INSTALLATION MANUAL
TOP INSTALLATION
PoolLock & PoolDeck factory
Liptál 415, CZ-756 31
Czech Republic
Tel.: +420 571 423 861
Fax: +420 571 423 322
Mob: +47 90 55 99 55
e-mail: [email protected]
1. Prepare the fixing brackets of roll-up tube to
2. Place the fixing bracket of roll-up tube to the
the side of pool, where should be the system
placed.
correct distance from the pool edge (A=1/2 of
diam. roll-up tube with fully wind-up cover - see
table in the back of the manual). If OVERHANG
INSTALLATION - the brackets should be placed
just on the edge of the pool! Inside edge of the
bracket should be in line with the edge of the pool.
3. The distance between the inside walls of the
4. Using a marker, mark the positions of the
brackets must be the same as the
POOL WIDTH.
5. Using ø8 mm drill, drill 50 mm deep holes for wallplugs.
bracket holes on the floor.
6. Cleanup the holes and hammer in the wallplugs.
7. Fix the bracket of roll-up tube to the floor using
attached screws St 5,5 x 50.
9. Put the bearing block on the shaft.
8. Check that the bracket is mounted in the correct
position and fix the second bracket of roll-up tube
at the opposite side of the pool. BE AWARE, to
ensure the correct functioning of the slatted
cover, the roll-up tube must be mounted in
horizontal position perpendiculary with pool wall.
Prepare the roll-up tube.
10. DO NOT USE A KNIFE! The watertight cable
cannot be damaged in any way! Use pliers to cut
the binder.
11. Run the cabel through the groove in the bracket.
12. Set the roll-up tube to the brackets and check
that it is placed in perpendicular way to the
pool.
13. Fix the roll-up tube in the brackets by using
14. Nuts should be tighten very well.
screws M8 x 100.
Steps 15-19 are valid for FLUSH instalation only.
If your cover is OVERHANG installation proceed straight to installation point No. 24
15. Devide the space between the brackets equally
to be able to place attached ROLLERS the way
that the space between each roller and also
between roller and bracket is equal..
17. Using ø8 mm drill, drill 50 mm deep holes for
wall-plugs.
16. Place the ROLLERS in perpendicular way with
pool edge and mark the position of fixing holes.
18. Cleanup the holes and hammer in the wallplugs.
19. Fix the ROLLERS to the floor with screws
St 5,5 x 50.
21. Attach the rest of slats to the first slat, which is
connected to the fixing straps.
20. Attach the slat fixing straps by screws St 3,5x6,5
to pre-made holes on the roll-up tube.
PoolDeck - Top installation
Diameters of roll-up tubes with fully wind-up cover
Valid from: 01.01.2008
Installation of the slats.
Attachment of the slats.
1. Place the ends of the mats at right angles to each other so the longest hook of the
first mat fits in the groove of the second mat.
2. Now press on the top side of the slats so the short hook clicks in the groove.
3. Repeat this wave-like movement over the entire width of the pool until the two mats
are attached together completely.
4. Once all the mats have been attached, click them onto the slats that are already
attached to the reel.
VERY IMPORTANT SAFETY CONCERN
Always ensure that the pool is completely covered with slats (there may be slats left
over) and that they all float on the water so the deck no longer can be pushed open.
Attachment of the guide plates
The directional guide plates are attached to the first two slats at edge of the slats.
These ensure that the slats go in the correct direction during unrolling.
A) Sketch for Top Mount Installation
B) Sketch for Under Mount Installation