2016 Flood Forecasting and Warning Program
Transcription
2016 Flood Forecasting and Warning Program
2016 Flood Forecasting and Warning Program For more information: www.quinteconservation.ca (613) 968-3434 or (613) 354-3312 RR 2, 2061 Old Highway 2 • Belleville, ON • K8N 4Z2 CONTENTS 1.0 INTRODUCTION 3 1.1 Emergency Management and Civil Protection Act 4 2.0 ROLES AND RESPONSIBILITIES OF AGENCIES 5 2.1 Municipal Role 5 2.1.1 Sandbags 5 2.2 Conservation Authority Role 6 2.2.1 Data Collection and Assessment 6 2.3 Provincial Role (Surface Water Monitoring Centre) 7 3.0 FLOOD MESSAGES 9 3.1 TYPES OF FLOOD MESSAGES 10 3.1.1 Water Safety Statement 10 3.1.2 Flood Outlook Statement 10 3.1.3 Flood Watch 10 3.1.4 Flood Warning 10 4.0 FLOOD RESPONSE PROCEDURES 11 4.1 ComMunications and Operations Related to Municipal Emergency Operations Centres 11 5.0 WHERE TO ORDER SAND BAGS 12 6.0 QUINTE CONSERVATION CONTACT INFORMATION 13 6.1 Flood Coordinators 13 6.2 McLeod Dam Operator 13 6.3 Flood Communications 14 Page 1 of 26 7.0 DATA COLLECTION SITES 15 7.1 Moira River Watershed 15 7.2 Napanee River Watershed 15 7.3 Prince Edward County Watershed 15 8.0 EXTREME EVENTS IN QUINTE 22 8.1 Moira River 22 8.2 Salmon River 23 8.3 Napanee River 24 9.0 HIGH RISK AREAS FOR MUNICIPALITIES 25 9.1 Moira RIver Watershed 25 9.2 Napanee Region Watershed 25 9.3 Prince Edward Region Watershed 26 There is a map at the back of this booklet showing high risk flood areas. With special thanks to the GTA Conservation Authorities Flood Group for providing some of the information in this booklet. Page 2 of 26 1.0 INTRODUCTION Quinte Conservation acts in an advisory capacity only, providing continuous monitoring of flood conditions. Quinte Conservation is not responsible for flood fighting other than in the operation of its own dams. During a flooding situation, Quinte Conservation’s office will be staffed appropriately to monitor water levels and weather conditions on a 24-hour basis if required. The responsibility for dealing with flood contingency planning in Ontario is shared by municipalities, Conservation Authorities and the Ministry of Natural Resources (MNR), on behalf of the province. As with all emergencies, municipalities have the primary responsibility for the welfare of residents, and should incorporate flood emergency response into municipal emergency planning. The MNR and the Conservation Authorities are primarily responsible for operating a forecasting and warning system, and the province may coordinate a response in support of municipal action. Quinte Conservation has developed a Flood Forecasting and Warning Service for its municipalities and residents within their watershed and the shoreline of Lake Ontario. The purpose of this service is to reduce risk to life and damage to property by providing local agencies and the public with notice, information and advice so that they can respond to potential flooding and flood emergencies. This Flood Forecasting and Warning Program is intended for all public officials and agency staff likely to play a role in the prevention, mitigation, preparedness, response and recovery pertaining to flood events. This version of the Program provides general information on the Quinte Conservation Forecasting and Warning System, as well as specific information and contacts for municipalities within its jurisdiction. Page 3 of 26 1.1 EMERGENCY MANAGEMENT AND CIVIL PROTECTION ACT Ontario’s Emergency Management and Civil Protection Act (EMCPA, 2006) sets out requirements for the development, implementation and maintenance of municipal and ministry emergency management programs. These comprehensive emergency management programs are based on the five principles of emergency management: prevention, mitigation, preparedness, response, and recovery. The province describes six “pillars of preparedness”; each an essential component of an emergency management program, including: 1. 2. 3. 4. 5. 6. Emergency Plans Emergency Operations Centre Training Exercises Emergency Information Public Education The province has assigned the emergency response responsibility for flooding to the MNR, which includes flood forecasting and warning as well as flood control operations. Where a Conservation Authority exists, the province relies on the Conservation Authority to assist them in their assigned responsibilities for flooding. Quinte Conservation’s Flood Forecasting and Warning Program provides vital service to our municipal partners to ensure that the flood aspects of these components are met. Page 4 of 26 2.0 ROLES AND RESPONSIBILITIES OF AGENCIES 2.1 MUNICIPAL ROLE Under the Emergency Management and Civil Protection Act (Ontario Regulation 380/04), municipalities have the primary responsibility and authority for response to flooding and flood emergencies, and also for the welfare of residents and protection of property. In order to fulfill this responsibility, municipalities should ensure that emergency plans are kept current and tested on a regular basis. Upon receiving a Flood Watch or Flood Warning municipalities shall: 1. 2. 3. 4. 5. Notify appropriate municipal officials, departments and agencies in accordance with their municipal emergency plan. Determine the appropriate response to a flood threat and, if warranted, deploy municipal resources to protect life and property. If required, declare a flood emergency and implement their emergency response plan. Request provincial assistance under the Emergency Management and Civil Protection Act, if municipal resources are inadequate to respond to the emergency. Maintain liaison with Conservation Authority Flood Coordinators. 2.1.1 Sandbags Each Municipality that traditionally experiences spring flooding must have its own supply of sandbags; however, Quinte Conservation has a stock of 40,000 sandbags for emergency use should its member municipalities run short. Please note that over 2,000 sandbags are required to construct a dyke 4 feet high by 100 feet long. Page 5 of 26 2.2 CONSERVATION AUTHORITY ROLE Conservation Authorities have several areas of responsibility for flooding and flood emergencies: 1. 2. 3. 4. 5. Support municipal flood emergency planning by providing technical advice pertaining to flood risk (e.g., hydrology, hydraulics, flood vulnerable areas, etc.) and engaging in flood mitigation projects to reduce flood risk prior to flood events. Maintain a local network, collect data, and monitor watershed and weather conditions daily in order to provide timely warning of anticipated or actual flood condition. Provide updated forecasts and other supporting technical data pertaining to flood conditions under their jurisdiction during an event. Issue flood messages to municipalities and other appropriate agencies, including the media and the public, to advise of potential flooding when appropriate. Operate Conservation Authority dams and flood control structures to reduce the effects of flooding when appropriate. Maintain communications with municipalities and the Surface Water Monitoring Centre of the MNR during a flood event. 2.2.1 Data Collection and Assessment In order to forecast a flood and to provide as much advance notice as possible, Quinte Conservation staff collects data from five different sources: 1. 2. Weather forecasts and runoff conditions from the Surface Water Monitoring Centre (MNR), CFB Trenton and various weather websites. All information is updated daily. Quinte Conservation stream gauges located throughout the watershed; water level, temperature and precipitation amounts are collected hourly. Page 6 of 26 3. 4. 5. Quinte Conservation staff perform snow measurements twice each month; snow depth and water content are measured. In areas prone to frazil ice flooding (Moira River Watershed) ice measurements are taken. The ice sheet, as well as the depth and viscosity of frazil ice below the ice sheet are measured. Daily visual assessment of rivers and lakes by Quinte Conservation staff plus the observation of staff gauges (generally a metre stick attached to bridges used by staff to monitor water levels). This activity includes documenting the extent of any flood damages. Snow depth and water content measured in our network of gauges. Quinte Conservation’s Flood Forecasting System enables staff to predict the amount of runoff from a rainfall or snow melt event as well as the approximate time when the peak water levels will be experienced. Remote gauging stations monitor rainfall; snow accumulation is monitored by direct measurement. Water level gauges also provide us with real time river flows. By comparison to documented events, staff can predict the time to peak for each river. Also, by monitoring upper stream gauges, we can make a prediction of the peak amount of runoff that will be experienced downstream. Quinte Conservation also uses a computer model to predict the amount of runoff that could result based on watershed conditions at the time using predicted rainfall depths. This computer model provides early awareness to staff of the potential for flooding conditions. 2.3 PROVINCIAL ROLE (SURFACE WATER MONITORING CENTRE) 1. 2. Operate and maintain a provincial forecasting and warning system to alert MNR District Offices and Conservation Authorities of potential meteorological events that could create a flood hazard. Maintain communications with MNR District Offices and Conservation Authorities regarding the status of provincial flood potential. Page 7 of 26 3. 4. Receive messages from Conservation Authorities, MNR District Offices and other agencies and provide analysis and information that is used to guide the MNRs response to a flood. Assists the MNR Districts where Conservation Authorities do not exist in the preparation of river response forecasts, daily planning cycle, and the monitoring of local storm conditions. Page 8 of 26 3.0 FLOOD MESSAGES A flood is defined as a situation where water levels in a watercourse exceed the channel banks. Quinte Conservation operates a 24-hour flood forecasting and warning program that monitors weather forecasts and watershed conditions. This information is used to assess the potential for flooding. When spring melt or severe storms are anticipated, Quinte Conservation estimates the severity, location, and timing of possible flooding, and provides these forecasts to local agencies. Quinte Conservation uses an array of technologies to disseminate flood messages. Quinte Conservation issues messages using email including Constant Contact email, Twitter, Facebook, media releases and website technologies. During a power or internet outage at the Quinte Conservation office a facsimile will be used. Messages are sent to designated individuals within municipalities and other local agencies. These individuals, in turn, are responsible for relaying the message to relevant individuals and departments within their organizations, and activating their role as defined by their organization’s Emergency Response Plan. In order to improve the understanding of flood messages sent by Quinte Conservation, flood messages may include the following terminology to describe the magnitude of anticipated flooding. No Flooding: Water levels remain within channel banks. Nuisance Flooding: Flooding of low lying lands. However, road access remains available and no structures will be flooded. Minor Flooding: Potential for some structural flooding and sections of road access may be impassable. No evacuation is required. Major Flooding: Potential for significant basement flooding, some 1st floor flooding, and significant road access cuts. Evacuation possibly required. Severe Flooding: Potential for many structures to be flooded, major disruption of roads and services. Evacuation is required due to risk to life and major damages to residential, industrial, commercial and/or agricultural sites. The event may produce negative environmental impacts caused by spills of Page 9 of 26 hazardous substances such as sewage, oils, chemicals, etc., that pose a threat to public safety and/or to the ecosystem. 3.1 TYPES OF FLOOD MESSAGES When conditions warrant, Quinte Conservation will communicate with local agencies using one of the following types of messages: 3.1.1 Water Safety Statement A Water Safety Statement indicates that high flows, unsafe banks, melting ice or other factors could be dangerous for users such as anglers, boaters, swimmers, children or pets. Flooding is not expected. 3.1.2 Flood Outlook Statement A Flood Outlook Statement gives early notice of the potential for flooding based on weather forecasts calling for heavy rain, snow melt, high wind or other conditions that could lead to high runoff, cause ice jams, lakeshore flooding or erosion. 3.1.3 Flood Watch This level notifies that the potential for flooding exists within specific watercourses and municipalities. Municipalities, emergency services and individual landowners in flood-prone areas should prepare. 3.1.4 Flood Warning A Flood Warning means flooding is imminent or already occurring in specific watercourses or municipalities. Municipalities and individuals should take action to deal with flood conditions. This may include road closures and evacuations. Page 10 of 26 4.0 FLOOD RESPONSE PROCEDURES As previously mentioned, during an actual flood event the primary responsibility for the welfare of residents and protection of property rests with the municipality. Upon receiving a flood message, municipalities should monitor their local conditions and determine the appropriate action, which may include activating their Emergency Response Plan. Where a flood emergency is beyond the capacity of a municipality, provincial assistance can be requested in accordance with the municipality’s Emergency Response Plan. During a flood, Quinte Conservation will continue to provide updated information as well as technical advice on flood mitigation. During the emergency, Quinte Conservation staff will continue to advise the Surface Water Monitoring Centre (MNR) of the status of the situation. The Centre will be responsible for updating and relaying information related to the emergency to the Ministry’s District Offices. 4.1 COMMUNICATIONS AND OPERATIONS RELATED TO MUNICIPAL EMERGENCY OPERATIONS CENTRES The Province of Ontario, through its Emergency Management and Civil Protection Act legislation, requires all municipalities to have valid emergency response plans and procedures in place. One component of this requirement is the need to have a defined Emergency Operations Centre (EOC) where municipal activities can be undertaken in the event of an emergency. Under normal flooding operations where there is no need to activate the EOC, Quinte Conservation will provide information as requested by their local municipalities. Quinte Conservation will present one or more members of staff at the EOC (if resources permit) where staff will coordinate flood related information and advice. Page 11 of 26 5.0 WHERE TO ORDER SAND BAGS Burtex Industries Arthur Saunders 66 Bartor Road Weston, ON M9M 2G5 P: 1-800-268-0908 C: 416-315-2396 F: 416-740-2261 E: [email protected] http://www.burtexburlap.com/ Polytarp Products Irving Kohl 350 Wildcat Road Toronto, ON M3J 2N5 P: 1-800-606-2231 x 280 P: 416-633-2231 x 280 F: 416-633-1685 E: [email protected] http://www.polytarp.com/ Vince Products Inc. / Harnois Shelters Vivianne Dion 507 Route 158 St-Thomas, QC J0K 3L0 P: 866-661-6646 x 203 F: 450-755-6878 E: [email protected] http://www.abrisharnois.com/en/ Page 12 of 26 6.0 QUINTE CONSERVATION CONTACT INFORMATION 6.1 FLOOD COORDINATORS Terry Murphy – General Manager E: [email protected] P: 613-968-3434 ext. 103 C: 613-391-4040 Christine McClure – Water Resources Manager E: [email protected] P: 613-968-3434 ext. 130 C: 613-848-1286 Paul McCoy – Planning and Regulations Manager E: [email protected] P: 613-968-3434 ext. 108 C: 613-967-7236 Back up phone / facsimile if main line out of service (613) 968-4949 6.2 MCLEOD DAM OPERATOR Tom Sweet – Dam Operator E: [email protected] C: 613-847-1317 Page 13 of 26 6.3 FLOOD COMMUNICATIONS Jennifer May-Anderson – Communications Manager E: [email protected] P: 613-968-3434 ext. 125 C: 613-847-1764 Page 14 of 26 7.0 DATA COLLECTION SITES 7.1 MOIRA RIVER WATERSHED 7.2 NAPANEE RIVER WATERSHED 7.3 PRINCE EDWARD COUNTY WATERSHED Page 15 of 26 ( >F =B78? >5 338=6C>= 867; 0=3B , !$ ( >F =B78?B >5 ( D3>A 0B74; 8; ><4CA4B !0? GC4=C %& 41 ( >F =B78? >5 ">AC7 A>= Skootamatta Lake " ) Lingham Lake %& 62 " ) Deerock Lake " ) !D=828?0; 8CH >5 !0A<>A0 0: 4 Kennebec Lake ( >F =B78?B >5 ( D3>A 0B74; " ) " ) Kalad ar " ) P ! ( >F =B78? >5 !03>2 " ) " ) " ) " ) " ) %& " ) " ) " ) 37 Mad oc " ) !D=828?0; 8CH >5 ( F 443 " " )) " ) " ) Moira Lake " ) Twe ed " ) " ) Stoco Lake " ) " ) " ) " ) " ) Beaver Lake " ) Tamw ort h " ) ( >F =B78? >5 ' C>=4 !8; ; B " ) !D=828?0; 8CH >5 4=CA4 0BC8=6B Camden Lake " ) " ) %& 62 ( >F =B78? >5 ' C8A; 8=6 & 0F 3>= " ) " ) Riv er " ) Mo ira ( >F =B78? >5 ( H4=38=060 Ri ve r " ) " ) on Sa lm " ) ( >F = >5 4B4A>=C> %Ñ " ) ch ( H4=38=060 !>70F : ( 4AA8C>AH Hay Bay Rea ) " ) " " ) " ) " ) " )" " ) )" " ) ) " ) " ) " )" ) ville Belle " )" ) " ) " ) 8CH >5 %D8=C4 +4BC ( >F = >5 A40C4A "0?0=44 8CH >5 4; ; 4E8; ; 4 %& 62 B a y o f Q u in te $&# &! ( ( &+ " " ) " ) " ) " ) 0C0 >; ; 42C8>= ' 8C4B !>8A0 &8E4A +0C4AB743 ' ' ( " "# ( ' ; >>3 >A420BC8=6 0=3 +0A=8=6 $A>6A0< >5 !>8A0 &8E4A "0?0=44 &468>= 0=3 $A8=24 3F 0A3 &468>= +0C4AB743B && #; 3 867F 0H 4; ; 4E8; ; 4 # =C0A8> " - FFF @D8=C42>=B4AE0C8>= 20 $A>3D243 1H %D8=C4 >=B4AE0C8>= D=34A ; 824=B4 F 8C7 C74 # =C0A8> !8=8BCAH >5 "0CDA0; &4B>DA24B >?HA867C %D8=C4 >=B4AE0C8>= 0=3 C74 %D44= B $A8=C4A 5>A # =C0A8> 0C0 8B ?A>942C43 8= " ) ( ! - >=4 " 868C0; !0??8=6 ' >DA24B 0B4 !0? # =C0A8> !8=8BCAH >5 "0CDA0; &4B>DA24B <064AH >?HA867C I >5 JA> $7>C> =2 K ; ; &867CB &4B4AE43 <064AH ' # # $ # =C0A8> !8=8BCAH >5 "0CDA0; &4B>DA24B <064AH &$ # =C0A8> !8=8BCAH >5 "0CDA0; &4B>DA24B 4H !0? A2 ' # =; 8=4 ' 4AE824B 8B2; 08<4A ( 78B <0? 8B 5>A 8; ; DBCA0C8E4 ?DA?>B4B >=; H %D8=C4 >=B4AE0C8>= <0: 4B => F 0AA0=C84B 0=3 0BBD<4B => ; 8018; 8CH F 70CB>4E4A A460A38=6 C74 CADC7 022DA02H 2DAA4=2H >A 2><?; 4C4=4BB >5 C78B <0? 0=3 8CB 0BB>280C43 30C0 * $0C7 , .' C055+>A: .DAC8B.$0D; .; >>3/ $A>6A0</ .!&+/ >; ; 42C8>=/ ' 8C4B <G3 # A868=0; >2D<4=C G 8= ??A>E43 5>A 38BCA81DC8>= A05C 5>A 2><<4=C A4E84F "> &* ' #" !! ,, Hay war d Lo ng " ) " " ) ) " ) Ri ve %& " ) Na pa ne e " ) 37 r " ) " ) " ) 24 !>=8C>A8=6 ' 8C4 ' =>F ' 0<?; 8=6 ' 8C4 ' C055 0D64 ' CA40< 0D64 !>8A0 &8E4A +0C4AB743 !D=828?0; >D=30AH N 8; ><4C4AB ' =E <A67> =4 227<5B=< 756:/ <2A + # 7:=;3B@ 3A %& 41 ' =E <A67> =4 !=@ B6 @ =<B3</ 1 / > FB3<B Skootamatta Lake " ) ' =E <A67> =4 3<B@ / : @ =<B3</ 1 " ) Deerock Lake Kennebec Lake " ) " ) Kalad ar P ! " ) " ) C<717>/ :7BG =4 ' E 332 " ) ) " )" " ) )" "" ) ) " ) " ) " ) Stoco Lake " ) " ) " ) " ) Beaver Lake " ) " ) Tamw ort h " )Ve ro n a " ) ' =E <A67> =4 &B=<3 7::A " ) " ) " ) " ) ' =E <A67> =4 &=CB6 @ =<B3</ 1 " ) Camden Lake " ) " ) Varty Lake " ) " ) " ) " ) " ) Mu sc o te Bay " ) " ) Ri ve r ' =E <A67> =4 ' G3<27</ 5/ %& 38 on Ri ve " ) r Na pa ne e " ) =G/ :7AB ' =E <A67> Sa lm ' =E < =4 @ 3/ B3@ !/ >/ <33 " ) %Ñ %Ñ ' =E < =4 3A3@ =<B= " ) Rea ch ' G3<27</ 5/ =6/ E 9 ' 3@ @ 7B=@ G %& 33 No rt h a Ch nn el Hay war d Lo ng B a y o f Q u in te Hay Bay ) " )" #%"% ' ' :==2 =@ 31/ AB7<5 / <2 */ @ <7<5 #@ =5@ /; lp h ac h ! !"' & " ) " ) " ) " ) / B/ =::31B7=< &7B3A !/ >/ <33 %357=< */ B3@ A632 & &' %* ! o Ad Re us =4 =7@ / %7D3@ !/ >/ <33 %357=< / <2 #@ 7<13 2E/ @ 2 %357=< */ B3@ A632A %% ":2 756E / G 3::3D7::3 "<B/ @ 7= ! , EEE ?C7<B31=<A3@ D/ B7=< 1/ #@ =2C132 0G $C7<B3 =<A3@ D/ B7=< C<23@ :713<A3 E7B6 B63 "<B/ @ 7= 7<7AB@ G =4 !/ BC@ / : %3A=C@ 13A =>G@ 756B $C7<B3 =<A3@ D/ B7=< / <2 B63 $C33< A #@ 7<B3@ 4=@ "<B/ @ 7= / B/ 7A >@ =831B32 7< ! ( ' , =<3 ! 757B/ : / >>7<5 &=C@ 13A / A3 / > "<B/ @ 7= 7<7AB@ G =4 !/ BC@ / : %3A=C@ 13A ;/ 53@ G =>G@ 756B H =4 I @ = # 6=B= <1 J :: %756BA %3A3@ D32 ;/ 53@ G &""# "<B/ @ 7= 7<7AB@ G =4 !/ BC@ / : %3A=C@ 13A ;/ 53@ G %# "<B/ @ 7= 7<7AB@ G =4 !/ BC@ / : %3A=C@ 13A 3G / > @ 1 & "<:7<3 &3@ D713A 7A1:/ 7;3@ ' 67A ;/ > 7A 4=@ 7::CAB@ / B7D3 >C@ >=A3A =<:G $C7<B3 =<A3@ D/ B7=< ;/ 93A <= E/ @ @ / <B73A / <2 / AAC;3A <= :7/ 07:7BG E6/ BA=3D3@ @ 35/ @ 27<5 B63 B@ CB6 / 11C@ / 1G 1C@ @ 3<1G =@ 1=;>:3B3<3AA =4 B67A ;/ > / <2 7BA / AA=17/ B32 2/ B/ ) # / B6 + -&B/ 44*=@ 9-C@ B7A-# / C:-:==2. # @ =5@ / ;. -!%*. =::31B7=<. &7B3A ;F2 "@ 757</ : =1C;3<B F 7< >>@ =D32 4=@ 27AB@ 70CB7=< @ / 4B 4=@ 1=;;3<B @ 3D73E != %) & "! ++ 13 =<7B=@ 7<5 &7B3 &<=E &/ ;>:7<5 &7B3 &B/ 44 / C53 &B@ 3/ ; / C53 !/ >/ <33 %357=< */ B3@ A632 C<717>/ : =C<2/ @ G N 7:=;3B3@ A %Ñ %& " ) 37 " ) " ) ) 62 " ) " " ) " ) " ) " ) " ) " ) " ) " ) " ) " ) " ) ch / > FB3<B Rea Ha y B a y Mu r d Lo ng ! !"' & " ) " ) " ) " ) war %& Hay 62 Mu s c o t e B ay %& 33 ) " )" &=>67/ A0C@ 56 Ad ;3:7/ A0C@ 56 al " ) se Con Lak con e " ) / ::=E 3:: 7::73@ :==;473:2 North B ay P l e a s a nt B ay *3::7<5B=< We l l i n g t o n B a y ac h %& !=@ B6 / @ GA0C@ 56 # 71B=<" ) 33 7:=;3B3@ A " ) Prince Edward Bay We st La ke N " ) Hu y c k ' s B ay ol e sR u ph &<=E &/ ;>:7<5 &7B3 13 =<7B=@ 7<5 &7B3 &B/ 44 / C53 &B@ 3/ ; / C53 #@ 7<13 2E/ @ 2 %357=< */ B3@ A632 C<717>/ : */ @ 2 =C<2/ @ G Picton Bay " ) We l l e r s B a y ' G3<27</ 5/ =6/ E 9 ' 3@ @ 7B=@ G B ay o f Q u i n te Can ray 7:=;3B@ 3A B ay o f Q u i nt e %Ñ + # ' =E < =4 3A3@ =<B= " ) " ) " ) %& " ) >>@ =D32 4=@ 27AB@ 70CB7=< @ / 4B 4=@ 1=;;3<B @ 3D73E != %) & "! ++ " ) Ea st La ke " ) " ) B6=: &=CB6 / @ GA0C@ 56 At h o l B a y #%"% S o u p H a r b o ur ' ' La ke O n t ar i o La ke O n t ar i o :==2 =@ 31/ AB7<5 / <2 */ @ <7<5 #@ =5@ /; / B/ =::31B7=< &7B3A #@ 7<13 2E/ @ 2 %357=< */ B3@ A632 & &' =4 %* ! ) =7@ / %7D3@ !/ >/ <33 %357=< / <2 #@ 7<13 2E/ @ 2 %357=< */ B3@ A632A %% ":2 756E/ G 3::3D7::3 "<B/ @ 7= ! , EEE ?C7<B31=<A3@ D/ B7=< 1/ #@ =2C132 0G $C7<B3 =<A3@ D/ B7=< C<23@ :713<A3 E7B6 B63 "<B/ @ 7= 7<7AB@ G =4 !/ BC@ / : %3A=C@ 13A =>G@ 756B $C7<B3 =<A3@ D/ B7=< / <2 B63 $C33< A #@ 7<B3@ 4=@ "<B/ @ 7= / B/ 7A >@ =831B32 7< ! ( ' , =<3 ! 757B/ : / >>7<5 &=C@ 13A / A3 / > "<B/ @ 7= 7<7AB@ G =4 !/ BC@ / : %3A=C@ 13A ;/ 53@ G =>G@ 756B H =4 I @ = # 6=B= <1 J :: %756BA %3A3@ D32 ;/ 53@ G &""# "<B/ @ 7= 7<7AB@ G =4 !/ BC@ / : %3A=C@ 13A ;/ 53@ G %# "<B/ @ 7= 7<7AB@ G =4 !/ BC@ / : %3A=C@ 13A 3G / > @ 1 & "<:7<3 &3@ D713A 7A1:/ 7;3@ ' 67A ;/ > 7A 4=@ 7::CAB@ / B7D3 >C@ >=A3A =<:G $C7<B3 =<A3@ D/ B7=< ;/ 93A <= E/ @ @ / <B73A / <2 / AAC;3A <= :7/ 07:7BG E6/ BA=3D3@ @ 35/ @ 27<5 B63 B@ CB6 / 11C@ / 1G 1C@ @ 3<1G =@ 1=;>:3B3<3AA =4 B67A ;/ > / <2 7BA / AA=17/ B32 2/ B/ # / B6 + -&B/ 44*=@ 9-C@ B7A-# / C:-:==2. # @ =5@ / ;. -# %*. =::31B7=<. &7B3A ;F2 "@ 757</ : =1C;3<B F 7< " ) " ) ) " 7BG =4 $C7<B3 *3AB ' =E < =4 @ 3/ B3@ !/ >/ <33 7BG =4 3::3D7::3 8.0 EXTREME EVENTS IN QUINTE Quinte Conservation staff have reviewed the flow records from several stream flow stations in the Quinte area. The records range from 100 years of record for the Moira River to 56 years for Salmon River. Typically flood events occur in the spring and all the largest events are spring runoff events. River flow peaks are driven by a combination of snow melt and spring rains. 8.1 MOIRA RIVER In Moira River at Foxboro the following years rank the highest for flood flows. Year Date Peak Daily (cms) 1981 26-Feb 364 1936 31-Mar 351 1976 3-Apr 343 2014 17-Apr 341 1948 25-Mar 314 1928 9-Apr 311 1980 24-Mar 306 1917 30-Mar 294 1947 10-Apr 292 1952 8-Apr 292 1960 9-Apr 286 1987 8-Apr 286 2008 15-Apr 285 The most common date for the peak to arrive is April 9th. In an average year the peak arrives on April 1 (this is affected by the fall events). The median Page 22 of 26 date for the peak spring runoff event is April 5th. Peaks occurring within one standard deviation of the mean fall between March 18th and April 30th. 8.2 SALMON RIVER In the Salmon River at Shannonville the following years rank the highest for flood flows (cms). Year Date Peak Daily (cms) 1981 21-Feb 106 1960 4-Apr 104 2014 9-Apr 99 1959 3-Apr 88.1 1976 28-Mar 86.4 1974 5-Apr 80.1 1993 31-Mar 78.3 1971 14-Apr 77.9 2005 4-Apr 76.8 1982 4-Apr 76.2 1973 18-Mar 75 2008 13-Apr 74.7 The most common date for the peak to arrive is April 4th. In an average year the peak arrives on March 20th (this is affected by the fall events). The median for the peak spring event is April 2nd. Peaks occurring within one standard deviation from the mean fall between March 7th and April 16th. Page 23 of 26 8.3 NAPANEE RIVER This gauge was moved to Camden East in 1974. Previous records exist from 1916 to 1974 for the former location in Napanee. Statistics were not performed on the earlier gauge. Year Date Peak Daily (cms) 2014 15-Apr 80 1976 1-Apr 76.5 1981 24-Feb 66.2 2008 14-Apr 59.3 1993 11-Apr 53.6 1978 13-Apr 53.5 1982 4-Apr 52.4 1974 7-Apr 51 1997 8-Apr 50.6 1980 25-Mar 49.7 2005 6-Apr 47.3 The most common date for the peak to arrive is April 14th. In an average year the peak arrives on March 19th (this date is affected by the fall events). The median for the peak spring event is April 3rd. The mean of the spring events occurs on March 24th. Peaks occurring within one standard deviation from the mean fall between February 21st and April 5th. Page 24 of 26 9.0 HIGH RISK AREAS FOR MUNICIPALITIES Flooding can occur from a number of factors, or combinations thereof, such as heavy snowfall combined with late or rapid snowmelts, deep frost and/or excessive rainy weather, or ice jams. Municipalities should prepare flood warning plans for each flood prone area. The major flood prone areas are as follows: 9.1 MOIRA RIVER WATERSHED • Moira River at Bannockburn; Village of Tweed; East Channel Outlet; Latta; Plainfield; Foxboro; and the City of Belleville • Skootamatta River at Actinolite • Deer Creek in the Village of Madoc • Stoco Lake • Moira Lake 9.2 NAPANEE REGION WATERSHED • Napanee River at Yarker; Camden East; Petworth Bridge; Newburgh; and Strathcona • Salmon River at Waddingham Valley; Croydon; Teskey Road Bridge; Kingsford; and Arden • White Lake (Sheffield Twp.) • Verona (Rock) Lake • Big Clear Lake • Varty Lake • Hambly Lake • Howes Lake • Thirteen Island Lake Page 25 of 26 9.3 PRINCE EDWARD REGION WATERSHED • Macaulay Creek/Marsh Creek/Hospital Creek all within the town of Picton • Bloomfield Creek in Bloomfield • Lane Creek in Wellington • Slab Creek in Hillier • Consecon Creek in Consecon Page 26 of 26 Quinte Conservation Watershed TOWN SHIP OF ADDIN GTON HIGH LANDS Upper Partridge Lake Dafoe Lake Merrill Lake TOWNSHIP S OF TUDO R & CASHEL Joeperry Lake Whitefish Lake TOWNSHIP OF NORTH FRONTENAC Grimstho rpe Lake Pringle Lake Skootamatta Lake Sheldrake Lake Jordan Lake TOWNSHIP OF CENTRAL FRONTENAC Lingham Lake TOWNSHIPS OF TUDOR & CASHE L 41 Deerock Lake 7 Arden MUNIC IPALI TY OF TWEED Bannockburn TOWNSHIP OF MADOC Lak e ield Lo n g Eldorado Lake 11 De po tL ak e 2 Sh e ff 20 Fif th 62 Big Clear Lake 7 Wolf Lake Robinson Lake 12 Actinolite 41 Thirteen Island 8Lake TOW NSHIP OF STONE MILLS MUN ICIPA LITY OF MARM ORA &Jarvis Lake LAK E 7 38 39 Village of Madoc 19 Howes Lake Moira Lake Village of Tweed 37East MUN ICIPAL ITY OF CENTRE HASTINGS TOW NSHIP OF STIRLING -RAWDON 13 White Channel Outlet Lake 13 Bend Bay 14 Croydon Teskey Rd Bridge 3 Moira River Petworth Bridge TOWN OF GREATER NAPANEE 8 Varty Lake 4 Village of Yarker Salmon River 41 1 Camden East Road Newburgh 12 6 7 Latta Plainfi eld Napanee River Strathcona ford TOW NSHIP OF TYENDINAGA Kings 11 Waddingham Valley 5 14 TOWNSH IP OF SOUTH FRONTENAC 6 2 14 41 Verona Lake Hambly Lake 7 Stoco Lake 38 37 Foxboro CITY OF QUIN TE WEST 62 CITY OF BELLEVILLE 15 LOYAL IST TOWNSH IP 1 31 1 2 18 2 City of Belleville 9 Hay Bay Lon gR eac h Bay of Quinte 28 49 Muscote Bay rs ye in Pr e ov 14 23 3 na Ca ray Mur C Adolphus Reach l b lin Ro ke La 5 62 Picton Bay 2 7 COUN TY OF PRINC E EDWARD 19 4 Hospital Creek Weller's Bay on sec Con Macaulay Creek 1 e La k Village of Consecon Village of Wellington Village of Bloomfield 11 Wellington Bay 0 2.5 5 10 15 20 Kilometers 12 17 20 8 Smith Bay 13 Marsh Creek Village of Hillier 33 North Bay 27 Pleasant Bay Huyck's Bay 25 Town of Picton Prince Edward Bay 10 1:370,000 West Lake South Bay East Lake 18 13 Legend Athol Bay 24 Salmon Point Soup Harbour Point Petre County Road Provincial Highway Highway 401 High Risk Flooding Areas