Lp. Inwestor Zakres kontraktu 1 UNISERV SA

Transcription

Lp. Inwestor Zakres kontraktu 1 UNISERV SA
2012
Lp.
Inwestor
1
UNISERV SA
2
Termatex
3
ZEMAN HDF
4
Streif Baulogistik Polska
5
ELWO S.A. Pszczyna
6
Durr Ecoclean Group
FOSTER WHEELER ENERGY
FAKOP
7
Zakres kontraktu
Manufacture and supply of flue gas and combustion duct
steel structures (COMBUSTION AIR DUCT & FLUE GAS
DUCT) for the facility at Laziska Power Plant – approx.
90Mg in total
Manufacture and supply of steel structure of columns for the
cooling tower shell located at Kladno K7 Power Plant
Manufacture and supply of steel structure for the shopping
mall “Piotr i Pawel” in Poznan
Manufacture and supply of roof steel structure for the facility
of Selt Sun Protection Systems in Opole at –approx. 100Mg
in total
Manufacture of 4 sets of foot plates for cranes
Manufacture and supply of steel structure for the facility of
Neue Rohrbrucke und LKW-Verladung and steel structure
for Fuel Handling System
Execution of complete belt conveyor lines
Long-term cooperation contract for execution of nonpressure energetic boiler elements.
2011
Lp.
Inwestor
1 POLIMEX - MOSTOSTAL
2
UNISERV Jarosław
3
JOY Maszyny Górnicze
4
ALSTAL Grupa Budowlana
5
ZRE „Katowice” S.A.
FOSTER WHEELER ENERGY
FAKOP
6
7
ENERGOBUDOWA Silesia
8
URSA
9
FABUD WKB
Zakres kontraktu
Execution of the steel structure EC Bielsko
Execution of the steel structure of the kiln for Glassworks in
Orzesze
Construction of combine conveyor elements
Execution of the steel structure of the DECATHLON bay in
Kalisz
Execution of the steel construction of the exhaust generator
Execution of elements for boiler
Execution of the steel structure of the ash valorization
instalation silo
Annual contract
Long-term cooperation contract for execution of steel
embeds for concrete
10 P.P.H.U DAMEX
11 VITKOWICE MILMET
Execution of the steel structure of the object EC
Moszczenica
Containers for transporting gas cylinders
2010
Lp.
5
Inwestor
FOSTER WHEELER ENERGY
FAKOP
GANMET
JOY Maszyny Górnicze
NIKE PRZEDSI BIORSTWO
BUDOWLANE
URSA
6
FABUD WKB
7
8
ARMAEX
ARMA GLIWICE
9
BORGA HALE
1
2
3
4
10 ZEMAN HDF wi tochłowice
Zakres kontraktu
Execution of elements for boiler
Annual contract
Construction of combine conveyor elements
Long-term cooperation contract for execution of steel
embeds for concrete
Annual contract
Long-term cooperation contract for execution of steel
embeds for concrete
Annual contract
Annual contract
Execution of the steel structure of the object HALA
RECORD w Toruniu
Execution of the steel structure of the object CHT
Warszawa
Execution of the steel structure of the object Sewage
Treatment Plant Strzelce Wielkie
Execution of the steel structure of the object AGORA Piła
Execution of the steel structure of the object DECK
PLATES, JIG OLYMPIC BRIDGE LONDON
2009
Lp.
Inwestor
1
BETON BYTOM
2
BORGA HALE
3
ENWIA
Zakres kontraktu
Long-term cooperation contract for execution of steel
embeds for concrete
Execution of the steel structure of the object ATUT
Mysłowice
Execution of the steel structure of the GLOB MEDIA bay in
Cz stochowa
Execution of the steel structure of the PREFABET-OSŁAWA
D BROWA bay
Execution of the steel structure of the pole in Tokarzewo
4
FABUD WKB
Long-term cooperation contract for execution of steel
embeds for concrete
5
FOSTER WHEELER ENERGY
FAKOP
Execution of elements for boiler
6
HERAEUS Electro-Nite Polska
7
JOY Maszyny Górnicze
8
KONSTAK
9 KONSTALEX
10 METAL - PARTS
11 VITKOWICE MILMET
NIKE PRZEDSI BIORSTWO
12
BUDOWLANE
13 PUREKO
14 RESTO
15 STATON
16 TOYOTA TSUSHO EUROPE
17 VOLVO
18 ZEMAN HDF wi tochłowice
Design, construction and assembly of universal table for TC
sensor assembly
Design, construction and assembly of SAF head assembly
line
Design, construction and assembly of VAC assembly line
Design, construction and assembly of conveyors used to
collect paper pipes
Construction of combine conveyor elements
Execution of the steel structure of the object BSH Polska
Łód
Execution of steel structure of stairs, ladders and barriers
Execution of the steel structure of the bay in Sosnowiec
Containers for transporting gas cylinders
Long-term cooperation contract for execution of steel
embeds for concrete
Construction of tank stirrers
Execution of the steel elements
Cutting and welding of steel elements
Long-term cooperation contract for execution of steel
embeds for concrete
Equipping AKS arów and Kutno with machines
Execution and assembly of the technological line of the
object BRIDGESTONE in Stargard Szczeci ski
Execution of safety rails and platfroms for the object
BRIDGESTONE Stargard Szczeci ski
Unloading and installation of MAKINO machine
Assembly of automatic high storage warehouse
Damper frame truck
Execution of the steel structure of the object BONARKA
Kraków
Execution of the steel structure of the object MITTAL
STEEL
Execution of the steel structure of the object KRUSZYN
k/Bydgoszczy
Execution of the steel structure of the object CH SALLER
Stargard Szcz.
Execution of the steel structure of the object NEONET
Dobre Miasto
Execution of the steel structure of the object OLYMPIC
BRIDGE
Embeds centering CRACOVIA Stadium
Landing area in Chełm
2008
Lp.
Inwestor
1
BETON BYTOM
2
FABUD WKB
4
FOSTER WHEELER ENERGY
FAKOP
HART-MET
5
HERAEUS Electro-Nite Polska
6
7
8
JANPOL FABRYKA MATERACY
JOY Maszyny Górnicze
KONSTALEX
9
MAN NIEPOŁOMICE
10
NIKE PRZEDSI BIORSTWO
BUDOWLANE
3
11 RESTO
12 STATON
13
SZROMEK ZAKŁAD
REMONTOWO-BUDOWLANY
14 TOYOTA TSUSHO EUROPE
Zakres kontraktu
Long-term cooperation contract for execution of steel
embeds for concrete
Long-term cooperation contract for execution of steel
embeds for concrete
Execution of elements for boiler
Execution of the steel structure
Design, construction and assembly of universal table for TC
sensor assembly
Design, construction and assembly of SAF head assembly
line
Design, construction and assembly of VAC assembly line
Design, construction and assembly of conveyors used to
collect paper pipes
Design, construction and assembly of pneumatic safety valve
Construction of combine conveyor elements
Execution of the steel structure of the auto show-room
Design and construction of press for mounting caps for
wheels of heave good vehicles
Long-term agreement for construction of steel elements for
concrete
Construction of steel structure for office building roof for
GLASPOL Pruszków object
Long-term agreement for construction of steel elements for
concrete
Executionf of the steel structure of the storage warehouse
MIKOŁÓW
Equipping AKS arów and Kutno with machines
Execution and assembly of the technological line of the
object BRIDGESTONE in Stargard Szczeci ski
Execution of safety rails and platfroms for the object
15 ZAMET BUDOWA MASZYN
16 ZEMAN HDF wi tochłowice
BRIDGESTONE Stargard Szczeci ski
Unloading and installation of MAKINO machine
Assembly of automatic high storage warehouse
Design and construction of driver and belt conveyor for ingot
butts and aluminium retained products
Execution of the steel structure of the object WIE E
STRZEGOMSKIE
Execution of the steel structure of the object ESTAKADA
Tychy
Execution of the steel structure of the object TEXTORIAL
PARK Łód
Execution of the steel structure of the object FORD
GONERA Łód
Construction of lifting beam steel structure
Execution of the steel structure of ladders, platforms of the
object GEMINI Bielsko Biała
2007
Lp.
Inwestor
1 BALTEX
FOSTER WHEELER ENERGY
2
FAKOP
3
GRUPA K TY
4
HERAEUS Electro-Nite Polska
5
IZOBUD
6
JOY Maszyny Górnicze
7
KONSTALEX
Zakres kontraktu
Execution of the shaft ladders
Execution of elements for boiler
Design, construction and assembly of warehouse shfting
machine 60m long powered by busbar
Design, construction and assembly of rolling conveyors with
chain drive and pneumatic lift of furnace burden line for alloy
profile ageing
Design, construction and assembly of universal table for
assembly of testing devices for alloys
Design, construction and assembly of plant additional
equipment
Design, construction and assembly of feeding hopper from
big-bag to Schalco
Design, construction and assembly of machine for cutting
paper tubes
Execution of the steel structure of the object ERGOM
Poland Sosnowiec
Construction of combine conveyor elements
Execution of the steel structure of the bay
Execution of ladders
8
KOTANI POLSKA
9 MAN STAR TRUCKS & BUSES
10 NTC EUROPE
11 TAKENAKA
12 TOYOTA TSUSHO EUROPE
13 ZEMAN HDF wi tochłowice
Assembly of additional elements of mechanical and
electrical presses produced by AIDA i SCHULLER
Assembly of the 800t Press
Execution of the press platforms
Instrument for welding bus rotor
Execution of elements for diesel engine production line
Construction and assembly of maintenance platform for
SCHULLER press fan
Desing, execution and assmebly of the KBK system in
gearboxes (transmissions) bay
Equipping gear box production hall with machinery and turnkey delivery of electrical and piping installations
Equipping engine production hall with machinery and turnkey delivery of electrical and piping installations
Foundation anchors
Execution of the steel structure of the object GM Fiat Tychy
Execution of the steel structure of the object EURO
DISPLAY Dzier oniów
Execution of the steel strukture of the objcet FERIO Konin
Execution of the steel strucutre of the object
WIENERBERGER Ole nica
2006
Lp.
Inwestor
1
BGH POLSKA
2
BIPROMET
3
BORGA HALE
4
BUDOSTAL IV
5
FAMED
6
FORMPOL
FOSTER WHEELER ENERGY
FAKOP
FUJITRANS EUROPE
7
8
Zakres kontraktu
Relocation and adjustment of 85kW grinder with sliding
table to EU requirements
Bag filter regeneration system at GŁOGÓW Copper Smelter
Execution of electrofilter structural elements for
Heat&Power Plant in Kraków
Execution of the steel structure of the Pabex bay in Tychy
Execution of the steel structure of the Promyk bay in
Kraków
Execution of coke-oven batteries structure for Przyja
Coke Plant Plant in D browa Górnicza
Design, execution and assembly of the steel structure of the
waste water treatment plant
Design, execution and assembly of rotary assembly tables
Execution of elements for boiler
Equipping AKS arów and Kutno with machines
9
HERAEUS ELECTRO-NITE
POLSKA
10 IZOBUD
11 KOTANI POLSKA
12
13
14
15
MAKAR Katowice
MAN STAR TRUCKS & BUSES
MOSTOSTAL B dzin
RESTO
16 TOYOTA TSUSHO EUROPE
17 ZEMAN HDF wi tochłowice
Design, execution and assembly of the tables for final
assembly of probes
Design, execution and assembly of the glue preparation
installation
Design, execution and assembly of the two-level warehouse
shelving
Execution of the steel structure of the PKM Sosnowiec
Station
Providing machinery and additional equipment to precision
forging plant
Execution of the steel structure of the high bay mezzanine
Execution of an intermediary plate for OKUMA
Execution of the steel structures of the oil cooler
Execution of the steel structure of the Aria bay in Kalisz
Modification and assembly of the KBK system
Transfer and installation of machines in gearboxes
(transmissions) bay
Execution of the steel structure of the object CARREFOUR
in Zamo
Execution of the steel structure of the Logistical Center bay
in Pruszcz Gda ski
Execution of the steel structure of the BGH bay in Katowice
Execution of the steel structure of the object POLSKAPRESS Mirowice
Execution of the steel structure of the ITAL-METAL Jelcz
Laskowice
Execution of the steel structure of the STARY BROWAR
bay in Pozna
Execution of the steel structure of the AUCHAN bay in
Rumia
Execution of steel construction of the object GALERIA
BAŁTYCKA Gda sk
Execution of the steel structure of the LG bay in Kobierzyce
2005
Lp.
Inwestor
1
ALUTECH
2
3
AREVA T&D
BIPROMET
Zakres kontraktu
Ingot tip conveyor to the 28 MN press
Execution of the conveyor for jackets form 28 MN press dies
Tilting assembly benches (tables)
Execution of the regeneration set of the filter for HUTA
4
BORGA HALE
5
CENO-TEC
6
ELEKTRON
7
FAURECIA Wałbrzych
FOSTER WHEELER ENERGY
8
POLSKA
9 FFT
10 FUJITRANS EUROPE
11 GKN DRIVELINE POLSKA
12
13
14
15
16
17
18
19
20
21
22
TRINEC in Czech Republic
Execution of the steel structure of the bay Nowy Karolinów
Execution and assembly of membrane construction in
SILESIA CITY CENTER Katowice
Assembly of auto show-rooms and services of AUDI and
PORSCHE in Warsaw
Execution of trolleys for sequential transport of seats
Execution of elements for boiler
Execution of the components of robot base
Equipping AKS arów with machines
Transport carriage with tilting platform
Table for final assembly of probes
Execution of the structure for charging the device
Replacement of roller transporters on the P-B line
Expansion of roll conveyor
Execution and delivery of assembly table
HERAEUS Electro-Nite Polska
Adaptation of automatic feeder of tubes
Device for pin disassembly (Mexico)
Device for shovel disassembly (Mexico)
Device for mesh shaping (Mexico)
Execution of an adhesive batching device (Mexico)
Execution of calculations and design of the racks for boxes
HUTA SZKŁA JAROSZOWIEC
Execution of the chamber for sand dryer at loading chamber
Execution of platforms and covers of channels
HYDRO ALUMINIUM CHRZANÓW
Equipment for extrusion and separation of dies
KOKSOWNIA PRZYJA D browa
Execution of benzene tank V=40m3
Górnicza
Execution of the system for drying and roasting of gypsum
KONSTAK
in Połaniec
Execution of construction of chain conveyors for conveying
LOGTECH
car bodies
OKNOPLAST
Execution the racks for windows transportation
Execution of steel structure of the trading and servicing bay
RESTO
in Tychy
Design, strength calculations and execution of stands of M
SAINT GOBAIN GLASS France
type for transport of glass Q= 28 Mt and type A
SAINT GOBAIN GLASS POLSKA
Execution of containers for broken glass
D browa Górnicza
STAR TRUCKS & BUSES
Execution of an intermediary plate for OKUMA
23 STRABAG
24 TOP QUALITY SERVICE
25 TOYOTA TSUSHO Japan
26 TOYOTA TMMP Wałbrzych
27 WABCO POLSKA
28 ZEMAN HDF wi tochłowice
Execution of assembly tables
Execution of steel structure of M 3.1. skylight, internal
staircase and clock tower SILESIA CITY CENTER in
Katowice
Execution of steel construction of stands for control of
windscreens
Assembly of devices and execution of the piping and wiring
systems in the DIESEL engine manufacturing plant of
TOYOTA MIP in Jelcz Laskowice – Stage II
Assembly of devices and execution of the piping and wiring
systems in the plant C-MAX Poland
Execution and delivery of control cubicles and supplying
lines T5 and T6 of the foundry
Cars emulating running path
Execution the steel structure components of the HIRSCH
bay in Łód
Execution of the steel structure of the object CARREFOUR
in Chorzów
Execution of the steel structure of the mezzanine at OPEL
in Gliwice
Execution of the steel structure of the HUTCHISON bay in
Bielsko-Biała
Execution of the steel structure of the gym hall in Bilcza
Execution of the steel structure of the HUF set of industrial
buildings in Tychy
Execution of the steel structure of the wastewater treatment
plant in Katowice
Execution of steel construction of IKEA Wrocław
2004
Lp.
Inwestor
1 ALUTECH
2 BIPROMET
3
BORGA HALE
4
CENO-TEC
Zakres kontraktu
Ingot tip conveyor
Execution of technological equipment of coking plant
Execution of load-carrying structure of the bay ORGANIKA
in Dolny Brzeg
Execution of steel structure of the bay Joanna IV Izabelin
Execution of steel structure of the industrial building
INTERCARS Czosnów
Execution of steel structure of the bay "HAM" Kraków
Execution of steel structure of a membrane roof of the
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
hospital in Lipsk
Execution of tube hot galvanized steel structure of the
object in Malchow
Assembly of overhead cranes
DEMAG CC
Strengthening the crane beams in the object of ALSTOM
Mikołow
FAURECIA GRÓJEC
Execution of HEZON platforms
Modernization of plate conveyor L8 for car shell
FIAT AUTO POLAND Tychy
transportation
Galeria Kazimierz Kraków
Execution of steel structure of the object
GLAS-BUD
Execution of tunnel furnace housing
Execution of roofing steel structure of the PKS station in
HEFAL SERWIS
Racibórz
Execution of roller conveyors
HERAEUS Electro-Nite Polska
Execution of charging device
HUTA SZKŁA JAROSZOWIEC
Execution of the design for box supports
HYDRO ALUMINIUM CHRZANÓW Redevelopment of the device for dies ejection
Execution of steel structure of the skylight of the Trading
INVIT
Center „REDUTA 2” in Warsaw
Execution of the base groups of the device for engine subIPF GmbH Niemcy
assembling at the OPEL POLSKA plant in Gliwice
Execution of brackets for cooler
KLIMA
Execution of screen printing cab
KROMISS-BIS
Execution of a tank for hot oil
LOGTECH Radzionków
Execution of steel safety screens system
Execution of intermediate plate for OKUMA
MAN STAR TRUCK&BUSSES
Execution of welding equipment
RESTO
Execution of steel structure of AVON Garwolin
Execution and assembly of 80T racks
Execution of BARRAGE coolers
SAINT GOBAIN GLASS POLSKA
Execution of protecting system for passing under the
D browa Górnicza
overhead crane beam at the glass warehouse
Execution of the glass agitators system;
SAINT GOBAIN GLASS
Design, mechanical calculations as well as performance of
Deutschland, France
the racks for glass transportation, type M and Type A
Assembly work, execution of foot-paces for drilling machine
Repair Dock in winouj cie
platforms
Assembly of the device as well as piping and wiring of the
TOYOTA TSUSHO Japan
DIESEL engine manufacturing plant TOYOTA MIP Jelcz
Laskowice – Stage II
UNTERSCHÜTZ
25 Sondermaschinenbau GmbH
Deutschland
26
27
28
29
Execution of the components of technological line for
manufacturing aluminum sections
Execution of the steel structure of the bay and platforms
URSA POLSKA
with hand rails as well as technological structures of
production lines;
Execution of suction nozzles for a cross-bar
VOLVO AUTO POLAND Wrocław
Execution of the transportation platform for cab assembly
Execution and erection of the steel structure of Penitentiary
Penitentiary Institution in Wojkowice
Pavilion
Execution of the steel structure of platforms and spandrelbeam construction of the bay ITALMETAL Jelcz in
Laskowice
Execution of roofing structure, platforms, stairs and barriers
NGK Ceramics in Gliwice
ZEMAN HDF wi tochłowice
Execution of the steel structure of the stacks and the
structure for ventilation central stations in the object STARY
BROWAR Pozna
Execution of the steel structure of the bay PHILIPS in Piła
Execution of the steel structure of hypermarket „Jedynka” in
Mielec