Columbia University Medical Center Strategic
Transcription
Columbia University Medical Center Strategic
Columbia University Medical Center School of Nursing Project Update March 21, 2014 Agenda I. Project Overview II. Plan Overview III. Russ Berrie IV. Noise and Vibration Management Plan V. Parking VI. Communications Page 2 PROJECT OVERVIEW Project Overview Site Plan Page 4 Project Overview Proposed Building Design Page 5 PLAN OVERVIEW Plan Overview Russ Berrie Ground Floor School of Nursing Page 7 Plan Overview Russ Berrie Typical Floor Plan School of Nursing Page 8 Plan Overview Russ Berrie ICM/7th Floor School of Nursing Page 9 RUSS BERRIE Russ Berrie Medical Science Pavilion • Naomi Berrie Diabetes Center • Research Activity • Animal Facility Berrie was the second building in the Audubon Biomedical Science and Technology Park Primary Construction Goal: To maintain ongoing daily research and clinical activities with minimal disruption Page 11 Vibration Sensitive Equipment Locations Room 5-520C: F. Mancia Crystallography Equipment 3rd Floor 4th Floor 5th Floor Room 4-408A S. Kousteni DEXA scanner Room 5-515 A. Marks Crystal Plate Storage Room 5-510 C. Karan Automation Suite Room 3-306 A. Christiano Microscopy Room Confocal Microscope Room 6-612 L. Sussel Confocal Microscope Room 4-404 S. Kousteni Histology Sectioning & Real Time PCR Machine 6th Floor Room 3-301 E. Lumpkin Electrophysiology RIG Room #1 Room 5-511 A. Marks Confocal Microscope Room 3-302A E. Lumpkin Electrophysiology RIG Room #2 Room 6-606 L. Sussel Epifluorescence Microscope Room 4-402 L. Shapiro Crystal Plate Incubator Page 12 Animal Holding Locations Room 738 Room 746 New Acoustical Barrier Room 730 New Acoustical Barrier Administration Building Services New Acoustical Barrier Cage and Rack Washing Colony Procedure Lab Page 13 NOISE AND VIBRATION MANAGEMENT Rock Excavation Building Section Building Section Russ Berrie Building Basement and Foundation Plan *Rock removal scheduled to range 3-4 months Page 15 Building Section School of Nursing Russ Berrie Page 16 Site Logistics Plan Page 17 Vibration Management Plan • Baseline tests/Cerami Associates • Employ best practices • Monitoring equipment • Hammer with baffle • Channel drilling • Hydraulic splitting • 3-4 month duration of rock removal Page 18 Noise and Dust Management Plan • Clean construction best practices • Manhattanville • Medical and Graduate Education Building • School of Nursing Building • Clean Construction • Dust • Noise • Vibration • Emissions • Pest Control • Site Management • Noise mitigation • Acoustical partitions at windows • Acoustical baffles at construction site fence Page 19 Construction Phase Harlem Hospital Building Kings County Hospital Building Irving Cancer Research Building Medical and Graduate Education Building Page 20 PARKING Faculty and Researchers Needs and Concerns • Availability and Cost of Parking • Proximity to Russ Berrie • Parking Lot Access Page 22 The Naomi Berrie Diabetes Center Patients Needs and Concerns • Cost of parking and proximity to Russ Berrie • Parking Lot Access Page 23 COMMUNICATIONS Project Timeline • Design Development: Complete • Construction Drawings: May 2014 • Bidding & Negotiations: September 2014 • Contracts & Permitting: October 2014 • Anticipated Construction Start: Q4 2014 • Duration of Noise Activity: 3-4 months Page 25 Ongoing Communications Outreach • Project Contacts: • Anthony Donatich, Project Manager • • Patrick Burke, Assistant Vice President of Capital Project Management • • [email protected] or 917-453-7687 [email protected] or 212-305-1006 General Construction-related Inquiries • [email protected] or 212-304-RUSS (7877) • Ongoing communications includes: • Electronic Signage • Email Updates • Project Website Page 26 Page 27 Page 28