Fort Benning Barracks, etc.

Transcription

Fort Benning Barracks, etc.
Strategic Sustainability
Fort Benning
Committed to Sustainable Practices
Fort Benning
Strategic Sustainability
•
Sustainability "meets the needs of the present
without compromising the ability of future
generations to meet their own needs."
•
Fort Benning’s strategic approach is the
interdependence between our Mission,
our Community, and our Environment
•
5 Year and 25 Year Strategic Sustainability
Plans
Fort Benning’s Sustainable
Focus Areas
Air
Land
Water
Energy
Solid Waste
Energy
Leadership in Energy and Environmental Design (LEED)
U.S. Green Build Council’s point system which insures the
incorporation of energy life cycle cost savings and environmental
considerations into design and construction. LEED promotes a wholebuilding approach to sustainability by recognizing performance in five
key areas; sustainable site development, water savings, energy
efficiency, materials selection, and indoor environmental quality
SIS Sustainable Interiors Showcase
LEED NC New Construction
EB Existing Building
Solid Waste
Battery recycling
Paint stripping and coating removal
Battery
recycling
Emergency
Planning
Paint
stripping
and coating removal
Community
Reporting
Fluorescent light
recycling
Emergency
Planning
and Community
Fuel filter and reuse
Reporting
Natural gas conversion
of boilers
Fluorescent
light recycling
Recycling non-hazardous waste
Fuel
filter and reuse
Solvent recycling
Natural
gas conversion of boilers
Waste reduction
Recycling
non-hazardous
Weapons cleaning
systems waste
Solvent recycling
Waste reduction
Weapons cleaning systems
Construction on Fort Benning: $2.9B
FY07
New Post
Exchange Mall
4
• Maneuver Captains Career Course
and Maneuver Advanced NonCommissioned Officer courses
conducted at Fort Benning & Fort
Knox
National Environmental
Policy Act (NEPA)/EIS
• Biological Assessment
• Socio-economic Studies
• Cultural Studies
• Noise & Traffic
• Air Quality
• Wetlands
• EIS Record of Decision
Environmental
Impact Statement
(EIS) Approval
1
Virtual Operating Capability:
• Dir of Tng & Doctrine (DOTD)
• Dir of Training (DOT)
• Capabilities Development &
Integration Directorate (CDID)
3
2
As of 26 Sep 06
• Ranges projected: 1 tank, 1 small arms
• New Hospital – Phase I (40% BRAC, 60% MEDCOM)
• Central Wash Facility, Tank Drivers Course
• Vehicle Maintenance Instructional Facility
• Maneuver Center Reception Station – Phase II
• General Instruction Facility – Phase II
• Combined Arms Collective Training Facility
Mechanic
Training
move
FY 07 Construction ($301M)
2
• EIS & mitigation
requirements drive all
MILCON groundbreaking
3
FY12
7
FY 09 Construction ($328M)
• Ranges projected: 3 small arms
• Utility Infrastructure – Phase I
• 19K & 63A/M barracks, Maneuver Simulation Center
• Training Support Brigade – Phase II
• Unit Maintenance Activity
• 16th Cavalry Regiment Headquarters
• Troop Medical & Dental Clinic, Harmony Church
• Medical & Dental Clinic Expansion, Sand Hill
• General Instruction Facility – Phase I
• Maneuver Center Reception Station – Phase I
• Bldg Conversion to Training Support Center
Digital MultiMulti-Purpose
Range Complex
(DMPRC) Complete
• FY07 MILCON
projects award
(design only)
FY11
FY 08 Construction ($412M)
• Ranges projected: 1 tank, 2 small arms
• 19D One Station Unit Training (OSUT) barracks
• Basic Combat Training barracks
• 1 Armor Training Brigade Headquarters
• Training Support Brigade – Phase I
• Child Development Center (6-10 yr old)
1
FY10
FY09
FY08
Basic
Combat
Training
move
5
MCOE Full
Operating Capability
(FOC)
FY 12
($89M)
• CDID
• DOT
– MCCC
– PCC
– MSTD
• DOTD
• Sustain
Maint
Facility
• Battle
Command
Training
Center
• Chapels
FY 10 Construction ($229M)
• Ranges projected: 2 small arms
• Maneuver Center Reception Station – Phase III
• General Instruction Facility – Phase III
• New Hospital – Phase II (40% BRAC, 60% MEDCOM)
• Maneuver Center Headquarters Expansion
• Armed Forces Reserve Center / Equip Concentrn Site
• Construct Training Area Roads & Trails, Repair Paved
Armor &
Cavalry
One Station
Unit Training
move
• NCOA
• 16th CAV
• 1 ATB
• 1-46, 22-46 Infantry Battalions
6
FY 11 Construction ($175M)
• Recreation Center, Harmony Church
• Physical Fitness Center, Harmony Church
• Ranges projected: 2 machine-gun & qualific
• 19D/K, 63A/M BNCOC
• M-ANCOC
• Armor Functional
• Armor BOLC III
• 63A/M OSUT
• 19K & 19D OSUT
• Basic Combat Tng
• MCOE FOC
• FY08 MILCON
• FY09 MILCON
• FY10 MILCON
• FY11 MILCON
7 Transfer
4
5
6
projects award
projects award
projects award
projects award
Complete
(NCOA, 1ATB &
(BRAC critical)
(AFRC)
16 CAV)
*Unfunded Requirements: Maneuver Battle Lab; Armor & Cavalry Museum
Museum