Model: PUHY-P216TSKMU-A

Transcription

Model: PUHY-P216TSKMU-A
Model:
PUHY-P216TSKMU-A
(Consists of One PUHY-P120TKMU-A, One PUHY-P96TKMU-A, and One CMY-Y100CBK3 Twinning Kit)
Job Name:
Location:
Engineer Name:
Contractor:
System No.:
Date:
OUTDOOR VRF HEAT PUMP SYSTEM FEATURES
• 3-phase, 208/230V
• Modular variable refrigerant flow (VRF) systems;
smaller capacity units can be piped together to form a single,
large-capacity two-pipe system
• Required Twinning Kit allows for easy field piping connection
• Selectable fan static, 0.12 or 0.24"WG external static pressure;
factory set to 0"WG
• Connects to CITY MULTI indoor units; controlled via
CITY MULTI Controls Network (CMCN)
• External finish: Pre-coated Galvanized-steel Sheets
• Operating Temperature Range
Cooling (Outdoor): 23° ~ 115°F (-5° ~ +46°C) DB
Heating (Outdoor): -4° ~ +60°F (-20° ~ +16°C) WB
PUHY-P120TKMU-A
PUHY-P96TKMU-A
OPTIONAL PARTS
□ Twinning Kit*.…………………………………...…….CMY-Y100CBK3
□ T-Branch Joint (≤ 72,000 Btu/h)………………..........CMY-Y102SS-G2
□ T-Branch Joint (≤ 144,000 Btu/h)……………….…....CMY-Y102LS-G2
□ T-Branch Joint (≤ 234,000 Btu/h)……………….........CMY-Y202S-G2
□ Header (4-Branch; ≤ 72,000 Btu/h)........………………CMY-Y104C-G
□ Header (8-Branch; ≤ 144,000 Btu/h)......………………CMY-Y108C-G
□ Header (10-Branch; ≤ 234,000 Btu/h)....………………CMY-Y1010C-G
* Twinning Kit is necessary to combine the refrigerant flows of the
modules and is sold separately.
Specifications
Unit Type
Nominal Cooling Capacity
Btu/h
Nominal Heating Capacity
Btu/h
System
PUHY-P216TSKMU-A
216,000
243,000
External Dimensions (H x W x D)
In. / mm
Refer to Module Data
Net Weight
Lbs. / kg
Electrical Power Requirements
Voltage, Phase, Hertz
Cooling Power Input
kW
Heating Power Input
Cooling Current (208/230V)
Heating Current (208/230V)
Minimum Circuit Ampacity
(MCA)**
kW
R.L.A.
R.L.A.
1,220 / 557
Module 1
PUHY-P120TKMU-A
120,000
135,000
65 x 68-29/32 x 29-5/23 /
1,650 x 1,750 x 740
697 / 316
Refer to Module Data**
Module 2
PUHY-P96TKMU-A
96,000
108,000
65 x 48
8-1/16 x 29-5/32 /
1,650 x 1,220 x 740
532 / 241
208 / 230V, 3-phase, 60Hz**
16.90
Refer to System Data
19.26
52.1 / 47.1
59.4 / 53.7
Refer to System Data
A
Refer to Module Data**
Maximum Breaker Size**
A
Refer to Module Data**
50**
40**
Maximum Overcurrent Protection**
A
Refer to Module Data**
73 / 67**
57 / 52**
45 / 42**
34 / 31**
Piping Diameter
From Twinning Kit to Indoor Units
(Brazed) (In. / mm)
From Modules to Twinning Kit
(Brazed) (In. / mm)
Indoor Unit
Sound Pressure Levels
Fan
Type x Quantity
Airflow Rate
Direct-drive Inverter Motor Output
Compressor Operating Range
Liquid (High Pressure)
Gas (Low Pressure)
Liquid (High Pressure)
Gas (Low Pressure)
Total Capacity
Model / Quantity
dB(A)
CFM
kW
Refer to System Data
5/8 / 15.88
1-1/8 / 28.58
Refer to Module Data
1/2 / 12.7
1-1/8 / 28.58
50 to 130% of ODUs
P06 ~ P96 / 2 to 46
62.5
Refer to Module Data
8% to 100%
3/8 / 9.52
7/8 / 22.2
Refer to System Data
60.0
58.0
Propeller Fan x 2
Propeller Fan x 1
11,300
6,200
0.92 + 0.92
0.92
Refer to System Data
Compressor Type x Quantity
Inverter-driven Scroll Hermetic x 1 Inverter-driven Scroll Hermetic x 1
Refer to Module Data
Compressor Motor Output
kW
8.1
7.1
Compressor Crankcase Heater
kW
Refrigerant
R410A
Refer to Module Data
Lubricant
MEL32
High-pressure Protection Device
601 psi / 4.15 MPa
601 psi / 4.15 MPa
Refer to Module Data Overheat Protection / Thermal Switch Overheat Protection / Thermal Switch
Compressor / Fan Protection Device
Inverter Protection Device
Overheat / Overcurrent Protection Overheat / Overcurrent Protection
Blue Fin Anti-corrosion Protection: Cellulose- and polyurethane-resin coating treatment applied to condenser coil that protects it from air contaminants;
≥1μm thick; Salt Spray Test Method - no unusual rust development to 480 hours.
** Each individual module requires a separate electrical connection. Reference electrical data for each individual module.
Left view
PUHY-P216TSKMU-A(-BS)
PUHY-P120TKMU-A(-BS)
PUHY-P96TKMU-A(-BS)
CMY-Y100CBK3
ø15.88(5/8)
ø28.58(1-1/8)
1650(64-31/32)
Twinning pipe~Outdoor unit
Intake
air
P96
P120
Unit model
Liquid
c or e
ø9.52(3/8)
ø12.7(1/2)
Gas
d or f
ø22.2(7/8)
ø28.58(1-1/8)
Outdoor unit 1
1750(68-29/32)
Note 1.Connect the pipes as shown in the figure above. Refer to the table above for the pipe size.
2.Twinning pipes should not be tilted more than 15 degrees from the horizontal plane.
Be sure to see the Installation Manual for details of Twinning pipe installation.
3.The pipe section before the Twinning pipe (sections "a" and "b" in the figure) must have at least 500mm(19-11/16) of straight section
(*including the straight pipe that is supplied with the Twinning pipe).
4.Only use the Twinning pipe by Mitsubishi (optional parts).
Component unit name
Package unit name
Outdoor unit 1
Outdoor unit 2
Outdoor Twinning Kit(optional parts)
Liquid a
Indoor unit~Twinning pipe
Gas
b
Twinning pipe connection size
Intake
air
Discharge air
740(29-5/32)
Front view
d
c
30(1-3/16)
f
e
Intake
air
b
To indoor unit
Gas Twinning pipe<optional parts>
a
To indoor unit
Liquid Twinning pipe<optional parts>
Outdoor unit 2
1220(48-1/16)
Module :
PUHY-P216TSKMU-A – DIMENSIONS
PUHY-P216TSKMU-A(-BS)
Unit : mm(in.)
57
(2-1/4)
Left side view
20
20
(13/16) (13/16)
586(23-3/32)
19.5
(25/32)
57
(2-1/4)
Refrigerant service valve
<liquid>
Refrigerant service valve
<gas>
Service panel
Intake
air
Control box
223
(8-25/32)
Intake
air
Discharge air
2X7-ø4.6(3/16) Hole
(Make hole at the plastic fan guard
for snow hood attachment)
<Snow hood attachment hole>
172
(6-25/32)
54(2-5/32)
(23-5/8)
=(5-29/32)X4
600=150X4
(2-25/32)
70
(8-9/16)
217
3
6
1
58(2-5/16)
140(5-17/32)
7
Front view
4
Top view
2
795(31-5/16)
(Mounting pitch)
Bottom view (Mounting pitch)
795(31-5/16)
Refrigerant service
valve <gas>
150(5-29/32)
83(3-9/32)
Refrigerant service
valve <liquid>
5
561(22-3/32)
590(23-1/4)
516(20-11/32)
49(1-15/16)
831(32-23/32)
1750(68-29/32)
831(32-23/32)
75(2-31/32)
541(21-5/16)
562(22-5/32)
80
(3-5/32)
196 (7-23/32)
151 (5-31/32)
121 (4-25/32)
77
(3-1/16)
89
(3-17/32)
145
(5-23/32)
84
(3-5/16)
Gas
Diameter
ø12.7
(1/2)
ø28.58
(1-1/8)
Gas
Service valve
Liquid
7
6
5
4
3
2
1
NO.
Specifications
140 × 77 Knockout hole
(5-17/32) (3-1/16)
For pipes
150 × 94 Knockout hole
Bottom through hole (5-29/32) (3-23/32)
Knockout hole
Front through hole ø62.7 or ø34.5
(2-15/32) (1-3/8)
Knockout hole
Front through hole ø43.7 or ø22.2
(1-3/4) (7/8)
For wires
Bottom through hole ø65 Knockout hole
(2-9/16)
Bottom through hole ø52 Knockout hole
(2-1/16)
For transmission cables Front through hole ø34 Knockout hole
(1-11/32)
Front through hole
Usage
*1 Expand the on-site piping and connect to the refrigerant service valve piping.
*2 Use the pipe joint(field supply) and connect to the refrigerant service valve piping.
*3 Indicates dimensions and connection specifications in the case the unit is
used in combination with other outdoor units.
*4 Furthest piping length (OU from IU) >
= 40m(131ft)
2X3-14(9/16)X20(13/16) Oval hole
80
(3-5/32)
Liquid
Refrigerant pipe
ø9.52 Brazed
(3/8) *2
PUHY-P120TKMU
(ø12.7 Brazed)
(1/2) *1 *3 *4 ø28.58 Brazed
(1-1/8) *2
ø12.7 Brazed
PUHY-P144TKMU (1/2)
*1
Model
Connecting pipe specifications
2X2-80(3-5/32)X35(1-13/32) Oval hole
<Sling hole>
Fan box
Service
panel
Intake
air
19.5
(25/32)
740(29-5/32)
29.5
(1-3/16)
(26-13/16)
681(678~684)
(26-23/32~26-15/16)
(Mounting pitch)
(740)(29-5/32)
Note1.Please refer to the next page for information
regarding necessary spacing around the
unit and foundation work.
2.At brazing of pipes, wrap the refrigerant service valve
with wet cloth and keep the temperature of
refrigerant service valve under 120°C(248°F).
PUHY-P120,144TKMU-A(-BS)
29.5
(1-3/16)
94
(3-23/32)
1347(53-1/16)
303
(11-15/16)
1650(64-31/32)
Module :
PUHY-P120TKMU-A or 144TKMU-A – DIMENSIONS
Unit : mm(in.)
57
(2-1/4)
Left side view
20
20
(13/16) (13/16)
586(23-3/32)
Discharge air
57
(2-1/4)
(6-25/32) 172
19.5
(25/32)
150(5-29/32)
4
251
272
80
(3-5/32)
Refrigerant service
valve <liquid>
6
5
(10-23/32) 272
(11-7/8)
301
(8-15/16) 227
(10-23/32)
(9-29/32)
3
Intake
air
Control box
Refrigerant service valve
<liquid>
Refrigerant service valve
<gas>
4X5-ø4.6(3/16) Hole
(Make hole at the plastic fan guard
for snow hood attachment)
<Snow hood attachment hole>
222
(8-3/4)
Intake
air
54(2-5/32)
(23-5/8)
(2-25/32) =(5-29/32)X4
600=150×4
70
(8-9/16)
217
196 (7-23/32)
146 (5-3/4)
121 (4-25/32)
Front view
75(2-31/32)
58(2-5/16)
140(5-17/32)
1
Bottom view
1060(41-3/4)
(Mounting pitch)
valve <gas>
2 Refrigerant service
150(5-29/32)
83(3-9/32)
7
Top view
1220(48-1/16)
1181(46-1/2)
77
(3-1/16)
89
(3-17/32)
145
(5-23/32)
84
(3-5/16)
2X2-14(9/16)X20(13/16) Oval hole
80
(3-5/32)
Liquid
Gas
Refrigerant pipe
Diameter
ø9.52 Brazed
(3/8) *1
ø22.2 Brazed
PUHY-P96TKMU
(ø12.7 Brazed) (7/8) *2
(1/2) *2 *3
Model
Connecting pipe specifications
ø9.52
(3/8)
ø28.58
(1-1/8)
Gas
Service valve
Liquid
7
6
5
4
3
2
1
NO.
Specifications
140
× 77 Knockout hole
Front through hole
(5-17/32) (3-1/16)
For pipes
150 × 94 Knockout hole
Bottom through hole (5-29/32) (3-23/32)
Knockout hole
Front through hole ø62.7 or ø34.5
(2-15/32) (1-3/8)
Knockout hole
Front through hole ø43.7 or ø22.2
(1-3/4) (7/8)
For wires
Bottom through hole ø65 Knockout hole
(2-9/16)
Bottom through hole ø52 Knockout hole
(2-1/16)
For transmission cables Front through hole ø34 Knockout hole
(1-11/32)
Usage
*1 Expand the on-site piping and connect to the refrigerant service valve piping.
*2 Use the pipe joint(field supply) and connect to the refrigerant service valve piping.
*3 Furthest piping length (OU from IU) >
= 90m(295ft)
2X2-80(3-5/32)X35(1-13/32) Oval hole
<Sling hole>
Service
panel
Intake
air
19.5
(25/32)
740(29-5/32)
29.5
(1-3/16)
(26-13/16)
681(678~684)
(26-23/32~26-15/16)
(Mounting pitch)
(740)(29-5/32)
Note1.Please refer to the next page for information
regarding necessary spacing around the
unit and foundation work.
2.At brazing of pipes, wrap the refrigerant service valve
with wet cloth and keep the temperature of
refrigerant service valve under 120°C(248°F).
PUHY-P96TKMU-A(-BS)
29.5
(1-3/16)
94
(3-23/32)
1650(64-31/32)
303
(11-15/16)
1347(53-1/16)
Module :
PUHY-P96TKMU-A – DIMENSIONS
Unit : mm(in.)
CMY-Y100CBK3
Twinning Kit:
CMY-Y100CBK3
For Gas pipe:
For Liquid pipe:
19-29/32"
7-7/32"
1"
7/8"
<Reducer(Accessory)>
1/2"
1/2"
5/8"
1/2"
Local brazing
3-7/8"
Pipe cover
(Dot-dashed part)
Local brazing
1/2"
6-5/16"
1-1/8"
Ref.: CMY_Y100VBK2_EXD_EUDB_SI
in.
1-1/8"
Note 2 13-15/32"
23-5/32"
ID: Inner Diameter
Distributer
Pipe cover
(Dot-dashed part)
1"
1/2"
2-15/32"
(2 pcs.)
Distributer
1/2"
1-15/16"
1-1/8"
7/8"
Note 2
3-9/32"
5/8"
1-15/16"
(2 pcs.)
7/8"
5/8"
3/8"
3/4"
7/8"
2-15/32"
(2 pcs.)
9-1/2"
OD: Outer Diameter
Note 1. Reference the attitude angle of the branch pipe below the fig.
15
Distributer
The angle of the branch pipe for high pressure is within 15 against the horizontal plane.
2. Use the attached pipe to braze the port-opening of the distributer.
3. Pipe diameter is indicated by inside diameter.
4. Only use the Twinning pipe by Mitsubishi (optional parts) .
Notes:
Mitsubishi Electric Air Conditioning & Refrigeration Systems Wo rks acquired ISO
based on a review of quality warranties for the production of refrigeration and air
conditioning equipment.
ISO Authorization System
The ISO 9000 series is a plant authorization system relating to quality warranties as
development, production, installation and auxiliary services" for products built at
an authorized plant.
Mitsubishi Electric Sales Canada Inc.
www.MitsubishiElectric.ca
Mitsubishi Electric Air Conditioning & Refrigeration Systems Works acquired environmental
The ISO 14000 series is a set of standards applying to environmental protection set by the
International Standard Organization (ISO).
Specifications are subject to change without notice.
SB_PUHY-P216TSKMU-A_201206a

Similar documents

Specifications

Specifications the production of refrigeration and air conditioning equipment. ISO Authorization System The ISO 9000 series is a plant authorization system relating to quality management as stipulated by the ISO....

More information

Model: 16-TON PUHY-P192YSJMU-A-BS

Model: 16-TON PUHY-P192YSJMU-A-BS Outdoor VRFZ Heat Pump SYSTEM FEATURES • 3-phase, 460V • Modular variable refrigerant flow zoning (VRFZ) systems; smaller capacity units can be piped together to form a single, large-capacity two-p...

More information