GATEWAY 1 TRAFFIC CALMING AND SAFETY IMPROVEMENTS
Transcription
GATEWAY 1 TRAFFIC CALMING AND SAFETY IMPROVEMENTS
Date Application Received (For MaineDOT Use Only Maine Department of Transportation GATEWAY 1 TRAFFIC CALMING AND SAFETY IMPROVEMENTS Existing FY08-09 Funding Traffic Calming Project Application • No local match is required; however, a project using other leveraged funds may enhance the application’s importance during the selection process. • Activities eligible for these traffic calming funds must be physical improvements that focus on US Route 1 or federally eligible roads affected by US Route 1. Studies or other planning projects are not eligible for these funds. • Safety tools such as access management or lighting may be included as part of a broader traffic calming application but cannot be submitted as a stand alone application. • Application deadline is September 1, 2008. • If you need assistance completing this application, please contact Darryl Belz at MaineDOT at 624-3300. Section 1: General Information Applicant Name(s):Town of Waldoboro Contact Person: William S. Post, Town Manager Mailing Address: P.O. Box J City: Waldoboro Daytime Phone No.: 832-5369 State: Maine Email: [email protected] Zip: 04572 NOTE: The following sections of this application request specific project related information. If warranted, pictures, maps, exhibits, diagrams, survey summaries, etc., should be included with the application. Consultations with MaineDOT Regional Office personnel may be necessary prior to completing this application. Please be concise. If additional space is required, please attach supplemental sheets. Section 2: Project Brief Location of Project: Provide town/city, street name(s) and additional project location references. Attach maps showing location of the proposed improvements. Indicate area affected or linked to the proposed improvement(s) especially noting valued community resources, including neighborhoods, schools within two (2) miles, businesses, and village areas. Town of Waldoboro: Intersection of Route 1 with Jefferson Street and Depot Street. See attached tax map (U-9) for location and related areas of interest that are affected. Project Summary: Provide a brief outline of the proposed project: The proposed plan would narrow the existing lanes through the intersection, provide a crosswalk, median refuge area, and flashing warning lights for pedestrians, add left turn lanes for Route 1 traffic, and potentially add stamped pavement shoulders to highlight this critical intersection. This combination of measures should help to control speed and improved safety for drivers and pedestrians. As another potential measure to aid in access, the timing and coordination of the traffic signals at Route 32 and at Route 220 would be addressed. 1 Section 3: Project Details Section 3.1 - Detailed Description of Infrastructure Project and Cost (if applicable) Provide a detailed description of project work items and/or construction costs: (Project description may be included as an attachment. Note that all infrastructure improvements must comply with the requirements of the Americans with Disabilities Act (ADA).) See Attachment A. Provide a description of ongoing year round maintenance issues that may result from the proposed project: (The project must not unduly impede winter maintenance such as snow plowing.) None Is the town in which the proposed traffic calming measure is to be located willing to provide ongoing maintenance? (If so, describe what year round maintenance activities will be necessary and how your town will pay for ongoing maintenance costs.) N/A Will funds requested under this program leverage other funding or projects? (Does this project use funds from other sources or can it be scheduled concurrently with another project in the area to enhance the scope and feasibility of this project.) No Section 3.2 - Project Description and Demonstrated Needs Project Description: Describe the proposed project and scope: (Attach diagrams, maps and/or correspondence that will help provide a clear description of the proposed scope.) This project will provide Left Turn Lanes for the intersection of U.S. Route 1 (Corridor) and the crossing arterials of Jefferson and Depot Streets (Arterials). In addition, the project will add a visual narrowing feature by using textured pavement. Finally, this project will synchronize the traffic signals at Route 32 and Route 220 to create traffic gaps to facilitate turning onto Depot or Jefferson Streets. See Attachment B. for a diagram of the proposed project, and Attachment C. for a photographic overlay of the project on the existing intersection. The cost of the project is estimated at $220,000 including preliminary and construction engineering and $9,000 in contingency (5% of actual construction cost of $168,000). If desired by MDOT after review by engineers, additional stamped shoulders could be added to the project at an estimated additional cost of $240,000. Describe why this project is important to your community/region and worthy of funding: The project intersection links our community East – West. The area to the West of the Corridor is a growing residential neighborhood that depends on Depot Street for access to the Corridor and the business district to the East. This intersection is a high crash location with frequent rear-end collisions due to turning traffic in the travel lane. In addition, traffic in this intersection routinely uses the “breakdown” lane for travel to avoid turning traffic. This presents a hazard to vehicles on the arterials, and creates an uncontrolled traffic pattern affecting the businesses that adjoin the intersection. Finally, the future development on the West side of the corridor will be enhanced by this project. A new medical facility is planned on Depot Street, which will increase traffic in this intersection. Without this project, the potential for more 2 accidents is very real. In addition, the West side of the corridor is ideally suited for roads that parallel the Corridor and the topography is well suited for neighborhood commercial development supported by the growing number of residents on the West side of the Corridor. However, without an efficient and safe access point at Depot Street, these plans will be very difficult to implement. Describe the Transportation Values: (Each project should serve primarily transportation purposes rather than a project whose emphasis is placed on improving aesthetics or enhancing nearby municipal, historical, recreational, or other facilities. A project serves valid transportation purposes if it improves a connection between origins and destinations, increases safety, or enhances the use of the transportation system and the transportation environment.) This project will support MDOT’s goals of safety and smooth traffic flow at the three major intersections in Waldoboro. First, by giving turning vehicles at the Jefferson-Depot Street intersection a refuge from the travel lane to await a turning opportunity, we not only make the intersection safer but also keep through-traffic flowing in the established travel lanes. Second, the project will improve the overall Corridor traffic flow by using signal synchronization to create traffic gaps to enable vehicles to turn left at the Jefferson-Depot Street intersection, making this intersection a viable Corridor egress intersection. This will reduce the pressure of left turn traffic at the Route 32 and Route 220 signaled intersections, again improving safety and traffic flow during peak travel hours. Describe the Positive Impacts on Community: (The project should have a measurable positive impact on the community.) The project will use traffic calming techniques to slow traffic at this intersection. This will enable travelers to use this intersection for East-West egress/access to the Corridor. This, in turn, will lower the non-residential traffic on nearby neighborhood streets as drivers seek to access the Corridor at the signaled-intersections of Routes 32 and 220. Economically, this will enhance the accessibility of the four commercial businesses at the project intersection. In addition, the potential for easier egress and access to the Corridor should enhance the opportunity for customers to enter the businesses during peak travel hours. In the future, this project will enhance the economic development potential of the West side of the Corridor, allowing the community to plan service roads, and parallel streets to permit access to businesses and neighborhoods. Describe Regional Impacts: (The project should have a measurable positive impact on the region.) Synchronizing the signals as part of this project will keep Corridor traffic flowing in travel lanes, which will help move the high volume of traffic that exists in this, one of Region 3’s busiest Corridor segments. Demonstrated Needs: (A project should serve important functions, and accomplish stated purposes.) Is the proposed project located in area that the Gateway 1 Spot Speed Study Summary Report has indicated speeding is a recurring problem? No th If so, what is the posted speed limit and the 85 percentile speeds at your proposed project location(s)? N/A Is the proposed project located in an area that MaineDOT has determined to be a high crash location (HCL)? Yes 3 Please provide Annual Average Daily Traffic (AADT) volume for the proposed project area: As of 2007: AADT of Route 1 is 12,770. AADT of Depot Street to Route 1 is 1,110. AADT of Jefferson Street to Route 1 is 2,370. Describe How the Project Brings New Opportunities: (Will the project create new opportunities for public benefits such as accommodating pedestrians and bicyclists and improving access to public facilities and local businesses.) This project will provide the opportunity for a crosswalk between the East and West sides of our community. This is a huge benefit not only for the “greening” of our Town for walking and biking, but also for safe access to the businesses adjoining this intersection. This is important since three of the four businesses offer food services to the neighborhood. Describe How Your Project Meets State Planning Goals/Economic/Tourism Benefits: (A project should enhance or enable a livable, compact community that has the potential to improve quality of life, thereby enhancing the economic vibrancy of a community or region.) The project will enhance the ability of Southbound Corridor traffic to access the historic downtown section of Waldoboro, with its water access point, historic buildings and businesses, and dramatic vistas of the Medomak River with waterfalls and seabirds. Describe the Potential Safety Improvements: This project will provide: • A safe pedestrian crossing for the Corridor • A refuge for left-turning vehicles to use while awaiting a turning opportunity • Synchronization of the adjacent signals to create traffic gaps allowing more turning opportunities • Traffic calming visual features to reduce speeds to enhance the safety of this heavy retail intersection • The ability for through-traffic to remain in travel lanes reducing the accident risk to traffic and pedestrians on the Arterials Describe previous measures your town has taken to reduce speeding in the project area such as increased law enforcement or educating the public: Our Police Department has stationed officers to monitor traffic and enforce speed limits and safe operation. However, the safety issue is traffic flow and not primarily speeds. Therefore, the proposed project would reduce the speed of the vehicles traveling through the intersection, but primarily provide travel lanes to enhance the safety of this intersection, restoring it as a viable egress and access point for the Corridor. If any portion of the project is located on an arterial highway that is also within a MaineDOT urban compact area, describe how the proposed project is consistent with MaineDOT’s traffic calming policy (see attached): N/A Section 4: Community Support Provide information on the consultation and support for the project by the community: ( Identify organizations that pledged their support of the project and the roles they plan to play in project implementation. Possible project partners may include school officials, local traffic engineers, municipal officials, law enforcement agencies, public health agencies or organizations, local elected officials, and other not for profit community groups. Include as attachments letters of support addressed to the applicant.) The public responses during informal discussions with residents that live on Depot and Jefferson Street were very positive. Most residents are tired of traveling the extra distance to access or egress the corridor at the signaledintersections. Specifically, they said that crossing or turning left was dangerous and they avoid it whenever possible, planning their trips to ensure they do not have to make left turns at this intersection. Additionally, the Town of 4 Waldoboro’s Board of Selectmen approve of this application and concept, and the Waldoboro Police Department, Emergency Medical Services and Fire Department also support this project. Is the municipality where the project is located certified to locally administer the project? Is the municipality willing to become LAP Certified? Yes X No Yes X No Note: Information on Locally Administered Project (LAP) requirements can be found at: http://www.state.me.us/mdot/locally-administratered-projects/consultant-brochure.php If your project is selected for funding, a municipal/state agreement with the Maine Department of Transportation will be required for the development, design, and construction of the project in accordance with Federal, State, and Local requirements. Section 5: Sensible Transportation Planning Please Note: Your community may receive additional bonus points if it has met some of the criteria listed below. To be eligible for these bonus points, please answer the following questions: Does your community have an approved Comprehensive Plan that has been found consistent by the State No If yes, please list the year it was found consistent: October 08, 1997. Planning Office? X Yes If applicable, please outline relevant ordinances and policies that have been enacted to support the Comprehensive Plan by promoting and encouraging compact development patterns in growth areas. Yes, the Town enacted a Land Use Ordinance in 2006 in line with the Comprehensive Plan. If your municipality has an identified growth area, has your town made any capital investments such as water or sewer to support development in that growth area? Yes. Our new water supply and sewage treatment plants are located on the West side of the Corridor. If applicable, please describe any regional efforts with surrounding municipalities that your community has undertaken to promote and encourage compact development patterns in growth areas. N/A Section 6: Project Details The applicant should request MaineDOT assistance with this section, if necessary. The estimated costs below were contributed by Gorrill Palmer Engineering Consultants. See Attachment D for total cost breakdown including $9,000 contingency and possible additional cost of stamped shoulders. Section 6.1 - Estimated Cost of Infrastructure Project Design Engineering, Environmental Documentation - Environmental Evaluation (if applicable): 1. $0 - Preliminary Design Engineering (if applicable): 2. $26,000 Right of Way/Land Acquisition (if applicable): 3. $0 Construction: (Includes Contingency) 4. $177,000 5 - Construction Engineering (if applicable): 5. $17,000 Total Value of Project (add lines 1 through 5): 6. $220,000 Local Match/Voluntary Contributions (Note: All match/voluntary contributions must be detailed. Bonus consideration may be given to applications that offer additional match/voluntary contributions.) - Cash: 7. $0 - In-kind, right of way, or other contributions: 8. $0 - Please describe local match in detail: N/A Total Local Match/Voluntary Contributions: 9. $0 %0 10. $220,000 Funds Requested from MaineDOT: Note: The sum of lines 9 and 10 should equal Line 6 above. Note: Section 3.2 of this form also requires further details on construction costs. The amount shown for “Construction” (Line 4) on the above estimate should match the total construction costs in Section 3.2, or an explanation must be given for the discrepancy. Section 7: Authorized Signatures An authorized representative of the city/town and applicant/sponsor must sign the application. Municipal Official: (check one) X Applicant Endorsement Name: William S. Post Title: Town Manager Phone#: 832-5369 Email: [email protected] ___________________________________________________________________ Signature _________________________ Date Applicant/Sponsor (if different) Name: Title: Phone#: Email: ___________________________________________________________________ Signature _________________________ Date These signatures indicate the willingness/ability to provide the designated level of matching funds and a willingness to enter into a municipal/State agreement with the Department requiring the municipality/applicant/sponsor to administer the development, design, and construction of the project abiding to federal, State, and local requirements. The applicant will 6 also be responsible for future maintenance of the completed project. Note that design should meet all applicable federal and State Standards and ADA Guidelines. Send all application information as follows: Seven complete hardcopy application packages (including all attachments and all required documents) must be submitted to: MaineDOT Bureau of Transportation Systems Planning 16 State House Station Augusta, ME 04333-0016 Gateway 1 Traffic Calming and Safety Improvements Eligibility Requirements and Definitions Basic Eligibility: Right-of-way: The applicant should provide a description of the right-of-way situation. Due to the limited size of the budget, only projects that have already acquired R.O.W., or have shown that R.O.W. will not be acquired will be considered for construction funding. The ability to successfully build project in a timely manner: If there is strong doubt about the ability to successfully move the project through completion by Fiscal 2011, construction funding should not be approved. Environmental Benefit (Natural, Historic, Cultural, Social) The project applicant should have shown that there are no identified obstacles that will keep the project from being approved. (e.g. environmental permitting) Project is not going to take the majority of the available funding: If a project estimate would take up too much of the total available funding under this traffic calming program, the proposed project will not be considered, unless a portion of the project can be funded and still be considered a viable project. Good Cost Estimate: It should be shown that the estimate, timeline and scope of work are practicable. Community Support/Public Involvement: The project has been shown to have broad community support. As required by state and federal transportation planning processes, public involvement is essential in the development of transportation plans, projects and programs. Public involvement should include, to the extent possible, input from individuals who will be affected by the transportation plan and programs. Scoring Criteria Definitions: Transportation Value: Each project should serve a primarily transportation purpose, as opposed to a recreational purpose. A project serves a valid transportation purpose if it serves as a connection between 7 origins and destinations, increases safety, or enhances the use of the transportation system and the transportation environment. Positive Impact on Community: community. The project will have a measurable and positive impact on the Regional Impact The project will have a measurable positive impact on a region: The project should serve users from beyond a single municipality. Demonstrated Need: The project should demonstrate that it serve’s an important function, and will accomplish the stated goal. State Planning Goals/ Economic/ Tourism Benefit: The project will enhance or enable a livable, compact community that has the potential to improve quality of life, thereby enhancing the economic vibrancy of a community or region. Potential Safety Improvement: A project that addresses existing or potential safety problems or issues. New Opportunities: The project has been shown to provide a new opportunity for public benefit. Sensible Transportation Bonus An applicant will receive bonus points if the community is on MaineDOT’s approved list of communities that have successfully obtained the following: • • • Approved Adopted Community Transportation Plan, and Adopted Ordinances that incorporate Land Use Development Strategies as outlined in Plan, Adopted Plan and Ordinances have met objectives outlined in the Maine Sensible Transportation Policy Act (STPA). An applicant will receive collaboration bonus points if the community is partnered with one or more communities, and all communities involved are on MaineDOT’s approved list of communities. 8 Attachment A Waldoboro Traffic Calming Description: The intersection of Route 1 with Jefferson and Depot Streets has historically been a high crash location that has been evaluated for potential signalization. Route 1 bisects the Town in this area, with these two, side streets being key corridors for access to other neighborhoods of the Town, including Town Hall and public safety building on the northeast corner, and a nursing home on Depot Street. Although this is a key intersection in the Town of Waldoboro, volumes are not sufficient to justify signalization, according to the MDOT. Therefore, drivers have had to navigate this high-speed (40 mph) intersection, and gain access to Route 1 unassisted, or take undesirable routes through Town to access that traffic signal at Route 32. The Town's preference to for action at this location would be construction of a modem roundabout that would address the speed, safety and access at this intersection. However, recognizing the significance of the undertaking for construction of a roundabout, the Town would like to try less intrusive traffic calming measures as a first step to address concerns at this location. The proposed plan would narrow the existing lanes through the intersection, provide a crosswalk, median refuge area, and flashing warning lights for pedestrians, add left turn lanes Route 1 traffic, and potentially add stamped pavement shoulders to highlight this critical intersection. This combination of measures should help to control speed and improved safety for drivers and pedestrians. This pedestrian connection across Route 1 is an important step to help knit the Town back together across this imposing barrier through Town. This improvement will also help to facilitate circulation in the community as the Town considers implementation of parallel service road along the northerly side of Route 1. For the service road concept to be effective, access points to Route 1 must be safe and offer reasonable operations for drivers. In the long term, the intersection improvement coupled with the service road would help to alleviated traffic volumes on Route 1 that are associated with intra-community trips. This plan would require five feet of widening on the north side of Route 1 east of the intersection and minor widening on the northwest comer, and construction of the center median. The extent of construction work would not be known until pavement cores are taken in the shoulders to determine if they are capable of carrying traffic that would be shifted onto them. As another potential measure to aid in access, the timing and coordination of the traffic signals at Route 32 and at Route 220 would be addressed. Currently, alternating platoon flows from these intersections increase the difficulty of exiting Jefferson and Depot Streets. If these signals can be coordinated such that the opposing Route 1 platoons arrive at the same time, should provide better gaps in traffic for turning vehicles. August 26, 2008 William S. Post, Town Manager Town of Waldoboro P.O. Box J Waldoboro, Maine 04572 Dear Mr. Post, The intent of this letter is to demonstrate my support for the Gateway 1 Traffic Calming and Safety Improvements Grant application you are submitting on behalf of the Town of Waldoboro. The proposed safety improvements at the intersection of Route 1, Jefferson Street and Depot Street are desperately needed. The intersection is a constant source of traffic issues, especially with traffic turning left onto Jefferson Street, or Depot Street from Route 1. In addition, there have been several accidents at the location, including accidents involving pedestrians hit while attempting to cross Route 1 from the residential neighborhood located on Depot Street. Route 1 bisects the Town east to west, and this intersection sees a large amount of traffic, as well as bicyclists and pedestrians attempting to cross Route 1. In addition, the intersection’s four corners have busy businesses including food establishments that serve a great deal of people. With the lack of turning lanes presently at the intersection, the traffic on Route 1 veers into the breakdown lanes and causes dangerous situations for those vehicles attempting to enter Route 1 from Depot Street and Jefferson Street. I fully support this grant application and wish you the best of luck. Sincerely, John T. Blamey Selectman Waldoboro, Maine August 26, 2008 William S. Post, Town Manager Town of Waldoboro P.O. Box J Waldoboro, Maine 04572 Dear Mr. Post, The intent of this letter is to demonstrate my support for the Gateway 1 Traffic Calming and Safety Improvements Grant application you are submitting on behalf of the Town of Waldoboro. The proposed safety improvements at the intersection of Route 1, Jefferson Street and Depot Street are desperately needed. The intersection is a constant source of traffic issues, especially with traffic turning left onto Jefferson Street, or Depot Street from Route 1. In addition, there have been several accidents at the location, including accidents involving pedestrians hit while attempting to cross Route 1 from the residential neighborhood located on Depot Street. Route 1 bisects the Town east to west, and this intersection sees a large amount of traffic, as well as bicyclists and pedestrians attempting to cross Route 1. In addition, the intersection’s four corners have busy businesses including food establishments that serve a great deal of people. With the lack of turning lanes presently at the intersection, the traffic on Route 1 veers into the breakdown lanes and causes dangerous situations for those vehicles attempting to enter Route 1 from Depot Street and Jefferson Street. This intersection is adjacent to the Municipal Building and thus used many times a day by emergency vehicles. I believe this project would also provide a more safe passage for these emergency vehicles. I fully support this grant application and wish you the best of luck. Sincerely, Richard W. Glidden Fire Chief Waldoboro, Maine August 26, 2008 William S. Post, Town Manager Town of Waldoboro P.O. Box J Waldoboro, Maine 04572 Dear Mr. Post, The intent of this letter is to demonstrate my support for the Gateway 1 Traffic Calming and Safety Improvements Grant application you are submitting on behalf of the Town of Waldoboro. The proposed safety improvements at the intersection of Route 1, Jefferson Street and Depot Street are desperately needed. The intersection is a constant source of traffic issues, especially with traffic turning left onto Jefferson Street, or Depot Street from Route 1. In addition, there have been several accidents at the location, including accidents involving pedestrians hit while attempting to cross Route 1 from the residential neighborhood located on Depot Street. Route 1 bisects the Town east to west, and this intersection sees a large amount of traffic, as well as bicyclists and pedestrians attempting to cross Route 1. In addition, the intersection’s four corners have busy businesses including food establishments that serve a great deal of people. With the lack of turning lanes presently at the intersection, the traffic on Route 1 veers into the breakdown lanes and causes dangerous situations for those vehicles attempting to enter Route 1 from Depot Street and Jefferson Street. Please keep in mind the fact that there is a proposal on Depot Street for a healthcare/nursing home facility in the near future thus putting the need for improvements paramount. The fact is a traffic light will be necessary at some point in the not too distant future. It might be fiscally responsible to put a traffic light in now rather than wasting grant money on improvements that will not meet all of the future needs of this intersection. I fully support this grant application and wish you the best of luck. Sincerely, Michael M. Monck Waldoboro EMS Director August 26, 2008 William S. Post, Town Manager Town of Waldoboro P.O. Box J Waldoboro, Maine 04572 Dear Mr. Post, The intent of this letter is to demonstrate my support for the Gateway 1 Traffic Calming and Safety Improvements Grant application you are submitting on behalf of the Town of Waldoboro. The proposed safety improvements at the intersection of Route 1, Jefferson Street and Depot Street are desperately needed. The intersection is a constant source of traffic issues, especially with traffic turning left onto Jefferson Street, or Depot Street from Route 1. In addition, there have been several accidents at the location, including accidents involving pedestrians hit while attempting to cross Route 1 from the residential neighborhood located on Depot Street. Route 1 bisects the Town east to west, and this intersection sees a large amount of traffic, as well as bicyclists and pedestrians attempting to cross Route 1. In addition, the intersection’s four corners have busy businesses including food establishments that serve a great deal of people. With the lack of turning lanes presently at the intersection, the traffic on Route 1 veers into the breakdown lanes and causes dangerous situations for those vehicles attempting to enter Route 1 from Depot Street and Jefferson Street. The traffic on this stretch of Route One, which passes through the intersection in question, flows above the posted safe speed limit. I believe this project would help to slow the traffic flow to a safer speed. I fully support this grant application and wish you the best of luck. Sincerely, William Labombarde Police Chief Waldoboro, Maine Board of Selectmen Meeting Minutes 08/12/08 On the motion of Wooster / Maxwell, the Board voted 5-0 to create a Waldoboro Conservation Commission and solicit for members. 6.3. Traffic Calming Grant Application - The Gateway One Project is looking to fund three test projects along the Route One corridor using traffic calming techniques to control speed without creating a bottle neck with traffic lights. The technique suggested to be used in Waldoboro is a ‘round about’ which will divert and slow traffic while creating a smooth flow for traffic entering and exiting Route One at the Jefferson Street/Depot Street/Route One intersection. There is a meeting with Gorrill Palmer Engineers, consultants for the project, to discuss the feasibility of the round about and other types of treatment for the intersection. At a future Board meeting, the Selectmen will be asked for their authorization to move forward with the grant application. See attachment for more information. 6.4. Names for Recreation Fields and Road to Fields – The Town Manager stated that the work on the Recreation complex project is about one-half complete. The Board should discuss how the two playing fields and the road into the complex are going to be named. The Town Manager stated that the Board could solicit suggestions from the public or decide on names themselves. The Board’s concensus was to solicit names from the public. Bob Butler suggested contacting the schools, perhaps offering a naming contest. On the motion of Blamey / Maxwell, the Board voted 5-0 to have the Town Manager solicit for names for the recreation fields and the road leading to the fields and take the widest dissemination including the schools and set a deadline of October 1, 2008 for nominations to come in. 7. Action Items: 7.1. Act on Medomak River Bank Stabilization Project Bid Award – The Town Manager stated that there was only one bid for this project which was from Harry C. Crooker & Sons in the amount of $218,235.94. The Department of Environmental Protection has issued a permit for the project, but the Army Corps of Engineers has not. The Army Corps of Engineers has issued comments on the project, including asking for additional and different types of vegetation to be planted along the base of the slope to assist with erosion control. The cost of this is expected to be an additional $1,700, which is not included in the bid price. The Manager recommended awarding the bid to Harry C. Crooker & Sons and then addressing the additional vegetation when the permit is issued by the Army Corps of Engineers. On the motion of Maxwell / Wooster, the Board voted 5-0 to award the Medomak River Bank Stabilization Project to Harry C. Crooker & Sons in the amount of $218,235.94 and authorize the Town Manager to enter into a contract with the company. 7.2. Act on Approval of Volunteer Fire Chief Job Description – The Town Manager stated that the job description has been finalized and reviewed by four fire chiefs, including Waldoboro’s current chief. If approved, the Manager stated that the position would be posted internally, with a copy of the announcement and job description mailed to each member of the Fire Department so that they all had the opportunity to apply. An oral board would then conduct interviews on August 25, 2008, so that the successful candidate could be confirmed by the Board on August 26th. The Manager asked for one Selectman to volunteer to serve on the oral board, and Clinton Collamore did so. Page 2 of 7 Board of Selectmen Meeting Minutes 08/12/08 SUMMARY ON THE GATEWAY 1 TRAFFIC CALMING GRANT PROGRAM BACKGROUND • • • Gateway 1 is a MDOT project to that covers US Route 1 from Brunswick to Prospect (100 miles) Waldoboro is in Region 3 of the project corridor, along with Warren, Thomaston, and Rockland The study seeks to: o Explore new ways of formulating transportation and land use decisions o Attempt to balance community growth with transportation needs TRAFFIC CALMING AND MAINE’S GATEWAY 1 PROJECT • • • At a traffic Calming Workshop in Belfast on June 3, 2008, the Gateway 1 staff unveiled their plan to test traffic calming as part of the Gateway 1 Project. Maine DOT (MDOT) seeks to use Traffic Calming techniques on US Route 1 to control speed while not “bottlenecking” the road with traffic lights understanding that only using law enforcement is not a satisfactory long-term solution to speed control. To test this theory, MDOT is seeking applications for grants to test various Traffic Calming techniques. o The parameters for these grants are: Only horizontal techniques will be used on Route 1, no speed bumps! Only three projects will be funded for the entire corridor, it is a competitive process Approved projects must show a benefit in speed reduction along with other advantages for the traffic flow and safety Grants will fully fund the test; no matching funds will be required, at this point. The goal is to have submissions in early September o MDOT has hired the engineering consultant firm of Gorrill-Palmer, Gray, Maine, to help communities assess potential solutions for their applications THE TRAFFIC CALMING CONCEPT • • • Traffic calming is a concept of slowing traffic through roadway design, rather than solely speed limits and enforcement The concept was developed in Germany, but has been used throughout Europe over the last 20 years The use of Traffic Calming techniques is not new to the United States; however, they are not as widely used as in other countries. This trend is changing as planners seek to lower speeds, and improve traffic flow, at a time when increasing traffic enforcement is becoming cost prohibitive Page 5 of 7 Board of Selectmen Meeting Minutes 08/12/08 • In Traffic Calming, the goal is to lower the median speed at the point of installation by 5 to 9 miles per hour, while improving traffic flow, along with highway egress and entry TRAFFIC CALMING TECHNIQUES • • • Traffic Calming Techniques basically fall into two categories vertical or horizontal Vertical techniques are very familiar to most Americans: they include speed bumps, speed tables (long, flat raised pavement sections), speed lumps (lower profile, raised pavement areas, horizontally spaced across an entire roadway width), raised crosswalks, etc. These techniques slow traffic through the force of gravity, by making the ride at high speed less comfortable. Horizontal techniques are less familiar to us and include traffic circles, roundabouts, narrowing the roadway with curb protrusions, entry features, etc. Horizontal techniques seek to slow traffic by altering the course of travel, or visually changing the path of travel, which causes motorists to slow down. They were used in the redesign of Business Route 1 in Damariscotta. A PROPOSAL FOR WALDOBORO • • • • • On Wednesday, August 13, the Town Manager, Public Works Director, and I will meet with Gorrill-Palmer regarding our proposed application Our target area is the intersection of Route 1 and Jefferson/Depot Streets Our suggested solution is a roundabout. This is not an Augusta traffic circle, rather it is a one-lane travel diversion Our goal is slow traffic at the intersection for safety, to allow turning traffic the opportunity to exit Route 1, and to allow merging traffic to enter or cross Route 1 more easily and safely In addition, the traffic sequencing (gap creation) that occurs with this type of installation will also allow pedestrian and bicycle traffic to cross Route 1 THE NEXT STEPS • • • If the engineering firm concurs that this is a feasible solution for our target intersection, the Board must approve the grant application. In addition, public support of this solution, or an alternative, is critical for MDOT accepting the application. Therefore, we will need to obtain public comment and document public support, perhaps at the scheduled September 11th public hearing on AD Gray School. I will report to the Board, at its next meeting, on the results of our meeting. Respectfully submitted, John Blamey Page 6 of 7 Board of Selectmen Meeting Minutes 08/26/08 Public Works Director John Daigle explained that due to increased paving material costs, many municipalities will not be paving this year. The State has also cut back on their projects. He recommends holding the funds and re-bid along with next year’s projects. The Town Manager feels the Reef Rd. Project should be completed this year though the price will probably higher since all the projects won’t be done. Currently he is waiting on a new quote and recommends tabling the issue until that quote has been received for consideration. Another option is to pave the Orffs Corner Rd and Reef Rd projects as well as half of the N. Nobleboro Rd. project and still stay in budget. On the motion of Blamey / Maxwell, the Board voted 5-0 to table action on this item until the next scheduled meeting on September 11, 2008 in anticipation of a recommendation from the Town Manager and the Public Works Director. 5.5. Act on Traffic Calming Grant Application - The consulting engineers from the Maine Department of Transportation felt that a ‘round-about’ at the Atlantic Hwy / Depot St / Jefferson St intersection would not be cost effective in regards to the available funding. A new plan including left turn lanes, textured pavement, and pedestrian crosswalk, along with the synchronization of the two existing traffic lights does however fit into available funding. The Grant Application would need to be turned in to the State by September 01, 2008. The Federally funded project would cost approximately $220,000.00. Butler feels if there is a pedestrian crosswalk it might imply that crossing Atlantic Hwy is something that should be done and he feels this is an unsafe practice. He was also wondering how the Project might affect vehicles exiting the four businesses that are at the intersection (now they will have to cross two lanes of traffic). The Town Manager replied there have been serious accidents there in the past and some involving pedestrians who try to cross the road, marked or not. The Project will allow for a marked crosswalk notifying drivers that pedestrians may cross there. Blamey added vehicles exiting the businesses now have to cross two lanes of traffic, but right now the second line of traffic is in the break down lane. On the motion of Wooster / Maxwell, the Board voted 5-0 to approve and submit the Traffic Calming Grant Application. 5.6. Act on Acceptance of Dividend from MMA Risk Management and Creation of Safety Reserve Account - Each year the Board of Directors of the Maine Municipal Association’s Property and Casualty Pool vote on the allowance of a dividend based on the loss ratio over the previous 12 months. To earn a dividend must have a loss ratio of 50 % or less for the qualifying year. This year the Town earned a $2,393 dividend check. Traditionally this dividend has been accepted and placed into a miscellaneous revenue account. The Safety Committee and Town Manager are recommending the creation of a Safety Page 5 of 7 WELLHEAD PROTECTION MAP and excerpt from Land Use Ordinance 1. The purpose of this Ordinance is to protect the public water supply in Waldoboro from land uses that pose a threat to the quality and/or quantity of ground water being extracted from the wells that serve the public water system. 2. This ordinance applies to all land uses located or proposed within the area delineated as Wellhead Protection Districts on the Land Use Map of the Town of Waldoboro.