. The 2 meter high bottom frame support 48”
diameter leg at each corner which when completed support the
soft yoke mooring arm assembly connected to FPSO
Ballast Tank
Loaded Out & Sea fastened GMMOS Yard Sharjah
Mooring System: Jacket Yoke Installed Offshore
GMMOS Scope:
• Bottom Jacket Frame, Jacket Legs, Pile Guides & Sleeves
• Ballast Tank including the conical sections, uni joint-connections together with
the section of arm to the knuckle, eight bulkhead plates, end cones, ring
stiffeners, tank outer shell, 24”pipe and manholes.
• Two arms of the yoke
• Sections of walkways, stairs and ladders
• Structure laid out and assembled to the design dimensions, walkways fitted,
painting completed, loaded out and sea fastened.
Description
Client
Project
Year Built
:
:
:
:
Gas Dehydration Package
Frames Separation Technologies/Halliburton
Shell EA, Nigeria
2001
Main Equipment Pressure Vessels:
1) Glycol Trim Cooler
2) Off Gas Condenser
3) Glycol Exchanger
4) Lean Glycol Fine Filter
5) Glycol Carbon Filter
6) Glycol Reboiler Heater
Qty.
1
2
1
2
1
3
Skids Structures:
Fabrication & Assemblies of Skid Frames, Gratings, Handrails, Ladders, Piping,
Electrical and Instrument, Valves and Free Issue Materials
Job No. 2103
Description
Client
Project
Year Built
:
:
:
:
Equipment List::
Glycol Flash Drums
Glycol Surge Drums
Still Column
Reflux Condenser
Glycol Reboiler
Glycol Storage Tank
Glycol Regeneration Skid (3-Z-111 Train 1 & 2)
Frames Separation Technologies/Halliburton
South Pars Phase 1
2001
Qty.
2
2
2
2
2
2
Weight Kg.
ID MM
4500
1500
4300
1200
2650
700
2650
700
8000
1700
3200
4790x1490
T/T MM
4750
4700
4150
4150
4240
1800
Matl
SA516GR70N
SA516GR70N
S240 316L
S240 316L
SA516GR70N
SA516GR70N
Skids Structures:
Fabrication & Assemblies of Skid Frames, Gratings, Handrails, Ladders, Piping, Electrical
and Instrument, Valves and Free Issue Materials
Job No. 2101
Description
Client
Project
Year Built
:
:
:
:
Glycol Regeneration Skid (Train 1 & 2)
Frames Separation Technologies/Halliburton
South Pars Phase 1
2001
Control Panels Electrical & Instrumentation Components
Job No. 2101
Description
Client
Project
Year Built
: 90 Ft U Shaped Burner Booms 2 Sets
: Halliburton
:
: 2005
Dimensions
Weight
Service
Year Built
: 1094” x 48” X 84” (L x W x H)
: 5400 Kgs.
: H2S
:
Description
Client
End User
Project
Year Built
:
:
:
:
:
Mag Anchors 6 Nos.
Single Buoy Moorings Inc.
Nigerian National Petroleum Corp.
Construction of Pipeline to Atlas Cove Depot
2000
15.5 Tons Mag Anchors
Description
Client
Project
Year Built
:
:
:
:
Fabrication of Conductor Guides & Deck
Total - ABK
Job EC 2100 North Side Slot Extension
2003
Fabrication of Conductor Guides & Deck under construction
Description
Client
Project
Year Built
: Pull in Winch, Ballast & Landing P/F + Add
Items & Riser Column Fender
: Technip Oceania
: Subsea 7 Enfield JV
: 2005
Job No.: 3607
Description
Client
Project
Year Built
:
:
:
:
SPM I Tubes Riser Clamp Support
Single Buoy Moorings
Shell Bonga, Lagos Nigeria
2002
Description
Client
Project
Year Built
: Hot Oil Fire Heaters Radiant Section,
Convection Boxes & Coils (Installed at Site)
: Born Canada
: Hayan Petroleum Company Stage 3 Jihar
: 2009 - 2010
Job No.: 4771
Description
Client
Project
Year Built
: 27 Nos. Anchor Piles & 12 Nos. Back
Off Mooring Piles Loaded to Rak Port Jetty
: Bluewater Energy
: Maersk Oil Qatar – Topside Modules
: 2009
Job No.: 4627
2ND STAGE SEPARATOR INSTALLED ON MODULE
AKER KVAERNER 1ST STAGE SEPARATOR
1st STAGE CLAD SEPARATOR 70MM - LAMPRELL/AKER
KVAERNER FLOATING PRODUCTION SEPARATION MODULE
85MM THK SS STRIP CLAD VERTICAL CONTACTOR - LAMPRELL/SBM/CHEVRON BRAZIL UPSTREAM (FRADE FPSO)
20MM X 27.5M VERTICAL SS STEEL COLUMN LAMPRELL/SBM/CHEVRON BRAZIL UPSTREAM (FRADE FPSO)
2 NOS. LPG STORAGE TANKS - MELROSE RESOURCES - WEST DIKIRNIS PLANT - EGYPT
24 METER HP FLARE KO DRUM - FOSTER WHEELER - ENOC NAPHTA HYDROTREATER PACKAGE
130 MM THK HP SEPARATOR DRUM
90 MM THK HP SEPARATOR DRUM
90MM STRIP CLAD VESSELS LP CRUDE METHANOL CATCH POT - PEERLESS/ EGYPTIAN METHANEX
72+3MM THK WELD OVERLAY FEED GAS FILTER COALESCERS TECHNIP GEOPRODUCTION TURKMENISTAN
50MM + 3 MM THK AMINE CONTACTORS 4 NOS. TECHNIP GEOPRODUCTION TURKMENISTAN
50MM + 3 MM THK WELD OVERLAY AMINE CONTACTOR 4 NOS. TECHNIP GEOPRODUCTION
TURKMENISTAN
2 OFF VACCUM DEARATORS LOAD OUT - ETA/BP AZERI AZERBAJAN
2 OFF VACCUM DEARATORS LOAD OUT - ETA/BP AZERI AZERBAJAN
90MM THK COMMON FEED GAS FILTER - PLENTY/TECHNIP - YEMGAS
DEARATORS - ETA PROCESS PLANT/BP ANGOLA - BLK 18 GREATER PLUTONIO PROJECT
PRODUCT CHAMBER FOR QATAR PETROLEUM - SNAMPROGETTI
50MM THK SS LOADING ARM PLENTY/TECHNIP - YEMGAS
HP FLARE KO DRUM SNAMPROGETTI/SAUDI ARAMCO
HP FUEL GAS SCRUBBER - SBM FPSO MYSTRAS
114MM THK MOLECULAR SIEVE KO DRUM - PETROFAC FOR
CRESCENT PETROLEUM
HALLIBURTON CALIBRATION TANKS
CT 7311 AMINE REGENERATOR CLAD VESSEL INSTALLATION AT SITE ASSEMBLY ENCANA DEEP PANUKE PROJECT
80MM THK CLAD DEEP AMINE CONTACTOR INSTALLATION AT
SITE ASSEMBLY ENCANA DEEP PANUKE PROJECT
Gulf Marine Maintenance & Offshore Service
Company Dubai – L. L. C.
PO Box 4613, Dubai, United Arab Emirates
Tel: 00971-4-3241433 Fax: 009714-3241027
Email: [email protected]/[email protected]
   
  
     
     
   
   
     
    
   
  
  
  
 
    
   
    
   
   
    
    
   
  
  
   
    
  
    
      
´0$4(*QTK\QPVCN)CU(KNVGTU
   
    
 
GMMOS Kazakhstan LLP
Promzone, AKMO88 Premises
Aktau 130001, Mangistau Oblast
Republic of Kazakhstan
Tel.: 007 3292 579500/519947
Email: [email protected]
    
   
   
      