Fort Benning Barracks, etc.
Transcription
Fort Benning Barracks, etc.
Strategic Sustainability Fort Benning Committed to Sustainable Practices Fort Benning Strategic Sustainability • Sustainability "meets the needs of the present without compromising the ability of future generations to meet their own needs." • Fort Benning’s strategic approach is the interdependence between our Mission, our Community, and our Environment • 5 Year and 25 Year Strategic Sustainability Plans Fort Benning’s Sustainable Focus Areas Air Land Water Energy Solid Waste Energy Leadership in Energy and Environmental Design (LEED) U.S. Green Build Council’s point system which insures the incorporation of energy life cycle cost savings and environmental considerations into design and construction. LEED promotes a wholebuilding approach to sustainability by recognizing performance in five key areas; sustainable site development, water savings, energy efficiency, materials selection, and indoor environmental quality SIS Sustainable Interiors Showcase LEED NC New Construction EB Existing Building Solid Waste Battery recycling Paint stripping and coating removal Battery recycling Emergency Planning Paint stripping and coating removal Community Reporting Fluorescent light recycling Emergency Planning and Community Fuel filter and reuse Reporting Natural gas conversion of boilers Fluorescent light recycling Recycling non-hazardous waste Fuel filter and reuse Solvent recycling Natural gas conversion of boilers Waste reduction Recycling non-hazardous Weapons cleaning systems waste Solvent recycling Waste reduction Weapons cleaning systems Construction on Fort Benning: $2.9B FY07 New Post Exchange Mall 4 • Maneuver Captains Career Course and Maneuver Advanced NonCommissioned Officer courses conducted at Fort Benning & Fort Knox National Environmental Policy Act (NEPA)/EIS • Biological Assessment • Socio-economic Studies • Cultural Studies • Noise & Traffic • Air Quality • Wetlands • EIS Record of Decision Environmental Impact Statement (EIS) Approval 1 Virtual Operating Capability: • Dir of Tng & Doctrine (DOTD) • Dir of Training (DOT) • Capabilities Development & Integration Directorate (CDID) 3 2 As of 26 Sep 06 • Ranges projected: 1 tank, 1 small arms • New Hospital – Phase I (40% BRAC, 60% MEDCOM) • Central Wash Facility, Tank Drivers Course • Vehicle Maintenance Instructional Facility • Maneuver Center Reception Station – Phase II • General Instruction Facility – Phase II • Combined Arms Collective Training Facility Mechanic Training move FY 07 Construction ($301M) 2 • EIS & mitigation requirements drive all MILCON groundbreaking 3 FY12 7 FY 09 Construction ($328M) • Ranges projected: 3 small arms • Utility Infrastructure – Phase I • 19K & 63A/M barracks, Maneuver Simulation Center • Training Support Brigade – Phase II • Unit Maintenance Activity • 16th Cavalry Regiment Headquarters • Troop Medical & Dental Clinic, Harmony Church • Medical & Dental Clinic Expansion, Sand Hill • General Instruction Facility – Phase I • Maneuver Center Reception Station – Phase I • Bldg Conversion to Training Support Center Digital MultiMulti-Purpose Range Complex (DMPRC) Complete • FY07 MILCON projects award (design only) FY11 FY 08 Construction ($412M) • Ranges projected: 1 tank, 2 small arms • 19D One Station Unit Training (OSUT) barracks • Basic Combat Training barracks • 1 Armor Training Brigade Headquarters • Training Support Brigade – Phase I • Child Development Center (6-10 yr old) 1 FY10 FY09 FY08 Basic Combat Training move 5 MCOE Full Operating Capability (FOC) FY 12 ($89M) • CDID • DOT – MCCC – PCC – MSTD • DOTD • Sustain Maint Facility • Battle Command Training Center • Chapels FY 10 Construction ($229M) • Ranges projected: 2 small arms • Maneuver Center Reception Station – Phase III • General Instruction Facility – Phase III • New Hospital – Phase II (40% BRAC, 60% MEDCOM) • Maneuver Center Headquarters Expansion • Armed Forces Reserve Center / Equip Concentrn Site • Construct Training Area Roads & Trails, Repair Paved Armor & Cavalry One Station Unit Training move • NCOA • 16th CAV • 1 ATB • 1-46, 22-46 Infantry Battalions 6 FY 11 Construction ($175M) • Recreation Center, Harmony Church • Physical Fitness Center, Harmony Church • Ranges projected: 2 machine-gun & qualific • 19D/K, 63A/M BNCOC • M-ANCOC • Armor Functional • Armor BOLC III • 63A/M OSUT • 19K & 19D OSUT • Basic Combat Tng • MCOE FOC • FY08 MILCON • FY09 MILCON • FY10 MILCON • FY11 MILCON 7 Transfer 4 5 6 projects award projects award projects award projects award Complete (NCOA, 1ATB & (BRAC critical) (AFRC) 16 CAV) *Unfunded Requirements: Maneuver Battle Lab; Armor & Cavalry Museum Museum