Aktivhaus

Transcription

Aktivhaus
Empowering the Environment - Aktivhaus B10
Dipl.Ing. Viola Kosseda – Werner Sobek New York
www.wernersobek.com
Empowering the Environment- Aktivhaus B10
Viola Kosseda, Dipl.Ing.
Werner Sobek New York/WSGreenTechnologies
Portland, Oregon, USA
28 Apr 2015
The Werner Sobek Group
Sustainability
The built environment plays a key role
~ 35 % Energy consumption
~ 35 % Emissions
~ 50 % Resources consumption
~ 50 % Waste
Building Life Cycle: Costs and Impacts on the Environment
Typical German Passivhaus
Typical Build-up of a Integrated Insulation
– 19 non-separable materials
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Coating
Wallpaper
Adhesive
Plaster internal
Brickwork
Mortar
Water pipes
Insulation pipes
Electrical wires
Insulation wires
Ductwork
Adhesive
Insulation
Anchors
Mortar armour
Concrete reinforcement
Etch primer
Plaster external
Coating
58% of total waste from building and construction sector
(Data for Germany)
Source: Flickr.com, Photo: unknown
Growing Demand - Shrinking Resources
• Shrinking supply of important construction materials
Copper (construction: 48%)
32 years
Plastic (constr.: 25%)
Aluminium (constr.: 50%)
45 years
100 years
Source: Chemie in unserer Zeit 4/2005; E.U. von Weizäcker - Faktor Fünf
Pictures: www.aluservice.de; www.eder.co.at; www.baulinks.de
• Shrinking resource-to-production-ratio
The Triple Zero® Conzept
Zero Energy



Zero Emission



Zero Waste



Balancing of Energy Requirements
Use of Renewable Energy
On-site Production of Energy
Eliminate Emission (e.g. CO²)
Eliminate Exhaust
Eliminate Dust Particles
Fully Deconstructible Assembly
Biocompatibility of Materials
Fully Recyclable
R 128
Stuttgart/Germany
R128
Architect
Werner Sobek, Stuttgart/Germany
Planning time
1998–1999
Construction time
1999–2000
Tasks completed
design, object planning and full engineering service for
loadbearing structure, special structures, and facades
Client
Ursula and Werner Sobek, Stuttgart/Germany
Plus Energy Standards
E-Mobility
Fit-out
Lighting
Cooling
Heating
Back-up
Warm Water
EnEV
Regenerative Energy
Regenerative Energy
“Standard Plus-Energy-House” Plus-Energy-House+E-Mobility
F87 - Efficiency House Plus with Electromobility
Berlin/Germany
F87 - Efficiency House Plus
with Electromobility
Berlin/Germany
Architect
Werner Sobek with ILEK, Stuttgart/Germany
Planning time
2010 - 2011
Building time
2011
Tasks completed by WSGT
Sustainability consultancy, MEP, Certification, EnEV,
Thermal Simulation, Life Cycle Costs, LCA, E-Mobility
Conzept, PV Integration
Client
BMVBS/Germany
F87
Berlin/Germany
© M. Koslik Berlin
© M. Koslik Berlin
Aktivhaus B10
Stuttgart/Germany
Project Motivation

Incorporate and Expand Experiences from the "Efficiency House Plus“

Interlink the Built Environment, Transportation and Sustainable Energy

Demonstrate Prospects for how we Live and Work in the future

Create a Flagship Project for the Stuttgart region
Aktivhaus B10
Stuttgart/Germany
Architect
Werner Sobek, Stuttgart/Germany
Planning time
2013 - 2014
Building time
2014
Tasks completed by WSGT
Design, general planning, interface design and
sustainability consultancy
Client
E-Lab Projekt gGmbH, Stuttgart/Germany
Project Goals

Produce 200% of the energy needed by the building itself

Predictive and self-learning building control system

Linking energy flows of the Building, the E-Cars and the District

Create Prototype as a source of innovation for the Planning
Process and for Building Technologies
Building Site: Bruckmannweg 10
Definition: Aktivhaus®

Buildings, that individually or within a network, produce more energy
than they need for themselves

Buildings that actively respond to changes of the energy performance
or comfort of the users

Buildings that form a self-organizing network with other buildings,
energy providers, energy storage and energy consumers following
the broad objective of energy self-sufficiency
Timeline
May –
July 2012
Oct. 2012 –
Aug. 2013
13. Sep.
2013
23. Dec
2013
24. Apr
2014
5. May
2014
16. May July 2014 –
2014
June 2015
Aug 2015 –
July 2016
Predecessor Building by Richard Döcker
DerYears
jetzige
Zustand
70
a Fallow
Ground: Situation until 5 May 2014
Archaeological Preinvestigation (20 Jan 2014)
Shading Study for the Month of June
Shading Study for the Month of June
B10, Stuttgart
Building Components
01
01 PV-Array
02
02 Ceiling / Lighting
03 Electricity-Module
04 MEP
03
07
05 Kitchen-Module
06 Bath-Module
04
05
06
08
09
07 Shutters for Modules
10
08 Division Entrance
09 Division Bedroom
10 Rotation Disk
11
Fabric Facade
12
Flying Space
13
Floor / Electric Supply
14
Glazing / Shading
15
Steel Frame
13
11
12
14
15
Floorplan
Section
Assembly Work at SchwörerHaus
Assembly Work at
SchwörerHaus
Assembly on Site (16 May 2014)
Assembly on Site (16 May 2014)
Building Envelope
Wood Frame Construction in the year 1927
Wall Build-Up
3 40 mm Substructure with
Insulation
5 160 mm Structural Wood
with Mineral Insulation
1
10 mm
Gypsum Board
6 16 mm Cospan®
Board
7 Textile Façade
2 16 mm Particleboard
4 38 mm Vacuum Insulated Panel
Roof Build-Up
(D1)
(D3)
1 2.5 mm Waterproofing
System
1 2.5 mm Waterproofing
System
2 24 mm Trilaminate
Board
2 80 mm PUR Insulation
3 38 mm Vacuum
Insulated Panel
3 280 mm Structural
Wood with Mineral
Insulation
4 70 mm Substructure
(D2)
5 12.5 mm Gypsum Board
4 24 mm Trilaminate
Board
7 12.5 mm Gypsum
Board
6 70 mm Substructure
5 160 mm Structural
Wood
Floor Build-Up
1 5 mm Flooring
1 2.5 mm Waterproofing System
2 25 mm Dry Screed
2 120 mm PUR Insulation
3 24 mm Trilaminate
Board
4 52 mm Trilaminate
Board
3 160 mm PUR
Insulation
4 160 mm Structural Wood
6
12.5 mm Gypsum
Board
5 70 mm Substructure
6 16 mm Cospan®
Board
5 100 mm Structural Wood
with Mineral Insulation
Vacuum Glazing
Terrace Elements
Building Systems
Electrical installation module and Technical building services equipment
PVT System
Electrical installation module
Turntable control
Wallbox
Controller hydraulics
Distribution cabinet / radio transmitter
Distribution Cabinet
Battery bank
Hydraulics
Power inverter
Server cabinet
Technical building services equipment
Ventilation heat recovery unit
Expansion tank
Storage tank
Fresh water station
Heat pump
Hydraulic matrix
Household water system
Pumps and controller
Electromobility
Electromobility
Building Automation
Self-learning Interface
© alphaEOS AG, 2014
53
Building Automation
© alphaEOS AG, 2014
54
Monitoring
Monitoring: Sensor Layout
Temperature
Weather Station
Energy Balance
Energy Production:
+ 8.341 kWh
Energy Demand:
- 4.247 kWh
Building Servides:
- 1.840 kWh
Building Controls:
- 1.208 kWh
Household Electricity:
- 1.199 kWh
Surplus:
+ 4.094 kWh
Plus Energy Standards
E-Mobility
Fit-out
Lighting
Cooling
Heating
Back-up
Warm Water
EnEV
Regenerative Energy
Regenerative Energy
“Standard Plus-Energy-House” Plus-Energy-House+E-Mobility
Plus Energy Standards
Network
E-Mobility
Fit-out
Lighting
Cooling
Heating
Back-up
Warm Water
EnEV
Regenerative Energy
Regenerative Energy
“Standard Plus-Energy-House”
Plus-Energy-House Aktivhaus
Smart Grid
B10 a Cornerstone for Smart Grids
B10
Weißenhof museum
Impressions
Further Development
www.aktivhaus-b10.de
Stuttgart
Dubai
Frankfurt
Istanbul
London
Moscow
New York
Sao Paulo
www.wernersobek.com