MAN - Genuine Complete Propulsion Packages - Mari-Tech
Transcription
MAN - Genuine Complete Propulsion Packages - Mari-Tech
Maritech 2004 Genuine Complete Propulsion Packages by Mr Lars Fischer Sales Manager, Propulsion Sales Locations of MAN B&W Diesel Great Britain Paxman Ruston Mirrlees Blackstone Four-stroke engines •Marine propulsion •Military marine •Power generation •Rail traction France Pielstick Four-stroke engines •Marine propulsion •Military marine •Power generation •Rail traction •Service •Licensor Stockport Colchester Denmark MAN B&W Diesel A/S Two-stroke engines Frederikshavn •Research and development •Marine propulsion •Power generation Copenhagen •Service •Spare parts Holeby •Licensor Rostock Hamburg Four-stroke engines •Complete propulsion package •GenSets •Power generation •Licensor Paris Augsburg Saint-Nazaire Jouet Germany MAN B&W Diesel AG Four-stroke engines •Research & development •Marine propulsion •Power generation •Service •Licensor The propulsion package traditions - are based on ten decades of: 4 hp - year 1904 • Craftsmanship • Experience • Knowledge • Research • Technical innovations 3,700 HP – as of today The Works A total of 33,500 m2 : • Advanced production plant • Foundry with pattern shop • Engine test facilities • Administration and service ”Minor Propulsion” Part of a Large Product Spectrum MAN B&W Two-stroke Package Type of vessel: 1600 TEU Container Vessel Main engine: 8S50MC-C 12640 kW at 127 rpm Tunnel gear: Renk 1800 kWe CP propeller: VBS1680 dia. Ø 5700 mm (GL ice E4) Four-stroke MAN B&W packages From L21/31 packages (1,290 kW/engine) To L58/64 packages (12,510 kW/engine) Market trends • • • • • Shipbuilding is moving to countries with low knowledge Shipyards are out-sourcing project and technical work Fewer suppliers with more complex product portfolio More complex requirements to the propulsion plant Propulsion systems and components are more complex - All of the above market trends call for genuine complete packages Trade packages from more locations Propeller experts Gear experts Engine experts + + Control experts + 80% focused on the shipyard The genuine package - All under one roof MAN B&W Alpha - during the entire life cycle ! 80% focused on the shipowner The concept of the genuine propulsion package The genuine package provides added value to all customers • Optimised combination of products and system solutions • Optimised quality of products • Single source of contact to all experts under one roof • One point of responsibility for the complete system • One point of service contact during operational lifetime The 5th product •Project guides •Dimension sketches on discs •Installation drawings •Instruction books •Strenght calculations - ice class •Special stern tube arrangements •Whirling calculations •Torsional vibration calculations •Axial vibration calculations •Optimum gear ratios •PTO/PTI configurations •Auxiliary propulsion systems •Flexstar units •Ship’s speed prognosis •Power analysis •Towing force estimation •Layout of propellers •Pressure impulses on hull •Alignment analysis and instructions •Epoxy chock calculations •Resilient installation •Highly flexible coupling •Noise levels •Ambient conditions •Ship’s operation profile •Engine selection •Jet assist •Two-stage charge air cooler •Layout of piping system •Back-pressure calculations •Layout of accessories •Waste heat recovery •Alphatronic controls •Manoeuvring stations •Operating modes •Load sharing •Joystick interfaces •Alphatronic safety systems Advantages for the shipyard Offered by the genuine propulsion package: No hidden costs, since interfaces and integration matters are solved Thorough design integration of engine, gearbox, propeller and control systems leads to minimal installation work on a reduced number of connecting points One "Plant Information" package of integrated documentation for the installation of the entire power train Shop tests at one location One batch delivery of all package elements is possible One team of multi-skilled commissioning engineers for starting up, quay tests and sea trials - installation costs may be reduced by up to 10% Technical clarifications Total Freight, commissioning, project handling yard installation Accessories CP propeller and controls Gearbox Main engine Price Package prices MAN B&W Competitor Advantages for the shipowner Offered by the genuine propulsion package: Optimal operating economy is ensured thanks to the optimised layout of engine, reduction gearbox, propeller and control systems Operating reliability, durability and predictable service intervals are assured without compromise, from individually optimised components Only one type of lube oil needed for engine, reduction gear and propeller. Simple and reduced on board handling and storage One integrated package of service documentation, maintenance programmes and spare parts catalogues One service organization addressing all propulsion plant support requirements Warranties, service agreements etc available for the complete power train - total operational economy improved by 2-3 % Advantages for the shipowner Confidence in genuine propulsion package: Technical guarantees SFOC, bollard pull, propeller efficiency Product guarantees General warranties, guaranteed TBO’s, pro rata guarantees Service agreements - offering predictable operational costs for the operator The New Generation of Propulsion Systems • • • • New Generation of Propulsion Engines Continuous development on Reduction Gearboxes Continuous development on CP Propellers New Generation of Remote Control System Main data - propulsion engines Designation Unit L21/31 L27/38 Bore Stroke Stroke/bore Swept volume/cyl Cyl nos Power/cyl Power range Speed SFOC (mcr) SLOC Bmep Mean piston speed Pmax mm mm ratio ltr in line kW kW rev/min g/kWh g/kWh bar m/s bar 210 310 1.5 : 1 10.7 6-7-8-9 215 1,290-1,935 1,000 184 0.5-0.8 24.1 10.3 200 270 380 1.4:1 21.8 6-7-8-9 340 2,040-3,060 800 182 0.5-0.8 23.5 10.1 200 The New Concept Engine L27/38 No cooling water in frame Separate camshafts Marine head connecting rod Noise dampening covers Oil in sump Cylinder Unit Concept • Easy withdrawal of complete cylinder unit, incl piston and connecting rod. • Overhaul intervals are 20-25,000 hours. • Quick and easy ‘pit-stop’ replacement is possible. • Professional workshop overhaul ensure optimal performance and life time. • Exchange/overhaul contracts are available. Cylinder Unit – ’Pit-stop’ Exchange Dismantling: 2 men – 1 hour Mounting: 2 men – 1 ½ hour Alpha Module Reduction Gearbox Type AMG28EV Type AMG55EV AMG28EV Gearbox Lubricating oil Servo oil – pitch astern Servo oil – pitch ahead Clutch oil VBS Propeller and AMG28EV Gearbox Propeller for a Chemical Tanker Engine Output Gear Red. Ratio PTO/PTI CPP Diameter 9L27/38 3060 kW 56VO78 800/144 750 kW VBS 980 3900 mm Local Monitoring, Control and Safety TC RPM IL-Bus-ME PI PI Alphacomm Monitoring 24Vdc Alphacomm Safety 24Vdc (Safety) Duplicated Net Engine RPM IL-Bus-MGP STOP IL-Bus-S (in Governor) STOP START Components on Engine and Gear Clutch In/Out Ahead/ Astern PI PI Alphacomm Monitoring I Pitch 24Vdc Alphatronic 2000 Remote control system Local monitoring, control and safety system The Operator Workstation, Complete % rpm Cylinder 1 bar O bar C O C 560 530 500 470 440 410 380 350 320 290 260 230 200 2 O C 560 530 500 470 440 410 380 350 320 290 260 230 200 3 O C 560 530 500 470 440 410 380 350 320 290 260 230 200 4 O C 560 530 500 470 440 410 380 350 320 290 260 230 200 5 O C 560 530 500 470 440 410 380 350 320 290 260 230 200 6 O C 560 530 500 470 440 410 380 350 320 290 260 230 200 7 O C 560 530 500 470 440 410 380 350 320 290 260 230 200 8 O C 560 530 500 470 440 410 380 350 320 290 260 230 200 9 O Exhaust Gas Temperature O bar Press. before Filter Press. after Filter TC Lub. Oil Press. O bar 6.0 5.5 5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0 C Temp. Lubricating Oil Press. Temp. bar C 560 530 500 470 440 410 380 350 320 290 260 230 200 Press. Fuel Oil O C Temp. In C Temp. Out bar 6.0 5.5 5.0 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0 Press. O SHUT DOWN Active SHUT DOWN Cancelled Emergency Stop Overspeed, Engine Engine Lub. Oil Press. Low HT Cooling Water Temp. High HT Cooling Water Press. Low Gear Lub. Oil Press. Low Oil Mist in Crank Case Panel / Lamp Test CONTROL POSITION RUN STOP START LOCAL REMOTE bar 40 35 30 25 20 15 10 5 0 Start Air Press. % rpm O C bar O C O C rpm % Pitch % Ahead Panel / Lamp Test Speed Start Blocking Turning Gear Prop. Pitch not Zero Propeller Locked % rpm Press. Temp. Charge Air Temp. Out Safety RESET SHUT DOWN bar 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0 bar TC Temp. Out rpm C C 560 530 500 470 440 410 380 350 320 290 260 230 200 LT Cooling Water HT Cooling Water CANCEL SHUT DOWN TC Temp. In bar O C 560 WASTE BY530 GATE PASS 500 OPEN 470 OPEN 440 410 BY380 WASTE PASS 350 GATE 320 290 260 TC Speed 230 200 O C Temp. In O rpm Fuel Index Astern Alphatronic 2000 Control System Slave Bridge Control Station Pitch RPM Operator Panel (*) Pitch RPM ES: Emergency Stop BU: Back-Up Control Operator Panel ES Slave Bridge Control Station BU Operator Panel (*) ES ES Handles Interface Bridge RPM Ship’s Alarm System Pitch Operator Panel (*) ES Start/Stop, Remote/Local Shaft Generator / PMS (in Governor) START STOP Operator Panel (OP-E) Governor Speed Set I Clutch In/Out, Remote/Local STOP Alphacomm Monitoring Remote Control System Fuel Index I Charge Air Press. Pitch Set Operator Panel (OP-GP) Serial Pitch Duplicated Network RPM Main Bridge Control Station Alphacomm Safety Clutch In/Out Ahead/ Astern Propeller Pitch Closed Loop Control Box Pitch I Duplicated Network Alphacomm Monitoring (ACM-GP) I Pitch Engine Room Serial Auxiliary Control Equipment Coordinated Control System Alphatronic 2000 Main Bridge Control Station - Standard U:tok_AT2000_b&ecr_panels_03.03.2000 Integrated Package of Instruction Books Reference - Example • • Owner has many years of experience with MAN B&W packages Ordered 6 state-of-the-art chemical tankers in 2001 with complete MAN B&W Alpha packages Wappen von Hamburg – 2 x 6L27/38-VBS April 2004 Market Status - New Engine Family L16/24 L16/24 Introduced Introduced Ordered Ordered 1995 1995 446 446 L27/38 L27/38 Introduced Introduced Ordered Ordered 1998 1998 878 878 L21/31 L21/31 Introduced Introduced Ordered Ordered 2001 2001 198 198 Four 1500 TEU container Vessels Highest ice class 8S50MC-C VBS1680 Tunnelgear PTO Conclusion The bottom line of the genuine package is: A unique propulsion system concept which offers the best technical and economical solutions from the first project ideas to scrap of the vessel.