portfolio - Aceco TI

Transcription

portfolio - Aceco TI
PORTFOLIO
MEET ACECO TI
Back-to-back solutions for highavailability Data Centers.
The leader in Data Center
infrastructure in Latin America.
Aceco TI offers back-to-back solutions for the entire lifecycle of Data
Centers: project, construction and maintenance, with national and
international certificates and the experience of a company that has
established over 700 Data Centers in Latin America and is now delivering a
new one every four days on average.
With an experience spanning over 40 years on the market, Aceco TI
has more than 850 professionals specialized in designing, building
and maintaining Data Centers of several sizes. The company has
evolved together with the Information Technology and its portfolio
includes environments designed and built for public and private
companies in Brazil and the rest of Latin America.
ma
nan
e
t
n
i
ce
consu
l tan
cy
ntation
ign
aut
des
om
t/
ati
ec
on
oj
pr
M
rt
ifi
DC
ce
The Aceco TI solutions cover the
entire lifecycle of Data Centers.
PF
imp
g
le m e
m ovin
END-TO-END GLOBAL SOLUTION
The Aceco TI services include all disciplines for establishing
a Data Center. This way, clients find in a single supplier all
solutions to design and build the Data Center most appropriate
to their needs.
ca
tio
n
com m i ss i o n i n g
D
ata
Ro
om
/
DATA CENTER TYPES
Mission Critical
Buildings
MISSION
CRITICAL
SIZE: MEGA
Exclusive buildings totally dedicated
to the Data Center and other IT
environments. They are designed to
keep IT, telecommunications, data,
voice and image equipment and
provide the security and redundancy
levels necessary to guarantee the
high availability of operations.
Ativas – MG
Multidisciplinary
buildings
MULTIDISCIPLINARY
SIZE: MEGA
Environments established in buildings
that share other departments or even
companies, where risks for incidents
are much higher. These Data Centers
demand provably efficient physical
security solutions that guarantee data
protection and availability, regardless
of the risks posed by neighbors.
TSE – DF
Pre-Fabricated
Modular Data
Centers
SIZE: MEGA
Retrofits
SIZE: MEGA
Built either indoors or outdoors,
these Data Centers, differently
from the usual containers, have the
advantage that they are not limited
to standard sizes, as they may be
built to meet the clients’ IT needs
and to expand whenever necessary.
Pado – PR
Data Centers in areas that
go through technological
refreshments with an operating
Data Center that does not allow
downtimes.
FNDE – DF
CLIENTS AND PROJECTS
MISSION CRITICAL
BUILDINGS
MISSION CRITICAL BUILDINGS
ALOG EQUINIX – SP
CLIENTS AND PROJECTS
FIRST PHASE
Qty.
GREEN
√
ONGOING
√
COMMAND AND
CONTROL CENTER
√
Description
Total
FINAL PHASE
Qty.
COMMAND AND
CONTROL CENTER
Description
√
MONITORING/FIGHTING
MONITORING/FIGHTING
CCTV
73
Fire
25
CCTV
130
Fire
25
Dry Sprinkler Fe Gas
(Dry Pipe)
UPS
16
825 kVA
12.200 kVA
Generators
7
2.500 kVA
17.500 kVA
64
30 TR
Telecom Room
3
30 TR
90 TR
UPS Room
16
20 TR
320 TR
POWER
Dry Sprinkler Fe Gas
(Dry Pipe)
POWER
UPS
2
875 kVA
1.750 kVA
COOLING
Generators
2
2.500 kVA
5.000 kVA
Data Center
Precision
Precision
8
30 TR
240 TR
Telecom Room
2
30 TR
60 TR
UPS Room
4
20 TR
60 TR
COOLING
TOTAL AREA
Data Center
800 m²
Built-Up Area
3.800 m²
TOTAL AREA
Data Center
3.200 m²
Built-Up Area
6.800 m²
ENTRADA E SAIDA
INTERNA
ENTRADA E SAIDA
EXTERNA
RACK
RACK
RACK
RACK
Server Room
1.494
250
2.000
MISSION
CRITICAL
SIZE: MEGA
ALOG EQUINIX – SP
Suspended Cable Tray
A national company that provides IT infrastructures to mid- and big-size corporations, Alog Equinix clinched
in 2011 a contract with Aceco TI to build the first phase of its third Data Center, located in the city of Barueri,
SP. The enterprise was at the time the largest site of the company and took a total investment of R$ 30
million. Recently, Alog Equinix finalized the second phase of the project by investing another R$ 21 million.
The contract was signed according to the end-to-end system, both in the first and second phases. The
company responsibility ranged from the analysis of the executive project to the integration and execution
of all specialties involved (civil construction, power, cooling, connectivity, access control, fire detection and
fighting), commissioning, integrated tests and certification.
Now, Aceco TI is building another Data Center for Alog Equinix, in Rio de Janeiro.
According to Alog Equinix’s Infrastructure Director, Mr. Peter Pretta, the company opted to hire Aceco TI to
carry out this project because, besides being specialized in building Data Centers, the company has a highly
trained and experienced technical staff. “We believe that Aceco TI has a real condition to add value to Alog
Equinix’s Data Center project,” said Mr. Pretta.
Another factor that was decisive in the hiring, according to Mr. Pretta, was the project’s finalization deadline.
“Due to matters related to internal logistics, Aceco TI had a team mobilized to start working immediately
and in full force in order to meet the tight deadlines required by Alog Equinix.” The construction term of the
first phase of Alog Equinix’s Data Center in São Paulo was 150 days. The second phase was completed in
120 days.
Fire Fighting
Total
Power Room
1.920 TR
CLIENTS AND PROJECTS
ALOG EQUINIX – SP
Façade
Data Center Inside View
Condensors
UPS Room
Meeting room
Sluice Door
ARSAT – ARGENTINA
CLIENTS AND PROJECTS
Qty.
1.35
0.85
COMMAND AND
CONTROL CENTER
√
ONGOING
√
Description
MONITORING/FIGHTING
75
4,46
CCTV
2,5
2,4
1,5
2,5
1,5
2,5
12,16
1,4
1,4
4,88
1,4
1,4
8,63
1,3
1,1
1,3
2,28
Fighting
FM-200 and
water
Stratos
Micra
NetWatch
0,96
14,85
15
104
Temperature
and liquid
sensors
POWER
UPS
5
825 kVA
4.125 kVA
Generator
5
1.634 kVA
8.170 kVA
Transformers
5
1.600 kVA
8.000 kVA
Chillers
5
370 TR
1.850 kVA
32
116 kVA
3.712 kVA
COOLING
Precision
TOTAL AREA
Data Room
150 m²
IT infrastructure
1.464 m²
Total built-up area
7.900 m²
Total land area
38.000 m²
CONNECTIVITY
Optical fibers
Server Room
MISSION
CRITICAL
SIZE: MEGA
Façade
ARSAT – ARGENTINA
Total
Command and Control Center
Generators
Arsat is a mixed capital company responsible for telecommunications, broadcasting and internet services
in Argentina. It is a high-technology company whose Data Center had to be in accordance with the
market’s chief standards and certifications.
Aceco TI won the bid to deliver Arsat’s complete mission critical building, as it offered an integrated, endto-end solution, designed in a modular, scalable form, with all pertinent certifications and executed in
nine months, from the physical work to the operations’ start-up.
The criticity and diversity of the services delivered to public and private clients in the country required
Arsat to certify the availability of its infrastructure by the Uptime Institute and also to obtain the ABNT
NBR 15247 certification of its Data Room. The company was also concerned about adopting green criteria,
such as the use of solar power, for instance.
Arsat’s Data Center is currently the biggest and most up-to-date in Argentina.
Server Room
Server Room
3.780 pt
ATIVAS – MG
CLIENTS AND PROJECTS
Qty.
GREEN
√
ONGOING
√
COMMAND AND
CONTROL CENTER
√
UPS
2
550 kVA
1.100 kVA
Generators
2
13,8 kVA
27,6 kVA
5
FM-200
Comfort
11
140 TR
Data Room
4
212 TR
69 kW
UPS Room
4
140 TR
69 kW
MONITORING/FIGHTING
Fighting
COOLING
TOTAL AREA
Data Room
99,30 m²
Infrastructure
1.731 m²
Built-up area
5.980 m²
CONNECTIVITY
Cat. 6
1.200 pt
Optical fibers
350 pt
MISSION
CRITICAL
Command and Control Center
ATIVAS – MG
With a built-up area totaling 11,000 and a US$ 50 million investment, the Ativas Data Center is the first
enterprise with a big-size structure of the type in Minas Gerais and one of the top Data Centers in Brazil,
with distinct areas for hosting, collocation and mainframe.
Built by Aceco TI, the environment has an initial area available for servers of 500 m2, with possibility
of reaching 1,500 m2 Its location is strategic in regards to access ways, electric power and
telecommunications.
Total
POWER
Building Outside View
SIZE: MEGA
Description
Confined Corridor
The electricity is fed by two distinct sub-stations within CEMIG’s ring. The addressing capacity reaches
more than 7.5MVA. With Tier III certification granted by the Uptime Institute, TR3 and TÜV, the Ativas Data
Center is the first of its kind in South America.
Data Center Inside View
Cold Water Piping
CLIENTS AND PROJECTS
ATIVAS – MG
Façade
Generator
Cold Water Piping
Power Panels
BRADESCO – SP
CLIENTS AND PROJECTS
Qty.
PSERIES
IBM2094
1,20
0,80
1,00
1,20
F
1,64
1,60
VTS
F
DS 8100
26. 06. 08
GA-26
CX.PISO
GH-23
7.500 kVA
Chiller
3
Servers
3.200 m²
Built-up area
10.000 m²
CONNECTIVITY
GA-23
CX.PISO
GH-20
GA-20
CX.PISO
CX.PISO
GH-17
6.000 kVA
2.500 kVA
CX.PISO
GH-26
CX.PISO
CX.PISO
750 kVA
3
TOTAL AREA
1,60
CX.PISO
8
Generators
GA-17
CX.PISO
GA-14
CX.PISO
GA-11
Cat. 6
Systimax
Optical fibers
28.000 pt
MISSION
CRITICAL
Data Center inside view
BRADESCO – SP
Total
UPS
Façade
SIZE: MEGA
Description
POWER
Bombs
Power Cabling over Suspended Tray
The Bradesco Data Center, projected by L&M Engenharia, is the first Tier IV project established in Brazil,
meaning that Bradesco has the redundancy of the redundancy throughout its infrastructure.
It is one of the most updated and with highest availability Data Centers in the country.
Building’s Inside View
Piping
EMBRATEL – SP
CLIENTS AND PROJECTS
Térreo
Qty.
COMMAND AND
CONTROL CENTER
Description
√
MONITORING/FIGHTING
CCTV
60
Fighting
√
Stratos
NOVEC
10
POWER
Segundo Andar
UPS
2
3.200 kVA
6.400 kVA
Generators
3
2.500 kVA
7.500 kVA
Precision
3
1.584 kVA
4.752 KW
Telecom Room
8
405 kVA
3.240 kW
COOLING
CONNECTIVITY
Terceiro Andar
Cat. 6
7.824 pt
Optical fibers
1.413 pt
TOTAL AREA
Infrastructure Area
1.339 m²
Data Center
1.272 m²
Total Area
2.611 m²
Quarto Andar
Server Room
Cobertura
MISSION
CRITICAL
SIZE: MEGA
Total
Building Outside View
EMBRATEL – SP
Climatization and Fire Fighting
The leading telephone operator in Brazil, with an annual turnover of R$ 8 billion, is building a new mega
Data Center to be used for colocation.
Aceco TI faced a fierce competition to be picked as the company responsible for this great enterprise,
located in the Lapa district of São Paulo.
The joint effort between Aceco’s Commercial and Engineering areas resulted in this project, one of the
biggest ever carried out by the company.
Command and Control Center
Confined Server Row
CLIENTS AND PROJECTS
EMBRATEL – SP
UPS Room
Bombs
Power Panels
Chillers and Bombs
Server Room
Cooling and Fire Fighting
LOCAWEB – SP
CLIENTS AND PROJECTS
Qty.
UPS
2
550 kVA
Total
2
S29 – 29 kW
UPS room
4
7,5 TR
LCP
12
18 kW/rack
1.100 kVA
COOLING
Precision
TOTAL AREA
High-density
environment
137 m²
Infrastructure
120 m²
Built-up area
500 m²
CONNECTIVITY
Cat. 6
254 pt
Optical fibers
24 pt
Data Center Inside View
Water Piping Under the Floor
Outside Water Piping
Racks equipped With LCP
Firefighting and Detection
LCP-Equipped Racks
UPS Batteries
MISSION
CRITICAL
SIZE: BIG
Description
POWER
Water Piping Under the Floor
LOCAWEB – SP
The Locaweb Data Center in São Paulo is a leading high-density environment. There are 12 racks
equipped with LCP – a specific cooling rack system for rack cooling based on cool water.
The piping structure necessary to safely take this water from the chillers to the rack is very complex and
difficult to install. Aceco TI, in addition to being charged to set up this entire piping network, was also
responsible for the construction of the UPS room, the battery room and civil architecture.
Power Panels
58 kW
30 TR
216 kW
CLIENTS AND PROJECTS
SONDA IT – CHILE
EXPANSION
√
GREEN
√
MOVING
√
ONGOING
√
CCTV
12
Câmeras Bosch
Fighting
Total
FM-200
Stratos
2
Micra
2+2
80 kVA
450 kVA
2
450 kVA
900 kVA
Precision
12
S23/S10 - Liebert
250 kVA
UPS Room
2
7,5 TR/btu
POWER
UPS
Generators
COOLING
TOTAL AREA
Data Room
93 m²
Data Center
360 m²
MISSION
CRITICAL
Command and Control Center
SONDA IT – CHILE
Description
MONITORING/FIGHTING
Façade
SIZE: MEGA
Qty.
Generator
Sonda IT hired Aceco TI as a regional specialist in assessing sites, designing project alternatives and
drawing up ROI (Return On Investment) analyses to conceive of the new and biggest Data Center of the
Company in the region.
Aceco TI was responsible for the project, the work’s management, the draw-up of the purchase program,
teams and services, as well as for the Tier III certification of the environment by the Uptime Institute.
Sonda IT received the Data Center Dynamics prize of Innovation in Mega Data Centers in 2012. As total
manager of the designing, execution and certification of the Data Center, Aceco TI is very proud of the
work carried out at this client.
Data Center Inside View
Chillers
15 TR
T-SYSTEMS – SP
CLIENTS AND PROJECTS
FIRST PHASE
Qty.
GREEN
√
ONGOING
√
COMMAND AND
CONTROL CENTER
√
Description
FINAL PHASE
Total
Qty.
COMMAND AND
CONTROL CENTER
Description
Total
√
MONITORING/FIGHTING
MONITORING/FIGHTING
CCTV
73
Fire
25
CCTV
130
Fire
25
Dry Sprinkler Fe Gas
(Dry Pipe)
UPS
16
825 kVA
12.200 kVA
Generators
7
2.500 kVA
17.500 kVA
64
30 TR
Telecom Room
3
30 TR
90 TR
UPS Room
16
20 TR
320 TR
POWER POWE
Dry Sprinkler Fe Gas
(Dry Pipe)
POWER
UPS
2
875 kVA
1.750 kVA
COOLING
Generators
2
2.500 kVA
5.000 kVA
Data Center
Precision
Precision
8
30 TR
240 TR
Telecom Room
2
30 TR
60 TR
UPS Room
4
20 TR
60 TR
COOLING
TOTAL AREA
TOTAL AREA
Data Center
800 m²
Built-Up Area
3.800 m²
1.920 TR
Data Center
3.200 m²
Built-Up Area
6.800 m²
MTS-1
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
st andar
11º
floor
Building Façade
Cool Water Tower
MISSION
CRITICAL
st andar
22º
floor
Pavimento
Térreo
Ground
Floor
SIZE: MEGA
T-SYSTEMS – SP
A member of the Deutsche Telekom group, T-Systems has been in Brazil for more than ten years, and
its Data Center used to be located in the premises of Mercedes-Benz and Volkswagen. The need for
expansion prompted T-Systems to decide to build its own Data Center and, for this purpose, it called upon
Aceco TI as a consultant to define the place and the way to build it.
Sluice Door
After a two-year process, Aceco TI assumed both the project and the execution of the work, designed
in three stages and in a modular form. One of the biggest in the country, the T-Systems Data Center is
Tier III certificated, as well as by the Uptime Institute, attesting to the redundancy of the environment
throughout its infrastructure.
Power Panels
Racks inside the Data Center
Generators
CLIENTS AND PROJECTS
T-SYSTEMS – SP
UPS Room
Precision Cooling and Firefighting
Cool Water Piping
Data Center Inside View
Data Center Inside View
Command and Control Center
Condensers
Power Panels
MULTIDISCIPLINARY
BUILDINGS
MULTIDISCIPLINARY BUILDINGS
AFIP – ARGENTINA
Tanques sistema de
extinción existentes
HALL ACCESO
DKC
Mass
STORAGE
DKU
Mass
STORAGE
A°A°
Evaporador
65 Kw
Qty.
rampa
0.15
FM-200
4 IBM 3174
IMP. HP
D640
5000
IBM 3494
- ROBOT -
IMP. HP
D640
5000
A°A°
Evaporador
65 Kw
IBM
S/390
IBM
SHARK
B4
FM-200
TDA TDB
IMP. HP
D640
5000
TDB
TSB
Sector para SUN
450 y SUN 250
No Rackeados
15
C3
TSA
UPS
2
300 kVA
Generators
2
13,8 kVA
17
17
S. O.
FM-200
A
AA
22
A°A°
Evaporador
65 Kw
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
IBM
3490 E
B40
A
IBM
3490 E
B40
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
Pleno de aire
acondicionado central
POWER
TOTAL AREA
C4
FUTURO VIDEOWALL
TDA TDB
TSA
IBM
3590
C2
TDA TDB
A°A°
Evaporador
65 Kw
N. O. C.
0.15
Data Room
365 m²
Built-Up Area
5.980 m²
LINHA BASE
FACHADA
Av. Paseo Colón
Avda. Paseo Colón
Data Center Inside View
Data Center Inside View
MULTIDISCIPLINARY
SIZE: MEGA
Command and Control Center
AFIP – ARGENTINA
Data Center Inside View
AFIP (Administración Federal de Ingresos Públicos) is Argentine’s body charged with the execution of the
policies ordered by the national Executive Power regarding the fiscal and customs area, as well as levying
taxes for the welfare system. It is the equivalent to Brazil’s Federal Revenue Department.
AFIP acquired the largest Data Room ever built by Aceco TI, one of the company’s most representative
projects in Latin America.
Condensers
Total
√
10
A°A°
Evaporador
65 Kw
(D)
IBM
3990
Cond. A° A°
IBM
9393
DKC
DKU
Sun Fire
15K
RACK 72"
Cabinet
IBM
RS/6000
Stor EDGE
L3500
Ultra ENTERPRICE
10.000
IBM
RS/6000
Mass
STORAGE
0.40
Mass
STORAGE
STS
B
IMPRESORAS
Equipo de Aire Acond. Liebert
Equipo de Aire Acond. Liebert
Mass
STORAGE
Cond. A° A°
IBM
3995
IBM
S/390
L700
TAPE
LIBRARY
(D)
B3
TSA
TSA
10
IBM
3995
TDA TDB
IBM 3494
- ROBOT -
TSA
FM-200
IBM
SHARK
TDA
Description
HITACHI
7700 E
STS
A
B2
0.35
COMMAND AND
CONTROL CENTER
Calle México
TAB. AAC
OPERADORES
TAB. ILUM. Y
TOMAS
OPERADORES
RACK 72"
Cabinet
Mass
STORAGE
L700
TAPE
LIBRARY
IMPRESORAS
TDEA TDEB TSE
RESERVADO PARA
UNIDAD
CERTIFICADORA
Sun Fire
15K
ACCESO PPAL.
SALA
OPERADORES
Sector para
acometida de
datos - Fibra
Optica
A°A°
Evaporador
65 Kw
8
Stor EDGE
L3500
TS 5 / TS
6
CIRCULACION INTERNA
ACCESO CTRO.
DE COMPUTOS
0.15
8
10
SUP. SALA = 364,62
m2
IBM
3490 E
H10
CLIENTS AND PROJECTS
SALA
SERVICIOS
ARCHIVO GUARDA DE
ECONOMATO
Ultra ENTERPRICE
10.000
ascensor
ascensor
montacargas
AIRE Y LUZ CENTRAL
Data Center Inside View
600 kVA
AMSA – CHILE
CLIENTS AND PROJECTS
Qty.
CCTV
Total
2
POWER
UPS
2
80 kVA
160 kVA
Generators
2
260 kVA
520 kVA
4
S23 – 23 kW
COOLING
Precision
TOTAL AREA
Data Room
40 m²
Infrastructure
80 m²
Data Center
100 m²
Vista Interna do Data Center
MULTIDISCIPLINARY
SIZE: MEDIUM
AMSA – CHILE
The Antofagasta Minerals S/A group is one of the biggest of the Chilean mining industry and, as part of its
corporate consolidation, it raised a building in Santiago to centralize operations.
When deciding between an inside or outside Corporate Data Center, AMSA found it more economical and
manageable to set up a Data Room with all infrastructural sub-systems in order to provide its centralized
data and systems with the highest reliability and independence level inside the building.
Description
MONITORING/FIGHTING
Data Center Entrance
Firefighting
Data Center Entrance
Data Center Outside View
During the latest earthquake to hit Chile, in 2010, Aceco TI’s Data Room safeguarded the integrity of the
assets: its structural resilience allowed it to absorb the vibrations during the quake without affecting
operations.
Biometric Access
92 kW
ANSES – ARGENTINA
Qty.
CLIENTS AND PROJECTS
CCTV
16
UPS
2
150 kVA
300 kVA
6
S20 – 20 kW
120 kW
COOLING
Precision
TOTAL AREA
Data Room
135 m²
Infrastructure
250 m²
Data Center
400 m²
CONNECTIVITY
Cat. 6A
280 pt
Optical fibers
60 pt
MULTIDISCIPLINARY
Façade
ANSES – ARGENTINA
Responding for managing the database of pension and retirement funds, ANSES (Administración Nacional
de la Seguridad Social) is the Argentinean equivalent of the Brazilian INSS (National Institute of Social
Security).
ANSES needed to move its Data Center and set in place the most reliable and safe technologies available
on the market. When the time came to bid the job, it was still to define the new site and, so, it took
advantage of the modularity and flexibility of Aceco TI’s Data Room technology to make it during the
bidding, thus saving about one year in the proceedings.
Total
POWER
Data Room Entrance
SIZE: MEGA
Description
MONITORING/FIGHTING
Inside View
The adaptability of the Data Room allowed it to use the contracted volume, thus defining its geometry and
establishment as soon as the agreement was signed. This opened the way for ANSES to engage in new,
very sophisticated, IT projects which, without a certificated Data Center, would have to be protracted or
disposed of.
Inside View
Inside View
Inside View
BANCO DE LA NACIÓN – PERU
CLIENTS AND PROJECTS
Qty.
MOVING
√
COMMAND AND CONTROL
CENTER
√
RETROFIT
√
Description
Total
MONITORING/FIGHTING
CCTV
8
Fighting
Novec
Stratos
4
3 X Micra 25 and 1 X Micra 100
POWER
UPS
1+1
160 kVA
Generators
1+1
750 kVA
320 kVA
Transformers
1+1
750 kVA
Data Center
4
74,7 kVA
UPS Room
2
20 kVA
NOC
2
36.000 TR
COOLING
298,8 kVA
40 kVA
72.000 TR
TOTAL AREA
Data Room
150 m²
Data Center
125 m²
Façade
V-9
3231
3029
2827
2625
SSHH
H.
33 34 15 16 17 18 19 20
SSHH
M.
MULTIDISCIPLINARY
P-9
V-26
SSHH H.
SSHH
M.
P-9
P-9
CLI S23
SIZE: BIG
Impresora
Impresora
ROBOT 02
ROBOT 03
CLI S23
ROBOT 04
Impresora
BANCO DE LA NACIÓN – PERU
RACK
TAPE
DRIVE
ROBOT 01
TDEA3 TDEB3
PCM
TDEB1 TDEA1
The Banco de la Nación of Peru is a pioneer in the use of Information and Communications Technologies.
The bank set as protection standard for its new Data Center a certified Data Room.
Aceco TI, besides offering the ABNT NBR 15247 and EN 1047-2 certified Data Room, had the most
consistent solution in terms of engineering, deadlines, prices and conformity with the required standards.
The bank’s expansion plans and growth required a safe, reliable Data Center, executed by a company that
would guarantee the environment’s quality, deadlines and maintenance. Aceco TI’s proven experience in
Data Center construction, not only in Peru, but throughout Latin America, was decisive for us to be picked
up by Banco de la Nación.
DG EXISTENTE
BM
S-
01
VIDEOWALL
24
23
22
21
BANCO DO BRASIL – DF
CLIENTS AND PROJECTS
Qty.
MOVING
Description
MONITORING/FIGHTING
CCTV
8
Sensors for humidity,
temperature, door,
smoke and liquids
NetWatch
Fighting
1
FM-200
2
PCR125C
Comfort
3
30 TR
90 TR
Precision
4
S23 - 23 kW
92 kW
POWER
UPS
COOLING
TOTAL AREA
Data Room
290 m²
Data Room Inside View
MULTIDISCIPLINARY
SIZE: BIG
BANCO DO BRASIL – DF
Total
√
Condensers
Cabling Under the Insert Floor
Since 1997, Aceco TI has built several Data Centers for Banco do Brasil. The most recent one, finished in
2009, is an environment of nearly 300 m², with equipment moving. Its construction was finished in just 90
days. Marked by planning and logistics effort, this great challenge to Aceco TI was crowned with success.
Work Underway
Work Underway
BNDES – RJ
CLIENTS AND PROJECTS
Qty.
COMMAND AND CONTROL
CENTER
√
MOVING
√
ONGOING
√
Description
MONITORING/FIGHTING
CCTV
10
POWER
UPS
2
275 kVA
550 kVA
Generators
2
650 kVA
1.300 kVA
Comfort
4
10 TR
Precision
12
S23 - 23 kW
UPS
4
10 TR
COOLING
TOTAL AREA
Data Room
195 m²
Condensers
126 m²
Generators
20 m²
Infrastructure
196 m²
Data Center
304 m²
Built-up area
446 m²
CONNECTIVITY
Cat. 6A
1.064 pt
Optical fibers
2.022 pt
Data Center Inside View
MULTIDISCIPLINARY
SIZE: BIG
Cabling Under the Raised Floor
BNDES – RJ
Total
Data Center Inside View
Power Panels
Generators
Condensers
Precision Cooling
UPS Room
The BNDES (National Economic and Social Development Bank) aims at supporting projects that
contribute to the Brazilian development.
In order to meet international parameters and improve its services even more, the BNDES has come
up with the Agir Project with the unswerving goal of modernizing all its technology. The first big work
to set up Agir was the new BNDES Data Center, which Aceco TI designed, built and is maintaining. The
environment has Tier III security, that is, all its power and cooling systems are redundant.
Aceco TI was also charged with moving the equipment from the old Data Center, located on the 1st
floor of the BNDES headquarters in Rio de Janeiro, to the 2nd basement floor of the same building, an
appropriate environment to receive a new infrastructure.
40 TR
276 kW
40 TR
O BOTICÁRIO – PR
CLIENTS AND PROJECTS
Qty.
GREEN
Stratos
5
CCTV
14
NetWatch
1
Humidity,
temperature, door,
smoke and liquid
sensors
Fighting
4
FM-200
UPS
4
120 kVA
480 kVA
Generators
2
630 kVA
1.260 kVA
Precision
9
S23 – 23 kW
UPS Room
4
10 TR
COOLING
TOTAL AREA
Data Room
180 m²
Data Center
330 m²
CONNECTIVITY
Cat. 6
376 pt
Optical distributor
99 pt
Optical fibers
208 pt
Automatic Firefighting and Precision Cooling
UPS Room
O Boticário is acknowledged for its ethical relationships with partners, the community and employees.
Using these same quality and responsibility criteria, the company invested in a new Data Center and
picked up Aceco TI for its project and construction.
Located in São José dos Pinhais, in the Curitiba metropolitan area, this Data Center is one of the most
up-to-date in the country and stores data from the entire O Boticário store chain. Aceco TI was involved in
its construction, from the project draw-up to the execution of the work and, currently, is responsible for its
maintenance.
Generators
Data Room for Telecom and IT Production
Condensers
Cabling under Raised Access Floor
O Boticário carried out a detailed research in order to decide what would be more interesting in practical
and financial terms to the company: to build an in-house Data Center or opt for outsourcing. When it
became clear that the first option was more advantageous and Aceco TI was chosen as the most able
to bring about the work, the company assumed the project of the annex building and carried out the
necessary adaptations to receive the Data Room and its entire attending infrastructure.
Later, O Boticário also built with Aceco TI its Data Center backup, an environment also equipped with a
Data Room, with 84 m².
Micra 25 e 100
POWER
MULTIDISCIPLINARY
O BOTICÁRIO – PR
Total
MONITORING/FIGHTING
Data Center Inside View
SIZE: MEGA
Description
√
Inside View
207 kW
40 TR
CAJA DE VALORES DE BUENOS AIRES – ARGENTINA
CLIENTS AND PROJECTS
Qty.
Description
CCTV
30
POWER
UPS
2
100 kVA
200 kVA
6
41 kVA
246 kVA
COOLING
Precision
TOTAL AREA
Data Center
600 m²
Condensers
200 m²
CONNECTIVITY
Cat. 6A
244 pt
Optical fibers
128 pt
Data Center Inside View
MULTIDISCIPLINARY
SIZE: MEDIUM
Data Center Inside View
CAJA DE VALORES DE BUENOS AIRES –
ARGENTINA
Total
MONITORING/FIGHTING
Environment Access Control
Data Center Inside View
Like in all world capitals, the operations of the Buenos Aires Exchange require total reliability of the
integrity of the dealings and a guaranteed systems and communications availability.
The strategy to build the Caja de Valores’s Data Center required a re-engineering of the electrical
infrastructure of several buildings related to its core activity, converging in the total updating of its primary
Data Center.
The biggest IT companies of the Latin market were called for the bidding, and Aceco TI was picked for its
capacity to design and execute the project. Currently, Caja de Valores also is attended by the company’s
Ongoing maintenance service.
Data Center Inside View
Data Center Inside View
Firefighting
CANTV – VENEZUELA
CLIENTS AND PROJECTS
Qty.
Fachada
MULTIDISCIPLINARY
SIZE: MEDIUM
CANTV – VENEZUELA
CanTV is a leading telecommunications company in Venezuela, as it delivers fixed and movable telephony
services and data transmission to millions of users and thousands of companies.
Facing the need to prepare its corporative Data Center for a higher criticity stage, the solution proposed
by Aceco TI was to design a maximum security environment with 50 m² for its critical servers and storage,
with a certified Data Room and the entire necessary infrastructure.
The Data Room was expanded in 2004, doubling in size, while the Data Room continued operating, with no
interruption of the production.
EXPANSION
Description
√
TOTAL AREA
Data Center
93 m² (48 m² + 45 m²)
Built-up Area
93 m² (48 m² + 45 m²)
Total
CLIENTS AND PROJECTS
CASAS BAHIA – SP
Qty.
Description
TOTAL AREA
Data Room
128,59 m²
Data Center Inside View
Inside View of the Data Room
MULTIDISCIPLINARY
SIZE: BIG
Façade
CASAS BAHIA – SP
One of the country’s leading retail chains, Casas Bahia has over 500 stores all over Brazil.
Its Data Center, protected with Aceco TI’s Data Room, is located in the company’s Technology Center in
São Caetano do Sul, SP.
Command and Control Center
Data Room Inside View
Command and Control Center
Data Room Inside View
Data Center Inside View
Total
CONTRALORIA GENERAL – PANAMÁ
CLIENTS AND PROJECTS
Qty.
ONGOING
√
RETROFIT
√
Description
Total
MONITORING/FIGHTING
CCTV
75
Fighting
2
FM-200
Stratos
Micra
NetWatch
2Tº, 2%HR, Voltage measurement, AA Alarm, UPS Alarm, FM-200
Failure, Stratos Failure, Door opening
POWER
UPS
2
40 kVA
80 kVA
Generators
1
150 kVA
150 kVA
COOLING
Precision
26,25 kVA
78,75 kVA
TOTAL AREA
Data Room
39 m²
Data Center
20 m²
CONNECTIVITY
Cat. 6
190
Optical fibers
1
Façade
Posible
ubicación
de
Grupo
Generador
MULTIDISCIPLINARY
SIZE: MEDIUM
CONTRALORIA GENERAL –
PANAMÁ
Controlling agency of the government of Panama, the Contraloría General required its Data Center to have
the availability and security indexes on a par with the needs of the State.
To secure such a high reliability, the Contraloría selected Aceco TI to build a new Data Center in the same
building where the old one was located, while keeping operations during the job and migration. The Data
Room modularity was used to execute the project in phases, transforming the old, outdated Data Center
into a modern Tier III certified environment.
The access difficulty inside the building required a very precise planning by our teams. The establishment
was concluded with success within the short period of 150 days.
UPS
BAT
UPS
BAT
Roxtec para Datos
y comunicaciones
4880
DOBLEALTURA
1200
300
600
7905
+0.39
CORREIOS – SP & DF
CLIENTS AND PROJECTS
SP
ONGOING
Qty.
Description
Total
√
ONGOING
MONITORING/FIGHTING
3
CCTV
4
Micra 25
Stratos
Description
1/7
Micra 100 /
Micra 25
2/1
64 kVA / 80 kVA
13
S24 – 24 kW
Total
POWER
Sensores de porta,
UPS, temperatura e
umidade
NetWatch
UPS
128 kVA /
80 kVA
COOLING
2
FM-200
2
200 kVA
400 kVA
Precision
9
S23 – 23 kW
207 kW
UPS Room
2
10 TR
Precision
POWER
UPS
Qty.
√
MONITORING/FIGHTING
Stratos
Fighting
DF
Data Room
COOLING
312 kW
TOTAL AREA
349,06 m²
20 TR
TOTAL AREA
Data Room
195,71 m²
Infrastructure
350 m²
Data Center
400 m²
Data Center Inside View
Correios – SP
MULTIDISCIPLINARY
SIZE: BIG
CORREIOS – SP & DF
Os Correios (The Brazilian Mail and Telegraph Company) has had Aceco TI Data rooms for over ten years.
This example clearly shows how much Aceco TI’s solutions are adaptable to the future and that, if a Data
Center maintenance is carried out in a correct way (The Mail (Os Correios) has used the Ongoing service
for years) its lifecycle can be long.
The Mail (Os Correios) has Data Rooms in São Paulo and Brasilia.
Correios – DF
CPFL – SP
CLIENTS AND PROJECTS
Qty.
000,0,00
MONITORING/FIGHTING
000,0,00
0,00
00,00
000,0,00
CCTV
0,00
00,00
000,0,00
000,0,00
Câmeras BOSCH
FM-200
Stratos
2
NetWatch
1
Micra
POWER
UPS
2+2
80 kVA
320 kVA
2
450 kVA
900 kVA
Data Center
12
S23 / S10 Liebert
250 kVA
UPS Room
2
7,5 TR
0,00
00,00
0,00
00,00
Generators
COOLING
TOTAL AREA
MULTIDISCIPLINARY
Command and Control Center
Data Room Outside View
Condensers
“The service provided by Aceco TI was very good, from the project conception down to its execution. It was
the first time that we used an end-to-end company. I’m very happy with the result. I’m convinced that
end-to-end is the best option for very complex works as of a Data Center. Aceco TI delivered the job on
schedule and without contractual addenda.”
Marcelo Carreras - IT Director
UPS Room
“We did the entire moving from the old Data Center to the new one without interrupting the operation. It
was a complex, but successful work. We were impressed by the way Aceco TI endeavored to upkeep the
environment. Whenever technicians soiled something during the job, a nearby team rushed in to clean up
and keep everything organized.”
Carlos Alberto Belarmino Teixeira – Architecture, Technology and Security Manager
“I’m known here at CPFL as a very demanding, even rigid, person with my suppliers. Even then, I
have absolutely no complaints about Aceco TI. On the contrary, the service has been excellent, from
construction down to maintenance.”
Raphael Basseto – Data Center Operations Coordinator, CPFL
12
Fighting
Data Center Inside View
CPFL – SP
Total
000,0,00
Cooling and Firefighting
SIZE: BIG
Description
ONGOING
Generator
Data Center Inside View
Data Room
93 m²
Data Center
360 m²
15 TR
DIPOL – SP
Qty.
00,00
0,00
ONGOING
√
COMMAND AND CONTROL
CENTER
√
Description
MONITORING/FIGHTING
00,00
0,00
00,00 0,00
0,00
00,00
CCTV
15
Fighting
1
FM-200
UPS
2
12 kVA
24 kVA
Generators
1
500 kVA
500 kVA
Comfort
9
9.000 btu
81.000 btu
Precision
6
S23 - 23 kW
UPS Room
2
5 TR
00,00
0,00
00,00
0,00
COOLING
00,00
0,00
2.29
00,00
0,00
00,00
0,00
00,00
0,00
D
CONNECTIVITY
Cat. 6
300 pt
Data Center General View
MULTIDISCIPLINARY
SIZE: BIG
Total
POWER
02
01
CLIENTS AND PROJECTS
00,00
0,00
00,00
0,00
Command and Control Center
DIPOL – SP
Data Room Upper View
The Intelligence Department of the Civil Police of the State of São Paulo (DIPOL) is the supporting body
of the General Police Station, and its goal is to plan, coordinate and support the Telecommunications,
Information Technology and Intelligence activities of the Civil Police of the State of São Paulo. It is also
its function to plan, coordinate and support the Police Intelligence activities and to plan and coordinate
activities to be carried out in the Information Technology and Telecommunications areas of the Civil Police.
Recently, DIPOL made a big investment towards improving the service it provides to the population
by ameliorating the information security and modernization of all police units. Such investments also
involved a modern Data Center, designed and built by Aceco TI, including a Certified Data Room and a
Command and Control Center in order to protect and manage current and future technological platforms.
Data Room Inside View
Data Room Inside View
138 kW
10 TR
ELEKTRO – SP
CLIENTS AND PROJECTS
Qty.
ONGOING
√
COMMAND AND
CONTROL CENTER
√
Fighting
1
Stratos
2
CCTV
6
FM-200
POWER
UPS
2
120 kVA
240 kVA
Generators
2
500 kVA
1.000 kVA
Transformers
2
1.000 kVA
2.000 kVA
Precision
4
S23 – 23 kW
92 kW
UPS room
2
7,5 TR
15 TR
COOLING
TOTAL AREA
Data Room
53 m²
Infrastructure
149 m²
Built-up area
370 m²
CONNECTIVITY
Cat. 6
240 pt
Optical fibers
448 pt
Generators
MULTIDISCIPLINARY
Data Center Outside View
ELEKTRO – SP
Total
MONITORING/FIGHTING
Data Center Inside View
SIZE: BIG
Description
Data Center Inside View
UPS room
Elektro hired Aceco TI to build a 53 m² Data Room located in Campinas, SP, with an UPS room, new
primary cabin, generator room, logic and command and control center, fire detection and fighting
systems.
Aceco TI received the Elektro Supplier Prize in the Information Technology Category, a tribute granted
annually by the company to its best contractors.
Power Panel
Structured Cabling
ELETRONUCLEAR – RJ
CLIENTS AND PROJECTS
RIO DE JANEIRO
Qty.
Description
Total
ANGRA
Qty.
LCP
√
LCP
√
MOVING
√
LCP
√
√
MONITORING/FIGHTING
COMMAND AND
CONTROL CENTER
MONITORING/FIGHTING
Fighting
1
FM-200
UPS
2
60 kVA
120 kVA
Generator
2
230 kVA
460 kVA
Telecom
2
5 TR
NOC Room
1
4 TR
Precision
3
S23 - 23 kW
UPS Room
2
4 TR
COOLING
10 TR
4 TR
Infrastructure
155 m²
CONNECTIVITY
Cat. 6
264 pt
Optical fibers
20 pt
69 kW
8 TR
TOTAL AREA
40 m²
CCTV
8
Fighting
4
FM-200
460 kVA
UPS
3
2 - 80 kVA / 1 - 30 kVA
190 kVA
Generator
2
260 kVA
520 kVA
Comfort
2
1,5 TR
Precision
3
S29 - 29 kW
UPS Room
4
7,5 TR
30 TR
LCP
2
5,7 TR
11,4 TR
COOLING
TOTAL AREA
Data Room
70 m²
Infrastructure
319 m²
Built-up area
180 m²
CONNECTIVITY
Cat. 6
480 pt
Optical fibers
70 pt
00,00
0,00
Rack
0,40x0,80
00,00
0,00
Data Room Inside View
00,00
0,00
00,00
0,00
00,00
0,00
MULTIDISCIPLINARY
SIZE: BIG
Data Room Outside View
Angra – RJ
Rio de Janeiro – RJ
ELETRONUCLEAR – RJ
Chillers
Eletronuclear’s main demand was to remove its CPD from inside the Nuclear Plant for the sake of
information security, besides the fact that the big increase in the number of employees in the environment
was causing serious climatization problems.
Since 2006, Aceco TI has worked with this client in an attempt at making that new Data Center feasible.
Recently, at 14 km from the plant, an ideal site became available and the work began in earnest.
Besides the main site in Angra, Aceco TI also built, in the City of Rio de Janeiro, Eletronuclear’s Backup
Data Center.
Firefighting and LCP
Total
POWER
POWER
Data Room
Description
Climatization Water Piping
3 TR
87 kW
ERICSSON – SP
CLIENTS AND PROJECTS
Qty.
ONGOING
Total
√
MONITORING/FIGHTING
Stratos
1
Micra 25
2
80 kVA
Comfort
3
60.000 btu
Precision
4
S23 – 23 kW
UPS Room
3
60.000 btu
POWER
UPS
160 kVA
COOLING
TOTAL AREA
Data Room
76 m²
Power Panel
MULTIDISCIPLINARY
SIZE: BIG
ERICSSON – SP
Description
Condensers
Cable Trays
Ericsson hired the construction of a Data Room with separation for the Telecom area. This is another big
company of the private sector that entrusted its critical area to Aceco TI’s specialization.
Ericsson is very happy with the company services, especially the Corrective and Preventive Programmed
Maintenance Service of Data Centers, Ongoing.
In the words of Mr. Franco Michele Galgano, Ericsson’s IT Manager: “Ericsson would hand over [the hiring
of] a critical environment, as its Data Center, only to a highly specialized company as Aceco TI. This is so
because Aceco has the necessary certifications and, especially, the ISO 9001 quality certification for the
maintenance services delivered.”
Electric Cabling Under the Floor
Cable Trays
180.000 btu
92 kW
180.000 btu
CLIENTS AND PROJECTS
GRU - GUARULHOS INTERNATIONAL AIRPORT – SP
207
MOVING
√
COMMAND &
CONTROL CENTER
√
ONGOING
√
Qty.
Description
10
FM-200
Total
MONITORING/FIGHTING
CCTV
121
122
CONDENSADOAS
SUSPENSAS
123
124
125
126
CONDENSADOAS
SUSPENSAS
CONDENSADOAS
SUSPENSAS
206
Fighting
Vesda
NetWatch
CORREDOR TÉCNICO
UPS
Generator
Transformers
SALA UPS
64m²
SALA DE CRISES
38m²
4
Micra
√
POWER
SALA COFRE
200m²
205
800 m³ Argonite
SALA NOC
108m²
SALA STAGING
30m²
SALA POP
23m²
1+1
120 kVA
240 kVA
1
500 kVA
500 kVA
1+1
150 kVA
300 kVA
COOLING
Data Center
8
23 kW
184 kW
UPS Room
4
23 kW
92 kW
Comfort
4
3 TR
12 TR
TOTAL AREA
204
Data Room
200 m²
Infrastructure
560 m²
Built-up area
560 m²
CONNECTIVITY
Cat. 6
720 pt
Optical fiber
360 pt
Data Center Inside View
MULTIDISCIPLINARY
SIZE: BIG
Command and Control Center
GRU - GUARULHOS INTERNATIONAL
AIRPORT – SP
Firefighting
UPS Room
Crisis Room
Confined Row and Cabling Under the Access Floor
It’s been some time that GRU (Guarulhos International Airport) was privatized. Invepar, the winning
consortium, is made up by OAS and Ascar. The latter is a South-African company that was already familiar
with the Data Room technology and decided that it was important that the new GRU counted on that level
of security. Then they found that Aceco TI marketed that solution in Brazil on an exclusive basis. This fact
was decisive for Aceco TI to be chosen to build this new Data Center.
The project was idealized with a scalability projection for up to ten years, that is, the infrastructure
was assembled in such a way as to allow that the electric capacity of the environment be progressively
expanded according to the demand.
The GRU technical team was quite flexible and open to new ideas. The original project lacked the
construction of a Command & Control Center, but Aceco TI’s engineers proposed the construction of that
environment, as it is key for the country’s leading airport.
GRU’s Data Center was built in record time – four months. It is the first airport in Brazil to have a
Data Room.
PAMI – ARGENTINA
C7
E
C3
C6
√
ONGOING
√
C
FM-200 and water
Stratos
Micra
42
Temperature and
liquid sensors
UPS
2
250 kVA
500 kVA
Generator
2
600 kVA
1.200 kVA
Transformers
2
1.000 kVA
2.000 kVA
Chillers
2
130 kVA
260 kVA
8
42 kVA
336 kVA
AIRE Y LUZ
Data Center
A
C16
C15
A
TSNOC
NOC
TAA-B
NOC
COOLING
TS-SRV-B
C13
C14
MONTANTE
EXISTENTE
C12
C11
B
B
C9
C10
FM 200
FM200
MONTANTE
AGUA
EXISTENTE
POWER
UPS Room
√
TOTAL AREA
Data Room
124 m²
Data Center
426 m²
Data Center Inside View
MULTIDISCIPLINARY
SIZE: MEDIUM
Command and Control Center
PAMI – ARGENTINA
PAMI is the acronym for Programa de Atención Médica Integral, or Integral Health Care Program, a health
agency under the Ministry of Health in Argentina.
Managed by the Instituto Nacional de Servicios Sociales para Jubilados y Pensionados, the retirees and
pensioners service, the PAMI cares for the golden agers, the needy and the veterans of the Malvinas/
Falklands War.
Many social assistance plans are run in PAMI’s Data Center. An interruption of the operations would have
very negative social repercussions on the government.
Data Center Inside View
Climatization in Row
The building where PAMI’s Data Center was established is old. It was necessary to set in place an
electrical infrastructure totally independent from the power of the building in order to provide the Data
Center with autonomy, charge increase and high availability. Moreover, it was built without interrupting
operations and is equipped with a certified Data Room.
Generators & Chillers
Total
8
C1
C4
Description
Fighting
NetWatch
TAA-B
Nuevo pleno
de energia
C
TCOM-B
C2
C5
POSIBLE
NUEVA
MONTANTE
FM200
TCOM-A
MONTANTE
ELECTRICIDAD
EXISTENTE
COMMAND AND
CONTROL CENTER
CCTV
TAA-A
Nuevo pleno
de energia
√
MONITORING/FIGHTING
C8
CLIENTS AND PROJECTS
Qty.
MOVING
Bird’s View
PETROBRAS – RJ
CLIENTS AND PROJECTS
MACAÉ
Qty.
Description
Total
EDISE
COOLING
Precision
Qty.
Description
11
21 kW
231 kW
4
60 kW
240 kW
2
10,5 kW
21 kW
1
21 kW
21 kW
Precision
2
31 kW
62 kW
TOTAL AREA
14
21 kW
294 kW
Data Room
309,31 m²
Infrastructure
32,46 m²
TOTAL AREA
Data Room
144,76 m²
Tape library
33,04 m²
Condensers
73,44 m²
Petrobras Macaé
Data Center Inside View
MULTIDISCIPLINARY
SIZE: BIG
PETROBRAS – RJ
Macaé
Edise
Petrobras Macaé
Petrobrás’s technology and management are entirely based on IT processes underway at the company’s
main office building, EDISE, in Rio de Janeiro.
To expand the availability and guarantee the continuation of IT operations in case a contingency comes up,
a Data Room was built. The place’s entire administrative area was also under Aceco TI’s responsibility.
Now in Macaé, in the Campos Basin, Petrobrás has the biggest oil extraction base in Brazil. There, the
Data Processing Center did not correspond to the security and infrastructure needs for the projects under
development. As a result, a new Data Center was built together with a Data Room to receive all IT area.
Later, the Macaé Data Room was expanded twice to receive the new equipment and a new Data Room was
built there for a robotized tape filing.
PetrobrasEDISE
Total
COOLING
PetrobrasEDISE
PODER JUDICIAL DE LA NACIÓN – ARGENTINA
CLIENTS AND PROJECTS
Qty.
CCTV
P.Inf.
8
2
120 kVA
240 kVA
4
47 kW
188 kW
COOLING
Precision
TOTAL AREA
T NOC
Data Room
240 m²
Data Center
700 m²
Infrastructure
520 m²
CONNECTIVITY
MULTIDISCIPLINARY
Command and Control Center
PODER JUDICIAL DE LA NACIÓN –
ARGENTINA
Total
POWER
UPS
Data Center Inside View
SIZE: BIG
Description
MONITORING/FIGHTING
Data Center
The Judiciary Power in Argentina launched a full-fledged computerization of the judicial management,
referred to as “digital process paper” with the goal of speeding up with greater reliability all proceedings
regarding the judiciary management.
The first bid of this plan consisted in contracting the drawing and implementation of its new Data Center
on which all future computerization plans will be based, by readapting the existing building to convert it
into a technological building totally dedicated to TIC.
The Aceco TI project involves a civil architecture work, operators’ areas, technical and infrastructural
rooms and a Command and Control Center totalizing about 1,500 m² with TIER III infrastructure drawing,
and also includes a mission critical environment with a 200 sq. m. Data Room as part of the new Data
Center.
Data Center
Cat. 6
360 pt
Optical fibers
96 pt
PODER JUDICIAL DE LA PROVINCIA DE SANTA FÉ – ARGENTINA
CLIENTS AND PROJECTS
Qty.
COMMAND AND CONTROL
CENTER
Total
√
MONITORING/FIGHTING
CCTV
4
POWER
PS
1
40 kVA
40 kVA
Comfort
2
12 kW
24 kW
Precision
1
23 kW
23 kW
COOLING
TOTAL AREA
Data Room
18 m²
CONNECTIVITY
Cat. 6A
144 pt
Optical fibers
120 pt
Data Room Outside View
MULTIDISCIPLINARY
SIZE: MEDIUM
PODER JUDICIAL DE LA PROVINCIA DE
SANTA FÉ – ARGENTINA
This project was the result of an IT management investigation by the Judicial Power of the Santa Fe
province, Argentina, which assessed different alternatives to design its Data Center.
Starting from this research and based on the projects previously carried out on a national and provincial
levels, the solution adopted was to set up a Data Room.
The environment is small, but totally designed to grow modularly both in dimensions and redundancy,
integrating complementary civil architecture works. This has allowed the use of the available budget to
reach the highest quality standards and even then achieve considerable room saving.
Description
Data Room Entrance
Data Room Entrance
POLÍCIA FEDERAL – DF
CLIENTS AND PROJECTS
Qty.
Total
Stratos
4
CCTV
8
Micra 25
Fighting
2
FM-200
UPS
3
160 kVA
480 kVA
Generators
1
500 kVA
500 kVA
Comfort
2
5TR
Precision
5
S23 – 23 kW
UPS room
6
10 TR
POWER
CLIMATIZATION
TOTAL AREA
Data Room
136 m²
Built-up area
245 m²
Infrastructure
116 m²
CONNECTIVITY
Data Center Inside View
MULTIDISCIPLINARY
SIZE: BIG
Description
MONITORING/FIGHTING
Data Center Upper View
POLÍCIA FEDERAL – DF
Data Center Upper View
This project, the result of almost six years of work, was approved especially due to some goals of the Federal
Police Department of the Federal District, which involve data centralization and the preparation for the 2014
World Cup, as Brasilia will be one of the cities where the games will take place.
Data Center Inside View
Cat. 6
450 pt
Optical fibers
350 pt
10 TR
115 kW
60 TR
PROCURADORIA GERAL DA REPÚBLICA (PGR) – (DF)
CLIENTS AND PROJECTS
Qty.
MOVING
√
ONGOING
√
Description
MONITORING/FIGHTING
CCTV
5
Fighting
1
FM-200
3
S23 – 23 kW
COOLING
Precision
TOTAL AREA
Data Room
44 m²
Built-up area
67 m²
Vista Interna do Data Center
MULTIDISCIPLINARY
SIZE: MEDIUM
PROCURADORIA GERAL DA REPÚBLICA
(PGR) – (DF)
Total
Cabling under Raised Floor
Procuradoria Geral da República (PGR), known as the site where the physical representation of the federal
Public Attorney’s Office, the attorneyships are allocated. At Procuradoria Geral da República (PGR) in
Brasilia, Deputy Attorneys General, as well as the Attorney General and his substitute, carry out their
duties. The PGR members work at the STF (Federal Supreme Court), the STJ (Superior Court of Justice)
and the TSE (Superior Electoral Court).
All such agencies, included among the most important of the Federal Government, had their Data Centers
built by Aceco TI.
Firefighting and Precision Cooling
Data Room Entrance
69 kW
PRODAM – SP
CLIENTS AND PROJECTS
Qty.
Data Center Inside View
MULTIDISCIPLINARY
SIZE: MEDIUM
PRODAM – SP
Prodam is the Information and Communication Technology Company of the City of São Paulo. As it moved
its Data Center from Ibirapuera to a new site, located in the Água Branca district, there came up the
demand to transfer the existing Data Room and computer equipment to the new place, together with
the total allocation of the infrastructure of both power and servers of the corporate data bank, as well as
mainframe, robot and disks.
Due to the distance between the old and new Data Center, the move was highly complex, as it was carried
out with the equipment operating.
ONGOING
√
COMMAND AND CONTROL
CENTER
√
MOVING
√
Description
Total
POWER
UPS
1
300 kVA
300 kVA
Generators
1
750 kVA
750 kVA
Precision
4
S23 - 23 kW
92 kW
UPS room
3
15 kW
45 kW
COOLING
TOTAL AREA
Data Room
51 m²
Infrastructure
131 m²
Built-up area
280 m²
CONNECTIVITY
Cat. 6
600 pt
Optical fibers
75 pt
PRODESP – SP
Qty.
EXPANSION
Description
Total
√
TJ - SP
MOVING
MONITORING/FIGHTING
Qty.
Description
MONITORING/FIGHTING
Stratos
4
CCTV
14
2 M-25 e 2 M-100
CCTV
6
POWER
POWER
UPS
10
160 e 220 kVA
1.720 kVA
Generators
2
290 kVA
580 kVA
Precision
8
S23 - 23 kW
184 kW
UPS room
2
15 TR
UPS
2
120 kVA
240 kVA
Generators
2
290 kVA
580 kVA
5
S23 - 23 kW
115 kW
COOLING
Precision
COOLING
TOTAL AREA
Data Room
141 m²
Infrastructure
190 m²
Built-up area
272 m²
30 TR
TOTAL AREA
Data Room
194 m²
UPS room
25 m²
Data Center Outside View
MULTIDISCIPLINARY
SIZE: BIG
Data Center Inside View
PRODESP – SP
Raised Floor Installation
The Data Center of the Data Processing Company of the State of São Paulo runs information that requires
the highest availability level.
Offices of Poupa Tempo (time saving units meant to cut red tape), for instance, serve about one thousand
people a day each. Should such offices stop operating, citizens would be badly harmed. This is a risk
Prodesp cannot run.
Firefighting
At Prodesp’s, there are three Aceco TI Data Centers protected with Data Rooms, of which one hosts the
data of the São Paulo Court of Justice (TJ).
Precision Cooling
Total
√
00,00
0,00
CLIENTS AND PROJECTS
SP
Power Panel
PRODEST – ES
√
ONGOING
√
Description
Total
MONITORING/FIGHTING
0000,0,00
0,00
00,00
CCTV
18
Fighting
2
FM-200
Generators
2
564 kVA
1.128 kVA
UPS
2
225 kVA
450 kVA
0000,0,00
0000,0,00
0000,0,00
0000,0,00
POWER
enofele
T
3
0
8
3
1
5
8
0
enofele
T
emoN
2
6
9
#
*
7
4
1
9
#
emoN
2
6
4
7
*
1
5
8
0
4
7
*
#
9
5
2
36
Nome
Telefone
COOLING
Telefone
enofele
T
Telefone
36
2
1
7
*
8
0
9
#
3
36
2
1
5
4
7
*
8
0
9
#
9
#
3
2
6
5
4
1
5
8
0
enofele
T
emoN
Nome
Nome
4
7
*
emoN
2
6
9
#
1
5
8
0
4
7
*
enofele
T
3
emoN
2
6
9
#
1
5
8
0
4
7
*
2
5
8
7,5 TR
30 TR
4
S23 - 23 kW
93 kW
UPS room
2/2
2,5 TR/5 TR
5 TR/10 TR
1
4
7
*
4
enofele
T
0
Comfort
Precision
3
6
9
#
emoN
3
6
9
#
2
5
8
0
enofele
T
1
4
7
*
emoN
3
6
9
#
2
5
8
0
enofele
T
1
4
7
*
emoN
CLIENTS AND PROJECTS
Qty.
COMMAND AND
CONTROL CENTER
TOTAL AREA
Data Room
130 m²
MF Room – 90
64 m²
Infrastructure
133 m²
Built-up area
1.200 m²
Colocation Room Interior
MULTIDISCIPLINARY
SIZE: MEGA
Façade
PRODEST – ES
Command and Control Center
Inside View of Confined Rack Passageway
Projected and built by Aceco TI, the Data Center of the Data Processing Company of Espirito Santo is the
biggest in that state.
It is a big, complete project, with a Data Center with 130 square meters in size and 1,200 m² of built-up area.
Cabling under Raised Floor
Outside View of Confined Rack Passageway
CLIENTS AND PROJECTS
PRODEST – ES
Cabling under Raised Floor
Condensers
Command and Control Center Outside View
Cabling under Raised Floor
Generator
Electricity Distribution Boards
Data Center Inside View
Data Center Inside View
Data Center Outside View
Fire Control
CLIENTS AND PROJECTS
SABESP – SP
MULTIDISCIPLINARY
SIZE: BIG
SABESP – SP
The largest basic sanitation utility company of Latin America and the sixth largest in the world projected
and built its Data Center, including equipment moving, through Aceco TI. The Data Room was built as the
old Data Center went on operating.
It was a long, complex, albeit successful, selling process that took almost a decade to come true.
Qty.
MOVING
Description
Total
√
MONITORING/FIGHTING
UPS
2
225 kVA
UPS room
2
5 TR
Precision
6
S23 – 23 kW
450 kVA
COOLING
TOTAL AREA
Data Room
94 m²
CONNECTIVITY
Cat. 6
600 pt
10 TR
138 kW
SECRETARIA DA FAZENDA – AC
CLIENTS AND PROJECTS
Sefaz – Oca
OCA
Qty.
Description
Total
POWER
UPS
40 kVA
80 kVA
1
200 kVA
200 kVA
Precision
2
S23-23 kW
92 kW
UPS room
2
S17-17 kW
34 kW
Generators
COOLING
TOTAL AREA
Data Room
48,14 m²
Infrastructure
168,01 m²
CONNECTIVITY
26,25 m²
CABLING
Optical fibers
SEFAZ – AC
48 pt
Qtde
Descrição
Total
POWER
Sefaz – AC
UPS
2
100 kVA
200 kVA
Generators
1
260 kVA
260 kVA
Precision
4
S23-23 kW
UPS Room
2
60 kbtu
COOLING
92 kW
120 kbtu
TOTAL AREA
Data Room
48 m²
Infrastructure
75,76 m²
MF120
CONNECTIVITY
264 pt
Optical Fibers
DTIC
Data Room View
104 pt
Qtde
Descrição
UPS
Sefaz – DTIC
2
60 kVA
Precision
4
S23-23 kW
69 kW
UPS Room
2
48 kbtu
96 kbtu
TOTAL AREA
Cooling and Fire Detection
Data Room
35 m²
Infrastructure
69,23 m²
MF120
32,34 m²
CONNECTIVITY
SECRETARIA DA FAZENDA – AC
Optical fibers
Debunking the image of a small, faraway state, Acre has heavily invested in IT, a fact that put it quite
ahead several other much bigger states. Secretaria da Fazenda, the Finance Department of the State of
Acre has already purchased three Data Rooms for different agencies.
The first Room was bought by the Department itself, and it has already been expanded. Like all projects
in Acre, it posed a big logistical challenge to Aceco TI due to the distance that the elements and other
implanted solutions had to overcome.
Data Center Building
Together with the expansion of this Data Room, another two were hired: one for OCA (Central Service
Agency) and another for DTCI (Information and Communication Technology Department).
This big investment is considered a landmark for the State of Acre, as it has now one of the most up-todate Finance Departments in the country.
Cabling
120 kVA
COOLING
MULTIDISCIPLINARY
SIZE: MEDIUM
Total
POWER
Generator
Data Center Civil Works
88 pt
CLIENTS AND PROJECTS
SECRETARIA DA FAZENDA – CE
Descrição
Total
Stratos
1
Micra 25
CCTV
4
Fighting
1
FM-200
UPS
2
60 kVA
120 kVA
Generators
1
180 kVA
180 kVA
3
S23 – 23 kW
√
MONITORING/FIGHTING
POWER
COOLING
Precision
TOTAL AREA
Data Room
44 m²
Data Center
80 m²
CONNECTIVITY
Data Center Inside View
MULTIDISCIPLINARY
SIZE: MEDIUM
Qtde
MOVING
Command and Control Center
SECRETARIA DA FAZENDA – CE
Data Room Entrance
Following on the steps of other Finance Departments that have updated their Data Centers, Secretaria da
Fazenda of Ceará also hired Aceco TI and set in place a Data Room.
The environment was built with the Data Center operating, including equipment moving.
Data Center Inside View
Cat. 6
300 pt
Optical fiber
150 pt
69 kW
SECRETARIA DA FAZENDA – SP
CLIENTS AND PROJECTS
Qtde
ONGOING
Descrição
MONITORING/FIGHTING
Stratos
6
CCTV
9
Fighting
1
FM-200
UPS
2
300 kVA
600 kVA
Generators
2
575 kVA
1.150 kVA
Comfort
3
24.000 btu
72.000 btu
Precision
12
S23 - 23 kW
UPS room
2
10 TR
POWER
COOLING
TOTAL AREA
Data Room
106,91 m²
Built-up area
490 m²
CONNECTIVITY
Cat. 6
250 pt
Optical fibers
388 pt
Facilities Before the Work
Moving
MULTIDISCIPLINARY
SIZE: BIG
SECRETARIA DA FAZENDA – SP
Secretaria da Fazenda, the Finance Department of the State of São Paulo recently hired Aceco TI to build
its Data Center.
The work execution went so smoothly that it was finished before the stipulated term.
The Ongoing service was contracted together with the job.
Total
√
Moving
Facilities Before the Work
Facilities Before the Work
Facilities Before the Work
276 kW
20 TR
SENIAT – VENEZUELA
CLIENTS AND PROJECTS
Qtde
3D Pop-up
MULTIDISCIPLINARY
SIZE: MEDIUM
SENIAT – VENEZUELA
SENIAT (Servicio Nacional Integrado de Administración Aduanera y Tributaria), the Venezuelan customs
and tax administration, launched an international bidding to pick up the company that would build its new
Data Center. Among all Latin American players, Aceco TI was chosen.
Our first mission was to assess and define the most convenient place to build the new Data Center. We
opted to design an independent building in the parking area of the corporate building.
All levying, foreign trade, customs and tax evasion control depend on SENIAT’s Data Center reliability. To
guarantee the security of such data, a certified Data Room with Tier III infrastructure was raised.
GREEN
Descrição
Total
√
MONITORING/FIGHTING
CCTV
Fighting
8
√
FM-200
POWER
UPS
2
120 kVA
Generators
COOLING
Precision
4+2
Liebert M35
UPS room
TOTAL AREA
Data Room
110 m²
Data Center
152 m²
CONNECTIVITY
Cat. 6
√
10 Gbps
240 kVA
Qty.
FAN COIL CASSETTE
CLI 1P-44
FAN COIL CASSETTE
CLI 1P-45
FAN COIL CASSETTE
CLI 1P-43
FAN COIL CASSETTE
CLI 1P-42
Total
Stratos
4
CCTV
16
Micra 100
FAN COIL CASSETTE
CLI 1P-41
FAN COIL CASSETTE
CLI 1P-39
POWER
FAN COIL CASSETTE
CLI 1P-38
FAN COIL CASSETTE
CLI 1P-46
UPS
FAN COIL CASSETTE
CLI 1P-40
30
274
30
30
64
20
20
30
264
23
40
135
30
37
30
273
30
274
QF-AT-2
0.80
TDFC-13
0.80
0.80
92
30
396
30
338
30
Precision
4
58,5 kW
234 kW
UPS room
4
15 TR
TANQUE DIARIO
PETROLEO G2
TOTAL AREA
TANQUE DIARIO
PETROLEO G3
03
TG2
TG3
03
03
03
TG1
03
TGSA
600 kVA
02
02
02
TANQUE DIARIO
PETROLEO G1
TSA-G1 TSA-G2 TSA-G3
300 kVA
COOLING
46
FAN COIL CASSETTE
CLI 1P-37
02
02
ACHURADO INDICA
EQUIPOS FUTUROS
02
2
QF-UPS-SP-1
SANITARIO
QF-AT-UPS-2
QLF-SP-1
TDAC +
CLIMA 3
30
QLF-SP-2
80
Data Center General View
MULTIDISCIPLINARY
SIZE: MEGA
Description
MONITORING/FIGHTING
03
CLIENTS AND PROJECTS
SONDA IT – SP
Data Center General View
SONDA IT – SP
With a presence on the Brazilian market spanning more than 20 years, Sonda IT offers integrated IT,
application software and business management systems service solutions using the most acclaimed
global platforms.
Currently, Sonda IT is targeting its IT services to meet the demand of clients lacking in Data Centers.
Aceco TI, thus, became a strategic supplier.
Sonda wanted to build a new headquarters in Santana do Parnaíba, near Alphaville. Aceco TI introduced to
the client the Tiers concept and the standards and concepts involved in the high-availability environment
certification process with physical security.
Although competitors had vied for the sale, the fact that we offered a Tier III Certified Data Center was
decisive for Sonda to choose Aceco TI to design and carry out the project.
Data Center General View
Precision
210 m²
Infrastructure
90 m²
Built-up area
300 m²
60 TR
SUPERIOR TRIBUNAL DE JUSTIÇA (STJ) – DF
CLIENTS AND PROJECTS
Qty.
MOVING
Description
Total
√
MONITORING/FIGHTING
Stratos
2
CCTV
5
Micra 25 e 100
Fighting
1
FM-200
UPS
2
60 kVA
120 kVA
Generators
1
260 kVA
260 kVA
Precision
4
S23 – 23 kW
92 kW
UPS room
2
5 TR
10 TR
POWER
COOLING
TOTAL AREA
Data Room
41 m²
Infrastructure
20 m²
CONNECTIVITY
Cat. 6
100 pt
MULTIDISCIPLINARY
SIZE: BIG
SUPERIOR TRIBUNAL DE JUSTIÇA (STJ)
– DF
Aceco TI has built safe and highly reliable Data Centers of all superior bodies of the Brazilian government.
The latest one to hire Aceco TI to build a Data Room was the Superior Court of Justice (STJ), whose
purchase process was guided by other success cases, such as of the Federal Supreme Court (the first
superior body to buy the Data Room), the Superior Labor Court and the Federal Public Attorney’s Office.
The STJ project is complete, and has all the infrastructure and redundancy necessary to the environment’s
high availability.
Facilities Before the Work
Facilities Before the Work
SUPREMO TRIBUNAL FEDERAL (STF) – DF
CLIENTS AND PROJECTS
Qty.
Current status
ONGOING
√
COMMAND AND
CONTROL CENTER
√
Total
MONITORING/FIGHTING
Stratos
1
CCTV
5
NetWatch
1
Humidity,
temperature, door,
smoke and liquid
sensors
Fighting
Micra 25
1
FM-200
1
75 kVA
75 kVA
3
S23 - 23 kW
69 kW
POWER
UPS
COOLING
Precision
Growth
TOTAL AREA
Data Room
43 m²
Expansion
60 m²
CONNECTIVITY
Cat. 6
216 pt
Data Center Inside View
MULTIDISCIPLINARY
SIZE: MEDIUM
Description
Cabling Under The Raised Floor
SUPREMO TRIBUNAL FEDERAL (STF) –
DF
Supremo Tribunal Federal, the Federal Supreme Court was the first among Superior Courts to buy a
Certified Data Room from Aceco TI.
Based on the decisions by the National Account’s Tribunal (TCU), The Federal Accounts Office, the sale
was brought about through an unenforceable character, proving the Data Room solution exclusiveness.
Data Center Inside View
Data Center Door
Precision Cooling and Fire Detection
Data Room Door
Condensers
TRIBUNAL DE CONTAS DA UNIÃO (TCU) – DF
CLIENTS AND PROJECTS
Qtde
MOVING
√
ONGOING
√
COMMAND AND CONTROL
CENTER
√
Descrição
MONITORING/FIGHTING
Stratos
3/4
CCTV
16
Fighting
1
NetWatch
3
Micra 25 / Micra 100
FM-200
POWER
UPS
Generators
2/1
64 kVA / 80 kVA
SIZE: MEDIUM
TRIBUNAL DE CONTAS DA UNIÃO (TCU)
– DF
The TCU, Federal Accounts Office helps Congress in the accounting, financial, budgetary, operational
and pecuniary inspection of the federal government, as well as direct and indirect administration entities
in regards to their legality, legitimacy, economy, subvention granting and revenue waiving. Thus, it is an
agency that determines to other public agencies how they should proceed in their hiring and
bidding policies.
The TCU has been involved in Aceco TI’s day-to-day matters regarding its sales to the public sector by
issuing opinions attesting to the quality and advantages of is solutions. In 2009, the TCU had to build a new
Data Center. Following a strict procedure, Aceco TI was picked as the appropriate company to carry out
the project.
128 kVA / 80 kVA
1
380 kVA
380 kVA
Precision
3
10 TR
30 TR
UPS Room
4
5 TR
20 TR
Comfort
1
1 TR
1 TR
Command and Control Center
2
3 TR
6 TR
COOLING
TOTAL AREA
Data Center
58 m²
MF-120
63 m²
Infrastructure
149 m²
CONNECTIVITY
MULTIDISCIPLINARY
Total
Cat. 6
140 pt
Optical fiber
136 pt
TRIBUNAL DE JUSTIÇA – SP
CLIENTS AND PROJECTS
Qty.
00,00
0,00
ONGOING
√
COMMAND AND CONTROL CENTER
√
Description
Total
00,00
0,00
00,00
0,00
00,00
0,00
MONITORING/FIGHTING
00,00
0,00
00,00
0,00
00,00
0,00
00,00
0,00
00,00
0,00
00,00
0,00
00,00
0,00
Stratos
1
CCTV
5
Micra 25
Fighting
1
FM-200
1
75 kVA
Comfort
2
24.000 btu
Precision
1
S17 – 17 kW
POWER
UPS
75 kVA
COOLING
TOTAL AREA
Data Room
5 m²
CONNECTIVITY
Cat. 6
Command and Control Center
MULTIDISCIPLINARY
SIZE: MEDIUM
TRIBUNAL DE JUSTIÇA – SP
Data Room Entrance
The main asset of the Tribunal de Justiça (Court of Justice of São Paulo) is information. There are millions
of suits with invaluable data. The responsibility of the Court is to watch over the privacy of the community
of our State and the credibility of the Judicial Power by making sure, among other things, that the
information exchanged between it and the lower courts is kept top secret.
To ensure this protection, the Court of Justice of São Paulo set in place an Aceco TI Data Room with
all options.
To improve efficiency, control and management of the IT operations and infrastructure, the Court of
Justice of São Paulo put in place a modern Command and Control Center, also built by Aceco TI.
Generator
Firefighting and Cooling
30 pt
48.000 btu
17 kW
CLIENTS AND PROJECTS
TRIBUNAL ELECTORAL – PANAMÁ
Qty.
Data Room
Data Room Maintenance
MULTIDISCIPLINARY
SIZE: MEDIUM
TRIBUNAL ELECTORAL – PANAMÁ
The Tribunal Electoral (Electoral Court of Panama) provides IT services to the government in areas that go
beyond the management of the electoral process. There was a demand to set in place a Data Center in the
landmark building it occupies today.
Aceco TI was asked to provide an engineering support to several alternative studies that made feasible the
establishment of a top-quality IT environment that could be executed in record time.
The option chosen was to readapt the existing Data Center, while the equipment was kept operating, by
establishing a Data Room.
Description
TOTAL AREA
Data Room Maintenance
Data Room Maintenance
49,46 m²
Total
TRIBUNAL REGIONAL DO TRABALHO (TRT) – MG
CLIENTS AND PROJECTS
Qtde
Descrição
Stratos
2
CCTV
6
Micra 25
Fighting
1
FM-200
UPS
2
60 kVA
120 kVA
Generators
1
170 kVA
170 kVA
Precision
3
S23 – 23 kW
UPS Room
2
36.000 btu
POWER
COOLING
TOTAL AREA
Data Room
60 m²
Infrastructure
70 m²
Total Area
130 m²
CONNECTIVITY
Cat. 6
288 pt
Optical fiber
72 pt
Data Center Entrance
MULTIDISCIPLINARY
SIZE: MEDIUM
TRIBUNAL REGIONAL DO TRABALHO
(TRT) – MG
Total
MONITORING/FIGHTING
Generators
The sale of an Aceco TI Safe Data Center to the Tribunal Regional do Trabalho (Superior Labor Court)
served as model for several Regional Labor Court all over Brazil to also invest in security.
That was the case of the Minas Gerais Regional Labor Court, who contracted Aceco TI to build its Safe
217 m² Data Center.
Condensers
Data Center Entrance
69 kW
72.000 btu
CLIENTS AND PROJECTS
TRIBUNAL REGIONAL DO TRABALHO – SP
MULTIDISCIPLINARY
SIZE: MEDIUM
TRIBUNAL REGIONAL DO TRABALHO –
SP
The Tribunal Regional do Trabalho (Regional Labor Court of São Paulo) hired Aceco TI to build its 255 m²
Safe Data Center.
In 2005, the TRT-SP had already installed two Stratos Early Fire Detection systems made up by 29
equipment units divided into the building’s 25 floors.
MOVING
√
ONGOING
√
Qty.
Description
3\2
Micra 25 \ Micra 100
Total
MONITORING/FIGHTING
Stratos
CCTV
8
Fighting
1
FM-200
UPS
4
80 kVA
320 kVA
Generators
2
330 kVA
660 kVA
Precision
5
S23 – 23 kW
115 kW
UPS Room
2
5 TR
Comfort
2
36.000 kW
POWER
COOLING
TOTAL AREA
Data Room
56 m²
Data Center
255 m²
Infrastructure
40 m²
TRIBUNAL SUPERIOR ELEITORAL (TSE) – DF
CLIENTS AND PROJECTS
Qty.
Description
Fighting
1
FM-200
Stratos
2
Micra 25 e 100
Humidity,
temperature, door,
smoke and liquid
sensors
NetWatch
COOLING
Precision
4
S20-20 kW
TOTAL AREA
Data Center
135,70 m²
Data Center Inside View
MULTIDISCIPLINARY
SIZE: BIG
TRIBUNAL SUPERIOR ELEITORAL (TSE)
– DF
Total
MONITORING/FIGHTING
Power Panel
Data Center Inside View
Data Center Inside View
The Brazilian electoral process is one of the most advanced and fastest in the world. Almost entirely
computerized, it is a process that depends on availability and reliability to uphold its legitimacy.
Since 2006, all data with the votes of Brazilian citizens have been computed in servers protected by an
Aceco TI Data Room.
Firefighting
Data Room Door
CCTV
80 kW
WALMART – SP
CLIENTS AND PROJECTS
Descrição
ONGOING
MONITORING/FIGHTING
Fighting
2
FM-200
1
FM-200 (ampliação)
4
S23-23 kW
COOLING
Precision
Data Room Façade
MULTIDISCIPLINARY
SIZE: MEDIUM
WALMART – SP
Total
√
Data Room Entrance
Walmart was introduced to the Aceco TI Data Room technology when it bought the Bompreço
supermarket chain, who had had such environments for a long time.
Now Walmart has not only built its own Data Room, but it has also built its backup site with Aceco TI in
Tamboré, SP, and expanded it without interrupting the equipment operation.
Condensers
Power Panel
92 kW
PRE-FABRICATED MODULAR
DATA CENTERS
PRE-FABRICATED MODULAR
DATA CENTERS
COLLAHUASI – CHILE
CLIENTS AND PROJECTS
Qtde
CCTV
Total
5
POWER
UPS
2
40 kVA
80 kVA
3
47 kVA
141 kVA
COOLING
Precision
TOTAL AREA
Outside View and Condensers
SIZE: BIG
COLLAHUASI – CHILE
Descrição
MONITORING/FIGHTING
Inside View
Minera Collahuasi, one of the leading companies of the Chilean mining industry, needed to set up a Data
Center to command its mineral exploration and exploitation activities 4,400 meters above sea level on the
Andes Mountains.
The complexity of this case required that the project be structured in a modular way, with a Data Room
that could be taken disassembled to the extraction field, where it would be quickly and safely installed.
The infrastructure design was drawn up by Aceto TI’s Engineering. Studies were carried out to establish
free-cooling systems and a solution with high, certified safety level was developed at a lower cost than
required for usual buildings, since the site’s cold temperatures were used to refrigerate the Data Center.
Power Panel
Data Room
100 m²
Condensers
660 m²
PADO – PR
CLIENTS AND PROJECTS
Qty.
ONGOING
Total
MONITORING/FIGHTING
CCTV
√
FIGHTING
√
Stratos
√
3
FM-200
1
NetWatch
Micra 25
Netbotz
POWER
AR3100
PRODUCT INFORMATION
AR3100
AR3100
AR3100
275.2 LBS [124.5 kg]
275.2 LBS [124.5 kg]
275.2 LBS [124.5 kg]
275.2 LBS [124.5 kg]
NetShelter SX 42U 600mm
NetShelter SX 42U 600mm
NetShelter SX 42U 600mm
NetShelter SX 42U 600mm
APC
PRODUCT INFORMATION
PRODUCT INFORMATION
APC
PRODUCT INFORMATION
APC
PRODUCT INFORMATION
APC
UPS
3
16 kVA
48 kVA
Generators
1
460 kVA
460 kVA
3
10 kW
NOITAMROFNI TCUDORP
COOLING
Precision
√
CONNECTIVITY
Cat. 6
√
200 pt
Optical fiber
√
100 pt
Optical distributor
√
100 pt
TOTAL AREA
Container Data Center Inside View
SIZE: MEDIUM
PADO – PR
When we hear of the Pado trademark, its famous padlocks come immediately to our minds. In fact, Pado
also makes hinges, locks, handles and other accessories.
Established in 1936, the company started up as a foundry. The designation Pado was formed by the
first two letters of the surnames of two of its partners: Paioletti and Dorner. In 2009, we were given an
authorization by the company to run a fast-track risk analysis. At the occasion, vulnerabilities were
identified in the high-criticity environment.
At the end of 2010 and early 2011, a project to establish a new Data Center was started: it would be of the
conventional type, with masonry walls, with approximately 25 m² in size, a UPS room and access hall. The
project included precision climatization, raised floor, monitoring system and early fire detection.
The solution was perfect for Pado’s needs, especially because it was fast and modular, besides offering
the possibility to change the environment’s place in the future. The project was then adapted and the
conventional Data Center was replaced by the Container.
The Container Data Center sold to Pado has F-90 fire-proof walls especially coated to be assembled in an
outdoor environment. The climatization system is of the in-row type, independent from the environment
outside the rack, with a 30kW refrigeration capacity. The solution also included an FM-200 gas firefighting
and remote infrastructural monitoring.
Description
√
Confined row
Infrastructure area
28 m²
Data Center
28 m²
Total Area
56 m²
30 kW
CLIENTS AND PROJECTS
PADO – PR
DCMPF Outside View
Container Data Center And Firefighting Inside View
DCMPF Entrace
Condensers
Firefighting System
RODOBENS – SP
Description
Total
√
MONITORING/FIGHTING
0,00
00,00
CCTV
3
Câmeras
Fighting
1
FM-200
Stratos
1
Micra 100
APC Netbotz
00,00
0,00
0,00
00,00
√
POWER
0,00
00,00
0,00
00,00
CLIENTS AND PROJECTS
Qty.
ONGOING
UPS
1+1
60
60
1
125
125
2+1
30
60
Generator
Cooling Units
COOLING
Precision
3
30 kVA
60 kVA
CONNECTIVITY
Cat. 6
124 pt
TOTAL AREA
DCMPF area
39 m²
IT infrastructure
150 m²
DCMPF Outside View
SIZE: BIG
RODOBENS – SP
Rodobens Negócios e Soluções was looking for a solution that could meet the widely varied IT demands of
its group, as it regarded business units involved from banks to insurance, and from leasing to car rental.
After a number of scenario and analysis studies on performance, efficiency, reliability, availability,
expansion and operating costs, the best alternative was found to be the establishment of an outdoor PreFabricated Modular Data Center.
Confined Row
DCMPF Entrance
To protect company data, the Data Center has 47U racks, with the telephony, backup and server areas
physically separated, redundant precision air conditioners, high-energy UPS systems, early fire detection
and gas firefighting mechanisms. Moreover, the structure also offers protection against fire, smoke,
water, humidity, corrosive gases and break-ins.
Power Panel
Condensers
VSE – SP
CLIENTS AND PROJECTS
Qty.
ONGOING
Description
Total
√
MONITORING/FIGHTING
CCTV
2
Fighting
FM-200
Stratos
DATA
CENTER
Câmeras
1
Micra
UPS
1
40 kVA
40 kVA
Generator
1
55 kVA
55 kVA
3
17 kVA
51 kVA
NetWatch
√
POWER
COOLING
Precision
TOTAL AREA
DCMPF area
20 m²
Vista Externa do DCMPF
SIZE: BIG
VSE – SP
Vale Soluções de Energia is a division of the Vale mining company that researches alternative
energy solutions.
The company needed a safer and more economic Data Center that would not entail higher operating
costs, while offering shorter deadlines and lower costs.
During Aceco TI’s sales convention, we installed a DCMPF to show our employees the benefits and
differences of the solution. At the occasion, some VSE executives took a tour of the DCMPF and found they
liked the solution a lot, as it excelled in terms of modularity and facility to set up.
Rack Row
DCMPF Entrance
Buying a DCMPF was also an advantage to VSE in regards to connectivity. It was built near a primary
cabin, a fact that made it easier to install optical fibers.
Hiring the Ongoing services was important for VSE to lower its operating costs. This way, Aceco TI takes
care of the environment for the client.
DCMPF Entrance
RETROFITS
RETROFITS
EDS – SP
CLIENTS AND PROJECTS
Qty.
ONGOING
Description
Total
√
MONITORING/FIGHTING
Stratos
1
CCTV
16
POWER
UPS
4
500 kVA
2.000 kVA
Generators
1
2.000 kVA
2.000 kVA
Precision
6
30 TR
180 TR
UPS Room
1
15 TR
15 TR
COOLING
TOTAL AREA
Data Center
1.132 m²
Infrastructure
300 m²
Data Center Inside View
SIZE: MEGA
EDS – SP
The EDS Data Center is one of the main cases of conventional Data Centers built by Aceco TI for a
private company.
The company provided the project and the work, with infrastructural adaptation to the Data Center
environment, especially POWER.
Generators
Condensers
Data Center Inside View
FNDE – DF
Qty.
Description
CLIENTS AND PROJECTS
CCTV
5
Fighting
1
FM-200
UPS
2
120 kVA
240 kVA
Generators
1
310 kVA
310 kVA
Precision
3
S23–23 kW
39 kW
Comfort
2
60.000 btu
120.000 btu
POWER
COOLING
TOTAL AREA
Data Center
65 m²
Data Center Inside View
Access Control
SIZE: MEDIUM
FNDE – DF
Data Room Door
Data Center Inside View
Precision Cooling
CCTV
The National Education Development Fund (FNDE) is an autarchy of the Ministry of Education with the aim
of providing funds and carrying out actions to develop education, guaranteeing a quality education to
all Brazilians.
Since 2006, the FNDE has a Safe Data Center equipped with Data Room and all required sub-systems,
designed and built by Aceco TI.
Total
MONITORING/FIGHTING
Electric Control Cabinets
Firefighting System
TIM – RJ AND SP
CLIENTS AND PROJECTS
TIM – RJ
Qty.
COMMAND AND
CONTROL CENTER
√
MOVING
√
Description
Total
Qty.
Description
Total
S23-23 kW
184 kW
MONITORING/FIGHTING
MONITORING/FIGHTING
Fighting
1
CCTV
4
2
Stratos
4
CCTV
12
COOLING
FM-200
Precision
8
TOTAL AREA
COOLING
Precision
TIM – SP
S20-20 kW
40 kW
Data Room
300 m²
Work area
600 m²
Tim’s 1st Floor
Tim RJ’s Ground Floor
Data Center Inside View
SIZE: MEGA
Command and Control Center
TIM – RJ AND SP
TIM has conventional Data Rooms and Data Centers built by Aceco TI in São Paulo and Rio de Janeiro.
It all began in a Data Room in Rio in 2003-2004, the first of the project’s required three. The second one
dealt with upgrades in infrastructure and the Telecom room, but contemplated especially the construction
of a big conventional Data Center. The third phase focused on the connectivity matter.
The new Data Center, built with the equipment operating, required a big effort by the Aceco TI moving
team, especially because 1,600 m² of floor were replaced during the job. To hoist the servers during
the exchange, a special equipment was used, a kind of hydraulic elevator especially designed for highsensitivity pieces of equipment.
Equipment Used to Hoist the Rack During Moving
TIM RJ – Data Center Inside View
The Data Room in São Paulo was the result of the evolution in the relationship between Aceco TI and TIM.
Situated in Santo André, this is also a big-size Room, as it was built in a space sufficient to shelter future
infrastructural expansions.
Data Center Inside View
Data Room Entrance
TRIBUNAL SUPERIOR DO TRABALHO (TST) – DF
CLIENTS AND PROJECTS
Qty.
SIZE: MEGA
TRIBUNAL SUPERIOR DO TRABALHO
(TST) – DF
The Tribunal Superior do Trabalho (Superior Labor Court) project was designed to shelter the CPD of the
TST itself, as well as of the CSJT (Labor Court Superior Council).
The TST Data Center has served as a springboard for all TRTs (Regional Labor Courts) in the country, as
they have invested more and more in Safe, High-Availability Data Centers.
ONGOING
Description
Total
√
MONITORING/FIGHTING
Stratos
1
CCTV
8
NetWatch
Fighting
Micra 100
Humidity, temperature, door, smoke and liquid sensors
2
FM-200
1
150 kVA
150 kVA
5
S23 – 23 kW
115 kW
POWER
UPS
COOLING
Precision
TOTAL AREA
Data Room
70 m²
Infrastructure
76 m²
Built-up area
204 m²
INTEGRATED COMMAND &
CONTROL CENTERS
INTEGRATED COMMAND &
CONTROL CENTERS
i= 1%
MURETA H=30cm
MURETA H=30cm
TANQUE
DORMITÓRIO MASC.
25m²
Qtde
Descrição
10
Cameras
SALA MULTI-USO
16m²
CALL CENTER
35,15m²
INTEGRATED
COMMAND &
CONTROL CENTER
√
ONGOING
√
RETROFIT
√
MONITORING/FIGHTING
CCTV
800
1800
Fighting
SOBE
Vesda
SOBE
QLF-NOC
85,4 m³ FM-200
2
Micra
QD-NOC
NetWatch
√
POWER
UPS
Generator
Cooling units
1+1
60
60
1
125
125
2+1
30
60
COOLING
Data Center
3
23 kVA
69 kVA
UPS Room
2
5 TR
10 TR
Another Environment
10
de 1 TR a 5 TR
33 TR
CONNECTIVITY
Cat. 6
168 pt
Optical fiber
21 pt
TOTAL AREA
Data Room
28 m²
IT Infrastructure
59 m²
Total built-up area
97 m² and
620 m² retrofit
Command & Control Center
CICC – INTEGRATED COMMAND & CONTROL CENTERS
Aceco TI was responsible for the construction of one of the most significant legacies for Brazilians following
the big events to be held in the country (Confederations Cup, the World Cup and the Olympic Games): the
Integrated Command & Control Centers (CICCs).
Under the coordination of the Extraordinary Office for Big Events (SESGE), the CICCs will concentrate
the monitoring of all security forces (police, fire brigades, public services) and will be the site from which
government officials will coordinate the entire work of anticipating and managing eventual crises during the
events.
Aceco TI built the complete infrastructure (redundant power systems, cooling system, access control, adequate
furniture, etc.) of the Data Rooms and of the ten CICCs to guarantee their total availability and operation 24
hours a day, seven days a week.
The CICCs will be one of the leading legacies left over to Brazilians. Following the events, the CICCs will be
totally used by the national public security system, including the addition of other areas, such as civil defense,
for instance, all of which will provide greater flexibility and services to the citizenship.
The first CICCs began operating in Rio de Janeiro, Brasilia, Minas Gerais and Pernambuco. The others – in
Amazonas, Bahia, Ceará, Mato Grosso, Paraná, São Paulo, Rio Grande do Norte, Rio Grande do Sul and
Brasilia – will be up and ready for the World Cup.
Total
TANQUE
SALA MULTI-USO
19,50m²
DORMITÓRIO FEM.
25m²
CONTRA PISO DE CONCRETO
IMPERMEABILIZADO E REGULARIZADO
SHAFT
1700
CLIENTS AND PROJECTS
CICC – INTEGRATED COMMAND & CONTROL CENTERS
1. Control Center
Environment that oversees,
controls, commands and
coordinates operations 24 hours
a day, 7 days a week, 365 days
a year.
2. Crisis Room
This is where the situational
diagnosis is made. It is the place
where past and present data
converge and point to future
decisions.
3. Coordinator Room
The official who
coordinates the Integrated
Command and Control
Center (CICC) operations.
4. Data Room
A certified and accredited security
environment that protects
the Data Center against main
physical threats such as fire and
water, for instance.
5. UPS Room
The UPS (or no-breaks) keep the
power of the Data Center and the
entire complex stable in case of
blackout until generators kick in.
6. Generators
The generators are
automatically started
in case of blackout.
VIVO – SP
CLIENTS AND PROJECTS
Qty.
ONGOING
Description
√
Command & Control Center
VIVO – SP
Vivo, the leading cellular telephone company in Brazil, in addition to hiring the construction of Aceco TI Data
Rooms for its Data Centers, has also built a big Command & Control Center to manage all is operations.
A total of 19 consoles for the Command & Control Center, each measuring 2m long, have been built, plus six
1m consoles to receive 44 operators.
Command & Control Center
Command & Control Center
Command & Control Center
Command & Control Center
Total
CLIENT
PURPOSE
CJF – FEDERAL LOWER COURT COUNCIL –
DF
Data Center protected with Data Room
CNJ – NATIONAL COURT COUNCIL – DF
Data Center protected with Data Room
FEDERAL COURT – RS, SC & SP
CPD, Data Center and Servers
GENERAL ATTORNEY’S OFFICE OF THE
REPUBLIC – DF, PR & SP
TOP CLIENTS
COURTS
ENERGY
CELG – ELECTRIC POWER COMPANY OF
GOIÁS – GO
CPD protected with Data Room
CHESF – HYDROELECRIC COMPANY OF SÃO
FRANCISCO – PE
Data Center protected with Data Room
CPFL – POWER & LIGHT COMPANY OF SÃO
PAULO – SP
Data Center protected with Data Room
CTEEP - ELECTRIC POWER TRANSMISSION
COMPANY OF SÃO PAULO – SP
Data Center protected with Data Room
ELEKTRO – SP
Data Center protected with Data Room
ELETROBRÁS AMAZONAS POWER – AM
Data Center protected with Data Room
ELETROBRÁS ELECTRONUCLEAR - RJ
Data Center protected with Data Room
JUSTICE COURT (Several States)
Data Center protected with Data Room, Tape
Library and CPD
MPE – STATE ATTORNEY’S OFFICE – ES, RJ
& SP
Data Center protected with Data Room
PGM – GENERAL MUNICIPALITY
ATTORNEYSHIP – RJ
Data Center protected with Data Room
FURNAS – RJ
Data Center protected with Data Room
PJN – PODER JUDICIAL DE LA NACIÓN –
ARGENTINA
Data Center protected with Data Room
MAE – ELECTRIC POWER WHOLESALE
MARKET – SP
Servers and Data Center protected with Data
Room
PODER JUDICIAL DE SANTA FE – ARGENTINA
Data Center protected with Data Room
MAE – MERCADO ATACADISTA DE ENERGIA
ELÉTRICA – SP
Servidores e Data Center protegido com SalaCofre
STF – FEDERAL SUPREME COURT – DF
Data Center protected with Data Room
STJ – SUPERIOR COURT OF JUSTICE – DF
Data Center protected with Data Room
TCE – STATE ACCOUNTS OFFICE – MS, PI, RJ
& SP
Data Center protected with Data Room
TCM – ACCOUNTS OFFICE OF THE
MUNICIPALITY OF RIO DE JANEIRO – RJ
Data Center protected with Data Room
TCU – FEDERAL ACCOUNTS OFFICE - DF
Data Center protected with Data Room
TRE – REGIONAL ELECTORAL COURT – AM
& MG
CPD, Data Center and Certifying Authority
TRIBUNAL ELECTORAL DE PANAMÁ
FINANCIAL
CLIENT
PURPOSE
BANCO FRANCÉS DEL RÍO DE LA PLATA – BBV
- ARGENTINA
Tape Library Backup
BANCO ITAÚ – SP
Robotized Tape Library, Disks and Robots
Data Center protected with Data Room
BANCO PANAMERICANO – SP
Data Center
TRT – REGIONAL LABOR COURT (several
States)
Data Center protected with Data Room
BANCO SANTANDER – SP
Manual and Robotized Tape Library, CPU, Disks,
Tape Library
TSE – SUPERIOR ELECTORAL COURT – DF
Data Center protected with Data Room and
Certifying Authority
BANCO VOTORANTIM – SP
Data Center protected with Data Room
TST – SUPERIOR LABOR COURT – DF
Data Center protected with Data Room
BANESE – SE
Outside Tape Library, Microfilms, Data Center
protected with Data Room/Backbone
BANESTES – ES
Manual Tape Library
BANK OF BRAZIL (several States)
Robotized File, Robotized Backup, Data Center
protected with Data Room
BANRISUL - RS
Robotized Tape Library
BCP – CENTRAL BANK OF PARAGUAY
Data Center
BICBANCO – SP
Data Center
BNDES – NATIONAL ECONOMIC AND SOCIAL
DEVELOPMENT BANK - RJ
Data Center protected with Data Room
ENERGY
CLIENT
PURPOSE
AES ELETROPAULO METROPOLITANA – SP
CPU, Disks, Robots protected with Data Room
BRIDAS – PANAMERICAN ENERGY –
ARGENTINA
Servers protected with Data Room
CLIENT
PURPOSE
BRADESCO – SP
Robotized and Manual Tape Library, Fire-Proof
Doors
BTG PACTUAL – SP
Data Center
BV FINANCEIRA – SP
Data Center protected with Data Room
CAJA DE AHORROS – PANAMA
TOP CLIENTS
FINANCIAL
GOVERNMENT
CLIENT
PURPOSE
ARTESP – SÃO PAULO TRANSPORTATION
AGENCY – SP
Data Center protected with Data Room
ATI – STATE INFORMATION TECHNOLOGY
AGENCY – PE
Data Center protected with Data Room
Data Center protected with Data Room
CICC – INTEGRATED COMMAND & CONTROL
CENTER – (Several States)
Data Center with Command and Control Center
and Data Room
CAJA DE VALORES – ARGENTINA
Data Center
CIEX – ARMY INTELLIGENCE CENTER – DF
Data Center protected with Data Room
CEF - FEDERAL SAVINGS BANK (several States)
Servers, Manual Tape Library, Backup Tape Library
/ Robot, CPU, Disks, Robots, main CPD, Robotized
Backup, Network, Servers and Data Center
CITEX – ARMY TELEMATICS INTEGRATED
CENTER – DF
Data Center protected with Data Room
CENTRUS – DF
Servers protected with Data Room
CLA – ALCÂNTARA LAUNCH CENTER – MA
Data Center protected with Data Room
CREDICITRUS – SP
Data Center
DENATRAN – NATIONAL TRANSIT
DEPARTMENT – DF
Data Center protected with Data Room
DEUTSCHE BANK – SP
Tape Library, Microfilms and Documents
Data Center protected with Data Room
DRESDNER BANK – PANAMA
Data Center
DIPOL – POLICE INTELLIGENCE AND
PLANING DIVISION – SP
GRAVAMES – SP
Data Center
Data Center protected with Data Room
HEDGING GRIFFO – SP
Data Center
FAPESP – RESEARCH SUPPORT
FOUNDATION OF THE STATE OF SÃO PAULO
– SP
HSBC – PR
Manual Tape Library, Robotized Backup
FEDERAL POLICE – DF
Data Center protected with Data Room
IRB BRASIL RESSEGUROS – RJ
Data Center
Manual Tape Library and Data Center
ITAÚ BBA – SP
Retrofit Datacenter
FINANCE DEPARTMENT – AC, CE, MG, PE, RJ
& RS
JP MORGAN – SP
Data Center
FNDE – NATIONAL EDUCATION
DEVELOPMENT FUND – DF
Data Center protected with Data Room
PREVI – RJ
Data Center
GAP – BR – BRASILIA SUPPORT GROUPING
– DF
Data Center protected with Data Room
GOVERNMENT OF SANTA FE – ARGENTINA
Data Center protected with Data Room
INCRA – NATIONAL SETTLEMENT AND
AGRARIAN REFORM INSTITUTE – DF
Data Center protected with Data Room
INFRAERO – BRAZILIAN AIRPORT
INFRASTRUCTURE COMPANY – DF
Servers, Network and Backup File
GOVERNMENT
CLIENT
PURPOSE
AFIP – ADMINISTRACIÓN FEDERAL DE
INGRESOS PÚBLICOS – ARGENTINA
Data Center protected with Data Room
INMET – NATIONAL METEREOLOGY
INSTITUTE – DF
Servers
ANP – NATIONAL PETROL AGENCY – DF
Data Center protected with Data Room
INPI – NATIONAL INDUSTRIAL PROPERTY
INSTITUTE – RJ
Data Center protected with Data Room
ANSES – ADMINISTRACIÓN NACIONAL DE LA
SEGURIDAD SOCIAL – ARGENTINA
Data Center protected with Data Room
IPLAN – GOVERNMENT MANAGEMENT
PLANNING INSTITUTE – RJ
Data Center protected with Data Room
ANTT – NATIONAL LAND TRANSPORTATION
AGENCY – DF
Data Center protected with Data Room
IPLANRIO – RJ
Data Center protected with Data Room
ANVISA – NATIONAL HEALTH SURVEILLANCE
AGENCY – DF
Data Center protected with Data Room
LEGISLATURE – SP
Data Center protected with Data Room
MEC – MINISTRY OF EDUCATION
Data Center protected with Data Room
TOP CLIENTS
GOVERNMENT
GOVERNMENT
CLIENT
PURPOSE
CLIENT
PURPOSE
METRO – METROPOLITAN COMPANY OF SÃO
PAULO – SP
Data Center protected with Data Room
SP TRANS – SÃO PAULO TRANSPORTATION
– SP
Data Center protected with Data Room
MINISTRY OF AERONAUTICS – RJ
Microfilms and Data Center
UNB – UNIVERSITY OF BRASILIA – DF
Data Center protected with Data Room
MINISTRY OF AGRICULTURE AND SUPPLIES
– DF
Data Center protected with Data Room
MINISTRY OF COMMUNICATIONS
Data Center protected with Data Room
MINISTRY OF DEFENSE – DF
Data Center and Certifying Authority protected
with Data Room
MINISTRY OF HEALTH – DF
Data Center protected with Data Room
CLIENT
PURPOSE
MINISTRY OF INTEGRATION
Data Center protected with Data Room
ANDARAÍ GENERAL HOSPITAL – RJ
Data Center
MINISTRY OF LABOR AND EMPLOYMENT –
DF
Data Center protected with Data Room
ANS – NATIONAL HEALTH AGENCY - RJ
Data Center protected with Data Room
MINISTRY OF MINES AND ENERGY – DF
Data Center protected with Data Room
CARDOSO FONTES HOSPITAL – RJ
Data Center
MINISTRY OF SCIENCES AND TECHNOLOGY
Data Center protected with Data Room
FEDERAL BONSUCESSO HOSPITAL – RJ
Data Center
MINISTRY OF SPORTS AND TOURISM
Data Center protected with Data Room
FUNASA – NATIONAL HEALTH FOUNDATION
Data Center protected with Data Room
MINISTRY OF THE FEDERAL ATTORNEY’S
OFFICE – DF
Data Center protected with Data Room
HC - PORTO ALEGRE CLINICS HOSPITAL – RS
Data Center
IPANEMA HOSPITAL – RJ
Data Center
MINISTRY OF TRANSPORTATION – DF
Data Center protected with Data Room
LAGOA HOSPITAL – RJ
Data Center
MUNICIPAL EDUCATION OFFICE – PE & SP
Data Center protected with Data Room
STATE SERVANTS HOSPITAL – RJ
Data Center protected with Data Room
MUNICIPAL FINANCE OFFICE – AL
Data Center protected with Data Room
PLANNING OFFICE OF MARANHÃO – MA
Protected Data Center with Data Room and other
Environments
PRESIDENCY OF THE REPUBLIC – DF
Data Center protected with Data Room
PUBLIC SECURITY OFFICE – SP
Data Center protected with Data Room
SABIN – FRIENDS SOCIETY OF THE
NATIONAL LIBRARY – RJ
Data Center protected with Data Room
SÃO PAULO CITY COUNCIL – SP
HEALTH
INDUSTRY
CLIENT
PURPOSE
ACHÉ – SP
Data Center
Data Center protected with Data Room
AJINOMOTO – SP
Data Center
SEAI – ENGENEERING, ARCHITECTURE AND
AGRONOMICS SOCIETY OF ALTO DO IRANI –
AM
Data Center protected with Data Room
AMAZONAS – SP
Antechamber Adaptation
BR DISTRIBUIDORA – RJ
Data Center
SEMIT – MUNICIPAL INFORMATION
TECHNOLOGY OFFICE – MA
Data Center protected with Data Room
CARAMURU ALIMENTOS – GO
Data Center
CATERPILLAR – SP
Manual Tape Library
SENIAT – SERVICIO NACIONAL INTEGRADO
DE ADMINISTRACIÓN ADUANERA Y
TRIBUTARIA – VENEZUELA
Data Center protected with Data Room
CHOCOLATES GAROTO – ES
Data Center
COSIPA – MG
Server Room
SESEG – STATE SECURITY OFFICE – RJ
Data Center
CSN – RJ
Data Center
SINTYS – SISTEMA DE IDENTIFICACIÓN
NACIONAL TRIBUTARIO Y SOCIAL –
ARGENTINA
Data Center protected with Data Room
DIEBOLD – SP
Data Center
TOP CLIENTS
INDUSTRY
RETAILERS
CLIENT
PURPOSE
CLIENT
PURPOSE
ELI LILLY – SP
Documentation and Samples
WALMART – SP & PE
Servers, CPU, Disk, Operating Tape Library, Data
Center
EMBRACO – SC
Manual Tape Library
EMBRAER – SP
Data Center, Tape Library
ZILOR – SP
Data Center
FIAT – MG & ARGENTINA
Backup Robot, Data Center
FREIOS VARGA – SP
Manual Tape Library
GERDAU – RS
Data Center
MERCEDES BENZ – ARGENTINA
CPD
O BOTICÁRIO – PR
Data Center
CLIENT
PURPOSE
PADO
Pre-Fabricated Modular Data Center
ALLIANZ – SP
Data Center
PETROBRÁS (Several States)
Technical/Exploitation Systems, Tape Library,
Data Center Annexed Rooms, CPD
ALOG – SP & RJ
Data Center
AMIL – SP
Data Center
ANTOFAGASTA MINERALS – CHILE
Data Center
ATIVAS – MG
Data Center
BRASIF – RJ
Data Center
Data Center
SERVICES
RAIZEN – SP
Data Center Expansion
REFRESCOS GUARARAPES – PE
Data Center
RENAULT – PR
Backup Room Retrofit
RIO POLÍMEROS – RJ
Data Center
SADIA – SP
CPD
CAGECE – WATER AND SEWER COMPANY OF
CEARÁ – CE
SCHINCARIOL – SP
Data Center
CERTISIGN – RJ
Certifying Authority
TETRAPAK – SP
Data Center, Power Distribution Panels Room
Data Center
THYSSEN KRUPP – SP
Data Center
CESAN – ESPÍRITO SANTO SANITATION
COMPANY – ES
VOLVO – PR
Data Center
COPASA – MINAS GERAIS SANITATION
COMPANY – MG
Data Center
DATAPREV (Several States)
Manual and Robotized Tape Library and Data
Center protected with Data Room
EBC – DF
Data Center
ECT – BRAZILIAN MAIL AND TELEGRAPH
COMPANY – SP & DF
Data Center
RETAILERS
CLIENT
PURPOSE
EDS – SP
Data Center
CASAS BAHIA – SP
Data Center
Data Center
COOPERHODIA – SP
Manual Tape Library
FEDERAL UNIVERSIY OF SANTA CATARINA –
SP
DROGASIL – SP
Data Center
GETNET – SP
Data Center
LOJAS RENNER – RS
Data Center
GLOBOSAT – RJ
Tape library
PÃO DE AÇÚCAR – SP
Data Center
GRU AIRPORT
Data Center protected with Data Room
SAB TRADING – SP
Tape Library
GRUPO ULTRA – SP
Data Center
SODEXO – SP
Servers, Network Center
HDI SEGUROS – SP
Data Center
USIMINAS – MG
Data Center
HERMES PARDINI – RJ
Data Center
CLIENT
PURPOSE
IMEMG – OFFICIAL PRESS OF THE STATE OF
MINAS GERAIS – MG
Data Center protected with Data Room
IMESP – OFFICIAL PRESS OF THE STATE OF
SÃO PAULO – SP
Certified Authority and Data Center protected
with Data Room
INEP – THE ANÍZIO TEIXEIRA NATIONAL
INSTITUTE OF EDUCATIONAL STUDIES AND
RESEARCH – DF
Data Center
IPEM – WEIGHTS AND MEASUREMENTS
INSTITUTE – SP
Data Center protected with Data Room
IRON MOUNTAIN/SSG - SP
TOP CLIENTS
SERVICES
SERVICES
CLIENT
PURPOSE
SABESP – SP
Data Center
SAN LUIZ LA PUNTA UNIVERSIY –
ARGENTINA
Data Center
SERPRO – FEDERAL DATA PROCESSING
SERVICE – SP, RJ & DF
CPU, Disks, Tape Library and Robotized Backups
protected with Data Room and Certifying
Authority
SONDA IT – SP
Data Center
T-SYSTEMS – SP
Data Center
Backup File
TOUTATIS – SP
Data Center
ITI – NATIONAL INFORMATION TECHNOLOGY
INSTITUTE – DF
Certifying Authority
UNB – BRASILIA UNIVERSITY – DF
Data Center
UNIMED – ES
Data Center
LOCAWEB – SP
Data Center
VALID – SP & RJ
Certifying Authority
LOTTERIES OF THE PROVINCE OF BUENOS
AIRES – ARGENTINA
Data Center
VSE – VALE ENERGY SOLUTIONS – SP
Pre-Fabricated Modular Data Center
PAMI – INSTITUTO NACIONAL DE
SERVICIOS SOCIALES PARA JUBILADOS Y
PENSIONADOS – ARGENTINA
Data Center protected with Data Room
POSTAL MUSEUM – DF
Files
PROCEMPA – RS
Data Center protected with Data Room
PRODABEL – DATA PROCESSING COMPANY
OF BELO HORIZONTE
Data Center protected with Data Room
PRODAM – DATA PROCESSING COMPANY OF
THE MUNICIPALITY OF SÃO PAULO – SP
STATE COMPANIES
CLIENT
PURPOSE
BR DISTRIBUIDORA – RJ
Data Center protected with Data Room
CPU, Disks and Robot protected with Data Room
CENAD – NATIONAL RISK AND DISASTER
MANAGEMENT CENTER – DF
Data Center protected with Data Room
PRODASAL – DATA PROCESSING COMPANY
OF SALVADOR – BA
Data Center protected with Data Room
CESAN – SANITATION COMPANY OF ESPÍRITO
SANTO – ES
Data Center protected with Data Room
PRODASEN – DF
Data Center and Robot protected with Data Room
Data Center protected with Data Room
PRODEB – DATA PROCESSING COMPANY OF
BAHIA – BA
Robot protected with Data Room
CONAB – NATIONAL SUPPLIES COMPANY –
DF
Data Center
PRODEMGE – DATA PROCESSING OF THE
STATE OF MINAS GERAIS – MG
Data Center protected with Data Room
CPTM – SÃO PAULO COMPANY OF
MEROPOLITAN TRAINS – SP
Data Center protected with Data Room
PRODERJ – INFORMATION AND
COMMUNICATION TECHNOLOGY CENTER OF
THE STATE OF RIO DE JANEIRO – RJ
Data Center protected with Data Room
DECEA – AIR SPACE CONTROL DEPARTMENT
– RJ
EMPLASA – SÃO PAULO METROPOLITAN
PLANNING COMPANY – SP
Data Center protected with Data Room
PRODESP – DATA PROCESSING COMPANY OF
THE STATE OF SÃO PAULO – SP
Certifying Authority, CPD and Data Center
protected with Data Room
MINT OF BRAZIL – RJ
Data Center and Certifying Authority
PRODEST – INFORMATION AND
COMMUNICATION TECHNOLOGY INSTITUTE
– ES
Data Center protected with Data Room
RODOBENS – SP
Pre-Fabricated Modular Data Center
CLIENT
PURPOSE
BRASIL TELECOM - DF & PR
Manual and Robotized Tape Library, Disks, Data
Center and Cyber Data protected with Data
Room, CPU and TCU Center
CANTV – VENEZUELA
Servers protected with Data Room
CLARO – SP
Servers, Network, PAX, Telecom protected with
Data Room
EMBRATEL – RJ
Backup Robot protected with Data Room
ERICSSON - SP
Data Center and Servers protected with Data
Room
TELEFONICA – SP
CPU, Disks, TCU, Tape Library and Servers
protected with Data Room
TIM CELULAR – PE, SP & RJ
Backup Robot, servers, Retrofit and Data Center
VIVO – RJ & SP
Data Center, Manual and Robotized Tape Library,
Disks protected with Data Center
ZTT – TECHNOLOGY &
TELECOMMUNICATIONS ZONE – PANAMA
IDC protected with Data Room
TOP CLIENTS
TELECOMMUNICATIONS
APPENDIX
ATTESTATIONS, CERTIFICATIONS AND CERTIFICATES
• Jorge Justus Nitzan
President
• Antonio Lopes Bob
Commercial Engineering Director
• Adenauser Neves
Administrative Director
• Carlos Morard
• Eurico Magno de Carvalho
JULY 2013
APPENDIX
CHIEF EXECUTIVES
TECHNICAL TEAM
JULY 2013
• Adenauser R. C. Mechanical Engineer
• Alberto Italo Rospigliosi Razzeto
Industrial Engineer
• Alexandre Maia Cardoso
Civil Engineer
Commercial Director - Latin America
• Alexandre Oliveira Cardoso
Mechanical Engineer
CFO
• André Hotz Tavares
Production Engineer
• Fernando Almeida Prado
Commercial / Marketing Director
• Andres Eduardo Singer
Architect
• João Lucio dos Reis Filho
Commercial Director
• Antonio Donizete Lopes Bob
Civil Engineer
• Lars Bjorkstrom
Engineering Director – Ongoing & Moving
• Barbara Ferreira de Matos
Architect
• Martin Monzón
Engineering Director – Latin America
• Bruno Zavaleta
Electronics Engineer
• Mauricio Caviglia
Commercial Director
• Carla Mariana Camacho
Electrical Engineer
• Panagiotis Lazaridis
Director – L&M Engineering
• Carlos Augusto C. Farias
Electrical Engineer
• Renato Oyakawa
HR & IT Director
• Carlos da Silva
Production Engineer
• Vaner Soares
Engineering Director – Works
• Carlos Guilherme de O. Silva
Electrical Engineer
• Carlos Roberto Felix dos Santos
Electrical Engineer
• Cecilia Soares do Nascimento
Civil Engineer
• Celso Rodrigues
Mechanical Engineer
• Celso Susumu Okuyama
Electrical Engineer
• César Luiz Floriano
Electrical Engineer
• Christiane Akemi Masaki
Computer Engineer
• Daniel Brasil de Almeida
Telecommunications Engineer
• Daniel Alvarez Diaz
Electrical Engineer
• Daniel Rodrigues Corassari
Electrical Engineer
• Danilo Augusto Santos de Souza
Electrical Engineer
• Deborah Castro da Silva
Mechanical Engineer
• Diego Bronzon de Paula
Electronics Engineer
• Diego Lopez Calviño
Electronics Engineer
• Edson de Simome Jr.
Telecommunications Engineer
• Edson Domingos de Souza
Electrical Engineer
• Eduardo Freitas
Electrical Engineer
• Eloy Barrientos
Civil Engineer
• Ericka Zorzella Patzina
Architect and Urbanist
• Fábio Aparecido Badini
Electrical Engineer
• Fábio Henrique Barbosa
Electrical Engineer
• Fabio Henrique Bisagio
Electrical Engineer
• Felipe Vasco Silva
Electrical Engineer
• Fernando Dendi
Civil Engineer
• Fernando Ribeiro de Sena
Environmental Engineer
• Gabriel Luiz Assad
Electrical Engineer
• Gabriela Araujo Perdomo
Architect
• Glaucio de Souza Ribeiro
Electrical Engineer
• Guilherme C. Negraes Jr.
Mechanical Engineer
JULY 2013
• Gustavo Pazelli
Electrical Engineer
• Harold Fuentes
Industrial Engineer
• Helio Lima
Electronics Engineer
• Hemil Maia Ribeiro
• Herivelto C. Luz
APPENDIX
TECHNICAL TEAM
TECHNICAL TEAM
JULY 2013
• Mário C. Machado Homem
Civil Engineer
• Martin Jose Monzon
Civil Engineer
• Maurício José Barros da Silva
Mechatronics Engineer
Electrical Engineer
• Maurício Tadeu Nicolletti
Electrical Engineer
Electrical Engineer
• Mauro Pieragnoli
Electrical Engineer
• Ivan Reynaldo de Rojas Galvan
Electronic Engineer
• Michele Cazzaro Rocha
Mechanical Engineer
• Jan Sens
Mechanical Engineer
• Nelson Arone Junior
Electrical Engineer
• Janet Alves dos Santos
Electrical Engineer
• Panagiotis Lazaridis
Mechanical Engineer
• Jean Paulo Pizzo
Electrical Engineer
• Patrícia Fiorone C. de Campos
Civil Engineer
• Jeanderson Formiga
Civil Engineer
• Paulo Magno C. Bonfim
Electrical Engineer
• Jhon Edward Davalos
Electrical Engineer
• Paulo Rabelo Pinto
Telecommunications Engineer
• João Paulo da Silva Xavier
Automation and Telecom Engineer
• Ricardo dos Santos Sant’Anna
Electronics Engineer
• João Y. M. Suzuki
Electrical Engineer
• Rodrigo Muzzi da Silva
Electrical Engineer
• Jorge Luis Rioja Saldivar
Electronic Engineer
• Rogerio de Oliveira
Electrical Engineer
• José Heitor Passavanti
Electrical Engineer
• Rolando Contreras
Electrical Engineer
• Julieta Serraz
Architect
• Rômulo Pimenta de Souza
Mechanical Engineer
• Kenro Sakamoto
Electrical Engineer
• Ronaldo Pavan
Electrical Engineer
• Lars Sigurd Bjorkstrom
Civil Engineer
• Salomon Sidney Benabou
Electrical Engineer
• Leandro Mercatelli
Civil Engineer
• Samara Cristina Souza Fernandes
Mechanical Engineer
• Leandro Neves de Souza
Mechanical Engineer
• Sergio Crosgnac Ferreira
Electrical Engineer
• Leandro T. N. Jorge
Electrical Engineer
• Sergio Luiz Gois Jr.
Electrical Engineer
• Leandro Ykeda
Electrical Engineer
• Silvio Marcio Junqueira Monteiro GomesCivil Engineer
• Leonardo Avila Leal de Meirelles DonatiElectrical Engineer
• Tetsuo Goto
Electrical Engineer
• Leonardo Hygor Tessari
Electrical Engineer
• Theresa Gabriela Pardi Walderrama
Electrical Engineer
• Lincoln Castilho Sasso
Electrical Engineer
• Thiago Augusto B. Silva
Electrical Engineer
• Ludimila Molotievski
Electrical Engineer
• Thiago Teixeira Petroni
Telecommunications Engineer
• Luis Alexandre Faria Morais Andrade
Mechanical Engineer
• Vagner Pascoa Vasques
Electrical Engineer
• Luis Eduardo Castilho
Industrial Engineer
• Vitor Zanetti Ferreira
Electrical Engineer
• Luis Henrique Pavarin
Electrical Engineer
• Walter Molina
Electrical Engineer
• Luiz Cristiano Soares
Electronics Engineer
• Luiz Gustavo Santos da Cruz
Electrical/Occupational Safety Engineer
• Luiz Henrique Prado Lobo Maiolo
Electrical Engineer
• Luiz Ricardo Matos
Civil Engineer
• Marcelo Almeida do Vale
Electrical Engineer
• Marcio Di Benedetto
Production Engineer
• Marco Antonio da Conceição Guerra Antunes Electrical/Occupational Safety Engineer
• Marcos Eduardo Silva
Electrical Engineer
• Marcos Rildon Monassega
Electrical Engineer
• Maria Fernanda B. de Brito
Architect
• Maria Florencia Cirelli
Architect
• Marina Amaral Sales Camargo
Electrical Engineer
APPENDIX
CERTIFICATES
ATTESTATIONS
APPENDIX
ATTESTATIONS
ATTESTATIONS
APPENDIX
TECHNICAL ASSETS CERTIFICATES
CORPORATE DATA FORM
Company Name
Aceco TI S.A.
Established
January 13, 1972
Address – Main Office (Invoicing)
Av. Armando Andrade, 529 – parte A
Taboão da Serra – SP – CEP: 06754-210
Site: http://www.acecoti.com.br
Corporate e-mail: [email protected]
Enrollments
CNPJ/MF: 43.209.436/0019-27
State Enrollment: 675.182.486.119
Municipal Enrollment: 1.083.335-8
Registrations
CREA / SP: 0383462
CREA / RJ: 2000201499
CREA / DF: 5507/RF
São Paulo (Plant/Industry)
Av. Armando Andrade, 529 – parte A
Parque Santos Dumont – Taboão da Serra / SP
CEP 06754-210
e-mail: [email protected]
BRANCHES
SÃO PAULO (Head Office)
Av. das Nações Unidas, 1.163 - 12º andar
Brooklin Novo - CEP 04578-000 – São Paulo - SP
Tel.: (55 11) 2164-7100
Fax: (55 11) 2164-7171
SÃO PAULO COUNTRYSIDE
Rua Siqueira Campos, 726
Centro - CEP 133300-290 – Indaiatuba - SP
Tel.: (55 19) 3834-2854
Fax: (55 19) 3834-2854
BRASÍLIA
SHN - Quadra 2 - Projeção I Bloco F - Loja 55
Edifício Executive Office Tower - CEP 70702-000 – Brasília - DF
Tel./Fax: (55 61) 3447 9205
RIO DE JANEIRO
Rua Almirante Barroso, 22 - 15º Andar
Centro - CEP 20031-000 – Rio de Janeiro - RJ
Tel.: (55 21) 2524-2922
Fax: (55 21) 2524-8070
APPENDIX
MAIN OFFICE
ARGENTINA
Gorostiaga 2355 Andar 12 C1426CT
Buenos Aires – Argentina
Tel.: (54 11) 4776-7002
Fax: (54 11) 4553-6223
CHILE
Av. Apoquindo, 6410 Of. 1305 Las Condes
Santiago – Chile
Tel.: (56 2) 2656-7047
COLÔMBIA
Calle 90, 19A - 49 - Oficina 302
Bogotá – Colombia
Tel.: (57) 1 530-4512 / 530-4513
PERU
Calle Monterrey, 355 Of. 1002
Urb. Chacarilla-Surco Cod. Postal: Lima33
Lima – Peru
Tel.: (51 1) 637-4027
COSTA RICA
Aceco TI Caribe y Centro America
Oficentro Plaza Roble, Edificio El Pórtico Piso 1, Escazú
San José – Costa Rica
Tel.: 506 2201-1411
MÉXICO
Aceco TI Mexico
Paseo de la Reforma 350, 10&11 Floors, CP 06600
México City – México
Tel.: 52 (55) 9171-8460
www.acecoti.com.br