A64-II - sotralentz HABITAT
Transcription
A64-II - sotralentz HABITAT
A64 - II Classic Sewage and Wastewater Treatment Plant br s prefa ic &a Ce ctiblo rk on all ma c Septic tank with integrated pre-filter and vertical draining sand filter bed ated tank Summary The Drulingen factory, France The Lantaron factory, Spain Plastepur® Sewage and Wastewater Treatment Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Anaerobic pre-treatment units – Grease Extractor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Anaerobic pre-treatment – 8 steps in the Epurbloc® septic tank . . . . . . . . . . . . . . . . . . . . 5 The ribbed septic tank Epurbloc® “Performance” . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Anaerobic pre-treatment units – Single Skin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Anaerobic pre-treatment units – Double Skin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9 Anaerobic pre-treatment units – “Performance” pre-filters . . . . . . . . . . . . . . . . . . . . . 10-11 ACTIBLOC® SBR with sludge activation from 1 to 300 PE . . . . . . . . . . . . . . . . . . . . . . . . . 12 Aerobic treatment plants – Sequential dosing tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Aerobic treatment plants - Non-drained sand filtering bed for permeable soils . . 14-15 Aerobic treatment plants – Vertical draining sand filter bed for impermeable soils 16-17 The “Performance” Compact Filter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-19 Main Pre-treatment Units SP Plastepur® dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Main Pre-treatment Units DP Plastepur® dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Secondary treatment Units Plastepur® dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Plastepur® Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Sotralentz-Habitat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 The Skierniewice factory, Poland 2 Plastepur® Sewage and Wastewater Treatment Plants Anaerobic pre-treatment with Septic Tank EPURBLOC® Performance and aerobic treatment plant with a vertical draining sand filter bed, discharging treated wastewater into the surface water system, for impermeable soils 1 2 stamp d fabricate re p n o s k septic tan 10 10 3 4 11 5 Boîte de visite SL-RVISIT ajustable 6 Kit FD 7 8 9 1 2 3 4 5 6 GAS EXTRACTION obligatory Higher Ventilation to roof apex Ø 110 with static exhaust (see user manual A24). Primary ventilation of the sewage and wastewater pipe, with ventilation hat Ø 110 mm a minimum of 1 m from the Higher Ventilation. Anaerobic pre-treatment with Grease Extractor SL-SG (optional) Inspection chamber SL-RVISIT adjustable to 5 heights, 3 inlets, 1 outlet Anaerobic pre-treatment with septic tank EPURBLOC® or settling tank “Performance” �, CE stamped, with detachable integrated clogging indicator equipped with “Performance” filtering material detachable and decay-resistant. Distribution Chamber 6 outlets SL-RR adjustable to 5 heights above the drainage pipes 7 8 AERATION Oxygen inlet (Lower ventilation) of the irrigation system trough the Looping Chamber perfored tape. Looping chamber 6 inlets/outlets SL-RBOU adjustable to 5 heights AERATION Oxygen inlet (Lower ventilation) of the collecting drainage pipes trough the Looping Chamber perfored tape. Vertical Collect chamber SL-RCOLV 1190 adjustable height 9 Treated water outlet pipe joined to the surface water system and orientated to spouting direction 10 Large plants (trees) at a minimum distance of 3 m from aerobic treatment plants 11 Party fence (property limit) at a minimum 3 m from aerobic treatment plants Aerobic treatment plants above are now achievable thanks to our kits: - for Non Drained Filtering Beds Kit FND - and for Vertical draining sand filter bed Kit FD (pages 14 to 17). 3 Anaerobic pre-treatment unit – Grease Extractor (optional) When the septic tank EPURBLOC is over 10 metres from the building and for private use exclusively Description • Only used household water (kitchen, bathrooms, washrooms…) is permitted into the Grease Extractor via the inlet baffle (IN), which is detachable and can be removed through the manhole Ø 400 mm or the threaded riser REHC riser REHC (optional and sold separately): 1 - reducing the inlet flow of used household water - avoiding the re-suspension of floating matter and heavy, Grease Extractor solid matter SL-SG 500 • The used household water now calmed by the inlet baffle (IN) with overspill and vents 6 x Ø 35 mm moves through the Grease Extractor, which separates: - the grease and floating matter which solidify and float to the surface to form a hat (surface crust). - from the sludge and solid matter that deposit on the bottom of the Grease Extractor. • Outlet baffle (OUT), which by design, collects and channels pre-filtered used household water towards the septic tank, the settling tank, the clarification tank, the ÉPURBLOC® or, exceptionally, with the rehabilitation of an existing separate sewage treatment system, directly to the pre-filter (SL-FD). • Fermentation gas is vented by decompression holes (inlet and outlet) then by the obligatory Higher Ventilation (VH) Ø 110 mm. Sotralentz suggests slotting Higher Ventilation (VH) into the inlet (IN) of the Grease Extractor (upstream) and not the outlet (OUT) of the Grease Extractor (downstream) (see user manual A24). • Monobloc tank with inlet (IN) and decompression holes, slot for Higher Ventilation (VH) and an outlet baffle (OUT) • Grease Extractors are obligatory with separate sewage treatment systems • Required with a septic tank or Epurbloc® CE stamped are situated more than 10 m from the building • Tank to be filled with clear water before start up and after drainage Grease Extractor • This Secondary treatment Unit is delivered with the barcode EAN 13 F . SL-SG 200 A 1 C 5 2 1 1 3 2 7 5 6 4 1 Slot of GAS Extraction for direct connection Higher Ventilation (VH) (see user manual A24). 2 Sewage water (WC) 3 Used household water (kitchen, dishwasher, washing machine, bathroom) 4 Grease Extractor SL-SG (optional) 5 Inspection chamber SL-RVISIT adjustable height, 3 inlets + 1 outlet (see page 27) 6 Anaerobic pre-treatment with septic tank EPURBLOC® or settling tank “Performance”, CE stamped, with detachable integrated clogging indicator equipped with “Performance” filtering material detachable and decay-resistant. 7 PVC Whole tube NF Ø 110 • Lifting ring On top C to direct connection to Higher Ventilation (VH) (see user manual A24) E 3 D 1 7 4 Plan of Grease Extractor B sleeve and watertight joints 8 D unclogging outlet and drainage of Grease Extractor • Height of covers is adjustable to the finished ground level with the screwing of REHC 400/200 risers • Slot for gas extraction A B 6 A Two covers Ø 400 mm • access side (IN) for checks • access side (OUT) for • Inlet (IN) with welded 8 separation steps in the Grease Extractor 1. Inlet baffle (IN) with 6 vents Ø 35 mm 2. Zone where floating solids and heavy matter separate 3. Hat of floating solids (grease…) 4. Accumulation of heavy matter 5. Accumulation of gas 6. Slot of GAS Extraction for direct connection Higher Ventilation (VH) (see user manual A24) 7. Water discharge through the outlet baffle (OUT) 8. Overspill on the inlet baffle (IN) A Inlet baffle (IN) Detachable and integrated with overspill and vents 6 X Ø 35 mm: • Separating floating and heavy matter • Detachable baffle F E REHC 400/200 Threaded riser suitable for manholes Ø 400 mm, (sold separately). Outlet baffle (OUT) : • Collect of water and For description, installation, operation, maintenance and guarantees of Secondary treatment Units, see our user manual A24. channelling towards a Epurbloc® unit • Enable unclogging • Detachable 4 Ce ctiblo rk on all ma c Anaerobic pre-treatment septic tank 8 steps in the Epurbloc br ic s for manholes Ø 400 mm, (sold separately). &a prefa REHC 400/200 Threaded riser suitable ated tank 8 7 5 4 1 2 6 3 3 1. Influx of raw domestic wastewater via an inlet baffle (IN), also allowing access for unclogging and decompression 2. Zone separating light and heavy domestic wastewater 3. Decanting sludge bed undergoing anaerobic fermentation 4. Hat composed of grease and floating matter 5. Accumulation of gas and aggressive agents 6. Zone of clear water and where removal of Suspended Solids (SS) occurs by action of the detachable, integrated pre-filter clogging indicator with its double deflector fitted with a “Performance” filtering material, detachable and nondecomposable “Performance” advantages Filtering Material is light (less than 2 kg); • Hydraulic efficacy, limited waste (see user manual A24); • Beads PP allowing optimal diffusion of pre-treated wastewater; • Organic matter contained in the pre-treated household wastewater is trapped by fins on the beads where they stick on contact. A biomass is formed by the growth of aerobic bacteria on the organic matter; • The biomass film does not exceed a thickness of 1 mm and its mass oscillates between 6 and 22 kg/m3; • Filtering material is integrated into all « Performance » Main Pre-treatment Units and Secondary treatment Units, so no forgetting to fit one during installation; • Easy to monitor, no material to remove; • Riser and clogging indicator stay in place during maintenance as the pre-filter and filtering material are removable; • Threaded riser fit directly on the Epurblocs® and Clarifications tanks; • Easy removal of the integrated Pre-filter in order to clean filtering material in the threaded REHC 400/200 risers; • Material and filtering element are non-decomposable, for unlimited use; • Pre-filter is watertight even to streaming water. The “Performance” filtering material is integrated into the Epurblocs “Performance”and Clarification tanks, detachable and nondecomposable. 7. Ejection of pre-treated household wastewater towards final aerobic purification (drainfield, filter bed…) 8. Slot of GAS Extraction for direct connection Higher Ventilation (VH) Ø 110 min. to vent fermentation gas with the aide of a static exhaust above the roof apex and with a ventilation slot at the unit’s inlet (see user manual A24) Easy cleaning of filtering material For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, Secondary treatment Units and Accessories, see our user manual A24. 5 New removable sleeve Anaerobic pre-treatment septic tank Epurbloc® “Performance” C ctiblo B rk on all ma Ce A D monitoring and drainage • access side (OUT) for monitoring and cleaning of the “Performance” pre-filter • Height of covers is adjustable to the finished ground level by screwing of REHC risers Horizontal and vertical reinforcement ribs: • reduce the volume of excavation debris • reduce the volume of infill • increase resistance • reduce excavation size • shallow burial depth H s br A Two covers Ø 400 mm &a prefa ic • access side (IN) for c All-Water ribbed septic tanks ated tank • Pit test in wet soil with Pre-filter clogging indicator side OUT, SS. deflector and “Performance” filtering material • Trapping a maximum of Suspended Solids (SS) • reducing the BOD5 (Biochemical Oxygen Demand over 5 days) • Integral vents of 6 X Ø 35 mm • Integrated detachable baffle. 0.60m above the water table (according to the starting conditions of the Double wall skin range with the “Plantco” fixation in user manual A24) • Hydraulic efficacy ≤ 1.2g of micro-beads tested on the 2000l version E A C E F • Inlet (IN) with welded I sleeve and watertight joints • Slot for GAS Extraction to direct connection Higher Ventilation (VH) (see user manual A24) Semi-partitioning • Improving hydraulic efficacy • Partitioning the Epurbloc® B into 2/3 IN and 1/3 OUT to facilitate sludge decanting and to reduce the SS (Suspended Solids) F D G I • Lifting ring on top H J Inlet baffle (IN) : • Influx of household wastewater • Access for unclogging • Integral decompression vents Ø 110 mm • Device removable J For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, Secondary treatment Units and Accessories, see our user manual A24. Threaded riser REHC (sold separately) Height 200 mm for manholes of Ø 400 mm fixation when required • Guidance handles on each side Riser montage on units 3 2 4 1 • Anchor ring for improved G 5 6 1. Place the supplied watertight joint on the unit’s screw thread 2. Screw the riser onto the unit 3. Screw the cover onto the riser 4. Threaded cover Ø 400 mm 5. Threaded riser height 200 mm 6. Integrated basket pre-filter clogging indicator, removable via the manhole Ø 400 mm and riser REHC 400/200 6 c ctiblo Ce s br ic &a prefa Anaerobic pre-treatment unit Single Skin rk on all ma ated tank REHC 400/200 Threaded riser suitable for manholes Ø 400 mm, (sold separately). SOTRALENTZ-HABITAT offers you sse striking advantages with a range of PLASTEPUR® Main Pre-treatment Units, CE stamped, and Secondary anaerobic treatment Units: 2 ou 3 1. Significant innovations in Sewage and Wastewater Treatment Plants: • Complete range: Homogeneity of your Plastepur® sewage disposal system, having obtained the rights to use the CE stamp. • Compact shapes and structures: Meeting installation restrictions, security and guaranteeing optimal resistance to compression: • Threaded REHC riser (sold separately) suitable for manholes Ø 400 mm; • Immediate positioning of the installation and total accessibility for monitoring and maintenance, in accordance with the current regulation; • Threaded riser REHC 600/250 + reinforced cover suitable for manholes Ø 600 mm and REHC 400/200 suitable for manholes of Ø 400 mm (sold separately); • Optimized hydraulic channelling: Shapes specially studied (test for the CE stamp). • Main “Performances” Pre-treatment Units with 1500l rectangular septic tank only for WC waters 4000l cylindrical septic tank for all waters filtering “Performances” material, integrated, detachable and non-decomposable; • Main and Secondary treatment Units and Accessories delivered with EAN 13 barcode. 2. Advantages to using extrusion blow-moulding High Density Polyethylene (HDPE) of Very High Molecular Weight (VHMW): • Lightness: 3000l of lightweight concrete weighs 1.3 tonnes, whereas a 30001 of PLASTEPUR® weighs 120kg, 10 times less than the lightweight concrete. Economize on the following procedures • Handling loading, unloading and storage on site • Transport: easier placement • Installation in areas inaccessible: to heavy service vehicles (diggers, cranes…); • Manual operations fork lift on site or JCB digger on worksite available for other operations. • Modest excavations and backfilling: placement is simple and rapid. • Functional shapes: Handling and positioning with lifting ring and/or guidance handles • Investment return comprehensively attractive; • Covers of Main and Secondary treatment Units always accessible due to the fitment of the universal threaded riser REHC; 3. Reliability and safety of extrusion blow-moulding HDPE VHMW: • Absolutely watertight, no risk of leaks (test for CE stamp) • Exceptional resistance to impacts and temperature variations • Highly reduced risk of accidents, increased personal safety • Entire monobloc is made automatically as one single piece by extrusion blow-moulding of an unreactive and homogeneous material. no mixed materials used in the assemblage • no change over time; • Non-decomposable multi-layer extrusion blow-moulded HDPE: - Excellent lasting power against aggressive agents in wastewater (sulphur anhydrides degrading concrete); - against corrosive elements from surrounding environment (acid soils) - recyclable. For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, Secondary treatment Units and Accessories, see our user manual A24. 7 Integrated anchor ring 5000l rectangular septic tank for all waters Integrated lifting ring 2 ou 3 Integrated Slot for Gas extraction Threaded riser REHC 600/250 Threaded riser REHC 600/250 + reinforced cover suitable for manholes Ø 600mm and REHC 400/200 suitable for manholes of Ø 400mm (sold separately) + B s br A ic &a Ce prefa Settling and clarification tanks “CE” stamped Holding tanks F.A.V. A1 ctiblo rk on all ma c Anaerobic pre-treatment unit Double Skin® ated tank C + • Threaded riser REHC 2 to 4 covers according to size, Ø 400 mm or 600 mm: • Access side (IN) for monitoring and drainage of settling or clarification tank • Access side (OUT) for monitoring and cleaning of the pre-filter or outlet baffle (OUT) • Height adjustable by screwing of risers REHC 400/200 or REHC 600/250 + reinforced cover (sold separately) 600/250 • + reinforced cover suitable for manholes of Ø 600 mm (sold separately) • Smooth interior surfaces, non-porous • No accumulation on the indentations inside DP units Pre-filter clogging indicator side (OUT) with SS deflector and “Performance” filtering material in the clarification tanks: • Capturing a maximum of SS (Suspended Solids) • reducing the BOD5 (Biochemical Oxygen Demand over 5 days) • Integral vents of 6 X Ø 35 mm • Baffle detachable and integrated. ent Units re-treatm P in a et: M kin n the mark Double S ormers aobove the water rf e p st e the high il with 1.10 m manual A24) One of in wet so allation user Pit test le ee inst (s b ta A C A E 2 ou 3 B F Settling or Clarification tank 16 000 l. For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, see our user manual A24. F D F It is essential to check the DP tanks and their sides with our technical staff before starting the excavation or placing load-bearing slab E • Inlet (IN) and outlet (OUT) • • • Integrated stabilization feet welded to the cavity bases, keeping the unit level • Option of anchoring to a reinforced concrete load-bearing slab, following our placement advice (see user manual A24) • Another anchorage option is possible with “Plantco” fixation on a bed of stabilised sand • • welded into the double skin without risks of leaks to breakage Elimination of connection errors Sleeve mounting point integrated into the inlet (IN) to guarantee easy installation without gluing of connection tubes and eliminating leaks On holding tanks: integrated stainless steel drainage pipe with optional pump connection point, without outlet: REHC risers (sold separately) (see user manual A24) Detachable baffle D • Double HDPE interior and exterior skins • Cellular form of the exterior skin • 6 extruded HDPE layers • ribbs • Highly resistant 8 Ce ctiblo rk on all ma c Anaerobic pre-treatment unit Double Skin® s br Large capacities, highly resistant &a prefa ic ated tank 3000 to 75000 litres of useful volume Non-deformable skins and double welded segments • Other possible uses: storage tanks, septic holding tanks FAV, storm spillways or tanks for recuperating rainwater or washing wastewater (see our brochures EP64 and EP24); • Diameter and height unchanged, only the length of the unit is increased from 182cm to 1 585cm • Example: Series placement of a 50 000 litres settling tank followed by a 25 000 litres “Performance” clarification tank with integrated pre-filter can give you a self-contained, grouped pre-treatment system with a large capacity, up to 75 000 litres • In all cases, the 2 units, Settling + Clarification tank, must have a suitable downstream FD “Performance” pre-filter, followed by a suitable 2 way sequential dosing tank. Units are insulating due to air pockets in the material’s structure: solid, resistant, stable, light and with an incomparable reduction of installation costs. Option: Child safety device to attach to the riser’s cover 1 600/580 Riser REHC with reinforced cover Threaded riser REHC 600/250 + reinforced cover suitable for manholes Ø 600mm and REHC 400/200 suitable for manholes of Ø 400mm (sold separately) Riser REHC 600/250 2 + Options : 1. Riser REHC 600 CR, adjustable to 1 height with reinforced cover for public areas. 2. Riser REHC 600/250 delivered without reinforced cover • Possibility of screwing to the top of risers REHC 600 CR and REHC 500/250: - Riser REHC 600/150 ht 150 mm - Riser REHC 600/300 ht 300 mm delivered without reinforced cover Another option: - Riser REHC 400/200 ht 200 mm Ø 400 mm For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, see our user manual A24. • Insensitive to normal temperature variations and to water volume load; • Simple to transport and install almost anywhere; • Made in a single piece, with double welding, these units are nondeformable and resistant to very large pressures, ground movements or welling ground water as well as large loads of backfill thanks to the cellular structure of the exterior double skin; • Unique shape that uses soil pressure to give additional stability and resistance, as shown by CERIB tests in situ (see user manual A24); • Made with Very High Molecular Weight HDPE material, increasing resistance even more and eliminating any porosity; • Placement without pre-filling; • Compression resistance as shown in empty testing and tests by CERIB to obtain the CE stamp; • The result of nearly 25 years of expertise in the technique of extrusion blowmoulding of polyethylene HDPE VHMW, the new Double Skin system gives incomparable solidity and guaranteed watertightness. Thick external surface with cellular structure. Thick, smooth internal surface • Produced by extrusion blowmoulding of HDPE-VHMW with thick surfaces (6 layers of HDPE) Double Skin and double welding (HDPE); • Life expectancy well above equivalents units in concrete or polyester; • Homogeneity of HDPE-VHMW guarantees almost zero degradation and thus all porosity. • Smooth internal surface (air pockets in the external skin) preventing any degradation, contrary to « classic » units made of concrete (degradation of concrete by sulphurous anhydride), or polyester (degradation of resins and fibres through osmosis) The “Performance” filtering material is integrated into the Epurblocs “Performance”and Clarification tanks, detachable and non-decomposable. Self-contained, grouped pre-treatment Settling + Clarification tank The succession of a settling tank, receiving 2/3 of the volume of all wastewater (decanting sludge and suspension of floating matter), followed by a clarification tank, receiving 1/3 of the volume of all wastewater (secondary decant of sludge and re-suspension of remaining floating matter) improved the performance of Sewage and Wastewater Treatment Plants. Settling tank 2 2/3 of total volume “Performance” clarification tank 3 1/3 of total volume 9 Anaerobic pre-treatment unit “Performance” Pre-filter REHC 400/200 Threaded riser suitable for manholes Ø 400 mm, (sold separately). Integrated or not in the septic tank Description • Principally destined to reduce the concentration of Suspended Solids (SS) that happen to come through the All Water septic tank as well as reducing the Biochemical Oxygen Demand over 5 days (BOD5) • Pre-treated household wastewater coming from the septic tank or from a self-contained, grouped installation (e.g.: FS Settling tank + EPURBLOC® + SL-FD) enters via the inlet baffle (IN) onto the filtering material (“Performance” filtering material) in order to retain any Suspended Solids (SS). • Evacuation is caused by the siphoning effect (high inlet IN/high outlet OUT) of the anaerobic system, thus ensuring a flow of less concentrated (in SS) pre-treated wastewater to a purification element or another solution determined by the nature of the soil, type of treated water outlet, by regulation laws. • Slot of GAS Extraction for direct connection Higher Ventilation (VH). Sotralentz recommends slotting the Higher Ventilation (VH) into the inlet (IN) of the pre-filter (upstream) and not the outlet (OUT) of the pre-filter (downstream) (see user manual A24). • Monobloc tank with high inlet (IN) and the high outlet baffle (OUT) with decompression vents and inspection cover, which can be fitted to the riser REHC (sold separately) • Pre-filter fitted with “Performance” filtering material and filled with clear water before use. • Secondary treatment Units are delivered with the EAN 13 barcode E . Option : • “Performance” pre-filter fitted with filtering meshes “Performance” integrated, detachable and non-decomposable • A pre-filter is obligatory where the CE stamped septic tank or settling tank is not fitted with a integrated removable clogging indicator or in grouped Non-mains Sewage and Wastewater Disposal systems. A Pre-filter SL-FD 1600 E Pre-filter SL-FD 200 B D C • Lifting ring • Inlet (IN) with welded sleeve mounting points and watertight joints: • Inflow of pre-treated wastewater • Slot for GAS Extraction to direct connection Higher Ventilation (VH) (see user manual A24) on top Ø 600 and Ø 400 for FD 2500 and 3500: • Access side (IN) for monitoring and separation, • Access side (OUT) to unblock the outlet and degreasing drainage, • Height adjustable to the final ground level by screwing REHC risers. Outlet baffle (OUT): • Collect of pre-treated wastewater and channelling towards a non-aerobic treatment system, • Baffle detachable. Pre-filter integrated or not Integrated “Performance” pre-filter clogging indicator, integrated and removable in the Epurbloc® or the clarification tank For a pre-treatment volume exceeding 10 000 litres, the integrated pre-filter serves as clogging indicator, and where this is so, pre-treatment must be followed by a non-integral pre-filter. B Non-Integrated For description, installation, operation, maintenance and guarantees of Secondary treatment Units, see our user manual A24. B D A “Performance” pre-filter must be placed downstream of the Septic tank or Settling tank, or a grouped system of settling + clarification tank C 4 Where there is a pre-filter is not integrated into the septic tank, the tank must contain 10% of total upstream pre-treated volume 10 Plastepur® anaerobic pre-treatment 1. Plastepur® anaerobic pre-treatment • Household wastewater, after having passed through Grease Extractor SL-SG (optional) 1 and “Performance” Epurbloc® 3 CE stamped followed by the Grease Extractor SL-SG 1 (optional), and sewage flow into the “Performance” Epurbloc® 3 CE stamped, to undergo an anaerobic pre-treatment, then flowing through the SL-FD pre-filter (optional) to final aerobic purification before ejection or infiltration into the surface water system. DISCHARGE a SL-FD “Performance” pre-filter (optional) 4 1 3 3 2 2 2. « Separate » Plastepur® pre-treatment • Subject to approval, authorization is only given when rehabilitating existing system pre-treating sewageonly (WC) in the sewage-only septic tanks 2 . 3. Special cases • During the installation of a grouped self-contained ANAEROBIC PRE-TREATMENT Grease Extractor SL-SG (optional) 4 1 5 Epurbloc® “Performance” 6 Key 1 GAS EXTRACTION obligatory Higher Ventilation to roof apex Ø 110 with static exhaust (see user manual A24) 2 Sewage (WC) 3 Household wastewater (kitchen, dishwasher, washing machine, bathroom) 4 Grease Extractor SL-SG 1 (optional) 5 Inspection chamber SL-RVISIT adjustable height, 3 inlets + 1 outlet (see page 27) 6 Anaerobic pre-treatment with septic tank EPURBLOC® or settling tank “Performance” 3 , CE stamped, with detachable integrated clogging indicator equipped with “Performance” filtering material detachable and decayresistant. 7 Pre-filter SL-FD 4 (optional). 4 rk on all ma Ce SL-FD pre-filter “Performance” (optional) but essential in the Compact Filter system or in the grouped system of settling + clarification tank ctiblo 7 prefa br ic &a 4 3 s 3 Fill with clear water before first use. Anaerobic pre-treatment with septic tank EPURBLOC® “Performance”, CE stamped, with detachable integrated clogging indicator equipped with “Performance” filtering material detachable and decay-resistant. (see user manual A24) c 5 1 Sewage and Wastewater Treatment Plants, the series of a settling septic tank 2 , “Performance” Epurbloc® 3 CE stamped, and “Performance” pre-filter SL-FD 4 (together representing 10 % of volume through the grouped system) is authorised. • Where there is « separate » pre-treatment, household wastewater must be pre-treated by the Grease Extractor SL-SG 1 , though this is optional for « all water » pre-treatment. ated tank 7 steps for separated anaerobic pre-filtre 1. High inlet baffle (IN) 2. Distribution of wastewater coming from the septic tank or the grouped system onto the “Performance” filtering material 3. “Performance” anaerobic filtering material 4. Pre-treated wastewater 5. Outflow of wastewater via the high outlet baffle (OUT) 6. Gas accumulation 7. Slot for gas extraction to direct connection to Higher Ventilation (VH) (see user manual A24) 11 7 1 2 6 5 Pre-filter 1000 3 4 Actibloc®, SBR sludge activation stations from 1 to 300 Population Equivalent (PE) ACTIBLOC® biological station, from 1 to 300 PE sequential with sludge activation and tested at a minimum DBO5 of 300 mg/l by the CSTB, CE stamped, destined for pretreatment and treatment of household wastewater, reducing pollution by around 97 %. Who needs an Actibloc® SBR sludge activation station? ACTIBLOC SP from 7 to 10 PE 2 x 3 500 l For any user living in a private or co-owned house, in a hotel or on a camping site, with a limited area of land and un-connectable to the mains sewage network, Actibloc® is the ideal solution. A sand filter bed is unnecessary, the burial area is reduced and the two main points to take into account are unequalled efficiency coupled with infrequent maintenance our n i o f n i e Mor tibloc c A d e t a c dedi hure A94 broc When to use Actibloc®? ACTIBLOC® is a system designed to pre-treate and treate available domestic wastewater, up to 300 PE, suitable for the treatment of wastewater from: • private houses non-connectable to the mains sewage network, • hotels non-connectable to the mains sewage network, • camping sites non-connectable to the mains sewage network, • small communal estates non-connectable to the mains sewage network Never for the purposes of treating wastewater from the following: • restaurants, cafeterias, snack bars, etc. (all food-related businesses), • milk and cheese processing units, etc. (milkderived wastewater), • bakers, cake shops, tea shops, etc. (all flour or starchy products), • delicatessens, butchers, tripe shops, etc. (all meat production and derivatives), • fish commerce or industry. Sludge settling tank and buffer of water peaks Activated sludge Sequential Biological Reactor ACTIBLOC DP 00 PE 3 o t p u Actibloc demand on ACTIBLOC SP from 9 to 12 PE 2 x 5 000 l for 13-300 PE How Actibloc® SBR activated sludge treatment plant works? 1st step 2nd and 3rd step in the same chamber 50% of the volume in a microstation or an activated sludge purification station 50% of the volume in a micro-station or an activated sludge purification station Aerobic biological treatment s br &a Ce prefa ic ated tank Decanting Outflow of treated water Sludge pumped back Hat of floating matter ctiblo rk on all ma c Anaerobic pre-treatment Dissolved oxygen Separation of light and heavy undissolved organic matter Deposit of undissolved organic matter before biological purification O2 O2 Bacteria Primary sludge bed O2 O2 O2 Dissolved organic matter Decomposition of dissolved matter in oxygen rich environment Secondary sludge bed Deposit of bacterial floc after biological purification Actibloc®: an SBR micro-station and activated sludge purification station, and tested with a minimum of 300 mg/l DBO5 by the CSTB, CE stamped, destined for the pre-treatment and treatment of household wastewater, reducing pollution by around 97 %. 12 Aerobic treatment plants sequential dosing tank Description • Sequential dosing tank designed to distribute, in a regular and even manner, pre-treated wastewater coming out of either “All Water” septic tank Epurbloc®“Performance” 3 , clarification tanks, CE stamped, or pre-filters “Performance” 4 , across drainfields (distribution/irrigation fields) or filter beds. • Independent installation as no electrical energy is required • Little maintenance, periodic servicing every 3 months and possible rinsing of baffles required (see user manual A24). • Increased performance of aerobic treatment and life span of the system. • Monobloc tank with calm water inlet (IN), slot for gas extraction to direct connection to Higher Ventilation (VH)(see user manual A24) and one or two low outlets (OUT) fitted with a fixed auto-flushing doser with 1- or 2way outlets • Sequential dosing tanks SL-CHAS 200 & 500 equipped with a fixed auto-flushing doser. • Sequential dosing tanks SL-CHAS 800 equipped with an auto-flushing doser which can be regulated to alter the tank’s storage volume (300, 400, 500 or 600 litres). REHC 400/200 Threaded riser suitable for manholes Ø 400 mm, (sold separately). dosing tank SL-CHAS 500 2V dosing tank SL-CHAS 200 1V Interior view For description, installation, operation, maintenance and guarantees of Secondary treatment Units, see our user manual A24. 2 steps of how the dosing tank works • Only pre-treated and grilled water can enter the sequential dosing tank, by the inlet baffle (IN) which reduces flow speed to avoid resuspension of floating matter and heavy solids • The stilled pre-treated and grilled water is stored in the tank of the sequential dosing tank. Suspended Solids (S.O.M.) deposits on the bottom of the unit (to empty periodically). • During tank auto-flushing a high-flow dose flows out into the aerobic treatment device. • Outlet baffle (OUT), by design, ensures the distribution of pre-treated water across the whole drainfield or filter bed • Gas pressure and pressure in the distribution network are regulated by a pressure release value to avoid pressurization of the network 2. Outflow towards the drainfield 1. Filling the dosing tank Drained sand filter-bed Installation of dosing tank 2-way SL-CHAS Lower collect Surface irrigation Kit FD Treated water outlet pipe Distribution of pretreated wastewater RVISIT Epurbloc® with integrated “Performance” pre- OUT 2-way doser IN VH SL-RBOUCHAS 600 SL-RRCHAS 600 VH (cf. A24) 13 Direction of the 2nd way SL-RCOL V 1190 Aerobic treatment plants Non-drained filtering beds for permeable soils Kit FND In the end, there can sometimes be no satisfying solution to independent sewage disposal, and in the absence of connection to the mains sewer system, it is necessary to abandon the construction or renovation project, as the land plot is unsuitable for construction. Consult our User Manual A24 for: • Determination of user number, volume • All installation instructions for Main and Secondary treatment Units and Accessories • Service and frequency of maintenance visits • Guarantee information RVISIT For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, Secondary treatment Units and Accessories, see our user manual A24. RVISIT TOPOLOGY AND WATER SEEPAGE CHARACTERISTICS OF THE SOIL Hardly permeable soil ctiblo &a s ic ated tank RBOU RR Epurbloc “Performance” Grass, plants Top soil, backfill Relatively deep permeable soil Relatively thick, highly permeable soil on fissured limestone subsoil Ce Underground infiltration in permeable soil Kit FND br Key Inspection chamber SL-RVISIT adjustable prefa For the installation of irrigation systems, infiltration mounds, and non-drained filter beds, use our Kit FND (see user manual A24) rk on all ma c The choice of an independent wastewater treatment system relies upon the analyses of soil and site characteristics • topology and water seepage characteristics of the soil • treated water outlet pipe possible • current use of the environment receiving the effluent. ering ance” filt “Perform integrated into material, ” Main Pre- 3 ance “Perform units, detachable t treatmenn-decomposable and no Shallow irrigation Irrigation on slopes > 5 % Cross-section Above Surface water 0,20 ANAEROBIC PRE-TREATMENT 0,40 Concrete Stabilized sand (dry mix 1 m3 sand + 200k cement) Gaseous accumulation (methane) and aggressive agents (sulphurous anhydride) Hat (grease, floating matter) Sludge bed undergoing settlement and anaerobic fermentation Household wastewater (separation and settling zone) “Performance” filtering material (anaerobic pre-filtration) 0,50 3 “Performance” Epurbloc® and clarification unit 7 Lift post SL-REL pumping station AEROBIC TREATMENT REPART 3,50 m 0,10 0,50 Deep irrigation mini 3,50 m mini BOU Shallow, broad irrigation 0,50 m 0,20 0,40 0,20 0,40 Pre-treated water lift pump Higher ventilation (VH) obligatory (Ø 110 mm) see user manual A24 Looping of Higher ventilation VH (Ø 110 mm) optional if connecting in upstream of Pre-treatment Unit 0,10 10 m BOU 0,60 mini to 0,80 maxi 0,30 0,10 0,70 0,50 BOU 0,50 m 0,10 Infiltration mounds, above ground Kit FND in areas with high water tables or in flood zones, with concreted Pre-treatment Units Sand RR RBOU Sandy-loamy soil Slope < 30° Fine gravel Ø20/40 mm Irrigation or collect pipes (Ø 110) 0,70 Non-return valve on the treated water outlet pipe Geotextile felt (63µm ≤ OF ≤ 100µm) (NF EN 10319, 11058 and 12956) Separating geogrill (400µm ≤ OF ≤ 600µm) (NF EN 10319, 11058 and 12956) 0,20 0,30 7 Impermeable polyethylene film (400µm) 14 Aerobic treatment plants Non-drained filtering beds for permeable soils Kit FND Non-drained filter bed in reconstituted soil Kit FND (with loam + sand layer) Non-drained filter bed in Kit FND reconstituted soil (with sand layer) y À @ RBOU RR RR RBOU 0,20 0,20 0,30 0,30 0,70 0,70 Components of Non-drained filtering beds Kit FND (sold separately) For the installation of your irrigation systems, your infiltration mounds, and non-drained filter beds made of reconstituted soil, use our Non-drained filtering beds C Kit FND D of 5 x 4, 5 x 5, 5 x 6, 5 x 7, 5 x 8, 5 x 9, 5 x 10, 5 x 11 and 5 m x 12 m including: A 1 Filtroplus geotextile felt BB 1 Filtrogrill geogrill C 1 adjustable RR chamber + 8 elbow joints integrated into the chamber D 1 adjustable RBOU chamber + 8 elbow joints integrated into the chamber C A B Kit FND Elevation view of irrigation network Ce ctiblo rk on all ma c D 6 ated tank RR distribution chamber adjustable to 5 heights with 6 outlets RR 7 AERATION Oxygen inlet (Lower ventilation) of the irrigation system trough the Looping Chamber perfored tape. Looping chamber 6 inlets/outlets SLRBOU adjustable to 5 heights RBOU 14 2 successive PVC elbow joints 45° Ø 110 15 PVC whole tube NF Ø 110 16 Rigid distribution pipes Ø 110 mm Pipes and piping sold separately. 6 15 16 14 7 AEROBIC TREATMENT PLANTS NON-DRAINED FILTERING BEDS 15 s br ic Key &a prefa Kit FND Aerobic treatment plants - Vertical drained sand filtering bed for impermeable soils Kit FD Key The choice of an independent wastewater treatment system relies upon the analyses of soil and site characteristics • topology and water seepage characteristics of the soil • treated water outlet pipe possible • current use of the environment receiving the effluent. TOPOLOGY AND WATER SEEPAGE CHARACTERISTICS OF THE SOIL Grass, plants Top soil, backfill Impermeable soil Highly permeable soil ANAEROBIC PRE-TREATMENT Concrete Stabilized sand (dry mix 1 m3 sand + 200k cement) Gaseous accumulation (methane) and aggressive agents (sulphurous anhydride) Hat (grease, floating matter) Sludge bed undergoing settlement and anaerobic fermentation Household wastewater (separation and settling zone) “Performance” filtering material (anaerobic pre-filtration) Higher ventilation (VH) obligatory (Ø 110 mm) see user manual A24 3 “Performance” Epurbloc® and clarification unit 4 “Performance” pre-filter SL-FD 7 Lift post SL-REL pumping station 9 Compact Filter (see page 18) Ce ic &a ated tank Above ground drained irrigation mound on impermeable soil RBOU RR AEROBIC TREATMENT Sand s br Looping of Higher ventilation VH (Ø 110 mm) optional if connecting in upstream of Pre-treatment Unit For the installation of drained irrigation mounds and drained filter beds, use Kit FD (see user manual A24) prefa For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, Secondary treatment Units and Accessories, see our user manual A24. ctiblo rk on all ma c In the end, there can sometimes be no satisfying solution to independent sewage disposal, and in the absence of connection to the mains sewer system, it is necessary to abandon the construction or renovation project, as the land plot is unsuitable for construction. Consult our User Manual A24 for: • Determination of user number, volume • All installation instructions for Main and Secondary treatment Units and Accessories • Service and frequency of maintenance visits • Guarantee information Kit FD RCOLV 0,20 Slope < 30° 0,30 Sandy-loamy soil Fine gravel Ø20/40 mm 0,70 Irrigation or collect pipes (Ø 110) Non-return valve on the treated water outlet pipe 0,10 7 Geotextile felt (63µm ≤ OF ≤ 100µm) (Standard EN 10319, 11058 and 12956) Separating geogrill (400µm ≤ OF ≤ 600µm) (Standard EN 10319, 11058 and 12956) Impermeable polyethylene film (400µm) Vertical draining sand filter bed on impermeable soil with ejection into the surface water system RVISIT Inspection chamber SL-RVISIT adjustable Kit FD Height difference Mini 1,2 m Maxi 1,6 m RVISIT RR 3 RBOU RCOL V Non-return valve or elbow joints running inline with the outflow 0,20 0,30 0,70 0,10 16 Aerobic treatment plants - Vertical drained sand filtering bed for impermeable soils Kit FD Components of drained filtering beds filter Kit FD (sold separately) FD-2 FD-1 To install your drained infiltration mounds and drained filtering beds in impermeable soil, use our Drained Filter Kit of Kit FD of 5 x 4, 5 x 5, 5 x 6, 5 x 7, 5 x 8, 5 x 9, 5 x 10, 5 x 11 and 5 m x 12 m, including: : A B C D E F G 1 Kit FD 1 Filtroplus geotextile 1 Impermeable membrane 400 µ 1 waterproofing collar 1 Filtrogrill geogrill 1 adjustable RR + 8 integrated elbow joints in the chamber 1 adjustable RBOU + 8 integrated elbow joints in the chamber 1 RCOLV 1190. + 12 elbow joints and 2 T-joints in the chamber 2 Follow our directions Kit FD . Kit FD composed of 2 chambers fitted onto 1 pallet: Kit FD-1 (Geosynthetics) and Kit FD-2 (chambers and joints) Kit FD - 1 E Kit FD - 2 E D B A G F C F ctiblo s br ic &a prefa Elevation view of vertical draining sand filtering bed rk on all ma Ce Puncture-resistant Geotextile sold separately in accordance with the size of Kit chosen (see user manual A24) c G ated tank Key Kit FD 6 7 Distribution Chamber 6 outlets SL-RR adjustable to 5 heights above the drainage pipes RR AERATION Oxygen inlet (Lower ventilation) of the irrigation system trough the Looping Chamber perfored tape. Looping chamber 6 inlets/outlets SL-RBOU adjustable to 5 heights RBOU 8 9 14 15 16 17 AERATION Oxygen inlet (Lower ventilation) of the collecting drainage pipes trough the Looping Chamber perfored tape. Vertical Collect chamber SL-RCOLV 1190 adjustable height RCOL V Treated water outlet pipe, pointing in direction of outflow PVC whole elbow joints NF Ø 110 PVC whole tube NF Ø 110 Rigid irrigation pipes Ø 110 mm Collect pipes Pipes and piping sold separately. 6 15 14 16 17 7 14 8 9 VERTICAL DRAINING SAND FILTER BED AEROBIC PURIFICATION 17 The “Performance” Compact Filter Aerobic treatment unit of pre-treated household wastewater Total surface area less than 10 m2 for a system of 4 PE Description Compact filter 2500 l. 4-6 PE Comprising a monobloc tank with a control and aeration chamber. Made by extrusion-blowmoulding of high-density polyethylene, comprising: • On the top section, a distribution pipe and a plate distributing the pre-treated wastewater over the entire surface of the synthetic filtering materials (PP) • On the central section, a body of synthetic filtering materials (PP) loosely placed to enable cleaning and replacement • On the bottom section, an arm supporting the synthetic filtration material (PP) and the collect drains which collect and outlet the treated wastewater • An upper inlet (IN) • A static extractor • Two columns for lower ventilation with hats • A drainage tube integrated when cleaning the filtering material • A collection and aeration chamber, with integrated perforated sampling cover • A lower outlet (OUT) with a shut-off valve for de-clogging and cleaning • Risers and inspection covers • Stiffeners • Handling grips Operation or description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, Secondary treatment Units and Accessories, see our user manual A24. The pre-treated domestic wastewater flows first to the “Performance” Epurbloc, then to the FD “Performance” pre-filter, and is then stocked in the sequential dosing tank. From there, the distribution pipe and plate distribute the pre-treated wastewater in a consistent and sequential manner over the entire surface of the synthetic filtering materials. The pre-treated wastewater flows by gravity over the filtering body, in which is embedded a layer of aerobic bacteria, completing the oxidation and purification processes. This oxidation is possible because: • Fresh air can enter via the aeration chamber and the two lower ventilation columns upstream of the filter by atmospheric pressure • An optimal circulation of air in the filter and its synthetic filtering materials is achieved by the static extractor positioned at the centre of the unit, drawing in air via the aeration chamber and expelling polluted air and gases Advantages • Light • Hydraulic efficacy, limited waste • Beads allow optimal diffusion of pre-treated wastewater. • Fins on the surface of the beads capture organic matter contained Compact filter 3500 l. 6-8 PE in domestic wastewater; they hook matter on surface contact. Organic matter forms a biomass due to the development of aerobic bacteria. • Biomass film does not exceed a thickness of 1 mm and weight oscillates between 6 and 22 kg/m3. • Suggested working temperature between 5 and 35°C allowing an optimal degradation of matter and reduction of the BOD (Biochemical Oxygen Demand) as contact time allows for optimal oxidation of matter • Filtering materials are integrated into Compact Filters, so no forgetting to install them during first operation. • Low investment and operation costs • Ease of inspection for the ANC (SPANC) public services • Riser stays in place during maintenance • Non-decomposable filtering materials, unlimited usage • Compact Filter is watertight to streaming water; • The installation’s useful surface area is reduced (less than 10 m2 for 4 inhabitant-equivalents). Installation of Compact filter • Epurbloc® “Performance”, CE stamped, then FD pre-filter “Performance”, then Dosing tank and finally Compact Filter, installed buried on a bed of stabilised sand (dry mix of 1 m3 sand to 200kg of cement), anchored with the “Plantco” fixation kit and backfilled with stabilised sand. Plan to anchor unit to a slab placed on stabilised sand when in presence of a high water table. • System 1 of 4-6 PE = Epurbloc® 3000 + FD 500 + CHAS 200 + Compact 2500. • System 2 of 6-8 PE = Epurbloc® 4000 + FD 800 + CHAS 200 + Compact 3500. 18 The “Performance” Compact Filter Aerobic treatment unit of pre-treated household wastewater Total surface area less than 10 m2 for a system of 4 PE High performance polypropylene beads used in Compact Filters, subject to approval • 3 types of PP beads allowing optimal diffusion of pre-treated • Advised working temperature between 5 and 35°C allowing an wastewater through the vertical filter. • Organic matter contained in domestic wastewater is trapped by fins on the beads where they stick on contact. A biomass is formed by the growth of aerobic bacteria on the organic matter. optimal degradation of matter and reduction in BOD (Biochemical Oxygen Demand) as contact time allows for optimal oxidation of matter • Biomass film does not exceed a thickness of 1 mm and weight oscillates between 6 and 22 kg/m3. Surface area > 125 ou 160 m2/m3 Useful volume : 10 or 4 % of material 90 or 96 % of air Weight per m3 : 40 or 37 kg/m3 Weight of the bead : 100 or 2,5 gr Colour : Slate grey Primary material : polypropylene Resistance to compression: 400 or 250 kg /1 m Melting temperature : + 72 °C Max. working temperature: + 65 °C Resistance to hydrocarbons: Good resistance on average Resistance to acids: Good to very good Resistance to cold Very good Side view RVISIT EPURBLOC® 3000 Inspection chamber SL-RVISIT adjustable “Performance” Epurbloc® 3000 cylindrical or rectangular FD 500 CHAS 200 “Performance” filter 500 litres Sequential dosing tank 200 litres FILTRE COMPACT 2500 “Performance” Compact Filter with anchorage system (embedded bars integrated in the welded feet + “Plantco” fixation) Aeration VH Ø 110 mm RVISIT ajustable Elevation view GAS EXTRACTION obligatory Higher Ventilation to roof apex Ø 110 with static exhaust of the three Main Pre-Treatment Units (septic tank, “Performance” pre-filter and sequential dosing tank) above the water level and not connected to the exhaust of the compact filter. Static exhauster not connected to the Higher ventilation (VH) Ø 110 mm 9400 2700 500 1700 500 1200 500 2300 Static extractor VH of the Compact Filter IN 1190 VH Aeration 19 ctiblo Ce &a s ic ated tank Main rooms Population Equivalent Weight (kg) Diameter Ø (mm) Inlet and outlet Length A (cm) Width B (cm) Total height Ht (cm) Inlet height He (cm) Outlet height Hs (cm) Inspection covers (mm) Height of retaining wall (cm) Height of sand (cm) Pre-filter (OUT) integrate and detachable clogging indicator “Performance” filtering material Above ground placement For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, see our user manual A24. Article All water br SL-FS 1000 SL-FS 1500 EPURBLOC® 1500 EPURBLOC® 2000 EPURBLOC® 3000 prefa Sewageonly “Performance” rectangular ribbed units rk on all ma suitable for manholes Ø 400 mm, (sold separately). 11634 11636 31988 24371 24372 1 to 4 5 to 6 1 to 2 1 to 4 5 8 12 3 4 6 42 64 64 92 119 110 110 110 110 110 170 170 170 190 270 77 77 77 119 119 123 166 166 144 144 100 143 143 118 118 97 140 140 115 115 2 x Ø 400 2 x Ø 400 2 x Ø 400 2 x Ø 400 2 x Ø 400 60 60 60 60 60 50 50 50 50 50 NO NO YES YES YES NO NO YES YES YES Approximate values REHC 400/200 Threaded riser c Main Pre-treatment Single Skin Units SP Plastepur® dimensions Option : threaded risers REHC 400/200 suitable for inlets and outlets of all Main Pre-treatment Units &a s Outlet height Hs (cm) Aeration height (cm) Inspection covers (mm) Height of retaining wall (cm) Height of sand (cm) Pre-filter (OUT) integrate and detachable clogging indicator “Performance” filtering material Above ground placement 165 140 136 144 2 x Ø 400 80 70 WITH YES 239 165 Approximate values c ctiblo Ce ated tank Inlet height He (cm) Diameter Ø (mm) Inlet and outlet ic All water EPURBLOC® 4000 24374 For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, see our user manual A24. Total height Ht (cm) Weight (kg) 110 Width B (cm) Population Equivalent 140 Length A (cm) Main rooms 8 rk on all ma suitable for manholes Ø 400 mm, (sold separately). br 6 REHC 400/200 Threaded riser prefa Article “Performance” cylindrical ribbed units Option : threaded risers REHC 400/200 suitable for inlets and outlets of all Main Pre-treatment Units ctiblo Ce &a s Inlet height He (cm) Outlet height Hs (cm) Inspection covers (mm) Height of retaining wall H (cm) Pre-filter (OUT) integrate and detachable clogging indicator “Performance” filtering material in EPURBLOC and CLARIF + ated tank Max. height with riser SL-REHC 600 Ht (cm) 110 235 135 160 235 135 160 358 135 160 481 135 ic For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, see our user manual A24. Total height without riser Ht (cm) Width B (cm) Length A (cm) Weight (kg) Diameter Ø (mm) inlet and outlet Population Equivalent 180 180 260 360 Main rooms 30327 7 10 30328 7 10 30329 10 16 30330 14 20 Article Clarification tank Article Settling tank All water 30323 30324 30325 30326 br 5000 SP-RKT (Ø110) 5000 SP-RKT (Ø160) 7500 SP-RKT 10000 SP-RKT Threaded riser REHC 600/250 + reinforced cover suitable for manholes Ø 600mm and REHC 400/200 suitable for manholes of Ø 400mm (sold separately) rk on all ma prefa suitable for manholes Ø 400 mm, (sold separately). 225 225 225 225 285 285 285 285 190 185 185 185 185 180 180 180 2 x Ø 400 2 x Ø 400 2 x Ø 400 2 x Ø 400 Forbidden Forbidden Forbidden Forbidden With or without With or without With or without With or without From origine From origine From origine From origine Option : threaded risers REHC 400/200 suitable for inlets and outlets on units 5000, 7500 and 10000 SP RKT. Option : threaded riser REHC600/250 + reinforced cover Ø 600 mm, suitable for inlets (IN) and outlets (OUT). 20 Approximate values Threaded riser REHC 600/250 REHC 400/200 Threaded riser c “Performance” Settling tank SP and Clarification tank SP Ce ctiblo rk on all ma c Main Pre-treatment Double Skin Units DP Plastepur® dimensions s br Settling tank tank (DC) Weight (kg) Length (cm) Width (cm) Height (cm) in FAV without riser Adjustable, max. height (cm) with riser SL-REHC 600 CR Inlet height (IN) He (cm) for DC and CLARIF Outlet (OUT) height Hs (cm) for DC and CLARIF Ø inlet/outlet (mm) Number of manholes Number of feet Pre-filter (OU) in “Performance” Clarification tank with filtering material 3000 5000 5000 6000 7000 9000 11000 12000 14000 15000 16000 18000 19000 22000 25000 27000 30000 35000 40000 50000 30378 24942 24943 30379 24944 24945 31871 24946 30380 30381 24947 30382 24948 30383 30052 30893 30751 33413 31511 33887 30372 24935 24936 30373 24937 24938 31870 24939 30374 30375 24940 30376 24941 30377 30051 30892 30750 33412 31510 33888 285 365 365 400 480 560 670 755 870 890 955 1065 1145 1340 1460 1515 1680 1985 2350 2910 182 235 235 264 316 370 452 505 587 619 640 726 780 916 998 1080 1162 1340 1585 1950 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 285 285 285 285 285 285 285 285 285 285 285 285 285 285 285 285 285 285 285 285 182 182 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177 179 179 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 174 110 110 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 1 1 1 2 2 2 2 2 2 2 2 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 6 6 6 6 8 8 8 10 10 12 12 12 16 YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES Approximate values Clarification (CLARIF) ated tank Type ic &a prefa Settling tank DP and Clarification tank DP Option: risers REHC 600 adjustable to 1 height with reinforced cover, for a max. height adjustable to 275cm or 290cm. Option: threaded riser REHC600/250 + reinforced cover Ø 600 mm, suitable for inlets (IN) and outlets (OUT) Threaded riser REHC 600/250 Weight (kg) Length (cm) Width (cm) Height (cm) without riser Inlet height (IN) He (cm) Diameter Ø inlet (mm) Diameter Ø of integrated mounting point for Higher Ventilation Number of manholes Number of feet + Article Threaded riser REHC 600/250 + reinforced cover suitable for manholes Ø 600mm and REHC 400/200 suitable for manholes of Ø 400mm (sold separately) FAV-DP 3000 FAV-DP 5000 FAV-DP 5000 FAV-DP 6000 FAV-DP 7000 FAV-DP 9000 FAV-DP 12000 FAV-DP 14000 FAV-DP 15000 FAV-DP 16000 FAV-DP 18000 FAV-DP 19000 FAV-DP 22000 FAV-DP 25000 FAV-DP 27000 FAV-DP 30000 FAV-DP 35000 FAV-DP 40000 FAV-DP 50000 30384 30385 23300 30386 24296 24839 24306 30387 30388 23694 30389 23695 30390 24307 30894 30752 33547 31512 33883 285 365 365 400 480 560 755 870 890 955 1065 1145 1340 1460 1515 1680 1985 2350 2910 182 235 235 264 316 370 505 587 619 640 726 780 916 998 1080 1162 1340 1585 1950 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 203 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 182 182 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177 177 110 110 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 1 1 1 2 2 2 2 2 2 2 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 6 6 6 6 8 8 8 10 10 12 12 12 16 Options: risers REHC 600 adjustable to 1 height with reinforced cover, for a max. height adjustable to 275cm or 290cm. Option: threaded riser REHC600/250 + reinforced cover Ø 600 mm, suitable for inlets (IN) and outlets (OUT) 21 For description, installation, operation, maintenance and guarantees of Main Pre-treatment Units, see our user manual A24. Designation (see user manual A24) It is essential to check the DP tanks and their sides with our technical staff before starting the excavation or placing loadbearing slab Approximate values FAV Holding tanks Secondary treatment Units Plastepur® dimensions REHC 400/200 Threaded riser suitable for manholes Ø 400 mm, (sold separately). Plastepur® Grease extractors SL-SG For description, installation, operation, maintenance and guarantees of Secondary treatment Units, see our user manual A24. Capacity, litres Usage Weight (kg) Diameter Ø (mm) Length A (cm) Width B (cm) Total height Ht(cm) Inlet height (IN) He (cm) Height of outlet (OUT) Hs (cm) Inspection covers (mm) Height of retaining wall H (cm) Height of sand H (cm) Metallic band 32602 11650 11698 11699 1 1,5 2 3 200 500 800 1000 Kitchen kitchen + bath kitchen + bath kitchen + bath 13 27 37 41 110 110 110 110 120 170 170 170 60 77 77 77 65 73 98 123 40 49 75 100 35 46 72 97 1 x Ø 400 2 x Ø 400 2 x Ø 400 2 x Ø 400 45 45 60 60 35 35 50 50 NO NO YES YES Approximate values Flow litres/sec. SL-SG 200 SL-SG 500 SL-SG 800 SL-SG 1000 Above ground placement Article (exclusively designed for private, non-communal use) Installation optional, obligatory is septic tank is placed more than 10 m from the house. Option : threaded riser REHC 400/200, suitable for inlets (IN) and outlets (OUT) of Secondary treatment Units SL-FD 500, 800, 1000 and 1600 For description, installation, operation, maintenance and guarantees of Secondary treatment Units, see our user manual A24. “Performance” Plastepur® Pre-filters SL-FD FD Performance article Volume of filtering material Number of filtering material Empty weight (kg) Weight with filtering material (kg) Diameter Ø (mm) Length A (cm) Width B (cm) Total height Ht (cm) Inlet height (IN) He (cm) Height of outlet (OUT) Hs (cm) Inspection covers (mm) Height of retaining wall H (cm) Height of sand H (cm) Metallic band 10525 11649 11694 11680 22894 22896 31052 31065 23289 23290 23638 23150 23151 31066 200 500 800 1000 1600 2500 3500 3 7 10 15 24 35 52 13 27 37 42 60 90 130 17 41 57 72 108 165 225 110 110 110 110 110 160 160 120 170 170 170 170 190 270 60 77 77 77 77 119 119 65 73 98 123 166 165 165 40 49 75 100 143 113 113 35 46 72 97 140 110 110 1 x Ø 400 2 x Ø 400 2 x Ø 400 2 x Ø 400 2 x Ø 400 Ø 600 & Ø 400 Ø 600 & Ø 400 45 45 60 60 60 NO NO 35 35 50 50 50 NO NO NO NO YES YES YES NO NO Above ground placement Approximate values SL-FD 200 SL-FD 500 SL-FD 800 SL-FD 1000 SL-FD 1600 SL-FD 2500 SL-FD 3500 Article FD (Pre-filter clogging indicator placed upstream of the septic tank) Option : threaded riser REHC 400/200, suitable for inlets (IN) and outlets (OUT) of Secondary Pre-treatment Units SL-FD 500, 800, 1000 and 1600 Sequential dosing tank Diameter Ø (mm) inlet (IN) Length A (cm) Width B (cm) Total height Ht(cm) Inlet height (IN) He (cm) Inspection covers (mm) 100 350 350 300 à 600 300 à 600 24 38 38 48 48 110 110 110 160 160 120 170 170 170 170 60 77 77 77 77 65 73 73 98 98 40 49 49 75 75 4 4 4 4 4 SL-CHAS 2V 2500 31300 2 x 1000 200 110/160 190 119 165 118 10 1 x Ø 400 2 x Ø 400 2 x Ø 400 2 x Ø 400 2 x Ø 400 1 x Ø 400 1 x Ø 600 NO NO NO YES YES YES YES YES YES YES NO YES Approximate values Weight (kg) 32520 30315 30316 30552 30553 Slot for connection to Higher Ventilation (VH) Dosing volumes in litres. SL-CHAS 1V 200 SL-CHAS 1V 500 SL-CHAS 2V 500 SL-CHAS 1V 800 SL-CHAS 2V 800 Cerclage métallique Article Obligatory placement upstream of a Compact Filter Tampons de visite (mm) For description, installation, operation, maintenance and guarantees of Secondary treatment Units, see our user manual A24. Option : threaded riser REHC 400/200, suitable for inlets (IN) and outlets (OUT) of Secondary treatment Units SL-CHAS 500 and 800 Length A (cm) Width B (cm) Total height Ht (cm) Inlet height (IN) He (cm) Height of outlet (OUT) Hs (cm) 31301 180 110 230 119 165 118 10 Compact Filter 3500(6-8 PE) 31942 250 110 310 119 165 118 10 Approximate values Ø (mm) inlet (IN) Compact Filter 2500 (4-6 PE) Inspection covers (mm) Weight (kg) For description, installation, operation, maintenance and guarantees of Secondary treatment Units, see our user manual A24. Article Aerobic treatment Compact Filter 2 x Ø 400 2 x Ø 600 2 x Ø 400 2 x Ø 600 Delivered with embedded fixation bars and “Plantco” fixation. 22 Plastepur® Accessories ories sold Accessa sep rately Range of chambers (inspection): • with circular silicone lipped seal • threaded riser SL-RVISIT adjustable to 5 heights 3 inlets + 1 outlet 2 SL-RR adjustable SL-RBOU adjustable to 5 heights to 5 heights 6 outlets 6 inlets/outlets Outlet side 1. Inspection chamber RVISIT adjustable to 5 heights, from 450 to 270 mm: • three (3) inlets and one (1) outlet at the same level • threaded whole cover, detachable. 5 Threaded cylindrical risers REHC SL-REHC 600/150 ht 150 mm without cover SL-REHC 600/300 ht 300 mm without cover SL-REHC 400/200 ht 200 mm, suitable for the majority of manholes Ø 400 mm SL-REHC 600 CR adjustable to 1 height, with reinforced cover see A24 2,850 320 100-160 110-160 * 20 - SL-RR adjustable 30197 3,250 320 * 50 20 110 100 SL-RBOU adjustable 30318 2,850 320 100 100 * 20 - SL-RCOL V 1190 23081 5,900 320 100 100 1130 50 20 100 100 1000 90 20 SL-RAP 1000 23083 5,000 320 SL-REHR 100 Riser 30497 0,600 320 100 SL-REHR 250 Riser 10275 1,250 320 250 SL-REHR 500 Riser 10276 2,000 320 500 SL-REHR 750 Riser 30498 2,850 320 750 SL-REHC 400/200 11767 2 400 200 SL-REHC 600/250♦ 32233 3 600 250 SL-REHC 600/150♦ 31369 1,5 600 150 SL-REHC 600/300♦ 31370 3 600 300 Reinforced cover 30880 10 600 SL-REHC 600 CR° 30881 13 600 ajustable sur 1 hauteur de 750 à 600 Approximate values Height of outlets (mm) SL-RVISIT adjustable * 5 heights adjustable from 450 to 270 mm Without reinforced cover ° With reinforced cover ♦ Diameter Ø outlets (mm) Type SL-REHC 600/250 without cover Diameter Ø total SL-REHC 600/250 without cover Inlet height (IN) He (cm) • • Designed to leave inspection covers of Main Pre-treatment Units accessible and apparent, in accordance with current regulation Facilitating monitoring and maintenance Allowing maximum backfilling above the water level by following instructions in the A24 user manual supplied with each unit Total height (mm) • Option: Child-safety device, in stainless steel suitable for riser covers REHC 400/200, REHC 600 CR or REHC 600/250 + reinforced cover. 23 SL-RAP 1 000 SL-REHR 100, 250, 500, 750 For description, installation, operation, maintenance and guaranteess, see our user manual A24. Reinforced cover For use in public areas Included with REHC 600 CR, suitable for REHC 600/250, and 650/150 and 600/300 (delivered separately). SL-RCOL V 1190 Risers chambers REHR: • adjustable height • threaded Weight (kg) 2. Distribution chamber RR adjustable to 5 heights, from 450 to 270 mm: • one (1) high inlet and six (6) low outlets at the same level • threaded whole cover, detachable 3. Looping chamber RBOU adjustable to 5 heights, from 450 to 270 mm: • six (6) inlets/outlets, low laterals possible • threaded perforated cover, detachable. 4. Collect chamber for vertical draining sand filtering bed SL-RCOLV 1190: • five (5) high inlets possible and one (1) low back outlet • threaded perforated cover, detachable • adjustable height. 5. Aeration and sampling chamber SL-RAP 1000: • two (2) high inlets possible and one (1) low back outlet • threaded perforated cover, detachable • adjustable height. 6. Threaded risers with adjustable heights 5 1 Article Inlet side 4 3 Diameter Ø inlet (mm) Close up of silicone-seal mounted on a threaded chamber A64 - II Sewage and Wastewater Treatment Plants Individual or grouped Main Pre-treatment Units conform • • • • • to the Standard XP D.T.U. 64-1, P 1.1, P 1.2, March 2007 to the Standard NF P15-910 to the Standard NF-EN 12 566-1, CE stamp on septic tanks to the Standard NF EN 12566-3+A1, CE stamp on Actibloc® Series number engraved on each Main Pre-treatment Units and bar-coded EAN 13. ISO 9001 : 2 008 Protection of the environment • Beyond improving the quality of wastewater pre-treatment, the primary material used (HDPE VHMW) to fabricate all of our units is 100% recyclable. mark on all prefabricated tanks User Ma nual installati on of SO TRALE (hou EP64 - I sehold w N Ten Year astewat TZ and Plastepu ® Guaran in accordan er decont tee r responsib ce with the law 78/1 ility 2, 4.01.197 of profe construct 8 (the profe ion mate ssionals that fabri ssion rial) by the cate and assimilate al police act IARD. Conform ity These prod ucts confo • Inter -Ministry rm to the: bylaw of 08.06.19 06.05.19 96) 96 (Official French gove Journal date rnment circu d (Official lars • Unifi Bulletin of the 06.0 of 22.05.1997 ed Tech 6.19 March 2007 nical Document D. 97) T. U. no64 • Frenc -1, P1.1 and h P1.2, • Frenc Standard NF P15910, h • Frenc Standard NF-EN 1085 maintenance h • Seria Standard NF-EN 12 , technical voca bulary l number engraved 566-1, CE mark on septic on every tanks device • Summar y ANC PLAS TEPU ® Quality assu R the complete rang rance ISO 10 year guar 9001 : 2008 e . . . . . . . . . . ....... antee, liabi ....... .2-3 Decree and . lity insur ance, EPER . . . . . . . . . . . . . . CE marking .3 S...... Trial certi certificat ....... ficate, CE e ..... . 4-5 mark . . ....... Maintena ....... ....... nce . . . . ....... . . . ..6 ....... Maintena ....... ...... nce ....... .6 General princ manual (incl. frequ . . . . . . . . . . . . . . . . . . . . .7 ency and iples . . . -8 drainage) Overview ....... . . . . . . .9-11 . of and FD and ANC PLASTEPU ® . . . . . . . . . . . . . ....... R systems FND filter . .12-13 Paramete kits . . . . rs ....... ....... settling tankto calculate capa ....... cities s and clari . .14-20 fication tankof septic tanks, Epurbloc ® s ..... ....... ....... Princi ..21 A 24-II A 94 - I aminatio n). You wa nt disposal to buy and ins purifica system PLASTE tall the indepen tio from yo n of sewage PUR for the pre dent sewage ur build and dome -treatm ing. ent and stic waste Read thi water fitment s booklet caref ully befor of This book our sewage e any dis installat contains inform posal system installation or and Secoion, proper usag ation concerns. ing ndary Pre e an -treatm d maintenan the description ce ent Units , and Acceof our Principa l ssories. PLASTEPU • SG R installation com 500 grea prising: se • Insp ection chamtrap • EPU ber RVIS RBLOC IT (new), • Vert ical flow sand filte surface r-bed wat with insp er discharge, equiwith ection area pped SL-RR, loop s for: distr collection ing SL-RBOU and ibution SL-RCOLV vertical User Manual of Aqualentz® installations for • harvesting of rainwater • storm spillways, flow regulators • accessories Economize by using Sotralentz Rainwater Harvesting systems… More than half of the national territory suffers from a growing and continuous lack of water resources. It is time to react by making a civic gesture by installing the Aqualentz range adapted to your needs Thank you in advance s Se ria Summary Kit FD www.sotr All informa alentz.co m, undertion available on the tab er –d “Habita our site: ate of t”, and link fab ric “notre off ati on re” l nu mb You want to buy and install one of the AquaLentz rainwater systems (pre-treatment, harvesting, filtration, spillway, fire water storage, swimming pool supply, watering…). Read this booklet carefully, available with every unit, before any fitment or use of our Rainwater Harvesting devices, extra Rainwater Harvesting units and accessories. This book contains information concerning the description, installation, proper usage and maintenance of our Rainwater Harvesting devices, extra Rainwater Harvesting units and accessories. G TO THE CONFORMIN DECREES OWING pal Pre -treatm ent Uni CE mark ts : on all tank Threaded riser SL-R and SL-R EHC 380, EHC SL-R Septic tank 600 CR . . . . . . . EHC 600/150, SL-R ....... s, settling EHC 600/ ....... 300 tanks and ....... rectangul .. . . . . ..22 ar ribbed Septic tank . . . . . . . . . . . . . Epurbloc ® ....... s, settling . . . . .23-2 tanks and Settling tank 4 and cylindrica l ribbed Epur 26 and 24 Settling tank + clarification tank bloc ® 25-2 SL-SP-SZ 6 ... Holding tank + clarification tank Double Skin ® . . . . . . . . . . .27-2 , Double 8 Skin SL-FA Detachab ....... le, pre-filter V..... . . ..28-29 . into Epur bloc ® and clogging indicator . . . . . . . . . . . . . . .30-31 clarificat Guide to Find our ion tanks integrated placemen kits: ....... and Seco t filter syste Kit FD for drain ....... ndary Pre-t of Principal . . . .32-3 ed ms reatm 3 ent Units non-drain and Kit FND for Second ....... ed filter syste ary Pre ....... -treatm (see page ms . . . . .34-4 Grease extra ent Uni s 13-18) 3 ctor SL-S ts G ..... Pre-filter ....... SL-FD . . ....... ....... Dosing tank ....... ....... SL-CHAS . . . . ..44 ....... . ....... ....... Accessori ....... ....... .45 ....... es ....... .46-47 NEW Inspection 3 inlets andchamber SL-RVISIT adjustab 1 outlet Distributi le, .... on to 5 heig box 6 outlets SL-R . . . . . . . . . . . . . ....... hts + SL-R R adjustab . .48-49 RCHAS Looping le ....... cham ....... + SL-RBOU ber 6 inlets/ou ....... tlets CHA Vertical colle S . . . . . . . . . . SL-RBOU adjustab . . . . .50-51 ....... le to 5 ct chamber ....... Contacts SL-RCOLV . . . . . . . heights ....... adjustab . . .52-53 ....... le . . . . . ....... . . . . . .54-5 ....... 5 ....... . . . . . . .56 EP 24 - II Reasons for selecting a Sotralentz system . . . . . .2 and 3 Conditions of use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Quality assurance ISO 9001: 2008 . . . . . . . . . . . . . . . . .4 Guarantees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 Decree 21.08.2008 . . . . . . . . . . . . . . . . . . . . . . . . . . .6-7 Decree 17.12.2008 . . . . . . . . . . . . . . . . . . . . . . . . . ..8-11 Tax credits 03.10.2008 . . . . . . . . . . . . . . . . . . . . . . . . .12 Article 200 ‘quarter’ compact . . . . . . . . . . . . . . . . . . . .13 Official tax bulletins . . . . . . . . . . . . . . . . . . . . . . . .14-17 CGCL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18 VAT 5.5 % . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..19 Sizing parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Rainwater for washing machines. . . . . . . . . . . . . . . . .20 Health and safety booklet . . . . . . . . . . . . . . . . . . . . . .21 Dimensions of underground cisterns SP, AT and DP standards . . . . . . . . . . . . . . . . .24-25 Dimensions of underground cisterns SP “BASIC” . 26-27 Description of underground cisterns SP and AT . . . .28-29 Description of underground cisterns DP . . . . . . . . . . . .32 Cascade grill filters High flow VF1 to VF6 . 33-35 Description of Single Skin SP, AT and DP . . . . . . . . .36-37 Dimensions of SP and DP storm spillways . . . . . . . .38-39 Fire water reserves . . . . . . . . . . . . . . . . . . . . . . . . ..40-41 Guide to placement of underground cisterns SP, AT and DP . . . . . . . . . . . . . . . . . . . .42-43 Filter beds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 XT Above ground storage, interior and exterior . . .45-51 Dimensions of above ground storage . . . . . . . . . . . . . .52 Maintenance of cisterns . . . . . . . . . . . . . . . . . . . . .53-54 Maintenance booklet . . . . . . . . . . . . . . . . . . . . . . . . . .55 Compact supply modules . . . . . . . . . . . . . . . . . . . .56-64 Steelpump pumps . . . . . . . . . . . . . . . . . . . . . .30 and 65 Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .66-69 Filtration and pre-treatment and anti-UV filtration .70-75 Hydrosystem 1000 and 400 . . . . . . . . . . . . . . . . . .76-78 Villavenir . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .79 Legal Notices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .64 FOLL n of , recuperatio • 21. 08. 2008 use in buildings its rainwater and exterior) (interior and , tax credits • 3. 10. 2008 private inspection of , 2008 12. le water • 17. distributing potabworks. installations recuperation and rainwater d Recuperate e rainwater cycl in a house All information available on our site: www.sotralentz.com, under the tab “Habitat”, and link “notre offre” (“our offer”) 1 Serial number – date of fabrication DISTRIBUTOR SotraLentz-Habitat • F-67320 Drulingen Tél. +33 (0) 388016800 • Fax +33 (0) 388016060 Email: [email protected] • Site: www.sotralentz.com stamp on ®all Actibloc 34 299 — 08/2011 — Under the reserve of technical modifications. Illustrations 3D and diagrams : Christophe Jaeger - Sotralentz • Editing : Christian Staebler, F-31800 Lalouret, +33 (0) 562009015 • Printing Scheuer, F-67320 Drulingen, +33 (0) 388012121. Translation : Collette Ridley, Atelier des Cultures +33 (0) 5 61 88 27 89 • Plastepur® Main Pre-treatment Units, Secondary treatment Units and Accessories are produced under the ISO 9001: 2 008 guarantee of quality