Aspen Ridge Phase 1 Lot Draw

Transcription

Aspen Ridge Phase 1 Lot Draw
Aspen Ridge Phase 1 Lot Draw
134 lots in the City’s newest neighbourhood in the popular University Heights Sector, including walk-out lots, which
back onto the Northeast Swale, which is one of the largest
pieces of unbroken prairie in the Saskatoon region.
Phase 1 – Lot Information Package
Table of Contents
Terms of Sale ............................................................................................................................................................................................................... 1
Attached Garage Placement ........................................................................................................................................................................... 3
Corner Garage Placement ................................................................................................................................................................................. 3
Architectural Controls ......................................................................................................................................................................................... 4
Zoning ........................................................................................................................................................................................................................... 4
Aspen Ridge General Information ................................................................................................................................................................... 4
Northeast Swale...................................................................................................................................................................................................... 4
Greenway ................................................................................................................................................................................................................... 5
Multi-Family Sites ................................................................................................................................................................................................... 5
Residential Care Homes – Type II, Pre-Schools & Discretionary Child Care Centres ...................................................... 6
Lot Grading .................................................................................................................................................................................................................... 6
Lot Grade Details .................................................................................................................................................................................................... 7
Grading Between Lots ........................................................................................................................................................................................ 8
Lot Grading Do’s & Don’ts ................................................................................................................................................................................. 8
Lot Grading – Walkout Basements .............................................................................................................................................................. 9
Foundation Drainage .............................................................................................................................................................................................10
Fencing ...........................................................................................................................................................................................................................13
Construction Notes .................................................................................................................................................................................................14
Starting Construction..........................................................................................................................................................................................14
Landscaping of City Boulevards .................................................................................................................................................................14
Boulevard Tree Planting ..................................................................................................................................................................................15
Disclosure of Adjacent Property Owners ................................................................................................................................................15
Construction Waste ............................................................................................................................................................................................15
Temporary Water Circulation Boxes ..........................................................................................................................................................16
Shallow Utility Servicing Information for New Residences ..........................................................................................................16
Other Information ................................................................................................................................................................................................. 16
Phase 1 – Lot Information Package
List of Figures
Figure 1 – Corner Lot Permitted Garage Placement .......................................................................................................................... 3
Figure 2 – The Greenway – Conceptual Layout ...................................................................................................................................... 5
Figure 3 – Sump Design .................................................................................................................................................................................... 12
Figure 4 – Aspen Ridge Decorative Fence Details ........................................................................................................................... 14
List of Attachments
Attachment 1 – Aspen Ridge Architectural Review Form ........................................................................................................... 17
Attachment 2 – Architectural Controls ......................................................................................................................................................19
Attachment 3 - Lot Grading Types Drawings .........................................................................................................................................34
Attachment 4 – Lot Grade Maps .....................................................................................................................................................................35
Attachment 5 – Design Contour Map ..........................................................................................................................................................43
Attachment 6 – Cut and Fill Contour Map ................................................................................................................................................44
Attachment 7 – Registered Survey Plan ....................................................................................................................................................45
Attachment 8 – Registered Feature Utility Plan ....................................................................................................................................46
Attachment 9 – Lot Information Map ..........................................................................................................................................................47
Attachment 10 – Aspen Ridge Zoning and Address Map ..............................................................................................................48
Attachment 11 – Aspen Ridge Neighbourhood Concept Plan ...................................................................................................50
Attachment 12 – Typical Servicing From Lane ....................................................................................................................................51
Attachment 13 – Joint Servicing Initiative ............................................................................................................................................52
Attachment 14 – Meeswasin Northeast Swale
................................................................................................................................55
Information included in this Lot Information Package has been compiled from several
sources. For clarification on matter regarding utility connections, please contact the
appropriate utility agency.
Aspen Ridge Phase 1 Lot Information
Terms of Sale
The City of Saskatoon Sells Residential Lots to:

Individuals who have not purchased a lot from the City of Saskatoon within the
last three years and who are purchasing a lot for the construction of their own
personal residence; and

Home builders who are currently on the Eligible Contractor list.
Down Payment
At the time of lot selection, an Agreement for Sale will be entered into with a minimum
down payment required of 13 percent of the total price of the lot plus GST on the price
of the lot (less the $3,000 deposit during lot draw process).
Interest
The interest rate will be set as the prime rate of interest on the date of the Agreement
of Sale. Interest will be charged on the unpaid balance starting on the later of
possession date, or completion of shallow buried utility servicing. If an extension to the
eight month term is required and granted, the interest rate would be five percent
above the rate established in the Agreement for Sale.
Possession of Land
All 134 lots will be sold with immediate possession.
Paying the Balance
The full balance (principal plus interest) is due within eight months’ time from the latter
of the Agreement for Sale date or the possession date. The balance may be paid early
with interest charged to and including the payout date.
Building Time Requirement
All lots purchased have a three-year time requirement to complete construction.
Construction may begin once possession of the lot is granted, utility servicing is
complete and the roadways are at gravel base. The build requirement will commence
from the date of possession. Construction includes final building inspection and
completion of all deficiencies within the three-year time frame; if it is not met, no
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Page |1
Aspen Ridge Phase 1 Lot Information
forgiveness of the mortgage will be granted. Contractors not meeting this requirement
may be removed from the Eligible Contractors list.
Residency Requirements for Individuals Who Purchase a Lot
Lots purchased have a four-year residency requirement. The four-year period begins
the same day Title is transferred into the purchaser(s) name. The original purchaser(s)
name must remain on Title to maintain the four-year requirement.
Forgivable Mortgage
A Forgivable Mortgage for $50,000, related to the build time and residency
requirements held by the City of Saskatoon, will be registered against each lot sold to
an Individual. Should the dwelling be completed within the required three years for the
date of possession, the mortgage will be forgiven on a monthly basis over the final
three years of the four-year residency period starting from the day Title is transferred
into the individual purchaser(s) name.
Eligible Contractors
Lots are not to be resold. Builders are purchasing City lots to construct homes for
potential homebuyers. If a lot is no longer required, please review the Cancellation
Policy.
Taxes
Property taxes become the responsibility of the purchaser(s) effective the first of the
month following the latter of the date of the Agreement for Sale or possession date on
lots waiting for service completion. For an estimate of the taxes on the land only,
please call the Assessment Division at 306-975-3227.
Transfer of Title
The Transfer of Title will be issued in one of the following ways:

under the appropriate trust conditions, the Transfer will be forwarded to the
purchaser’s solicitor; or

upon receipt of payment in full, the Transfer will be forwarded to the purchaser’s
solicitor.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Page |2
Aspen Ridge Phase 1 Lot Information
Default or Voluntary Cancellation
An Agreement for Sale is defaulted when any of the terms are not met within the time
of the agreement. In the event of cancellation or default, a $500 processing fee is
charged plus a restocking fee for the time the purchaser has held the lot. The
restocking fee is one percent of the purchase price of the lot plus GST, multiplied by
the number of months (no charge for first 30 days) which have elapsed between the
date of the Agreement of Sale and the date of the Quit Claim. The restocking fee is
deducted from monies paid (i.e. down payment) and any remaining portion is
refunded. Voluntary cancellation cannot occur once construction has begun or Title
has been transferred into the purchaser(s) name.
Attached Garage Placement
For lots that require the construction of an attached garage, a garage side is assigned.
The garage must be constructed against the required side of the lot as assigned. The
intent of this control is to pair garages together against a common property line in
order to provide a better streetscape appearance. The garage side placements are
shown in the attached Lot Information Map and will be included in the Agreement for
Sale.
Corner Garage Placement
All corner lots that require an attached garage have the following in the Sales
Agreement: The garage must be located on the side of the property that is furthest
from the intersection.
FIGURE 1: CORNER LOT PERMITTED GARAGE PLACEMENT
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Page |3
Aspen Ridge Phase 1 Lot Information
Page |4
Architectural Controls
Please note the attachments titled, Aspen Ridge Phase 1 Architectural Controls and the
Building Permit Plan Approval Form. House designs must be approved prior to
release of the Building Permit. When Building Plans and the Approval Form are
delivered to the Building Standards Division, Saskatoon Land will evaluate architecture
to ensure it conforms to the Aspen Ridge Phase 1 Architectural Controls. Complete
information will ensure no delays in the Building Permit Process.
Please be advised that if the dwelling is constructed in violation of the Architectural
Controls as approved and initialed in the Sales Agreement, the City may take legal
action to require compliance. Issuance of a Building Permit will not absolve the
Purchaser from meeting this requirement. Such action could result in the demolition or
partial demolition of the building at the expense of the Purchaser.
Zoning
A zoning map for Aspen Ridge has been included in this Lot Information Package. If
you require more information on zoning, please visit (www.saskatoon.ca) and search
zoning bylaw, or contact the Planning and Development Division at 306-975-2645.
The lots within the Aspen Ridge are zoned R1A and R1B Districts. Please consult the
City’s Zoning Bylaw for the development standards of these two districts.
Aspen Ridge General Information
Northeast Swale
The Northeast Swale is an ancient river channel formed by glacial activity that took
place thousands of years ago. The Swale provides the rare opportunity of building a
neighbourhood that borders on a natural, greenspace that will be preserved for
generations to come. This allows you to plan the construction of your new home
around some of the best views in the City. In order to ensure this amenity is preserved
for you and your neighbours, it is important to be mindful of the swale through the
construction and occupancy of your new home. To help with this, the Meewasin Valley
Authority has provided a primer on the Swale. See Attachment 12 for a background on
the Swale and some things to consider when constructing your home.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Aspen Ridge Phase 1 Lot Information
The Greenway
The Greenway is a transitional zone between the development bordering the
Northeast Swale and the Swale, meant to help ensure neighbouring development is
compatible with the desire to preserves the Swale. It provides a buffer between the
neighbourhood and the Swale, while also providing space to accommodate drainage,
and room for a trail linking future neighbourhoods and providing access the Meewasin
Valley Authority’s planned trails and interpretive areas within the Swale.
FIGURE 2: THE GREEWAY – CONCEPTUAL LAYOUT
Nearby Multi-Family Sites
Dwelling Group Townhousing Sites:

Low Density: Parcel A, on Feheregyhazi Boulevard

Low/Medium Density: Parcel C, on Feheregyhazi Boulevard or Fast Crescent
Street Townhousing Sites:

Low/Medium Density: Parcel B, on Feheregyhazi Boulevard
These sites will be subject to the Architectural Guidelines contained in the Architectural
Controls for Multiple-Unit Dwelling Districts document which may be viewed on our
website (www.saskatoon.ca), search “Architectural Controls for Multi-Unit Dwelling
Districts 2013”.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Page |5
Aspen Ridge Phase 1 Lot Information
Residential Care Homes – Type II, Pre-Schools & Discretionary Child Care Centres
Sites within the Aspen Ridge neighbourhood have been pre-designated for
development as Residential Care Homes – Type II, Pre-Schools, and Child Care
Centres. A Residential Care Home –Type II is a care home in which the number of
residents under care is more than five, and no more than fifteen. A Discretionary Child
Care Centre is a child care facility having more than eight resident and non-resident
children. The locations of sites for these uses have been spread throughout the
neighbourhood and among various phases of development. In general, these
locations are adjacent to collector streets on corner lots in order to provide access to
transit service, and to mitigate any potential parking conflicts. Pre-designated lots will
be offered for sale separately by tender as potential Residential Care Homes – Type II,
Pre-Schools, and Child Care Centres. If not purchased for these uses, the subject lots
will be returned to inventory and sold as typical single-unit lots. Residential Care
Home lots in Phase 1 are located at 303 and 307 Fast Court.
Lot Grading
Lot grading is the slope of the lot in order to provide good drainage away from the
buildings in such a way that surface runoff from rainstorms or snowmelt is directed
toward the storm sewer. Runoff is controlled through the use of side and back of lot
swales to eliminate or minimize the impact on adjacent properties and to ensure proper
overland drainage.
Complete development of all lots in an area may occur over a number of years and,
unfortunately, some homeowners landscape their lot without proper consideration for the
predesignated overland drainage pattern of the area. Early development does not
preclude a homeowner’s responsibility to maintain this drainage pattern. If a homeowner
obstructs drainage in any way, thereby creating a flooding problem for neighbours
upstream, that homeowner must correct the situation at their own expense. Similarly, a lot
should not be landscaped below design grades otherwise flooding may occur.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Page |6
Aspen Ridge Phase 1 Lot Information
Lot Grade Details
The following information has been prepared to assist the homeowner, builder and
contractor in setting the house elevations and final lot grades. Lot grade details are
shown on the following sets of drawings in this package:
a) Lot grade drawings – show the final design elevations at property corners and
at other points that are deemed critical elevation points. It is important that
builders and homeowners match these grades with final landscaping
elevations. These elevations are required as a minimum for building plan
approval;
b) Lot grading types A, A-D, D-A, C, C-D and D-C, including a three-dimensional
view and side view of the grading type; and
c) A drawing showing a cross section of a typical side yard fence and side yard
grading that will not impede side yard drainage.
During the initial stages of subdivision development, all streets, easements, lanes,
and walkways are pre-graded to design elevations set to accommodate drainage
throughout the area. In the case of the utility easements, the grade is constructed
approximately 100mm (4”) below the final design grade, which allows the
homeowner to add topsoil without creating drainage problems for neighbouring
yards.
Once house construction is complete lot
grading is a two-step procedure. The first
step is the rough grade stage, which
includes backfilling the foundation walls
and shaping the lot to conform to the pregrade drainage plan. When rough grading
is complete the lot should be within 7 to
20cm below the final design grade to
allow for the addition of topsoil. Once the
lot is at the final design grade, sod,
decorative rock, wood chips, or other
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Page |7
Aspen Ridge Phase 1 Lot Information
surface treatments can be installed. It is strongly recommended that lot owners
consult a legal surveyor or other qualified professional to get the final grade
elevations before landscaping is started.
Grading Between Lots
A sloped surface is required to effectively drain water away from the foundation
walls, including under steps and decks in order to reduce the risk of water entering
the basement during rainfalls or snowmelt. Drainage swales are shallow sloped
channels intended to move surface runoff away from lots toward the storm sewers.
Drainage swales are located on common property lines and graded in accordance
with the drainage plan for the affected lots as shown on the lot type drawings
included in this package.
If decorative rock or wood chips are to be used in the swale the grade below this
treatment must be at the final grade elevation to facilitate proper runoff to the storm
sewer.
Lot Grading Do’s & Don’ts
Do’s:
1. Do require construction plans to include finished grade elevations around the
house foundation and along property lines. Do not leave your house and site
grading to chance. Building Standards requires the submission of the lot
corner elevations on the site plan submitted for building permit approval. It is
strongly recommended that the plans also include finished elevations along the
foundation and garage grade beam, garage slab, foundation windows, side
property lines, edge of driveways and sidewalks (particularly along the side of
the house), and the top and bottom of any retaining feature.
2. Do use a level to set the finished grades along the property line, particularly
before installing sidewalks and fencing.
3. Do discuss with adjacent property owners’ final drainage grades along the
property line. Proper lot drainage requires cooperation of adjacent
homeowners.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Page |8
Aspen Ridge Phase 1 Lot Information
4. Do undertake a final site inspection of easements, side yard and sidewalks with
each sub-trade prior to releasing final payment.
5. Please disregard any grade information displayed on electrical pedestals
and transformer boxes.
Don’ts:
1. Don’t excavate into the easement or berm. These contain critical utilities vital to
the neighbourhood.
2. Don’t fill the rear easement, as this will block the intended drainage.
3. Don’t build raised flowerbeds against the fence/property lines without making
provisions for drainage (see attached plans).
4. Don’t try to build HIGHER than both adjacent neighbours. This leads to
expensive provisions for retaining walls, and frequent flooding of neighbouring
properties.
For more information, please contact Gerald Prefontaine, Drainage Inspector,
Transportation and Utilities at 306-975-2320.
Lot Grading – Walkout Basement Lots (Fast Court and Fast Crescent)
Some of the lots in this development area have been graded to accommodate the
inclusion of a walkout basement into the design of your home. Walkout basement
lots are noted with a “W” on the Phase 1 Lot Information Map. The grading of these
lots is designed for walkout basement home. While the “W” lots will accommodate
walkout basements, other lots will not. Between walkout basement lots and nonwalkout basement lots there are transitional lot areas where the back lot grades
slope increases successively on each lot until walkout basements can be
accommodated. The grading design for this area is shown on the Final Design
Contour plans attached to this package of information. It is very important to review
these plans to determine how your lot has been designed to slope. If there are any
questions about this information, they should be directed to Saskatoon Land at
306-975-3278. The Lot Grade Sheets also provide important information indicating
the specific elevations that must be maintained along the front and rear property
lines.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Page |9
Aspen Ridge Phase 1 Lot Information
Lots identified on the map as Walkout Basement Lots (“W”) must be constructed
on these lots. Lots not identified with the “W” may or may not support walkout
basements. The decision to build a walkout on these lots is up to the purchaser.
It is strongly recommended that all purchasers discuss their plans to develop their
homes with their neighbours to ensure that the grades between the houses will
meet both of the neighbours needs. Retaining walls or other means may be
necessary if one neighbour intends to build a walkout lot in an area where the
grades transition from walkout to conventional. Saskatoon Land will not be
responsible for the cost of retaining walls or other associated work to
accommodate grade variance along property boundaries from their current design
shown on the Final Design Contour Plan. The intent is that all areas have been
graded approximately 100mm (4 inches) below final grade and that no additional
grading would be required along the side and rear property lines.
Foundation Drainage
1. Foundation Drainage (Weeping Tile) Requirements
a. The bottom of every exterior foundation wall shall be drained as per the
National Building Code.
b. Connection of foundation drains of all buildings to the sanitary sewer
collection system will not be permitted.
2. Discharge of Foundation Drainage Water
a. All buildings are required to drain foundation water into a sump, which in
turn discharges the water to the surface or to a storm sewer.
3. Surface Discharge
a. Sump pumps discharging to surface may not discharge directly onto a
pervious ground surface within one metre of any building that has a
basement or a level below the finished ground surface.
b. The location of the point of discharge shall be directed away from adjacent
properties.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
P a g e | 10
Aspen Ridge Phase 1 Lot Information
c. If the lot drains from the front and to the back (Type D), surface discharge
may be either the front or back yard. If the lot drains from the back to the
front (Type A), surface discharge must be to front yard.
d. The discharge may not be into the area of the required side yard setback
unless the side yard is adjacent to a street, park or buffer strip.
4. Discharge to Storm Sewer
a. Sumps discharging to storm sewers shall be pumped to the main by a
pressure service connection as per detailed drawings Sump with Pumped
Discharge to Storm Sewer, Detailed Drawing 102-0025-r004.
5. Sump Design Criteria – Sump Pit Details
a. As per National Building Code 9.14.5.2, sump pits are to be a minimum of
750mm deep and 0.25 square metres in area.
b. Sump pits is to be fitted with a tight fitting removable cover.
c. Sump pit will be constructed of concrete, plastic, or non-corrosive metal.
d. Sump pit is to be fitted with an opening to accept a 100mm drain with the
invert of the pipe located above centre of the sump pit height.
e. Sump pit is to be placed on an even, well compacted surface.
6. Foundation Drainage (Weeping Tile) to Sump Pit
a. A weeping tile collection system shall be provided around the building
perimeter and tied to a sump pit using a positively graded, non-perforated,
100mm pipe which discharges into the side of the pit.
b. Provision shall be made to ensure soil gas is prevented from entering the
dwelling unit through the weeping tile and through the sump pit.
7. Sump Pump
a. Provide a sump pump (column of submersible type) capable of pumping 50
L/m at three metres of head.
b. The pump shall be fitted with an automatic on/off level control.
c. The pump discharge must have a minimum pipe diameter of 32mm. The
pipe must be adequately secured.
d. Sump pumps connected directly to a storm sewer must be equipped with a
spring check valve and shut-off valve located downstream of the check
valve, so that the connection to the main can be isolated from maintenance.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
P a g e | 11
Aspen Ridge Phase 1 Lot Information
SUMP WITH PUMPED DISCHARGE TO SURFACE
P a g e | 12
SUMP WITH PUMPED DISCHARGE TO STORM SEWER
FIGURE 3: SUMP DESIGN
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
Aspen Ridge Phase 1 Lot Information
Fencing
Decorative Aluminum Fence:
A decorative aluminum fence will be placed in the rear yard of:

Lots 16 to 38, Block 701, Plan No. 102201769

Lots 1 to 14, Block 706, Plan No. 102201769
A decorative aluminum fence will be placed on the rear yard and side yard of:

Lots 23, 24 and 38, Block 701, Plan No. 102201769

Lots 1 & 14, Block 706, Plan No. 102201769
These lots are adjacent to a park or greenway. The centre line of this fence is
located approximately 250mm (10”) inside the purchaser’s property line. The
inside edge of the structural pilings for this fence is located approximately 400mm
(16”) inside the purchasers property line. The purchaser will be responsible for all
future maintenance of the fence. The location of the fence should be taken into
consideration when siting your house on the lot and, specifically with a side yard
fence, while planning your basement excavation. Pay special attention that your
basement excavation and other construction activities do not disturb the structural
pilings or other components of the fence. The drawing titled, “Decorative Fence
Details” illustrates the fence details and style.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
P a g e | 13
Aspen Ridge Phase 1 Lot Information
Figure 4: Aspen Ridge Decorative Fence Details
Example of Decorative Aluminum Fence
Note: Final design specifications have not been finalized. The above figure is shown for example purposes only and is subject to change.
Chain Link Fencing
A black chain link fence (6 feet high) will be constructed adjacent to Municipal
Buffer along Fedoruk Drive directly behind the following lots:
Lots 8-15, Block 701, Plan No. 102201769
Homeowners will be allowed to connect their side yard fences to the chain link
fence. Pedestrians and vehicle access to the buffer from lots is not permitted. This
fence will be located within the purchasers’ property line.
Construction Notes
Starting Construction
Possession of the site is granted for construction purposes when the down payment
has been received, the Agreement for Sale is finalized. In order to assist the utility
companies, please post your civic address at the front of the property when
construction begins.
Landscaping of City Boulevards
It is the homeowner's responsibility to landscape and maintain the boulevard along
both the front of their property and along the side of corner lots. Boulevards are
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
P a g e | 14
Aspen Ridge Phase 1 Lot Information
defined as the landscaping space between the edge of the roadway and the
property lines. Where the sidewalk is attached to the curb, the boulevard is the
space between the edge of the sidewalk and the property line. Where the sidewalk
is not attached to the curb, the boulevard includes the space between the curb and
the sidewalk. These areas need to be landscaped and maintained by the
homeowner at their expense.
Boulevard Tree Planting
The Community Tree Planting Program was established in 1991 via pre-paid levies
from the original sale of lots. Through this program, the City of Saskatoon, Urban
Forestry Section hand plants 30mm (1.2”) caliper trees on boulevards in recently
developed neighbourhoods. Streets are selected for this Program based on a
review of newly developed areas. The City considers the number of lots that are
fully developed and landscaped. This review is completed the season prior to
planting. The Plant by Request Program is also available to residents to request to
have a tree planted in an available planting site on the boulevard. This program
plants 30mm (1.2”) caliper trees. For Plant by Request Program, please contact
Urban Forestry, Community Services at 306-975-2890.
Disclosure of Adjacent Property Owners
Please note in order to facilitate discussions between property owners respecting
lot grading, fencing issues and property maintenance issues, Saskatoon Land will,
upon request, disclose the names of purchasers to adjacent property owners.
Construction Waste
As per City of Saskatoon Bylaw No. 8310, The Waste Bylaw, 2004 any owner or
contractor carrying out the construction of a building on any property shall place all
waste into a waste container or enclosure. The owner or contractor shall dispose of
all waste resulting from the construction in a timely manner so as to ensure there is
no unreasonable accumulation of waste on the property during the construction.
It is required that a waste disposal bin remains on each building site for the duration
of construction in order to ensure that the waste is not dispersed on or around the
property or surrounding properties. Upon completion of construction, it is the owner
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
P a g e | 15
Aspen Ridge Phase 1 Lot Information
or the contractor’s responsibility to clear their site of all waste. If the waste is not
removed, the City may remove the waste and all associated costs will be charged to
the property owner or the contractor.
Temporary Water Circulation Boxes
To ensure water quality is maintained throughout the initial stages of development
in this phase; temporary water circulation boxes are installed. The locations of
these temporary water circulation boxes are identified on the attached map. These
temporary water circulation boxes are removed during the installation of the water
and sewer connection to the house. For more information, please contact the
Construction and Design Division at 306-975-2454.
Shallow Utility Servicing Information for New Residences
Crown Utility Corporations recently introduced a new joint servicing initiative that
includes the installation of gas, electric and communications in a common trench
from the main line to the dwelling. This approach achieves efficiencies for the
installation of the service lines and addresses the challenges associated with space
constraints.
Please see Attachment 11, which includes information on shallow utility servicing and
a site check readiness sheet, which lists the items required prior to the installation of
services to your home. For further information on your shallow utilities services,
please contact the appropriate utility agency.
Other Information
Lots are sold “As Is”. These terms are contained in the Agreement of Sale. The terms may
change without notice. Any questions should be asked to ensure you understand the
terms of your purchase.
CITY OF SASKATOON
Saskatoon Land
WWW.SASKATOON.CA
P a g e | 16
Attachment 1
Aspen Ridge Architectural Review Form
Aspen Ridge - Phase 1 Lot Draw
1. Location
Lot
Block
Plan #
Civic Address
2. Applicant
Contact Person
Builder
Telephone #
Email
Draftsperson
Email
(if applicable)
3. House Size & Form
House Type (i.e. two-storey, bungalow, etc.)
Attached Garage
Interior Dimensions
Detached Garage
Pad Dimensions
Sq. Ft. (above grade)
excluding garage area
Attached Garage
Side (viewed facing
the home from the
front street)
* Primary Roof Slope
* No roof slope is required on lots 1 - 14, Block 706 and Lots 16 - 28, Block 705.
Saskatoon Land Phase 1 - Aspen Ridge
Aspen Ridge Architectural Review Form
Page 1 of 2
4. Front Facade Exterior Materials and Products
Material Type
Application
Surface Area
Manufacturer
Colour
Exterior Material 1
Exterior Material 2
Exterior Material 3
* For Attached Garage Lots
Garage Door Manufacturer
Garage Door
Product Name
5. Highly Visible Lots*
*This section applies to:
• Corner lots and the side building elevations which face the street; and
• Park backing or flanking lots and the side or rear building elevations which face park space.
Please enter information for the applicable fields.
Side Elevation Surface Area
Rear Elevation Surface Area
Side Elevation Accent Material Area
Side Elevation Window/Door Area
Rear Elevation Accent Material Area
Rear Elevation Window/Door Area
The Aspen Ridge Architectural Review Form must be submitted in conjunction with your application
for a Building Permit to the Building Standards Division. Failure to submit the form or submission of an
incomplete form may delay the issuance of your Building Permit.
Interpretation and application of the Aspen Ridge Architectural Controls are at the sole discretion of
Saskatoon Land. Failure to comply with these controls may result in removal from Saskatoon Land’s
Eligible Contractor List.
Saskatoon Land to complete this area
Approved by
Date
Saskatoon Land Phase 1 - Aspen Ridge
Aspen Ridge Architectural Review Form
Page 2 of 2
Attachment 2
Attachment 4
Aspen Ridge
Phase 1 Architectural Controls
Aspen Ridge
Phase 1 Architectural Controls
ARCHITECTURAL CONTROLS
To enhance the street appeal of Aspen Ridge, Saskatoon Land has selected a variety
of architectural controls aimed at creating an aesthetically pleasing streetscape and
encouraging a variety of different exterior building materials.
The architectural controls selected by Saskatoon Land are an integral component in
strengthening neighbourhood streetscapes and fostering diversity amongst housing
choices, creating a warm and inviting environment.
INDEX
3
3
4
5
6
7
8
9
10
11
12
13
14
15
Architectural Controls by Lot Type
Standard Lot - Attached Garage
Executive Walk-Out Basement Lot - Attached Garage
Laned Lot - Detached Garage
Highly Visible Lots
Exterior Building Material Requirements
Exterior Building Material Requirements - Highly Visible Lots
Garage Placement
Architecturally Significant Garage Doors
Attached Garage Integration
Columns and Entry Features
Roof Pitch
General Design Considerations - All Lot Types
Building Permit Application - Plan Submittal Requirements
CITY Of SASKATOON - SASKATOON LAND
2
Aspen Ridge
Phase 1 Architectural Controls
ARCHITECTURAL CONTROLS BY LOT TYPE
Phase 1 of Aspen Ridge features three lot types, Standard Lot Attached Garage, Executive Walk-Out Basement Lot Attached
Garage and Laned Lot Detached Garage. The architectural controls for each type are noted below:
Standard Lot - Attached Garage
•
•
•
•
•
a) No dwelling shall be constructed on any of the lots which has an above grade floor area
(excluding attached decks, patios and garages) less than:
i. 1,000 square feet in the case of a bungalow, bi-level or split-level dwelling.
ii. 1,200 square feet in the case of a two-storey dwelling.
Standard Lot Attached Garage
Lots 1 to 15, Block 701;
Lots 1 to 13, Block 702;
Lots 1 to 10, Block 703;
Lots 16 to 28, Block 705;
Lots 1 to 14, Block 706.
b) All dwellings must be constructed with a minimum single-wide attached garage. The garage must be constructed at the
same time as the dwelling is built. Minimum inside dimensions shall be 3.5 metres wide and 6.0 metres long.
c) The roof of the principal dwelling shall have a minimum 6-in-12 pitch except when it can be demonstrated that a lesser
sloped roof pitch is integral to any architectural style and consistent with the intent of strengthening the streetscape and
harmonizing the interface between housing forms.
No roof pitch requirement exists for Lots 16 to 28, Block 705 and Lots 1 to 14, Block 706.
d) Attached garages shall not protrude more than 2.4 metres (8 ft) from the facade of any habitable floor area of the dwelling.
e) All attached garages require architecturally significant garage doors consistent with the architectural style of the dwelling.
f) All dwellings require a minimum of two different exterior building materials on the front elevation with each material
being no less than 50 square feet in area or a minimum of three exterior building materials with each material being no less
than 25 square feet in area.
Aspen Ridge Phase 1
Sales Map
Attachment 2
11
1
20
19
36
Standard Lot - Attached
Garage (No Roof Pitch
Requirement) Locations
35
34
17
32
701
29
Fa
KLO
PPE
11
st
Fa
16
20
21
13
RCH
RCH
1
22
5
4
3
6
7
kD
rive
A
Cr
24
25
23
5
24
2
es
4
3
2
4
3
2
1
1
25
ne704
a
tL
4
3
5
6
7
8
9
10
11
C
13
14
15
16
B
ce
nt
12
re
he
Fe Datt
an
N
rd
va
le
ou
iB
az
h
gy
M
iW
Legend:
CITY Of SASKATOON - SASKATOON LAND
Single Family
Easement 2m
Drainage
Multi-Family Parcels
Easement 3m
Park
Multi-Family Parcels
Easement 5m
Buffer
Mixed Use Commercial
Mail Boxes
Residential
Care Home
Medium/High Density
Low/Medium Density
Lot Number
11
26
NBU
RG
5
28
6
s
Fa
1
23
12
10
6
27
7
3
1
12
2
8
19
8
2
1
9
18
9
5
4
2
10
10
st W
ay
17
703
st
10
15
11
13
MR2
t
oru
3
urt
12
70111
MB1
9
12
7
6
7
en
13
8
8
sc
14
4
st C
o
14
9
re
15
9
Fa
8
702
5
Fa
16
Fed
7
13
re
s
C
10
22
21
20
6
12
705 22
13
2
C
23
11
ce
nt
26
25
24
10
21
14
28
11
20
15
3
14
st C 706
res
cen
t
19
31
30
12
18
4
15
Fa
16
33
27
19
16
13
20
5
urn
707
17
14
709
6
dT
18
38
19
7
lsta
21
D1
18
8
Bo
22
37
18
17
9
Standard Lot - Attached
Garage Locations
17
16
10
12
Proposed Bus Stop
ay
3
Aspen Ridge
Phase 1 Architectural Controls
Executive Walk-Out Basement Lot - Attached Garage
Executive Walk-Out Basement
Lot - Attached Garage
a) No dwelling shall be constructed on any of the lots which has an above-grade floor
area (excluding attached decks, patios and garages) less than:
•
Lots 16 to 38, Block 701
i. 1,200 square feet in the case of a bungalow, bi-level or split-level dwelling.
ii. 1,500 square feet in the case of a two-storey dwelling.
b) All dwellings must be constructed with a minimum double-wide attached garage. The garage must be constructed at the
same time as the dwelling is built. Minimum inside dimensions shall be 5.4 metres wide and 6.0 metres long.
c) The roof of the principal dwelling shall have a minimum 6-in-12 pitch except when it can be demonstrated that a lesser
sloped roof pitch is integral to any architectural style and consistent with the intent of strengthening the streetscape and
harmonizing the interface between housing forms.
d) Attached garages shall not protrude more than 2.4 metres (8 ft) from the facade of any habitable floor area of the dwelling.
e) All attached garages require architecturally significant garage doors consistent with the architectural style of the dwelling.
f) All dwellings require a minimum of two different exterior building materials on the front elevation with each material
being no less than 75 square feet in area or a minimum of three exterior building materials with each material being no less
than 40 square feet in area. No vinyl siding shall be permitted on any building elevation.
g) All dwellings shall be constructed with direct access from the basement level to the backyard (walk-out units).
Aspen Ridge Phase 1
Sales Map
Attachment 2
15
11
1
16
10
17
9
Executive Walk-Out Basement
Lot - Attached Garage
Locations
20
D1
19
17
18
32
20
14
28
27
C
st
7
10
Fa
15
14
5
13
Fed
MB1
oru
KLO
PPE
NBU
RG
3
11
12
st W
ay
17
4
18
19
9
20
8
21
22
2
1
13
RCH
RCH
1
5
4
3
6
7
kD
rive
A
1
6
24
25
23
5
24
2
es
4
3
2
11
3
2
1
1
25
ne704
a
tL
5
4
3
6
7
9
8
10
C
ce
nt
11
12
13
14
15
16
B
re
he
Fe Datt
an
N
rd
va
le
ou
iB
az
h
gy
M
iW
Single Family
Easement 2m
Drainage
Multi-Family Parcels
Easement 3m
Park
Multi-Family Parcels
Easement 5m
Low/Medium Density
4
12
26
Legend:
Medium/High Density
5
t
23
13
MR2
7
28
6
s
Fa
Cr
8
27
7
3
2
8
10
9
21
6
5
1
10
9
16
11
703
7
st
10
Fa
15
8
2
rt
12
70111
9
702
4
st C
ou
9
Fa
8
Fa
6
17
16
14
10
t
en
sc
re
19
13
12
2
C
23
22
21
20
18
12
re
s
ce
nt
26
25
11
705 22
13
3
14
st C 706
res
cen
15
11
12
19
701
31
29
4
15
Fa
16
33
24
16
13
35
5
urn
707
17
14
36
709
6
dT
18
38
19
7
lsta
21
34
30
Bo
22
37
18
8
CITY Of SASKATOON - SASKATOON12LAND
Mixed Use Commercial
Mail Boxes
Lot Number
Proposed Bus Stop
Fire Hydrant
Corner Garage Location
Decorative Fence
Garage Location
Masonry Fence
Concrete Pad
ay
Buffer
Residential
Care Home
Saskatoon Land - July 2015
Note: The Saskatoon Land does not guarantee the accuracy of this plan. Lot dimensions
and the location of other features are compiled from available information and are subject
to change without notice. Park and buffer renderings are for illustrative purposes only and
does not represent what will be constructed.
To ensure accuracy, please refer to the
Registered Plan of Survey. Distances are in meters unless shown otherwise. Do not scale.
4
Aspen Ridge
Phase 1 Architectural Controls
Laned Lot - Detached Garage
Narrow Lots - Detached Garage
a) No dwelling shall be constructed on any of the lots which has an above-grade
floor area (excluding attached decks, patios and garages) less than:
•
•
•
i. 1,000 square feet in the case of a bungalow or bi-level.
ii. 1,200 square feet in the case of a two-storey dwelling.
Lots 11 to 25, Block 703;
Lots 1 to 16, Block 704; and
Lots 1 to 15, Block 705
b) All dwelling units shall be bungalows, raised bungalows, bi-levels, or two-storeys. Split-level dwellings are not permitted.
c) All dwellings shall be constructed with an architecturally significant entry feature which may include a covered veranda,
a covered entry feature or a modern contemporary interpretation of a pergola. In the event that columns are used, column
styles should be consistent with the overall architectural style of the dwelling.
d) The roof of the principal dwelling shall have a minimum 6-in-12 pitch except when it can be demonstrated that a lesser
sloped roof pitch is integral to any architectural style and consistent with the intent of strengthening the streetscape and
harmonizing the interface between housing forms.
e) All dwellings must be constructed with a concrete garage pad with access from the rear lane only. The concrete garage pad
must be constructed at the same time the dwelling is built with a minimum dimension of 6 metres wide and 6 metres long.
The concrete pad shall be located at a minimum of 1.2 metres from the rear property line, and include a paved apron that
connects it to the rear property line.
f) All dwellings require a minimum of two different exterior building materials on the front elevation with each material
being no less than 50 square feet in area or a minimum of three exterior building materials with each material being no less
than 25 square feet in area.
Aspen Ridge Phase 1
Sales Map
Attachment 2
11
1
16
10
17
9
20
D1
19
16
13
36
35
17
15
29
14
28
oru
KLO
PPE
t
Fa
s
6
11
5
13
RCH
RCH
1
2
5
4
3
6
8
7
kD
rive
A
23
5
24
2
es
4
3
25
4
3
ce
nt
5
2
1
e704
n
La
st
1
1
26
C
6
7
8
9
10
11
12
13
14
15
16
B
ard
lev
u
Bo
i
az
yh
g
re
he
Fe Datt
an
N
iW
a
M
y
NBU
RG
22
Fa
Cr
2
28
6
4
1
12
21
2
1
10
20
25
3
27
7
3
2
rt
9
703
19
8
7
st
10
18
9
ay
4
t
24
11
t
Fed
3
8
st W
17
23
5
en
12
70111
MB1
9
702
4
9
Fa
8
ou
13
16
cen
21
12
10
6
sc
st C
15
14
7
5
Fa
15
10
7
re
6
17
16
14
re
C
10
20
19
13
11
8
C
23
22
21
18
12
sc
en
t
26
25
11
12
2
13
MR2
9
706
705 22
13
Fa
27
10
res
20
3
14
11
st C
19
701
31
24
12
18
32
4
15
Fa
16
33
20
5
urn
707
17
14
709
6
dT
18
38
37
19
7
lsta
21
34
30
Bo
22
Laned Lot - Detached Garage
Locations
18
8
Legend:
CITY Of SASKATOON - SASKATOON LAND
Single Family
Easement 2m
Drainage
Multi-Family Parcels
Easement 3m
Park
Medium/High Density
Multi-Family Parcels
Easement 5m
Buffer
Mixed Use Commercial
Mail Boxes
Residential
Care Home
Low/Medium Density
Lot Number
Fire Hydrant
12
Proposed Bus Stop
Corner Garage Location
5
Aspen Ridge
Phase 1 Architectural Controls
Highly Visible Lots
Highly Visible Lots
Lots 1, 16 to 38, Block 701;
Lots 1, 6, 7, and 13, Block 702;
Lots 1, 10, 11, and 25, Block 703;
Lots 1 and 16, Block 704;
Lots 1, 15, 16 and 28, Block 705;
Lots 1 to 14, Block 706
•
•
•
•
•
•
In addition to the controls noted in the preceding sections, any dwelling elevation
facing a street or park also requires the following:
a) Other than a front facade which has other requirements as noted in this document, any building elevation which flanks a street or faces a park requires a
secondary exterior building material no less than 40 square feet in area.
b) Other than a front facade which has other requirements as noted in this document, any building elevation which flanks a street or faces a park requires the
placement of windows and/or a door that occupy no less than five percent of the
area of the subject building elevation.
Aspen Ridge Phase 1
Sales Map
Attachment 2
15
11
1
16
10
17
9
Highly Visible Lot Locations
Bo
21
20
19
16
17
19
701
31
14
Fa
14
re
C
st
13
Fed
MB1
oru
KLO
PPE
NBU
RG
3
8
11
5
20
21
13
RCH
RCH
1
22
5
4
3
6
7
kD
rive
A
1
4
t
24
25
11
3
2
1
26
2
es
C
28
6
23
5
24
4
3
2
1
25
ne704
a
tL
s
Fa
Cr
5
27
7
2
1
12
8
4
2
8
19
9
3
1
10
9
18
703
6
st
10
st W
ay
17
7
2
rt
12
70111
9
702
st C
ou
9
Fa
8
Fa
15
16
23
12
10
6
4
3
5
6
7
8
9
10
11
13
14
15
16
B
ce
nt
12
t
7
4
15
10
7
21
13
MR2
en
5
Fa
14
11
8
sc
6
17
16
13
12
9
re
22
21
19
12
10
705 22
13
2
C
23
10
20
18
11
sc
en
t
26
25
24
20
15
29
28
27
3
14
11
st C 706
res
cen
18
32
30
12
Fa
16
33
4
15
13
36
35
34
20
5
urn
707
17
14
709
6
dT
18
38
37
19
7
lsta
22
D1
18
8
re
he
Fe Datt
a
N
iB
az
h
gy
ni
rd
va
le
ou
M
Wa
y
Legend:
Single Family
Easement 2m
Drainage
Multi-Family Parcels
Easement 3m
Park
Multi-Family Parcels
Easement 5m
Buffer
Mixed Use Commercial
Mail Boxes
Residential
Care Home
Medium/High Density
Low/Medium Density
Lot Number
Fire Hydrant
12
Proposed Bus Stop
Corner Garage Location
Decorative Fence
Garage Location
Masonry Fence
Concrete Pad
CITY Of SASKATOON - SASKATOON LAND
Saskatoon Land - July 2015
Note: The Saskatoon Land does not guarantee the accuracy of this plan. Lot dimensions
and the location of other features are compiled from available information and are subject
to change without notice. Park and buffer renderings are for illustrative purposes only and
does not represent what will be constructed.
To ensure accuracy, please refer to the
Registered Plan of Survey. Distances are in meters unless shown otherwise. Do not scale.
6
Aspen Ridge
Phase 1 Architectural Controls
EXTERIOR BUILDING MATERIAL REQUIREMENTS
Standard Attached Garage Lots and Laned Detached Garage Lots
All dwellings require a minimum of two different exterior building materials on the front elevation with each material being
no less than 50 square feet in area or a minimum of three exterior building materials with each material being no less than
25 square feet in area.
Executive Walk-out Basement Lots
All dwellings require a minimum of two different exterior building materials on the front elevation with each material being
no less than 75 square feet in area or a minimum of three exterior building materials with each material being no less than
40 square feet in area. No vinyl siding is permitted on any building elevation.
Note: Material types and areas must be clearly identified on the drawings submitted in support of your Building Permit
Application. Failure to do so may result in delays to the approval of your Building Permit Application.
Board &
Batten
Cedar Shakes
Masonry
Application
Masonry
Application
This home utilizes cedar shakes along the roof line and stone accent This home features board and batten siding along the dormers,
features near the garage edges, with the balance of the facade con- stone accents along the veranda columns, with the balance of the
sisting of cement fiber siding.
front facade consisting of cement fiber siding.
•
•
Trim features will not be counted as a material. In order to be included towards the required material amount, the material
must be visible from the front street. Material wrapped around a column or architectural feature, facing a side or rear yard
will not count towards the required material total.
The materials being used need to be distinctly different and discernible from each other. Contrast with the trim materials and
exterior building materials being used is also encouraged.
CITY Of SASKATOON - SASKATOON LAND
7
Aspen Ridge
Phase 1 Architectural Controls
EXTERIOR BUILDING MATERIAL REQUIREMENTS
HIGHLY VISIBLE LOTS - PARK & STREET FLANKING ELEVATIONS
Other than a front facade which has other requirements as noted in this document, any building elevation which flanks a
street or faces a park requires a secondary exterior building material no less than 40 square feet in area.
Other than a front facade which has other requirements as noted in this document, any building elevation which flanks a
street or faces a park requires the placement of windows and/or a door that occupy no less than five percent of the area of the
subject building elevation. Illustrations of building facade requirements are shown below.
50 square feet of a cedar accent material is provided along the rear elevation of the dwelling which faces a linear park. The rear elevation has an area of 1,100 square feet, requiring
the placement of a minimum of 55 square feet of window and/or door area. In this example, 124 square feet of window and door area has been provided.
80 square feet of cedar plank is provided along the side building elevation which faces the
flanking street. The side elevation facing the flanking street has an area of 840 square feet,
requiring the placement of a minimum of 42 square feet of window and/or door area. Five
windows are provided resulting in a total window area of 75 square feet.
CITY Of SASKATOON - SASKATOON LAND
8
Aspen Ridge
Phase 1 Architectural Controls
GARAGE PLACEMENT
For lots requiring an attached garage, one further requirement will also apply to all of the lots that indicates which side of
the lot the garage must be placed.
Garage sides on a given block are paired together against a common property line in order to provide a better streetscape
appearance.
Corner Lots
For corner attached garage lots, the garage must be located on the side of the property that is furthest from the intersection.
Figure 1 demonstrates the permitted options (A & C) for the placement of an attached garage on a corner lot, attached to the
front of the house furthest from the street corner or at attached to the rear of the house.
Figure 1 - Corner Lot Garage Placement
A - permitted
B - not permitted
CITY Of SASKATOON - SASKATOON LAND
C - permitted
9
Aspen Ridge
Phase 1 Architectural Controls
ARCHITECTURALLY SIGNIFICANT GARAGE DOORS
The street appeal of a home contributes to the general appeal of any residential area. Garage doors make up a significant
portion of the facade of any attached garage home. Any home with a front or rear attached garage requires garage door styles
that complement the home’s exterior. The garage door must include some architectural features. Examples of garage door
types, design elements and corresponding architectural styles are outlined below:
•
•
•
•
•
•
Coped edges;
Decorative glass;
Designed inserts;
Wide trim pieces;
Natural woods; and
Aluminum and Glass.
Garage door supplier and model information must be submitted along with your building permit application. Garage
doors will be reviewed and approved
Aluminum composite garage door, suitable
for modern contemporary architectural
style.
Aluminum composite garage door with left
side window placements suitable for modern contemporary architectural style.
Craftsman style garage door featuring wide
trim pieces and decorative glass windows.
Garage door with dark finish and coped
edges, suitable for traditional architectural
style.
CITY Of SASKATOON - SASKATOON LAND
10
Aspen Ridge
Phase 1 Architectural Controls
ATTACHED GARAGE INTEGRATION
For lots which require an attached garage, the attached garage shall not protrude more than 2.4 metres (8 ft) from the facade
of any habitable floor area of the dwelling.
Examples showing acceptable garage projections are illustrated below.
The attached garage projects 2.0 metres from the second
storey of the dwelling.
The attached garage projects 2.4 metres from the second
storey of the dwelling.
The attached garage projects 2.4 metres from the second
storey bonus room.
CITY Of SASKATOON - SASKATOON LAND
11
Aspen Ridge
Phase 1 Architectural Controls
COLUMNS & ENTRY FEATURES
For lots which require an architecturally significant entry feature, features should be consistent with the overall architectural
style of the dwelling.
This may include the use of covered verandas, modern contemporary interpretations of pergolas or covered entry features.
In the event that columns are used, column styles should be consistent with the overall architectural style of the dwelling.
This might include the use of wide-based, tapered columns with stone detailing at the column base for craftsman style homes,
cedar clad columns for modern contemporary style homes, or columns with masonry cladding along the full length of the
column for traditional style homes.
Modern interpretation of a pergola entry.
Covered entry feature, with supporting
column.
Covered entry feature, with supporting
column.
Covered veranda with substantial columns.
Wide-based, tapered columns, with stone
detailing.
Wide-based columns, with stone detailing.
CITY Of SASKATOON - SASKATOON LAND
12
Aspen Ridge
Phase 1 Architectural Controls
ROOF PITCH
The roof of the principal dwelling shall have a minimum 6-in-12 pitch except in instances where it can be demonstrated that
a lesser sloped pitch contributes towards a consistent architectural style or enhanced level of street appeal.
Approval of roof pitches less than 6-in-12 will be at the discretion of Saskatoon Land. Some examples that outline the acceptable use of roof pitches less than 6-in-12 are identified below.
The use of a low-pitched gabled roof for a
craftsman style home.
The use of a flat roof or low-sloped roof in a
modern contemporary style home.
The use of a low-pitched hip roof, with wide
overhanging eaves in a prairie style home.
CITY Of SASKATOON - SASKATOON LAND
13
Aspen Ridge
Phase 1 Architectural Controls
GENERAL DESIGN CONSIDERATIONS - ALL LOT TYPES
Massing and Relief
All building volumes must incorporate intermittent variances in plan and elevation to encourage shadow lines on
facades and visible elevations which will enhance the streetscape by introducing interesting architecture. This includes
all building elevations that are adjacent to or visible from
public streets, public parks, and adjacent developments.
Repetition
The same elevations should not be repeated on adjacent
properties or directly across the street. For adjacent properties a change in architectural detailing is required.
Examples of acceptable changes are, but not limited to, the
following: roof and dormer orientation and slope, front attached garage roof style or orientation, the size and location of windows and doors, colours and finish materials.
Front Door Placement
It is strongly encouraged that the front door of a dwelling
be highly visible on the front facade by directly facing the
fronting street.
If the door does not face the street, architectural elements
such as foyer windows, additional accent materials or other
architectural elements must be added to enhance the house
entrance.
CITY Of SASKATOON - SASKATOON LAND
14
Aspen Ridge
Phase 1 Architectural Controls
BUILDING PERMIT APPLICATION - PLAN SUBMITTAL REQUIREMENTS
As a summary to the requirements outlined in this document, please ensure the following information is included in your
Building Permit Application:
Standard Lot Attached Garage & Executive Walk-Out Basement Lot Attached Garage Types
•
•
•
Exterior building material types and areas along the front facade of the dwelling;
For highly visible lots, exterior building material areas, and window and door areas for building elevations that flank a
street or face a park; and
Garage door supplier and model information.
Laned Lot Detached Garage
•
•
Exterior building material types and areas along the front facade of the dwelling; and
For highly visible lots, exterior building material areas, and window and door areas for building elevations that flank a
street or face a park.
Failure to include this information may result in delays in the processing of your building permit application. Building
permit applications must be submitted to the Building Standards Division.
Interpretation and application of the Aspen Ridge Architectural Controls are at the sole discretion of Saskatoon Land. Saskatoon Land’s decision is final. Failure to comply with these controls may result in removal from Saskatoon Land’s eligible
contractor list.
For any questions on the requirements and guidelines included in this document, please contact Saskatoon Land at
(306) - 975 - 3278 or by email at [email protected]
CITY Of SASKATOON - SASKATOON LAND
15
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Attachment 7
Attachment 8
lst
2.
64 82
7
8.6
1
1
13
12
6
12
14
65
17
18
nt
61
65
.82
12
.83
8
11
.83
12
.10
12
.82
9.1
12
9.1
4
15
12
9.1
.20
67
1
1
2.
67 20
5
37
.53
.26
67 0
9
67
24
.20
8
6
8
12 2
.20
38
.9
11
2
9.4
2
5.66
10
.64
12
.82
9.7
12
.2
68 0
3
.95
33
13
.4
.82
12
.2
6
7
12 4
.20
.82
12
54
12
.20
67
12 0
.20
2
.20
12
54
2
54
7
13 3
.42
12
12
.82
4
12
12
.20
66
6
.82
12
5
13
.4
.20
66
7
.82
.82
9.7
.
66 20
3
.
.42
13
12
9
12
66
12 2
19
20
12
.20
14
54 03
6
55
13 1
13
.42
MR2
.20
1
2.
65 20
9
13
Fa 8
706
st
76
Cr
es
5
21
4
22
ce
nt
3
23
2
65
.82
12
11
10
4
11
13
1
2.
65 20
5
0
12
.42
13
.4
.03 4
.
.42
14
13
0
1
65
.30
.42
12
.2
.20
.42
15
13
12
.20
38
33
.95
.20
64
C
.64
.42
14
55 03
0
55
13 5
16
13
12
n
55
13 9
.42
3
.
55 03
4
36
.00
5
.03
.20
.81
Tu
r
36
.0
14
707
17
14
12
16
11
3
.82
4
14
0
33
.95
0
.00
36
.0
56
3
14
14
.0
55 3
8
.42
13
.
.03 44
5
36
.0
33
.95
.00
36
tad
13
19
14
1
4.
56 03
2
6
13 7
.42
18
14
.0
709
6
0
36
.00
36
62.79
63
34
.28
Cre
60
7
60
36
30
.0
7
.9
10
10.96
603
.2
0
29
.3
9
43
12
9
13
.42
12
.8
61 2
5
61
1
12.
9
8.4
4.48
3
12
.97
6.04
3
6. 6.5
543
2 6.44
5
9.3
sce
82
82
12.
9.9
8
10
10.
7.9
6
5
14
.
.03 05
5.66
10.
38
19
18
6
5.66
701
14 1
.03
17
14
3.4
$1
19
62 2
,7
3
7.07 9
4.4
$1 38.15 00
6027 6 .35
1
31
38 9,
.00 70
0
$1
$1 32.6
17
3
5
9,9
,50
$1
0
38 00
10
.08
$1
,10
60
$1
,90
0
10
0
3
8.0
,10
$1
0
$1
0
54
10
,50
,10
29
0
38
$1
.5
4.4
0
.
00
2
10
$1
0
,10
54
$1
$1
,50
79
0
10
,60
0
$1
,10
$1
0
6
54
0
36 6,0
,50
.00 00
0
$1
$1
58
54
,00
,50
0
0
$1
$1
5
47
8,0
,00
00
0
$1
58
,00
0
$1
58
,00
0
38
$1
$1
.00
58
47
,00
,00
0
38
0
$1
$1
.00
58
58
,00
,7
0
38 00
$1
$1
.1
58
58
2
,00
.7
00
0
38
$1
.4
58
6
,00
36
0
.00
$1
58
,00
0
36
$1
.00
66
,00
0
3
$1
6.0
0
66
,0
36
.00 00
36
$1
.00
79
,60
29
.33
0
.1
4
26
35
16.
2
13.
4
42
13.
12.
82
4, 33
57
20
9
.03
1
14 4.0
.03 5
14
.
56 03
6
14 5
.03
14
.03
6
$18
57
0
Bo
ls
57
31
14
16
7
14
.03
21
.16
6.07
7.51
3 34
38 ,000
.65
57
4
57
9
3
.03
1
14 4.0
.03 5
8
.03
32
14
.
.03 05
14
.03
14
1
.91
$19
$18 32
4
38 ,400
.4
$1 31 0
83
,
38 50
.32 0
$1
83 30
37 ,4
.1 00
$1
6
83
,
29
7
34 0
.7 0
4
2
.83
3, 35
38 000
.78
38. 400
52
$1
93 28
34,00
.6 0
00
90 36
,20
38 0
$1
9
D1
7
.1
13 43
)
56
38.
ECOLOGICAL BUFFER
13
.4
8
14
.01
00
5,8
$23
,3
36
$1
12
.
68 82
7
12
st
1
, 9
38 500
.0
9
$1
8 0
01 .02 0
,80
0
$1 38
10 .00
,10
$1
0
10
,10
$1
0
10
,10
$1
0
10
,10
$1
0
10
,10
0
,
3 8
$1
.00
.1
4
38
57
38
.
38
.0
10
47.33
,600
$172
37.6
7
$167
,600
,
35
54
$1
.3
7
3
32
4
4.3
.1630
0
54
3
0
6
38
.2
5,
00
0
.00
,50
54
38
00
34
.4
3
,7
5.43
$1
38
36 ,30
.24 0
$1
4.
3
.2
38
0
54
,50
$1
6
38
34
$1
38
0
,50
$1
54
,50
0
$1
43 0
$1
3
3 1,6
$1 4.76 00
30
,0
00
40
,8
. 0
34
.
$1
7
34
.3
38
.00
0
,50
54
4
34
.3
3
34
.4
0
.40
,30
54
35
$1
$1
2
30
.3
34
.4
3
0
.86
,80
35
51
$1
54
$1
13
.
3
38
st
89
28
.
36 0
.53
,80
0
,50
54
$1
38 42
7
2
.4
13
Fa
37 15
5
13
.
37 42
9
10
.
367
9
10.2
72
$1
6
0
.00
53
38 ,4
0
$1
39
1
13
.4
2
13
.4
.4
3
13
5.
88
56
7.
7
.8
22
6
$1
01
TD
A
12
ha
y
g
N
re
e
h
0
ta
n
iW
Note: This map is conceptual and may change.
Easement 2m
Concrete Pad
Single Family
Easement 3m
Residential Care
Home
Park
No Roof Slope Requirement
Multi-Family Parcels
Easement 5m
Multi-Family Parcels
Lot Number
12
Fire Hydrant
Mixed Use Commercial
Civic Address
123
Walkout Basement
P
at
ay
Legend:
C
nt
Dr
Single Family
Corner Garage
Location
Proposed Bus Stop
M
zi
G
Low Density - RMTN
ce
3
.3
23
41
Fe
Low/Medium Density - RMTN1
es
nt
rd
a
ev
l
u
Bo
Group Townhousing
RMTN
26
7.
sc
e
6
.1
22
Cr
0
.0
40
7
Cr
e
82
ive
CO
UR
T
00
,1
100.00 00
4
,1
26
.09
0
$1
0
.0
0
.0
5
.0
40
0
8
1 0.00
4
$1
0
.0
40
40
0
.0
1
.0
3
B
.
12
8
.3
do
ru
k
40
0
,1
85
$1 8.26
00
,0
81
$1 0
0
.
00
,3
33
$1 .00
38
Fe
8
704
RCH
00
,3
33 9
$137.9
.8
6
0
21
e
38
5
3
IN
E
RCH
0
.2
12
.
9
.4
9,10
MB1
L
ER
13
7
10.3
$164,400
OW
10.37
00
,9
39 00
10
5
$1
13
C
rt
38
3
.4
VP
s
a
F
C
C
37.1
8K
Co
u
$15
13
an
L
t
40
9
.2
701
RE
C
T
40
10
st
C
10 .00
40
Fa
st
703
8.05
7.43
10.29
Fa
C
$1
68
3.
T
702
C
ay
5.88
C
W
.0 0
36 ,00
0
050.0 00
$1 4 0,3 0
0
1 .0
$1 40 ,10
10 .00 0
$1 40 ,10
10 .00 0
$1 40 ,10
10 .00 0
$1 40 ,10
0
C
5.35
3
13
.4
3
$1 34.
52 21
38 ,7
.0 00
5
13
.
13
40 42
3
.4
3
7
13
.
40 42
13
.
13
.
45
41 42
1
01
34
.
5
13
.
13
.
41 42
45
41
9
13
.
13
.4
5
42
3
5
.4
13
Fa
705
7.83
.8
6
68
4
69 2
50 .10 14
12
1
14.
14 6
9.1
1
.20
3
9.7
36
.42
25
4
5
695
$1
13
50
69
9.1
26
12
9
9.7
7
0
93
4
.20
1
5
4
.42
9.1
, 27
6.69 02
51 5 9 12
69
35 00
4
1
50
12
.1
.6 0
.20
3.11
8.1 4
$1
9.1
4
51 4 9 11
7.6 6 5
2
4
93 26
5
10
27
1
.14
12
7.6
9.1
10
11
51
.20
36 ,00
5
4
9 9.1
.5 0
12 1 9.1414 5
$1
9
28
9.1
52 4 9 9
11
93 25
0
1
4
.46
3
.1
13
9 8
10
52 4 9 8
13
37 ,00
11
.06
14 .14 9 522
9, .72
7
.5 0
.14
.
4
4
4
2
$1
7
6
53
8.9
$1 3
15 .14 9 526
9 24
1 9.14
13
5
11
5
.05
Group Townhousing
.46
38 3,0
6
53
72
8.9
.5 0
16 .14 9 530
5 9.1
5
0 0
4
11
13
5
.14
53
8.9
5
.49
RMTN1
.
34
05
17
9 9.1
5
9.1
54 4 9 4
10 11.4
39
9.1
53
4
18
3
.
.
8
4
1
1
9
$1
9
2
3
54 4
9.1
93 23
9.7
12
19 .14 9 542
2 5.66
2
7
4
.82
.0
26 5
.14
39 ,0
55 5
2
9.1
35
54
8 5.1
20
9
.6 00
1
5
4
.
6
7
9
12
1
2 .15 16
$1
9
9.1
55 5 6
.82
21 0.64 550
9 22
.78 1
4 9
5
4
10
40 3,0
6.27
25 .14 15
9.4
9.1
12
8
22
.
.2 00
5
6
.82
55
4
59
4
0 9
5
$1
15 9
9.1
25 14 14
8
13
9 21
23 10.64 4 55
4
12
.4
7
6 9.
40 3,0
.82
15 9
8
9.1
4
95 1
13
.8 0
5.
2
4
24
4
4
1
5
1 0
12
$1
15
12
8.0 9
2 9.
.
9.1
6
9 20
9.
.82
7
15 82
15
24 14 12
4
25
41 3,0
0
4
12 5
12
8.4
9.
1
.3 0
8
.
12
.07
.
9
7 0
5
1
$1
23 .14 11
.82
15
14 82
8.4
9 19
9
6
14
12 1
1
12
34 4 10
39 3,0
9.
.07
.82
2
4
2
8.4
16
.5 0
7
1
1
.
14
.48
4
1
3 0
14
0 9.
8
32
2
12 7
8.4
9.
12
9
.07
23 .14
.8
$20 18
3
1
14
13 2
14
12 7
8,1
6 9
16
.
3
9
2
9
1
.07
8
.48
0
8
2.4
39.
2 .14
12
34 0
.
3
2
13
14
2 9
6 12.
9
13 82
9.
.2
7
12 9
10
22 .14
4
07
10 71
12
.43
4
17
0
1
9
.82
35
8
0
.1
3
1
1
1
9
2
8
5.6
13
2.0
$214,300
6
, .0
2 .14
0
5
7
12
11
63 35
14
4 9
.
48.76
5
9.
12
$1
5
21 .14
12 04
Street Townhousing
24
.07
0
.
1
8
6
9
5
0
0.1
14
.04
6.5
0
.
3
9
9
1
,
4
1
12
4
16
2 .75
35 2
15
RMTN1
27 13
2
4
12
6.44 4
4
.16 10.112
9
1
1
.
0
.
6
.66
6.27
$ 29.
9
0
,60
3
35
3
3
35 06
20 .75
13
0
1
$217
8
4
0
3
0
9
12
1
2 9
.1
15
.3
3
14
.0
9.
.17 2
53.9
3551.6
10
20 76
2
.5
2 ,5006
34 6
7
2
0
5.
8.61
6
14
30 82
12
15 0
7 4.9
35
15
9.
.
4
.
1
0
4
0
1
1
.7
13
1
34 6
$1 3 1 ,10 82
9
.42
,90 25
1
14
2
11
32.
9.
5 1.
84 37.
34
31 20
.
01
$1
14 3
36
9
13 7
33 69
2.
$
7
1
.
0
.
2
.
8
7.6
15
5
42
1
8
14
.2
23
9
31 20
34
9
18
33
13
.7
13 3
2.
4
8
1
22
.42
6.43
9
.87
3
3
31 .81
18
8
8.
9.5 39
12
.2
10
12
1
19
1
3
4
3.4
GU
33
4
11
Y-W
0
10 5
.2
13
.3
331 327
5
.4
7
12
I
363
26.76
57
58
14 3
.16
14
T
37
31
3
15
14
14
9
14
.0
7
22
5.50
38
$2
1
Mail Boxes
1
2.
58 39
2
y
3
.05
.03
Wa
2
14 7
.03
14
14
10
58
61
14
1
14 4.0
.03 5
11
5.41
39
.
80
1
7
13.
2.0
(
9
60
61.68
Meewasin Northeast
Swale
13
.4
6
7
36
38.8
ad
.08
14
.6
4
94 Lots - Fast Crescent, Lane, Court & Way
8
Bo
32
.00
Category II Lot Information Map
Light Standard
Decorative Fence
Transformer
Wildlife Fence
Service Pedestal
Utility Corridor
Temporary Water
Circulator
T
W
AF - Saskatoon Land - October 2015
Note: The Saskatoon Land does not guarantee the accuracy of this plan. Lot dimensions
and the location of other features are compiled from available information and are subject
to change without notice. Park and buffer renderings are for illustrative purposes only and
does not represent what will be constructed. To ensure accuracy, please refer to the
Registered Plan of Survey. Distances are in meters unless shown otherwise. Do not scale.
Attachment 10
A
01S A04979
102001880
3
904-1
DAG1
B
5
4
n
He
ry
Da
ay
yd
a
Ro
n
He
d
ry
Bay
000-1
Woolf Bend
Twp Road 372
DAG1
718 -1
07
0-
2
FUD
A
6
Da
ay
yd
e
Cr
sc
en
t
Be
nd
Barrett Street
a
Ro
d
6
3
Thakur Street
Site
Thakur Street
d
FUD
a
Ro
101478821
A
ry
y
da
Whitehead Avenue
n
He
y
Da
Barrett Street
ay
yd
Potential
School
Da
Shevchenko Avenue
n
He
ry
y
Pa
ne
st
Fa
M3
M
rn
Ho
B1B
B4A
069-2
32
33
34
35
36
37
38
W
ay
13
l
no
r
11
10
Ma
y
23
Sh or es
Gla
cia
8
re
rg
Ba
l
cia
d
r
va
u le
Bo
6
7
5
Gla
en
e
Ev
662
20
Fe
t
ur
Co
64
2
s
102132447
7
22
18
eg
r
he
RMTN
19
az
yh
i
ce
Cr
es
W
ay
er
rm
ni
Da
tt
a
e
n
La
R1B
t
t
ch
nt
uk
Tu
rn
Bo
l st
ad
nt
R1A
Agra Road
Proposed
Fire Hall
No. 12
W
ay
d
r
va
Fa
s
as
ce
ce
RM3
R1A
Li n
k
R 1B
Cre scent
s ch
Ken
a
ad
lst
Bo
Unio
n
uk
Wa
y
uk
uk
Bolsta
d
t
u le
Bo
RMTN1
cO
3
12
e
or
Sh
9
c
Gla
ia l
4
nd
R1A
d
on
23
5
Be
Fa
s
Wa
y
Tu
rn
Fa
s
Fa
s
t
12
Co
ur
13
24
6
22
25
9
26
10
21
11
P ar
k
14
8
27
0
66
20
15
7
10
19
16
6
Sep 09, 2015
9
1
66
Cove
87
nd
5
8
Scale 1:8,500
ce
Fas
t
nt
t
Klo p
p en b
u rg
Be
2
s
4
e
or
Sh
3
31
17
18
31
1
52
35
32
20
36
33
28
17
30
37
34
10
38
4
16
29
s
Cr
es
s ch
Way
nt
3
9
13
15
28
ia l
2
8
12
16
7
070-0
Bylaw 8770
7
11
1
15
6
10
643
6
27
5
9
23
14
5
1
4
59
22
24
21
4
65
8
26
Gla
c
5
1
4
7
13
es
29
14
3
12
M
or
an
30
2
11
25
9
6
2
nt
7
3
l
1
4
64
ce
8
16
cia
24
Sh
or
e
11
15
38
3
es
Cr
5
or
Sh
23
M
10
14
21
2
19
1
1
102107562
643
MR
13
17
2
2
6
9
65
12
10
3
Gla
1
11
10
9
14
4
3
8
641
0
14
11
0
64
es
12
19
5
4
13
20
6
5
14
15
18
9
8
MB
10
7
uk
or
12
13
16
22
15
12
9
d
Fe
17
21
16
13
or
Sh
8
3
20
B1
Cr
es
an
an
or
Ke
n
Cr
es
d
rd
va
M
e
17
iv
Dr
on
Bo
l st
ad
ltz
10 20 52 87 5
m
Bo
l st
ad
Ba
Co
m
Link
Tu rn
nt
e
RM
TN
Lane
Bo
lsta
u le
Bo
Dr
iv
an
or
hu k
s ch
Bolsta
d
M
Kenasc
R 1B
Ken
a
e
ce
11
Note: The information contained on this map is for
reference only and is not to be used for legal purposes
ne
O
Dr
iv
M
ry
ro
cC
14
Zoning Map of Aspen Ridge
nd
n
Li nk
es
Cr
6
Be
rb
a
RMT
N1
RMT
N1
Ken
a
Wa
y
Driv e
on d
Cres
A
nd
y
Pa
10
FUD
66S1839 2
Be
McOrm
902 -2
Way
1
9
11
0-
an
07
Orb
y Road
Hen ry Dayda
Kalra Street
4
Brentnell Avenue
5
14
Kalra Street
Pl a
ce
lf
oo
W
28
Until street names and lots are
officially registered, all addressing
is proposed and subject to change.
Addressing for multi-unit dwellings
will not be confirmed until building
permits have been submitted.
65
64
7
24
643
23
1
65
25
65
639
22
21
es
er
ve
)
pa
lR
427
un
i ci
(M
419
11
411
6
5
50
2
70 06
0
7
71 714 18 22
10
7 7
11
1
51
12
13
14
15
3
20
175
1
3
3
52
2
1
7
52
6
5
21
5
366
17
16
358 15
4
9
21
1
53
26
362
7
21
4
9
51
5
16
8
7
20
14
5
5
51
8
51 22
5
9
179
1
6
7
13
403
2
7
3
50
407
8
7
3
9 23 727
1
5
71 71 71 7
12
2
50 06
5
0
10
51 14
11
5
415
4
8
423
12
9
5
7
70
603
13
10
9
607
14
6
3
70
615
611
15
11
7
623
619
17
10
9
8
627
19
16
635
8
6 660 664 66
631
20
18
30
29
5
65
9
66
3
66
7
27
26
3
354 14
3
171
1
6
22 27
4
350 13
20 10
2
13
1
3
2
2
4
5
14
167
346 12
3
21
23
8
15
21
163
2
342 11
16
2
2
6
2
17
2
2
338 10
0
159
18
12
23 34
11
19
2
334 9
8
20
1
6
155
10
3
4
2
1
21
9
2
330 8
14
22
8
8
13 34
7
326 7
1
6
0
322 6
13 26
5
7
14 143
1
4
2
11
9
318 5
12 18
3
13
10
1
5
4
314 4
13 31
9
11 10 2 1
1
1
8
6
310 3
0
1
7
2
13
758
10
306 2
29
655
1
2
651
12
3
302 1
754 28
3
70
4
647
07
7
750
1
11
5
27
71
5
643
746 26
71 9 6
10
2
1
0
7
7
639
3
6
9
72
742 25
70
15
0
635
16
71
738
8
4
1
17
24
7
631
8
734
7
18
71
14
2
627
23
5
2
6
7
0 13
19
25
34
12
623
20
22
6
5
3
21
3
2 11
619
33
0
4
1
27
8 10
43
3
32
615
9
2
9
3
4
3
12
2
23
3
32 20 8
3
5
611
219
13
3
2
33
7
1
6
2
4
14
3
1
1
607
5
3
3
7
2
211
15
5
32
31
11
1
603
3
2
16
207
3
6
2 10
8
9
5
17
31
203
8
9
5
18
57
31
12
8
4
11
7
11
19
5
3
10
7
9
7
0
7
58 83
0
8
7
7
3
5
20
6
22
5
3
5
6 6
4
0
6
21
3
3 2
9
5
1
21
57
2 5
1
6
5
22
5
5
20
1
57
8 4
7
5
1
5
14 43
57
19
4
3
38
1
7
9
55
16
56
18
13
0
2
5
1
3
63
17
5
6
402
5
17
9
18
37
1
6
63
14
2
54
59
5
5
406
16
2
3 13
5
4
6
3
4
3
5
1
5
6
36
5
15
410
1
7 12
4
15
55
627
64
14
414
35
7
1 11
4
5
14
5
5
10
6
13
8
(M
5
623
418
3
53
un
6
13
12
ici
65 9 9
6
54
64
34
pa
34
2
lR
42
5
5
0
12
6
8
5
e
619
11
0
se
6
7
3
16
rve
33
53
4
11
66 7 7
426
)
39
65
17
5
6
615
6
8
2
8
6
5
10
5
32
430
5
18
65
1 6
2
53
2
42
9
67 5 5
52
611
9
19
66
31
4
7
31
43
5
6
6
4
9
7
8
20
66 0
10
607
67 3 3
52
30
438
21
67 4
7
15
23
68 7 2
5
6
7
0
3
22
14
6
29
9
8
6
1
6
8
5
1 1
13
5
23
67 2
423
5
28
69
51 11 7
12
5
24
5 50
68
69
4
3
11
419
6
27
8
50
25
10
6
3
9
0
9
4
1
1
9
26
2
5
26
6
5
8
4
0
1
27
411
69
7
25
51
6
28
11
407
24
5
12
4
13
15
3
403
14
3
16
54
2
370
17
4
395
23
1
10
18
53
55 5 1
26
9
2
19
22
391
55 9
8
4
2
5
2
1
5 46
20
8
5
55
4
21
25 8 16
387
5 50
21
725
7
340
15
25 4
5
4
0
15
20
5
5
383
0
6
1
5
2
9
22
4
14
8
5
6
6
5
1
4
2
23
19
5
1
5
4
13
5
379
7
2
23 2
24
15 1
12
14
4
8
25
375
18
23 8 11
15 7
38
9
1
3
4
23
10
4
14 3
371
10
13 0 2
22 0
9
17
14 9
6
22 6
11
367
13 6
8
1
3
1
4 5
2 2
7
12
5
12 2
35
21 18
13
0 4
16
6
13
12
363
35 6 3
21 4
5
34 2 2
20 0
9
4
303
35 5
15
20 6
3
34
8 1
2
3
35
1
0
3
2
7
230
1
3
14
4
35
31
1
2
33
7
13
31 1
34
5
3
3
12
31
34
4
9
11
32 9
33
(M
5
3
un
5
10
icip
3
3
1
103
al
6
Bu
33
9
ffe
2
20
2
13
4
13
0
12
6
12
2
11
8
11
4
11
0
10
6
10
2
2
8
14
13
2
52 3
53 7
53 1
53 5
9
50
50 3
7
51
51 1
5
53
8
54
7
51
51 4
52 8
52 2
53 6
0
5
50
50 2
6
(M
Re unic
se ipa
rve l
)
14
6
0
726
73
327
r)
8
7
120
4
81
8
81
2
82
Planning & Development
6
82
NOTE: The information contained on this map is for reference only
and should not be used for legal purposes. All proposed line work
is subject to change. This map may not be reproduced without the
expressed written consent of the Regional Planning, Mapping &
Research Section.
0
83
823
827
831
4
83
DRAWING NOT TO BE SCALED
September 14, 2015
8
83
2
84
N:\Planning\MAPPING\Addressing\Aspen_Ridge\Aspen Ridge Addressing.dwg
(11x17)
st
Fa
t
ur
st
Fe
GT
Fa
r
he
ha
zi
t
en
sc
y
eg
re
C
st
Fa
ay
W
nt
ce
es
Cr
La
at
D
ni
ta
le
u
Bo
ST
ne
st
Fa
rd
va
ay
W
W
d
ay
lsta
Tu
rn
GT
lst
ad
lst
ad
Bo
Bo
Bo
n
Tur
uk
d
Bolsta
k
Lin
huk
huk
n
Unio
GT
ad
lst
Bo
Ken
asc
asc
huk
as
Ke
n
Ken
GT
ST
an
Tu
rn
t
en
sc
e
Cr
Co
Fa
st
es
ce
nt
Cr
st
Fa
ad
lst
Bo
or
ch
Bolsta
d
asc
y
ST
Way
Crescen
t
Wa
McOr
M
Link
nt
Cr
es
ce
Lane
uk
Kenas
ch
ST
O
Ken
Drive
Way
Link
mond
rba
n
GT
GT
GT
GT
GT
GT
GT
ST
ST
ST
GT
GT
GT
GT
GT
ORIGINAL ASPEN RIDGE
CONCEPT PLAN
APPROVED JUNE 23, 2014
ASPEN RIDGE CONCEPT PLAN
GT
GT
ST
GT
Fe
ru
do
k
cC
M
ry
ro
iv
Dr
e
N:\Planning\MAPPING\Concept Plans\Aspen Ridge\Concept Plan_070_APPROVED.dwg
DRAWING NOT TO BE SCALED
March 16, 2015
NOTE: The information contained on this map is for reference
only and not to be used for legal purposes. All proposed line
work is subject to change. This map may not be reproduced
without the expressed written consent of Community Services
Future Growth, Mapping & Research Section.
CONCEPT PLAN BOUNDARY
PERIMETER HIGHWAY ALIGNMENT
CITY LIMITS
POTENTIAL CELL TOWER LOCATION
POTENTIAL RESIDENTIAL CARE HOME SITE
(upon confirmation of the perimeter highway alignment)
MEDIUM DENSITY MULTI-UNIT
LOW-DENSITY MIXED-USE
MEDIUM-DENSITY MIXED-USE
POTENTIAL SCHOOL SITE
MUNICIPAL RESERVE
BUFFER STRIP
SWALE
GREENWAY
LANDSCAPED DRAINAGE OPEN SPACE
URBAN HOLDING AREA
POTENTIAL ROADWAY EXTENSION
FINAL CONFIGURATION TO BE DETERMINED
(GROUP TOWNHOUSE)
LOW/MEDIUM DENSITY MULTI-UNIT
(STREET TOWNHOUSE)
LOW/MEDIUM DENSITY MULTI-UNIT
(GROUP TOWNHOUSE)
SINGLE-UNIT DETACHED
LOW DENSITY MULTI-UNIT
Attachment 11
Attachment 12
Attachment 13
Joint Servicing Initiative
January 2015
Background of the Joint Servicing
Initiative
To support the thriving economy currently being experienced in
Saskatchewan; SaskEnergy, SaskPower and SaskTel are working
on refining and broadening the process of a “joint service
installation” approach for urban residential home builders.
This process will provide a timely, cost-effective and coordinated
service to home builders that includes the installation of gas,
electric and communications in a common trench from the main
line to the dwelling. This collaborative approach will achieve
efficiencies for the installation of the urban service lines and
address challenges associated with space constraints for new lots.
Index:
Background
Joint trench lots
Site Check
Readiness
Procedures for
applying for
services
What You Need to Know About
Joint Trench Lots
Joint Trench Lots are for shallow utility services in urban
residential areas (single family homes) where the electric, gas, and
communication lines are all installed in a common trench.
Currently joint trench installation is only being done in Regina,
Saskatoon, Warman, Martensville and Dalmeny.
If you have purchased a lot in any of these locations, a contract crew
will be installing all shallow utilities in one trench from the main
line at the back of the lot to the dwelling.
To prepare for the installation of your shallow utilities please refer
to the Site Check Readiness list on the following page.
PAGE 2
JOINT SERVICING INITIATIVE
JANUARY 2015
Site Check Readiness
To ensure installation of your service is completed when scheduled, your site must be ready for the crew on the
date you indicate on the application (site ready date). Along with your application, please submit a plot plan
for the address or addresses you are applying for.
Site readiness includes the following:
1.
Provide a plot plan that indicates the location of the residence within the property.
2.
House number must be visible from the street.
3.
In order to secure the natural gas bracket, a 24” x 10” pressure treated board must be in place that does
not contravene any natural gas codes.
4.
You must maintain a .9 metre (3 ft) clearance around the natural gas service regulator with any exhaust
vents, opening windows or doors. Please refer to your mechanical contractor for appropriate codes of other
intake clearances.
5.
The area around the house is backfilled and the lot is to within 150 mm (6”) of finished grade. To ensure
proper installation routing, customers are asked to ensure that property pins are in place and marked
for easy locating by our field staff.
6.
Utility access within the site must meet the following requirements:
i) Access is required for equipment to get into the yard(s) where the work needs to occur (trencher,
mini hoe, etc.), clear of buildings, fences, decks, etc.
ii) A clear path is maintained for the trench route from the metering points to the takeoff points. The
width needs to be enough to operate small trenchers and mini hoes at a minimum in ideal soil
conditions, and larger equipment when frozen or rocky conditions exist. The trench is to be at least
0.6 metres (2 ft) off of the parallel property line (for fencing) and at least 0.6 metres (2 ft) wide to
ensure separation of facilities in the trench. Further width is often required at surface to slope
trench during installation for safe trenching rules. This will require approximately 2 metres (6.5 ft)
clear access along the property line to the meter (electric and gas) boards to allow for construction
of the facilities.
iii) Be aware that any pads or foundations near this route may slump with settling of the trench.
7.
The trench is from the pedestal or pole to the meter location(s) (typically the closest corner from the
pedestal or pole to the house). This service route must be clear of debris or obstructions, such as dirt
piles and lumber.
i) SaskEnergy and SaskPower reserve the right to determine the meter location due to physical
impediments that may restrict access for personnel and equipment. Alternate meter locations
must be pre-approved prior to construction.
8.
If separate trenches are utilized, the natural gas trench (SaskEnergy) must be at least 1 metre (3 ft) in
distance from the SaskPower trench.
9.
In instances where both gas, electric and communication cables are installed in the same trench (currently
only in Regina, Saskatoon, Warman, Martensville and Dalmeny), you must leave a 1.2 metre (4 ft)
corridor adjacent to the property line for utilities. If the minimum of 1.2 metres is not maintained, an
encroachment over the gas service may occur and you will be responsible for reparation and subsequent
cost.
10. Your electrician has attached an energization sticker on the meter socket indicating the service is ready
for connection. The sticker ensures:
i) An electrical permit has been obtained
ii) The main panel is connected and in the open (off) position
iii) The service is grounded and ready to be connected to SaskPower’s electrical system
11.
To facilitate your service connection, please notifiy SaskPower once your electrician has affixed the
energization sticker.
PAGE 3
JOINT SERVICING INITIATIVE
JANUARY 2015
Urban Applications for Services
SaskEnergy and SaskPower have been working on a process to streamline our customers
application experience. Beginning February 17, 2015, you will be able to make application
for gas and electric urban services by utilizing either one of the Crowns’ websites. The
information will be shared between the two Crowns using a secure file transfer protocol.
We encourage you to make application via SaskPower’s website rather than SaskEnergy’s.
This will enable the Crowns to eliminate some manual processes that would otherwise occur
when applying via SaskEnergy’s website.
When you know the date that your property will be ready for servicing, you can make
application to either SaskEnergy or SaskPower by the following methods:
•
If you use SaskEnergy’s application, please apply online at saskenergy.com
•
If you use SaskPowers application, please apply online to saskpower.com or call
1-888-SKPOWER (1-888-757-6937) and select Option 4.
•
For your telephone and cable providers (SaskTel, Shaw or Access) the conduit will be
installed in the joint trench along with SaskPower and SaskEnergy. It is the
responsibility of the homeowner to apply for telephone and cable service to one of
these providers.
Even though Joint Installation is only being offered in Saskatoon, Regina, Warman,
Martensville, and Dalmeny all urban applications for service will be shared between the
crowns.
Attachment 14
402 Third Avenue South
Saskatoon, SK S7K 3G5
Meewasin Northeast Swale
The Meewasin Northeast Swale is an ancient river channel formed by glacial activity that took place
thousands of years ago. This remarkable feature runs adjacent to the South Saskatchewan River and is
approximately 2800 hectares in size. The Swale is a grassland ecosystem of rare native prairie and wetland areas. It is an important wildlife corridor, with over 200 plant species and 180 bird species.
The Swale acts as a natural filter for both air and water and mitigates flooding in adjacent neighbourhoods. It promotes physical health and well-being, encourages community engagement and stewardship,
and contributes to the vitality and productivity of the community.
The development of The Swale is a once-in-a-lifetime opportunity to enhance the legacy of our region by
integrating this important natural system into the fabric of our city.
To help protect the Meewasin Northeast Swale (Swale), here are some important things to remember:
 The Swale is a nocturnal preserve - Light from adjacent neighbourhoods affects wildlife and
plants in the Swale by altering their daily cycle of light and dark. Aspen Ridge neighbours can help
keep the night sky dark by using Dark Sky Compliant lighting; such as downward facing outdoor
lighting with cutoffs, no brighter than necessary, on a motion sensor, and turned off when not in
use. Visit www.darksky.org for more information about Light Pollution and the Dark Skies Movement.
 The Swale is home to abundant wildlife - Many grassland birds, birds of prey (e.g. owls and
hawks), waterfowl, deer, coyotes, frogs, snakes, badgers, ground squirrels, and a variety of other
fascinating creatures live in the Swale. Please respect the wildlife and allow them a safe distance.
Feeding wildlife can lead to dependence on handouts and nuisance animals. Keep garbage and
compost in animal proof containers to discourage wildlife and neighbourhood pets.
 The Swale is native prairie with many rare and unique plants - Native prairie is highly susceptible to invasion from exotic plants that will outcompete for space and resources. Please consider
planting native and non-invasive plants in your yard. Planting seed and fruit bearing shrubs can
help to provide food and shelter for birds in your yard. See the Native Plant Society’s document
“Native Plant Material and Services Supplier List” for recommendations of sources for native plant
please visit: http://www.npss.sk.ca/docs/2_pdf/Native_Plant_Source_List_2013__revised.pdf.
 Chemicals have an impact on Swale flora and fauna - Please consider the use of fertilizer,
herbicides or pesticides cautiously and use environmentally friendly alternatives, when possible, to
reduce impacts on the native vegetation, wildlife, and wetlands.
 For Swale management, call Meewasin - The native vegetation may look wild and unkempt at
times, but even dead trees provide food and shelter for wildlife so please resist conducting any
maintenance activities of your own in the Swale or Greenway. Contact Meewasin with any safety
concerns regarding vegetation as they regularly conduct resource management activities on site to
help keep the Swale healthy and rich with biodiversity.
 Trails are designed to protect sensitive areas - Please use only marked trails. These trails have
been carefully planned to respect wildlife and sensitive areas. Avoid damaging vegetation and
please do not pick wildflowers. Dogs must be on leash in the Recreation Zone and picked up after.
There are no dogs allowed in the Ecological Core. Please help protect the rare and endangered
species in the Swale.
meewasin.com
[email protected]
T: 306-665-6887
meewasin.com
[email protected]
T: 306-665-6887