Statement of Qualifications for Geotechnical and Environmental
Transcription
Statement of Qualifications for Geotechnical and Environmental
GEOTECH ENGINEERING AND TESTING 800 VICTORIA DRIVE HOUSTON, TEXAS 77022-2908 TEL. (713) 699-4000 FAX (713) 699-9200 STATEMENT OF QUALIFICATIONS FOR TRANSPORTATION/INFRASTRUCTURE SERVICING PROJECTS STATEWIDE www.geotecheng.com 2011 GEOTECH ENGINEERING AND TESTING TABLE OF CONTENTS Page Introduction ..................................................................................................... 1 TxDOT Precertification ....................................................................................... 2 Personal Organization ......................................................................................... 2 Knowledge/Qualifications .................................................................................... 3 Project Experience ............................................................................................. 3 Geotechnical Engineering Services ......................................................................... General ...................................................................................................... Field Equipment ........................................................................................... Geotechnical Laboratory ................................................................................. Engineering Analysis and Report ....................................................................... 4 4 4 4 5 Environmental Engineering Services ....................................................................... 5 Construction Materials Engineering Services ............................................................. 6 Forensic Engineering Services............................................................................... 7 Accreditations................................................................................................... 7 Professional Affiliations ...................................................................................... 7 Scheduling....................................................................................................... 8 Insurance ........................................................................................................ 8 Historically Underutilized Business (HUB), Disadvantaged Business Enterprise (DBE) and Minority Business Enterprise (MBE)............................... 9 In-House Computer Capabilities............................................................................. 9 i GEOTECH ENGINEERING AND TESTING EXHIBITS Appendix A - Resumes of Key Members Appendix B - Project Experience TxDOT Harris County Toll Road Authority Harris County Harris County Flood Control Port of Houston City of Houston Metropolitan Transit Authority Fort Bend County Montgomery County Galveston County Water Authorities Other Groups Appendix C - Accreditation Certificates Appendix D - HUB and DBE Certificates ii GEOTECH ENGINEERING AND TESTING GEOTECH ENGINEERING AND TESTING COMPANY PROFILE INTRODUCTION The purpose of this document is to provide our client a complete package of our capabilities for Texas Department of Transportation (TxDOT), City of Houston, Harris County, Montgomery County, Fort Bend County, Galveston County, Harris County Toll Road, Metro, and Harris County Flood Control, Port of Houston, water authorities, etc. projects. The information in this document can be used to put Geotech Engineering and Testing on your team. We provide our services statewide. Geotech Engineering and Testing (GET) is a Texas owned, multi-disciplined organization of licensed engineers, geologists, field and laboratory technicians, and clerical personnel who combine their technical capabilities, past experience, dedication, and enthusiasm to offer the finest service through a combined team effort. GET has a staff of about fifty-five (55) engineers, technicians, and support staff. All of our employees are located in our Houston office. The firm, which was established in 1985, provides the following services: o Geotechnical Engineering, including soil exploration, and laboratory geotechnical testing. o Engineering analyses and transportation foundation studies regarding foundations, pavings, slope-stability, retaining walls, construction, etc. o Building foundation studies, including recommendations for foundation alternatives, such as drilled footings, spread footings, settlement, piling, bearing capacity, etc. o Construction materials engineering, including earthwork, asphaltic concrete, portland cement concrete, plant inspection and testing, and steel. o Roadway and bridge construction inspection. o Environmental engineering, including hazardous materials initial site assessments. o Forensic engineering, including roads, retaining walls and foundation distress studies. Geotech Engineering and Testing is certified as a Historically Underutilized Business (HUB) by the State of Texas. GET is also certified as Disadvantaged Business Enterprise (DBE) with Texas Department of Transportation. In addition, GET is certified as a Minority Business Enterprise (MBE) with City of Houston, Houston ISD, SCTRCA and NCTRCA. Furthermore, GET is listed as a Small Business with Metropolitan Transit Authority and Port of Houston. GEOTECH ENGINEERING AND TESTING 1 TxDOT PRECERTIFICATION Geotech Engineering and Testing’s TxDOT sequence number is 423. Our firm has been precertified with TxDOT in the following categories: Category of Work Category of Work Description 14.1.1 Soil Exploration 14.2.1 Geotechnical Testing 14.3.1 Transportation Foundation Studies 14.4.1 Building Foundation Studies 2.13.1 Hazardous Materials Initial Site Assessment 12.1.1 Asphaltic Concrete 12.1.2 Portland Cement Concrete 12.2.1 Plant Inspection and Testing 11.1.1 Roadway Construction Management and Inspection Major Bridge Construction Management and Inspection 11.2.1 PERSONAL ORGANIZATION GET is committed to providing the client with high quality engineering and testing services in a cost effective and efficient manner. Our staff members are very experienced and are prequalified to perform these services. The GET project team is headed by David Eastwood, P.E., C.A.P.M., who is a licensed professional engineer in Texas, with over 33 years of experience in geotechnical, environmental, construction materials and forensic engineering services. Mr. Eastwood’s TxDOT employee sequence No. is 2691. He is responsible for the overall functions of the company. David Eastwood is the past president of Houston Chapter of Texas Council for Engineering Laboratories. He helped with development of the geotechnical guidelines for design and construction for City of Houston, Harris County, Harris County Flood Control District, etc. facilities. Mr. Eastwood conducts training in geotechnical, environmental, materials, and forensic engineering for the City of Houston, Harris County, City of Sugarland, American Institute of Architects, and Greater Houston Builders Association. Mr. Eastwood is on the PostTensioning Institute’s Slab-at-Grade Geotechnical Committee. Furthermore, he is the past president of Foundation Performance Association, an organization specializing in foundation failure evaluation. In addition, Mr. Eastwood has been certified as a Corrective Action Project Manager with the Texas Commission on Environmental Quality (TCEQ). Mr. Fred Ehteshami, P.E., (TxDOT employee sequence No. 7404), who is a licensed professional engineer in Texas, with over 36 years of experience in geotechnical, environmental, construction materials and forensic engineering will be the project manager for the geotechnical, materials environmental and forensic engineering team. GEOTECH ENGINEERING AND TESTING 2 Dr. Dave Sikdar, Ph.D., P.E., who has a Ph.D. in civil engineering and about three years of experience in geotechnical, environmental and materials engineering will be a project manager for the geotechnical, materials, environmental and forensic engineering team. Dr. Al Dutta, Ph.D. who has a Ph.D. in civil engineering with about five years of experience in geotechnical, environmental and materials engineering will be a project manager for the geotechnical, materials, environmental and forensic engineering team. Dr. Bernard Jung, Ph.D., who has a Ph.D. civil engineering and about three years of experience in geotechnical, environmental and materials engineering will be a project manager for the geotechnical, materials, environmental and forensic engineering team. The laboratory service will be managed by Mr. Abbas Shadab (TxDOT employee sequence No. 7405), BSCE, CET. Mr. Shadab has about 35 years of experience with geotechnical and materials testing. He is also certified as a NICET Level IV technician. Our field exploration will be headed by Mr. Abraham Guerra. Mr. Guerra has been the manager of drilling services with GET for the past several years. He will handle all of the borings up to a depth of 50-ft. All of our borings projects greater than 50-ft in depth will be drilled by our subcontractors. Our construction materials testing engineering (CME) services are headed by Mr. Bart Wootan, CET, NICET Level III. Mr. Wootan has more than 17 years of experience in conducting materials engineering services. Resumes of some of our staff members are presented in Appendix A of this document. KNOWLEDGE/QUALIFICATIONS GET’s staff members have advanced degrees in geotechnical engineering. Our staff members include: Total Number of Engineers: (15) P.E.’s: (4) Ph.D’s: (3) Master’s: (3) Bachelor’s: (3) Number of Technicians: (20) Certifications: 1. NICET 2. ACI 3. TxDOT Number of Drillers: (5) Crew Chief Certified: (2) Helper Certified: (3) PROJECT EXPERIENCE Geotech Engineering and Testing’s staff have worked on many transportation and infrastructure projects, including roads, bridges, water, waste water, port and harbor facilities, rail, aviation projects, and public infrastructure projects for TxDOT, Harris County Toll Road Authority, Harris County Flood Control, City of Houston, Harris County Infrastructure Department, Metro, Fort Bend County, Montgomery County, Galveston County, etc. A partial list of project references is presented in Appendix B of this document. GEOTECH ENGINEERING AND TESTING 3 GEOTECHNICAL ENGINEERING SERVICES General Geotech Engineering and Testing and its staff members have many years of experience in conducting engineering services for more than 15,000 projects. Our firm conducts over 1,200 projects a year. We conduct our services all over Texas. Field Equipment GET is equipped with five drilling rigs, including a Diedrich Drilling Rig, to perform dry or hollow stem borings. We also have two Beaver and two portable rigs. We can conduct drilling and sampling with our rigs up to 50-feet. In addition, together with our subcontractor drillers, we can drill to much deeper depths, install monitor wells, piezometers, and inclinometers. Our field crews have many years of experience in various subsoil and groundwater conditions. Our commitment to the client is to provide dependable service, the best and most up-to-date equipment, and reliable drilling personnel. GET has the capability and experience in surveying and staking the boring locations, and providing clearance from underground utilities. In areas that are heavily wooded, we can arrange for clearing of the project site. GET is one of the few firms in Texas which is equipped with miniature rigs. These rigs are small enough that they can access hard to reach places and sites that are wooded, without significant clearing. Furthermore, since these rigs are portable, they can easily be placed on sites with wet subgrade soil conditions which create access problems. Geotechnical Laboratory Geotech Engineering and Testing’s laboratory testing has the capabilities to perform geotechnical testing under controlled conditions in order to evaluate not only standardized test of materials, but also tests of new materials used in research and development. Our tests will be conducted in general accordance with ASTM, TxDOT and AASHTO standards. Some of the geotechnical laboratory testing capabilities are as follows: o o o o o o o o o Moisture content Atterberg Limits Gradation tests Consolidation tests Swell tests Density tests Organic Contents Compaction Other specialized tests o o o o o o o o Soil suction Permeability tests Pinhole test Torvane Resistivity tests Proctor tests Hydrometer tests Shear Strength o o o o o o o o Unconfined Compression Test Triaxial tests Chemical tests Hand Pentrometer California Bearing Ratio Bar Linear Shrinkage Specific Gravity Soil Classification GEOTECH ENGINEERING AND TESTING 4 Engineering Analysis and Report The field and laboratory data together with our engineering recommendations will be presented in an engineering report. The report will address the specific project design, construction, and quality control requirements. ENVIRONMENTAL ENGINEERING SERVICES The environmental laws require that prospective owners of properties conduct a reasonable and appropriate inquiry into the property, its past user, and the associated environmental liabilities. Failure to recognize environmental problems at a site can result in significant financial liabilities to the purchaser or the seller. Geotech Engineering and Testing can provide Phase I, Phase II, and Phase III Environmental Studies. These studies include Hazardous Materials Initial Site Assessments, ASTM E 1527 Standard Practice for Environmental Site Assessment: Phase I Environmental Site Assessment Process, and ASTM E 1528, Standard Practice for Environmental Site Assessments: Transaction Screen Process. GET has a Corrective Action Project Manager (CAPM) on the staff to conduct Environmental Engineering Services. GET can provide Environmental Site Assessment (ESA) studies anywhere in Texas. Our services include, but are not limited to the following: o o Site reconnaissance. Records search and review of regulatory agencies databases. o Communications with previous owners. o Aerial photograph review of past property use. o Review of chain-of-title activity for determining past property use. o Soil borings and monitor well installations. o Soil and groundwater sampling. o Physical and chemical testing of soil and groundwater samples. o Permitting and remediation, recommendations. o Asbestos studies. o Geological fault studies. Geotech Engineering and Testing’s Underground Tank Management Group provides consulting engineering services in the following areas: o o o o o o Site reconnaissance. Corrective action plan, operation, monitoring and performance. Regulatory guidance and negotiation. Permit application preparation. Groundwater monitoring and leak detection. Risk assessment and remediation. GEOTECH ENGINEERING AND TESTING 5 Geotech Engineering and Testing combines its depth of experience with the latest in Environmental, Geotechnical, Construction Materials Engineering and computer techniques to provide information necessary for the project under consideration. Our professional staffs of engineers have intimate knowledge of the expanding technology, its uses, and its limitations. CONSTRUCTION MATERIALS ENGINEERING SERVICES Public Agencies, Architects, Developers, and Contractors have always been concerned with the performance and quality of materials. The knowledge of how the great variety of materials used will perform is the key to the success of any project. Thus, quality assurance during construction has become increasingly important as a result of the rapid technological expansion of construction methods and materials. Quality assurance and material testing provides the evidence needed to establish confidence to all concerned that the materials and techniques used are accomplished under the standards required by the design team. The technical staff of Geotech Engineering and Testing always strives to keep abreast of new developments and procedures utilized in quality control programs. Our engineers and field technicians provide a vital link between the owner, professional design team and the contractor. GET's abilities in construction materials testing include testing and monitoring of the following: o Concrete testing, including but not limited to; slump, air, cylinders, beams, yield, coring, cement content, mix design verification, batch plant inspection and rebar inspection. o Soil testing, including but not limited to; densities, proctors, plasticity indices, gradations, 200's, cement and lime stabilization, and geotechnical testing. o Asphalt testing, including but not limited to; densities, cutback sampling, cores, theoretical specific and gravity, bulk density, gradation and extraction, mix design and stability. o Structural steel, including but not limited to; weld inspection, A325 Bolt torque, welder qualifications, magnetic particle inspections, ultrasonic, liquid penetrant, paint thickness, holiday testing and sandblasting inspection. GET's laboratories have been approved by Harris County, City of Houston Quality Control, City of Houston Special Testing Department, Texas Department of Transportation, Metropolitan Transit Authority and Texas Department of Criminal Justice. GEOTECH ENGINEERING AND TESTING 6 FORENSIC ENGINEERING SERVICES Geotech Engineering and Testing's staff specializes in roads, bridges, foundations, retaining walls and slope distress studies. The firm has specialized equipment and sampling devices that can obtain soil samples in areas with limited access. Furthermore, the firm has strong instrumentation and non-destructive testing capabilities. GET's testing facilities can test distressed structural materials and evaluate the causes of distress and determine proper remedial measures. During the past 25 years, GET's staff has conducted many forensic engineering projects. Furthermore, our staff members have served as expert witnesses and have testified in court. ACCREDITATIONS Geotech Engineering and Testing has qualifications equal to an ISO 9000 company. The firm has been accredited by the American Association for Laboratory Accreditation (A2LA). The scope of our accreditation includes geotechnical, construction materials engineering ASTM E329, C1077 for concrete, D-3740 for soils and D-3666 Bituminous. A copy of our accreditation is presented in Appendix B. The firm has also been inspected by Cement and Concrete Reference Laboratory (CCRL), for concrete and aggregate testing. All of our equipment has been calibrated within the past 12 months. Geotech Engineering and Testing is also involved in the American Association of State Highway and Transportation Officials (AASHTO) materials reference laboratory program. PROFESSIONAL AFFILIATIONS Geotech Engineering and Testing, together with its staff members, are associated with and/or are members of the following technical societies: o o o o o o o o o o o o o o TexITE - Texas Institute of Transportation Engineers ACEC -American Council of Engineering Companies APWA - American Public Work Association ASCE - American Society of Civil Engineers TSPE - Texas Society of Professional Engineers NSPE - National Society of Professional Engineers ASTM - American Society for Testing Materials ACI - American Concrete Institute HCA - Houston Contractors Association AGC - Association of General Contractors DFI - Deep Foundations Institute GHBA - Greater Houston Builder's Association TIBD - Texas Institute of Building Design SAME - Society of American Military Engineers GEOTECH ENGINEERING AND TESTING 7 o o o o o o o o o o o HCEC - Houston Council of Engineering Consultants PTI - Post-Tensioning Institute EAA - Environmental Assessment Association HRA - Houston Realtor Association SEAoT - Structural Engineer's Association of Texas Chi Epsilon - National Civil Engineering Honor Society CEFPI - Council of Educational Facility Planners International FPC - Foundation Performance Committee CEC - Consulting Engineers Council SBCCI - Southern Building Code Congress International AREMA – American Railway Engineering and Maintenance-of-Way Association SCHEDULING GET can generally mobilize on public infrastructure anywhere in Texas immediately after project authorization. This is because we have our own drilling rigs and full service laboratories. This condition will expedite project execution time. All of the laboratory testing will be conducted inhouse. We have a relatively large staff of engineers and support staff which will result in timely execution of the project tasks. INSURANCE GET's insurance coverage is as follows: TYPE OF COVERAGE Worker's Compensation LIMITS OF LIABILITY $1,000,000 each accident 1,000,000 Disease - policy limit 1,000,000 Disease - each employee General Liability: Comprehensive, contractual, independent contractors, personal injury o General Aggregate o Bodily Injury o Property Damage Automobile Liability: Comprehensive, owned, hired, non-owned Professional Liability: Errors and Omissions $2,000,000 $1,000,000 each person $1,000,000 each occurrence $1,000,000 each person $1,000,000 each occurrence $1,000,000 $2,000,000 GEOTECH ENGINEERING AND TESTING 8 HISTORICALLY UNDERUTILIZED BUSINESS (HUB) Geotech Engineering and Testing (GET) is certified as a Disadvantaged Business Enterprise (DBE) and Historically Underutilized Business (HUB) by the State of Texas, Texas Department of Transportation (TxDOT), VIA Metropolitan Transit Authority, Metropolitan Transit Authority (METRO), Cities of Houston, San Antonio and Beaumont. In addition, the firm is certified as a DBE by the North Central Texas Regional Certification Agency (NCTRCA), etc. In addition, the firm is certified as a Minority Business Enterprise (MBE) with the City of Houston. A copy of our DBE and HUB Certificates are presented in Appendix C of this statement of qualifications. Furthermore, GET is listed as a Small Business with Metropolitan Transit Authority and Port of Houston. IN-HOUSE COMPUTER CAPABILITIES Our in-house computer capabilities include a networked computer system with 25-stations. Our engineering computer programs consist of Wincore boring logs, retaining walls, slope-stability, laterallyloaded piles, axially loaded piles, pile groups, wave equation, settlement, seepage, pavement design, sheet pile design, etc. A summary of our computer programs are as follows: Software Name Wincore Darwin L Pile Axpile Weap DEFPIG VOLFLOW Tstab Stable Slope TCON MAGSET SEPOL SPW SHT Wall gINT Description Boring Log Program in Accordance to TxDOT Standards AASHTO Computerized Software Program for Design of Pavement Structures Laterally Loaded Pile Design Load-Settlement, Axially-Loaded Piles Wave Equation Analysis of Pile Driving Deformation Analyses of Pile Groups Design of Foundations on Expansive Soils, using a Suction Model Slope-Stability Computer Program, University of California at Berkley Slope-Stability Computer Program Slope-Stability Computer Program Analyses of Consolidation Settlement, Assuming Vertical and/or Radial Drainage Computer Program to Calculate the Magnitude of Settlement of a MultiLayered Soil System Soil Profile Settlement Analysis System Computer Program of Design of Bulkheads Design of Sheetpile Walls Computer Boring Log Program word\soq\txdot GEOTECH ENGINEERING AND TESTING APPENDIX A Resumes of Key Members GEOTECH ENGINEERING AND TESTING DAVID A. EASTWOOD, P. E., C.A.P.M. PRESIDENT TxDOT Employee Sequence No. 2691 SUMMARY Mr. Eastwood is the President of Geotech Engineering and Testing (GET). He has practiced consulting engineering for about 33 years, serving in key technical project management and administrative roles. His experience in these functions includes a wide range of project types, ranging from public infrastructure, public works, municipal work, industrial facilities, commercial developments to waste disposal facilities, power plants, dams, marine terminals and underground storage tank contamination studies. Mr. Eastwood has the ability to provide clients with cost effective alternatives to difficult problems. One of Mr. Eastwood's greatest attributes is his ability to contribute constructively, responsively, and professionally as a member of the client's project design team. EDUCATION 1977 Bachelor of Science in Civil Engineering, University of Houston 1978 Master of Science in Civil Engineering, University of Houston 1978 Present Post Graduate studies at Princeton, Rice University, and the University of Houston LICENSES Licensed Professional Engineer - Texas No. 51419 Licensed Professional Engineer - Louisiana No. 25966 Licensed Professional Engineer - New Mexico No. 12576 Licensed Professional Engineer - Oklahoma No. 17513 Corrective Action Project Manager - Texas C.A.P.M. No. 01181 AWARDS/ACHIEVEMENTS Academy of Distinguished Civil & Environmental Engineers at the University of Houston, Cullen College of Engineering EXPERIENCE Mr. Eastwood has about 33 years of experience on various aspects of geotechnical, environmental, materials and forensic engineering services. GEOTECH ENGINEERING AND TESTING OVERALL EXPERIENCE 1. Design and construction of public infrastructure for the past 33 years. Some of the major projects consist of Houston Ship Channel Toll Bridge and Harris County Toll Road. Mr. Eastwood has been involved in design and construction of roads, bridges, tunnels, bulkheads, embankments, retaining walls, pavements, rail, water and wastewater facilities. 2. David Eastwood is the president of Houston Chapter of Texas Council for Engineering Laboratories. He helped with the development of the geotechnical guidelines for design and construction for City of Houston, Harris County, Harris County Flood Control District, etc. facilities. Mr. Eastwood conducts training in geotechnical, environmental, materials, and forensic engineering for the City of Houston, Harris County, City of Sugarland, American Institute of Architects, and Greater Houston Builders Association. 3. Soils and foundation studies for design and construction of high rises, office buildings, laboratories, residential developments, industrial sites, commercial buildings, petrochemical complexes, bridges, pavements, rail projects, and waterfront structures. 4. Forensic (Foundation) Engineering and expert testimony for transportation, residential and commercial projects. Mr. Eastwood is the founder and former President of the Foundation Performance Association, an association of engineers specializing in the evaluation of distress. Mr. Eastwood is on the Design Committee of American Society of Civil Engineers (ASCE) Texas Section Residential Foundation Committee. In addition, Mr. Eastwood is also on the Post-Tensioning Institute Slab-on-Grade Committee. This committee develops design guidelines for design of post-tensioned slabs-on-grade throughout the United States. 5. Environmental site assessment studies, waste management, field studies, monitor well installations, laboratory testing, recommendations regarding contaminations of landfills, underground storage tanks, remediations, and permitting. Mr. Eastwood is certified as a Corrective Action Project Manager (C.A.P.M.) by the Texas Commission on Environmental Quality (TCEQ). 6. Analysis of experimental test data and correlation of data with respect to swelling characteristics of expansive soils as they relate to design of transportation, public works, residential and commercial structures. 7. Design and construction of deep foundations, including pile drivability studies, and correlation of actual and computer programmed predictions of pile driving resistance. 8. Extensive computer programming and analyses capabilities with respect to: (a) (b) (c) (d) (e) (f) (g) 9. slope stability of embankments pile foundations settlement dynamics of foundations seepage expansive soils waste disposal facilities Design of bulkheads and large marine platforms. GEOTECH ENGINEERING AND TESTING 10. Finite element analyses of pipeline bends. 11. Extensive experience in soil stabilization as it relates to lime, cement and fly ash stabilization. 12. Design of parking lots and roads using geotextiles. 13. Pavement design for shopping centers, streets, and highways. 14. Geologic fault studies. PUBLICATIONS "State of Art on Expansive Clays", report submitted to the American Society of Civil Engineers Shallow Foundation Committee on Expansive Clays, 1978. "Hazards of Expansive Clays", Presented before the ASCE Convention in Portland, Oregon, April, 1980. "Methodology for Foundations on Expansive Clays", published in December, 1980 edition of ASCE Journal of Geotechnical Engineering Division. "Geotechnical Considerations in Design of Hazardous Waste Impoundments", presented before the ASCE Texas Section Spring Meeting in Fort Worth, Texas, March 1982. "Recommended Homeowner Foundation Maintenance Program For Residential Projects In The Houston Area", published in April, 1990 Edition of Houston Builder. D. Eastwood, P.E. "Geotechnical Guidelines For Design of Residential Projects In The Houston Area", presented in the Soil-Structure Interaction Seminar, July 1994. D. Eastwood, P.E. and others "Reasons for Foundation Failure", presented in the SoilStructure Interaction Seminar, Houston, June 1996. D. Eastwood, P.E. and others "Design of Foundations with Trees in Mind", presented before the ASCE, Texas Section, Spring Meeting in Houston, April 1997. D. Eastwood, P.E. and others "Design of Residential Foundations on Expansive Soils in Texas." Report developed for the Texas Board of Professional Engineers, March 1998. D. Eastwood, P.E. “State of Practice for Geotechnical Engineering for Design of Custom Homes in the Houston Area between 1990 to 2001” Presented before ASCE, Texas Section, Spring Meeting in Arlington, April 2002. D. Eastwood, P.E. “Application of the New em, ym Soil Parameters” Presented before PTI Conference and Exhibition May, 2002. H. Stephen Tien, Ph.D and D. Eastwood, P.E. “Case Study of the Pavement Distress at a Service Station” Presented before ASCE, Texas Section, Fall Meeting, Dallas, September 2003. GEOTECH ENGINEERING AND TESTING H. Stephen Tien, Ph.D, P.E. and D. Eastwood, P.E. “Case Studies of Residential Foundation Movements in Southern Houston Area” Presented before ASCE, Texas Section, Fall Meeting, Houston, September 2004. D. Eastwood, P.E. “Recommended Guidelines for Design and Construction of Inground Swimming Pools in Texas” Presented before ASCE, Texas Section, Fall Meeting, October 2009. GEOTECH ENGINEERING AND TESTING FRED EHTESHAMI, P.E. VICE PRESIDENT TxDOT Employee Sequence No. 7404 SUMMARY Mr. Ehteshami is a vice president with Geotech Engineering and Testing (GET). He has about 36 years of experience in conducting geotechnical, environmental, materials, and forensic engineering studies. He is responsible for the daily operations of his engineering group. His expertise is in the field and laboratory testing, preparation of proposals and reports, technical analysis of geotechnical and foundation problems, instrumentation of soils and construction materials, pile load tests, foundation and pavement designs, research and development in the soils and materials field, slope stability, and designing retaining walls and tie-back walls. Mr. Ehteshami has many years of experience in design and construction of roads, bridges, freeways, rail structures, retaining walls, MSE walls, soil nailing, buildings, parks, tunnels, dams, prisons, wastewater facilities, water plants, schools, shopping centers, subdivisions, chain stores, airports, near-shore facilities, apartment buildings, and petrochemical complexes. In addition, Mr. Ehteshami has several years of experience in conducting Phase I and Phase II Environmental Site Assessments Studies. Furthermore he has developed Remedial Action Plans. The Phase I assignments have included public work, industrial, commercial, and residential projects. Phase II and III projects have included underground storage tanks and landfills. Mr. Ehteshami has been involved on several forensic engineering projects including roads, retaining walls, slopes, and foundations. EDUCATION 1976 Master of Science in Civil Engineering, University of Texas at El Paso, Texas 1974 Bachelor of Science in Civil Engineering University of Texas at El Paso, Texas LICENSES Licensed Professional Engineer – Texas No. 90790 EXPERIENCE 1997 - Present Geotech Engineering and Testing, Houston, Texas Vice President 1997- 1998 Geotech Engineering and Testing, Houston, Texas Manager of Construction Materials Engineering Laboratory 1976 - 1997 Various Engineering Firms as a Project Engineer GEOTECH ENGINEERING AND TESTING DAVE SIKDAR, Ph.D., P.E. ENGINEERING MANAGER SUMMARY Mr. Sikdar is an engineering manager at Geotech Engineering and Testing (GET) with the responsibility for the daily operations of geotechnical explorations, data analyses and the preparation of report recommendations. He has several years of experience in fields of geotechnical, materials, environmental and forensic engineering. His experience is in public infrastructure, including water, wastewater, roads, bridges, freeways, retaining walls, commercial buildings, rail, parks, underground utilities, airports, ports, flood control channel, and subdivisions. He has also conducted studies in slope stability, retaining walls, groundwater and contamination modelling. Mr. Sikdar is also actively involved in environmental site assessment projects, including Phase I and Phase II Environmental Site Assessment Studies. Furthermore, he handles forensic engineering projects as they relate to foundations, retaining walls, and pavements. EDUCATION 2007 Ph.D. in Civil Engineering – North Dakota State University 1997 M.S.C.E. in Geotechnical Engineering – Bengal Engineering College, India 1993 B.S.C.E. in Civil Engineering – University of North Bengal, India LICENSES 2008 Licensed Professional Engineer – Oregon 2006 Licensed Professional Engineer – North Dakota AFFILIATIONS Associate member, American Society of Civil Engineers EXPERIENCE 2009 - Present Geotech Engineering and Testing - Houston, Texas Project Manager 2007 - 2009 URS Corporation - Portland, Oregon Geotechnical Engineer 2003-2007 North Dakota State University – Fargo, North Dakota Research/Teaching Assistant GEOTECH ENGINEERING AND TESTING AMAL DUTTA, Ph.D. PROJECT MANAGER SUMMARY Dr. Dutta is an engineering manager at Geotech Engineering and Testing (GET) with the responsibility for the daily operations of geotechnical explorations, data analyses and the preparation of report recommendations. His experience is in the fields of geotechnical, materials, environmental and forensic engineering. He is involved in public infrastructure, including roads, bridges, freeways, retaining walls, rail, commercial buildings, parks, underground utilities, airports, ports, flood control channel, and subdivisions. He has also conducted studies in slope stability, retaining walls, groundwater and contamination modelling. Dr. Dutta is also actively involved in environmental site assessment projects, including Phase I and Phase II Environmental Site Assessment Studies. Furthermore, he handles forensic engineering projects as they relate to foundations, retaining walls, and pavements. EDUCATION 2006 Ph.D. in Civil/Geotechnical/Materials Engineering – University of Tennessee, Knoxville, Tennessee 1990 M.S.C.E. in Applied Geology – Jadavpur University, West Bengal, India 1987 B.S.C.E. in Geology – Jadavpur University, West Bengal, India EXPERIENCE 2007 - Present Geotech Engineering and Testing - Houston, Texas Project Manager 2001 - 2006 University of Knoxville – Department of Civil Engineering – Knoxville, Tennessee Research Fellow GEOTECH ENGINEERING AND TESTING BERNARD JUNG, Ph.D. PROJECT MANAGER SUMMARY Dr. Jung is a project manager at Geotech Engineering and Testing (GET) with the responsibility for the daily operations of geotechnical explorations, data analyses and the preparation of report recommendations. He has several years of experience in fields of geotechnical, materials, environmental and forensic engineering. His experience is in public infrastructure, including roads, bridges, freeways, retaining walls, rail, commercial buildings, parks, water, wastewater, airports, ports, flood control channel, and subdivisions. He has also conducted studies in slope stability, retaining walls, groundwater and contamination modelling. Mr. Jung is also actively involved in environmental site assessment projects, including Phase I and Phase II Environmental Site Assessment Studies. EDUCATION 2005 Ph.D. in Geotechnical Engineering – Texas A & M University, College Station, Texas 2005 M.S.C.E. Geotechnical Engineering – Texas A & M University, College Station, Texas 2000 B.S.C.E. Civil Engineering – Daejeon University, Daejeon, Korea EXPERIENCE 2009 - Present Geotech Engineering and Testing - Houston, Texas Project Manager 2003-2008 Texas A & M – College Station, Texas Graduate Research Assistant GEOTECH ENGINEERING AND TESTING ABBAS SHADAB, BSCE, SET MANAGER OF CONSTRUCTION MATERIALS TESTING TxDOT Employee Sequence No. 7405 SUMMARY Mr. Shadab is the Manager of Construction Materials Testing Operations with Geotech Engineering and Testing (GET). He is responsible for Communications with the clients, trouble shooting Quality Control, technician job assignments, proposal preparations, report review for the day to day operations of GET's materials testing division. Mr. Shadab has more than 35 years of experience. During his many years of experience he has worked on many large capital projects, including roads, bridges, rail, buildings, prisons, hospitals, parks, port facilities, flood control infrastructure, subdivisions, water, wastewater plants, airports, etc. Mr. Shadab's experience is in the area of steel, concrete, soils, asphalt and fireproofing materials. EDUCATION 1975 Bachelor of Science in Civil Engineering University of Karachi, Pakistan CERTIFICATIONS NICET Level IV - Concrete, Soils, and Asphalt ACI - Field Testing of Concrete, Grade 1 EXPERIENCE 1990 - Present Geotech Engineering and Testing, Houston, Texas Project Manager, Materials Engineer 1982 - 1990 National Engineering Services Pakistan Consulting Engineers, Pakistan Resident Engineer on Akra Kaur Dam Project GEOTECH ENGINEERING AND TESTING BART WOOTAN, CET CONSTRUCTION MATERIALS TESTING PROJECT MANAGER SUMMARY Mr. Wootan, CET, NICET Level III is the Construction Materials Testing Project Manager with Geotech Engineering and Testing (GET). He is responsible for communications with the clients, trouble shooting quality control, technician job assignments, proposal preparations, report review for the day to day operations of GET's materials testing division. Mr. Wootan has more than 17 years of experience. During his many years of experience he has worked on many public infrastructure projects. Some of his typical projects consist of roads, bridges, freeways, rail structures, retaining walls, MSE walls, soil nailing, buildings, parks, tunnels, dams, prisons, wastewater facilities, water plants, schools, shopping centers, subdivisions, chain stores, airports, near-shore facilities, apartment buildings, and petrochemical complexes. Mr. Wootan's experience is in the area of steel, concrete, soils, asphalt and fireproofing materials. EDUCATION 1989 Cameron Yoe High School Cameron, Texas CERTIFICATIONS NICET Level III - Concrete, Soils, Asphalt ACI Concrete Field Testing - Grade I CEI - Certified Environmental Inspector Certification for Radiation Safety and user of Nuclear Gauge EXPERIENCE 1993 - Present Geotech Engineering and Testing, Houston, Texas Construction Materials Testing Project Manager GEOTECH ENGINEERING AND TESTING APPENDIX B Partial Projects Listing of - TxDOT Harris County Toll Road Authority Harris County Harris County Flood Control Port of Houston City of Houston Metropolitan Transit Authority Fort Bend County Montgomery County Galveston County Water Authorities Other Groups GEOTECH ENGINEERING AND TESTING TxDOT GROUP TxDOT Category of Work Project Name Client Date 2009 Description 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Bridge Structure on Market Street West Bound and East Bound at Hunting Bayou Harris County, Texas Harris County c/o AIA Engineers, Ltd. 15310 Park Row Houston, Texas 77084 Mr. Sandeep Patel, P.E. Tel.: 281-493-4140 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 State Highway 99 BS 146-E to Chambers Co. Line & Harris Co. Line to SH 99 at FM 1405 Harris & Chambers Counties CSJ 3187-01-005 CSJ 3187-02-006 TxDOT 2006 c/o AECOM 5757 Woodway, Suite 101 Houston, Texas 77057 Mr. Stephen G. Berckenhoff, P.E. Tel.: 713-780-4100 We conducted geotechnical studies on a 3000-ft long, two-lane bridge over Cedar Bayou. The scope of our work consisted of soils exploration studies, geotechnical testing, for recommendations on storm sewers, pavement requirements, design of bridge abutments, settlement bearing capacity, bridge foundations, including drilled footings. We developed recommendations on slopestability analysis for the bridge structure. We conducted all of our borings off of a barge in the middle of Cedar Bayou. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 MSE Retaining Wall State Highway 61 and Interstate 10 Station 992+00 to Station 928+00 Chambers County, Texas TxDOT c/o CH2M Hill 7600 West Tidwell Houston, Texas 77040 Mr. Glen McCabe, P.E. Tel.: 713-462-0161 Conducted geotechnical studies for a MSE wall structure. The scope of our work will consist of soils exploration studies, geotechnical testing, foundation studies for retaining walls. We will check for groundwater levels and any construction problems. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 U.S. 277 for the Childress District, Texas TxDOT 2003 c/o Kennedy Consulting 808 S. College St. McKinney, Texas 75069 Mr. Trevor L. Castilla, P.E. Tel.: 972-542-1754 Conducted geotechnical studies on seven bridges along 10 miles of U.S. 277, soil exploration, transportation foundation studies, geotechnical testing, developed reccommendations and soils stratigraphy for seven bridges. 14.1.1 14.2.1 14.3.1 Scour Analysis I-10 at Turtle Bayou Bridge Chambers County, Texas TxDOT c/o CH2M Hill 7600 West Tidwell Houston, Texas 77040 Mr. Glen McCabe, P.E. Tel.: 713-462-0161 2003 Conducted geotechnical studies for a channel scour study. The scope of our work entailed soils exploration studies, geotechnical testing. Checked for groundwater levels any construction problems. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 U.S. 290, Bastrop County Bridge Bastrop County, Texas TxDOT c/o Costello, Inc. 9990 Richmond Ave. Suite 450 North Houston, Texas 77042 Mr. Rick Liesse, P.E. Tel.: 713-783-7788 2002 Conducted geotechnical studies, geotechnical testing, developed recommendations for subgrade stabilization, pavement design, calculated the traffic loading, developed alternate pavement design recommendations, site preparation and construction recommendations. Developed recommendations on bridge foundations including piling and drilled footings. 14.1.1 14.2.1 14.3.1 14.4.1 TxDOT Intersection of Sage Road and State Highway 59 Houston, Texas TxDOT c/o J.F. Thompson , Inc. 6110 Clarkson Lane Houston, Texas 77055 Mr. David Kubala, P.E. Tel.: 713-956-4100 2002 Conducted geotechnicals, geotechnical testing, computed settlement, foundation alternative, retaining walls, site preparation, site geology, subgrade stabilization, bearing capacity, soil nailing. 12.1.2 13.1.1 Loop 20 Laredo, Texas TxDOT c/o Kennedy Consultants 808 South College Street Suite 300 McKinney, Texas 75069 Mr. Trevor Castillo, P.E. Tel.: 972-542-1754 2002 Conducted concrete coring, roadway and construction inspection in the Laredo District. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Evergreen Pool Contract for the Houston District TxDOT c/o Binkley & Barfield 1710 Seamist Drive Houston, Texas 77008 Mr. Bobby White, P.E. Tel.: 713-869-3433 2001 Conducted soils exploration studies, geotechnical testing, transportation foundation studies for retaining walls, bridges, settlement, bearing capacity, bridge foundations, including drilled footings. Developed recommendations on MSE walls, stability analysis, etc. for the bridges along State Highway 290. 2004 Conducted geotechnical studies, geotechnical testing for bridge over Hunting Bayou, design recommendations for drilled footings and pile foundations, slope-stability, scour, site preparation, construction considerations, etc. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 Dixie Drive Houston, Texas TxDOT 2001 c/o JNS Consulting Engineers, Inc. 17171 Park Row, Suite 160 Houston, Texas 77084 Mr. Jon Strange, P.E. Tel: 713-973-9139 Conducted geotechnical studies, geotechnical testing, developed recommendations on subgrade stabilization, pavement design, underground utilities, calculate the traffic loading, developed alternate pavement design recommendations, developed site preparation and construction recommendations. 14.1.1 14.2.1 14.3.1 11.2.1 Alvin-Mustang Hike and Bike Trail Brazoria County, Texas TxDOT c/o City of Alvin c/o A B Engineering 9009 N. Loop West Suite 230 Houston, Texas 77029 Mr. Tom Knickerbocker Tel.: 713-242-7030 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footings, settlement computations, construction considerations, site preparation, etc. 2001 HARRIS COUNTY TOLL ROAD AUTHORITY GROUP TxDOT Category of Work Project Name Client Date Description 12.1.2 12.2.1 12.3.1 HCTRA Contract 223 Highway and Bridge Maintenance for Various Locations on Harris Co. Toll Road (Henry Road) Harris County, Texas Harris Co. Toll Road Authority 330 Meadow Fern Houston, Texas 77067 Mr. Quinton Alberto Tel.: 73-651-0555 2009 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.2 12.2.1 12.3.1 HCTRA Contract Sam Houston Tollway East Main Lanes Harris County, Texas Harris Co. Toll Road Authority 330 Meadow Fern Houston, Texas 77067 Mr. Quinton Alberto Tel.: 832-601-7867 2008 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.2 12.2.1 12.3.1 HCTRA Contract Shadow Lake Harris County, Texas Harris Co. Toll Road Authority 330 Meadow Fern Houston, Texas 77067 Mr. Quinton Alberto Tel.: 832-601-7867 2008 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.2 12.2.1 12.3.1 Miscellaneous Testing for HCTRA Harris County, Texas Harris Co. Toll Road Authority 330 Meadow Fern Houston, Texas 77067 Mr. Quinton Alberto Tel.: 832-601-7867 2008 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 14.1.1 14.2.1 14.3.1 Harris County Toll Road Authority Beltway, Section 1 Detention Ponds B2 and C2 Station 2003+00 Harris County, Texas Harris Co. Toll Road Authority c/o Lockwood, Andrews and Newnam 2925 Briarpark Drive Houston, Texas 77042 Mr. Jesse Chavez, P.E. Tel.: 713-821-0365 2008 Conducted geotechnical studies, geotechnical testing for two detention ponds, including detailed computerized slope stability, erosion protection and testing per HCFCD requirements, trench safety, trench construction and safety requirements, soil stabilization, recommended concrete pavement sections, site preparation, construction considerations. 12.1.2 12.2.1 12.3.1 HCTRA Contract 220 On Call Term Contract ITC Communications System Harris County, Texas Harris Co. Toll Road Authority 1301 Franklin Houston, Texas 77002 Mr. David Hall Tel.: 713-615-0555 2008 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.2 12.2.1 12.3.1 11.1.1 11.2.1 HCTRA Contract 221 Highway and Bridge Maintenance for Various Locations on HCTRA Roadway Harris Co. Toll Road Authority 1301 Franklin Houston, Texas 77002 Mr. David Hall Tel.: 713-615-0555 2008 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.2 12.2.1 12.3.1 13.1.1 Rehabilitation of the Verdi Pump Station Contract No. 13 Harris County, Texas Harris Co. Toll Road Authority 1301 Franklin Suite 107 Houston, Texas 77002 Mr. David Hall Tel.: 713-615-0555 2007 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.2 12.2.1 12.3.1 13.1.1 Hardy Toll Road and Greens Bayou Fiber Optic Cable System Contract No. 210 Harris County, Texas Harris Co. Toll Road Authority 1301 Franklin Suite 107 Houston, Texas 77002 Mr. David Hall Tel.: 713-615-0555 2007 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.2 12.2.1 12.3.1 13.1.1 Emergency Generators Dairy Ashford Toll Store Westside Service Center and Fort Bend County Toll Plaza Contract No. 208 Harris County, Texas Harris Co. Toll Road Authority 1301 Franklin Suite 107 Houston, Texas 77002 Mr. David Hall Tel.: 713-615-0555 2007 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Harris County Toll Road Authority Improvement to Riley Fuzzel Road from 925-ft West of Hardy Toll Road to Spring Creek Harris County, Texas Harris Co. Toll Road 2006 Authority 330 Meadowfern Houston, Texas 77067 Mr. David Goldberg, P.E. Tel.: 832-601-7915 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footing, construction considerations, pavement design, slope stability, bearing capacity, settlement computations, subgrade stabilization, site preparaation, retaining walls, MSE walls, etc. The project was design per TxDOT Standards. 12.1.2 12.2.1 12.3.1 Improvements to Riley Fuzzel Road Road Log No. 43627-1, 51 925-ft West of Hardy Toll Road to Spring Cypress Harris County, Texas Harris Co. Toll Road 2006 Authority 330 Meadowfern Drive Houston, Texas 77067 Mr. David Goldberg, P.E. Tel.: 832-601-7915 Conducted earthwork testing, concrete observations and testing, pier installation observations, plant inspection, construction inspection. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Harris County Toll Road Authority Beltway, Section 1 Station 1910+00 to Station 2003+00 Harris County, Texas Harris Co. Toll Road 2005 Authority c/o Lockwood, Andrews and Newnam 2925 Briarpark Drive Houston, Texas 77042 Mr. Louis Carannante, P.E. Tel.: 713-266-6900 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footing, construction considerations, pavement design, slope stability, bearing capacity, settlement computations, subgrade stabilization, site preparation, retaining walls, MSE walls, geologic fault study, etc. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Harris County Toll Road Authority Beltway, Section 2 Station 2003+00 to Station 2085+00 Harris County, Texas Harris Co. Toll Road 2005 Authority c/o R.G. Miller Eng., Inc. 12121 Wickchester, #200 Houston, Texas 77079 Mr. Jesse Garcia, Jr., P.E. Tel.: 713-461-8455 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footing, construction considerations, pavement design, slope stability, retaining wall design, bearing capacity, settlement computations, subgrade stabilization, site preparation, MSE walls, geologic fault study, etc. 12.1.2 12.2.1 12.3.1 13.1.1 Harris County Toll Road Authority Sam Houston Freeway Lane Additions Harris County, Texas Harris Co. Toll Road Authority 330 Meadowfern Suite 200 Houston, Texas 77067 Mr. George Lyons, P.E. Tel.: 832-601-7805 2005 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.2 12.2.1 12.3.1 13.1.1 Harris County Toll Road Authority US 59 to South Rice Ramp “N” Extension Harris County, Texas Harris Co. Toll Road Authority 330 Meadowfern Suite 200 Houston, Texas 77067 Ms. Lisa Gonzales, P.E. Tel.: 832-601-7807 2003 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date 2002 Description 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Harris County Toll Road Authority Sam Houston Lane Additions Overpasses, Bridges at Bellaire, Beechnut & Brays Bayou from Station 281+49 to Station 364+00 Harris County, Texas Harris Co. Toll Road Authority c/o Pepe Engineering 11999 Katy Freeway Suite 340 Houston, Texas 77079 Mr. Salim Joubran, P.E. Tel.: 281-293-0856 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Harris County Toll Road Authority U.S. 59 at South Rice Ramp “N” Entrance Harris County, Texas Harris County Toll Road 2002 Authority c/o Uptown Development 1980 Post Oak Blvd. Suite 1580 Houston, Texas 77056 Mr. Robert Taube Tel.: 713-621-2011 Conducted geotechnical exploration, including foundation recommendations for a bridge, pavement design, settlement, bearing capacity, retaining walls 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Harris County Toll Road Authority West Park Freeway Section 2 Harris County, Texas Harris Co. Toll Road 2002 Authority c/o Demopulos & Ferguson Associates, Inc 2180 North Loop West Suite 305 Houston, Texas 77018 Mr. Paul Demopulos, P.E Tel.: 713-783-7117 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footing, construction considerations, pavement design, slope stability, retaining wall design, bearing capacity, settlement computations, subgrade stabilization, site preparation. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Harris County Toll Road Authority West Park Freeway Segment 7 Harris County, Texas Harris Co. Toll Road Authority c/o Costello, Inc. 9990 Richmond Ave. Suite 450 North Houston, Texas 77042 Mr. Rick Liesse, P.E. Tel.: 713-783-7788 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footing, construction considerations, pavement design, slope stability, retaining wall design, bearing capacity, settlement computations, subgrade stabilization, site preparation. 2000 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footing, construction considerations, pavement design, bearing capacity, settlement computations, subgrade stabilization, site preparation. HARRIS COUNTY GROUP TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 Crosby-Lynchburg Drainage Harris County, Texas Harris County 2010 c/o Ergon Transportation Solutions 11500 NW Frwy, Ste. 491 Houston, Texas 77092 Mr. Harris Simeonidis, P.E. Tel.: 713-956-9601 Conducted geotechnical studies, geotechnical testing for drainage conditions open ditches, outfall, trench safety, groundwater, slope-stability, erosion control, trench safety, lateral pressures, scour, dewatering, site preparation, construction considerations. 14.1.1 14.2.1 14.3.1 Transtar Metal Building 6922 Old Katy Road Houston, Texas Harris County c/o Johnston, LLC 800 Wilcrest, Ste 150 Houston, Texas 77042 Mr. Brent Dahl, P.E. Tel.: 713-532-2466 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for drilled footings and floating slab, site conditions, lateral and uplift cappacity of drilled footings, subsoil settlement, site preparation, preparation, earthwork, site drainage, constructtion considerations, etc. 14.1.1 14.2.1 14.3.1 West Montgomery Road from Gulf Bank Road to Breen Drive (Precinct 1 Limit) Harris County, Texas Harris County c/o TSC Engineering Company 3300 S. Gessner Road Suite 100 Houston, Texas 77063 Ms. A. Cheng Ranft, P.E. Tel.: 713-784-777 2010 Conducted geotechnical studies, geotechnical testing for approximately 6800-ft of road, 4-lane concrete boulevard with sidewalks and storm sewers, resilient modulus and CBR values, concrete pavement design, soil stabilization requirements, design of storm sewer including dewatering bedding and trench safety, lateral pressures, site preparation, construction considerations. A Desktop Geologic Fault Study was also conducted. 12.1.1 12.1.2 12.2.1 Woodland Hills Drive from approximately 50’ South. at Woodland Park Drive to Will Clayton Parkway APIN: 08104M0086 Precinct 4, Job 10-0148 Harris County, Texas Harris County 1310 Prairie, Suite 1040 Houston, Texas 77002 Mr.Iraj Mostamand, P.E. Tel.: 713-755-4933 2010 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, concrete coring, compressive strength of concrete, field density tests, proofrolling observations, utility trench backfill for underground utilities. 2010 GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 Crosby-Lynchburg (FM 2100) Road from 110-ft North of Gulf Pump Road (FM 1942) to 15-ft South of Magnolia Avenue Harris County, Texas Harris County 2010 c/o Ergon Transportation Solutions 11500 Northwest Freeway Suite 491 Houston, Texas 77092 Mr. Harris Simeonidis, P.E. Tel.: 713-956-9601 Conducted geotechnical studies, geotechnical testing for approximately 5500-ft of Road, 5-lane concrete thoroughfare with turn lanes and open ditches, storm sewers, outfalls, CBR values, asphalt pavement design, dewatering, trench safety, groundwater, slope-stability, erosion control, trench safety, lateral pressures, scour, traffic signals, site preparation, construction considerations. A Phase I Geologic Fault Study was also con-ducted. 14.1.1 14.2.1 14.3.1 Jacintoport Boulevard from 500-ft West of Sheldon Rd. to 1400-ft East of Peninsula Blvd. and Peninsula Blvd. from Jacintoport Blvd. to 2500-ft East of Jacintoport Blvd. Harris County, Texas Harris County 2010 c/o Amani Engineering, 8313 SW Freeway, St. 350 Houston, Texas 77074 Mr. Vas Vellore, P.E. Tel.: 713-270-5700 Conducted geotechnical studies, geotechnical testing, groundwater, resilient modulus, CBR values, asphalt pavement design, soil stabilization, construction considerations, site preparation, etc. 12.1.1 12.1.2 12.2.1 New Restroom/Concession Building and Press Boxes El Franco Lee Park 9500 Hall Road Precinct 1 Harris County, Texas Harris County Public Infrastructure Dept. 1310 Prairie, Ste. 1105 Houston, Texas 77002 Mr. Iraj Mostamand, P.E. Tel.: 713-755-4933 Conducted testing of subgrade soils for building and paving areas, density testing, drilled footing observations, subgrade stabilization recommendations, masonry testing, structural steel observations. 12.1.1 12.1.2 12.2.1 Harris County MUD #148 Water Plant Additions Includes Hydropneumatic Tank Booster Pumps and Emergency Generators Harris County, Texas Harris County 2009 c/o Landev Engineers, Inc. 1702 Seamist Dr., Ste 301 Houston, Texas 77008 Mr. Marvin Zahradnik P.E. Tel.: 713-869-2402 Conducted construction materials engineering for laboratory compaction, field density for bedding and backfill soils for underground utilities, booster pump and generator pad, concrete testing for compressive strength. 12.1.1 12.1.2 12.2.1 Emergency Generator Addition Water Plant No. 2 Reid Road MUD #2 Harris County, Texas Harris County 2009 c/o Landev Engineers, Inc. 1702 Seamist Dr., Ste 301 Houston, Texas 77008 Mr. Dennis Hughes, P.E. Tel.: 713-869-2402 Conducted construction materials engineering for laboratory compaction, field density for bedding and backfill soils for underground utilities, booster pump and generator pad, concrete testing for compressive strength. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Cypresswood Drive from Carolina Oaks to East of Carolina Hills Dr. APIN 090103M23BZ Harris County, Texas Harris County 2009 c/o Gunda Corporation, Inc. 7322 Southwest Freeway Suite 1802 Houston, Texas 77074 Mr. Ramesh Gunda, P.E. Tel.: 713-541-3530 Conducted geotechnical studies, geotechnical testing, approximately 2300+ -ft of roadway, concrete road, storm and sanitary sewers, bridge, resilient modulus and CBR values, concrete pavement design, groundwater, drilled footings and pile foundation recommendations, slopestability and erosion protection, bridge scour, trench safety, scour at bridge bents, site preparation and construction considerations. Desktop faulty study. 12.1.1 12.1.2 12.2.1 Crosby Area Drainage Improvements Job No. 08/0546 Precinct 2 Harris County, Texas Harris County Public Infrastructure Dept. 1310 Prairie, Ste. 1105 Houston, Texas 77002 Mr. Iraj Mostamand, P.E. Tel.: 713-755-4933 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Freeport Street from I-10 to Uvalde Road Precinct 2 Harris County, Texas Harris County 2009 c/o Scientech Engineers 701 Shepherd Drive Suite 200 Houston, Texas 77007 Mr. David Sadeghpour, P.E. Tel.: 713-977-6090 Conducted geotechnical studies, geotechnical testing for approximately 10,296-ft± including 5-lane, concrete curb, and gutters, storm sewers, box culvert, bridge and traffic signals, including resilient modulus, concrete pavement design, soil stabilization, storm sewer recommendations, including bedding, dewatering, and trench safety, groundwater monitoring, slope-stability, lateral pressures, box culvert design, including lateral pressure and bedding, construction considerations, site preparation. 14.1.1 14.2.1 14.3.1 Louetta Road from Hawthorne Ridge to Cypress Church Harris County, Texas Harris County c/o R. G. Miller Eng. 12121 Wickchester Ln Suite 200 Houston, Texas 77079 Mr. Robert Sigfried, P.E. Tel.: 713-461-9600 Conducted geotechnical studies, geotechnical testing for 3490-ft of Louetta Road consisting of four-lane, concrete curb and gutters, silent modulus, CBR values, concrete pavement design, asphaltic concrete transition recommendations, soil stabilization, groundwater data, construction considerations, site preparation, etc. 2009 2009 2009 GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 2.13.1 Scott Street Extension from Almeda Genoa Road to Orem Drive and Detention Pond Harris County, Texas Harris County c/o HNTB Corporation 2950 North Loop West Suite 900 Houston, Texas 77092 Mr. Gregory D. Denby Tel.: 713-354-1500 2009 Conduct a Phase I Environmental Site Assessment Study, including chain of title, review of aerial photos, water wells, oil and gas well maps, flood insurance maps, wetland concerns, interview with owners, report of findings, recommendations for Phase II. 14.1.1 14.2.1 14.3.1 Paving Extension of Scott Street from Bltwy 8 to Almeda Genoa Harris County, Texas Harris County 2008 c/o Charles D. Gooden Consulting Engineers 2320 Holmes Rd., St. A Houston, Texas 77051 Mr. Charles D. Gooden, P.E. Tel.: 713-660-6905 Conducting geotechnical studies, geotechnical testing, soil testing, recommendations on concrete roadway, storm sewers and detention pond including soils stratigraphy and groundwater, subgrade properties, concrete coring, soil stabilization, trench safety, dewatering, slopestability, erosion protections, construction considerations, etc. In addition, geologic fault study was conducted. 12.1.1 12.1.2 12.2.1 Reconstruction of 10 Roads (Sims Road, ET. Al) in Wade Camp Area Precinct 2, Job: 08/0270 Harris County, Texas Harris County 1310 Prairie, Suite 1105 Houston, Texas 77002 Mr. Iraj Mostamand, P.E. Tel.: 713-755-5370 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing. 14.1.1 14.2.1 14.3.1 Fire Station 22314 North Freeway Spring, Texas Harris County Emerg. Services District 7 P.O. Box 1401 Spring, Texas 77373 Mr. James Morell Tel.: 713-856-5100 2008 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for drilled footings and floating slab, subsoil settlement, swell potential, pavement design, construction considerations, site preparation, etc. 14.1.1 14.2.1 14.3.1 Fire Station East Louetta and Lexington Road Spring, Texas Harris County Emerg. Services District 7 P.O. Box 1401 Spring, Texas 77373 Mr. James Morell Tel.: 713-856-5100 2008 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for drilled footings and floating slab, subsoil settlement, swell potential, pavement design, construction considerations, site preparation, etc. 14.1.1 14.2.1 14.3.1 Paving Extension of Scott Street from Bltwy 8 to Fuqua Harris County, Texas Harris County 2008 c/o Charles D. Gooden Consulting Engineers 2320 Holmes Rd., St. A Houston, Texas 77051 Mr. Charles D. Gooden, P.E. Tel.: 713-660-6905 Conducting geotechnical studies, geotechnical testing, soil testing, recommendations on concrete roadway, storm sewers and detention pond including soils stratigraphy and groundwater, subgrade properties, concrete coring, soil stabilization, trench safety, dewatering, slopestability, erosion protections, construction considerations, etc. In addition, geologic fault study was conducted. 14.1.1 14.2.1 14.3.1 Becker Road South of UPRR to North of Palo Dura APIN 07103M001B Harris County 2008 c/o Amani Engineering 8313 Southwest Freeway Suite 350 Houston, Texas 77074 Mr. H. Prasad Kolluru, P.E. Tel.: 713-270-5700 Conducting geotechnical studies, geotechnical testing, recommendations on concrete paving, gutters, storm sewers, including bedding requirements, dewatering, trench safety, recommendations on and detention pond, including soil type, slope-stability analysis and erosion control, coring, soil stabilization and construction considerations. Furthermore, a Phase I Environmental Site Assessment Study was conducted. In addition, Geologic Fault Study was conducted. 12.1.1 12.1.2 12.2.1 New Restroom Building at Crowley Park . 5100 Lauder Road Job No. 08-0047 Harris County, Texas Harris County 1310 Prairie, Suite 1105 Houston, Texas 77002 Mr.Iraj Mostamand, P.E. Tel.: 713-755-4933 2008 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing. 12.1.1 12.1.2 12.2.1 T.C. Jester Blvd. from Ivy Falls Drive to . Cypresswood Drive Job No. 07/0390 Harris County, Texas Harris County 1310 Prairie, Suite 1105 Houston, Texas 77002 Mr.Iraj Mostamand, P.E. Tel.: 713-755-5370 2008 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing. 14.1.1 14.2.1 14.3.1 Woodland Hill Drive from 500-ft South of Woodland Path Drive to Will Clayton Parkway Harris County ,Texas APIN 08014M0086 Harris County c/o Robert Reid Consult. Engineer, Inc. 2055 South Gessner Suite 200 Houston, Texas 77063 Mr. John Spencer, P.E. Tel.: 713-977-9192 2008 Conducting geotechnical studies, geotechnical testing, recommendations on concrete paving, design of storm sewers, including bedding requirements, dewatering, trench safety, lateral pressures, site preparation, soil stabilization and construction considerations. 2008 GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.1 12.1.2 12.2.1 Cypress Rose Hill Road U.S. 290 West Bound . Frontage Road to 500’ N. of Cypress Mill Park Lane APIN: 0310300010 Precinct 3, Job 07/0453 Harris County, Texas Harris County 1310 Prairie, Suite 1040 Houston, Texas 77002 Mr.Iraj Mostamand, P.E. Tel.: 713-755-5370 2008 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. 14.1.1 14.2.1 14.3.1 Wallisville Road Left Turn Lane and Approach Widening and Storm Sewer Line Precinct 2 Harris County, Texas Harris County c/o Jacobs & Kelcey 3010 Briarpark Drive Suite 200 Houston, Texas 77042 Mr. Dave Wright, P.E. Tel.: 713-474-4000 2008 Conducted geotechnical studies, geotechnical testing, pavement recommendations, concrete coring, bedding and dewatering recommendations for storm sewer, trench safety, soil stabilization, use of excavation materials, construction considerations. 14.1.1 14.2.1 14.3.1 Bellaire Boulevard from Marchena Street to 500-ft East of State Highway 6 PIN CI/103/0805/001 Harris County, Texas Harris County 2007 c/o Gunda Corporation, Inc. 7322 Southwest Freeway Suite 1802 Houston, Texas 77074 Mr. Rajesh Tanwani, P.E. Tel.: 713-541-3530 Conducted geotechnical studies, geotechnical testing, pavement recommendations, coring existing paving, subgrade properties, soil stabilization, trench safety , lateral pressures, construction considerations. 14.1.1 14.2.1 14.3.1 Mueschke Road from 500-ft. North of Little Cypress Creek To 500-ft. North of Wilks Drive Harris County, Texas PIN CI/103/0905/001 Harris County c/o Demopulos & Ferguson Assoc., Inc. 2180 N. Loop West Suite 305 Houston, Texas 77018 Mr. Dan Organ Tel.: 713-783-7117 2006 Conducted geotechnical studies, geotechnical testing, recommendations on concrete paving, piezometric water levels, slope-stability for detention pond, trench safety recommendations, lateral pressures and construction considerations. 12.1.1 12.1.2 12.2.1 Paving Improvements and Traffic Signal Modifications to Service Spring Trace Harris County, Texas Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. 14.1.1 14.2.1 14.3.1 Boone Road from Westpark to Westpark Tollway Harris County, Texas Harris County MUD 2007 No. 402 c/o Landev Engineering, Inc. 1702 Seamist Drive, Suite 301 Houston, Texas 77008 Mr. Marvin Zahradnik, P.E. Tel.: 713-869-2402 Harris County 2006 c/o EFC, Inc. 12841 Jones Rd., Ste. 101 Houston, Texas 77070 Mr. Richard Ghanem, P.E. Tel.: 281-894-2001 14.1.1 14.2.1 14.3.1 2.13.1 Cypress North Houston from Jones Road to Oak Plaza/Marcia Harris County, Texas PIN CI/103/1204/001 Harris County 2006 c/o Landtech Consultants, Inc. 2627 North Loop West Houston, Texas 77008 Mr. Ronald Kersh, P.E. Tel.: 713-861-7068 Conducted geotechnical studies, geotechnical testing, pavement studies, recommendations on storm sewers, including bedding requirements, dewatering, trench safety, slope-stability and erosion control for detention pond, lateral pressures in the trenches. Conducted Full Phase I Environmental Site conducted record review, conducted interviews, reviewed historical information produced report. 14.1.1 14.2.1 14.3.1 Southmore Avenue from East of S. Johnson Street to East of Strawberry Road Harris County, Texas Harris County 2006 c/o Scientech Engineers 5701 Woodway, Ste. 200 Houston, Texas 77057 Mr. Nadeem Abbasi, P.E. Tel.: 713-977-6090 Conducted geotechnical studies, geotechnical testing, for about 4750-ft of road, storm sewers, detention pond, and outfall. Developed recommendations for design of storm sewers, including bedding requirements, dewatering, trench safety, slope-stability and erosion protection for detention pond. 14.1.1 14.2.1 14.3.1 Eldridge Parkway from Bissonet Blvd. to Harris County Line Harris County, Texas Harris County c/o IDC 7322 Southwest Freeway Suite 1717 Houston, Texas 77074 Mr. Larry Janak, P.E. Tel.: 713-541-5591 Conducted geotechnical studies, geotechnical testing, laboratory testing, recommendations on pavement design, asphalt transition, storm sewers including bedding requirements, dewatering, trench safety and traffic signal structures. In addition, recommendations for slopestability, erosion control with respect to the detention pond and traffic signal structures. 2006 Conducted geotechnical studies, geotechnical testing, recommendations on concrete pavement design, soil stabilization and construction considerations. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.1 12.1.2 12.2.1 Runneburg Road Reconstr. from U.S. 90 to Parish Rd. Precinct 2 Job No. 05/0281 Harris County, Texas Harris County Eng. Dept. 1001 Preston Ave., 7th Fl. Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-5370 2006 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. 12.1.1 12.1.2 12.2.1 Paving , Drainage and Traffic Signal improvements of Greens Road from Old Greens Ro to Aldin Westfield and Waverly Road Job No. 05/0388, Precinct 4 Harris County, Texas Harris County Eng. Dept. 1001 Preston Ave., 7th Fl. Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-5370 2006 will conduct testing of subgrade soils, subgrade stabilization recommendations, utility backfill, concrete coring, asphalt testing, portland cement concrete testing, plant inspections, roadway construction inspection. 12.1.1 12.1.2 12.2.1 New Concrete Roadway and Parking Lots El Franco Lee Park Phase 6 Harris County, Texas Harris County Eng. Dept. 1001 Preston Ave., 7th Fl. Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-5370 2006 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.1 12.1.2 12.2.1 Industrial Road Improvements Harris County Eng. Dept. East of Federal Road to 1001 Preston Ave., 7th Fl. West of Sheffield Boulevard Houston, Texas 77002 Job No. 06/0156 Mr. David Eby, P.E. Precinct 2 Tel.: 713-755-5370 Harris County, Texas 2006 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.1 12.1.2 12.2.1 150,000 Guardrail Repairs on Various Locations in Harris County, Texas Job No. 05/0226 Harris County Eng. Dept. 1001 Preston Ave., 7th Fl. Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-5370 2006 Conducted earthwork testing, concrete observations and testing, plant inspection, construction inspection. 12.1.1 12.1.2 12.2.1 200,000 Repairs/Replacement of Concrete Pavement, Curbs Driveways, Sidewalks and Related Items Precinct 3 Harris County, Texas Harris County Eng. Dept. 1001 Preston Ave. 7th Fl. Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-5370 2006 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 14.1.1 14.2.1 14.3.1 2.13.1 Wood Forest Boulevard 100-ft E. of Freeport Blvd. to Haymarket Harris County, Texas Harris County 2005 c/o Isani Consultants, Inc. 3143 Yellowstone Blvd. Houston, Texas 77054 Mr. Jim Vanderwater, P.E. Tel.: 713-747-2399 Conducted geotechnical studies, geotechnical testing, recommendations for pavement, detention pond, including concrete design, subgrade stabilization, construction considerations, bedding requirements, dewatering and trench safety. Conducted hazardous materials site assessment study. 14.1.1 14.2.1 14.3.1 Park Row Boulevard From Westgreen Blvd. to W. of Price Plaza Precinct 3 Harris County, Texas Harris County 2005 c/o Infrastructure Associates 6117 Richmond Ave. Houston, Texas 77057 Mr. Brad White,P.E. Tel: 713-622-0120 Conducted geotechnical studies, geotechnical testing, recommendations for pavement, detention pond, and storm sewers, including concrete design, subgrade stabilization, construction considerations, bedding requirements dewatering and trench safety. Also foundation recommendations for traffic signals. 14.1.1 14.2.1 14.3.1 Mueschke Road One Mile North of US 290 to 500-ft N. of Sandy Hill Precinct 3 Harris County, Texas Harris County c/o Sunland Group 10497 Town & Country Suite 550 Houston, Texas 77024 Ms. Ivy Wang, P.E. Tel.: 713-335-2857 Conducted geotechnical studies, geotechnical testing, recommendations for pavement and storm sewers; including concrete design, subgrade stabilization, asphaltic concrete transition, construction considerations, bedding requirements, dewatering and trench safety. 14.1.1 14.2.1 14.3.1 West Little York Road at Louetta Road and Kuykendahl Road at Louetta Road Improvements Harris County, Texas Harris County 2005 c/o Binkley & Barfield, Inc. 1710 Seamist Drive Houston, Texas 77008 Mr. Robert H. Siegfried, P.E. Tel.: 713-869-3433 2005 Conducted geotechnical studies, geotechnical testing, laboratory testing, recommendations on design of pavements, site preparation, earthwork, soil stabilization, etc. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.1 12.1.2 12.2.1 Various Roads Asphalt Overlay and Base Repair Precinct One Job No. 05/01262 P092962 Harris County, Texas Harris County Eng. Dept. 1001 Preston Ave., 7th Fl. Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-5370 2005 Conducted testing of subgrade soils, subgrade stabilization recommendations, asphaltic concrete testing, plant inspections, roadway construction inspection. 12.1.1 12.1.2 12.2.1 Fonteno Family Park Precinct 2 Harris County, Texas Harris County Eng. Dept. 1001 Preston Ave. 7th Fl. Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-5370 2005 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, foundations inspection. 12.1.1 12.1.2 12.2.1 J.D. Walker Community Center, Concrete Parking Edna Mae Washington Park Job No. 04/0242 Precinct 2 Harris County, Texas Harris County Eng. Dept. 1001 Preston Ave. 7th Fl. Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-5370 2005 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 14.1.1 14.2..1 14.3.1 11.1.1 11.2.1 T.C. Jester Boulevard North of Ivy Falls to Cypress Drive Foundation Design, Stability Analysis, and Settlement Studies of Embankment Harris County 2004 c/o CivilTech Engineering 11821 Telge Road Cypress, Texas 77429 Mr.. Mike Lacy, P.E. Tel.: 281-304-0200 Conducted geotechnical studies, geotechnical testing, including recommendations for subsoil settlement, swell potential, pavement design, slope stability for divided bridge and embankments. Recommendation on trenches, storm sewers and detention pond. 14.1.1 14.2.1 14.3.1 2.13.1 Harris County Courthouse Corner of Westpark Drive and Boone Road Harris County, Texas Harris County 2004 c/o EFC, Inc. 12841 Jones Road Suite 101 Houston, Texas 77070 Mr. Richard Ghanem, P.E. Tel.: 281-894-2001 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for drilled footings, subsoil settlement, swell potential, pavement design, site drainage and design of underground utilities. In addition, we conducted an environmental site assessment and NEPA site review. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Grant Road Detention Pond Grant Road Harris County, Texas Harris County c/o Brooks & Sparks 15915 Katy Freeway Suite 440 Houston, Texas 77094 Mr. Don Promosic, P.E. Tel.: 281-578-9595 2004 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for a bridge, including piles, drilled footings, settlement computations, construction considerations, pavement design, slope stability, retaining wall design, bearing capacity, subgrade stabilization, site preparation. 14.1.1 14.2.1 14.3.1 Blairwood Drive from Sheldon to Lamkin and Sunshine Drive from Lamkin to Garden Tree Harris County, Texas Harris County 1001 Preston, 7th Floor Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-4933 2003 Conducted geotechnical studies, geotechnical testing, including pavement design bearing capacity, subgrade stabilization, site preparation. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Barker Cypress Road from Cypress Creek to Jarvis Road Harris County, Texas Harris County c/o Huitt-Zollars 1500 S. Dairy Ashford Suite 200 Houston, Texas 77077 Mr. Chuck Shine, P.E. Tel.: 281-496-0066 2003 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for a bridge, including piles, drilled footings, settlement computations, construction considerations, pavement design, slope stability, retaining wall design, bearing capacity, subgrade stabilization, site preparation. 12.1.1 12.1.2 12.2.1 13.1.1 Genoa Red Bluff Camp Overlays - Seabrook Roads East Meyer Avenue Precinct 2 Harris County, Texas Harris County Engineering Dept. 1001 Preston, 7th Floor Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-4933 2003 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 12.1.1 12.1.2 12.2.1 13.1.1 Theiss Mail Route Road Segments A and B Harris County, Texas Harris County Engineering Dept. 1310 Prairie 10th Floor, Room 1040 Houston, Texas 77002 Mr. Ray Phillips, P.E. Tel.: 713-755-7020 2003 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.1 12.1.2 12.2.1 13.1.1 Cypress Wood Estates Grant Road and Kitzman Off-Site Drainage Improv. Precinct 4 Harris County, Texas Harris County Engineering Dept. 1001 Preston, 7th Floor Houston, Texas 77002 Mr. David Eby, P.E. Tel.: 713-755-4933 2003 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Scarsdale Boulevard Harris County, Texas Harris County c/o Binkley & Barfield 1710 Seamist Drive Houston, Texas 77008 Mr. Bobby White, P.E. Tel.: 713-869-3433 2002 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footings, settlement computations, construction considerations, pavement design, slope-stability, retaining wall design, MSE walls, bearing capacity, subgrade stabilization, site preparation. 14.1.1 14.2.1 14.3.1 Schroeder Road Prestonwood Park Section I Houston, Texas 77022 Harris County Eng. 1310 Prairie, 10th Floor Room 1040 Houston, Texas 77002 Mr. Ray Phillips, P.E. Tel.: 713-755-7020 2002 Conducted geotechnical studies, goetechnical testing, including forensic engineering to develop calculations for pavement failure, underground utilities, backfill excavation, construction considerations, pavement design, subgrade stabilization, site preparation. 12.1.1 12.1.2 12.2.1 Reliant Stadium Harris County, Texas Harris County Sports Authority 1200 Post Oak Houston, Texas77056 Mr. Doug Baker Tel.: 713-355-2164 2002 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection 12.1.2 12.2.1 Toyota Center Harris County, Texas Harris County Sports Authority 1200 Post Oak Houston, Texas 77056 Mr. Doug Baker Tel.: 713-355-2164 2002 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection 12.1.2 12.2.1 12.3.1 13.1.1 UST System Closure Tract 29 (Spring Cypress) Precinct 4 Harris County, Texas Harris County 1310 Prairie 10th Floor, Room 1040 Houston, Texas 77002 Mr. Ray Phillips, P.E. Tel.: 713-755-7020 2002 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Grant Road Harris County, Texas Harris County 2000 c/o Brooks & Sparks 15915 Katy Freeway, Ste 440 Houston, Texas 77094 Mr. Don Promisic, P.E. Tel.: 281-578-9595 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footings, settlement computations, construction considerations, pavement design, slope stability, retaining wall design, bearing capacity, subgrade stabilization, site preparation. 14.1.1 14.2.1 14.3.1 Theiss Mail Route Segment B Harris County, Texas Harris County c/o Sander Engineering 10555 Richmond Suite 100 Houston, Texas 77042 Mr. Dennis Sander, P.E. Tel.: 713-784-4830 Conducted geotechnical studies, geotechnical testing, including pavement design, slope stability, bearing capacity, subgrade stabilization, site preparation, construction considerations. 2000 HARRIS COUNTY FLOOD CONTROL GROUP Project Name Work Authorization No. 10/0077, HCFCD Project ID No. K120-00-00-X012 Harris County, Texas Client Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 Date 2010 Description Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. GEOTECH ENGINEERING AND TESTING Project Name Client Date Description Work Authorization No. 10-0036, HCFCD Project ID No. Z100-00-00-X150 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2010 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Work Authorization No. 10/0055, HCFCD Project ID No. W100-00-00-X019 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2010 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Work Authorization No. 10/0053, HCFCD Project ID No. D124-00-00-X006 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2010 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Work Authorization No. 09/0397, HCFCD Project ID No. Z100-00-00-X143 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2010 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Work Authorization No. 09/0398, HCFCD Project ID No. Z100-00-00-X144 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2010 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Work Authorization No. 09/0205, HCFCD Project ID No. C124-00-00-X005 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2009 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Work Authorization No. 09/0039, HCFCD Project ID No. Z-100-00-00-X112 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2009 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Work Authorization No. 09/0038, HCFCD Project ID No. A121-00-00-X005 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2009 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Repairs/Replacement of Concrete Pavement, Curbs Driveways, Sidewalks and Related Items in Spring Camp Area, Precinct 4 Job No. 08/0417 Harris County, Texas Harris County Flood Control District 1310 Prairie Street Suite 1105 Houston, Texas 77022 Mr. Iraj Mostamand, P.E. Tel.: 713-755-4933 2008 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. GEOTECH ENGINEERING AND TESTING Project Name Client Date Description HCFCD Unit F-210-00-00 From Crestline Street to Approx..2 miles south Precinct 2 APIN 0410200008 Harris County, Texas Harris County Flood Control District 1310 Prairie Street Suite 1105 Houston, Texas 77022 Mr. Iraj Mostamand, P.E. Tel.: 713-755-4933 2008 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Pedestrian Bridge over HCFCD Units P518-02- . 00-B001 At Keith-Weiss Park Work Auth. No. 07/0169 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4000 2008 Conducted testing of subgrade soils, sieve analysis, subgrade stabilization recommendations, batch plant observations, mix design reviews, asphalt testing and asphalt coring. Crosby MUD Utility Relocations Work Auth. No. 07/0030 HCFCD Project ID No. R100-00-00-E003 Harris County, Texas Harris County Flood Control District 9900 NW Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2008 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Work Auth. No. 07/0121 HCFCD Project ID No. D500-04-00-E017 Harris County, Texas Harris County Flood Control District 9900 NW Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2008 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Work Auth. No. 07/0124 HCFCD Project ID No. D500-04-00-E020 Harris County, Texas Harris County Flood Control District 9900 NW Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2008 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Work Auth. No. 07/090 HCFCD Project ID No. D512-21-01-00-E029 Harris County, Texas Harris County Flood Control District 9900 NW Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2008 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Work Auth. No. 07/0097 HCFCD Project ID No. E500-121-00-E001 Harris County, Texas Harris County Flood Control District 9900 NW Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2007 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. General Repairs In West Harris County Project ID Z100-00-00 X110 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Mr. Liz Bond, P.E. Tel.: 713-684-4253 2007 We are conducting materials testing including concrete and soils testing for several projects. Buffalo Speedway Bridge over Sims Bayou Project ID C100-00-00 B023 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Mr. Liz Bond, P.E. Tel.: 713-684-4253 2007 We are conducting materials testing including concrete and soils testing for several projects. GEOTECH ENGINEERING AND TESTING Project Name Client Date Description Conduct Materials Eng. Project No. 2100-0000-X088 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Mr. Liz Bond, P.E. Tel.: 713-684-4253 2006 We are conducting materials testing including concrete and soils testing for several projects. Regional Detention Basin Basin (E515-01-00) Project ID# E515-01-00-E001 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Mr. Kris Goparaju, P.E. Tel.: 713-316-4802 2006 Conducted geotechnical studies, provided geotechnical recommendations for detention basin design, slope stability analysis, slope erosion protection, site preparation, evaluate the dispersive characteristics of on-site soils. Brays Bayou Federal Flood Control Project Arthur Storey Park Detention Facilities Compartment 1 & 2 Phase 6 D500-06-0-E002 Harris County Flood Control District 9900 NW Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2005 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. On-Call Materials Eng. Work Auth. No. 05/0157 Precinct ID No. T10300-00-X006 Harris County, Texas Harris County Flood Control District 9900 NW Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2005 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Failed Sheet Pile Wall Replacement Project ID U106-0000-X009 Precinct 4 Houston, Texas Harris County Flood Control District c/o Tom-Mac, Inc. P.O. Box 262541 Houston, Texas 77027 Mr. Thomas McMillian Tel.: 713-991-7317 2005 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Evergreen Contract to Conduct Materials Eng. Services throughout Harris County Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Mr. Liz Bond, P.E. Tel.: 713-684-4253 2004 We are conducting materials testing including concrete and soils testing for several projects. Hall Park Regional Detention Basin (P518-03-00) Project ID# P518-03-00-E001 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Mr. Kris Goparaju, P.E. Tel.: 713-316-4802 2004 Conducted geotechnical studies, provided geotechnical recommendations for slope stability analysis, slope erosion protection, channel improvement, site prepara tion, evaluate the dispersive characteristics of on-site soils. Channel Side Slopes Repair Between Cherry Brook and Witchita Streets Project #I101-00-00-X005 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Mr. Kris Goparaju, P.E. Tel.: 713-316-4802 2004 Conducted geotechnical studies, provided geotechnical recommendations for slope stability analysis, slope erosion protection, channel improvement, site preparation, evaluate the dispersive characteristics of on-site soils. Work Auth. No. 02/0241 Project ID No. E112-3 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2003 We are conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. GEOTECH ENGINEERING AND TESTING Project Name Client Date Description Earthen Channel Restoration Project ID# P114-0000-X001 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2003 Conducted testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. I-10 John Rolston Space Center Boulevard Contract H103-00–00-X005 Houston, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220`7 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2002 Conducted testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Project ID# Q112-03-00X001 Harris County Flood Harris County, Texas Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2002 Conducted testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Repairs in White Oak Bayou Maintenance Contract No. Z100-00-00-X018 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2002 Conducted testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Bay Oak Bayou Space Center Boulevard Maintenance Contract No. Z100-00-00-X036 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2002 Conducted testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Settlers Village Washout with Failure Type E Inlet H.C.F.C. Project ID No. U102-00-00-X006 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2002 Conducted testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Repairs on Vince Bayou Maintenance Contract No. Z100-00-00-X018 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2002 Conducted testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Channel Rehabilitation Langham Way to Keith Harrow H.C.F.C.D. Project ID # U102-01-00-X-005 Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 220 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 2002 Conducted testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. Berry Gully from Near City of South Houston Limits to southward to near Coronation Street Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Mr. Ron Langston, P.E. Tel.: 713-316-4802 2001 Conducted geotechnical studies, provided geotechnical recommendations for slope stability analysis, slope erosion protection, channel improvement, site preparation ,evaluate the dispersive characteristics of on-site soils. GEOTECH ENGINEERING AND TESTING Project Name Client Harris County Flood Control Unit P118-19-00-X004 From Orange Grove to Blue Meadow Harris County, Texas Harris County Flood Control District 9900 Northwest Freeway Suite 200 Houston, Texas 77092 Ms. Liz Bond, P.E. Tel.: 713-684-4253 Date 2000 Description Conducted geotechnicals studies, provided geotechnical recommendations for slope stability analysis, slope erosion protection, channel improvements, site preparation, evaluate the dispersive characteristics of on-site soils. PORT OF HOUSTON GROUP Project Name Client Date Description Port of Houston Demolition of Transit Sheds, Lighting and Access Modif. At Wharf Nos. 24 and 25 At Turning Basin Houston Texas Port of Houston Auth. 2010 111 East Loop North Houston, Texas 77029 Mr. Steven DeWolf, P.E. Tel.: 281-470-5689 Conducted Portland Cement Concrete testing and plant inspections Port of Houston Pavement Replacement at Barbours Cut Terminal 2008 Houston Texas Port of Houston Auth. 111 East Loop North Houston, Texas 77029 Mr. Steven DeWolf, P.E. Tel.: 281-470-5689 Conducted Portland Cement Concrete testing and plant inspections Port of Houston Pile Capacity Evaluation Jacinto Port Terminal Peninsula Blvd. Harris County, Texas Port of Houston Auth. 2007 c/o LJA Eng &Surv., Inc. 2929 Briarpark Drive Suite 600 Houston, Texas 77042 Mr. Daniel Copps, III, P.E. Tel.: 713-953-5200 Conducted soils exploration studies, geotechnical testing for pile capacity evaluation, generalized soils stratigraphy, estimated timber pile capacity. Port of Houston Pavement Replacement and Storm Sewers Jacinto Port Terminal Peninsula Blvd. Harris County, Texas Port of Houston Auth. 2007 c/o LJA Eng &Surv., Inc. 2929 Briarpark Drive Suite 600 Houston, Texas 77042 Mr. Daniel Copps, III, P.E. Tel.: 713-953-5200 Conducted soils exploration studies, geotechnical testing for concrete pavement replacement and storm sewer replacement, pavement design recommendations, bedding requirements, dewatering, trench safety and lateral pressures recommendations, subgrade stabilization, construction considerations and site preparation. Port of Houston Administration Building Bayport Terminal Bayport, Texas Port of Houston Auth. c/o Kirksey Architecture 6909 Portwest Drive Houston, Texas 77024 Mr. Benito Guerrier, AIA Tel.: 713-426-7407 2007 Conducted soils exploration studies, geotechnical testing for two-story building, including building foundation, compaction of on-site fill soils lateral and uplift capacity of drilled footings or spread footings, subgrade stabilization, pavements, construction considerations and site preparation. Repair of Slab at Wharf No. 18 at the Turning Basin, File: 2006-0255 Port of Houston Harris County, Texas Port of Houston Auth. P.O. Box 2562 Houston, Texas 77252 Mr. Steven DeWolf, P.E. Tel.: 281-470-5689 2006 Conducted Portland Cement Concrete testing and plant inspections. Repair of Dock at Wharf No. 23 at the Turning Basin Terminal File: 2006-0254 Port of Houston Harris County, Texas Port of Houston Auth. P.O. Box 2562 Houston, Texas 77252 Mr. Steven DeWolf, P.E. Tel.: 281-470-5689 2006 Conducted Portland Cement Concrete testing and plant inspections. Repair of Dock at Wharf No. 1, Damage Claim N. H-2865, File: 2006-0256 Port of Houston Harris County, Texas Port of Houston Auth. P.O. Box 2562 Houston, Texas 77252 Mr. Steven DeWolf, P.E. Tel.: 281-470-5689 2006 Conducted Portland Cement Concrete testing and plant inspections. Additional Paving at Barbours Cut Terminal 6 Port of Houston, Texas Port of Houston Auth. P.O. Box 2562 Houston, Texas 77252 Mr. Steven DeWolf, P.E. Tel.: 281-470-5689 2002 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection 2008 GEOTECH ENGINEERING AND TESTING Project Name Client Wastewater Treatment Plant Jacinto Port Port of Houston, Texas Port of Houston Auth. P.O. Box 2562 Houston, Texas 77252 Mr. Steven DeWolf, P.E. Tel.: 281-470-5689 Date 2000 Description Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection CITY OF HOUSTON GROUP TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 Kingwood Lift Station No. 21 Renewal and Replacement R-00025670098-3, #4600009907 Kingwood Drive and Kings Central WWTP Access Rd City of Houston, Texas City of Houston c/o CH2M Hill, Inc. 14701 St. Mary’s LaneAshford V Houston, Texas 77079 Ms. LaVern Keeton Tel.: 281-721-8475 2011 Conducted geotechnical studies, geotechnical testing for electrical building, force main replacement, access road, groundwater, concrete pavement design, piezometer installation and data, open excavation including bedding, backfilling, groundwater and dewatering, trench safety, lateral earth pressures, drilled footing and slab-on-grade foundation recommendations, subsoil settlements, lateral and uplift capacity, site drainage, site preparation, construction considerations. A Desktop Fault Study was also conducted. 12.1.1 12.2.1 12.3.1 Basewide Repairs Texas Air and National Guard, Ellington Field Houston, Texas City of Houston c/o Basecom/The Beck Group 5209 Vesta Farely Fort Worth, Texas 76119 Mr. Robert Saenz Tel.:830-385-9395 2010 Conducted construction materials engineering, including testing of subgrade soils, laboratory densities, observations,. 2010 Conducted geotechnical studies, geotechnical testing for pump and lift station, soils stratigraphy, groundwater levels, soil stabilization construction requirements for excavations and backfilling, dewatering, design of the lift station, including caisson construction, dewatering and buoyancy, lateral earth pressure for concrete wet wall, bearing capacity for wet wall, piezometers. _ 14.1.1 14.2.1 14.3.1 Pump and Lift Station R/R R-000267-0102-3 and R-000267-0109-3 City of Houston, Texas City of Houston c/o Arcadis 2929 Briarpark Drive Suite 300 Houston, Texas 77042 Mr. Edward Quiroz, P.E. Tel.: 713-953-4800 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 2.13.1 Fondren Road from Hillcroft to McHard Road City of Houston, Texas WBS No. N-000821-001-3 City of Houston c/o Van De Weile & Vogler, Engienering, Inc. 2925 Briarpark, Suite 275 Houston, Texas 77042 Mr. Daniel Simeone, P.E. Tel.: 713-782-0042 Conducted geotechnical studies, geotechnical testing for 5800-ft of Fondren Road, concrete roadway, storm and sanitary sewer, bridge in accordance with Harris County Flood Control District Guidelines, box culvert, traffic signals, offsite detention pond, concrete pavement design, soil stabilization, design of storm and sanitary sewers, design of divided bridge including drilled footings and pile foundations, slope-stability, bridge embankment, bridge scour, trench safety, etc. A Phase I Geologic Fault Study. 14.1.1 14.2.1 14.3.1 2.13.1 Jadewood Lift Station FN 324 at Jadewood Dr. WBS No. R-0002670083-3 City of Houston, Texas City of Houston 2010 c/o CP&Y, Inc. 2925 Briarpark, Suite 850 Houston, Texas 77042 Mr. John Mudd, P.E. Tel.: 713-532-1730 Conducted geotechnical studies, geotechnical testing, including soils stratigraphy, groundwater levels, physical characteristics, soil stabilization construction requirements for excavations and backfilling, dewatering, design of the lift station, including caisson construction, dewatering and buoyancy, lateral earth pressure for concrete wet wall, bearing capacity for wet wall, piezometers. Conducted a Phase I ESA for 12.1.1 12.2.1 12.3.1 Terminal E Parking Garage George Bush IAH Houston, Texas City of Houston 2010 Department of Aviation 16930 J.F. Kennedy Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 Conducted construction materials engineering, including testing of subgrade soils, laboratory densities, drilled footing, spread footing, structural steel, bolt torque, reinforcement observations, mix design reviews, ultrasonic testing, concrete testing. City of Houston 2010 Department of Aviation 16930 J.F. Kennedy Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 Conducted construction materials engineering, including testing of subgrade soils, laboratory densities, drilled footing, spread footing, structural steel, bolt torque, reinforcement observations, mix design reviews, ultrasonic testing, concrete testing. _ 12.1.1 12.2.1 12.3.1 Roof Repairs, Moving Walkways and FIS Elevators in Terminal D Garage, Bush Intercontinental WBS No. A-000483-0006-4 _ GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.2 12.2.1 12.3.1 San Felipe Park 1717 Allen Parkway WBS No. F-000727-0001-4 Houston, Texas City of Houston Building Services Dept. P.O. Box 61189 Mr. Farouq Kirmani Tel.: 832-393-8042 2010 Conducted construction materials testing including proofrolling, compaction, field density, backfill for underground utilities, retaining walls, concrete mix design, drilled and spread footing, masonry observations 12.1.1 12.2.1 12.3.1 Non-Destructive Evaluation Beam Terminal E Parking Garage, Bush Intercontinental Airport, LOA No. 18 City of Houston, Texas _ City of Houston 2010 Department of Aviation 16930 J.F. Kennedy Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 Conducted non-destructive observations of beam reinforcement using a Ferroscan Electromagnetic Device, ground penetrating radar observations. This was to detect size and placement of reinforcement in the concrete beams. 14.1.1 14.2.1 14.3.1 Neighborhood Street Reconstruction Project NSR 450 WBS No.: N-000382000-1-3 City of Houston c/o Civiltech Engineer. 11821 Telge Road Cypress, Texas 77429 Mr. Michael Lacy, P.E. Tel.: 281-304-0200 2010 Conducting geotechnical studies, geotechnical testing, street reconstruction, outfall at Brays Bayou, subgrade properties including silent modulus and CBR values, pavement design, soil stabilization, augering, lateral pressures, trench excavations, backfilling, underground utilities recommendations including bedding, dewatering, trench safety, construction considerations, site preparation. A Desktop Fault Study was also conducted. 14.1.1 14.2.1 14.3.1 Young Library Griggs Road at Martin Luthern King Blvd. Houston, Texas City of Houston 2010 c/o Jaymark Engineering 16000 Stuebner Airline Suite 320 Houston, Texas 77379 Mr. John Barcellona, P.E. Tel.: 281-374-0399 Conducted geotechnical studies, geotechnical testing, one-story building, root fibers, active zone, site preparation, earthwork, foundation recommendations, spread and drilled footings, lateral and uplift loading, settlements, soil treatment alternatives, PVR, concrete pavement recommendations, subgrade treatment for crushed concrete paving 14.1.1 14.2.1 14.3.1 Water Infiltration Issues Cargo Office Building Pavement and Taxiway EB Bush IAH Houston, Texas City of Houston 2010 Department of Aviation 16930 J.F. Kennedy Blvd. Houston, Texas 77032 Mr. Beecroft Shittu, P.E. Tel.: 281-233-1774 Conducted geotechnical studies, geotechnical testing, for forensic engineering services, evaluation of leak at a building, pavements and a taxiway. 12.1.2 12.2.1 12.3.1 72-Inch Waterline along Fuqua from Existing 96-inch Waterline near Beamer to Stover Street WBS No.: S000900-0100-4 Houston, Texas City of Houston 611 Walker, 14th Floor Houston, Texas 77002 Mr. Mike Pezeshki, P.E. Tel.: 713-837-7389 Conducted testing of subgrade soils, utility backfill testing, laboratory densities. 14.1.1 14.2.1 14.3.1 Barryknoll Drainage Improve- City of Houston 2009 ments Lockwood, Andrews Ditch W151 to Bunker Hill & Newnam, Inc. Ditch W151 to Gessner Rd. 2925 Briarpark Dr., St. 400 Houston, Texas Houston, Texas 77042 Ms. Tara G. Godwin, P.E. Tel.: 713-266-6900 Conducted geotechnical studies, geotechnical testing for waterline, storm sewer and roadway, box culverts, piezometers, site geology, design parameters, bedding and dewatering requirements, lateral pressure of trenches, trench safety and construction, pavement design, site preparation, construction considerations. A Geologic Fault Study was also conducted. 2.13.1 Jadewood Lift Station Jadewood Drive WBS No. R-000267-0083-4 GFS No. R-0267-83-2 City of Houston, Texas City of Houston c/o Chaing, Patel & Yerby, Inc. 2925 Briarpark Suite 850 Houston, Texas 77042 Mr. John N. Mudd, EIT Tel.: 713-532-1730 2009 Conducted Phase I Environmental Site Assessment study, including site reconnaissance, review of federal, state and local regulatory agency records, aerial photos, water wells, oil and gas maps, flood insurance rate map, interview with owners and occupants, recommendations on a Phase II ESA. 14.1.1 14.2.1 14.3.1 Bellaire West Drainage Improvements Project City of Houston, Texas City of Houston c/o Civiltech Eng., Inc. 11821 Telge Road Cypress, Texas 77429 Mr. Michael Lacy, P.E. Tel.: 281-304-0200 2009 Conducted geotechnical studies, geotechnical testing, for detention pond, outfall, soils stratigraphy, groundwater, erosion protection, slope stability, storm sewer design, detention pond design, bedding requirements, trench safety, outfall design, channel scour, construction considerations, site preparation. Desktop Fault Study. 2010 GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 Box Culvert Installation Ellington Airport City of Houston, Texas LOA No. 13, Project 615E WBS A-000138-0014-4-01 City of Houston Houston Airport System 16930 J.F. Kennedy Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 2009 Conducted geotechnical studies, geotechnical testing for installation of box culvert 8’-9’ deep, recommendations on design of head walls, lateral pressures, culvert bedding, recommendations on two service roads, subgrade, properties, coring, asphalt and concrete pavement design recommendations, trench safety, drilled footing recommendations, site preparation and construction considerations. 14.1.1 14.2.1 14.3.1 Safety Storage Building at George Bush Intercontinental Airport Project No. 615E WBS A-000138-0014-4-01 City of Houston, Texas_ City of Houston 2009 Department of Aviation 16930 J.F. Kennedy Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1773 Conducted geotechnical studies, geotechnical testing, paving recommendations, building foundation recommendations including drilled footings, floating slab or spread footings, bearing pressures, lateral and uplift capacity, site preparation and construction considerations. 14.1.1 14.2.1 14.3.1 Diesel Generator Tank HAS A.O.C/E.O.C. 4500 Will Clayton Blvd. Houston, Texas City of Houston Houston Airport System P.O. Box 60106 Houston, Texas 77205 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1773 2009 Conducted geotechnical studies, geotechnical testing, including recommendations for design and construction of 30,000 sq. ft. building, including drilled or spread footings, concrete coring, groundwater management, site preparation, lateral capacity, uplift capacity, allowable bearing pressure, settlement analysis, earthwork, construction considerations. 14.1.1 14.2.1 14.3.1 Chemical Storage & Plant Security Entrances, Truck Turnaround Lanes, East, Purification Plant WBS No.: S-000056-0045-3 City of Houston, Texas City of Houston c/o Malcolm Pirnie, Inc. 1700 West Loop South, Suite 1450 Houston, Texas 77027 Mr. Frank Stephens, P.E. Tel.: 713-960-7482 2009 Conducted geotechnical studies, geotechnical testing, including plant 3 entrance, widening, turnaround areas, coring, site conditions, concrete pavement design, soil stabilization, underground utilities, including bedding dewatering and trench safety, lateral pressures, groundwater management, site preparation, earthwork, compaction, trench safety, construction considerations. 14.1.1 14.2.1 14.3.1 2.13.1 Janowski Area Water Line Replacement WBS No. S-000035-0102-3 City of Houston, Texas City of Houston c/o Jaymark Engineering 11811 North Freeway Suite 210 Houston, Texas 77060 Mr. Mark Taylor P.E. Tel. 281-999-3087 2009 Conducted geotechnical studies, geotechnical testing, including recommendations for design and construction of water lines including bedding and dewatering requirements, shaft design recommendations, lateral pressures, trench excavations, backfilling, including groundwater effects and dewatering, trench safety, earthwork, construction considerations, etc. A Desktop Geologic Fault Study was also conducted. In addition, we conducted a Phase I and Phase II Environmental Site Assessment for this project. 14.1.1 14.2.1 14.3.1 2.13.1 North Eldridge Parkway Widening from Memorial to I-10 WBS No. N-000795-1-3 City of Houston, Texas City of Houston 2009 c/o Civiltech Eng. 11821 Telge Road Cypress, Texas 77429 Mr. Darrell Kaderka, P.E. Tel.: 281-304-0200 Conduct geotechnical studies, geotechnical testing, including recommendations for design and construction of road, storm sewer, subgrade properties resilient modulus, CBR values, concrete coring, pavement design, soil stabilization, design of storm sewers including bedding requirements, dewatering, trench safety, lateral pressures, and construction considerations. A Limited Fault Study was also con-ducted. 14.1.1 14.2.1 14.3.1 2.13.1 Oakwood Area Water Line Replacement WBS No. S-000035-0100-3 City of Houston, Texas City of Houston 2009 c/o Jaymark Engineering 11811 N. Freeway, Ste. 210 Houston, Texas 77060 Mr. Mark Taylor P.E. Tel. 281-999-3087 Conducted geotechnical studies, geotechnical testing, including recommendations for design and construction of water lines including bedding and dewatering requirements, shaft design recommendations, lateral pressures, trench excavations, backfilling, including groundwater effects and dewatering, trench safety, earthwork, construction considerations, etc. A Phase I Geologic Fault Study was also conducted. In addition, we conducted a Phase I and Phase II Environmental Site Assessment for this project. 12.1.1 12.2.1 12.3.1 612-K Crane Rail Weld Inspections at Bush Intercontinental Airport Project No. 615E WBS A-000138-0014-4-01 City of Houston, Texas_ City of Houston 2009 Department of Aviation 16930 J.F. Kennedy Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 Conducted visual and ultrasonic testing on welded connections of the 612 K Crane Rail GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.1 12.2.1 12.3.1 Terrazzo Testing Bush IAH, LOA No. 15 Project No. 615E WBS A-000138-0014-4-01 City of Houston, Texas _ City of Houston 2009 Department of Aviation 16930 J.F. Kennedy Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 Conducted site visit, reviewed plans and specifications, technical data sheets, tensile adhesion pull test, moisture transmission testing, core terrazzo to check for moisture entrapment and cracks in slabs, etc. 12.1.2 12.2.1 12.3.1 Kendall Library and Community Center E-000094-0002-4 Houston, Texas City of Houston 2009 900 Bagby, 2nd Floor Houston, Texas 77002 Ms. Michelle Easley Delk Tel.: 832-393-8133 Conducting testing of subgrade soils, utility backfill testing, concrete testing, laboratory densities, drilled footing observations, field gradation, stabilization recommendations, etc. 12.1.2 12.2.1 12.3.1 Automated People Movers Phase 3 Package ¾-Project 536 L/M APM Station and North/ South Secure Corridor Houston, Texas City of Houston Department of Aviation 16930 JFK Boulevard Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 2009 Conducting testing of subgrade soils, utility backfill testing, laboratory densities, drilled footing observations, mix design reviews, batch plant inspections, structural steel observations, ultrasonic testing, concrete testing, etc. 14.1.1 14.2.1 14.3.1 Chiller and Generator Enclosure HAS A.O.C/E.O.C. 4500 Will Clayton Blvd. Houston, Texas City of Houston Houston Airport System P.O. Box 60106 Houston, Texas 77205 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1773 2008 Conducted geotechnical studies, geotechnical testing, including recommendations for design and construction of warehouse building, chiller and generator enclosure, including drilled or spread footings, concrete coring, groundwater management, site preparation, lateral capacity, uplift capacity, allowable bearing pressure, settlement analysis, earthwork, construction considerations. 14.1.1 14.2.1 14.3.1 Neighborhood Street Recon. Project No. 450 Baldinger from Dallas to Dead-End North of Rusk Benjamin from Baldinger To South 72nd City of Houston, Texas WBS No. N-000382-000-1-3 City of Houston c/o Civiltech Engineering 11821 Telge Road Cypress, Texas 77429 Mr. Michael Lacy, P.E. Tel.: 281-304-0200 2008 Conducted a Phase I Environmental Site Assessment Study to reconstruct several streets, including fire insurance maps and review of aerial photos. 14.1.1 14.2.1 14.3.1 2.13.1 Lockwood Lift Station Rehabilitation WBS No. R-00026700B3-4 City of Houston, Texas City of Houston 2008 c/o Demopulos and Ferguson Associates, Inc. 2180 North Loop West Suite 305 Houston, Texas 77018 Mr. Chris Demopulos, P.E. Tel.: 713-783-7117 Conducted geotechnical studies, geotechnical testing, including, soils stratigraphy, groundwater levels, design parameters for force main; including bedding requirements buoyancy, construction requirements, trench excavations and backfilling; including groundwater effects and dewatering considerations, pavement design recommendations, trench safety recommendations, design of retention system. Conducted Phase II Environmental Site Assessment Study. 14.1.1 14.2.1 14.3.1 City of Houston Recycling Center Facility Harvard Street Houston, Texas City of Houston c/o Jaymark Engineering Corporation 11811 North Freeway Suite 210 Houston, Texas 77060 Mr. Mark Taylor, P.E. Tel.: 281-999-3087 2008 Conducted geotechnical studies, geotechnical testing, paving recommendations, building foundation recommendations including drilled footings, floating slab bearing pressures, lateral and uplift capacity, site preparation and construction considerations. 12.1.2 12.2.1 12.3.1 Miscellaneous Professional Services LOA#10 Project No. 615E WBS A-000138-0014-4-01 Houston, Texas City of Houston Department of Aviation 16930 JFK Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 2008 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection, steel testing, non-destructive testing, foundation observations 14.1.1 14.2.1 14.3.1 11th Street From West Side of Heights Boulevard to West Side of Studewood Street WBS No. N-000745-0001-3 City of Houston, Texas City of Houston 2008 c/o PGAL 5555 San Felipe Suite 100 Houston, Texas 77056 Mr. Costas Georghiou, P.E. Tel.: 713-968-9398 Conducted geotechnical studies, geotechnical testing, paving recommendations, bearing pressures, lateral and uplift capacity, site preparation and construction considerations. Also conducted was a Limited Phase I Geologic Fault Study. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 Hay Storage Building at George Bush Intercontinental Airport Project No. 615E WBS A-000138-0014-4-01 City of Houston, Texas_ City of Houston Airport System P.O. Box 60106 Houston, Texas 77205 Mr. Dale B. Wright, P.E. Tel.: 281-233-1773 2008 Conducted geotechnical studies, geotechnical testing, paving recommendations, building foundation recommendations including drilled footings, floating slab or spread footings, bearing pressures, lateral and uplift capacity, site preparation and construction considerations. 14.1.1 14.2.1 14.3.1 Pavement Recommendations City of Houston for Auto Parking Lot at Houston Airport System William P. Hobby Airport P.O. Box 60106 City of Houston, Texas Houston, Texas 77205. WBS No. A-000138-014-4-01 Mr. Dale B. Wright, P.E. Tel.: 281-233-1773 2008 Conducted geotechnical studies, geotechnical testing, including paving recommendations, site preparation, construction considerations. 14.1.1 14.2.1 14.3.1 11.2.1 Bike and Pedestrian Bridge Atwell and Bob White West Brays Bayou West Trail Houston, Texas City of Houston c/o AIA Engineers, Ltd. 15310 Park Row Cypress, Texas 77084 Mr. Sandeep Patil, P.E. Tel.: 281-493-4140 2008 Conducted geotechnical studies, geotechnical testing, including site conditions for bike and pedestrian bridge, design of bridge foundations, drilled piers and prestressed concrete piles, retaining wall recommendations, site preparation, construction considerations. The bridge was design per TxDOT Standards. 14.1.1 14.2.1 14.3.1 Warehouse Building Project 519 HAS A.O.C/E.O.C. 4500 Will Clayton Blvd. Houston, Texas City of Houston Houston Airport System P.O. Box 60106 Houston, Texas 77205 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1773 2008 Conducted geotechnical studies, geotechnical testing,including foundations for 30,000 sq. ft. warehouse building, column loads, lateral and uplift capacity of drilled and spread footings, soil stabilization, trench safety, groundwater management, site preparation, earth work, construction considerations. 12.1.2 12.2.1 12.3.1 Hobby, Bush IAH and Ellington Field Aiport LOA #8, Project #615E WBS A-000138-0014-4-01 Houston, Texas City of Houston Department of Aviation 16930 JFK Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 2008 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection, steel testing, non-destructive testing, foundation observations 14.1.1 14.2.1 14.3.1 Parks and Recreation Department Headquarters Improvements Brook Avenue Houston, Texas City of Houston 2008 c/o Harrison Kornberg Architects 1113 Vine Street, Suite 210 Houston, Texas 77002 Mr. Kristopher T. McGraw, AIA Tel.: 713-229-0688 Conducted geotechnical studies, geotechnical testing, including site conditions, building foundation type, depth, allowable loading, including drilled footings, spread footings and slab-on-grade recommendations, laboratory testing, settlement studies, lateral and uplift capacity, soil stabilization, concrete pavement recommendations, desgn and construction of box culvert, trench safety, site preparation, etc. 14.1.1 14.2.1 14.3.1 Northwest Maintenance Facility UST System Modification 5900 Teague Road City of Houston, Texas City of Houston c/o Malcolm Pirnie, Inc. 1700 West Loop South, Suite 1450 Houston, Texas 77027 Mr. Ashish Bagga, P.E. Tel.: 713-960-7444 2008 Conducted geotechnical studies, geotechnical testing, including site conditions, suitable canopy foundation type, depth, and allowable loading, recommendations on spread and drilled footings. Also conducted subsoil settlement, groundwater management, site preparation, earthwork, compaction, trench safety, construction considerations. 12.1.2 12.2.1 12.3.1 Wastewater Collection System Rehabilitation and Renewal WBS No.: R-000266-0118-4 Lab Contract No. 53704 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2008 Conducted testing of subgrade soils, utility backfill testing, portland cement concrete testing, plant inspecttions, sewer construction inspection, foundation observations. 12.1.2 12.2.1 12.3.1 Roseneath Drive Storm Sewer Replacement WBS No. M000126059-4 Contract No. 4600009227 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2008 Conducted testing of subgrade soils, utility backfill testing, portland cement concrete testing, plant inspecttions, sewer construction inspection, foundation obervations. 12.1.2 12.2.1 12.3.1 IAH Terminal “C” Garage Exterior and Interior Renovations LOA #4, Project #615E Houston, Texas City of Houston Department of Aviation 16930 JFK Blvd. Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 2008 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection, steel testing, non-destructive testing, foundation observations GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.2 12.2.1 12.3.1 Hobby Airport Base Evaluation, HAS # 417E CIP# A.0313, A 01411 and A 04224 Houston, Texas City of Houston c/o Reytec Construct. 1901 Hollister Houston, Texas 77080 Mr. Frank Gomez Tel.: 281802-0746 2007 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection, steel testing, non-destructive testing, foundation observations 14.1.1 14.2.1 14.3.1 Nottingham and Yorkshire Storm Sewer and Pavement Improvements GFS No. M-0247-01-2 City of Houston, Texas City of Houston c/o Civiltech Eng., Inc. 11821 Telge Road Cypress, Texas 77429 Mr. Michael Lacy, P.E. Tel.: 281-304-0200 2007 Conducted geotechnical studies, geotechnical testing, including, groundwater measurements, pavement design, soil stabilization, soil design parameters for underground utilities, bedding and dewatering, auger, shaft design recommendations, trench excavations, backfilling and construction considerations. 12.1.2 12.2.1 12.3.1 13.1.1 Neighborhood Sanitary Sewer Improvements WBS No. R-002011-0043-4 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2007 Conducted testing of subgrade soils, utility backfill, stabilization recommendations, field density testing, portland cement concrete testing, asphalt testing and observations, reinforced concrete pipe batch plant inspections. 12.1.2 12.2.1 12.3.1 Neighborhood Sanitary Sewer Improvements WBS No. R-0020110043-4 Contract No. 53704 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2007 Conducted testing of subgrade soils, utility backfill testing, laboratory densities. 14.1.1 14.2.1 14.3.1 City of Houston Airport System Evergreen Geotechnical and Materials Engineering Services Contract 4600007812 07-0524, Project 615-E City of Houston Airport System 16930 JFK Boulevard Houston, Texas 77032 Mr. Adil Godiwalla, P.E. Tel.: 281-233-1934 2007 GET will conduct geotechnical and materials testing services on Houston Airport System projects. Project budget: $200,000. 14.1.1 14.2.1 14.3.1 2.13.1 24-Inch Force Main and Berkley Lift Station GFS: R-0267-83-3 File: WW 4873 City of Houston, Texas City of Houston 2006 c/o Chiang, Patel & Yerby 2925 Briarpark Suite 850 Houston, Texas 77042 Ms. Patricia Syzdek Tel.: 713-532-1730 Conducted geotechnical studies, geotechnical testing, including trench safety recommendations, soil stabilization, requirements, construction requirements for excavations and backfilling including groundwater and dewatering considerations, bedding requirements, lateral loading, bearing capacity. Conducted hazardous materials site assessment study. 14.1.1 14.2.1 14.3.1 Dixie Area Water Line Replacement GFS: S-0035-B9-2, WA: 10782 Lancaster Storm Sewer Relief Project GFS: M-022-02-2 File No.: SM5013 City of Houston, Texas City of Houston 2006 c/o Jaymark Engineering 11811 North Freeway Suite 210 Houston, Texas 77060 Ms. Flor Gonzalez Tel.: 281-999-3087 Conducted geotechnical studies, geotechnical testing, including pavement design, soil design parameters for underground utilities including dewatering, groundwater elevations, trench safety, construction considerations, analyses, geologic fault study. 14.1.1 14.2.1 14.3.1 Sheet Pile Wall for Restrictor Structure at Red Gully Bayou at Mesa Road C.I.P. N-0680-01-2 JNS Job No. 013-11B City of Houston, Texas 2006 Conducted geotechnical studies, geotechnical testing, for sheet pile wall structure, including review of reports, lateral earth pressure coefficients, slope-stability and anchoring recommendations, dewatering, groundwater, construction considerations and site preparation. 12.1.2 12.2.1 12.3.1 Water Line Replacement in Junction City Area GFS No. S-0035-C5-3 File No. WA10787 Contract No. 62002 Houston, Texas City of Houston c/o JNS Consulting Engineers, Inc. 17171 Park Row Suite 160 Houston, Texas 77084 Mr. Bo Wall, P.E. Tel.: 713-270-5700 City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, utility backfill testing, laboratory densities. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 12.1.2 12.2.1 12.3.1 Safe Sidewalk Program GFS No. N-0800-02-3 File No. SB9214-02 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections. 12.1.2 12.2.1 12.3.1 Treewater & Kirkwood No. 1 & 2 Lift Station Replacement GFS No. R-0267-79-3 WW 4895-03 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections. 12.1.2 12.2.1 12.3.1 11.1.1 11.2.1 Reconstruction of West Little Bridge at Vogel Creek GFS No. N-0687-04-3 File No.: SB9246-02 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, pile installation inspections, drilled footing inspections. 12.1.2 12.2.1 12.3.1 Water Line Replacement in Clinton Park, Settegast, Sunnyside Area GFS No. S-0036-09-3 File No. WA10874-02 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, utility backfill testing, laboratory densities. 12.1.2 12.2.1 12.3.1 Sanitary Sewer Rehabilit. by Sliplining and Pipe Bursting Methods Contract No. 4600006514 WBS No. R-000294-011-4 File No. 4257-77 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, utility backfill testing, laboratory densities, portland cement concrete testing, plant inspections. 12.1.2 12.2.1 12.3.1 13.1.1 Safe Sidewalk Program GFS No. N-0610-A-F1-3 File No. SB9137-1 Contract No. 5374 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections. 12.1.2 12.2.1 12.3.1 13.1.1 Sanitary Sewer Rehabilitation GFS No. R-0295-02-3 File No. WW4257-59 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, utility backfill testing, sewer construction inspection. 12.1.2 12.2.1 12.3.1 13.1.1 Waterline Replacement at Lake Houston GFS No. S-0035-C6-3 Houston, Texas City of Houston 611 Walker, 17th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7209 2006 Conducted testing of subgrade soils, utility backfill testing, portland cement concrete testing, plant inspections, sewer construction inspection, foundation observations. 12.1.2 12.2.1 12.3.1 13.1.1 Scott Street Paving From S. Acres to E. Orem GFS No. N-0618-01-3 File No. SB9084 Houston, Texas City of Houston 611 Walker, 14th Floor Houston, Texas 77002 Mr. Mike Pezeshki, P.E. Tel.: 713-837-7389 2006 Conducted laboratory compaction, field density tests on backfill and subgrade soils, stabilization recommendations concrete testing compressive strength and batch plant observations. 12.1.2 12.2.1 12.3.1 13.1.1 West Gray Sanitary Sewer Replacement Northside Phase II/Alemeda Sims Sewer Area GFS No. R-2011-41-3 Houston, Texas City of Houston 611 Walker, 14th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7030 2006 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, sewer construction inspection, non-destructive testing, foundation observations. 12.1.2 12.2.1 12.3.1 13.1.1 Ella Paving from Pinemont to W. Little York GFS No. N-0546-01-3 File No.: SB9046 Houston, Texas City of Houston 611 Walker, 14th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7030 2006 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, sewer construction inspection, non-destructive testing, foundation observations. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date 12.1.2 12.2.1 12.3.1 13.1.1 Safe Sidewalk Program GFS No. N0610A-09-3 File No.: SB9008-3R Houston, Texas City of Houston 611 Walker, 14th Floor Houston, Texas 77002 Mr. Gaju Patel, P.E. Tel.: 713-837-7030 14.1.1 14.2.1 14.3.1 2.13.1 Flow Meters at Five Water Plant Facilities D-254, D-123, D-203 West Houston 3 and Willowchase Mud Plant GFS No.: S-0936-08-2 City of Houston, Texas City of Houston 2005 c/o PTI, Inc. 2925 Briar Park Drive Suite 950 Houston, Texas 77042 Mr. Frank C. Mbachu, P.E. Tel.: 713-266-6145 Conducted geotechnical studies, geotechnical testing, design parameters for flow meters including bedding and dewatering requirements, groundwater elevations, trench safety and backfilling, construction considerations and subgrade stabilization. Conducted hazardous materials site assessment study. 14.1.1 14.2.1 14.3.1 Pleasentville Neighborhood Paving and Underground Utilities City of Houston Houston, Texas City of Houston 2005 c/o Vogt Engineering, L.P 110 Vision Park Blvd. Shanendoah, Texas 77384 Mr. David Vogt, P.E. Tel.: 936-273-9980 Conducted geotechnical studies, geotechnical testing, recommendations for pavement, underground utilities, including bedding and dewatering requirements, trench safety recommendations. Conducted hazardous materials site assessment study and a geologic fault study. 2.13.1 Pump and Chasewood Lift Station Renewal and Replacement at 6938 ½ Chasewood City of Houston GFS No.: R-0267-83-2 City of Houston 2005 c/o Chiang, Patel & Yerby 2925 Briarpark, Suite 850 Houston, Texas 77042 Ms. Patricia Syzdek Tel.: 713-532-1730 Conducted hazardous materials site assessment study. 14.1.1 14.2.1 14.3.1 Paving Improvements Intersection of Long Point and Blalock City of Houston GFS No.: N-0674-02-2 City of Houston 2005 c/o Demopulos & Ferguson 2180 North Loop West Suite 200 Houston, Texas77018 Mr. Chris Demopulos, P.E. Tel.: 713-783-7117 Conducted geotechnical studies, geotechnical testing, including design recommendations for pavement, construction considerations, subgrade stabilization. 14.1.1 14.2.1 14.3.1 SLW Aviation Hanger Facility Houston Hobby Airport Harris County, Texas City of Houston c/o Jacob White Construction Co. P.O. Box 890688 Houston, Texas 77289 Tel.: 281-286-6666 Conducted geotechnical studies, geotechnical testing including recommendations for design and construction of airport hanger, drilled footing and spreading footing recommendations, site preparation, earthwork, construction considerations. 14.1.1 14.2.1 14.3.1 New Downtown Fire Station 1 Bound by Louisiana, St. Joseph’s Parkway, Milam Street and Pierce Avenue GFS No.: C-0149-02-03 City of Houston, Texas City of Houston 2005 c/o Prozign Architects 9525 Katy Frwy., Ste. 315 Houston, Texas 77024 Mr. Albert Wong, AIA Tel.: 713-977-6060 Conducted geotechnical studies, geotechnical testing, including design recommendations for a fire station and antenna. Recommendations included lateral and uplift capacity of drilled footings, groundwater management, earthwork, site preparation, site drainage, trench safety, underground utilities, including bedding requirements and dewatering. Concrete and asphalt pavement recommendations. Conducted a Phase I Geologic Fault Study. 14.1.1 14.2.1 14.3.1 Waterline Extensions and Crossing the Willowbrook Service Area GFS No. S-0100-12-3 City of Houston, Texas City of Houston 2005 c/o Brooks and Sparks 15915 Katy Frwy, Ste. 440 Houston, Texas 77094 Mr. Sean Rooney, P.E. Tel.: 281-578-9595 Conducted geotechnical studies, geotechnical testing, including design recommendations for waterlines, dewattering, trench safety, tunnel shafts, pipe jacking and augering, pavements, construction considerations, analyses, subgrade stabilization and piezometer installations. 14.1.1 14.2.1 14.3.1 2.13.1 36-Inch Diameter Water Line Harris County Mud 402 & 403 Beltway 8 East Harris County, Texas City of Houston 2005 c/o Binkley & Barfield, Inc. 1710 Seamist Drive Houston, Texas 77008 Mr. Chris Campbell, P.E. Tel.: 713-869-3433 Conducted geotechnical studies, geotechnical testing, including design recommendations for waterlines, dewattering, trench safety, buoyancy, pavements, construction considerations, analyses and subgrade stabilization. Conduct hazardous materials site assessment study. 14.1.1 14.2.1 14.3.1 2.13.1 Ley Road from Mesa to Grade Separations at HB & TRR City of Houston Houston, Texas City of Houston 2004 c/o Scientech Engineers 5701 Woodway, Suite 200 Houston, Texas 77057 Mr. David Sadeghpour, P.E. Tel.: 713-977-6090 Conducted geotechnical studies, geotechnical testing including design recommendations for waterlines, dewatering, trench safety, pavements, construction considerations, box culvert recommendations, slope-stability analyses and subgrade stabilization. Conduct hazardous materials site assessment study. 2006 2005 Description Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, sewer construction inspection, non-destructive testing, foundation observations. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 2.13.1 Alabama South Subdivision City of Houston, Texas City of Houston 2004 c/o Sunland Engineering 9575 Katy Frwy, Ste. 200 Houston, Texas 77024 Mr. Brian Tao, P.E. Tel.: 713-467-8484 Conducted geotechnical studies, geotechnical testing, including design recommendations for waterlines, dewatering, trench safety, pavements, construction considerations and subgrade stabilization. 14.1.1 14.2.1 14.3.1 2.13.1 City of Houston Water Main Replacement Kelving Houston, Texas City of Houston 2004 c/o JNS Consulting Eng. 17171 Park Row, Ste. 160 Houston, Texas 77084 Mr. Jon Strange, P.E. Tel.: 713-973-9139 Conducted geotechnical studies, geotechnical testing, including underground utilities recommendations, trench safety, construction considerations, pavement design, retaining wall design, bearing capacity, subgrade stabilization, site preparation, hazardous initial site assessment and geologic fault study. 12.1.2 12.2.1 12.3.1 13.1.1 City of Houston Burn Building and Drill Tower Rennovations Val Jahnke Fire Training Academy 8030 Braniff Houston, Texas City of Houston 2004 c/o Morris Architects 3355 West Alabama Houston, Texas 77098 Mr. Anderson Smith, AIA Tel.: 713-622-1180 Conducted testing laboratory services, including conducting Schmidt Hammer testing, NDE testing, concrete petrographic analyses, compressive strength testing, Tensile testing of reinforcement and testing for chlorides. 14.1.1 14.2.1 14.3.1 City of Houston Bush Intercontinental Airport Expansion Houston, Texas City of Houston c/o Old World Builders 18000 Groeschke Road Houston, Texas 77084 Mr. Jim Ward Tel.: 713-818-6516 Conducted geotechnical studies, geotechnical testing for pavement recommendations, site preparation, earthwork, construction considerations, etc. 14.1.1 14.2.1 14.3.1 2.13.1 30-Inch Diameter Sanitary Sewer Force Main Crossing of Buffalo Bayou City of Houston City of Houston 2003 c/o Demopulos & Ferguson Associates, Inc. 2180 N. Loop West Suite 305 Houston, Texas 77018 Mr. Chris Demopulos, P.E. Tel.: 713-783-7117 Conducted geotechnical studies, geotechnical testing for a tunnel, construction considerations, pavement design, retaining wall design, bearing capacity, subgrade stabilization, site preparation, and slopestability. 14.1.1 14.2.1 14.3.1 2.13.1 Submersible Pump Lift Station City of Houston FN118 Lang Lift Station City of Houston 2003 c/o Demopulos & Ferguson Associates, Inc. 2180 N. Loop West Suite 305 Houston, Texas 77018 Mr. Chris Demopulos, P.E. Tel.: 713-783-7117 Conducted geotechnical studies, geotechnical testing, including underground utilities recommendations, lift station design, construction considerations, retaining wall design, bearing capacity, subgrade stabilization and site preparation. 14.1.1 14.2.1 14.3.1 City of Houston Project 554 Houston, Texas City of Houston Aviation Department 16930 JFK Blvd. Houston, Texas 77032 Mr. Bill Gaw, P.E. Tel.: 281-233-3000 2003 Conducted geotechnical studies, geotechnical testing for pavement recommendations, site preparation, earthwork, construction considerations, etc. 12.1.2 12.2.1 12.3.1 Conoco/Phillips Bush IAH Houston, Texas City of Houston c/o KBR 16155 Park Row, Ste 100 Houston, Texas 77084 Mr. Ronnie McKinney Tel.: 713-676-4770 2003 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection, steel testing, non-destructive testing foundation observations and concrete coring. 12.1.2 12.2.1 12.3.1 13.1.1 City of Houston Dept. of Aviation George Bush Intercontinental Airport, Terminal C Houston, Texas City of Houston 2002 P.O. Box 1562 2003 Houston, Texas 77251 Mr. Mike Pezeshki, P.E. Tel.: 832-395-2262 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection, steel testing, non-destructive testing foundation observations and concrete coring. 2004 GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 2.13.1 Pech Road Houston, Texas City of Houston c/o Huitt-Zollars, Inc. 1500 S. Dairy Ashford Suite 200 Houston, Texas 77077 Mr. Greg Wine, P.E. Tel.: 281-496-0066 2002 Conducted geotechnical studies, geotechnical testing, including pavement recommendations for the road, construction considerations, settlement computations, subgrade stabilization, site preparation, Phase I Geologic Fault Study, hazardous materials initial site assessment. 14.1.1 14.2.1 14.3.1 2.13.1 Chimney Rock Road Houston, Texas City of Houston c/o HNTB 100 Glenborough Drive Suite 1300 Houston, Texas 77067 Mr. Steve Hrncir, P.E. Tel.: 832-601-2000 2002 Conducted geotechnical studies, geotechnical testing, including underground utilities recommendations for pavement design, retaining wall design, bearing capacity, subgrade stabilization, site preparation recommendations, hazardous materials initial site assessment. 14.1.1 14.2.1 14.3.1 2.13.1 Westbury Street Houston, Texas City of Houston c/o JNS Consulting Eng. 17171 Park Row Suite 160 Houston, Texas 77084 Mr. Jon Strange, P.E Tel.: 713-973-9139 2002 Conducted geotechnical studies, geotechnical testing, including pavement design, retaining wall design, bearing capacity, subgrade stabilization, site preparation recommendations, trench safety, hazardous initial site assessment. 14.1.1 14.2.1 14.3.1 2.13.1 Knollwood Village Houston, Texas City of Houston c/o Brown & Gay 11490 Westheimer Suite 700 Houston, Texas 77077 Mr. David Scholler, P.E. Tel.: 281-558-8700 2002 Conducted geotechnical studies, geotechnical testing, including underground utilities recommendations, construction considerations, pavement design, retaining wall design, bearing, capacity, subgrade stabilization site preparation, hazardous initial site assessment. 14.1.1 14.2.1 14.3.1 2.13.1 Wilchester West Houston, Texas City of Houston c/o R. G. Miller Eng. 12121 Wilchester Suite 200 Houston, Texas 77079 Mr. Ron Neilsen, P.E. Tel.: 713-461-9600 2002 Conducted geotechnical studies, geotechnical testing, including underground utilities recommendations, settlement computations, construction considerations, pavement design retaining, wall design, bearing capacity subgrade stabilization, site preparation, Phase I Geologic Fault Study, hazardous materials initial site assessment. 2.13.1 Proposed Water Line Replacement Ridgecrest Subdivision Houston, Texas City of Houston c/o AIA Engineers, Ltd. 1011 Highway 6 South Suite 117 Houston, Texas 77077 Mr. Sandeep Patil, P.E. Tel.: 281-493-4140 2002 Conducted Phase I Environmental Site Assessment Study, hazardous materials initial site assessment. 12.1.2 12.2.1 12.3.1 13.1.1 City of Houston Dept. of Aviation George Bush Intercontinental Airport, Utility Meter Modifications Houston, Texas City of Houston P.O. Box 1562 Houston, Texas 77251 Mr. Mike Pezeshki, P.E. Tel.: 832-395-2262 2002 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection, steel testing, non-destructive testing, foundation observations. 14.1.1 14.2.1 14.3.1 14.4.1 City of Houston Smith Library Parking Expansion Houston, Texas City of Houston c/o Carroll Consultants 10260 Westheimer Suite 600 Houston, Texas 77042 Mr. Michael Lewis, P.E. Tel.: 713-783-4478 2002 Conducted geotechnicals, geotechnical testing computed heave, settlement, foundation alternatives, drilled footings, slab-on-grade, site preparation, site geology, subgrade stabilization, bearing capacity, pavement design recommendations. 12.1.2 12.2.1 12.3.1 City of Houston Houston Airport System Administration Building City of Houston, Texas City of Houston Aviation Department 16930 JFK Blvd., Houston, Texas 77032 Mr. Bill Gaw, P.E. Tel.: 281-233-3000 2003 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection, steel testing, non-destructive testing foundation observations and concrete coring. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work 14.1.1 14.2.1 14.3.1 Project Name Tidwell Road Houston, Texas Client City of Houston c/o AIA Engineers, Ltd. 1011 Highway 6 South Suite 117 Houston, Texas 77077 Mr. Ashraf Islam, P.E. Tel.: 281-493-4140 Date 2001 Description Conducted geotechnical studies, geotechnical testing, including foundation recommendations for pavement design, retaining wall design, bearing capacity, subgrade stabilization, site preparation recommendations. METROPOLITAN TRANSIT AUTHORITY GROUP TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 New Chiller Building Kashmere BOF Houston, Texas Metropolitan Transit 2009 Authority Arup 7670 Woodway, Ste. 162 Houston, Texas 77063 Mr. Saud A. Memon, P.E. Tel.: 713-783-2787 Will conduct geotechnicals, geotechnical testing for chiller building with spread footings and drilled footings slab steel locating, sieve analysis, particle size analysis, allowable bearing pressure, site preparation, construction considerations. 14.1.1 14.2.1 14.3.1 West Fuqua Park and Ride Sabo Road and Sagetree Dr. Houston, Texas Metropolitan Transit Authority c/o Infrastructure Assoc. 6117 Richmond Ave. Suite 200 Houston, Texas 77057 Mr. Vasant Hariani, P.E. Tel.: 713-622-0120 Will conduct geotechnicals, geotechnical testing for 1.8 acre parking facility, either concrete or asphalt paving, storm sewers, groundwater, subgrade, CBR values, trench safety, lateral pressures, design of storm sewers, including bedding requirements, groundwater and bouyancy forces, site preparation, construction considerations. 12.1.1 12.1.2 12.2.1 13.1.1 Travis Street Pierce to Commerce Houston, Texas Metropolitan Transit 2005 Authority 1201 Louisiana, 18th Floor P.O. Box 61429 Houston, Texas 77208-1429 Mr. Frank Andrews, P.E. Tel.: 713-739-3894 Conducted construction materials engineering, including testing of concrete, soils, asphalt. Conducted testing of underground utility backfill, subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 12.1.1 12.1.2 12.2.1 13.1.1 Richmond Transit Center Rice and West Alabama Houston, Texas Metropolitan Transit 2005 Authority c/o Uptown Houston District c/o Cobb Fendley and Associates, Inc. 5300 Hollister, Suite 400 Houston, Texas 77040 Mr. Bobby Nagel, P.E. Tel.: 713-462-3242 Conducted construction materials engineering, including testing of concrete, soils, asphalt. Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 12.1.1 12.1.2 12.2.1 13.1.1 Metro Lightrail Line Section 5 Houston, Texas Metropolitan Transit 2003 Authority 1201 Louisiana, 18th Floor P.O. Box 61429 Houston, Texas 77208-1429 Mr. Frank Andrews, P.E. Tel.: 713-739-3894 Conducted construction materials engineering, including testing of concrete, soils, asphalt. Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 12.1.1 12.1.2 12.2.1 13.1.1 Milam Street Commerce to Pierce Houston, Texas Metropolitan Transit 2003 Authority 1201 Louisiana, 18th Floor P.O. Box 61429 Houston, Texas 77208-1429 Mr. Frank Andrews, P.E. Tel.: 713-739-3894 Conducted construction materials engineering, including testing of concrete, soils, asphalt. Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 12.1.1 12.1.2 12.2.1 13.1.1 Westchase Park and Ride Houston, Texas Metropolitan Transit 2003 Authority th 1201 Louisiana, 18 Floor P.O. Box 61429 Houston, Texas 77208-1429 Mr. Frank Andrews, P.E. Tel.: 713-739-3894 Conducted construction materials engineering, including testing of concrete, soils, asphalt. Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 2009 GEOTECH ENGINEERING AND TESTING FORT BEND COUNTY GROUP TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 North Wastewater Treatment Plant Chemical Feed Facility and Road Improvements Sugar Land, Texas City of Sugar Land c/o Alan Plummer Assoc. 3100 Wilcrest Drive Suite 270 Houston, Texas 77042 Ms. Karen Hood, P.E. Tel.: 713-343-4902 2010 Conducted geotechnical studies, geotechnical testing for wastewater treatment plant, three chemical feed facility, chemical feed building and road improvements, groundwater, soils stratigraphy, subgrade preparation, earthwork, mat and waffle slab foundation recommendations for tank containment and building, settlement, PVR, modulus, site preparation and construction considerations. 14.1.1 14.2.1 14.3.1 11.2.1 Falcons Landing Boulevard from Station 15+00 to Station 38+00 Fort Bend County, Texas Fort Bend County 2010 c/o Huitt-Zollars 1500 S. Dairy Ashford Suite 200 Houston, Texas 77077 Mr. Qayyum K. Javed, P.E. Tel.: 281-496-0066 Conducted geotechnical studies, geotechnical testing, for construction of approximately 2400±-ft of Falcon Landing Boulevard, consisting of concrete roadway, storm/sanitary sewers, bridge over Willow Fork Buffalo Bayou, MSE walls, soils stratigraphy, groundwater, CBR, resilient modulus, concrete pavement design, design of storm sewers including dewatering, bedding, trench safety, design of divided bridge over channel including drilled footing recommendations with pile/pier group efficiency, slope ratios, erosion control, lateral pressures, backfill of existing pond recommendations. 12.1.1 12.1.2 12.2.1 Highway 59 Waterline Repairs Sugar Land, Texas City of Sugar Land c/o Huitt-Zollars 1500 S. Dairy Ashford Suite 200 Houston, Texas 77077 Mr. Mike Wilkinson Tel.: 281-275-2466 2010 Conducted construction materials engineering testing, for design and construction of a waterline, paving, utility trench backfilling, concrete testing. concrete coring, asphalt testing and observations, batch plant observations. 12.1.1 12.1.2 12.2.1 Improvements to Katy Gaston Road from FM 1093 to Cinco Ranch Blvd. Fort Bend County, Texas Fort Bend County c/o Schaumburg & Polk 11767 Katy Freeway Suite 900 Houston, Texas 77079 Mr. Mark Dessens, P.E. Tel.: 281-920-0487 2010 Conducting testing of field density for paving, utility trench backfilling, concrete testing. concrete coring, asphalt testing and observations, batch plant observations. 14.1.1 14.2.1 14.3.1 16-inch Waterline Country Club Boulevard to Sugar Creek Boulevard Sugar Land, Texas City of Sugar Land 2009 c/o Huitt-Zollars 1500 S. Dairy Ashford Suite 200 Houston, Texas 77077 Mr. Emmanuel De Pau, P.E. Tel.: 281-496-0066 Conducted geotechnical studies, geotechnical testing, for design and construction of a 2400± waterline, includeing, soil design parameters groundwater data, augering recommendations, trench safety, backfilling, dewatering, construction considerations, site preparation. 14.1.1 14.2.1 14.3.1 Lomardy Lift Station Lombardy Drive and San Marino Street Sugar Land, Texas City of Sugar Land c/o Johnston, LLC 800 Wilcrest Drive Suite 150 Houston, Texas 77042 Mr. Dinh Ho, P.E. Tel.: 713-532-2460 2009 Conducted geotechnical studies, geotechnical testing, for design and construction of a lift station, including, physical characteristics of soils, construction requirements, backfilling, caisson construction, dewatering, buoyancy, side friction resistance, bearing capacity, construction considerations, site preparation. 14.1.1 14.2.1 14.3.1 Pavilion at Memorial Park 15300 University Blvd. Sugar Land, Texas City of Sugar Land P.O. Box 110 Sugar Land, Texas 77487 Mr. Gregory Willey Tel.: 281-275-2358 2009 Conducted geotechnical studies, geotechnical testing, drilled footings, floating slab foundation recommendations, lateral and uplift capacity, PVR, soil stabilization, void spaces, construction considerations, site preparation, earthwork and surface water drainage. 14.1.1 14.2.1 14.3.1 11.2.1 Old Richmond Road Bridge Fort Bend County, Texas Fort Bend County c/o AIA Engineers, LTD 15310 Park Row Drive Houston, Texas 77084 Ms. Janice E. Kruse, P.E. Tel.: 281-493-4140 2009 Conducted geotechnical studies, geotechnical testing, for bridge over Red Gully, recommendations for concrete piles, pile group efficiency, slope stability recommendations for short-term, long-term, and rapid draw down, trench safety recommendations, gradation testing, construction considerations, site preparation. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 Ransom Road from Williams Way to to Wheaton Street Fort Bend County , Texas Fort Bend County 2009 c/o Othon, Inc. Consulting Engineers 11111 Wilcrest Green Dr. Suite 128 Houston, Texas 77042 Mr. Charles A. Othon Tel.: 713-975-8555 Conducted geotechnical studies, geotechnical testing, for approximately 12,989-ft± of Ransom Road, including 4-lanes, open ditches, storm sewer and detention pond, including resilient modulus, CBR values, recommendations on asphalt and concrete paving, design including erosion control, slope-stability, trench safety, lateral pressures, etc. 12.1.1 12.1.2 12.2.1 Turn Lanes Dairy Ashford and Austin Parkway CIP-TR08-01 and TR08-02 Sugar Land, Texas City of Sugar Land P.O. Box 110 Sugar Land, Texas 77487 Mr. Michael J. Wilkinson Tel.: 281-275-2466 2008 Conducting testing of subgrade soils, fill soils, portland cement concrete testing. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Pedestrian Bridge at Main Street and 1st Street Sugar Land, Texas City of Sugar Land 111 Gillingham Lane Sugar Land, Texas 77478 Mr. Michael J. Wilkisnon Tel.: 281-275-2466 2007 Conducted geotechnicals, geotechnical testing, including bridge foundations, drilled footings and prestressed concrete piles, potential construction problems, construction considerations. 12.1.1 12.1.2 12.2.1 11.1.1 12.2.1 Fort Bend County MUD No. 124 Wastewater Treatment Plant Improvements BGE Job No. 2480 Fort Bend County, Texas Fort Bend County c/o Myrtle Cruz 1621 Miliam, 3rd Floor Houston, Texas 77002 Ms. Sheila Stedman Tel.: 713-759-1368 2007 Conducted construction materials engineering, including testing of concrete and soils. This is a roadway and bridge construction inspection project. 12.1.1 12.1.2 12.2.1 11.1.1 11.2.1 Lakeview Drive Reconstr. Sugar Land, Texas City of Sugar Land Public Works Depart. 111 Gillingham Sugar Land, Texas 77487 Mr. Michael J. Wilkinson Tel.: 281-275-2466 2006 Conducted construction materials engineering, including testing of concrete, soils, steel, asphalt. This is a roadway and bridge construction inspection project. 12.1.1 12.1.2 12.2.1 Water Plant 3 and Well No. 7 Project WA 0102 Sugar Land, Texas City of Sugar Land P.O. Box 110 Sugar Land, Texas 77487 Mr. Michael J. Wilkinson Tel.: 281-275-2466 2005 Conducting testing of subgrade soils, fill soils, portland cement concrete testing. 12.1.1 12.1.2 12.2.1 On-Call Materials Eng. Project ST0506 P.O. # 074332 Sugar Land, Texas City of Sugar Land P.O. Box 110 Sugar Land, Texas 77487 Accounts Payable Tel.: 281-275-2455 2005 Conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. 12.1.1 12.1.2 12.2.1 13.1.1 11.1.1 11.2.1 McMane Street Improv. Precinct 2 Fort Bend County, Texas Section Four Station 708+00 to 772+00 Fort Bend County 2003 c/o PTI 2925 Briarpark Drive, #950 Houston, Texas 77042 Dr. Frank C. Mbachu, P.E. Tel.: 713-266-6145 Conducted construction materials engineering, including testing of concrete, soils, steel, asphalt. This is a roadway and bridge construction inspection project. 12.1.1 12.1.2 12.2.1 13.1.1 11.1.1 11.2.1 Fort Bend County Parkway Section One Station 533+00 to 544+00 Section Four Station 708+00 to 772+00 Fort Bend County, Texas Fort Bend County c/o TC& B 5757 Woodway Houston, Texas 77057 Mr. Joel Schramm, P.E. Tel.: 713-267-2885 Conducted construction materials engineering, including testing of concrete and soils. This is a roadway and bridge construction inspection project. 14.1.1 14.2.1 14.3.1 2.13.1 West Airport Boulevard Fort Bend County, Texas Fort Bend County 2002 c/o JNS Consulting Eng. 17171 Park Row, Suite 160 Houston, Texas 77084 Mr. Jon Strange, P.E. Tel.: 713-973-9139 2003 Conducted geotechnical studies, geotechnical testing, including piles, drilled footings, settlement computations, construction considerations, pavement design, slope stability, retaining wall design, bearing capacity, subgrade stabilization, site preparation, hazardous materials initial site assessment. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 West Belfort Road Fort Bend County, Texas Fort Bend County 2002 c/o Cobb, Fendley & Assoc. 5300 Hollister Suite 400 Houston, Texas 77040 Mr. Herb McDonald, P.E. Tel.: 713-462-3242 Conducted geotechnical studies, geotechnical testing, settlement computations, construction bearing considerations, pavement design, retaining wall design, capacity, subgrade stabilization, site preparation. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Settgast Road Fort Bend County, Texas City of Missouri City c/o Carter Burgess 55 Waugh Drive Suite 300 Houston, Texas 77007 Mr. Buddy Barnes, P.E. Tel.: 713-869-7900 Conducted geotechnical studies, geotechnical testing, including foundation recommendations for bridges, including piles, drilled footing, construction considerations, pavement design, slope stability, retaining wall design, bearing capacity, settlement computations, subgrade stabilization, site preparation. 2001 MONTGOMERY COUNTY GROUP TxDOT Category of Work Project Name Client Date Description 12.1.2 12.2.1 12.3.1 FM 1484 Extension (Mike Meador Parkway) Precinct 1 Montgomery County, Texas Montgomery County 301 N. Thompson Suite 209 Conroe, Texas 77301 Mr. Jeff Johnson Tel.: 936-539-7833 2010 Conducted testing of portland cement concrete testing, plant inspections, roadway construction inspection. 14.1.1 14.2.1 14.3.1 Four-Story New County Montgomery County Administration Building301 N. Thompson and Three-Story Parking Suite 209 Garage Conroe, Texas 77301 North Thompson Street Mr. Mark Bosma Montgomery County, Texas Tel.: 936-538-8070 2009 Conducted geotechnical studies, geotechnical testing, including drilled footings or spread footings, detailed settlement study, asphalt pavement for auto and light truck loads, site preparation, construction considerations, site drainage. Conducted testing of portland cement concrete testing, plant inspections, roadway construction inspection. 12.1.2 12.2.1 12.3.1 State Highway Improvements Montgomery County 2008 FM 1485 Transportation Program Montgomery County, Texas 207 West Phillips, Ste. 106 Conroe, Texas 77301 Attn: Mr. Jose Ramirez, P.E. Tel.: 936-441-9121 Conducted testing of portland cement concrete testing, plant inspections, roadway construction inspection. 12.1.2 12.2.1 12.3.1 Montgomery County Drainage Montgomery County 2007 District No. 6, Phase I Regional Detention Basin Montgomery County, Texas 1500 South Dairy Ashford Suite 200 Houston, Texas 77077 Tel.: 281-496-0066 Conducted testing of portland cement concrete testing, plant inspections, roadway construction inspection. 14.1.1 14.2.1 14.3.1 Community Center Gerald Street Montgomery County, Texas Montgomery County 301 North Thompson Conroe, Texas 77301 Mr. Keith Lester Tel.: 936-538-8175 2006 Conducted geotechnical studies, geotechnical testing, including drilled footings and spread footings, pavement recommendations for parking area, site conditions, trench safety, site preparation, construction considerations for the building and parking areas. 12.1.2 12.2.1 12.3.1 13.1.1 Rayford Reconstruction from I-45 to Railroad Montgomery County, Texas Montgomery County 1130 Pruitt Road Spring, Texas 77380 Mr. Art Salinas Tel.: 281-367-3977 2006 Conducted testing of portland cement concrete testing, plant inspections, roadway construction inspection. 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Jackson Road Bridge FM 149 at FM 1486 Montgomery County, Texas Montgomery County 2003 Office of County Engineers 301 N. Thompson Suite 209 Conroe, Texas 77301 Mr. Mike Beitler, P.E. Tel.: 936-539-7833 Conducted geotechnical studies, geotechnical testing, including pile design, bearing capacity, settlement computations, subgrade stabilization, site preparation, construction considerations for Jackson Road Bridge. GEOTECH ENGINEERING AND TESTING GALVESTON COUNTY TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 12.1.2 12.2.1 12.3.1 8th 9th and 10th Streets from State Highway 146 to Kipp Avenue City of Kemah Galveston County, Texas Galveston County c/o LJA Engineering & Surveying, Inc. 11821 E. Frwy, Ste. 400 Houston, Texas 77029 Mr. W. Trochesset, P.E. Tel.: 713-450-1300 2011 Conducted geotechnical studies, geotechnical testing for two-lane concrete sections with open ditches, designed as residential streets, groundwater, soil stabilization, CBR values, resilient modulus, construction considerations, site preparation. In addition, we conduct testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. 14.1.1 14.2.1 14.3.1 Hanson Road From FM 2094 to Kemah City Limits Galveston County, Texas Galveston County c/o Pate Engineers 13333 Northwest Frwy. Suite 300 Houston, Texas 77040 Mr. Travis Sellers, P.E. Tel.: 713-463-3178 2010 Conducted geotechnical studies, geotechnical testing for 2300± two-lane concrete roadway, including groundwater, CBR, concrete pavement design, soil stabilization, construction considerations, site preparation. 12.1.1 12.1.2 12.2.1 33rd Street Sanitary Sewer Rehabilitation Galveston, Texas City of Galveston c/o CDM 3050 Post Oak Blvd. Suite 300 Houston, Texas 77056 Mr. Jeff Peters, P.E. Tel.: 713-423-7300 2010 Conducted construction materials engineering including testing of soils and asphalt. Conducted testing of utility backfill materials and placement, paving sugbgrade, stabilization determination and asphalt testing. 14.1.1 14.2.1 14.3.1 7 Mile Road Reconstruction from Stewart to San Luis Pass Galveston County, Texas Galveston County c/o Klotz Associates, Inc. 1160 Dairy Ashford Suite 500 Houston, Texas 77079 Mr. Kevin Hoffman, P.E. Tel.: 281-589-7257 2009 Conducted geotechnical studies, geotechnical testing for 2600± asphalt roadway and open ditches, including asphalt pavement design, resilient modulus and CBR values for natural soils, coring, stabilization requirements, for pavements, design of open ditches including slope ratios and erosion protection site preparation and construction considerations. 14.1.1 14.2.1 14.3.1 Lawrence Road from SH 96 to FM 2094 Galveston County, Texas Galveston County c/o Lina T. Ramey & Associates, Inc. 2400 Augusta Drive Suite 301 Houston, Texas 77057 Ms. Lina T. Ramey, P.E. Tel.: 713-972-0200 2009 Conducted geotechnical studies, geotechnical testing for 10,269± of concrete road, open ditches, CBR values, concrete pavement design, soil stabilization, concrete coring and patching, site preparation, construction considerations. 14.1.1 14.2.1 14.3.1 Melody Lane Widening 160-ft NW of Leroy to FM 2351 (Edgewood) Galveston County, Texas Galveston County c/o Klotz Associates, Inc. 1160 Dairy Ashford Suite 500 Houston, Texas 77079 Mr. Kevin Hoffman, P.E. Tel.: 281-589-7257 2009 Conducted geotechnical studies, geotechnical testing for concrete roadway and storm sewers, including concrete pavement design, resilient modulus and CBR values for soils, stabilization requirements, storm sewer recommendations, dewatering, trench safety, lateral pressures, site preparation and construction considerations. 12.1.1 12.1.2 12.2.1 My Road Project I-45 to GH & HRR Galveston County, Texas Galveston County 2008 Office of County Engineer 123 Rosenberg, Suite 4157 Galveston, Texas 77550 Mr. Michael Fitzgerald, P.E. Tel.: 409-770-5549 Conducted construction materials engineering including testing of soils, concrete and asphalt. Conducted testing of utility backfill materials and placement, paving subgrade, lime determination, plant inspections, and asphalt testing and observations. 12.1.1 12.1.2 12.2.1 13.1.1 Deats Road I-45 to GH & HRR Galveston County, Texas Galveston County 2004 Office of County Engineer 123 Rosenberg, Suite 4157 Galveston, Texas 77550 Mr. Michael Fitzgerald, P.E. Tel.: 409-770-5549 Conducted construction materials engineering including testing of soils, concrete and asphalt. Conducted testing of utility backfill materials and placement, paving subgrade, lime determination, plant inspections, and asphalt testing and observations. 14.1.1 14.2.1 14.3.1 Port of Galveston Parking Facility Galveston County, Texas Galveston County 123 Rosenberg Ave. P.O. Box 32877553 Galveston, Texas 77550 Mr. Albert Churchhill Conducted geotechnical studies, geotechnical testing, including pavement design, bearing capacity, settlement computations, subgrade stabilization, site preparation, pavement recycling, construction considerations. 2003 GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 11.2.1 Mary Wagner Bridge Over Hostetter Creek Montgomery County, Texas Montgomery County 2003 Office of County Engineers 301 N. Thompson Suite 209 Conroe, Texas 77301 Mr. Mike Beitler, P.E. Tel.: 936-539-7833 Conducted geotechnical studies, geotechnical testing, including pile design, bearing capacity, settlement computations, subgrade stabilization, site preparation, construction considerations for Mary Wagner Bridge. 12.1.2 12.2.1 12.3.1 13.1.1 Clear Lake Road Improvements Galveston County, Texas Galveston County 2003 Office of County Engineer 123 Rosenberg, Suite 4157 Galveston, Texas 77550 Mr. Michael Fitzgerald, P.E. Tel.: 409-770-5549 Conducted construction materials engineering, including testing of soils and asphalt. Conducted testing of utility backfill materials and placement, paving subgrade, lime determination, plant inspector and asphalt testing and observations. 14.1.1 14.2.1 14.3.1 Deats Road I-45 to GH & HRR Galveston County, Texas Galveston County 2002 c/o PTI , Inc. 2925 Briarpark Drive Suite 950 Houston, Texas 77042 Mr. David L. Collins, P.E. Tel.: 713-266-6145 Conducted geotechnical studies, geotechnical testing, including pavement design, bearing capacity, settlement computations, subgrade stabilization, site preparation, pavement recycling and construction considerations. 14.1.1 14.2.1 14.3.1 Reconstruction/Full Depth Reclamation Various Roads Montgomery County, Texas Montgomery County 2002 Office of County Engineers 301 N. Thompson Suite 209 Conroe, Texas 77301 Mr. Mike Beitler, P.E. Tel.: 936-539-7833 Conducted geotechnical studies, geotechnical testing, including pavement design, bearing capacity, settlement computations, subgrade stabilization, site preparation, pavement recycling, construction considerations. 12.1.2 12.2.1 12.3.1 13.1.1 Montgomery County Arena and Convention Facility Montgomery County, Texas Montgomery County 9055 Airport Road FM 1484 Conroe, Texas 77303 Mr. Don Carpenter Tel.: 409-538-8005 Conducted testing of subgrade soils, portland cement concrete testing, plant inspections, roadway construction inspection. 1999 WATER AUTHORITIES TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 San Jacinto River Auth. Replacement of Siphons for Locations 8 (MillerWilson Road), 11 (Runneberg), 13 (Church St.) San Jacinto Water Authority c/o CobbFendley 13430 NW Freeway Suite 1100 Houston, Texas 77040 Mr. Dale Conger, P.E. Tel.: 713-462-3242 2010 Conducted geotechnical studies, geotechnical testing for design and construction of Siphons, including, groundwater dewatering, soils stratigraphy, retention system, construction considerations, backfilling, lateral earth pressures, site preparation 14.1.1 14.2.1 14.3.1 12-inch Waterline NFBWA Segment 1A to Bissonnet MUD Water Plant 1, and NFBWA Segment 1A to Bissonnet MUD Water Plant 2 West Harris Regional Water Authority Harris County, Texas West Harris County 2009 Water Authority Huitt-Zollars 1500 S. Dairy Ashford Suite 200 Houston, Texas 77077 Mr. Emmanuel De Pau, P.E. Tel.: 281-496-0066 Conducted geotechnical studies, geotechnical testing for, design and construction of two waterline alignments, including, groundwater dewatering, soils stratigraphy, retention system, construction considerations, trench excavations, backfilling, lateral earth pressures, tunnel shaft recommendations. In addition, we also conducted a Phase I Geologic Fault Study. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work 14.1.1 14.2.1 14.3.1 2.13.1 Project Name 24” – 36” Waterline Harris County MUD #443 Water Plant to Tuckerton West Harris County Water Authority Harris County, Texas Client West Harris County Water Authority c/o Sander Engineering 10555 Richmond Ave. Suite 100 Houston, Texas 77042 Mr. Erik Miller, P.E. Tel.: 713-784-4830 Date 2009 Description Conducted geotechnical studies, geotechnical testing, for 4000± lineal ft. of waterline, including groundwater data, trench excavation, backfilling, dewatering, trench safety, construction considerations, site preparation, etc. Conducted a Phase I Environmental Site Assessment. In addition, conducted Phase I Geologic Fault Study. OTHER GROUPS TxDOT Category of Work Project Name Client Date Description 2.13.1 14.1.1 14.2.1 14.3.1 East West Streets Sidewalk Reconstruction Downtown Redevelopment TIRZ 3 Houston, Texas LAN, Inc. 2011 2925 Briarpark Dr. Suite 400 Houston, Texas 77042 Ms. V. L. Montalbano, P.E. Tel.: 713-266-6900 Conducted limited geotechnical testing and Limited Phase II Environmental Site Assessment study, estimate the degree of hydrocarbon, VOC contamination, evaluate pavement sections, site conditions, TPH, BTEX, MTBE tests, groundwater, etc. 14.1.1 14.2.1 14.3.1 8th, 9th and 10th Streets from SH 146 to Kipp Ave. City of Kemah Galveston County, Texas City of Kemah c/o LJA Eng. & Surv. 11821 East Freeway Suite 400 Houston, Texas 77029 Tel.: 713-450-1300 2011 Conducted soil exploration studies, geotechnical testing for reconstruction of several streets, subgrade properties including resilient modulus and CBR values, soil stabiliaation for concrete and asphalt streets, construction consideration and site preparation. 14.1.1 14.2.1 14.3.1 West Main Force Main, Lift Station and Butler Road Force Main League City, Texas City of League City c/o Sander Engineering 10555 Richmond Suite 100 Houston, Texas 77042 Mr. Erik Miller, P.E. Tel.: 713-784-4830 2010 Conducted geotechnical studies, geotechnical testing for lift station and force main, augering and pipe jacking techniques, design recommendations, bedding, dewatering, groundwater, retention system, backfilling, buoyancy forces, lateral pressures, trench safety, uplift loads, pavement design, site preparation, construction considerations. A Phase I Fault Study was also conducted. 14.1.1 14.2.1 14.3.1 City of Conroe Sanitary Sewer Project La Salle to League Line Rd Near Lake Conroe City of Conroe, Texas City of Conroe 2010 300 W. Davis Conroe, Texas 77305 Mr. Andres Berdugo, P.E. Tel.: 936-522-3133 Conducted soil exploration studies, geotechnical testing, including lift stations, sanitary sewer, sanitary gravity sewers, including groundwater, excavation recommendations on bedding, dewatering, thrust restraint, backfilling, soil design parameters, trench construction, lateral earth pressures, construction consideration and site preparation. 12.1.1 12.1.2 12.2.1 Buffalo Speedway from Bissonet to US 59 Houston, Texas UKRA c/o Gunda Corp. 7322 Southwest Frwy. Suite 1802 Houston, Texas 77074 Mr. Ramesh Gunda, P.E. Tel.: 713-541-3530 2010 Conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. 12.1.1 12.1.2 12.2.1 Kirby Drive Paving from Richmond to Westhiemer WBS No. M-000278-0001-4 Houston, Texas UKRA c/o Guunda 2010 Corporation 7322 Southwest Frwy. Suite 1802 Houston, Texas 77074 Mr. Rajesh Tanwani, P.E. Tel.: 281-933-7388 Conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. 12.1.1 12.1.2 12.2.1 Stadium Lane On-Street Paved Parking Friendswood, Texas City of Friendswood 2010 910 South Friendswood Dr. Friendswood, Texas 77546 Mr. Brian Rouane Tel.: 281-996-3295 Conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date Description 14.1.1 14.2.1 14.3.1 Starvation Gap Marsh Restoration Project Texas Parks and Wildlife Galveston, Texas Professional Engineering & Environmental Consultants, Inc. 1065 Muller Pkwy Suite B Westwego, LA 70094 Mr. Mo Saleh, P.E. Tel.: 504-347-1900 2009 Conducted geotechnical studies, geotechnical testing, for marsh areas and borrow pits, soils stratigraphy, settlement of areas due to dredged spoils, construction problems. 14.1.1 14.2.1 14.3.1 12.1.1 12.1.2 12.2.1 Design of Sheet Piling Retaining Wall for The River Revetment Structure at The Colorado River (1506-0901) Matagorda County, Texas LJA Engineering & Surveying 2929 Briarpark Drive Suite 600 Houston, Texas 77042 Mr. Wilson Wong, P.E. Tel.: 713-953-5200 2009 Conducted geotechnical studies, geotechnical testing, revetment structure, sheet pile wall, cantilever or anchor foundation system, design of bulkhead, lateral pressures, rock backfill, soil design parameters, slope-stability, erosion protection, lateral and uplift loading, pile capacity, soil stabilization, construction considerations, site preparation. Conducted testing of laboratory compaction. Field density testing for backfill material, concrete testing and observations. 14.1.1 14.2.1 14.3.1 Rosewood Remedial Site Rosewood Ave. & Ridgeway Drive Austin, Texas HDR Engineering, Inc. 2009 4401 W. Gate Blvd. Suite 400 Austin, Texas 78745 Mr. Craig McColloch, P.E. Tel.: 512-912-5178 Conducted geotechnical studies, geotechnical testing, suitability of on site soils for capping materials, well installation, piezometer installation, slope-stability for excavations, including short-term, long-term and rapid draw down, erosion control, site preparation and construction considerations. 14.1.1 14.2.1 14.3.1 Reconstruction of County Road 257 (Blue Water Highway) from Surfside to Treasure Island Brazoria County, Texas Coast & Harbor Eng. 2009 3410 Far West Blvd. Suite 210 Austin, Texas 78731 Mr. Hugo Bermudez, P.E. Tel.: 512-342-9700 Conducted geotechnical exploration, soil testing, for sheet pile walls, asphalt paving, slope-stability, design of bulkhead, including soil design parameters, active and passive coefficients, sheet pile anchoring, erosion protection, earthwork, site preparation, construction considerations, etc. 14.1.1 14.2.1 14.3.1 Pavement Design Recommendations Ameriport Facility, Phase I Baytown, Texas National Property Holdings 3330 S. Sam Houston Parkway E. Houston, Texas 77047 Mr. Ryan Lovell, P.E. Tel.: 713-578-1211 2008 Conducted geotechnical exploration, soil testing, for buildings, pavement, detention ponds, utilities, lift station, rail including, groundwater levels, constructability issues, site preparation, traffic loading, recommendations for concrete paving, earthwork, potential vertical rise, slope ratios and erosion protection, dewatering, trench safety, bouyancy, bedding requirements, vegetation control, box culverts, construction considerations, etc. 14.1.1 14.2.2 14.3.1 ADA Ramp at Texas national Guard 3006 Gulf Freeway Texas City, Texas Powers Brown Architecture 1314 Texas Avenue 2nd Floor Houston, Texas 77002 Mr. Bruce J. Walck Tel.: 713-224-0456 2008 Conducted geotechnicals, geotechnical testing, coring, laboratory testing, recommendations on pavement for ramp to a building, potential vertical rise, construction considerations, bearing capacity and site preparation. 14.1.1 14.2.1 14.3.1 Brazoria County, Precinct 3 Service Center at 2508 North Gordon Street Alvin, Texas Brazoria County Auditor 2007 111 East Locust, Room 303 Angleton, Texas 77515 Mr. Charles Crook, CPPB Tel.: 979-864-1825 Conducted geotechnicals, geotechnical testing, coring, laboratory testing, foundation recommendations, allowable bearing pressure, pier and pile recommendations, potential vertical rise, pavement recommendations, construction considerations, bearing capacity and site preparation. 12.1.1 12.1.2 12.2.1 Dallas Salmon Wastewater Treatment Plant City of League City League City, Texas City of League City 2005 c/o CDM 1800 West Loop South Mr. Jeffery S. Peters, P.E. Tel.: 713-850-1921 Conducting testing of subgrade soils, fill soils, portland cement concrete testing. 12.1.1 12.1.2 12.2.1 Alabama Street Pasadena Blvd. to Secretariat CIP Project No. 5050 Pasadena, Texas City of Pasadena P.O. Box 672 Pasadena, Texas 77501 Mr. Robin Green, P.E. Tel.: 713-475-7836 Conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. 2005 GEOTECH ENGINEERING AND TESTING TxDOT Category of Work Project Name Client Date 2004 Description 12.1.1 12.1.2 12.2.1 Pasadena Police Academy Driving Track Phase II, CIP #P003-2 Pasadena, Texas City of Pasadena 1211 East Southmore Pasadena, Texas 77502 Mr. Mark Gardemal Tel.: 713-475-5572 14.1.1 14.2.1 14.3.1 11.1.1 11.2.1 Pifer Road Drainage Impr. From Station 1+00 to Station 24+00 The City of Hunters Creek Village, Texas City of Hunters Creek 2004 c/o Robert T. Deden Services 9328 West View .Houston, Texas 77055 Mr. Robert T. Deden, P.E Tel.: 713-461-8822 Conducted geotechnicals, geotechnical testing including foundation recommendations for box/pipe storm sewers, bridge on Pifer, including spread footings and drilled footing; construction considerations, bearing capacity, settlement computations, subgrade stabilization. 14.1.1 14.2.1 14.3.1 Foxmeadows from Fairmont to Allen Genoa, Young Street from Fairmont to Crenshaw, Federal, Crenshaw and Hernandez City of Pasadena, Texas City of Pasadena c/o JNS Consulting Engineering, Inc. 17171 Park Row Suite 160 Houston, Texas 77084 Mr. Jon Strange, P.E. Tel.: 713-973-9139 Conducted geotechnicals, geotechnical testing for pavement, underground utilities, and box culvert. Developed recommendations on pavement design, bearing capacity, settlement computations, subgrade stabilization, construction considerations and site preparation. 2002 Conducting testing of subgrade soils, fill soils, portland cement concrete testing, plant inspections. GEOTECH ENGINEERING AND TESTING APPENDIX C Accreditation Certificates GEOTECH ENGINEERING AND TESTING APPENDIX D HUB and DBE Certificates GEOTECH ENGINEERING AND TESTING