The Big Rock
Transcription
The Big Rock
THE STORY COUNTY FREEDOM FLIGHT AND HERITAGE MEMORIAL IN STORY CITY, IOWA LOADING THE 40 TON ROCK BEGINS AT SCHILDBERG QUARRY ..\Desktop\0606031020.jpg BIG ROCK LOADED, READY FOR THE LONG 90 MILE HAUL ..\Desktop\0606031037 (2).jpg CRANE SERVICE WAITS FOR BIG ROCK TO ARRIVE ON A FOGGY MORNING ..\Desktop\002.JPG TH 10 JUNE 2013 THE BIG ROCK ARRIVES IN STORY CITY ..\Desktop\005.JPG ..\Desktop\011.JPG CRANE SERVICE PREPARES TO UNLOAD THE BIG ROCK ..\Desktop\009.JPG ..\Desktop\008.JPG THE UNLOADING BEGINS ..\Desktop\017.JPG ..\Desktop\032.JPG ..\Desktop\027.JPG RENEE PLACES ASHES PRIOR TO FINAL PLACEMENT OF THE ROCK RENEE MAKES FINAL POSITIONING OF THE ROCK ROCK IN IT’S FINAL RESTING PLACE ..\Desktop\033.JPG RENEE AND CREW WHO MADE IT POSSIABLE (THANKS SO MUCH) ..\Desktop\030.JPG AL HOLM POWER WASHES THE ROCK ROCK CLEAN AND READY TO PRIME ROD AND MIKE DRAPED FLAG ON ROCK TO CHECK PROPOSED LAYOUT MIKE, AL,& WENDEL PRIME THE ROCK (FOUR GALLON OF PRIMER) AL, WENDEL , DWAYNE & MIKE INSTALL TENT OVER THE ROCK DAY ONE JULY 29,2015 ROD BEGINS SKETCHING DAY TWO JULY 30, 2015 ROD BEGINS TO PAINT DAY THREE JULY 31, 2015 PROGRESS MADE DAY FOUR ST AUGUST 1 . 2015 DAY FIVE TH AUGUST 6 . 2015 REALLY TAKING SHAPE DAY SIX TH. AUGUST 10 2015 DAY SEVEN TH AUGUST 11 . 2015 DAY EIGHT TH AUGUST 12 2015 DAY 9 ND. AUGUST 22 2015 ..\Desktop\001.JPG ..\Desktop\001.JPG DAY 10 AUGUST 26, 2015 DAY 11 AUGUST 27, 2015 DAY 12 SEPTEMBER 02 , 2015 TRIBUITE TO VETERANS SIDE OF THE FREEDOM FLIGHT AND HERITAGE MEMORIAL IS COMPLETED DAY 13 SEPTEMBER O3, 2015 CREW MOVING TENT SO HERITAGE SKETCHING CAN BEGIN ..\Desktop\003.JPG DAY 14 SEPTEMBER 4, 2015 DAY 15 SEPTEMBER 5, 2015 DAY 16 SEPTEMBER 8, 2015 DAY 17 SEPTEMBER 9, 2015 ..\Desktop\004.JPG DAY 18 SEPTEMBER15,2015 DAY 19 SEPTEMBER16,2015 DAY 20 SEPTEMBER 23, 2015 DAY 21 SEPTEMBER 24, 2015 DAY 22 SEPTEMBER 25, 2015 DAY 23 SEPTEMBER 26, 2015 DAY 24 OCTOBER 2 , 2015 DAY 25 OCTOBER 5 , 2015 ..\Desktop\003.JPG ..\Desktop\004.JPG BASIC ART WORK COMPLETED TODAY. WHAT A GREAT ACCOMPLISHMENT THANK YOU ROD !!!!!! DAY 26 OCTOBER 6, 2015 ROD SIGNS HIS NAME TO A BEAUTIFUL CONTRIBUTION OF HIS ART WORK ..\Desktop\Oct.10,2015 007.JPG ..\Desktop\Oct.10,2015 009.JPG DWAYNE FIIHR, AL HOLM,MIKE JENSEN APPLY FIRST COAT OF SEALER ..\Desktop\sealing the Rock 10-6-15 002.JPG OCTOBER 7, 2015 THE TENT IS TAKEN DOWN BY AL HOLM, BRIAN HOLM,RON LOVIG, MIKE JENSEN ..\Desktop\003.JPG RENEE TWEDT THE GAL THAT MADE IT POSSIBLE FOR THE VETERANS TO TAKE THE FLIGHT TO WASHINGTON D.C. AND FOR GETTING THE ROCK TO STORY CITY Rod 008.JPG FUTURE IMPROVEMENTS : SIDEWALK AROUND THE ROCK WITH HAND-I-CAPPED ACCESS, LANDSCAPING, LIGHTING AND A SIGN LISTING EVERYONE THAT MADE IT POSSIBLE . WIRTH CONCRETE BEGINS EXCAVATION AND FORMING FOR PLACEMENT OF NEW CONCRETE 006.JPG 004.JPG 005.JPG 007.JPG 002 (2).JPG 008.JPG 003.JPG 001 (2).JPG 003 (2).JPG 001.JPG 002.JPG 002.JPG 003.JPG 004.JPG 005.JPG 006.JPG FORMING COMPLETE CONCRETE PLACEMENT BEGINS 005.JPG 006.JPG 007.JPG 004.JPG 004.JPG 001.JPG 009.JPG 008.JPG 010.JPG 012.JPG 003.JPG 014.JPG 013.JPG WORK BEGINS FINISHING THE CONCRETE 0002.JPG02.JPG 011.JPG 001.JPG 002.JPG 003.JPG 004.JPG 005.JPG 006.JPG FORMS ARE OFF NOVEMBER 10 &11, 2015 AL HOLM , DWAYNE FIIHR, MIKE JENSEN MOVE BLACK FILL DIRT UP AROUND THE NEW CONCRETE dirt work around rock 001.JPG dirt work around rock 002.JPG dirt work around rock 003.JPG dirt work around rock 004.JPG dirt work around rock 005.JPG PETE TEKIPPE TAKING PHOTOS FOR THE PLAQUE DECEMBER 31, 2015 A COLD WINTER DAY PETE TEKIPPE TOOK THE FOLLOWING 3 GREAT PHOTOS FOR USE ON THE PLAQUE, GREAT JOB THANK YOU PETE ! THANKS FOR WATCHING LANDSCAPING & LIGHTING TO COME IN THE SPRING