portfolio - Aceco TI
Transcription
portfolio - Aceco TI
PORTFOLIO MEET ACECO TI Back-to-back solutions for highavailability Data Centers. The leader in Data Center infrastructure in Latin America. Aceco TI offers back-to-back solutions for the entire lifecycle of Data Centers: project, construction and maintenance, with national and international certificates and the experience of a company that has established over 700 Data Centers in Latin America and is now delivering a new one every four days on average. With an experience spanning over 40 years on the market, Aceco TI has more than 850 professionals specialized in designing, building and maintaining Data Centers of several sizes. The company has evolved together with the Information Technology and its portfolio includes environments designed and built for public and private companies in Brazil and the rest of Latin America. ma nan e t n i ce consu l tan cy ntation ign aut des om t/ ati ec on oj pr M rt ifi DC ce The Aceco TI solutions cover the entire lifecycle of Data Centers. PF imp g le m e m ovin END-TO-END GLOBAL SOLUTION The Aceco TI services include all disciplines for establishing a Data Center. This way, clients find in a single supplier all solutions to design and build the Data Center most appropriate to their needs. ca tio n com m i ss i o n i n g D ata Ro om / DATA CENTER TYPES Mission Critical Buildings MISSION CRITICAL SIZE: MEGA Exclusive buildings totally dedicated to the Data Center and other IT environments. They are designed to keep IT, telecommunications, data, voice and image equipment and provide the security and redundancy levels necessary to guarantee the high availability of operations. Ativas – MG Multidisciplinary buildings MULTIDISCIPLINARY SIZE: MEGA Environments established in buildings that share other departments or even companies, where risks for incidents are much higher. These Data Centers demand provably efficient physical security solutions that guarantee data protection and availability, regardless of the risks posed by neighbors. TSE – DF Pre-Fabricated Modular Data Centers SIZE: MEGA Retrofits SIZE: MEGA Built either indoors or outdoors, these Data Centers, differently from the usual containers, have the advantage that they are not limited to standard sizes, as they may be built to meet the clients’ IT needs and to expand whenever necessary. Pado – PR Data Centers in areas that go through technological refreshments with an operating Data Center that does not allow downtimes. FNDE – DF CLIENTS AND PROJECTS MISSION CRITICAL BUILDINGS MISSION CRITICAL BUILDINGS ALOG EQUINIX – SP CLIENTS AND PROJECTS FIRST PHASE Qty. GREEN √ ONGOING √ COMMAND AND CONTROL CENTER √ Description Total FINAL PHASE Qty. COMMAND AND CONTROL CENTER Description √ MONITORING/FIGHTING MONITORING/FIGHTING CCTV 73 Fire 25 CCTV 130 Fire 25 Dry Sprinkler Fe Gas (Dry Pipe) UPS 16 825 kVA 12.200 kVA Generators 7 2.500 kVA 17.500 kVA 64 30 TR Telecom Room 3 30 TR 90 TR UPS Room 16 20 TR 320 TR POWER Dry Sprinkler Fe Gas (Dry Pipe) POWER UPS 2 875 kVA 1.750 kVA COOLING Generators 2 2.500 kVA 5.000 kVA Data Center Precision Precision 8 30 TR 240 TR Telecom Room 2 30 TR 60 TR UPS Room 4 20 TR 60 TR COOLING TOTAL AREA Data Center 800 m² Built-Up Area 3.800 m² TOTAL AREA Data Center 3.200 m² Built-Up Area 6.800 m² ENTRADA E SAIDA INTERNA ENTRADA E SAIDA EXTERNA RACK RACK RACK RACK Server Room 1.494 250 2.000 MISSION CRITICAL SIZE: MEGA ALOG EQUINIX – SP Suspended Cable Tray A national company that provides IT infrastructures to mid- and big-size corporations, Alog Equinix clinched in 2011 a contract with Aceco TI to build the first phase of its third Data Center, located in the city of Barueri, SP. The enterprise was at the time the largest site of the company and took a total investment of R$ 30 million. Recently, Alog Equinix finalized the second phase of the project by investing another R$ 21 million. The contract was signed according to the end-to-end system, both in the first and second phases. The company responsibility ranged from the analysis of the executive project to the integration and execution of all specialties involved (civil construction, power, cooling, connectivity, access control, fire detection and fighting), commissioning, integrated tests and certification. Now, Aceco TI is building another Data Center for Alog Equinix, in Rio de Janeiro. According to Alog Equinix’s Infrastructure Director, Mr. Peter Pretta, the company opted to hire Aceco TI to carry out this project because, besides being specialized in building Data Centers, the company has a highly trained and experienced technical staff. “We believe that Aceco TI has a real condition to add value to Alog Equinix’s Data Center project,” said Mr. Pretta. Another factor that was decisive in the hiring, according to Mr. Pretta, was the project’s finalization deadline. “Due to matters related to internal logistics, Aceco TI had a team mobilized to start working immediately and in full force in order to meet the tight deadlines required by Alog Equinix.” The construction term of the first phase of Alog Equinix’s Data Center in São Paulo was 150 days. The second phase was completed in 120 days. Fire Fighting Total Power Room 1.920 TR CLIENTS AND PROJECTS ALOG EQUINIX – SP Façade Data Center Inside View Condensors UPS Room Meeting room Sluice Door ARSAT – ARGENTINA CLIENTS AND PROJECTS Qty. 1.35 0.85 COMMAND AND CONTROL CENTER √ ONGOING √ Description MONITORING/FIGHTING 75 4,46 CCTV 2,5 2,4 1,5 2,5 1,5 2,5 12,16 1,4 1,4 4,88 1,4 1,4 8,63 1,3 1,1 1,3 2,28 Fighting FM-200 and water Stratos Micra NetWatch 0,96 14,85 15 104 Temperature and liquid sensors POWER UPS 5 825 kVA 4.125 kVA Generator 5 1.634 kVA 8.170 kVA Transformers 5 1.600 kVA 8.000 kVA Chillers 5 370 TR 1.850 kVA 32 116 kVA 3.712 kVA COOLING Precision TOTAL AREA Data Room 150 m² IT infrastructure 1.464 m² Total built-up area 7.900 m² Total land area 38.000 m² CONNECTIVITY Optical fibers Server Room MISSION CRITICAL SIZE: MEGA Façade ARSAT – ARGENTINA Total Command and Control Center Generators Arsat is a mixed capital company responsible for telecommunications, broadcasting and internet services in Argentina. It is a high-technology company whose Data Center had to be in accordance with the market’s chief standards and certifications. Aceco TI won the bid to deliver Arsat’s complete mission critical building, as it offered an integrated, endto-end solution, designed in a modular, scalable form, with all pertinent certifications and executed in nine months, from the physical work to the operations’ start-up. The criticity and diversity of the services delivered to public and private clients in the country required Arsat to certify the availability of its infrastructure by the Uptime Institute and also to obtain the ABNT NBR 15247 certification of its Data Room. The company was also concerned about adopting green criteria, such as the use of solar power, for instance. Arsat’s Data Center is currently the biggest and most up-to-date in Argentina. Server Room Server Room 3.780 pt ATIVAS – MG CLIENTS AND PROJECTS Qty. GREEN √ ONGOING √ COMMAND AND CONTROL CENTER √ UPS 2 550 kVA 1.100 kVA Generators 2 13,8 kVA 27,6 kVA 5 FM-200 Comfort 11 140 TR Data Room 4 212 TR 69 kW UPS Room 4 140 TR 69 kW MONITORING/FIGHTING Fighting COOLING TOTAL AREA Data Room 99,30 m² Infrastructure 1.731 m² Built-up area 5.980 m² CONNECTIVITY Cat. 6 1.200 pt Optical fibers 350 pt MISSION CRITICAL Command and Control Center ATIVAS – MG With a built-up area totaling 11,000 and a US$ 50 million investment, the Ativas Data Center is the first enterprise with a big-size structure of the type in Minas Gerais and one of the top Data Centers in Brazil, with distinct areas for hosting, collocation and mainframe. Built by Aceco TI, the environment has an initial area available for servers of 500 m2, with possibility of reaching 1,500 m2 Its location is strategic in regards to access ways, electric power and telecommunications. Total POWER Building Outside View SIZE: MEGA Description Confined Corridor The electricity is fed by two distinct sub-stations within CEMIG’s ring. The addressing capacity reaches more than 7.5MVA. With Tier III certification granted by the Uptime Institute, TR3 and TÜV, the Ativas Data Center is the first of its kind in South America. Data Center Inside View Cold Water Piping CLIENTS AND PROJECTS ATIVAS – MG Façade Generator Cold Water Piping Power Panels BRADESCO – SP CLIENTS AND PROJECTS Qty. PSERIES IBM2094 1,20 0,80 1,00 1,20 F 1,64 1,60 VTS F DS 8100 26. 06. 08 GA-26 CX.PISO GH-23 7.500 kVA Chiller 3 Servers 3.200 m² Built-up area 10.000 m² CONNECTIVITY GA-23 CX.PISO GH-20 GA-20 CX.PISO CX.PISO GH-17 6.000 kVA 2.500 kVA CX.PISO GH-26 CX.PISO CX.PISO 750 kVA 3 TOTAL AREA 1,60 CX.PISO 8 Generators GA-17 CX.PISO GA-14 CX.PISO GA-11 Cat. 6 Systimax Optical fibers 28.000 pt MISSION CRITICAL Data Center inside view BRADESCO – SP Total UPS Façade SIZE: MEGA Description POWER Bombs Power Cabling over Suspended Tray The Bradesco Data Center, projected by L&M Engenharia, is the first Tier IV project established in Brazil, meaning that Bradesco has the redundancy of the redundancy throughout its infrastructure. It is one of the most updated and with highest availability Data Centers in the country. Building’s Inside View Piping EMBRATEL – SP CLIENTS AND PROJECTS Térreo Qty. COMMAND AND CONTROL CENTER Description √ MONITORING/FIGHTING CCTV 60 Fighting √ Stratos NOVEC 10 POWER Segundo Andar UPS 2 3.200 kVA 6.400 kVA Generators 3 2.500 kVA 7.500 kVA Precision 3 1.584 kVA 4.752 KW Telecom Room 8 405 kVA 3.240 kW COOLING CONNECTIVITY Terceiro Andar Cat. 6 7.824 pt Optical fibers 1.413 pt TOTAL AREA Infrastructure Area 1.339 m² Data Center 1.272 m² Total Area 2.611 m² Quarto Andar Server Room Cobertura MISSION CRITICAL SIZE: MEGA Total Building Outside View EMBRATEL – SP Climatization and Fire Fighting The leading telephone operator in Brazil, with an annual turnover of R$ 8 billion, is building a new mega Data Center to be used for colocation. Aceco TI faced a fierce competition to be picked as the company responsible for this great enterprise, located in the Lapa district of São Paulo. The joint effort between Aceco’s Commercial and Engineering areas resulted in this project, one of the biggest ever carried out by the company. Command and Control Center Confined Server Row CLIENTS AND PROJECTS EMBRATEL – SP UPS Room Bombs Power Panels Chillers and Bombs Server Room Cooling and Fire Fighting LOCAWEB – SP CLIENTS AND PROJECTS Qty. UPS 2 550 kVA Total 2 S29 – 29 kW UPS room 4 7,5 TR LCP 12 18 kW/rack 1.100 kVA COOLING Precision TOTAL AREA High-density environment 137 m² Infrastructure 120 m² Built-up area 500 m² CONNECTIVITY Cat. 6 254 pt Optical fibers 24 pt Data Center Inside View Water Piping Under the Floor Outside Water Piping Racks equipped With LCP Firefighting and Detection LCP-Equipped Racks UPS Batteries MISSION CRITICAL SIZE: BIG Description POWER Water Piping Under the Floor LOCAWEB – SP The Locaweb Data Center in São Paulo is a leading high-density environment. There are 12 racks equipped with LCP – a specific cooling rack system for rack cooling based on cool water. The piping structure necessary to safely take this water from the chillers to the rack is very complex and difficult to install. Aceco TI, in addition to being charged to set up this entire piping network, was also responsible for the construction of the UPS room, the battery room and civil architecture. Power Panels 58 kW 30 TR 216 kW CLIENTS AND PROJECTS SONDA IT – CHILE EXPANSION √ GREEN √ MOVING √ ONGOING √ CCTV 12 Câmeras Bosch Fighting Total FM-200 Stratos 2 Micra 2+2 80 kVA 450 kVA 2 450 kVA 900 kVA Precision 12 S23/S10 - Liebert 250 kVA UPS Room 2 7,5 TR/btu POWER UPS Generators COOLING TOTAL AREA Data Room 93 m² Data Center 360 m² MISSION CRITICAL Command and Control Center SONDA IT – CHILE Description MONITORING/FIGHTING Façade SIZE: MEGA Qty. Generator Sonda IT hired Aceco TI as a regional specialist in assessing sites, designing project alternatives and drawing up ROI (Return On Investment) analyses to conceive of the new and biggest Data Center of the Company in the region. Aceco TI was responsible for the project, the work’s management, the draw-up of the purchase program, teams and services, as well as for the Tier III certification of the environment by the Uptime Institute. Sonda IT received the Data Center Dynamics prize of Innovation in Mega Data Centers in 2012. As total manager of the designing, execution and certification of the Data Center, Aceco TI is very proud of the work carried out at this client. Data Center Inside View Chillers 15 TR T-SYSTEMS – SP CLIENTS AND PROJECTS FIRST PHASE Qty. GREEN √ ONGOING √ COMMAND AND CONTROL CENTER √ Description FINAL PHASE Total Qty. COMMAND AND CONTROL CENTER Description Total √ MONITORING/FIGHTING MONITORING/FIGHTING CCTV 73 Fire 25 CCTV 130 Fire 25 Dry Sprinkler Fe Gas (Dry Pipe) UPS 16 825 kVA 12.200 kVA Generators 7 2.500 kVA 17.500 kVA 64 30 TR Telecom Room 3 30 TR 90 TR UPS Room 16 20 TR 320 TR POWER POWE Dry Sprinkler Fe Gas (Dry Pipe) POWER UPS 2 875 kVA 1.750 kVA COOLING Generators 2 2.500 kVA 5.000 kVA Data Center Precision Precision 8 30 TR 240 TR Telecom Room 2 30 TR 60 TR UPS Room 4 20 TR 60 TR COOLING TOTAL AREA TOTAL AREA Data Center 800 m² Built-Up Area 3.800 m² 1.920 TR Data Center 3.200 m² Built-Up Area 6.800 m² MTS-1 AC AC AC AC AC AC AC AC AC AC st andar 11º floor Building Façade Cool Water Tower MISSION CRITICAL st andar 22º floor Pavimento Térreo Ground Floor SIZE: MEGA T-SYSTEMS – SP A member of the Deutsche Telekom group, T-Systems has been in Brazil for more than ten years, and its Data Center used to be located in the premises of Mercedes-Benz and Volkswagen. The need for expansion prompted T-Systems to decide to build its own Data Center and, for this purpose, it called upon Aceco TI as a consultant to define the place and the way to build it. Sluice Door After a two-year process, Aceco TI assumed both the project and the execution of the work, designed in three stages and in a modular form. One of the biggest in the country, the T-Systems Data Center is Tier III certificated, as well as by the Uptime Institute, attesting to the redundancy of the environment throughout its infrastructure. Power Panels Racks inside the Data Center Generators CLIENTS AND PROJECTS T-SYSTEMS – SP UPS Room Precision Cooling and Firefighting Cool Water Piping Data Center Inside View Data Center Inside View Command and Control Center Condensers Power Panels MULTIDISCIPLINARY BUILDINGS MULTIDISCIPLINARY BUILDINGS AFIP – ARGENTINA Tanques sistema de extinción existentes HALL ACCESO DKC Mass STORAGE DKU Mass STORAGE A°A° Evaporador 65 Kw Qty. rampa 0.15 FM-200 4 IBM 3174 IMP. HP D640 5000 IBM 3494 - ROBOT - IMP. HP D640 5000 A°A° Evaporador 65 Kw IBM S/390 IBM SHARK B4 FM-200 TDA TDB IMP. HP D640 5000 TDB TSB Sector para SUN 450 y SUN 250 No Rackeados 15 C3 TSA UPS 2 300 kVA Generators 2 13,8 kVA 17 17 S. O. FM-200 A AA 22 A°A° Evaporador 65 Kw AA AA AA AA AA AA AA AA AA AA IBM 3490 E B40 A IBM 3490 E B40 AA AA AA AA AA AA AA AA AA AA AA Pleno de aire acondicionado central POWER TOTAL AREA C4 FUTURO VIDEOWALL TDA TDB TSA IBM 3590 C2 TDA TDB A°A° Evaporador 65 Kw N. O. C. 0.15 Data Room 365 m² Built-Up Area 5.980 m² LINHA BASE FACHADA Av. Paseo Colón Avda. Paseo Colón Data Center Inside View Data Center Inside View MULTIDISCIPLINARY SIZE: MEGA Command and Control Center AFIP – ARGENTINA Data Center Inside View AFIP (Administración Federal de Ingresos Públicos) is Argentine’s body charged with the execution of the policies ordered by the national Executive Power regarding the fiscal and customs area, as well as levying taxes for the welfare system. It is the equivalent to Brazil’s Federal Revenue Department. AFIP acquired the largest Data Room ever built by Aceco TI, one of the company’s most representative projects in Latin America. Condensers Total √ 10 A°A° Evaporador 65 Kw (D) IBM 3990 Cond. A° A° IBM 9393 DKC DKU Sun Fire 15K RACK 72" Cabinet IBM RS/6000 Stor EDGE L3500 Ultra ENTERPRICE 10.000 IBM RS/6000 Mass STORAGE 0.40 Mass STORAGE STS B IMPRESORAS Equipo de Aire Acond. Liebert Equipo de Aire Acond. Liebert Mass STORAGE Cond. A° A° IBM 3995 IBM S/390 L700 TAPE LIBRARY (D) B3 TSA TSA 10 IBM 3995 TDA TDB IBM 3494 - ROBOT - TSA FM-200 IBM SHARK TDA Description HITACHI 7700 E STS A B2 0.35 COMMAND AND CONTROL CENTER Calle México TAB. AAC OPERADORES TAB. ILUM. Y TOMAS OPERADORES RACK 72" Cabinet Mass STORAGE L700 TAPE LIBRARY IMPRESORAS TDEA TDEB TSE RESERVADO PARA UNIDAD CERTIFICADORA Sun Fire 15K ACCESO PPAL. SALA OPERADORES Sector para acometida de datos - Fibra Optica A°A° Evaporador 65 Kw 8 Stor EDGE L3500 TS 5 / TS 6 CIRCULACION INTERNA ACCESO CTRO. DE COMPUTOS 0.15 8 10 SUP. SALA = 364,62 m2 IBM 3490 E H10 CLIENTS AND PROJECTS SALA SERVICIOS ARCHIVO GUARDA DE ECONOMATO Ultra ENTERPRICE 10.000 ascensor ascensor montacargas AIRE Y LUZ CENTRAL Data Center Inside View 600 kVA AMSA – CHILE CLIENTS AND PROJECTS Qty. CCTV Total 2 POWER UPS 2 80 kVA 160 kVA Generators 2 260 kVA 520 kVA 4 S23 – 23 kW COOLING Precision TOTAL AREA Data Room 40 m² Infrastructure 80 m² Data Center 100 m² Vista Interna do Data Center MULTIDISCIPLINARY SIZE: MEDIUM AMSA – CHILE The Antofagasta Minerals S/A group is one of the biggest of the Chilean mining industry and, as part of its corporate consolidation, it raised a building in Santiago to centralize operations. When deciding between an inside or outside Corporate Data Center, AMSA found it more economical and manageable to set up a Data Room with all infrastructural sub-systems in order to provide its centralized data and systems with the highest reliability and independence level inside the building. Description MONITORING/FIGHTING Data Center Entrance Firefighting Data Center Entrance Data Center Outside View During the latest earthquake to hit Chile, in 2010, Aceco TI’s Data Room safeguarded the integrity of the assets: its structural resilience allowed it to absorb the vibrations during the quake without affecting operations. Biometric Access 92 kW ANSES – ARGENTINA Qty. CLIENTS AND PROJECTS CCTV 16 UPS 2 150 kVA 300 kVA 6 S20 – 20 kW 120 kW COOLING Precision TOTAL AREA Data Room 135 m² Infrastructure 250 m² Data Center 400 m² CONNECTIVITY Cat. 6A 280 pt Optical fibers 60 pt MULTIDISCIPLINARY Façade ANSES – ARGENTINA Responding for managing the database of pension and retirement funds, ANSES (Administración Nacional de la Seguridad Social) is the Argentinean equivalent of the Brazilian INSS (National Institute of Social Security). ANSES needed to move its Data Center and set in place the most reliable and safe technologies available on the market. When the time came to bid the job, it was still to define the new site and, so, it took advantage of the modularity and flexibility of Aceco TI’s Data Room technology to make it during the bidding, thus saving about one year in the proceedings. Total POWER Data Room Entrance SIZE: MEGA Description MONITORING/FIGHTING Inside View The adaptability of the Data Room allowed it to use the contracted volume, thus defining its geometry and establishment as soon as the agreement was signed. This opened the way for ANSES to engage in new, very sophisticated, IT projects which, without a certificated Data Center, would have to be protracted or disposed of. Inside View Inside View Inside View BANCO DE LA NACIÓN – PERU CLIENTS AND PROJECTS Qty. MOVING √ COMMAND AND CONTROL CENTER √ RETROFIT √ Description Total MONITORING/FIGHTING CCTV 8 Fighting Novec Stratos 4 3 X Micra 25 and 1 X Micra 100 POWER UPS 1+1 160 kVA Generators 1+1 750 kVA 320 kVA Transformers 1+1 750 kVA Data Center 4 74,7 kVA UPS Room 2 20 kVA NOC 2 36.000 TR COOLING 298,8 kVA 40 kVA 72.000 TR TOTAL AREA Data Room 150 m² Data Center 125 m² Façade V-9 3231 3029 2827 2625 SSHH H. 33 34 15 16 17 18 19 20 SSHH M. MULTIDISCIPLINARY P-9 V-26 SSHH H. SSHH M. P-9 P-9 CLI S23 SIZE: BIG Impresora Impresora ROBOT 02 ROBOT 03 CLI S23 ROBOT 04 Impresora BANCO DE LA NACIÓN – PERU RACK TAPE DRIVE ROBOT 01 TDEA3 TDEB3 PCM TDEB1 TDEA1 The Banco de la Nación of Peru is a pioneer in the use of Information and Communications Technologies. The bank set as protection standard for its new Data Center a certified Data Room. Aceco TI, besides offering the ABNT NBR 15247 and EN 1047-2 certified Data Room, had the most consistent solution in terms of engineering, deadlines, prices and conformity with the required standards. The bank’s expansion plans and growth required a safe, reliable Data Center, executed by a company that would guarantee the environment’s quality, deadlines and maintenance. Aceco TI’s proven experience in Data Center construction, not only in Peru, but throughout Latin America, was decisive for us to be picked up by Banco de la Nación. DG EXISTENTE BM S- 01 VIDEOWALL 24 23 22 21 BANCO DO BRASIL – DF CLIENTS AND PROJECTS Qty. MOVING Description MONITORING/FIGHTING CCTV 8 Sensors for humidity, temperature, door, smoke and liquids NetWatch Fighting 1 FM-200 2 PCR125C Comfort 3 30 TR 90 TR Precision 4 S23 - 23 kW 92 kW POWER UPS COOLING TOTAL AREA Data Room 290 m² Data Room Inside View MULTIDISCIPLINARY SIZE: BIG BANCO DO BRASIL – DF Total √ Condensers Cabling Under the Insert Floor Since 1997, Aceco TI has built several Data Centers for Banco do Brasil. The most recent one, finished in 2009, is an environment of nearly 300 m², with equipment moving. Its construction was finished in just 90 days. Marked by planning and logistics effort, this great challenge to Aceco TI was crowned with success. Work Underway Work Underway BNDES – RJ CLIENTS AND PROJECTS Qty. COMMAND AND CONTROL CENTER √ MOVING √ ONGOING √ Description MONITORING/FIGHTING CCTV 10 POWER UPS 2 275 kVA 550 kVA Generators 2 650 kVA 1.300 kVA Comfort 4 10 TR Precision 12 S23 - 23 kW UPS 4 10 TR COOLING TOTAL AREA Data Room 195 m² Condensers 126 m² Generators 20 m² Infrastructure 196 m² Data Center 304 m² Built-up area 446 m² CONNECTIVITY Cat. 6A 1.064 pt Optical fibers 2.022 pt Data Center Inside View MULTIDISCIPLINARY SIZE: BIG Cabling Under the Raised Floor BNDES – RJ Total Data Center Inside View Power Panels Generators Condensers Precision Cooling UPS Room The BNDES (National Economic and Social Development Bank) aims at supporting projects that contribute to the Brazilian development. In order to meet international parameters and improve its services even more, the BNDES has come up with the Agir Project with the unswerving goal of modernizing all its technology. The first big work to set up Agir was the new BNDES Data Center, which Aceco TI designed, built and is maintaining. The environment has Tier III security, that is, all its power and cooling systems are redundant. Aceco TI was also charged with moving the equipment from the old Data Center, located on the 1st floor of the BNDES headquarters in Rio de Janeiro, to the 2nd basement floor of the same building, an appropriate environment to receive a new infrastructure. 40 TR 276 kW 40 TR O BOTICÁRIO – PR CLIENTS AND PROJECTS Qty. GREEN Stratos 5 CCTV 14 NetWatch 1 Humidity, temperature, door, smoke and liquid sensors Fighting 4 FM-200 UPS 4 120 kVA 480 kVA Generators 2 630 kVA 1.260 kVA Precision 9 S23 – 23 kW UPS Room 4 10 TR COOLING TOTAL AREA Data Room 180 m² Data Center 330 m² CONNECTIVITY Cat. 6 376 pt Optical distributor 99 pt Optical fibers 208 pt Automatic Firefighting and Precision Cooling UPS Room O Boticário is acknowledged for its ethical relationships with partners, the community and employees. Using these same quality and responsibility criteria, the company invested in a new Data Center and picked up Aceco TI for its project and construction. Located in São José dos Pinhais, in the Curitiba metropolitan area, this Data Center is one of the most up-to-date in the country and stores data from the entire O Boticário store chain. Aceco TI was involved in its construction, from the project draw-up to the execution of the work and, currently, is responsible for its maintenance. Generators Data Room for Telecom and IT Production Condensers Cabling under Raised Access Floor O Boticário carried out a detailed research in order to decide what would be more interesting in practical and financial terms to the company: to build an in-house Data Center or opt for outsourcing. When it became clear that the first option was more advantageous and Aceco TI was chosen as the most able to bring about the work, the company assumed the project of the annex building and carried out the necessary adaptations to receive the Data Room and its entire attending infrastructure. Later, O Boticário also built with Aceco TI its Data Center backup, an environment also equipped with a Data Room, with 84 m². Micra 25 e 100 POWER MULTIDISCIPLINARY O BOTICÁRIO – PR Total MONITORING/FIGHTING Data Center Inside View SIZE: MEGA Description √ Inside View 207 kW 40 TR CAJA DE VALORES DE BUENOS AIRES – ARGENTINA CLIENTS AND PROJECTS Qty. Description CCTV 30 POWER UPS 2 100 kVA 200 kVA 6 41 kVA 246 kVA COOLING Precision TOTAL AREA Data Center 600 m² Condensers 200 m² CONNECTIVITY Cat. 6A 244 pt Optical fibers 128 pt Data Center Inside View MULTIDISCIPLINARY SIZE: MEDIUM Data Center Inside View CAJA DE VALORES DE BUENOS AIRES – ARGENTINA Total MONITORING/FIGHTING Environment Access Control Data Center Inside View Like in all world capitals, the operations of the Buenos Aires Exchange require total reliability of the integrity of the dealings and a guaranteed systems and communications availability. The strategy to build the Caja de Valores’s Data Center required a re-engineering of the electrical infrastructure of several buildings related to its core activity, converging in the total updating of its primary Data Center. The biggest IT companies of the Latin market were called for the bidding, and Aceco TI was picked for its capacity to design and execute the project. Currently, Caja de Valores also is attended by the company’s Ongoing maintenance service. Data Center Inside View Data Center Inside View Firefighting CANTV – VENEZUELA CLIENTS AND PROJECTS Qty. Fachada MULTIDISCIPLINARY SIZE: MEDIUM CANTV – VENEZUELA CanTV is a leading telecommunications company in Venezuela, as it delivers fixed and movable telephony services and data transmission to millions of users and thousands of companies. Facing the need to prepare its corporative Data Center for a higher criticity stage, the solution proposed by Aceco TI was to design a maximum security environment with 50 m² for its critical servers and storage, with a certified Data Room and the entire necessary infrastructure. The Data Room was expanded in 2004, doubling in size, while the Data Room continued operating, with no interruption of the production. EXPANSION Description √ TOTAL AREA Data Center 93 m² (48 m² + 45 m²) Built-up Area 93 m² (48 m² + 45 m²) Total CLIENTS AND PROJECTS CASAS BAHIA – SP Qty. Description TOTAL AREA Data Room 128,59 m² Data Center Inside View Inside View of the Data Room MULTIDISCIPLINARY SIZE: BIG Façade CASAS BAHIA – SP One of the country’s leading retail chains, Casas Bahia has over 500 stores all over Brazil. Its Data Center, protected with Aceco TI’s Data Room, is located in the company’s Technology Center in São Caetano do Sul, SP. Command and Control Center Data Room Inside View Command and Control Center Data Room Inside View Data Center Inside View Total CONTRALORIA GENERAL – PANAMÁ CLIENTS AND PROJECTS Qty. ONGOING √ RETROFIT √ Description Total MONITORING/FIGHTING CCTV 75 Fighting 2 FM-200 Stratos Micra NetWatch 2Tº, 2%HR, Voltage measurement, AA Alarm, UPS Alarm, FM-200 Failure, Stratos Failure, Door opening POWER UPS 2 40 kVA 80 kVA Generators 1 150 kVA 150 kVA COOLING Precision 26,25 kVA 78,75 kVA TOTAL AREA Data Room 39 m² Data Center 20 m² CONNECTIVITY Cat. 6 190 Optical fibers 1 Façade Posible ubicación de Grupo Generador MULTIDISCIPLINARY SIZE: MEDIUM CONTRALORIA GENERAL – PANAMÁ Controlling agency of the government of Panama, the Contraloría General required its Data Center to have the availability and security indexes on a par with the needs of the State. To secure such a high reliability, the Contraloría selected Aceco TI to build a new Data Center in the same building where the old one was located, while keeping operations during the job and migration. The Data Room modularity was used to execute the project in phases, transforming the old, outdated Data Center into a modern Tier III certified environment. The access difficulty inside the building required a very precise planning by our teams. The establishment was concluded with success within the short period of 150 days. UPS BAT UPS BAT Roxtec para Datos y comunicaciones 4880 DOBLEALTURA 1200 300 600 7905 +0.39 CORREIOS – SP & DF CLIENTS AND PROJECTS SP ONGOING Qty. Description Total √ ONGOING MONITORING/FIGHTING 3 CCTV 4 Micra 25 Stratos Description 1/7 Micra 100 / Micra 25 2/1 64 kVA / 80 kVA 13 S24 – 24 kW Total POWER Sensores de porta, UPS, temperatura e umidade NetWatch UPS 128 kVA / 80 kVA COOLING 2 FM-200 2 200 kVA 400 kVA Precision 9 S23 – 23 kW 207 kW UPS Room 2 10 TR Precision POWER UPS Qty. √ MONITORING/FIGHTING Stratos Fighting DF Data Room COOLING 312 kW TOTAL AREA 349,06 m² 20 TR TOTAL AREA Data Room 195,71 m² Infrastructure 350 m² Data Center 400 m² Data Center Inside View Correios – SP MULTIDISCIPLINARY SIZE: BIG CORREIOS – SP & DF Os Correios (The Brazilian Mail and Telegraph Company) has had Aceco TI Data rooms for over ten years. This example clearly shows how much Aceco TI’s solutions are adaptable to the future and that, if a Data Center maintenance is carried out in a correct way (The Mail (Os Correios) has used the Ongoing service for years) its lifecycle can be long. The Mail (Os Correios) has Data Rooms in São Paulo and Brasilia. Correios – DF CPFL – SP CLIENTS AND PROJECTS Qty. 000,0,00 MONITORING/FIGHTING 000,0,00 0,00 00,00 000,0,00 CCTV 0,00 00,00 000,0,00 000,0,00 Câmeras BOSCH FM-200 Stratos 2 NetWatch 1 Micra POWER UPS 2+2 80 kVA 320 kVA 2 450 kVA 900 kVA Data Center 12 S23 / S10 Liebert 250 kVA UPS Room 2 7,5 TR 0,00 00,00 0,00 00,00 Generators COOLING TOTAL AREA MULTIDISCIPLINARY Command and Control Center Data Room Outside View Condensers “The service provided by Aceco TI was very good, from the project conception down to its execution. It was the first time that we used an end-to-end company. I’m very happy with the result. I’m convinced that end-to-end is the best option for very complex works as of a Data Center. Aceco TI delivered the job on schedule and without contractual addenda.” Marcelo Carreras - IT Director UPS Room “We did the entire moving from the old Data Center to the new one without interrupting the operation. It was a complex, but successful work. We were impressed by the way Aceco TI endeavored to upkeep the environment. Whenever technicians soiled something during the job, a nearby team rushed in to clean up and keep everything organized.” Carlos Alberto Belarmino Teixeira – Architecture, Technology and Security Manager “I’m known here at CPFL as a very demanding, even rigid, person with my suppliers. Even then, I have absolutely no complaints about Aceco TI. On the contrary, the service has been excellent, from construction down to maintenance.” Raphael Basseto – Data Center Operations Coordinator, CPFL 12 Fighting Data Center Inside View CPFL – SP Total 000,0,00 Cooling and Firefighting SIZE: BIG Description ONGOING Generator Data Center Inside View Data Room 93 m² Data Center 360 m² 15 TR DIPOL – SP Qty. 00,00 0,00 ONGOING √ COMMAND AND CONTROL CENTER √ Description MONITORING/FIGHTING 00,00 0,00 00,00 0,00 0,00 00,00 CCTV 15 Fighting 1 FM-200 UPS 2 12 kVA 24 kVA Generators 1 500 kVA 500 kVA Comfort 9 9.000 btu 81.000 btu Precision 6 S23 - 23 kW UPS Room 2 5 TR 00,00 0,00 00,00 0,00 COOLING 00,00 0,00 2.29 00,00 0,00 00,00 0,00 00,00 0,00 D CONNECTIVITY Cat. 6 300 pt Data Center General View MULTIDISCIPLINARY SIZE: BIG Total POWER 02 01 CLIENTS AND PROJECTS 00,00 0,00 00,00 0,00 Command and Control Center DIPOL – SP Data Room Upper View The Intelligence Department of the Civil Police of the State of São Paulo (DIPOL) is the supporting body of the General Police Station, and its goal is to plan, coordinate and support the Telecommunications, Information Technology and Intelligence activities of the Civil Police of the State of São Paulo. It is also its function to plan, coordinate and support the Police Intelligence activities and to plan and coordinate activities to be carried out in the Information Technology and Telecommunications areas of the Civil Police. Recently, DIPOL made a big investment towards improving the service it provides to the population by ameliorating the information security and modernization of all police units. Such investments also involved a modern Data Center, designed and built by Aceco TI, including a Certified Data Room and a Command and Control Center in order to protect and manage current and future technological platforms. Data Room Inside View Data Room Inside View 138 kW 10 TR ELEKTRO – SP CLIENTS AND PROJECTS Qty. ONGOING √ COMMAND AND CONTROL CENTER √ Fighting 1 Stratos 2 CCTV 6 FM-200 POWER UPS 2 120 kVA 240 kVA Generators 2 500 kVA 1.000 kVA Transformers 2 1.000 kVA 2.000 kVA Precision 4 S23 – 23 kW 92 kW UPS room 2 7,5 TR 15 TR COOLING TOTAL AREA Data Room 53 m² Infrastructure 149 m² Built-up area 370 m² CONNECTIVITY Cat. 6 240 pt Optical fibers 448 pt Generators MULTIDISCIPLINARY Data Center Outside View ELEKTRO – SP Total MONITORING/FIGHTING Data Center Inside View SIZE: BIG Description Data Center Inside View UPS room Elektro hired Aceco TI to build a 53 m² Data Room located in Campinas, SP, with an UPS room, new primary cabin, generator room, logic and command and control center, fire detection and fighting systems. Aceco TI received the Elektro Supplier Prize in the Information Technology Category, a tribute granted annually by the company to its best contractors. Power Panel Structured Cabling ELETRONUCLEAR – RJ CLIENTS AND PROJECTS RIO DE JANEIRO Qty. Description Total ANGRA Qty. LCP √ LCP √ MOVING √ LCP √ √ MONITORING/FIGHTING COMMAND AND CONTROL CENTER MONITORING/FIGHTING Fighting 1 FM-200 UPS 2 60 kVA 120 kVA Generator 2 230 kVA 460 kVA Telecom 2 5 TR NOC Room 1 4 TR Precision 3 S23 - 23 kW UPS Room 2 4 TR COOLING 10 TR 4 TR Infrastructure 155 m² CONNECTIVITY Cat. 6 264 pt Optical fibers 20 pt 69 kW 8 TR TOTAL AREA 40 m² CCTV 8 Fighting 4 FM-200 460 kVA UPS 3 2 - 80 kVA / 1 - 30 kVA 190 kVA Generator 2 260 kVA 520 kVA Comfort 2 1,5 TR Precision 3 S29 - 29 kW UPS Room 4 7,5 TR 30 TR LCP 2 5,7 TR 11,4 TR COOLING TOTAL AREA Data Room 70 m² Infrastructure 319 m² Built-up area 180 m² CONNECTIVITY Cat. 6 480 pt Optical fibers 70 pt 00,00 0,00 Rack 0,40x0,80 00,00 0,00 Data Room Inside View 00,00 0,00 00,00 0,00 00,00 0,00 MULTIDISCIPLINARY SIZE: BIG Data Room Outside View Angra – RJ Rio de Janeiro – RJ ELETRONUCLEAR – RJ Chillers Eletronuclear’s main demand was to remove its CPD from inside the Nuclear Plant for the sake of information security, besides the fact that the big increase in the number of employees in the environment was causing serious climatization problems. Since 2006, Aceco TI has worked with this client in an attempt at making that new Data Center feasible. Recently, at 14 km from the plant, an ideal site became available and the work began in earnest. Besides the main site in Angra, Aceco TI also built, in the City of Rio de Janeiro, Eletronuclear’s Backup Data Center. Firefighting and LCP Total POWER POWER Data Room Description Climatization Water Piping 3 TR 87 kW ERICSSON – SP CLIENTS AND PROJECTS Qty. ONGOING Total √ MONITORING/FIGHTING Stratos 1 Micra 25 2 80 kVA Comfort 3 60.000 btu Precision 4 S23 – 23 kW UPS Room 3 60.000 btu POWER UPS 160 kVA COOLING TOTAL AREA Data Room 76 m² Power Panel MULTIDISCIPLINARY SIZE: BIG ERICSSON – SP Description Condensers Cable Trays Ericsson hired the construction of a Data Room with separation for the Telecom area. This is another big company of the private sector that entrusted its critical area to Aceco TI’s specialization. Ericsson is very happy with the company services, especially the Corrective and Preventive Programmed Maintenance Service of Data Centers, Ongoing. In the words of Mr. Franco Michele Galgano, Ericsson’s IT Manager: “Ericsson would hand over [the hiring of] a critical environment, as its Data Center, only to a highly specialized company as Aceco TI. This is so because Aceco has the necessary certifications and, especially, the ISO 9001 quality certification for the maintenance services delivered.” Electric Cabling Under the Floor Cable Trays 180.000 btu 92 kW 180.000 btu CLIENTS AND PROJECTS GRU - GUARULHOS INTERNATIONAL AIRPORT – SP 207 MOVING √ COMMAND & CONTROL CENTER √ ONGOING √ Qty. Description 10 FM-200 Total MONITORING/FIGHTING CCTV 121 122 CONDENSADOAS SUSPENSAS 123 124 125 126 CONDENSADOAS SUSPENSAS CONDENSADOAS SUSPENSAS 206 Fighting Vesda NetWatch CORREDOR TÉCNICO UPS Generator Transformers SALA UPS 64m² SALA DE CRISES 38m² 4 Micra √ POWER SALA COFRE 200m² 205 800 m³ Argonite SALA NOC 108m² SALA STAGING 30m² SALA POP 23m² 1+1 120 kVA 240 kVA 1 500 kVA 500 kVA 1+1 150 kVA 300 kVA COOLING Data Center 8 23 kW 184 kW UPS Room 4 23 kW 92 kW Comfort 4 3 TR 12 TR TOTAL AREA 204 Data Room 200 m² Infrastructure 560 m² Built-up area 560 m² CONNECTIVITY Cat. 6 720 pt Optical fiber 360 pt Data Center Inside View MULTIDISCIPLINARY SIZE: BIG Command and Control Center GRU - GUARULHOS INTERNATIONAL AIRPORT – SP Firefighting UPS Room Crisis Room Confined Row and Cabling Under the Access Floor It’s been some time that GRU (Guarulhos International Airport) was privatized. Invepar, the winning consortium, is made up by OAS and Ascar. The latter is a South-African company that was already familiar with the Data Room technology and decided that it was important that the new GRU counted on that level of security. Then they found that Aceco TI marketed that solution in Brazil on an exclusive basis. This fact was decisive for Aceco TI to be chosen to build this new Data Center. The project was idealized with a scalability projection for up to ten years, that is, the infrastructure was assembled in such a way as to allow that the electric capacity of the environment be progressively expanded according to the demand. The GRU technical team was quite flexible and open to new ideas. The original project lacked the construction of a Command & Control Center, but Aceco TI’s engineers proposed the construction of that environment, as it is key for the country’s leading airport. GRU’s Data Center was built in record time – four months. It is the first airport in Brazil to have a Data Room. PAMI – ARGENTINA C7 E C3 C6 √ ONGOING √ C FM-200 and water Stratos Micra 42 Temperature and liquid sensors UPS 2 250 kVA 500 kVA Generator 2 600 kVA 1.200 kVA Transformers 2 1.000 kVA 2.000 kVA Chillers 2 130 kVA 260 kVA 8 42 kVA 336 kVA AIRE Y LUZ Data Center A C16 C15 A TSNOC NOC TAA-B NOC COOLING TS-SRV-B C13 C14 MONTANTE EXISTENTE C12 C11 B B C9 C10 FM 200 FM200 MONTANTE AGUA EXISTENTE POWER UPS Room √ TOTAL AREA Data Room 124 m² Data Center 426 m² Data Center Inside View MULTIDISCIPLINARY SIZE: MEDIUM Command and Control Center PAMI – ARGENTINA PAMI is the acronym for Programa de Atención Médica Integral, or Integral Health Care Program, a health agency under the Ministry of Health in Argentina. Managed by the Instituto Nacional de Servicios Sociales para Jubilados y Pensionados, the retirees and pensioners service, the PAMI cares for the golden agers, the needy and the veterans of the Malvinas/ Falklands War. Many social assistance plans are run in PAMI’s Data Center. An interruption of the operations would have very negative social repercussions on the government. Data Center Inside View Climatization in Row The building where PAMI’s Data Center was established is old. It was necessary to set in place an electrical infrastructure totally independent from the power of the building in order to provide the Data Center with autonomy, charge increase and high availability. Moreover, it was built without interrupting operations and is equipped with a certified Data Room. Generators & Chillers Total 8 C1 C4 Description Fighting NetWatch TAA-B Nuevo pleno de energia C TCOM-B C2 C5 POSIBLE NUEVA MONTANTE FM200 TCOM-A MONTANTE ELECTRICIDAD EXISTENTE COMMAND AND CONTROL CENTER CCTV TAA-A Nuevo pleno de energia √ MONITORING/FIGHTING C8 CLIENTS AND PROJECTS Qty. MOVING Bird’s View PETROBRAS – RJ CLIENTS AND PROJECTS MACAÉ Qty. Description Total EDISE COOLING Precision Qty. Description 11 21 kW 231 kW 4 60 kW 240 kW 2 10,5 kW 21 kW 1 21 kW 21 kW Precision 2 31 kW 62 kW TOTAL AREA 14 21 kW 294 kW Data Room 309,31 m² Infrastructure 32,46 m² TOTAL AREA Data Room 144,76 m² Tape library 33,04 m² Condensers 73,44 m² Petrobras Macaé Data Center Inside View MULTIDISCIPLINARY SIZE: BIG PETROBRAS – RJ Macaé Edise Petrobras Macaé Petrobrás’s technology and management are entirely based on IT processes underway at the company’s main office building, EDISE, in Rio de Janeiro. To expand the availability and guarantee the continuation of IT operations in case a contingency comes up, a Data Room was built. The place’s entire administrative area was also under Aceco TI’s responsibility. Now in Macaé, in the Campos Basin, Petrobrás has the biggest oil extraction base in Brazil. There, the Data Processing Center did not correspond to the security and infrastructure needs for the projects under development. As a result, a new Data Center was built together with a Data Room to receive all IT area. Later, the Macaé Data Room was expanded twice to receive the new equipment and a new Data Room was built there for a robotized tape filing. PetrobrasEDISE Total COOLING PetrobrasEDISE PODER JUDICIAL DE LA NACIÓN – ARGENTINA CLIENTS AND PROJECTS Qty. CCTV P.Inf. 8 2 120 kVA 240 kVA 4 47 kW 188 kW COOLING Precision TOTAL AREA T NOC Data Room 240 m² Data Center 700 m² Infrastructure 520 m² CONNECTIVITY MULTIDISCIPLINARY Command and Control Center PODER JUDICIAL DE LA NACIÓN – ARGENTINA Total POWER UPS Data Center Inside View SIZE: BIG Description MONITORING/FIGHTING Data Center The Judiciary Power in Argentina launched a full-fledged computerization of the judicial management, referred to as “digital process paper” with the goal of speeding up with greater reliability all proceedings regarding the judiciary management. The first bid of this plan consisted in contracting the drawing and implementation of its new Data Center on which all future computerization plans will be based, by readapting the existing building to convert it into a technological building totally dedicated to TIC. The Aceco TI project involves a civil architecture work, operators’ areas, technical and infrastructural rooms and a Command and Control Center totalizing about 1,500 m² with TIER III infrastructure drawing, and also includes a mission critical environment with a 200 sq. m. Data Room as part of the new Data Center. Data Center Cat. 6 360 pt Optical fibers 96 pt PODER JUDICIAL DE LA PROVINCIA DE SANTA FÉ – ARGENTINA CLIENTS AND PROJECTS Qty. COMMAND AND CONTROL CENTER Total √ MONITORING/FIGHTING CCTV 4 POWER PS 1 40 kVA 40 kVA Comfort 2 12 kW 24 kW Precision 1 23 kW 23 kW COOLING TOTAL AREA Data Room 18 m² CONNECTIVITY Cat. 6A 144 pt Optical fibers 120 pt Data Room Outside View MULTIDISCIPLINARY SIZE: MEDIUM PODER JUDICIAL DE LA PROVINCIA DE SANTA FÉ – ARGENTINA This project was the result of an IT management investigation by the Judicial Power of the Santa Fe province, Argentina, which assessed different alternatives to design its Data Center. Starting from this research and based on the projects previously carried out on a national and provincial levels, the solution adopted was to set up a Data Room. The environment is small, but totally designed to grow modularly both in dimensions and redundancy, integrating complementary civil architecture works. This has allowed the use of the available budget to reach the highest quality standards and even then achieve considerable room saving. Description Data Room Entrance Data Room Entrance POLÍCIA FEDERAL – DF CLIENTS AND PROJECTS Qty. Total Stratos 4 CCTV 8 Micra 25 Fighting 2 FM-200 UPS 3 160 kVA 480 kVA Generators 1 500 kVA 500 kVA Comfort 2 5TR Precision 5 S23 – 23 kW UPS room 6 10 TR POWER CLIMATIZATION TOTAL AREA Data Room 136 m² Built-up area 245 m² Infrastructure 116 m² CONNECTIVITY Data Center Inside View MULTIDISCIPLINARY SIZE: BIG Description MONITORING/FIGHTING Data Center Upper View POLÍCIA FEDERAL – DF Data Center Upper View This project, the result of almost six years of work, was approved especially due to some goals of the Federal Police Department of the Federal District, which involve data centralization and the preparation for the 2014 World Cup, as Brasilia will be one of the cities where the games will take place. Data Center Inside View Cat. 6 450 pt Optical fibers 350 pt 10 TR 115 kW 60 TR PROCURADORIA GERAL DA REPÚBLICA (PGR) – (DF) CLIENTS AND PROJECTS Qty. MOVING √ ONGOING √ Description MONITORING/FIGHTING CCTV 5 Fighting 1 FM-200 3 S23 – 23 kW COOLING Precision TOTAL AREA Data Room 44 m² Built-up area 67 m² Vista Interna do Data Center MULTIDISCIPLINARY SIZE: MEDIUM PROCURADORIA GERAL DA REPÚBLICA (PGR) – (DF) Total Cabling under Raised Floor Procuradoria Geral da República (PGR), known as the site where the physical representation of the federal Public Attorney’s Office, the attorneyships are allocated. At Procuradoria Geral da República (PGR) in Brasilia, Deputy Attorneys General, as well as the Attorney General and his substitute, carry out their duties. The PGR members work at the STF (Federal Supreme Court), the STJ (Superior Court of Justice) and the TSE (Superior Electoral Court). All such agencies, included among the most important of the Federal Government, had their Data Centers built by Aceco TI. Firefighting and Precision Cooling Data Room Entrance 69 kW PRODAM – SP CLIENTS AND PROJECTS Qty. Data Center Inside View MULTIDISCIPLINARY SIZE: MEDIUM PRODAM – SP Prodam is the Information and Communication Technology Company of the City of São Paulo. As it moved its Data Center from Ibirapuera to a new site, located in the Água Branca district, there came up the demand to transfer the existing Data Room and computer equipment to the new place, together with the total allocation of the infrastructure of both power and servers of the corporate data bank, as well as mainframe, robot and disks. Due to the distance between the old and new Data Center, the move was highly complex, as it was carried out with the equipment operating. ONGOING √ COMMAND AND CONTROL CENTER √ MOVING √ Description Total POWER UPS 1 300 kVA 300 kVA Generators 1 750 kVA 750 kVA Precision 4 S23 - 23 kW 92 kW UPS room 3 15 kW 45 kW COOLING TOTAL AREA Data Room 51 m² Infrastructure 131 m² Built-up area 280 m² CONNECTIVITY Cat. 6 600 pt Optical fibers 75 pt PRODESP – SP Qty. EXPANSION Description Total √ TJ - SP MOVING MONITORING/FIGHTING Qty. Description MONITORING/FIGHTING Stratos 4 CCTV 14 2 M-25 e 2 M-100 CCTV 6 POWER POWER UPS 10 160 e 220 kVA 1.720 kVA Generators 2 290 kVA 580 kVA Precision 8 S23 - 23 kW 184 kW UPS room 2 15 TR UPS 2 120 kVA 240 kVA Generators 2 290 kVA 580 kVA 5 S23 - 23 kW 115 kW COOLING Precision COOLING TOTAL AREA Data Room 141 m² Infrastructure 190 m² Built-up area 272 m² 30 TR TOTAL AREA Data Room 194 m² UPS room 25 m² Data Center Outside View MULTIDISCIPLINARY SIZE: BIG Data Center Inside View PRODESP – SP Raised Floor Installation The Data Center of the Data Processing Company of the State of São Paulo runs information that requires the highest availability level. Offices of Poupa Tempo (time saving units meant to cut red tape), for instance, serve about one thousand people a day each. Should such offices stop operating, citizens would be badly harmed. This is a risk Prodesp cannot run. Firefighting At Prodesp’s, there are three Aceco TI Data Centers protected with Data Rooms, of which one hosts the data of the São Paulo Court of Justice (TJ). Precision Cooling Total √ 00,00 0,00 CLIENTS AND PROJECTS SP Power Panel PRODEST – ES √ ONGOING √ Description Total MONITORING/FIGHTING 0000,0,00 0,00 00,00 CCTV 18 Fighting 2 FM-200 Generators 2 564 kVA 1.128 kVA UPS 2 225 kVA 450 kVA 0000,0,00 0000,0,00 0000,0,00 0000,0,00 POWER enofele T 3 0 8 3 1 5 8 0 enofele T emoN 2 6 9 # * 7 4 1 9 # emoN 2 6 4 7 * 1 5 8 0 4 7 * # 9 5 2 36 Nome Telefone COOLING Telefone enofele T Telefone 36 2 1 7 * 8 0 9 # 3 36 2 1 5 4 7 * 8 0 9 # 9 # 3 2 6 5 4 1 5 8 0 enofele T emoN Nome Nome 4 7 * emoN 2 6 9 # 1 5 8 0 4 7 * enofele T 3 emoN 2 6 9 # 1 5 8 0 4 7 * 2 5 8 7,5 TR 30 TR 4 S23 - 23 kW 93 kW UPS room 2/2 2,5 TR/5 TR 5 TR/10 TR 1 4 7 * 4 enofele T 0 Comfort Precision 3 6 9 # emoN 3 6 9 # 2 5 8 0 enofele T 1 4 7 * emoN 3 6 9 # 2 5 8 0 enofele T 1 4 7 * emoN CLIENTS AND PROJECTS Qty. COMMAND AND CONTROL CENTER TOTAL AREA Data Room 130 m² MF Room – 90 64 m² Infrastructure 133 m² Built-up area 1.200 m² Colocation Room Interior MULTIDISCIPLINARY SIZE: MEGA Façade PRODEST – ES Command and Control Center Inside View of Confined Rack Passageway Projected and built by Aceco TI, the Data Center of the Data Processing Company of Espirito Santo is the biggest in that state. It is a big, complete project, with a Data Center with 130 square meters in size and 1,200 m² of built-up area. Cabling under Raised Floor Outside View of Confined Rack Passageway CLIENTS AND PROJECTS PRODEST – ES Cabling under Raised Floor Condensers Command and Control Center Outside View Cabling under Raised Floor Generator Electricity Distribution Boards Data Center Inside View Data Center Inside View Data Center Outside View Fire Control CLIENTS AND PROJECTS SABESP – SP MULTIDISCIPLINARY SIZE: BIG SABESP – SP The largest basic sanitation utility company of Latin America and the sixth largest in the world projected and built its Data Center, including equipment moving, through Aceco TI. The Data Room was built as the old Data Center went on operating. It was a long, complex, albeit successful, selling process that took almost a decade to come true. Qty. MOVING Description Total √ MONITORING/FIGHTING UPS 2 225 kVA UPS room 2 5 TR Precision 6 S23 – 23 kW 450 kVA COOLING TOTAL AREA Data Room 94 m² CONNECTIVITY Cat. 6 600 pt 10 TR 138 kW SECRETARIA DA FAZENDA – AC CLIENTS AND PROJECTS Sefaz – Oca OCA Qty. Description Total POWER UPS 40 kVA 80 kVA 1 200 kVA 200 kVA Precision 2 S23-23 kW 92 kW UPS room 2 S17-17 kW 34 kW Generators COOLING TOTAL AREA Data Room 48,14 m² Infrastructure 168,01 m² CONNECTIVITY 26,25 m² CABLING Optical fibers SEFAZ – AC 48 pt Qtde Descrição Total POWER Sefaz – AC UPS 2 100 kVA 200 kVA Generators 1 260 kVA 260 kVA Precision 4 S23-23 kW UPS Room 2 60 kbtu COOLING 92 kW 120 kbtu TOTAL AREA Data Room 48 m² Infrastructure 75,76 m² MF120 CONNECTIVITY 264 pt Optical Fibers DTIC Data Room View 104 pt Qtde Descrição UPS Sefaz – DTIC 2 60 kVA Precision 4 S23-23 kW 69 kW UPS Room 2 48 kbtu 96 kbtu TOTAL AREA Cooling and Fire Detection Data Room 35 m² Infrastructure 69,23 m² MF120 32,34 m² CONNECTIVITY SECRETARIA DA FAZENDA – AC Optical fibers Debunking the image of a small, faraway state, Acre has heavily invested in IT, a fact that put it quite ahead several other much bigger states. Secretaria da Fazenda, the Finance Department of the State of Acre has already purchased three Data Rooms for different agencies. The first Room was bought by the Department itself, and it has already been expanded. Like all projects in Acre, it posed a big logistical challenge to Aceco TI due to the distance that the elements and other implanted solutions had to overcome. Data Center Building Together with the expansion of this Data Room, another two were hired: one for OCA (Central Service Agency) and another for DTCI (Information and Communication Technology Department). This big investment is considered a landmark for the State of Acre, as it has now one of the most up-todate Finance Departments in the country. Cabling 120 kVA COOLING MULTIDISCIPLINARY SIZE: MEDIUM Total POWER Generator Data Center Civil Works 88 pt CLIENTS AND PROJECTS SECRETARIA DA FAZENDA – CE Descrição Total Stratos 1 Micra 25 CCTV 4 Fighting 1 FM-200 UPS 2 60 kVA 120 kVA Generators 1 180 kVA 180 kVA 3 S23 – 23 kW √ MONITORING/FIGHTING POWER COOLING Precision TOTAL AREA Data Room 44 m² Data Center 80 m² CONNECTIVITY Data Center Inside View MULTIDISCIPLINARY SIZE: MEDIUM Qtde MOVING Command and Control Center SECRETARIA DA FAZENDA – CE Data Room Entrance Following on the steps of other Finance Departments that have updated their Data Centers, Secretaria da Fazenda of Ceará also hired Aceco TI and set in place a Data Room. The environment was built with the Data Center operating, including equipment moving. Data Center Inside View Cat. 6 300 pt Optical fiber 150 pt 69 kW SECRETARIA DA FAZENDA – SP CLIENTS AND PROJECTS Qtde ONGOING Descrição MONITORING/FIGHTING Stratos 6 CCTV 9 Fighting 1 FM-200 UPS 2 300 kVA 600 kVA Generators 2 575 kVA 1.150 kVA Comfort 3 24.000 btu 72.000 btu Precision 12 S23 - 23 kW UPS room 2 10 TR POWER COOLING TOTAL AREA Data Room 106,91 m² Built-up area 490 m² CONNECTIVITY Cat. 6 250 pt Optical fibers 388 pt Facilities Before the Work Moving MULTIDISCIPLINARY SIZE: BIG SECRETARIA DA FAZENDA – SP Secretaria da Fazenda, the Finance Department of the State of São Paulo recently hired Aceco TI to build its Data Center. The work execution went so smoothly that it was finished before the stipulated term. The Ongoing service was contracted together with the job. Total √ Moving Facilities Before the Work Facilities Before the Work Facilities Before the Work 276 kW 20 TR SENIAT – VENEZUELA CLIENTS AND PROJECTS Qtde 3D Pop-up MULTIDISCIPLINARY SIZE: MEDIUM SENIAT – VENEZUELA SENIAT (Servicio Nacional Integrado de Administración Aduanera y Tributaria), the Venezuelan customs and tax administration, launched an international bidding to pick up the company that would build its new Data Center. Among all Latin American players, Aceco TI was chosen. Our first mission was to assess and define the most convenient place to build the new Data Center. We opted to design an independent building in the parking area of the corporate building. All levying, foreign trade, customs and tax evasion control depend on SENIAT’s Data Center reliability. To guarantee the security of such data, a certified Data Room with Tier III infrastructure was raised. GREEN Descrição Total √ MONITORING/FIGHTING CCTV Fighting 8 √ FM-200 POWER UPS 2 120 kVA Generators COOLING Precision 4+2 Liebert M35 UPS room TOTAL AREA Data Room 110 m² Data Center 152 m² CONNECTIVITY Cat. 6 √ 10 Gbps 240 kVA Qty. FAN COIL CASSETTE CLI 1P-44 FAN COIL CASSETTE CLI 1P-45 FAN COIL CASSETTE CLI 1P-43 FAN COIL CASSETTE CLI 1P-42 Total Stratos 4 CCTV 16 Micra 100 FAN COIL CASSETTE CLI 1P-41 FAN COIL CASSETTE CLI 1P-39 POWER FAN COIL CASSETTE CLI 1P-38 FAN COIL CASSETTE CLI 1P-46 UPS FAN COIL CASSETTE CLI 1P-40 30 274 30 30 64 20 20 30 264 23 40 135 30 37 30 273 30 274 QF-AT-2 0.80 TDFC-13 0.80 0.80 92 30 396 30 338 30 Precision 4 58,5 kW 234 kW UPS room 4 15 TR TANQUE DIARIO PETROLEO G2 TOTAL AREA TANQUE DIARIO PETROLEO G3 03 TG2 TG3 03 03 03 TG1 03 TGSA 600 kVA 02 02 02 TANQUE DIARIO PETROLEO G1 TSA-G1 TSA-G2 TSA-G3 300 kVA COOLING 46 FAN COIL CASSETTE CLI 1P-37 02 02 ACHURADO INDICA EQUIPOS FUTUROS 02 2 QF-UPS-SP-1 SANITARIO QF-AT-UPS-2 QLF-SP-1 TDAC + CLIMA 3 30 QLF-SP-2 80 Data Center General View MULTIDISCIPLINARY SIZE: MEGA Description MONITORING/FIGHTING 03 CLIENTS AND PROJECTS SONDA IT – SP Data Center General View SONDA IT – SP With a presence on the Brazilian market spanning more than 20 years, Sonda IT offers integrated IT, application software and business management systems service solutions using the most acclaimed global platforms. Currently, Sonda IT is targeting its IT services to meet the demand of clients lacking in Data Centers. Aceco TI, thus, became a strategic supplier. Sonda wanted to build a new headquarters in Santana do Parnaíba, near Alphaville. Aceco TI introduced to the client the Tiers concept and the standards and concepts involved in the high-availability environment certification process with physical security. Although competitors had vied for the sale, the fact that we offered a Tier III Certified Data Center was decisive for Sonda to choose Aceco TI to design and carry out the project. Data Center General View Precision 210 m² Infrastructure 90 m² Built-up area 300 m² 60 TR SUPERIOR TRIBUNAL DE JUSTIÇA (STJ) – DF CLIENTS AND PROJECTS Qty. MOVING Description Total √ MONITORING/FIGHTING Stratos 2 CCTV 5 Micra 25 e 100 Fighting 1 FM-200 UPS 2 60 kVA 120 kVA Generators 1 260 kVA 260 kVA Precision 4 S23 – 23 kW 92 kW UPS room 2 5 TR 10 TR POWER COOLING TOTAL AREA Data Room 41 m² Infrastructure 20 m² CONNECTIVITY Cat. 6 100 pt MULTIDISCIPLINARY SIZE: BIG SUPERIOR TRIBUNAL DE JUSTIÇA (STJ) – DF Aceco TI has built safe and highly reliable Data Centers of all superior bodies of the Brazilian government. The latest one to hire Aceco TI to build a Data Room was the Superior Court of Justice (STJ), whose purchase process was guided by other success cases, such as of the Federal Supreme Court (the first superior body to buy the Data Room), the Superior Labor Court and the Federal Public Attorney’s Office. The STJ project is complete, and has all the infrastructure and redundancy necessary to the environment’s high availability. Facilities Before the Work Facilities Before the Work SUPREMO TRIBUNAL FEDERAL (STF) – DF CLIENTS AND PROJECTS Qty. Current status ONGOING √ COMMAND AND CONTROL CENTER √ Total MONITORING/FIGHTING Stratos 1 CCTV 5 NetWatch 1 Humidity, temperature, door, smoke and liquid sensors Fighting Micra 25 1 FM-200 1 75 kVA 75 kVA 3 S23 - 23 kW 69 kW POWER UPS COOLING Precision Growth TOTAL AREA Data Room 43 m² Expansion 60 m² CONNECTIVITY Cat. 6 216 pt Data Center Inside View MULTIDISCIPLINARY SIZE: MEDIUM Description Cabling Under The Raised Floor SUPREMO TRIBUNAL FEDERAL (STF) – DF Supremo Tribunal Federal, the Federal Supreme Court was the first among Superior Courts to buy a Certified Data Room from Aceco TI. Based on the decisions by the National Account’s Tribunal (TCU), The Federal Accounts Office, the sale was brought about through an unenforceable character, proving the Data Room solution exclusiveness. Data Center Inside View Data Center Door Precision Cooling and Fire Detection Data Room Door Condensers TRIBUNAL DE CONTAS DA UNIÃO (TCU) – DF CLIENTS AND PROJECTS Qtde MOVING √ ONGOING √ COMMAND AND CONTROL CENTER √ Descrição MONITORING/FIGHTING Stratos 3/4 CCTV 16 Fighting 1 NetWatch 3 Micra 25 / Micra 100 FM-200 POWER UPS Generators 2/1 64 kVA / 80 kVA SIZE: MEDIUM TRIBUNAL DE CONTAS DA UNIÃO (TCU) – DF The TCU, Federal Accounts Office helps Congress in the accounting, financial, budgetary, operational and pecuniary inspection of the federal government, as well as direct and indirect administration entities in regards to their legality, legitimacy, economy, subvention granting and revenue waiving. Thus, it is an agency that determines to other public agencies how they should proceed in their hiring and bidding policies. The TCU has been involved in Aceco TI’s day-to-day matters regarding its sales to the public sector by issuing opinions attesting to the quality and advantages of is solutions. In 2009, the TCU had to build a new Data Center. Following a strict procedure, Aceco TI was picked as the appropriate company to carry out the project. 128 kVA / 80 kVA 1 380 kVA 380 kVA Precision 3 10 TR 30 TR UPS Room 4 5 TR 20 TR Comfort 1 1 TR 1 TR Command and Control Center 2 3 TR 6 TR COOLING TOTAL AREA Data Center 58 m² MF-120 63 m² Infrastructure 149 m² CONNECTIVITY MULTIDISCIPLINARY Total Cat. 6 140 pt Optical fiber 136 pt TRIBUNAL DE JUSTIÇA – SP CLIENTS AND PROJECTS Qty. 00,00 0,00 ONGOING √ COMMAND AND CONTROL CENTER √ Description Total 00,00 0,00 00,00 0,00 00,00 0,00 MONITORING/FIGHTING 00,00 0,00 00,00 0,00 00,00 0,00 00,00 0,00 00,00 0,00 00,00 0,00 00,00 0,00 Stratos 1 CCTV 5 Micra 25 Fighting 1 FM-200 1 75 kVA Comfort 2 24.000 btu Precision 1 S17 – 17 kW POWER UPS 75 kVA COOLING TOTAL AREA Data Room 5 m² CONNECTIVITY Cat. 6 Command and Control Center MULTIDISCIPLINARY SIZE: MEDIUM TRIBUNAL DE JUSTIÇA – SP Data Room Entrance The main asset of the Tribunal de Justiça (Court of Justice of São Paulo) is information. There are millions of suits with invaluable data. The responsibility of the Court is to watch over the privacy of the community of our State and the credibility of the Judicial Power by making sure, among other things, that the information exchanged between it and the lower courts is kept top secret. To ensure this protection, the Court of Justice of São Paulo set in place an Aceco TI Data Room with all options. To improve efficiency, control and management of the IT operations and infrastructure, the Court of Justice of São Paulo put in place a modern Command and Control Center, also built by Aceco TI. Generator Firefighting and Cooling 30 pt 48.000 btu 17 kW CLIENTS AND PROJECTS TRIBUNAL ELECTORAL – PANAMÁ Qty. Data Room Data Room Maintenance MULTIDISCIPLINARY SIZE: MEDIUM TRIBUNAL ELECTORAL – PANAMÁ The Tribunal Electoral (Electoral Court of Panama) provides IT services to the government in areas that go beyond the management of the electoral process. There was a demand to set in place a Data Center in the landmark building it occupies today. Aceco TI was asked to provide an engineering support to several alternative studies that made feasible the establishment of a top-quality IT environment that could be executed in record time. The option chosen was to readapt the existing Data Center, while the equipment was kept operating, by establishing a Data Room. Description TOTAL AREA Data Room Maintenance Data Room Maintenance 49,46 m² Total TRIBUNAL REGIONAL DO TRABALHO (TRT) – MG CLIENTS AND PROJECTS Qtde Descrição Stratos 2 CCTV 6 Micra 25 Fighting 1 FM-200 UPS 2 60 kVA 120 kVA Generators 1 170 kVA 170 kVA Precision 3 S23 – 23 kW UPS Room 2 36.000 btu POWER COOLING TOTAL AREA Data Room 60 m² Infrastructure 70 m² Total Area 130 m² CONNECTIVITY Cat. 6 288 pt Optical fiber 72 pt Data Center Entrance MULTIDISCIPLINARY SIZE: MEDIUM TRIBUNAL REGIONAL DO TRABALHO (TRT) – MG Total MONITORING/FIGHTING Generators The sale of an Aceco TI Safe Data Center to the Tribunal Regional do Trabalho (Superior Labor Court) served as model for several Regional Labor Court all over Brazil to also invest in security. That was the case of the Minas Gerais Regional Labor Court, who contracted Aceco TI to build its Safe 217 m² Data Center. Condensers Data Center Entrance 69 kW 72.000 btu CLIENTS AND PROJECTS TRIBUNAL REGIONAL DO TRABALHO – SP MULTIDISCIPLINARY SIZE: MEDIUM TRIBUNAL REGIONAL DO TRABALHO – SP The Tribunal Regional do Trabalho (Regional Labor Court of São Paulo) hired Aceco TI to build its 255 m² Safe Data Center. In 2005, the TRT-SP had already installed two Stratos Early Fire Detection systems made up by 29 equipment units divided into the building’s 25 floors. MOVING √ ONGOING √ Qty. Description 3\2 Micra 25 \ Micra 100 Total MONITORING/FIGHTING Stratos CCTV 8 Fighting 1 FM-200 UPS 4 80 kVA 320 kVA Generators 2 330 kVA 660 kVA Precision 5 S23 – 23 kW 115 kW UPS Room 2 5 TR Comfort 2 36.000 kW POWER COOLING TOTAL AREA Data Room 56 m² Data Center 255 m² Infrastructure 40 m² TRIBUNAL SUPERIOR ELEITORAL (TSE) – DF CLIENTS AND PROJECTS Qty. Description Fighting 1 FM-200 Stratos 2 Micra 25 e 100 Humidity, temperature, door, smoke and liquid sensors NetWatch COOLING Precision 4 S20-20 kW TOTAL AREA Data Center 135,70 m² Data Center Inside View MULTIDISCIPLINARY SIZE: BIG TRIBUNAL SUPERIOR ELEITORAL (TSE) – DF Total MONITORING/FIGHTING Power Panel Data Center Inside View Data Center Inside View The Brazilian electoral process is one of the most advanced and fastest in the world. Almost entirely computerized, it is a process that depends on availability and reliability to uphold its legitimacy. Since 2006, all data with the votes of Brazilian citizens have been computed in servers protected by an Aceco TI Data Room. Firefighting Data Room Door CCTV 80 kW WALMART – SP CLIENTS AND PROJECTS Descrição ONGOING MONITORING/FIGHTING Fighting 2 FM-200 1 FM-200 (ampliação) 4 S23-23 kW COOLING Precision Data Room Façade MULTIDISCIPLINARY SIZE: MEDIUM WALMART – SP Total √ Data Room Entrance Walmart was introduced to the Aceco TI Data Room technology when it bought the Bompreço supermarket chain, who had had such environments for a long time. Now Walmart has not only built its own Data Room, but it has also built its backup site with Aceco TI in Tamboré, SP, and expanded it without interrupting the equipment operation. Condensers Power Panel 92 kW PRE-FABRICATED MODULAR DATA CENTERS PRE-FABRICATED MODULAR DATA CENTERS COLLAHUASI – CHILE CLIENTS AND PROJECTS Qtde CCTV Total 5 POWER UPS 2 40 kVA 80 kVA 3 47 kVA 141 kVA COOLING Precision TOTAL AREA Outside View and Condensers SIZE: BIG COLLAHUASI – CHILE Descrição MONITORING/FIGHTING Inside View Minera Collahuasi, one of the leading companies of the Chilean mining industry, needed to set up a Data Center to command its mineral exploration and exploitation activities 4,400 meters above sea level on the Andes Mountains. The complexity of this case required that the project be structured in a modular way, with a Data Room that could be taken disassembled to the extraction field, where it would be quickly and safely installed. The infrastructure design was drawn up by Aceto TI’s Engineering. Studies were carried out to establish free-cooling systems and a solution with high, certified safety level was developed at a lower cost than required for usual buildings, since the site’s cold temperatures were used to refrigerate the Data Center. Power Panel Data Room 100 m² Condensers 660 m² PADO – PR CLIENTS AND PROJECTS Qty. ONGOING Total MONITORING/FIGHTING CCTV √ FIGHTING √ Stratos √ 3 FM-200 1 NetWatch Micra 25 Netbotz POWER AR3100 PRODUCT INFORMATION AR3100 AR3100 AR3100 275.2 LBS [124.5 kg] 275.2 LBS [124.5 kg] 275.2 LBS [124.5 kg] 275.2 LBS [124.5 kg] NetShelter SX 42U 600mm NetShelter SX 42U 600mm NetShelter SX 42U 600mm NetShelter SX 42U 600mm APC PRODUCT INFORMATION PRODUCT INFORMATION APC PRODUCT INFORMATION APC PRODUCT INFORMATION APC UPS 3 16 kVA 48 kVA Generators 1 460 kVA 460 kVA 3 10 kW NOITAMROFNI TCUDORP COOLING Precision √ CONNECTIVITY Cat. 6 √ 200 pt Optical fiber √ 100 pt Optical distributor √ 100 pt TOTAL AREA Container Data Center Inside View SIZE: MEDIUM PADO – PR When we hear of the Pado trademark, its famous padlocks come immediately to our minds. In fact, Pado also makes hinges, locks, handles and other accessories. Established in 1936, the company started up as a foundry. The designation Pado was formed by the first two letters of the surnames of two of its partners: Paioletti and Dorner. In 2009, we were given an authorization by the company to run a fast-track risk analysis. At the occasion, vulnerabilities were identified in the high-criticity environment. At the end of 2010 and early 2011, a project to establish a new Data Center was started: it would be of the conventional type, with masonry walls, with approximately 25 m² in size, a UPS room and access hall. The project included precision climatization, raised floor, monitoring system and early fire detection. The solution was perfect for Pado’s needs, especially because it was fast and modular, besides offering the possibility to change the environment’s place in the future. The project was then adapted and the conventional Data Center was replaced by the Container. The Container Data Center sold to Pado has F-90 fire-proof walls especially coated to be assembled in an outdoor environment. The climatization system is of the in-row type, independent from the environment outside the rack, with a 30kW refrigeration capacity. The solution also included an FM-200 gas firefighting and remote infrastructural monitoring. Description √ Confined row Infrastructure area 28 m² Data Center 28 m² Total Area 56 m² 30 kW CLIENTS AND PROJECTS PADO – PR DCMPF Outside View Container Data Center And Firefighting Inside View DCMPF Entrace Condensers Firefighting System RODOBENS – SP Description Total √ MONITORING/FIGHTING 0,00 00,00 CCTV 3 Câmeras Fighting 1 FM-200 Stratos 1 Micra 100 APC Netbotz 00,00 0,00 0,00 00,00 √ POWER 0,00 00,00 0,00 00,00 CLIENTS AND PROJECTS Qty. ONGOING UPS 1+1 60 60 1 125 125 2+1 30 60 Generator Cooling Units COOLING Precision 3 30 kVA 60 kVA CONNECTIVITY Cat. 6 124 pt TOTAL AREA DCMPF area 39 m² IT infrastructure 150 m² DCMPF Outside View SIZE: BIG RODOBENS – SP Rodobens Negócios e Soluções was looking for a solution that could meet the widely varied IT demands of its group, as it regarded business units involved from banks to insurance, and from leasing to car rental. After a number of scenario and analysis studies on performance, efficiency, reliability, availability, expansion and operating costs, the best alternative was found to be the establishment of an outdoor PreFabricated Modular Data Center. Confined Row DCMPF Entrance To protect company data, the Data Center has 47U racks, with the telephony, backup and server areas physically separated, redundant precision air conditioners, high-energy UPS systems, early fire detection and gas firefighting mechanisms. Moreover, the structure also offers protection against fire, smoke, water, humidity, corrosive gases and break-ins. Power Panel Condensers VSE – SP CLIENTS AND PROJECTS Qty. ONGOING Description Total √ MONITORING/FIGHTING CCTV 2 Fighting FM-200 Stratos DATA CENTER Câmeras 1 Micra UPS 1 40 kVA 40 kVA Generator 1 55 kVA 55 kVA 3 17 kVA 51 kVA NetWatch √ POWER COOLING Precision TOTAL AREA DCMPF area 20 m² Vista Externa do DCMPF SIZE: BIG VSE – SP Vale Soluções de Energia is a division of the Vale mining company that researches alternative energy solutions. The company needed a safer and more economic Data Center that would not entail higher operating costs, while offering shorter deadlines and lower costs. During Aceco TI’s sales convention, we installed a DCMPF to show our employees the benefits and differences of the solution. At the occasion, some VSE executives took a tour of the DCMPF and found they liked the solution a lot, as it excelled in terms of modularity and facility to set up. Rack Row DCMPF Entrance Buying a DCMPF was also an advantage to VSE in regards to connectivity. It was built near a primary cabin, a fact that made it easier to install optical fibers. Hiring the Ongoing services was important for VSE to lower its operating costs. This way, Aceco TI takes care of the environment for the client. DCMPF Entrance RETROFITS RETROFITS EDS – SP CLIENTS AND PROJECTS Qty. ONGOING Description Total √ MONITORING/FIGHTING Stratos 1 CCTV 16 POWER UPS 4 500 kVA 2.000 kVA Generators 1 2.000 kVA 2.000 kVA Precision 6 30 TR 180 TR UPS Room 1 15 TR 15 TR COOLING TOTAL AREA Data Center 1.132 m² Infrastructure 300 m² Data Center Inside View SIZE: MEGA EDS – SP The EDS Data Center is one of the main cases of conventional Data Centers built by Aceco TI for a private company. The company provided the project and the work, with infrastructural adaptation to the Data Center environment, especially POWER. Generators Condensers Data Center Inside View FNDE – DF Qty. Description CLIENTS AND PROJECTS CCTV 5 Fighting 1 FM-200 UPS 2 120 kVA 240 kVA Generators 1 310 kVA 310 kVA Precision 3 S23–23 kW 39 kW Comfort 2 60.000 btu 120.000 btu POWER COOLING TOTAL AREA Data Center 65 m² Data Center Inside View Access Control SIZE: MEDIUM FNDE – DF Data Room Door Data Center Inside View Precision Cooling CCTV The National Education Development Fund (FNDE) is an autarchy of the Ministry of Education with the aim of providing funds and carrying out actions to develop education, guaranteeing a quality education to all Brazilians. Since 2006, the FNDE has a Safe Data Center equipped with Data Room and all required sub-systems, designed and built by Aceco TI. Total MONITORING/FIGHTING Electric Control Cabinets Firefighting System TIM – RJ AND SP CLIENTS AND PROJECTS TIM – RJ Qty. COMMAND AND CONTROL CENTER √ MOVING √ Description Total Qty. Description Total S23-23 kW 184 kW MONITORING/FIGHTING MONITORING/FIGHTING Fighting 1 CCTV 4 2 Stratos 4 CCTV 12 COOLING FM-200 Precision 8 TOTAL AREA COOLING Precision TIM – SP S20-20 kW 40 kW Data Room 300 m² Work area 600 m² Tim’s 1st Floor Tim RJ’s Ground Floor Data Center Inside View SIZE: MEGA Command and Control Center TIM – RJ AND SP TIM has conventional Data Rooms and Data Centers built by Aceco TI in São Paulo and Rio de Janeiro. It all began in a Data Room in Rio in 2003-2004, the first of the project’s required three. The second one dealt with upgrades in infrastructure and the Telecom room, but contemplated especially the construction of a big conventional Data Center. The third phase focused on the connectivity matter. The new Data Center, built with the equipment operating, required a big effort by the Aceco TI moving team, especially because 1,600 m² of floor were replaced during the job. To hoist the servers during the exchange, a special equipment was used, a kind of hydraulic elevator especially designed for highsensitivity pieces of equipment. Equipment Used to Hoist the Rack During Moving TIM RJ – Data Center Inside View The Data Room in São Paulo was the result of the evolution in the relationship between Aceco TI and TIM. Situated in Santo André, this is also a big-size Room, as it was built in a space sufficient to shelter future infrastructural expansions. Data Center Inside View Data Room Entrance TRIBUNAL SUPERIOR DO TRABALHO (TST) – DF CLIENTS AND PROJECTS Qty. SIZE: MEGA TRIBUNAL SUPERIOR DO TRABALHO (TST) – DF The Tribunal Superior do Trabalho (Superior Labor Court) project was designed to shelter the CPD of the TST itself, as well as of the CSJT (Labor Court Superior Council). The TST Data Center has served as a springboard for all TRTs (Regional Labor Courts) in the country, as they have invested more and more in Safe, High-Availability Data Centers. ONGOING Description Total √ MONITORING/FIGHTING Stratos 1 CCTV 8 NetWatch Fighting Micra 100 Humidity, temperature, door, smoke and liquid sensors 2 FM-200 1 150 kVA 150 kVA 5 S23 – 23 kW 115 kW POWER UPS COOLING Precision TOTAL AREA Data Room 70 m² Infrastructure 76 m² Built-up area 204 m² INTEGRATED COMMAND & CONTROL CENTERS INTEGRATED COMMAND & CONTROL CENTERS i= 1% MURETA H=30cm MURETA H=30cm TANQUE DORMITÓRIO MASC. 25m² Qtde Descrição 10 Cameras SALA MULTI-USO 16m² CALL CENTER 35,15m² INTEGRATED COMMAND & CONTROL CENTER √ ONGOING √ RETROFIT √ MONITORING/FIGHTING CCTV 800 1800 Fighting SOBE Vesda SOBE QLF-NOC 85,4 m³ FM-200 2 Micra QD-NOC NetWatch √ POWER UPS Generator Cooling units 1+1 60 60 1 125 125 2+1 30 60 COOLING Data Center 3 23 kVA 69 kVA UPS Room 2 5 TR 10 TR Another Environment 10 de 1 TR a 5 TR 33 TR CONNECTIVITY Cat. 6 168 pt Optical fiber 21 pt TOTAL AREA Data Room 28 m² IT Infrastructure 59 m² Total built-up area 97 m² and 620 m² retrofit Command & Control Center CICC – INTEGRATED COMMAND & CONTROL CENTERS Aceco TI was responsible for the construction of one of the most significant legacies for Brazilians following the big events to be held in the country (Confederations Cup, the World Cup and the Olympic Games): the Integrated Command & Control Centers (CICCs). Under the coordination of the Extraordinary Office for Big Events (SESGE), the CICCs will concentrate the monitoring of all security forces (police, fire brigades, public services) and will be the site from which government officials will coordinate the entire work of anticipating and managing eventual crises during the events. Aceco TI built the complete infrastructure (redundant power systems, cooling system, access control, adequate furniture, etc.) of the Data Rooms and of the ten CICCs to guarantee their total availability and operation 24 hours a day, seven days a week. The CICCs will be one of the leading legacies left over to Brazilians. Following the events, the CICCs will be totally used by the national public security system, including the addition of other areas, such as civil defense, for instance, all of which will provide greater flexibility and services to the citizenship. The first CICCs began operating in Rio de Janeiro, Brasilia, Minas Gerais and Pernambuco. The others – in Amazonas, Bahia, Ceará, Mato Grosso, Paraná, São Paulo, Rio Grande do Norte, Rio Grande do Sul and Brasilia – will be up and ready for the World Cup. Total TANQUE SALA MULTI-USO 19,50m² DORMITÓRIO FEM. 25m² CONTRA PISO DE CONCRETO IMPERMEABILIZADO E REGULARIZADO SHAFT 1700 CLIENTS AND PROJECTS CICC – INTEGRATED COMMAND & CONTROL CENTERS 1. Control Center Environment that oversees, controls, commands and coordinates operations 24 hours a day, 7 days a week, 365 days a year. 2. Crisis Room This is where the situational diagnosis is made. It is the place where past and present data converge and point to future decisions. 3. Coordinator Room The official who coordinates the Integrated Command and Control Center (CICC) operations. 4. Data Room A certified and accredited security environment that protects the Data Center against main physical threats such as fire and water, for instance. 5. UPS Room The UPS (or no-breaks) keep the power of the Data Center and the entire complex stable in case of blackout until generators kick in. 6. Generators The generators are automatically started in case of blackout. VIVO – SP CLIENTS AND PROJECTS Qty. ONGOING Description √ Command & Control Center VIVO – SP Vivo, the leading cellular telephone company in Brazil, in addition to hiring the construction of Aceco TI Data Rooms for its Data Centers, has also built a big Command & Control Center to manage all is operations. A total of 19 consoles for the Command & Control Center, each measuring 2m long, have been built, plus six 1m consoles to receive 44 operators. Command & Control Center Command & Control Center Command & Control Center Command & Control Center Total CLIENT PURPOSE CJF – FEDERAL LOWER COURT COUNCIL – DF Data Center protected with Data Room CNJ – NATIONAL COURT COUNCIL – DF Data Center protected with Data Room FEDERAL COURT – RS, SC & SP CPD, Data Center and Servers GENERAL ATTORNEY’S OFFICE OF THE REPUBLIC – DF, PR & SP TOP CLIENTS COURTS ENERGY CELG – ELECTRIC POWER COMPANY OF GOIÁS – GO CPD protected with Data Room CHESF – HYDROELECRIC COMPANY OF SÃO FRANCISCO – PE Data Center protected with Data Room CPFL – POWER & LIGHT COMPANY OF SÃO PAULO – SP Data Center protected with Data Room CTEEP - ELECTRIC POWER TRANSMISSION COMPANY OF SÃO PAULO – SP Data Center protected with Data Room ELEKTRO – SP Data Center protected with Data Room ELETROBRÁS AMAZONAS POWER – AM Data Center protected with Data Room ELETROBRÁS ELECTRONUCLEAR - RJ Data Center protected with Data Room JUSTICE COURT (Several States) Data Center protected with Data Room, Tape Library and CPD MPE – STATE ATTORNEY’S OFFICE – ES, RJ & SP Data Center protected with Data Room PGM – GENERAL MUNICIPALITY ATTORNEYSHIP – RJ Data Center protected with Data Room FURNAS – RJ Data Center protected with Data Room PJN – PODER JUDICIAL DE LA NACIÓN – ARGENTINA Data Center protected with Data Room MAE – ELECTRIC POWER WHOLESALE MARKET – SP Servers and Data Center protected with Data Room PODER JUDICIAL DE SANTA FE – ARGENTINA Data Center protected with Data Room MAE – MERCADO ATACADISTA DE ENERGIA ELÉTRICA – SP Servidores e Data Center protegido com SalaCofre STF – FEDERAL SUPREME COURT – DF Data Center protected with Data Room STJ – SUPERIOR COURT OF JUSTICE – DF Data Center protected with Data Room TCE – STATE ACCOUNTS OFFICE – MS, PI, RJ & SP Data Center protected with Data Room TCM – ACCOUNTS OFFICE OF THE MUNICIPALITY OF RIO DE JANEIRO – RJ Data Center protected with Data Room TCU – FEDERAL ACCOUNTS OFFICE - DF Data Center protected with Data Room TRE – REGIONAL ELECTORAL COURT – AM & MG CPD, Data Center and Certifying Authority TRIBUNAL ELECTORAL DE PANAMÁ FINANCIAL CLIENT PURPOSE BANCO FRANCÉS DEL RÍO DE LA PLATA – BBV - ARGENTINA Tape Library Backup BANCO ITAÚ – SP Robotized Tape Library, Disks and Robots Data Center protected with Data Room BANCO PANAMERICANO – SP Data Center TRT – REGIONAL LABOR COURT (several States) Data Center protected with Data Room BANCO SANTANDER – SP Manual and Robotized Tape Library, CPU, Disks, Tape Library TSE – SUPERIOR ELECTORAL COURT – DF Data Center protected with Data Room and Certifying Authority BANCO VOTORANTIM – SP Data Center protected with Data Room TST – SUPERIOR LABOR COURT – DF Data Center protected with Data Room BANESE – SE Outside Tape Library, Microfilms, Data Center protected with Data Room/Backbone BANESTES – ES Manual Tape Library BANK OF BRAZIL (several States) Robotized File, Robotized Backup, Data Center protected with Data Room BANRISUL - RS Robotized Tape Library BCP – CENTRAL BANK OF PARAGUAY Data Center BICBANCO – SP Data Center BNDES – NATIONAL ECONOMIC AND SOCIAL DEVELOPMENT BANK - RJ Data Center protected with Data Room ENERGY CLIENT PURPOSE AES ELETROPAULO METROPOLITANA – SP CPU, Disks, Robots protected with Data Room BRIDAS – PANAMERICAN ENERGY – ARGENTINA Servers protected with Data Room CLIENT PURPOSE BRADESCO – SP Robotized and Manual Tape Library, Fire-Proof Doors BTG PACTUAL – SP Data Center BV FINANCEIRA – SP Data Center protected with Data Room CAJA DE AHORROS – PANAMA TOP CLIENTS FINANCIAL GOVERNMENT CLIENT PURPOSE ARTESP – SÃO PAULO TRANSPORTATION AGENCY – SP Data Center protected with Data Room ATI – STATE INFORMATION TECHNOLOGY AGENCY – PE Data Center protected with Data Room Data Center protected with Data Room CICC – INTEGRATED COMMAND & CONTROL CENTER – (Several States) Data Center with Command and Control Center and Data Room CAJA DE VALORES – ARGENTINA Data Center CIEX – ARMY INTELLIGENCE CENTER – DF Data Center protected with Data Room CEF - FEDERAL SAVINGS BANK (several States) Servers, Manual Tape Library, Backup Tape Library / Robot, CPU, Disks, Robots, main CPD, Robotized Backup, Network, Servers and Data Center CITEX – ARMY TELEMATICS INTEGRATED CENTER – DF Data Center protected with Data Room CENTRUS – DF Servers protected with Data Room CLA – ALCÂNTARA LAUNCH CENTER – MA Data Center protected with Data Room CREDICITRUS – SP Data Center DENATRAN – NATIONAL TRANSIT DEPARTMENT – DF Data Center protected with Data Room DEUTSCHE BANK – SP Tape Library, Microfilms and Documents Data Center protected with Data Room DRESDNER BANK – PANAMA Data Center DIPOL – POLICE INTELLIGENCE AND PLANING DIVISION – SP GRAVAMES – SP Data Center Data Center protected with Data Room HEDGING GRIFFO – SP Data Center FAPESP – RESEARCH SUPPORT FOUNDATION OF THE STATE OF SÃO PAULO – SP HSBC – PR Manual Tape Library, Robotized Backup FEDERAL POLICE – DF Data Center protected with Data Room IRB BRASIL RESSEGUROS – RJ Data Center Manual Tape Library and Data Center ITAÚ BBA – SP Retrofit Datacenter FINANCE DEPARTMENT – AC, CE, MG, PE, RJ & RS JP MORGAN – SP Data Center FNDE – NATIONAL EDUCATION DEVELOPMENT FUND – DF Data Center protected with Data Room PREVI – RJ Data Center GAP – BR – BRASILIA SUPPORT GROUPING – DF Data Center protected with Data Room GOVERNMENT OF SANTA FE – ARGENTINA Data Center protected with Data Room INCRA – NATIONAL SETTLEMENT AND AGRARIAN REFORM INSTITUTE – DF Data Center protected with Data Room INFRAERO – BRAZILIAN AIRPORT INFRASTRUCTURE COMPANY – DF Servers, Network and Backup File GOVERNMENT CLIENT PURPOSE AFIP – ADMINISTRACIÓN FEDERAL DE INGRESOS PÚBLICOS – ARGENTINA Data Center protected with Data Room INMET – NATIONAL METEREOLOGY INSTITUTE – DF Servers ANP – NATIONAL PETROL AGENCY – DF Data Center protected with Data Room INPI – NATIONAL INDUSTRIAL PROPERTY INSTITUTE – RJ Data Center protected with Data Room ANSES – ADMINISTRACIÓN NACIONAL DE LA SEGURIDAD SOCIAL – ARGENTINA Data Center protected with Data Room IPLAN – GOVERNMENT MANAGEMENT PLANNING INSTITUTE – RJ Data Center protected with Data Room ANTT – NATIONAL LAND TRANSPORTATION AGENCY – DF Data Center protected with Data Room IPLANRIO – RJ Data Center protected with Data Room ANVISA – NATIONAL HEALTH SURVEILLANCE AGENCY – DF Data Center protected with Data Room LEGISLATURE – SP Data Center protected with Data Room MEC – MINISTRY OF EDUCATION Data Center protected with Data Room TOP CLIENTS GOVERNMENT GOVERNMENT CLIENT PURPOSE CLIENT PURPOSE METRO – METROPOLITAN COMPANY OF SÃO PAULO – SP Data Center protected with Data Room SP TRANS – SÃO PAULO TRANSPORTATION – SP Data Center protected with Data Room MINISTRY OF AERONAUTICS – RJ Microfilms and Data Center UNB – UNIVERSITY OF BRASILIA – DF Data Center protected with Data Room MINISTRY OF AGRICULTURE AND SUPPLIES – DF Data Center protected with Data Room MINISTRY OF COMMUNICATIONS Data Center protected with Data Room MINISTRY OF DEFENSE – DF Data Center and Certifying Authority protected with Data Room MINISTRY OF HEALTH – DF Data Center protected with Data Room CLIENT PURPOSE MINISTRY OF INTEGRATION Data Center protected with Data Room ANDARAÍ GENERAL HOSPITAL – RJ Data Center MINISTRY OF LABOR AND EMPLOYMENT – DF Data Center protected with Data Room ANS – NATIONAL HEALTH AGENCY - RJ Data Center protected with Data Room MINISTRY OF MINES AND ENERGY – DF Data Center protected with Data Room CARDOSO FONTES HOSPITAL – RJ Data Center MINISTRY OF SCIENCES AND TECHNOLOGY Data Center protected with Data Room FEDERAL BONSUCESSO HOSPITAL – RJ Data Center MINISTRY OF SPORTS AND TOURISM Data Center protected with Data Room FUNASA – NATIONAL HEALTH FOUNDATION Data Center protected with Data Room MINISTRY OF THE FEDERAL ATTORNEY’S OFFICE – DF Data Center protected with Data Room HC - PORTO ALEGRE CLINICS HOSPITAL – RS Data Center IPANEMA HOSPITAL – RJ Data Center MINISTRY OF TRANSPORTATION – DF Data Center protected with Data Room LAGOA HOSPITAL – RJ Data Center MUNICIPAL EDUCATION OFFICE – PE & SP Data Center protected with Data Room STATE SERVANTS HOSPITAL – RJ Data Center protected with Data Room MUNICIPAL FINANCE OFFICE – AL Data Center protected with Data Room PLANNING OFFICE OF MARANHÃO – MA Protected Data Center with Data Room and other Environments PRESIDENCY OF THE REPUBLIC – DF Data Center protected with Data Room PUBLIC SECURITY OFFICE – SP Data Center protected with Data Room SABIN – FRIENDS SOCIETY OF THE NATIONAL LIBRARY – RJ Data Center protected with Data Room SÃO PAULO CITY COUNCIL – SP HEALTH INDUSTRY CLIENT PURPOSE ACHÉ – SP Data Center Data Center protected with Data Room AJINOMOTO – SP Data Center SEAI – ENGENEERING, ARCHITECTURE AND AGRONOMICS SOCIETY OF ALTO DO IRANI – AM Data Center protected with Data Room AMAZONAS – SP Antechamber Adaptation BR DISTRIBUIDORA – RJ Data Center SEMIT – MUNICIPAL INFORMATION TECHNOLOGY OFFICE – MA Data Center protected with Data Room CARAMURU ALIMENTOS – GO Data Center CATERPILLAR – SP Manual Tape Library SENIAT – SERVICIO NACIONAL INTEGRADO DE ADMINISTRACIÓN ADUANERA Y TRIBUTARIA – VENEZUELA Data Center protected with Data Room CHOCOLATES GAROTO – ES Data Center COSIPA – MG Server Room SESEG – STATE SECURITY OFFICE – RJ Data Center CSN – RJ Data Center SINTYS – SISTEMA DE IDENTIFICACIÓN NACIONAL TRIBUTARIO Y SOCIAL – ARGENTINA Data Center protected with Data Room DIEBOLD – SP Data Center TOP CLIENTS INDUSTRY RETAILERS CLIENT PURPOSE CLIENT PURPOSE ELI LILLY – SP Documentation and Samples WALMART – SP & PE Servers, CPU, Disk, Operating Tape Library, Data Center EMBRACO – SC Manual Tape Library EMBRAER – SP Data Center, Tape Library ZILOR – SP Data Center FIAT – MG & ARGENTINA Backup Robot, Data Center FREIOS VARGA – SP Manual Tape Library GERDAU – RS Data Center MERCEDES BENZ – ARGENTINA CPD O BOTICÁRIO – PR Data Center CLIENT PURPOSE PADO Pre-Fabricated Modular Data Center ALLIANZ – SP Data Center PETROBRÁS (Several States) Technical/Exploitation Systems, Tape Library, Data Center Annexed Rooms, CPD ALOG – SP & RJ Data Center AMIL – SP Data Center ANTOFAGASTA MINERALS – CHILE Data Center ATIVAS – MG Data Center BRASIF – RJ Data Center Data Center SERVICES RAIZEN – SP Data Center Expansion REFRESCOS GUARARAPES – PE Data Center RENAULT – PR Backup Room Retrofit RIO POLÍMEROS – RJ Data Center SADIA – SP CPD CAGECE – WATER AND SEWER COMPANY OF CEARÁ – CE SCHINCARIOL – SP Data Center CERTISIGN – RJ Certifying Authority TETRAPAK – SP Data Center, Power Distribution Panels Room Data Center THYSSEN KRUPP – SP Data Center CESAN – ESPÍRITO SANTO SANITATION COMPANY – ES VOLVO – PR Data Center COPASA – MINAS GERAIS SANITATION COMPANY – MG Data Center DATAPREV (Several States) Manual and Robotized Tape Library and Data Center protected with Data Room EBC – DF Data Center ECT – BRAZILIAN MAIL AND TELEGRAPH COMPANY – SP & DF Data Center RETAILERS CLIENT PURPOSE EDS – SP Data Center CASAS BAHIA – SP Data Center Data Center COOPERHODIA – SP Manual Tape Library FEDERAL UNIVERSIY OF SANTA CATARINA – SP DROGASIL – SP Data Center GETNET – SP Data Center LOJAS RENNER – RS Data Center GLOBOSAT – RJ Tape library PÃO DE AÇÚCAR – SP Data Center GRU AIRPORT Data Center protected with Data Room SAB TRADING – SP Tape Library GRUPO ULTRA – SP Data Center SODEXO – SP Servers, Network Center HDI SEGUROS – SP Data Center USIMINAS – MG Data Center HERMES PARDINI – RJ Data Center CLIENT PURPOSE IMEMG – OFFICIAL PRESS OF THE STATE OF MINAS GERAIS – MG Data Center protected with Data Room IMESP – OFFICIAL PRESS OF THE STATE OF SÃO PAULO – SP Certified Authority and Data Center protected with Data Room INEP – THE ANÍZIO TEIXEIRA NATIONAL INSTITUTE OF EDUCATIONAL STUDIES AND RESEARCH – DF Data Center IPEM – WEIGHTS AND MEASUREMENTS INSTITUTE – SP Data Center protected with Data Room IRON MOUNTAIN/SSG - SP TOP CLIENTS SERVICES SERVICES CLIENT PURPOSE SABESP – SP Data Center SAN LUIZ LA PUNTA UNIVERSIY – ARGENTINA Data Center SERPRO – FEDERAL DATA PROCESSING SERVICE – SP, RJ & DF CPU, Disks, Tape Library and Robotized Backups protected with Data Room and Certifying Authority SONDA IT – SP Data Center T-SYSTEMS – SP Data Center Backup File TOUTATIS – SP Data Center ITI – NATIONAL INFORMATION TECHNOLOGY INSTITUTE – DF Certifying Authority UNB – BRASILIA UNIVERSITY – DF Data Center UNIMED – ES Data Center LOCAWEB – SP Data Center VALID – SP & RJ Certifying Authority LOTTERIES OF THE PROVINCE OF BUENOS AIRES – ARGENTINA Data Center VSE – VALE ENERGY SOLUTIONS – SP Pre-Fabricated Modular Data Center PAMI – INSTITUTO NACIONAL DE SERVICIOS SOCIALES PARA JUBILADOS Y PENSIONADOS – ARGENTINA Data Center protected with Data Room POSTAL MUSEUM – DF Files PROCEMPA – RS Data Center protected with Data Room PRODABEL – DATA PROCESSING COMPANY OF BELO HORIZONTE Data Center protected with Data Room PRODAM – DATA PROCESSING COMPANY OF THE MUNICIPALITY OF SÃO PAULO – SP STATE COMPANIES CLIENT PURPOSE BR DISTRIBUIDORA – RJ Data Center protected with Data Room CPU, Disks and Robot protected with Data Room CENAD – NATIONAL RISK AND DISASTER MANAGEMENT CENTER – DF Data Center protected with Data Room PRODASAL – DATA PROCESSING COMPANY OF SALVADOR – BA Data Center protected with Data Room CESAN – SANITATION COMPANY OF ESPÍRITO SANTO – ES Data Center protected with Data Room PRODASEN – DF Data Center and Robot protected with Data Room Data Center protected with Data Room PRODEB – DATA PROCESSING COMPANY OF BAHIA – BA Robot protected with Data Room CONAB – NATIONAL SUPPLIES COMPANY – DF Data Center PRODEMGE – DATA PROCESSING OF THE STATE OF MINAS GERAIS – MG Data Center protected with Data Room CPTM – SÃO PAULO COMPANY OF MEROPOLITAN TRAINS – SP Data Center protected with Data Room PRODERJ – INFORMATION AND COMMUNICATION TECHNOLOGY CENTER OF THE STATE OF RIO DE JANEIRO – RJ Data Center protected with Data Room DECEA – AIR SPACE CONTROL DEPARTMENT – RJ EMPLASA – SÃO PAULO METROPOLITAN PLANNING COMPANY – SP Data Center protected with Data Room PRODESP – DATA PROCESSING COMPANY OF THE STATE OF SÃO PAULO – SP Certifying Authority, CPD and Data Center protected with Data Room MINT OF BRAZIL – RJ Data Center and Certifying Authority PRODEST – INFORMATION AND COMMUNICATION TECHNOLOGY INSTITUTE – ES Data Center protected with Data Room RODOBENS – SP Pre-Fabricated Modular Data Center CLIENT PURPOSE BRASIL TELECOM - DF & PR Manual and Robotized Tape Library, Disks, Data Center and Cyber Data protected with Data Room, CPU and TCU Center CANTV – VENEZUELA Servers protected with Data Room CLARO – SP Servers, Network, PAX, Telecom protected with Data Room EMBRATEL – RJ Backup Robot protected with Data Room ERICSSON - SP Data Center and Servers protected with Data Room TELEFONICA – SP CPU, Disks, TCU, Tape Library and Servers protected with Data Room TIM CELULAR – PE, SP & RJ Backup Robot, servers, Retrofit and Data Center VIVO – RJ & SP Data Center, Manual and Robotized Tape Library, Disks protected with Data Center ZTT – TECHNOLOGY & TELECOMMUNICATIONS ZONE – PANAMA IDC protected with Data Room TOP CLIENTS TELECOMMUNICATIONS APPENDIX ATTESTATIONS, CERTIFICATIONS AND CERTIFICATES • Jorge Justus Nitzan President • Antonio Lopes Bob Commercial Engineering Director • Adenauser Neves Administrative Director • Carlos Morard • Eurico Magno de Carvalho JULY 2013 APPENDIX CHIEF EXECUTIVES TECHNICAL TEAM JULY 2013 • Adenauser R. C. Mechanical Engineer • Alberto Italo Rospigliosi Razzeto Industrial Engineer • Alexandre Maia Cardoso Civil Engineer Commercial Director - Latin America • Alexandre Oliveira Cardoso Mechanical Engineer CFO • André Hotz Tavares Production Engineer • Fernando Almeida Prado Commercial / Marketing Director • Andres Eduardo Singer Architect • João Lucio dos Reis Filho Commercial Director • Antonio Donizete Lopes Bob Civil Engineer • Lars Bjorkstrom Engineering Director – Ongoing & Moving • Barbara Ferreira de Matos Architect • Martin Monzón Engineering Director – Latin America • Bruno Zavaleta Electronics Engineer • Mauricio Caviglia Commercial Director • Carla Mariana Camacho Electrical Engineer • Panagiotis Lazaridis Director – L&M Engineering • Carlos Augusto C. Farias Electrical Engineer • Renato Oyakawa HR & IT Director • Carlos da Silva Production Engineer • Vaner Soares Engineering Director – Works • Carlos Guilherme de O. Silva Electrical Engineer • Carlos Roberto Felix dos Santos Electrical Engineer • Cecilia Soares do Nascimento Civil Engineer • Celso Rodrigues Mechanical Engineer • Celso Susumu Okuyama Electrical Engineer • César Luiz Floriano Electrical Engineer • Christiane Akemi Masaki Computer Engineer • Daniel Brasil de Almeida Telecommunications Engineer • Daniel Alvarez Diaz Electrical Engineer • Daniel Rodrigues Corassari Electrical Engineer • Danilo Augusto Santos de Souza Electrical Engineer • Deborah Castro da Silva Mechanical Engineer • Diego Bronzon de Paula Electronics Engineer • Diego Lopez Calviño Electronics Engineer • Edson de Simome Jr. Telecommunications Engineer • Edson Domingos de Souza Electrical Engineer • Eduardo Freitas Electrical Engineer • Eloy Barrientos Civil Engineer • Ericka Zorzella Patzina Architect and Urbanist • Fábio Aparecido Badini Electrical Engineer • Fábio Henrique Barbosa Electrical Engineer • Fabio Henrique Bisagio Electrical Engineer • Felipe Vasco Silva Electrical Engineer • Fernando Dendi Civil Engineer • Fernando Ribeiro de Sena Environmental Engineer • Gabriel Luiz Assad Electrical Engineer • Gabriela Araujo Perdomo Architect • Glaucio de Souza Ribeiro Electrical Engineer • Guilherme C. Negraes Jr. Mechanical Engineer JULY 2013 • Gustavo Pazelli Electrical Engineer • Harold Fuentes Industrial Engineer • Helio Lima Electronics Engineer • Hemil Maia Ribeiro • Herivelto C. Luz APPENDIX TECHNICAL TEAM TECHNICAL TEAM JULY 2013 • Mário C. Machado Homem Civil Engineer • Martin Jose Monzon Civil Engineer • Maurício José Barros da Silva Mechatronics Engineer Electrical Engineer • Maurício Tadeu Nicolletti Electrical Engineer Electrical Engineer • Mauro Pieragnoli Electrical Engineer • Ivan Reynaldo de Rojas Galvan Electronic Engineer • Michele Cazzaro Rocha Mechanical Engineer • Jan Sens Mechanical Engineer • Nelson Arone Junior Electrical Engineer • Janet Alves dos Santos Electrical Engineer • Panagiotis Lazaridis Mechanical Engineer • Jean Paulo Pizzo Electrical Engineer • Patrícia Fiorone C. de Campos Civil Engineer • Jeanderson Formiga Civil Engineer • Paulo Magno C. Bonfim Electrical Engineer • Jhon Edward Davalos Electrical Engineer • Paulo Rabelo Pinto Telecommunications Engineer • João Paulo da Silva Xavier Automation and Telecom Engineer • Ricardo dos Santos Sant’Anna Electronics Engineer • João Y. M. Suzuki Electrical Engineer • Rodrigo Muzzi da Silva Electrical Engineer • Jorge Luis Rioja Saldivar Electronic Engineer • Rogerio de Oliveira Electrical Engineer • José Heitor Passavanti Electrical Engineer • Rolando Contreras Electrical Engineer • Julieta Serraz Architect • Rômulo Pimenta de Souza Mechanical Engineer • Kenro Sakamoto Electrical Engineer • Ronaldo Pavan Electrical Engineer • Lars Sigurd Bjorkstrom Civil Engineer • Salomon Sidney Benabou Electrical Engineer • Leandro Mercatelli Civil Engineer • Samara Cristina Souza Fernandes Mechanical Engineer • Leandro Neves de Souza Mechanical Engineer • Sergio Crosgnac Ferreira Electrical Engineer • Leandro T. N. Jorge Electrical Engineer • Sergio Luiz Gois Jr. Electrical Engineer • Leandro Ykeda Electrical Engineer • Silvio Marcio Junqueira Monteiro GomesCivil Engineer • Leonardo Avila Leal de Meirelles DonatiElectrical Engineer • Tetsuo Goto Electrical Engineer • Leonardo Hygor Tessari Electrical Engineer • Theresa Gabriela Pardi Walderrama Electrical Engineer • Lincoln Castilho Sasso Electrical Engineer • Thiago Augusto B. Silva Electrical Engineer • Ludimila Molotievski Electrical Engineer • Thiago Teixeira Petroni Telecommunications Engineer • Luis Alexandre Faria Morais Andrade Mechanical Engineer • Vagner Pascoa Vasques Electrical Engineer • Luis Eduardo Castilho Industrial Engineer • Vitor Zanetti Ferreira Electrical Engineer • Luis Henrique Pavarin Electrical Engineer • Walter Molina Electrical Engineer • Luiz Cristiano Soares Electronics Engineer • Luiz Gustavo Santos da Cruz Electrical/Occupational Safety Engineer • Luiz Henrique Prado Lobo Maiolo Electrical Engineer • Luiz Ricardo Matos Civil Engineer • Marcelo Almeida do Vale Electrical Engineer • Marcio Di Benedetto Production Engineer • Marco Antonio da Conceição Guerra Antunes Electrical/Occupational Safety Engineer • Marcos Eduardo Silva Electrical Engineer • Marcos Rildon Monassega Electrical Engineer • Maria Fernanda B. de Brito Architect • Maria Florencia Cirelli Architect • Marina Amaral Sales Camargo Electrical Engineer APPENDIX CERTIFICATES ATTESTATIONS APPENDIX ATTESTATIONS ATTESTATIONS APPENDIX TECHNICAL ASSETS CERTIFICATES CORPORATE DATA FORM Company Name Aceco TI S.A. Established January 13, 1972 Address – Main Office (Invoicing) Av. Armando Andrade, 529 – parte A Taboão da Serra – SP – CEP: 06754-210 Site: http://www.acecoti.com.br Corporate e-mail: [email protected] Enrollments CNPJ/MF: 43.209.436/0019-27 State Enrollment: 675.182.486.119 Municipal Enrollment: 1.083.335-8 Registrations CREA / SP: 0383462 CREA / RJ: 2000201499 CREA / DF: 5507/RF São Paulo (Plant/Industry) Av. Armando Andrade, 529 – parte A Parque Santos Dumont – Taboão da Serra / SP CEP 06754-210 e-mail: [email protected] BRANCHES SÃO PAULO (Head Office) Av. das Nações Unidas, 1.163 - 12º andar Brooklin Novo - CEP 04578-000 – São Paulo - SP Tel.: (55 11) 2164-7100 Fax: (55 11) 2164-7171 SÃO PAULO COUNTRYSIDE Rua Siqueira Campos, 726 Centro - CEP 133300-290 – Indaiatuba - SP Tel.: (55 19) 3834-2854 Fax: (55 19) 3834-2854 BRASÍLIA SHN - Quadra 2 - Projeção I Bloco F - Loja 55 Edifício Executive Office Tower - CEP 70702-000 – Brasília - DF Tel./Fax: (55 61) 3447 9205 RIO DE JANEIRO Rua Almirante Barroso, 22 - 15º Andar Centro - CEP 20031-000 – Rio de Janeiro - RJ Tel.: (55 21) 2524-2922 Fax: (55 21) 2524-8070 APPENDIX MAIN OFFICE ARGENTINA Gorostiaga 2355 Andar 12 C1426CT Buenos Aires – Argentina Tel.: (54 11) 4776-7002 Fax: (54 11) 4553-6223 CHILE Av. Apoquindo, 6410 Of. 1305 Las Condes Santiago – Chile Tel.: (56 2) 2656-7047 COLÔMBIA Calle 90, 19A - 49 - Oficina 302 Bogotá – Colombia Tel.: (57) 1 530-4512 / 530-4513 PERU Calle Monterrey, 355 Of. 1002 Urb. Chacarilla-Surco Cod. Postal: Lima33 Lima – Peru Tel.: (51 1) 637-4027 COSTA RICA Aceco TI Caribe y Centro America Oficentro Plaza Roble, Edificio El Pórtico Piso 1, Escazú San José – Costa Rica Tel.: 506 2201-1411 MÉXICO Aceco TI Mexico Paseo de la Reforma 350, 10&11 Floors, CP 06600 México City – México Tel.: 52 (55) 9171-8460 www.acecoti.com.br