COMPANY CURRICULUM Geosonda Activities Since 1991.
Transcription
COMPANY CURRICULUM Geosonda Activities Since 1991.
COMPANY CURRICULUM Geosonda Activities Since 1991. SUBSOIL EXPLORATION FOR FOUNDATION DESIGN (JANUARY, 1991) Project: La Florida Power Plant – Metropolitan Region Client: Asociación Canalistas Río Maipo Project Design: E.C. Rowe & Asoc. GEOTECHNICAL BORINGS AND IN SITU TESTS. DETAIL ENGINEERING – EL TORITO TAILINGS DAM (APRIL/JUNE, 1990 - JAN/FEB, 1991) Project: El Torito Tailings Dam – V Region Client: Disputada Las Condes Mining Co. – V Region Project Design: Geotécnica Consultores S.A. GEOTHECNICAL BORINGS AND IN SITU TESTS BALANCE CHIMNEY AND TURBINES BUILDING (APRIL/AUG, 1991) Project: Ralco Hydroelectric Power Plant Dam, Bío-Bío – VIII Region Client: Ingendesa S.A. Project Design: Ingendesa S.A. SUBSOIL EXPLORATION, GEOTECHNICAL BORINGS AND TESTS (SEPTEMBER, 1991) Project: Bridges La Unión and Paso Sepultura / Santiago – San Antonio Highway V Region Client: Ministry of Public Works (MPW) Project Design: Asintota Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS, FOUNDATION DESIGN (JUNE/AUG, 1991) Project: El Refugio Gold Mine, Copiapó – III Region Client: Bema Gold (Chile) Ltd. Project Design: E.C. Rowe & Asoc. GEOTECHNICAL BORINGS – LOS PELAMBRES COPPER MINE TUNNELS (APRIL/MAY, 1991) Project: Tunnels Electrical Connections – IV Region Client: Minera Los Pelambres Copper Mine Project Design: Minera Los Pelambres Copper Mine GEOTECHNICAL EXPLORATORY BORINGS AND IN SITU TESTS (JULY/AUG, 1991) Project: Huequecura Hydroelectric Power Plant Dam, Bío-Bío – VIII Region Client: Ingendesa S.A. Project Design: Ingendesa S.A. EXPLORATION BORINGS AND IN SITU TESTS (AUG/OCT, 1991) Project: Extension of Chagres Cooper Smelting Plant – V Region Client: Disputada Las Condes Copper Mine Project Design: E.C. Rowe & Asoc. GEOTECHNICAL EXPLORATION AND BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (JULY/AUG, 1991) Project: New Airport Arturo Merino Benitez (Santiago) - Metropolitan Region Client: Aeronautical Dept. - Ministry of Public Works Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (SEPTEMBER, 1991) Project: Bridges San José, El Yeso, Volcán - Cajón del Maipo - R.M. Client: Highway Dept. - Ministry of Public Works (M.P.W.) Project Design: Intrat Ltd. SUBSOIL GEOTHECNICAL EXPLORATION, IN SITU TESTS AND PIEZOMETERS INSTALLATION (SEPT/DEC, 1991) Project: La Candelaria Copper Mine Tailings Dam, Copiapó – III Region Client: Bechtel Chile, S.A. Project Design: Geotécnica Consultores S.A SUBSOIL GEOTECHNICAL EXPLORATION AND IN SITU TESTS FOR FOUNDATIONS DESIGN (SEPT/DEC, 1991) Project: La Candelaria Copper Mine Building Foundations, Copiapó – III Region Client: Bechtel Chile, Ltd. Project Design: Petrus Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (AUG/NOV, 1991) Project: Guacolda Thermoelectric Power Plant – Huasco – III Region Client: Chilgener S.A. Project Design: Petrus Ingeniería Ltd BORINGS AND IN SITU TESTS (NOV/DEC, 1991) Project: Corrales Hydroelectric Power Plant Dam – VI Region Client: Andrade Gutierrez (Brazil) Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (NOV, ‘91/JAN, ‘92) Project: Puclaro Irrigation Dam, La Serena – IV Region Client: Ministry of Public Works (M.P.W.) Project Design: Ingendesa / Edic Ings. Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (NOV, ‘91/JAN, ‘92) Project: Los Leones Embankment Tailings Dam, Stage IV - A Client: Codelco Andina Division Project Design: Ricardo Edwards y Cia. Ltd. GEOTECHNICAL BORINGS, IN SITU TESTS AND PIEZOMETERS INSTALLATION (FEB/APRIL, 1992) Project: Los Leones Embankmen Tailings Dam, Stage IV – B and Piuquenes Tailings Dam Client: Codelco Andina Division Project Design: Ricardo Edwards y Cia. Ltd. SUBSURFACE EXPLORATION BORINGS (OFF SHORE AND IN LAND), INCLINOMETERS INSTALLATION IN SITU TESTS (MARCH/JULY, 1992) Project: San Vicente Seaport Site Repair, Talcahuano Client: Seaports Department – M.P.W. Project Design: Fernando Martinez & Asoc., ARA Ing. EXPLORATION BORINGS AND IN SITU TESTS (APRIL/MAY, 1992) Project: Molibdene Plant Foundations and Las Tórtolas Waste Processing Plant Client: Disputada Las Condes Mining Co. Project Design: Minmetal – Geotécnica Consultores S.A. GEOTECHNICAL BORINGS, IN SITU TESTS AND PIEZOMETERS INSTALLATION (MAY/OCT, 1992) Project: Pangue Hydroelectric Power Plant Dam – VIII Region Client: Pangue S.A. – Ingendesa S.A. Project Design: Ingendesa S.A. GEOTECHNICAL BORINGS FOR ENVIRONMENTAL EVALUATION (JUNE,1992) Project: Xerox Industrial Plant, La Reina – Metropolitan Region Client: Dames & Moore (Chile) Ltd. Project Design: Dames & Moore Chile Ltd. GEOTECHNICAL BORINGS, IN SITU TESTS AND PIEZOMETERS INSTALLATION (JUNE/JULY, 1992) Project: Quebrada del Buitre Tailings Dam, Copiapó – III Region Client: Ojos del Salado Mining Co. Project Design: Geotécnica Consultores S.A GEOTECHNICAL EXPLORATORY BORINGS FOR STRUCTURES REINFURCEMENT (AUG/SEPT, 1992) Project: Extension and Reinforcement, Guacolda Nr 1 Seaport, Huasco – III Region Client: Chilgener S.A. Project Design: RFA Ingenieros, Ltd. GEOTECHNICAL BORINGS, IN SITU TESTS FOR FOUNDATION DESIGN (OCT/DEC, 1992) Project: Quebrada Blanca Mine, Iquique – I Region Client: Fluor Daniel (Chile) Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS FOR FOUNDATION DESIGN OF LEACHING PILES (OCT/DEC, 1992) Project: Quebrada Blanca Mine – Iquique – I Region Client: Fluor Daniel (Chile) Project Design: NCL Ingeniería y Construcción Ltd GEOTECHNICAL BORINGS, IN SITU PERMEABILITY AND RESISTANCE TESTS, PIEZOMETERS INSTALLATION (OCT/NOV, 1992) Project: San Antonio Tailings Dam, Coyhaique – XI Region Client: El Toqui Mining Co. / LAC Project Design: E.C. Rowe & Asoc “ROLLED” CONCRETE WALL TESTS AND SAMPLING (NOVEMBER, 1992) Project: Pangue Hydroelectric Power Plant Dam – VIII Region Client: Pangue S.A. Project Design: Ingendesa S.A. MINING EXPLORATORY BORINGS (DEC, ‘92/FEB, ‘93) Project: El Durazno Copper Mine – Salamanca – IV Region Client: Sociedad Explotaciones Mineras Project Design: Grupo Callejas GEOTECHNICAL EXPLORATION BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (JANUARY, 1993) Project: Paraiso II Tower Building - Cochoa Client: Margen Ltd. Construction Co. Project Design: Geofun Ltd. EXPLORATION BORINGS, IN SITU TESTS, PERMEABILITY TESTS, PIEZOMETER INSTALLATIONS, GEOLOGICAL/GEOTECHNICAL REPORT (FEB/MARCH, 1993) Project: LOMA ALTA Tailings Dam – Contract LA-01 – VI Region Client: PEHUENCHE Electric Co. – Ingendesa S.A. Project Design: PEHUENCHE Electric Co GEOTECHNICAL EXPLORATIORY BORINGS FOR LAPIZLAZULI QUALITY AND VOLUME EVALUATION (FEB/MARCH, 1993) Project: Las Flores de Los Andes Lapizlazuli Mine Client: Las Flores de Los Andes, Ltd. Project Design: Las Flores de Los Andes, Ltd. / Geologist Mr. Rivano GEOTECHNICAL EXPLORATION BORINGS (FEB/APRIL, 1993) Project: Viña – Valparaíso Jacked – in Sewer Culvert – V Region Client: Consorcio Oceanico (Argentina – Brazil) Project Design: CBPO (Brazil) – BRH (Argentina) GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (APRIL, 1993) Project: New Access to Arturo Merino Benitez Airport – Santiago - Metropolitan Region Client: Aeronautical Dept. - M.P.W. Project Design: Asintota Ltd. GEOTECHNICAL EXPLORATION BORINGS AND IN SITU TESTS (APRIL/MAY, 1993) Project: Los Monos Irrigation Dam, Itata Basin – VIII Region Client: Irrigation Dept. – M.P.W. – Ingendesa S.A. Project Design: Ingendesa / Edic Ings. Ltd. GEOTECHNICAL EXPLORATION BORINGS FOR FOUNDATIONS DESIGN (MAY, 1993) Project: Caleta Portales Fishermen Deck – V Region Client: Contex Construction Co. Project Design: E.C. Rowe & Asoc. GEOTECHNICAL BORINGS FOUNDATIONS DESIGN (MAY/JUNE, 1993) Project: Rocalobos Tower Building – V Region Client: Margen Ltd. Construction Co. Project Design: Geofun Ltd. GEOTECHNICAL BORINGS AND IN SITU PERMEABILITY TESTS (MAY/JUNE, 1993) Project: Zaldívar Copper Mine – II Region Project Design: E.C. Rowe & Asoc GEOTECHNICAL BORINGS AND IN SITU PERMEABILITY TESTS FOR FOUNDATIONS DESIGN (JUNE, 1993) Project: Las Canteras, Colina - Metropolitan Region Client: Magma Geólogos Consultores Asoc. Project Design: Magma Geólogos Consultores Asoc. GEOTECHNICAL BORINGS AND IN SITU TESTS. PIEZOMETERS INSTALLATION (JULY/SEPT, 1993) Project: Laja Diguillín, Irrigation Dam – VIII Region Client: Ministry of Public Works (M.P.W.) Project Design: Irrigation Dept. – M.P.W. GEOTECHNICAL BORINGS AND TESTS FOR FOUNDATIONS DESIGN (JULY, 1993) Project: Plaza Real Mall Building – III Region Client: Hidrosan S.A. Project Design: Arturo Goldsack Jarpa, P.E. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (AUGUST, 1993) Project: Eurovista Tower Building – Cochoa – V Region Client: Eurocochoa Norte, Ltd. / Real Estate Co. Project Design: Miguel Petersen Acevedo, P.E. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (SEPTEMBER, 1993) Project: Ochagavia Dry Fishing Port, Lo Espejo, Santiago - Metropolitan Region Client: Asintota Ltd. Project Design: Asintota Ltd. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (SEPTEMBER, 1993) Project: Delta Maule River Bridge – VI Region Client: E.C. Rowe & Asoc. Project Design: E.C. Rowe & Asoc GEOTECHNICAL BORINGS, FIRST AND SECOND STAGE (OCT/NOV, 1993) Project: Viña – Valparaíso Jacked – in Sewer Culvert – V Region Client: ESVAL S.A. Project Design: Prof. Fernando Martínez Serrano y Asoc. EXPLORATION BORINGS AND PIEZOMETERS INSTALLATION (NOV, ‘93/MAY, ‘94) Project: Pangue Hydroelectric Power Plant, Paleocauce and Dam Areas VIII Region Client: Ingendesa S.A. for Pangue S.A. Project Design: Ingendesa S.A. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN, SECOND STAGE (NOVEMBER, 1993) Project: Ochagavia Drive Fishing Port - Lo Espejo - Metropolitan Region Client: Asintota Ltd. Project Design: Asintota Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (NOVEMBER, 1993) Project: ENAMI – Ventanas Copper Plant – V Region Client: E.C. Rowe & Asoc. Project Design: E.C. Rowe & Asoc. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (NOV/DEC, 1993) Project: New Bridge over Tolten River – IX Region Client: Highways Department –M.P.W. Project Design: Asintota Ltd. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (DECEMBER, 1993) Project: Hotel Sheraton San Cristóbal Tower – Santiago - Metropolitan Region Client: Mauricio Poblete Ingeniería Ltd./Sheraton Corp. Project Design: Mauricio Poblete Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS, THIRD STAGE (DECEMBER, 1993) Project: Viña – Valparaíso Sewer Culvert – V Region Client: ESVAL S.A. Project Design: Prof. Fernando Martínez Serrano y Asoc. GEOTECHNICAL BORINGS AND IN SITU TESTS (DEC, ‘93/JAN, ‘94) Project: Minosal Copper Mine Tailings Dam # 8 - La Candelaria, Copiapó Client: Geotécnica Consultores S.A. Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND TESTS FOR FOUNDATIONS DESIGN (JANUARY, 1994) Project: Puerto Pacífic Building – Viña del Mar – V Region Client: Manso de Velasco Real Estate Co. Project Design: Petrus Ingeniería Ltd. DRILLING AND DRAINAGE INSTALLATIONS (JAN/FEB, 1994) Project: Eurocochoa Tower Building – V Region Client: Desco S.A. Project Design: Drainage Gonzalo Ruiz-Tagle / Arquitect. Larrain y Vivanco Ltd. ENVIROMENTAL BORINGS FOR EVALUATION AND PIEZOMETERS INSTALLATION (JANUARY, 1994) Project: Excelsior Chemical Co. (Härting – Shell) – Quilicura - Metropolitan Region Client: Dames & Moore Chile Ltd. Project Design: Dames & Moore Chile Ltd. GEOTECHNICAL BORINGS AND PIEZOMETERS INSTALLATION (JANUARY, 1994) Project: Chañaral Port Copper Tailings – III Region Client: NCL and Río Bravo Gold Mining (Canada) Project Design: NCL and Río Bravo Gold Mining (Canada) GEOTECHNICAL BORINGS AND IN SITU TESTS (FEBRUARY, 1994) Project: Leaching Piles, La Copa Area, Los Bronces - Metropolitan Region Client: Disputada Las Condes Mining Co. Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (FEB/MARCH, 1994) Project: Mejillones Thermoelectric Power Plant – II Region Client: Babcock Wilcox (Spain) Project Design: Petrus Ingenieros Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (MARCH, 1994) Project: Mejillones Thermoelectric Power Plant – II Stage – II Region Client: Edelnor Ltd. Project Design: Petrus Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (MARCH, 1994) Project: Tailings Dam – Fachinal Gold Mine Client: CDE Chilean Mining Co. Project Design: E.C. Rowe y Asoc. GEOTECHNICAL BORINGS AND TESTS (MARCH/MAY, 1994) Project: Bridges for Highway 5 S, Parral –San Carlos Client: Highway Department – M.P.W. Project Design: Asintota Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (MARCH/APRIL, 1994) Project: Gas Purifier Plant – V Region Client: Chilgener, Ventanas S.A. Project Design: Petrus Ingeniería e Inspecciones S.A. GEOTECHNICAL BORINGS (APRIL, 1994) Project: El Bolsico Irrigation Dam, Talca – VI Region Client: Geofun Ltd. Project Design: Geofun Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (MAY, 1994) Project: Redesign, Viña – Valparaíso Sewer Culvert, Fourth Stage Client: ESVAL S.A. Project Design: ESVAL S.A. GROUND AND FLUVIAL GEOTECHNICAL BORINGS IN SITU TESTS (JULY/SEPT, 1994) Project: Rucatayo Hidroelectric Power Plant – XI Region Client: Pilmaiquen S.A. Electric Co. Project Design: Hidrelec Ltd. GEOTECHNICAL BORINGS, IN SITU TESTS, PIEZOMETERS INSTALLATION (MAY, ‘94/JAN, ‘95) Projec: Laja – Diguillín Irrigation Dam – VIII Region Client: Irrigation Depart. – M.P.W. Project Design: Ministry of Public Works (M.P.W.) CONCRETE DAMAGE EVALUATION BORINGS THROUGH MILL FOUNDATIONS (JULY, 1994) Project: Cemento Polpaico Plant, Foundation of Mill Nr 7 - Metropolitan Region Client: Ingendesa S.A. Project Design: Ingendesa S.A. DRILLING AND PIPE INSTALLATION BELOW PAVEMENT FOR DRAINAGE (AUGUST, 1994) Proyect: Sociedad Agrícola El Carmen - Metropolitan Region Client: Sociedad Agrícola El Carmen - Metropolitan Region Project Design: Juan Waidele Wolff, P.E. GEOTECHNICAL BORINGS FOR ENVIRONMENTAL EVALUATION, FIRST STAGE (AUGUST, 1994) Project: Goodyear Industrial Plant, Cerrillos - Metropolitan Region Client: Dames & Moore Chile Project Design: Dames & Moore Chile GEOTECHNICAL BORINGS FOR ENVIRONMENTAL EVALUATION, THIRD STAGE (SEPTEMBER, 1994) Project: Excelsior Coating Plant, Quilicura (SHELL – Härting) – Metropolitan Region Client: SHELL Chile S.A.C.E.I. Project Design: Dames & Moore Chile Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (OCTOBER, 1994) Project: Playa Amarilla Building – Concón – V Region Client: Raul del Río Construction Co. Project Design: Musante y Astorga Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (NOV/DEC, 1994) Project: Exploration for Deep Underground Gas Storage Tank, First Stage Client: GASCO S.A. Project Design: Edic – Geostock (France) MINE EXPLORATIONS PROJECT (NOV, ‘94/ MARCH, ‘95) Project: Peregrino y Cateador Copper Mines - Metropolitan Region Client: Vizcachas Curacaví Mining Co. GEOTECHNICAL BORINGS AND TESTS FOR AIRFIELD DESIGN (DECEMBER, 1994) Project: Airport Robinson Crusoe Island Airport Client: ByR Constructora, Ltd. Project Design: Vectra Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (NOV/DEC, 1994) Project: Chacabuquito Electric Power Plant - V Region Client: Aconcagua Electric Co. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (DEC, ‘94/JAN, ‘95) Project: Sheraton Hotel New Tower – Santiago - Metropolitan Region Client: Sheraton Hotel Project Design: Mauricio Poblete Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (JANUARY, 1995) Project: Züblin Plant – Quilicura - Metropolitan Region Client: Züblin Chile Ltd. Project Design: Pedro Acevedo M., P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (FEBRUARY, 1995) Project: Bridges Gorbea, Quilche and Melefquen – IX and X Region Client: Ingelog, Ltd. Consultores Project Design: Miguel Farias C., P.E. BORINGS FOR DRAINAGE (FEBRUARY, 1995) Project: Rocalobos Tower Building – Reñaca – V Region Client: Desco S.A. Project Design: Margen Real Estate Co. – Mr. Alvaro Morales, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS (MARCH/APRIL, 1995) Project: New Access Highway to Valparaíso Coast Way – Tunnels and Highway Crossing – V Region Client: Intrat Ingenieros Consultores Project Design: Intrat, Michel Van Sin Jan F. P.E., Ph D., and Geol. Santiago Castro GEOTECHNICAL RECOGNITION MINE EXPLORATION (MARCH, 1995) Project: Mining Exploration - Metropolitan Region Client: Compañía Industrial El Volcán, Ltd. Project Design: Manuel Álvarez P.E. (El Volcán) GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (APRIL, 1995) Project: Coraceros Buildings – Viña del Mar Client: Bezanilla & Bezanilla Constructora Ltd. Project Design: Claus Fahrenkrog y Co. Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (APRIL / MAY, 1995) Project: Rucue Hydroelectric Power Plant, Intake Tunnel – VIII Region Client: Colbun – Machicura, Ltd. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS, PIEZOMETERS INSTALLATION (MAY / AUGUST, 1995) Project: Laja – Diguillín Irrigation Dam, Third Stage – VIII Region Client: Irrigation Depart. – M.P.W. Project Design: M.P.W. GEOTECHNICAL BORINGS AND IN SITU TESTS (MAY/JUNE, 1995) Project: Viña – Valparaíso Sewer Culvert, Fifth Stage – V Region Client: ESVAL Project Design: Prof. Miguel Petersen Acevedo, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS (MAY/JUNE, 1995) Project: Cellulose and Wood Storehouse, Seaport of Coronel – VIII Region Client: Puerto Coronel, Ltd. Project Design: Petrus Ingenieros Ltd. GEOTECHNICAL EXPLORATORY BORINGS FOR MINE (MAY/JUNE, 1995) Project: Miner’s Pick – Second Stage - Metropolitan Region Client: Vizcachas Mining Co. Project Design: Vizcachas Mining Co. GEOTECHNICAL BORINGS (JUNE, 1995) Project: Ibañez Bridge for Highway Crossing – Linares – VII Region Client: Intrat Ltd. Project Design: MF Ingenería de Fundaciones Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (JUNE/SEPTEMBER, 1995) Project: Viña – Valparaíso Sewer Culvert, Sixth Stage – V Region Client: ESVAL S.A. Project Design: Prof. Miguel Petersen Acevedo, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (AUGUST / OCTOBER, 1995) Project: Turbines Building, II Stage, Rucue Hydroelectric Power Plant – VIII Region Client: E.E. Colbun – Machicura S.A. Project Design: E.C. Rowe & Asoc. GEOTECHNICAL BORINGS AND IN SITU TESTS (JULY, 1995) Project: Huanta Bridge, La Serena – IV Region Client: Ingelog – M.P.W. Project Design: MF Ingenieros de Fundaciones Ltd. GEOTECHNICAL BORINGS AND SPECIAL TESTS (AUGUST / OCTOBER, 1995) Project: Deep Undergrand Gas Storage Tank, Second Stage - Metropolitan Region Client: GASCO S.A. Project Design: Edic – Geostock (France) GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (JULY, 1995) Project: Quilicura Electric Transference Plant - Metropolitan Region Client: Ruz & Vukasovic Project Design: Engineer Manuel Ruz J./ARA GEOTECHNICAL BORINGS (AUGUST, 1995) Project: Gas Pipe from Argentina – Los Morros Bridge Area, Maipo River -Metropolitan Region Client: B y R Ingenieros y Constructora, Ltd. Project Design: B y R – Techint (Argentina) ENVIRONMENTAL BORINGS RECSA PLANT (AUGUST, 1995) Project: RECSA Industrial Plant – Quilicura - Metropolitan Region Client: Dames & Moore Chile Project Design: Dames & Moore Chile GEOTECHNICAL BORINGS FOR DESIGN (SEPTEMBER / OCTOBER, 1995) Project: 5 N Highway Access and Bridges, Quilicura – Montenegro - Metropolitan Region Client: Len y Asoc. / Road Repairing Department – M.P.W. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOUNDATIONS DESIGN (SEPTEMBER / OCTOBER, 1995) Project: Reina Victoria Building - Coraceros, Viña del Mar – V Region Client: Bezanilla & Bezanilla Constructora Ltd. Project Design: Geofun Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOUNDATIONS DESIGN (SEPTEMBER, 1995) Project: RIVET Industrial Plant – Lampa - Metropolitan Region Client: RIVET Ltd. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS, IN SITU TEST AND PIEZOMETERS INSTALLATION (NOV/ DEC, 1995) Project: Laja Diguillín Irrigation Dam – Fourth Stage – VIII Region Client: Irrigation Dept. – M.P.W. Project Design: Irrigation Dept. – M.P.W. BORINGS FOR GROUTING VERIFICATION (OCTOBER, 1995) Project: Viña – Valparaíso Sewer Culvert, Seventh Stage Client: ESVAL S.A. Project Design: Geotécnica Consultores S.A. ROCK PERMEABILITY TESTS (OCT/ NOV, 1995) Project: Pullallí Copper Mine, La Ligua – V Region Client: GEOTEC – Pegasus Project Design: SRK (South America) GEOTECHNICAL BORINGS AND IN SITU TESTS (NOVEMBER, 1995) Project: Viña – Valparaíso Sewer Culvert, Eigth Stage – V Region Client: ESVAL S.A. Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND TESTS FOR FOUNDATION DESIGN(NOV / DEC, 1995) Project: Puerto Pacífico Building, Coraceros, Viña del Mar – V Region Client: Manso de Velasco Real Estate Co. Project Design: Petrus Ingenieros Ltd. GEOTECHNICAL BORINGS FOR STABILITY EVALUATION(NOV, ‘95/JAN, ‘96) Project: Stability Evaluation, Seaport of Antofagasta – II Region Client: La República Insurance Co. Project Design: Petrus Ingenieros Ltd. ENVIRONMENTAL BORINGS AND PIEZOMETER INSTALLATIONS (NOVEMBER, 1995) Project: SHELL Industrial Plant – Quilicura - Metropolitan Region Client: SHELL Chile S.A.I.C. Project Design: SHELL Chile S.A.I.C. GEOTECHNICAL BORINGS(NOV/DEC, 1995) Project: Second La Calavera Tunnel, 5 N Highway – V Region Client: Highway Dept. –M.P.W. Project Design: R & Q Ingeniería Ltd. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (NOV/DEC, 1995) Project: Combined Cycle Electric Power Plant – Quillota - VRegion Client: Ingendesa for Pehuenche S.A. Project Design: Ingendesa S.A. GEOTECHNICAL BORINGS AND TESTS(DEC, ‘95/JAN, ‘96) Project: Transandean Gas Pipe from Argentina – VIII Region Client: Fluor Daniel Chile Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (DEC, ‘95/JAN, ‘96) Project: Rosario Highway Crossing and Gultro, 5 S Highway – Rancagua VII Region Client: Highway Dept. – M.P.W. Project Design: Intrat Ingenieros Consultores Ltd. GEOTECHNICAL BORINGS AND SPECIAL TESTS FOR DESIGN (JAN/FEB, 1996) Project: Valdivia – CELCO – Cellulose Plant, San José de la Mariquina – X Region Client: CELCO S.A. Project Design: Prof. Fernando Marinez Serrano y Asoc. GEOTECHNICAL BORINGS AND TESTS FOR DESIGN (JAN/FEB, 1996) Project: Oasis Electric Power Plant – Mejillones, II Region Client: Geotécnica Consultores S.A. Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS (NOV, ‘95/APRIL, ‘96) Project: Extension 5 S Highway / Chillán – Collipulli – VIII / IX Region Client: Petrus Ingenieros Ltd. Project Design: Ingenieros Cuatro – Highway Dept. / M.P.W. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (JANUARY, 1996) Project: San Alfonso del Mar Buildings- Mirasol Beach, Algarrobo, V Region Client: Geofun Ltd. Project Design: Geofun Ltd. GEOTECHNICAL BORINGS AND TESTS (FEBRUARY, 1996) Project: Viña – Valparaíso Sewer Culvert, Complementary Investigations (9th Stage) – V Region Client: ESVAL S.A. Project Design: Geotécnica Consultores S.A. ENVIRONMENTAL BORINGS FOR EVALUATION (FEBRUARY, 1996) Project: SHELL Chile Industrial Plant- Quilicura - Metropolitan Region Client: SHELL Chile S.A.C.I. Project Design: SHELL Chile S.A.C.I. ENVIRONMENTAL BORINGS FOR EVALUATION (FEBRUARY, 1996) Project: Otero Comercial Industrial Plant – Santiago - Metropolitan Region Client: Harnishfeger Industria (USA) – Otero Ltd. Project Design: Woodward Clyde – Mexican Subsidiary EXPLORATORY BORINGS FOR MINE (JAN/APRIL, 1996) Project: Fellemberg and Actual Mines - Metropolitan Region Client: Compañía Industrial El Volcán Ltd. Project Design: Eprom Ltd. PERMEABILITY TESTS AND STANDARD PENETRATION TESTS (FEB/MARCH, 1996) Project: Pullallí Copper Mine – La Ligua – V Region Client: GEOTEC/Pagasus Mining Co. Chile Project Design: Knight Piesold Chile GEOTECHNICAL BORINGS AND IN SITU TESTS (MARCH, 1996) Project: Repair Maule Channel, North Side – Talca – VI Region Client: Irrigation Department – M.P.W. Project Design: Conic – Bf & Edic Engineers Ltd. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (MARCH, 1996) Project: Trebol Ready Mix Cement Plant – Quilicura, R.M. Client: Puga, Mujica y Asoc. Ltd. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS FOR DESIGN (MAY/JUNE, 1996) Project: Repair 5S Highway, Angostura – Camarico / Vespucio – Paine – VI Region Client: Len y Asoc. and Highway Dept. – M.P.W. Project Design: Len y Asoc. and Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (APRIL, 1996) Project: Viña – Valparaíso Sewer Culvert, Complementary Investigations II Stage V Region Client: ESVAL S.A. Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (JUNE / JULY, 1996) Project: Valdivia/CELCO Cellulose Procesing Plant, II Stage – IX Region Client: CELCO S.A. Project Design: Prof. Fernando Martinez Serrano y Asoc. GEOTECHNICAL BORINGS, PITS AND IN SITU PERMEABILITY TESTS (MAY, 1996) Project: Hydrogeological Evaluation Cerro Minero Acids Plant – VI Region Client: Codelco - El Teniente Division Project Design: Edic Engineers Ltd. PERMEABILITY TESTS (MAY, 1996) Project: Sterile Dump Site at Los Pelambres Mine, Salamanca, IV Region Client: GEOTEC Boyles Bros. S.A. Project Design: GEOTEC Boyles Bros. S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (JUNE, 1996) Project: Allipén River Bridge, Temuco, X Region Client: Geoprospec Ltd. Project Design: Prof. Andrés Pérez Magalhaes, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS (JULY / AUG, 1996) Project: Viña –Valparaíso Sewer Culvert, Complementary Investigations Third Stage, Pudeto St./Prieto St./ Sotomayor Plaza – V Region Client: ESVAL S.A. Project Design: Cade – Idepe / Geotécnica Consultores S.A GEOTECHNICAL BORINGS AND IN SITU SPECIAL TESTS (JULY / OCT, 1996) Project: Deep Underground Gas Storage Tank, Third Stage Client: GASCO S.A. Project Design: Edic Engineers Ltd. Geostock (France) GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (JUNE, 1996) Project: Sewage Treatment Plant / Pucón, X Region Client: Essar S.A. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (JULY, 1996) Project: Punta Puyai Beach Resort, Papudo, V Region Client: Punta Puyai Ltd. / Real Estate Co. Project Design: Ruz y Vukasovic Ingenieros Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (JULY, 1996) Project: Highway I 60 Bridges – San Fernando, El Camarón, Ranquilhue, Colhue VI Region Client: Ingelog Ltd. (Highway Dept. – M.P.W.) Project Design: Ingelog Ltd. PERMEABILITY TESTS, STANDARD PENETRATION AND UNDISTURBED SAMPLING (JULY / NOV, 1996) Project: Tailings Dams: La Fraguita, Quebrada Seca, Cuncumen, Las Lajas Client: Minera Los Pelambres Copper Co. – GEOTEC Boyles Bros. Ltd. Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS, PERMEABILITY AND RESISTANCE TESTS (SEPT / OCT, 1996) Project: Underground Metro, Extension Line 5 / Baquedano – Sta. Ana Client: Metro S.A. Project Design: Mauricio Poblete Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (AUG / SEPT, 1996) Project: Nehuenco Electric Power Plant, Quillota, V Region Client: Colbún – Machicura S.A. / Siemens A.G. (Germany) Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (SEPT/ OCT, 1996) Project: Tunnel for Salesíanos Channel, Catemu, V Region Client: Irrigation Dept. – M.P.W. Project Design: ELECTROWATT PERMEABILITY TESTS INSIDE BORINGS (NOV – JAN, 1997) Project: Tunnel for Conveyor Belt, Los Pelambres Copper Mine, IV Region Client: Minera Los Pelambres / GEOTEC Boyles Bros. S.A. Project Design: SRK (South America) GEOTECHNICAL BORINGS AND SPECIAL IN SITU TESTS (JUNE / DEC, 1996) Project: Deep Underground Gas Storage Tank – Fourth Stage - Metropolitan Region Client: GASCO S.A. Project Design: Edic Engineers Ltd. / Geostock (France) GEOTECHNICAL BORINGS AND IN SITU TESTS (NOV 1996 – MARCH 1997) Project: Lo Prado II Highway Tunnel / Metropolitan Region Client: Highway Dept. – M.P.W. Project Design: Asintota Ltd. SPECIAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (OCT / NOV 1996) Project: Thermoelectrical Power Plant – San Isidro – Quillota, V Region Client: Mitsubishi Corporation (Japan) Project Design: Oyo Corporation (Japan) GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (NOV / DEC, 1996) Project: Polipropilene Industrial Plant – Talcahuano – VIII Region Client: PETROX S.A. – TECMONT (ITALY) Project Design: Prof. Fernando Martinez y Asoc. / Tecmont (Italy) GEOTECHNICAL BORINGS AND IN SITU TESTS (JAN/ FEB, 1997) Project: Viña – Valparaíso Sewer Cuvert, Detailed Engineering – V Region Client: ESVAL S.A. Project Design: Cade - Idepe GEOTECHNICAL BORINGS AND TESTS (JANUARY, 1997) Project: Irrigation Dam – Los Aromos, V Region Client: Ruz y Vukasovic Ingenieros Constructores Ltd. Project Design: Manuel Ruz Jorquera, P.E. PERMEABILITY AND STANDARD PENETRATION TESTS AND UNDISTURBED SAMPLING (JANUARY, 1997) Project: Radomiro Tomic Copper Mine – II Region Client: GEOTEC Boyles Bros. S.A. Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (JAN / FEB, 1997) Project: Optimization Combarbalá River Hydraulic Resources – IV Region Client: Irrigation Department – M.P.W. Project Design: Edic Engineers Ltd. BORINGS AND INSTALLATION OF ENVIRONMETAL CONTROL PIEZOMETERS AND OBSERVATION WELLS (JANUARY, 1997) Project: Waste Treatment and Control Plant Client: Hidronor Chile Ltd. Project Design: Hidronor Chile Ltd. / Luis Paredes, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (FEBRUARY, 1997) Project: Extension Arturo Merino Benitez Airport (Santiago) - Metropolitan Region Client: Aeronautical Dept. – M.P.W. Project Design: Geotécnica Consultores S.A. RECOGNITION BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (JAN/ FEB, 1997) Project: Atacama Gas Electrical Power Plant – Mejillones – II Region Client: Ingendesa S.A. Project Design: Ingendesa S.A. / Luis Miguel de Pablo, P.E. GEOTECHNICAL BORINGS (H.S.A.) AND GROUTING (JAN / FEB, 1997) Project: Repair Coya Sur Nitrate Plant, Antofagasta – II Region Client: Soquimich Ltd. Project Design: Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND REPAIR OF TUNNEL (FEB / MAY 1997) Project: Andina Copper Mine to Ovejería Tailings Dam Tunnel 1 – ST1, Los Andes – V Region Client: Montcocol TP (France) – Cogifer Chile Ltd. Project Design: Consortium REG – GC – JR GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (APRIL, 1997) Project: Pacífico Port Buildings / Coraceros / Viña del Mar – V Region Clien: Manso de Velasco Real Estate Co. Project Design: Petrus Ingenieros Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (MAY / SEPT, 1997) Project: Geotechnical Feseability Mine Area / Concentrador / Tranferencias Contract Nr: 23165 TSC 11 / 23265 TSC 4B Client: Minera Los Pelambres Mining Co. / Bechtel Chile, Salamanca – IV Region Project Design: E.C. Rowe y Asoc. GEOTECHNICAL BORINGS AND IN SITU TESTS (MAY / OCT, 1997) Project: Hydroelectrical Use of Duqueco River, Santa Bárbara – VIII Region Client: Entrecanales - Cubiertas Chile S.A. Project Design: Electrowatt (Chile) S.A. GEOTECHNICAL BORINGS AND IN SITU SPECIAL TESTS (MAY / SEPT, 1997) Project: Deep Underground Gas Storage Tank – Fifth, Stage - Metropolitan Region Client: GASCO S.A. Project Design: Edic Engineers Ltd. / Geostock (France) GEOTECHNICAL BORINGS AND IN SITU TESTS (MAY / JULY, 1997) Project: Tailings Dam for Gold Mine – Copiapó - III Region Client: Santa Rosa Mining Co. – TEK Corporation – Marte / Lobo Mines Project Design: Ingenieros Geotécnicos Ltd. GEOTECHNICAL BORINGS AND SPECIAL IN-SITU TESTS FOR FOUNDATIONS DESIGN (JUNE / AUG, 1997) Project: Iatata Cellulose Plant – San Pedro de Aldea - VIII Region Client: CELCO S.A. Project Design: Prof. Fernando Martinez Serrano & Asoc. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (AUGUST, 1997) Project: Taltal Thermoelectrical Power Plant – II Region Client: CELTA S.A. Project Design: Ingendesa S.A. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (SEPTEMBER, 1997) Project: Alto Cochoa Tower – Reñaca – Viña del Mar – V Region Client: Bezanilla & Bezanilla Constructora Ltd. Project Design: Claus Fahrenkrog Sch., P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (OCT / NOV, 1997) Project: Tucapel Hydroelectric Power Plant – Antuco – VIII Region Client: Colbún Machicura Electric Co. S.A. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (OCT/ NOV, 1997) Project: Quebrada Blanca Copper Mine – Iquique – I Region Client: Petrus Ingenieros Ltd. / Cominco Ltd., TEK Corp. Project Design: Arce, Reciné Asoc. (ARA) – Bechtel Chile Ltd. – Petrus Ingenieros Ltd. GEOTECHNICAL BORINGS AND TESTS FOR DESIGN (OCT / NOV, 1997) Project: New Bridge over Limarí River, 5 N Highway – IV Region Client: Pedro Ortigosa de Pablo, P.E. (Petrus Ingenieros Ltd.) Project Design: Fermín Gonzalez Ramos, P.E., / SACYR (Spain) GEOTECHNICAL BORINGS, IN SITU TESTS FOR FOUNDATIONS DESIGN (NOVEMBER, 1997) Project: Bioceánica Tower Building – San Antonio – V Region Client: Zulueta Real Estate and Investment Co. Project Design: Prof. Miguel Petersen Acevedo, P.E. GEOTECHNICAL BORINGS, IN SITU TESTS FOR FOUNDATIONS DESIGN (NOV / DEC, 1997) Project: Wood Chips Processing Plant – Puerto Montt – X Region, First Stage Client: Dames & Moore Chile Ltd. – CPM Consultants (Canada) – Boise Cascade Project Design: Boise Cascade (USA), CRS Forestal, Ltd. GEOTECHNICAL BORINGS AND LUGEON TESTS, PIEZOMETERS INSTALLATION (NOV, ‘97/FEB, ‘98) Project: Los Pelambres / Mine and Sterile Dump Area. Contract 85,000 TDP, Salamanca – IV Region Client: Minera Los Pelambres (Mining Co.) Project Design: SRK (South America) S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (MARCH/APRIL, 1998) Project: Pascua – Gold Mine Tailings Dam – Contract 2030 B – III Region Client: Nevada Mining Co. (Barrick) Project Design: Knight Piesold Consultants GEOTECHNICAL BORINGS AND IN SITU TESTS (JAN/FEB, 1998) Project: Callihue Irrigation Dam – San Fernando – VI Region Client: Irrigation Dept. – M.P.W. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (MARCH/APRIL, 1998) Project: Pascua – Gold Mine Plant – Contract 2030 C – III Region Client: Nevada Mining Co. (Barrick) Project Design: Knight Piesold Consultants GEOTECHNICAL BORINGS AND IN SITU TESTS (MARCH/APRIL, 1998) Project: Start-up of San Francisco Sterile Dump Area - Metropolitan Region Client: Disputada Las Condes Mining Co. - CMD Project Design: Geotécnica Consultores S.A. BORINGS AND PIEZOMETERS INSTALLATION (MARCH/APRIL, 1998) Project: Los Pelambres Mine – Salamanca - IV Region Client: Minera Los Pelambres Project Design: SRK (South America) GEOTECHNICAL BORINGS AND IN SITU TESTS (MARCH / MAY, 1998) Project: Integral Evaluation of Putaendo Valley Irrigation Resources – V Region Client: National Irrigation Commission (CNR) – M.P.W. Project Design: Geofun Ltd. / A & C Ingenieros GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (MARCH, 1998) Project: Pumping Plants – Chile / Argentina Gas Duct – II Región Client: Sonacol / Arcan Chile Ltd. (Argentina) Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (APRIL, 1998) Project: Los Quillayes Tailings Dam – IV Region Client: Minera Los Pelambres / Bechtel (Chile) Project Design: Geotécnica Consultores S.A. MARINE AND IN-LAND GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (JULY / SEP, 1998) Project: Quintero Seaport Dock – V Region Client: ENAP Chilean Oil Refinery Co. Project Design: Petrus Ingeniería e Inspecciones S.A. / ARA Ingenieros Consultores GEOTECHNICAL BORINGS AND TESTS FOR FOUNDATIONS DESIGN (MAY, 1998) Project: Extension Colon Copper Concentration Plant Client: Codelco - El Teniente Division Project Design: Petrus Ingeniería e Inspecciones S.A. GEOTECHNICAL BORINGS AND PIEZOMETERS INSTALLATION FOR FOUNDATIONS DESIGN (JUNE / JULY, 1998) Project: Tocopilla Thermoelectrical Plant – II Region Client: ABB – WWG (Switzerland) Project Design: Petrus Ingeniería e Inspecciones S.A GEOTECHNICAL BORINGS AND TESTS FOR SOIL BELOW FOUNDATIONS (MAY / JUNE, 1998) Project: Extension Metro Underground Line 5 - Baquedano / Sta. Ana – Evaluation Foundations Condition of Metropolitan Cathedral Client: Metro S.A. / Ingecol Constructing Co. – Mendez Jr. (Brazil)– Sical Ltd. Project Design: Cade – Idepe SEALING INJECTIONS FOR SEALING ARTESIAN WELLS (JUNE / JULY, 1998) Project: Los Pelambres Mine – Salamanca – IV Region Client: Minera Los Pelambres (Mining Co.) Project Design: Los Pelambres / Geosonda Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (AUG/ SEPT, 1998) Project: Hydroelectric Optimization of Duqueco River – Second Stage – Santa Bárbara – VIII Region Client: Entrecanales Cubiertas Chile Ltd. Project Design: Fichtner Chile GEOTECHNICAL BORINGS AND IN SITU TESTS (SEPT / OCT, 1998) Project: Gas Pipe Line Argentina / Chile – Calama / Antofagasta - II Region Client: Econor Ltd. - Calama (Techint) Project Design: Econor Ltd. / Techint (Argentina) GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (SEPTEMBER, 1998) Project: Cementos Chile Cement Plant, Vallenar – III Region Client: Cementos Chile S.A. Project Design: Petrus Ingenieros Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (JULY / OCTOBER, 1999) Project: Aconcagua River Regulation Dam, Factibility Evaluation – Catemu – V Region Client: Hydraulic Works Dept. – M.P.W. Project Design: Edic Engineers Ltd. EXPLORATION BORINGS AND DRY SAMPLING -HOLLOW STEM AUGER- (SEPTEMBER / OCTOBER, 1998) Project: Aguas Blancas Nitrate Mine Client: Atacama Minerals Chile, S.C.M. Project Design: Atacama Minerals Chile, S.C.M. GEOTECHNICAL BORINGS, IN SITU FOR DESIGN (SEPTEMBER / NOVEMBER, 1998) Project: Bridges Collipulli / Temuco and Temuco / Río Bueno, 5 S Highway, IX Region Client: Ferrovial Agroman Empresa Constructora Ltd. Project Design: Mauricio Poblete Servicios de Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS(OCT / NOV, 1998) Project: Hydroelectric Optimization of Duqueco River – Santa Bárbara, VIII Region Client: Entrecanales Cubiertas (Chile) Ltd. Project Design: Idearen Ltd. (Spain) GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (DEC, ‘98/MAY, ‘99) Project: New Highway Access to Valparaíso Seaport – La Pólvora, Second Stage Client: Cade- Idepe / Road Department – M.P.W. Project Design: Mauricio Poblete Servicios de Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (DEC. 99 / MARCH 00) Project: Bridges 5 S Highway Temuco – Collipulli – IX / X Region Client: Ferrovial Agroman Constructora Ltd. Project Design: Mauricio Poblete Servicios de Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (JAN/FEB, 1999) Project: Hydraulic Resources Evaluation – Maipo River – Metropolitan Region Client: National Irrigation Comission (CNR) / JICA Study Mission (Japan) Project Design: JICA (Japan) ENVIRONMENTAL BORINGS, HUMIDITY/ SATURATION EVALUATION AND HYDRODINAMIC STUDY (JAN/APRIL, 1999) Project: Study of Copper Leaching Piles – (Hollow Stem Auger) – II Region Client: Codelco- Chuquicamata Division – Calama Project Design: Water Management Consultants (Chile) Ltd. STANDARD PENETRATION TESTS FOR STABILITY DESIGN VERIFICATION (JAN/FEB, 1999) Project: New Embankment Wall, Caren Tailings Dam – Rancagua – VI Region Client: Arinor Ltd. / Codelco – El Teniente Div. Project Design: Codelco - El Teniente Division – Rancagua – VI Region GEOTECHNICAL BORINGS AND SPECIAL TESTS (FEB/JUNE, 1999) Project: PérezCalderaNr1andNr2CopperTailingsDamHumidity/SaturationGradeEvaluationofTailingsMaterial(HollowStemAugerSystem) Client: Disputada Las Condes Mining Co. Project Design: Geol. Hugo Delucchi Fuenzalida / REG Ingenieros GEOTECHNICAL VERIFICATION BORINGS FOR PIEZOMETER AND INCLINOMETERS INSTALLATION (FEB/MARCH, 1999) Project: New Embankment Wall, Caren Tailings Dam – Rancagua – VI Region Client: Ingenieros y Constructores Mendez Jr. (Brazil) / Movitec Ltd. Project Design: Codelco - El Teniente Division – Rancagua – 6th Region GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (FEB/APRIL, 1999) Project: Sewage Treatment Plant – La Boca II Beach – Concón – V Region Client: ESVAL S.A. Project Design: ESVAL S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (JUNE, 1999) Project: Improvement Irrigation System / Cogotí Irrigation Dam – III Region Client: Hydraulic Works Dept. – M.P.W. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN-SITU TESTS (JUNE, 1999) Project: Río Blanco Regulation Dam / Longavi River – Parral – VII Region Client: Hydraulic Works Dept. – M.P.W. Project Design: Edic Engineers Ltd. GEOTECHNICAL VERIFICATION BORINGS (MAY/JUNE, 1999) Project: Chancador Retaining Wall Nr 2,3 / El Refugio Gold Mine – Copiapó – III Region Client: Maricunga Mining Co. Project Design: Interamericana – Compañía de Seguros Integrales ENVIRONMENTAL BORINGS AND OBSERVATION WELLS (MAY, 1999) Project: Warner Lambert Pharmaceutical Industry Plant / Metropolitan Region Client: Ingedos Ltd. / ERM (USA) Project Design: Manuel León, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS (MAY/JUNE, 1999) Project: Development of Hydraulic Resources of Illapel River – IV Region Client: Hydraulic Works Dept. – M.P.W. Project Design: Ingendesa S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (OCT, ‘99/MARCH, ‘00) Project: New Access Highway to Valparaíso Seaport– La Pólvora – III Stage Client: Cade –Idepe /Highway Dept. – M.P.W. Project Design: Mauricio Poblete Servicios de Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS (JULY, 1999) Project: Alto Norte Tailings Dam /Antofagasta – II Region Client: Noranda Chile S.A. Project Design: Alfredo Edwards Ingenieros Consultores Ltd. GEOTECHNICAL BORINGS, IN SITU TESTS FOR FOUNDATIONS AND STRUCTURES DESIGN (SEPT/NOV, 1999) Project: Structures and Accesses 5 S Highway Temuco – OC. CH19990368 – Río Bueno – IX Region Client: Ferrovial Agroman Chile Ltd. Project Design: Mauricio Poblete Servicios de Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (SEPT/NOV, 1999) Project: Highway Accesses and Crossing for Rancagua´s By-Pass – OC.CH19990470 – VI Region Client: Ferrovial Agroman Chile Ltd. Project Design: Pedro Ortigosa de Pablo, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (SEPT/NOV, 1999) Project: New Highway (Southern) Access to Santiago – OC. CH19990473 - Metropolitan Region Client: Ferrovial Agroman Chile Ltd. Project Design: Mauricio Poblete Servicios de Ingeniería Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (SEPT/NOV, 1999) Project: Structures and Highway Crossings – Collipulli / Temuco – OC.CH19990509 - Highway 5 South – IX Región Client: Ferrovial Agroman Chile Ltda. Project Design: Mauricio Poblete Servicios de Ingeniería Ltda. MARINE GEOTECHNICAL BORINGS AND IN SITU TESTS FOR GEOTECHNICAL AND STABILITY ANALYSIS (OCT/NOV, 1999) Project: Sea Port of San Vicente – Site 1 – Talcahuano – VIII Region Client: Antonio Fernandez Samaniego – F.C.Q. GEOTECNIA Project Design: Procon S.A. Ingeniería EXPLORATION BORINGS AND IN SITU TESTS (DEC, ‘99/FEB, ‘00) Project: El Yeso Irrigation Dam – Diaphragm Wall Condition - Metropolitan Region Client: EMOS S.A. Project Design: Consultores S.A. LUGEON PERMEABILITY TESTS (DEC, ‘99/FEB, ‘00) Project: La Escondida Mine – Antofagasta – II Region Client: La Escondida Mining Co. Project Design: GEOTEC Boyles Bros. S.A. EXPLORATION TEST BORINGS, HOLLOW STEM AUGER SYSTEM(SEPTEMBER, 1999) Project: Pampa Blanca Saltpeter Dump Area Client: Soquimich - Nitratos, Ltd. Project Design: Soquimich - Nitratos, Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (DECEMBER, 1999) Project: Makro Supermarket Foundation Design - Valdivia – IX Region Client: Justiniano y Meyer Arquitectos Ltd. Project Design: Geofun Ltd GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (JAN/FEB, 2000) Project: Bridges Ensenada, Río Oscuro, Maullín – X Region Client: Highway Dept - M.P.W. Project Design: Mauricio Poblete y Co. Ltd ENVIRONMENTAL BORINGS (FIRST STAGE) AND OBSERVATION WELLS INSTALLATION (SECOND STAGE) (NOV, 1991/MARCH, 2000) Project: ESSO Plant, Antofagasta – II Region Client: ESSO Chile Petrolera S.A. Project Design: ESSO Chile Petrolera S.A. – Prof. Dr. Andrés Olea (Chile University) HABILITACIÓN DE POZOS DE OBSERVACIÓN (NOV, 1999 / MARZO, 2000) Project: ESSO Plant, Antofagasta – II Region Client: ESSO Chile Petrolera S.A. Project Design: ESSO Chile Petrolera S.A. – Prof. Dr. Andrés Olea (Chile University) GEOTECHNICAL BORINGS AND IN SITU TESTS(FEB/APRIL, 2000) Project: Feasibility Evaluation La Punilla Irrigation Dam - Punilla - Chillán – VIII Region Client: Hydraulic Works Dept. - M.P.W. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN(FEB/MARCH, 2000) Project: Praxair Industrial Plant - Colina - Metropolitan Region Client: Fundición Praxair Ltd. Project Design: Mauricio Poblete y Co. Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (FEB/ MARCH, 2000) Project: Highway By-Pass Chillán - 5 S Highway - Chillán – VIII Region Client: Ferrodel / Delta / Ferrovial Construction Co. Project Design: Mauricio Poblete y Co. Ltd. STANDARD PENETRATION TESTS (SPT) AND LUGEON TYPE (MACH/JUNE, 2000) Project: Pascua - Lama Gold Mine Client: Barrick Mining Co. – (Argentina) / GEOTEC Boyles Bros. S.A. Project Design: Tecnoandina de Sondajes Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (APRIL/MAY, 2000) Project: Altamar Building, Concón Av., Reñaca - V Region Client: Bezanilla & Bezanilla Constructora Ltd. Project Design: Claus Fahrenkrog Sch., P.E. GEOTECHNICAL BORINGS AND IN-SITU TESTS FOR STRUCTURES AND HIGHWAY ACCESSES (APRIL/ MAY, 2000) Project: 5 S Highway - Santiago / Talca – Metropolitan Region to VII Region Client: Ferrovial Agroman Constructora Ltd. Project Design: Mauricio Poblete y Co. Ltd GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (APRIL / MAY, 2000) Project: North Grinding Plant, Mejillones – II Region Client: Cemento Polpaico Ltd. Project Design: Mauricio Poblete y Co. Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (APRIL 2000) Project: Rengo Crossover Access to 5 S Highway – VI Region Client: Ferrovial Agroman Constructora Ltd. Project Design: Mauricio Poblete y Co. Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (MAY/JULY, 2000) Project: Costanera Mall - Puerto Montt – X Region Clien: Salfa Mantajes, Ltd. / Inversiones Paseo del Mar Project Design: Ricardo Carnevali Kunstman, P.E. LUGEON PERMEABILITY TESTS (JULY/NOV, 2000) Project: Rosario Proyect, Dª Inés de Collahuasi Mine - Iquique – I Region Client: Dª Ines de Collahuasi Mine / GEOTEC Boyles Bros. S.A. GEOTECHNICAL EXPLORATION BORINGS AND IN SITU TESTS FOR SETTLEMENTS RESEARCH (AUG/OCT 2000) Project: Stability of Condensation Tank TK - 051 Concentration Plant - El Chacay – IV Region Client: Minera Los Pelambres Co. - SGC Ajustadores Ltd. (Interamericana Insurance / Allianz Insurance) GEOTECHNICAL BORINGS AND IN SITU TESTS FOR DESIGN (AUG/SEPT 2000) Project: Cofferdam, Ralco Hidroelectric Power Plant - Santa Bárbara – VIII Region Client: FEBRAG S.A. Consortium Project Design: Edic Engineers Ltd. / Prof. Guillermo Noguera Larrain, P.E. GEOTECHNICAL BORINGS AND INSTRUMENT INSTALLATION - INCLINOMETER + SETTLEMENTS CONTROL - (OCTOBER 2000) Project: Primary Crusher Foundation Monitoring Client: Minera Los Pelambres Mining Co. Project Design: MLP / Geologist Agustín Álvarez V. GEOTECHNICAL MARINE AND IN LAND BORINGS AND IN SITU TESTS FOR STRUCTURAL DESIGN (NOV/ DEC 2000) Project: San Antonio Seaport Enlargement Client: FCQ Geotécnia – Proconsa S.A. Project Design: Proconsa / FCQ Geotécnia GEOTECHNICAL AND ENVIROMENTAL BORINGS, WATER WELLS AND IN SITU TESTS (NOV. 2000 / MARCH 2001) Project: Two Tailing Dams, Caimanes – IV Region Client: Minera Los Pelambres Project Design: SRK (Sudamerica) S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS – II STAGE (DEC. 2000 / JAN. 2001) Project: Punilla, Water Supply Dam – San Fabián de Alico – VIII Region Client: Hydraulic Dept., Ministry Public Works Project Design: Edic Engineers Ltd. GEOTECHNICAL OFF – SHORE AND IN LAND BORINGS IN SITU TESTING FOR FOUNDATIONS DESIGN (DEC. 2000 / MARCH 2001) Project: Two Electrical Power Plants – Laguna Verde – Valparaíso – V Region Client: GENER S.A. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (FEB. / APRIL 2001) Project: Calama City Integration Plan – II Region Client: CODELCO – Div. Chuquicamata Project Design: Petrus Engineers Ltd. GEOTECHNICAL BORINGS AND IN SITU PERMEABILITY TESTS (APRIL 2001) Project: Drainage for Calama´s City Buildings – II Region Client: CODELCO – Div. Chuquicamata Project Design: Enrique Montoya Engineering Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTING (APRIL / MAY 2001) Project: La Farfana Water Treatment Plant – Maipú – Santiago Client: EMOS S.A. Project Design: FCQ Geotechnics and Engineering GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (APRIL / MAY 2001) Project: Chacabuquito Hidroelectric Power Plant – Turbines House Client: Guardia Vieja Hidroelectric S.A. Project Design: Rodriguez & Goldsack Ltd. GEOTECHNICAL BORINGS FOR INSTRUMENTATION (MARCH/APRIL 2001) Project: Highway Settlements Monitoring – Cristo Redentor Tunnel – V Region Client: CIMM Technology and Services S.A. / Ministry of Public Works – Highway Dept. Project Design: CIMM Technology and Services S.A. IN SITU PERMEABILITY TESTS (MAY/AUG, 2001) Project: Salar Punta Negra – Minera Escondida - II Region Client: Geotec Boyles Bros. S.A HORIZONTAL GEOTECHNICAL BORINGS FOR TUNNEL DESIGN (JUNE/SEPT, 2001) Project: Ralco Hidroelectric Power Plant – Diversion Tunnel - Alto Bío-Bío – VIII Region Client: C.C. Araucaria Entrecanales Cubiertas S.A. (Spain) Project Design: Ingendesa S.A. GEOTECHNICAL BORINGS, IN SITU TESTS, PIEZOMETER INSTALLATION (JUNE/SEPT, 2001) Project: Two Caimanes Tailings Dams / Quillayes Tailings Dam – Contract SC-07- IV Region Client: Minera Los Pelambres Project Design: SRK Consultants S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (JULY/AUGUST, 2001) Project: Buenaventura Bridge – Panamerican Higway Client: Soc. Concesionaria Aconcagua / OHL (México) Project Design: Rodriguez & Goldsack Ltd. GEOTECHNICAL BORINGS, IN SITU STRENGTH AND PRESSIOMETRIC TESTS (AUG/ SEPT, 2001) Project: Water Treatment Plant – La Farfana – Metropolitan Region Client: Ferrovial Agroman (Chile) S.A. Project Design: Ferrovial Agroman (Chile) S.A. GEOTECHNICAL BORINGS (H. STEM AUGER) AND SCPTU IN SITU TESTS (OCT, 2001/NOV, 2002) Project: Quillayes Tailings Dam – Salamanca – IV Region Client: Minera Los Pelambres Project Design: SRK Consultants S.A. GEOTECHNICAL BORINGS AND PIEZOMETER INSTALLATION (NOVEMBER 2001) Project: Laguna Seca Tailings Dam – II Region Client: C. Fahrenkrog & Co. / BESALCO S.A. Project Design: C. Fahrenkrog & Co. / Minera Escondida LUGEON (PACKER) PERMEABILITY TESTS (NOV,2001/JAN 2002) Project: Spence – Sierra Gorda – Antofagasta – II Region Client: Geotec Boyles Bros. S.A. Project Design: Piteau & Assoc. (Canada) GEOTECHNICAL BORINGS, IN SITU TESTS AND PIEZOMETER INSTALLATION (NOV,2001/MARCH,2002) Project: Quebrada Seca Tailings Dam – Salamanca – IV Region Client: Minera Los Pelambres Project Design: SRK Consultants S.A. GEOTECHNICAL BORINGS, SETTLEMENT AND INCLINOMETER, PIEZOMETER INSTALLATION (NOV,2001/ JAN, 2002) Project: Monitoring of Primary Crusher – IV Region Client: Minera Los Pelambres Project Design: SRK Consultants S.A. GEOTECHNICAL BORINGS -HOLLOW STEM AUGER- AND IN SITU TESTS (FEBRUARY, 2002) Project: Perez Caldera 1 and 2 Tailings Dam – Metropolitan Region Client: Cía. Minera Disputada de las Condes (Exxon) Project Design: Juan Rayo Ing. S.A. / Geoprospec Ltda GEOTECHNICAL BORINGS AND IN SITU TESTS (MAY, 2002) Project: La Florida Sewage Water Facilities – Talca – VII Region Client: HIDROSAN Ingeniería Ltda. Project Design: Rodriguez & Goldsack Ltda. GEOTECHNICAL BORINGS, IN SITU TESTS AND PIEZOMETER INSTALLATION (MAY/JUNE, 2002) Project: Guardia Vieja Hidroelectric Power Plant – V Region Client: Obras y Desarrollo S.A. Project Design: Edic Engineers Ltd. EXPLORATORY BORINGS -HOLLOW STEM AUGER- (APRIL/MAY 2002) Project: Exploration for Gold Mine – Marga Marga River – Quilpué – V Region Client: Aries S.A. Project Design: Oscar Melo Riquelme, P.E., Consultant. GEOTECHNICAL BORINGS, IN SITU TESTS, PRESSIOMETRIC TESTS (AUG/SEPT, 2002) Project: Nehuenco II Thermoelectrical Power Plant Foundations Client: ALSTOM Chile S.A. / Colbún – Machicura S.A. Project Design: ALSTOM Chile S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (JUNE, 2002) Projec: Highway Crossings for Rancagua By-Pass – OC. G3270 – Rancagua – VI Region Client: Ferrovial Agroman Chile S.A. Project Design: Ferrovial Agroman Chile S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (JUNE/AUG, 2002) Project: Highway Crossings Temuco / Río Bueno – OC. CH20020405 – Highway 5 South – Temuco - IX Region Client: Ferrovial Agroman Chile S.A. Project Design: Ferrovial Agroman Chile S.A. GEOTECHNICAL BORINGS AND IN SITU (JULY/AUG, 2002 ) Project: Highway Crossings Southern Access to Santiago – OC. AS0040 – Metropolitan Region Client: Ferrovial Agroman Chile S.A. Project Design: Ferrovial Agroman Chile S.A. GEOTECHNICAL BORINGS AND PIEZOMETER INSTALLATION (JULY/AUG, 2002) Project: Slope Stability Monitoring at Negro Bridge – Km. 776,60 Highway 5 S. – OC. CH20020803 – Malleco - IX Region Client: Ferrovial Agroman Chile S.A. Project Design: Ferrovial Agroman Chile S.A GEOTECHNICAL BORINGS AND IN SITU TESTS (JULY/AUG 2002) Project: Slope Stability Design of Temuco By Pass – Km. 670 Highway 5 S. – OC. 2002-11 Nº1006 – Malleco - IX Region Client: Ferrovial Agroman Chile S.A. Project Design: Ferrovial Agroman Chile S.A. BORINGS AND INCLINOMETERS AND SETTLEMENT INSTRUMENTATION INSTALLATION (JULY/AUG, 2002) Project: Monitoring Malleco´s Slope – OC: CH20020816 – Highway 5 S. - Collipulli - IX Region Client: Ferrovial Agroman Chile S.A. Project Design: Claus Fahrenkrog Co. Ltd. BORINGS AND PERFORATION FOR TUNNEL ALIGNMENT (SEPT/NOV, 2002) Project: La Farfana Water Plant – Storm Water Sewer – Metropolitan Region Client: EL DIAL S.A. – Besalco S.A. Project Design: BESALCO S.A. EVALUATION OF GEOTECHNICAL CONDITIONS (JAN/MAY, 2003) Project: Ovejería Tailings Dam – Metropolitan Region Client: CODELCO – Andina Division Project Design: Knight Piesold S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS (DEC, 2002/JAN, 2003) Project: Ralco Hidroelectric Power Plant – Diversion Tunnel – VIII Region Client: Consorcio Constructor Araucaria (Spain) Ltd. Project Design: Ingendesa S.A. GEOTECHNICAL BORINGS, IN SITU TESTS AND PIEZOMETER INSTALLATION (DEC, 2002/MAY, 2003) Project: Mauro and Quillayes Tailings Dams – Contract CSM-02 - IV Region Client: Los Pelambres Minerals Project Design: Golder & Assoc. / Arcadis Geotecnica Consultores / JRI Engineering ENVIROMENTAL STUDY BORINGS WITH HOLLOW STEM AUGER (JAN/FEB, 2003) Project: Las Salinas Plant – Viña del Mar – V Region Client: Exxon / Mobil / Shell Project Design: Arcadis Geotecnica Consultores GEOTECHNICAL BORINGS FOR FOUNDATIONS (MARCH/MAY, 2003) Project: Vista ESO Observatory – Antofagasta – II Region Client: ESO European Southern Observatory Project Design: Petrus / ARA Engineering INJECTIONS FOR FOUNDATIONS (MAY/JUNE 2003 ) Project: COGOTI Water Dam – Combarbalá – IV Region Client: EDECO Ltd. Project Design: Edic Engineers Ltd. ENVIROMENTAL MINITORING WELLS (SEPT/OCT, 2003) Project: Las Vegas de Calama – II Region Client: Falconbridge Mining Lomas Bayas Project Design: ARCADIS Geotecnica Consultores S.A. HOLLOW STEM AUGER GEOTECHNICAL BORINGS FOR FOUNDATIONS DESIGN (JULY/AUG, 2003) Project: Turistical / comercial Center Portal Valdivia – X Region Client: Del Pacifico Construction Co. Ltd. Project Design: Ricardo Carnevali Kunstmann P.E. ENVIROMENTAL BORINGS -HOLLOW STEM AUGER- (SEPT/OCT, 2003) Project: Las Salinas Plant – Viña del Mar – V Region Client: EXXON Co. Project Design: PROANALISIS S.A. (Argentina) GEOTECHNICAL BORINGS, IN SITU TESTING FOR FOUNDATION DESIGN (OCT, 2003) Project: Foundations Design Pdte. Riesco / S. Sebastian Tower – Las Condes - Metropilitan Region Client: Briones & Martinez Constructing Co. Ltd. Project Design: Ing. Andrés Pérez Magalhães / GEOPROSPEC Ltd. GEOTECHNICAL BORINGS, IN SITU TESTING FOR FOUNDATION DESIGN (SEPT/OCT, 2003) Project: Concepción New Jailhouse - VIII Region Client: Ministry of Public Works (MOP) Project Design: PETRUS Engineers S.A. ENVIROMENTAL BORINGS, PERMEABILITY TESTS, MONITORING WELLS (NOV/ DEC, 2003) Project: Laguna Verde Leach Piles – Cerro Bayo Mining Co. – FACHINAL - Chile Chico – XI Region Client: Cerro Bayo Mining Co. Project Design: Knight Piesold S.A. ENVIROMENTAL BORINGS AND OBSERVATION WELLS INSTALLATION (DECEMBER, 2003) Project: Sewell´s Monitoring Wells – Caletones – Rancagua – VI Region Client: CODELCO – El Teniente Division Project Design: ARCADIS Geotecnica Consultores S.A. ENVIROMENTAL RESEARCH (DECEMBER, 2003) Project: Enviromental Status of Santiago´s HYATT hotel – Metropolitan Region Client: ESNR International (U.S.A.) Project Design: ESNR International (U.S.A.) GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (NOV/DEC, 2003) Project: Bridges 1 and 2 Foundations – Route 0298 – Rafael – Menque – VIII Region Client: Ministry of Public Works / CCP Ingenieria Ltd. Project Design: Mr. Miguel Farías C., P.E. / Mr. Nelson San Martín, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (DEC, 2003 / JAN, 2004) Project: Foundations of Bridge Canela Alto – Combarbalá – IV Region Client: Ministry of Public Works / TRICAM Construction Co. Ltd. Project Design: Mr. Miguel Farías C., P.E. / Mr. Nelson San Martín, P.E. PERMEABILITY TESTS IN ROCK -PACKER TESTS OR LUGEON TESTS- (DEC, 2003 / JAN 2004) Project: Hidrogeological Investigation Open Pit of El Teniente Mine – Rancagua – VI Region Client: Geotec Boyles Bros. / CODELCO – El Teniente Division Project Design: SRK Consulting Engineers (Chile) S.A. GEOTECHNICAL BORINGS AND PIEZOMETER INSTALLATION (JAN / FEB, 2004) Project: Hidrogeological Investigation at El Cardonal – V Region Client: Siemel S.A. / Mrs. María Noseda Z. Project Design: Ing. Andrés Pérez Magalhães / GEOPROSPEC Ltd. GEOTECHNICAL INVESTIGATION BORINGS (FEB, 2004) Project: San Antonio Seaport Enlargement and Dredging Analysis – V Region Client: San Antonio International Terminal (STI) Project Design: FCQ Geotecnica / PROCONSA Ingeniería S.A. EXPLORATORY GEOTECHNICAL BORINGS FOR UNDERGROUND SUBWAY METRO (FEBRUARY 2004) Project: Line 2 North – Recoleta - Metropolitan Region Client: DPS - METRO S.A. Project Design: Edic Engineers Ltd. GEOTECHNICAL BORINGS, IN SITU TESTS FOR FOUNDATIONS DESIGN (MARCH 2004) Project: Isla Teja Marine and Geotechnical Characterization of Large Terrane – X Region Client: SOCOVESA Valdivia S.A. Project Design: Mr. Andrés Pérez Magalhães / GEOPROSPEC Ltd. GEOTECHNICAL, HIDROGEOLOGICAL BORINGS AND HIDROGEOLOGICAL TESTING (MARCH 2004 / FEBRUARY 2005) Project: Mauro Tailings Dam and Tunnels for Tailings Transportation – Contract SCM-07 – Caimanes / Salamanca – IV Region Client: Minera Los Pelambres Project Design: ARCADIS Geotecnica Consultores / GOLDER & Associates S.A. GEOTECHNICAL/GEOLOGICAL SOIL INVESTIGATION (JULY / AUGUST 2004) Project: Characterization of Chanco´s Soils, Stage I – VII Region Client: B.O. S.A. Investements Project Design: Geol. Mr. Guillermo Alfaro Hanne GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (DECEMBER 2004 / JANUARY 2005) Project: Alhue Bridge, El Asiento – V Region Client: Minera La Florida S.A. Project Design: SECOIA Ltda. Gabriel Cabezas Monsalve, P.E. GEOTECHNICAL BORINGS, IN SITU TESTS FOR FOUNDATION DESIGN (JANUARY 2005) Project: Urmeneta Building – Puerto Montt - X Region Client: EDYKON Ltd. Project Design: Mr. Ricardo Carnevali Kunstmann, P.E. GEOTECHNICAL/GEOLOGICAL SOIL INVESTIGATION (DECEMBER 2004 / JANUARY 2005) Project: Characterization of Chanco´s Soils, Stage II – VII Region Client: B.O.S.A. Investements Project Design: Geol. Mr. Guillermo Alfaro Hanne ENVIROMENTAL MONITORING WELLS (FEBRUARY/ MARCH 2005) Project: Enviromental Observation and Monitoring Wells for Celulose Industry - Licanten – VII Region Client: CELULOSA ARAUCO S.A. – Licanten Plant Project Design: ENVICON CHILE S.A. / Mr. Luis Brades, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (FEBRUARY / MARCH 2005) Project: Extension of Mall Paseo del Mar – Puerto Montt – X Region Client: PASMAR S.A. Project Design: Mr. Ricardo Carnevali Kunstmann, P.E. SOIL INVESTIGATION FOR TUNNEL DESIGN (MARCH / APRIL 2005) Project: Tunnel Vespucio – El Salto – Kennedy - Metropolitan Region Client: Constructora Vespucio Norte S.A. Project Design: M.O.P. (Ministry of Public Works) – Highway Design Section EMVIROMENTAL MONITORING WELLS INSTALLATION (MARCH / APRIL 2005) Project: GASATACAMA Electric Power Plant – III Region Client: GASATACAMA GENERACION S.A. Project Design: Gestion Ambiental Consultores S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (JUNE 2005) Project: Caja Los Heroes Building – Puerto Montt – X Region Client: Inmobiliaria JCE S.A. Project Design: Mr Ricardo Carnevali Kunstmann, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (APRIL 2005) Project: New Staring Silo for cement – Curicó – VII Region Client: CEMENTOS BIO-BIO S.A. Project Design: GEOPROSPEC Ltd / Mr. Andrés Pérez Magalhães, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATIONS DESIGN (MARCH 2005) Project: Plaza Casino Hotel – Puerto Varas – X Region Client: PLAZA CASINO S.A. Project Design: Mr Ricardo Carnevali Kunstmann, P.E. OFFSHORE GEOTECHNICAL BORINGS AND TESTS FOR FOUNDATIONS DESIGN (APRIL / AUGUST 2005) Project: Enrargement of San Antonio Seaport – V Region Client: STI San Antonio International (SEAPORT) S.A. Project Design: PROCONSA Ingeniería S.A. STRUCTURAL CONDITION INVESTIGATION THROUGH CORE DRILLING (JUNE / AUGUST 2005) Project: Underground Retaining Wall Structural Conditions Client: STI San Antonio International (SEAPORT) S.A. Project Design: RFA Ingenieros Consultores Ltd / MP Ingeniería S.A. GROUTED CUT-OFF WALL VERIFICATION – BORINGS AND PERMEABILITY TESTING (AUGUST / SEPTEMBER 2005) Project: Cut Off Wall – Quillayes Tailings Dam – Salamanca – IV Region Client: ESTRATOS Ltd Project Design: REG Ingeniería Ltda. GEOTECHNICAL BORINGS, IN SITU GEOTECHNICAL AND GEOPHYSICAL TESTING AND ELECTRONIC PIEZOMETER INSTALLATION (JULY / NOVEMBER, 2005) Project: Caren Tailings Dam – 4th Stage – Metropolitan Region Client: BROTEC S.A. / CODELCO El Teniente Div. Project Design: CODELCO Chile / MHW Chile Ltda. CAREN TAILING DAM ENLARGEMENT GEOTECHNICAL BORINGS AND IN SITU TESTS (JULY / NOVEMBER 2005) Project: Future Enlargement of Caren Tailings Dam – 5th Stage and Subseguent – Metropolitan Region Client: REG Ingeniería Ltd / CODELCO El Teniente Div. Project Design: REG Ingeniería Ltd GEOTECHNICAL INVESTIGATION FOR MERVAL SUBWAY (SEPTEMBER, 2005) Project: Merval Subway Viña-Valparaíso – V Region Client: DICTUC S.A. (Departamento de Investigaciones Científicas y Tecnológicas Universidad Católica) Project Design: Metro Regional Valparaíso S.A. HIDROELECTRIC POWER PLANT – FACTBILITY INVESTIGATION (OCTOBER/ NOVEMBER, 2005) Project: Ñuble Power Plant – Chillán – VIII Region Client: CGE Compañía General de Electricidad Project Design: EDIC Ingenieros Ltd. RAMADILLA IRRIGATION DAM – GEOTECHNICAL BORINGS AND IN SITU TESTS (NOVEMBER / DECEMBER 2005) Project: La Vega Dam – Ramadilla Area – Combarbalá – IV Region Client: AFRUVA S.A. Project Design: GEOPROSPEC Ltd / Mr. Andrés Pérez Magalhães, P.E. ENVIROMENTAL MONITORING WELLS INSTALLATION BY MEANS OF HOLLOW STEM AUGER (NOVEMBER / DECEMBER 2005) Project: Enviromental Control Gasatacama Power Plant - Atacama – II Region Client: GASATACAMA GENERACION S.A. Project Design: Gestion Ambiental Consultores S.A. / Geosonda Ltd. FOUNDATION DESIGN – ELECTRIC POWER PLANT GEOTECHNICAL BORINGS AND IN SITU TESTS (NOVEMBER / DECEMBER 2005) Project: AES Gener Gas Generator N° 3 – Ventanas – V Region Client: AES Gener S.A. Project Design: Rodríguez & Goldsack Ingenieros Ltd. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (DECEMBER, 2005) Project: Intake Tower # 5 – Enlargement of Quillayes Tailings Dam – Salamanca – IV Region Client: MINERA LOS PELAMBRES Project Design: Golder & Assoc. Chile S.A. / JRI TAILINGS DAM ENLARGEMENT GEOTECHNICAL BORINGS AND IN SITU TESTS (FEBRUARY / MAY 2006) Project: Las Tórtolas Tailings Dam – East Dam Anglo American – Metropolitan Region Client: ARCADIS Geotecnica Consultores Project Design: ARCADIS Geotecnica Consultores GEOTECHNICAL BORINGS FOR FOUNDATION DESIGN (NOVEMBER, 2006) Project: Colonos del Sur Hotel – Puerto Varas – X Región Client: Hoteles Colonos del Sur S.A. Project Design: Ing. Sr. Ricardo Carnevali Kunstmann GEOTECHNICAL BORINGS FOR FOUNDATION DESIGN (OCTOBER / NOVEMBER, 2006) Project: Mejillones Thermoelectrical Power Plant - Options I and II – AES Gener S.A. – Mejillones – II Región Client: Ingeniería Proyersa Ltda. Project Design: RODRIGUEZ & GOLDSACK Ltda. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (OCTOBER / NOVEMBER, 2006) Project: BHP BILLITON Thermoelectrical Power Plant – Mejillones – II Región Client: Ingeniería Proyersa tda. Project Design: RODRIGUEZ & GOLDSACK Ltda. GEOTECHNICAL BORINGS FOR ASHES DEPOSITION AREA - ENGINEERING SCHEME (DECEMBER 2006 / JANUARY 2007) Project: BHP BILLITON Thermoelectrical Power Plant – Mejillones – II Región Client: Ingeniería Proyersa tda. Project Design: RODRIGUEZ & GOLDSACK Ltda. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (NOVEMBER, 2006 / JANUARY, 2007) Project: II Recondition to 190 KTPD (Kilo Tons Per Day) – Minera Los Pelambres – Salamanca – IV Region Client: BECHTEL Chile Ltda. Project Design: PETRUS Ingenieros Ltda. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR INTAKE TUNNEL AND HYDRAULIC FALL (JANUARY, 2007 / APRIL, 2007) Project: Alto Maipo Hydroelectrical Power Plant – Contract AM-CO204 – Metropolitan Region (Santiago) Client: AES Gener S.A. Project Design: ARCADIS Geoécnica Consultores GEOTECHNICAL BORINGS AND LAB TESTS – ENGINEERING FEASIBILITY (DECEMBER 2006 / AUGUST 2007) Project: Caren Tailings Dam – 5th Stage Construction and Rock Borrow Fill Investigation Client: CODELCO Chile – El Teniente Division Project Design: REG Ingeniería Ltda. GEOTECHNICAL BORINGS INLAND AND SEA FOR FOUNDATIONS DESING (JANUARY – MARCH, 2007) Project: Esperanza – Foundations of Sea Terminal for Copper Concentrate – Michilla – Mejillones – II Region Client: ANTOFAGASTA MINERALS S.A. (AMSA) Project Design: PROCONSA Ingeniería Ltda. GEOTECHNICAL BORINGS FOR TUNNEL DESIGN UNDER SANTIAGO’S SAN CRISTOBAL HILL (APRIL, 2007) Project: Vespucio – El Salto Highway Tunel - Metropolitan Region (Santiago) Client: Constructora Vespucio Norte S.A. Project Design: Constructora Vespucio Norte S.A. GEOTECHNICAL BORINGS, IN SITU TESTS, PIEZOMETERS INSTALLATION (APRIL – JUNE, 2007) Project: Geotechnical and Geological Exploration – Optimization of Tailings Dam – Quillayes Tailings Dam – Salamanca – IV Region Client: Minera Los Pelambres Project Design: ARCADIS Geotécnica Consultores S.A. GEOTECHNICAL BORINGS FOR FOUNDATIONS DESING (APRIL – JUNE,2007) Project: Plaza Los Colonos Hotel – Puerto Varas – X Region Client: Inmobiliaria Santa Inés Ltda. Project Design: Ricardo Carnevali Kunstmann, P.E. GEOTECHNICAL BORINGS AND IN SITU TESTS (JUNE – JULIO, 2007) Project: Lican Hidroelectrical Power Plant – Puyehue Lake – X Region Client: IBENER S.A. (Spain) Project Design: IBENER S.A. (Spain) GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESING (AUGUST – SEPTEMBER, 2007) Project: Los Robles Thermoelectrical Power Plant – Constitución – VII Region Client: AES Gener S.A. Project Design: PETRUS Ingeniería S.A. GEOTECHNICAL BORINGS - COMPLEMENTARY (SEPTIEMBRE – DICIEMBRE, 2007) Project: Alto Maipo Hydroelectrical Power Plant – Contract AMCO208 – Santiago Metropolitaan Region Client: AES Gener S.A. Project Design: AES Gener S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESING (OCTOBER, 2007) Project: Bío-Bío Cement Silo – San Antonio Seaport – V Region Client: Cementos Bío-Bío Centro S.A. Project Design: Geoprospec Ltda. GEOTECHNICAL EXPLORATION FOR FOUNDATION DESING (AUGUST / OCTOBER, 2007) Project: Bocamina Thermoelectrical Power Plant – Enlargement of Plant – Coronel – VIII Región Client: ENDESA S.A. Project Design: Ingeniería y Construcción TECHNIMONT Ltda. GEOTECHNICAL BORINGS, IN SITU TESTS AND PIEZOMETER INSTALLATION (FEBRUARY / APRIL, 2008) Project: Cut off Wall N° 2 – Quillayes Tailings Dam – Contract CSQ-015 – Minera Los Pelambres – Salamanca – IV Región Client: Minera Los Pelambres Project Design: Golder Associates S.A. GEOTECHNICAL BORINGS, PERMEABILITY TESTS AND PIEZOMETER INSTALLATION (FEBRUARY / APRIL, 2008) Project: Los Lagos Hydroelectrical Power Plant – Feasibility – Osorno – X Región Client: HIDROSUR S.A. Project Design: EDIC – INGENTRA Ltda. GEOTECHNICAL BORINGS FOR SUBSURFACE EXPLORATION (APRIL / MAY, 2008) Project: Subsurface Exploration at Los Carros and Loanco – Chanco – Constitución – VII Región Client: Andrés Pirazzoli y Cía. Ltda. Project Design: Andrés Pirazzoli y Cía. Ltda. GEOTECHNICAL BORINGS AND IN SITU TESTS (FEBRUARY / SEPTEMBER, 2008) Project: New Andina 230 KYPD (Kilo Tons Per Day) – Enviromental Engineering Tailings Dam – Los Andes – V Región Client: CODELCO Chile – División Andina Project Design: ARCADIS Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND PERMEABILITY TESTS (JULY / OCTOBER, 2008) Project: La Mina Hydroelectrical Power House – Contract LM N° 006/2008 – San Clemente – Talca – VII Región Client: COLBUN S.A. Project Design: Golder Associates S.A. GEOTECHNICAL BORINGS AND PERMEABILITY TESTS (OCTOBER, 2008 - AUGUST, 2009) Project: Guaiquivilo – Melado Dam and Power Plants – Contract GU 009/2008 – San Clemente – Talca – VII Región Client: COLBUN S.A. Project Design: Golder Associates S.A. / EDIC Ingenieros GEOTECHNICAL BORINGS FOR SOIL EXPLORATION (OCTOBER / DECEMBER, 2008) Project: Subsurface Exploration – Empedrado – Constitución – VII Región Client: Antonio Zotti Rosetti y Cía. Sociedad Minera Project Design: Carlos Theune H., Senior Geologist GEOTECHNICAL BORINGS HSA (HQ-3) AND SCPTU TESTING (NOVEMBER 2009 / JANUARY 2010) Project: Candelaria Tailings Dam – Dynamic Stability Analysis – Contract 2450900834-001 – Copiapó – III Región Client: Cía Contractual Minera Candearia (FREEPORT MCMORAN COPPER & GOLD) Project Design: ARCADIS Geotécnica Consultores S.A. GEOTECHNICAL BORINGS AND PERMEABILITY TESTS (JANUARY, 2010 / MARCH, 2010) Project: La Mina Hydroelectrical Power Plant – Contract CHLM 11/2009 – San Clemente – Talca – VII Región Client: COLBUN S.A. Project Design: COLBUN S.A GEOTECHNICAL BORINGS HSA AND SCPTU TESTS (MAY / JUNE, 2010) Project: Talabre Tailings Dam – Seismic Stability Analysis – Contract 4500953546 – Chuquicamata – Calama – II Región– Contract CHLM 11/2009 – San Clemente – Talca – VII Región Client: COLDELCO _ División NOrte Project Design: Knight Piesold S.A. GEOTECHNICAL BORINGS, PERMEABILITY AND HYDROFRACTURING TESTS (PHASE I: FEBRUARY / JUNE, 2010 - PHASE II: OCTOBER/ DECEMBER, 2010 - PHASE III: DECEMBER 2010 / JANUARY, 2011) Project: Los Condores Hydroelectrical Power Plant – Contract CLC-229.10 – San Clemente – Talca – VII Región Client: ENDESA S.A. Project Design: INGENDESA S.A. GEOTECHNICAL BORINGS HSA AND SCPTU TESTS (NOVEMBER, 2010 / MARCH, 2011) Project: Candelaria Tailings Dam – Dynamic Stability Evaluation – Contract 2451004402-001 – Stage II (See 322) – Copiapó – III Región Client: Cía Contractual Minera Candearia (FREEPORT MCMORAN COPPER & GOLD) Project Design: ARCADIS Geotécnica Consultores S.A. GEOTECHNICAL BORINGS, PERMEABILITY TESTS, PIEZOMETER INSTALLATION (DECEMBER, 2010 / AUGUST, 2011) Project: Guaiquivilo – Melado Hydroelectrical Power Plants – Contract CHGU-ING-N° 024/2010 Client: COLBUN S.A. Project Design: Golder Associates S.A. GEOTECHNICAL BORINGS, IN SITU TESTS FOR FOUNDATION DESING (JUNE / SEPTEMBER, 2011) Project: Extremely Large Telescope E-ELT-ESO Observatory – Cerro Armazones – Antofagasta – II Región Client: ESO-EUROPEAN SOUTHERN OBSERVATORY Project Design: ARCADIS Chile S.A. GEOTECHNICAL EXPLORATIONS BORINGS, IN SITU TESTS FOR FOUNDATION DESING (AUGUST / SEPTEMBER, 2011) Project: Subsurface Exploration – German School of Valparaiso – Viña del Mar – V Región Client: Corporación Colegio Alemán de Valparaiso Project Design: Corporación Colegio Alemán de Valparaiso – Germán Olate Muñoz EVALUATION OF WATER TABLE RECOVERY THROUGH PIEZOMETER (OCTUBRE / NOVIEMBRE, 2011) Project: Guaiquivilo – Melado Hydroelectric Power Station – Contract CHGU N° 04/2011 – Talca – VII Región Client: COLBUN S.A. Project Design: COLBUN S.A. HOLLOW STEM AUGER (HSA) SUBSURFACE EXPLORATION (DECEMBER, 2011 / JANUARY, 2012) Project: Tailings Dam Florida Mine – Alhue – Santiago Metropolitan Región Client: MINERA FLORIDA Ltda. - YAMANA GOLD INC. Project Design: MINERA FLORIDA Ltda. - YAMANA GOLD INC. GEOTECHNICAL BORINGS FOR FOUNDATION DESING (DECEMBER, 2011 / JANUARY, 2012) Project: Los Tilos uilding – Puerto Varas – X Región Client: Constructora Cerro Moreno Sur Ltda. Project Design: Constructora Cerro Moreno Sur Ltda. GEOTECHNICAL BORINGS, PERMEABILITY TESTS, PIEZOMETER INSTALLATION (DECEMBER, 2011 / MARCH, 2012) Project: El Buitre /* Los Diques Tailings Dams – Copiapó – III Región Client: Cía Contractual Minera Candearia (FREEPORT MCMORAN COPPER & GOLD) Project Design: MWH Chile Ltda. GEOTECHNICAL BORINGS, PERMEABILITY TESTS, TELEVIEWER MONITORING (MARCH / NOVEMBER, 2012) Project: Minera EL Espino – Illapel – IV Región Client: PUCOBRE S.A. / EL ESPINO S.A. Project Design: Ingeproc Ltda. HOLLOW STEM AUGER BORINGS, PIEZOMETER INSTALLATION SCPTU TESTS (NOVEMBER, 2012/JANUARY, 2013) Project: Tailing Dams San Esteban 1, 2 and 3 - Copiapo – II Region Client: Cía Contractual Minera Candearia (FREEPORT MCMORAN COPPER & GOLD) Project Design: ARCADIS S.A. GEOTECHNICAL BORINGS AND PERMEABILITY TESTS (NOVEMBER, 2012 / JANUARY, 2013) Project: Valle Hermoso Irrigation Dam – Combarbalá – IV Region Client: Ministry of Public Works – Hydraulic Department Project Design: MN Ingenieros y Cía. Ltda. GEOTECHNICAL BORINGS, IN SITU VA, PERMEABILITY, SPT, LPT TESTS. PIEZOMETER INSTALLATION (APRIL / NOVEMBER, 2013) Project: La Coipa Tailings Dam – Dynamic Stability Analysis - Copiapo – III Region Clien: Minera Mantos de Oro - KINROSS Project Design: BGC Ingenieria Ltda. GEOTECHNICAL BORINGS, PERMEABILITY TESTS, HYDROFRATURE TESTS (JULY / OCTOBER, 2013) Project: Espejo de Tarapacá Dam and Power Plant Client: Energia VALHALLA SpA Project Design: SKAVA Consulting S.A. GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESING (JULY / SEPTEMBER, 2013) Project: Mall Costanera Puerto Montt - Extension Client: PASMAR S.A. Project Design: Ricardo Carnevali Kunstmann, P.E. GEOTECHNICAL BORINGS AND PERMEABILITY TESTS IN SITU (OCTOBER, 2013 / MAY, 2014) Project: Los Diques Tailings Dam – Phase III - Contract 32451302691 - Copiapo – III Region Client: Cía Contractual Minera Candearia (FREEPORT MCMORAN COPPER & GOLD) Project Design: MWH Ingenieros GEOTECHNICAL BORINGS, IN SITU TESTS FOR FOUNDATION DESIGN (FEBRUARY - JULY, 2014) Project: Extension Site 3 - Puerto San Antonio – V Region Client: STI San Antonio Terminal Internacional Project Design: RFA Ingenieros GEOTECHNICAL BORINGS AND IN SITU TESTS FOR FOUNDATION DESIGN (MARCH – APRIL, 2014) Project: E-CL - GDF Suez Thermoelectrical Power Plant Enlargement - Mejillones – Antofagasta – II Region Client: E-CL Energia Project Design: Gabriel Cabezas Monsalve, P.E.