EDC Concesion Vial Cordoba - Sucre - En

Transcription

EDC Concesion Vial Cordoba - Sucre - En
CRUZ DEL VISO
SECOND ROADWAY
REHABILITATION AND MAINTENANCE
SINCELEJO EASTERN BYPASS
TOLU VIEJO
LORICA
SINCELEJO
SINCELEJO
COROZAL
SAMPUES
CORDOBA
CERETE
CIENAGA
DE ORO
LA YE
MONTERIA
SAHAGUN
SUCRE
BOLIVAR
CONSTRUCTORA
EMMA
CASE STUDY: CORDOBA – SUCRE ROAD CONCESSION
Constructora Emma partners with Autopistas de la Sabana S.A., a road concession operating
transport infrastructure between the Cordoba and Sucre districts, as well as linking these districts
to the interior of the country. This road corridor links cities and commercial, productive and
touristic centers in the region. Its importance stems from the amount of tourist traffic generated by
inland districts, specifically throughout the Montería-Cerete-Lorica-Covenas section, the main
route to Colombia’s Caribbean Sea. Additionally, the La Ye-Sincelejo-Corozal trunkline receives
high traffic from heavy vehicles which use it to reach the main ports in the Atlantic Coast.
REHABILITATION
START
END
AIRPORT T INTERSECTION
MONTERIA
CERETE
CIENAGA
SINCELEJO
SINCELEJO PASS-THROUGH
COROZAL
PUERTA DE HIERRO (PR 25+000)
SUCRE-BOLIVAR DISTRICT BORDER
CARRETO (PR 108+695)
EL MAIZAL ROAD (RECONSTRUCTION)
CANO BAGRE BRIDGE (PR 13+149)
SINCELEJO
CERETE
AIRPORT T INTERSECTION
CIENAGA
LA YE
COROZAL
PUERTA DE HIERRO
SUCRE-BOLIVAR DISTRICT BORDER
CARRETO (PR 108+695)
CRUZ DEL VISO (PR 25+093)
LORICA METALLIC BRIDGE (PR 25+000)
TOLU VIEJO
TOTAL LENGTH OF REHABILITATED ROADS (KM)
KM
CORDOBA
SUCRE
7.00
14.00
17.00
16.78
11.80
12.00
13.20
29.00
55.42
25.23
4.50
41.00
18.05
7.00
14.00
17.00
16.78
264.98
54.78
210.2
CORDOBA
SUCRE
11.80
12.00
13.20
29.00
55.42
25.23
4.50
41.00
18.05
CONSTRUCTION OF THE SECOND ROADWAY
START
END
AIRPORT T INTERSECTION (PR 0+000)
CAI PR 6+942 (CERETE)
LA GALLERA (SAMPUES)
COROZAL EXIT (PR 0+000)
MONTERIA PARALLEL CONECTING ROAD
41 ST TRAFFIC CIRCLE TO PLANETA RICA
MONTERIA RING ROAD (PR+850)
SINCELEJO
LA YE
SINCELEJO
CERETE
CIENAGA DE ORO (PR20+000)
BREMEN PR 6+500
ENTRANCE TO COROZAL INTERSECTION
KM
13.40
20.00
11.20
8.80
2.00
1.60
9.20
14.50
20.20
19.25
13.40
20.00
TOTAL LENGTH OF CONSTRUCTION NEW ROAD (KM)
120.15
46.20
TOTAL LENGTH OF MAINTENANCE AND OPERATION (KM)
385.13
CONSTRUCTORA
EMMA
MONTERIA CERETE INSERSECTION (MOCARI)
SAMPUES (RETURNS FOR 1.5 KM)
SAHAGUN (RETURNS FOR 1.2 KM)
TOLU VIEJO (RETURNS FOR 1.2 KM)
OFFICE
Carretera La Cordialidad, Transversal 54 No. 96-700
Sector Doña Manuela, Cartagena, Colombia.
Tel: (57+5) 652 0236 - 651 6650 - 652 5770
11.20
8.80
2.00
1.60
9.20
14.50
20.20
19.25
73.95